Major Franchise Permit: MFP19005674
IVR Number: 19005674
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :10/18/2019Application Date:3123059041Parcel Number:4600 DAVIS AVE S
Permit Type:11/19/2019Issue Date:Franchise
Permit Work Class:11/18/2020Expiration Date:Major Utility
Job Number:JB#59888Franchise Type:Cable
Description:Comcast is proposing to overlash new 48ct fiber 800'. Overlash 144ct fiber 6200'. pull new 48ct through existing
underground on private property and set new node cabinet on private property.
APPROVED WITH COMMENTS OR REDLINES
PRE CONSTRUCTION MEETING REQUIRED
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Scott Nall
SEFNCO Communications Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: 41108Construction Contractor: SEFNCCI850QD
COPPER RIDGE RENTON LLC 404 SARATOGA AVE STE # 100
SANTA CLARA , CA 95050
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management, LLC
JB#59888
Cody Shackett
253 235-7406
owen_shackett@comcast.com
4600 Davis Ave S RN22D NEW NODE RN59
Comcast is proposing to overlash new 48 ct approximately 800'; overlash
144 ct approximately 6200'; pull new 48 ct thru existing underground on private
property and set new node cabinet on private property.
SEFNCO Communications, Inc.
SEFNCC1850QD BLO29666
10-18-2019
MFP19005674
Scott Warlick 10/22/2019
Justin Johnson 11/19/2019
This permit is for Major construction work in the ROW and will be billed at an additional
$60/HR for inspections. After hours and weekend work will be billed at $125/HR
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
RN22D NEW NODE RN59
SEFNCO Communications, Inc.
CODY SHACKETT 253 235-7406
410 Valley Ave NW, Ste 12, Bldg C, Puyallup, WA 98371
owen_shackett@comcast.com
4600 DAVIS AVE S
9:00 am to 3:00 pm
11-19-2019
Reset FormPrint Form
Stefania Spencer, Permit Coordinator 10-18-2019
MFP19005674
Scott Warlick
Monday - Friday 10/22/2019
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
S 48TH ST TALBOT RD STALBOT RD SS 48TH STEOPEOPEOPEOPEOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLEOPEOPEOPEOP
EOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLS 46TH PLTALBOT RD SBE
PREPARED
TO STOP
ROAD
WORKAHEAD
BE
PREPARED
TO STOP
ROAD
WORKAHEAD
COMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
LIMITSPEED R2-1
25
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
SITE SPECIFIC TRAFFIC CONTROL PLAN
BROADWAY [ PROPOSED WORK UNDER GROUND ]
CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS)
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888TCP-11 54/20/2018TCP PERMITMNJWMFP19005674
S 192ND ST
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FLFLFLFLFLFL
FL FLEOP EOP EOP EOP EOP EOP EOP EOP
EOPEO
P EOPFL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FLFLFLFLFLFL FLFLEOP EOP EOP EOP EOP EOP EOP EOP
EOP
EOPEOPEOPEOPEOPEOPEOP98TH AVE SS 192ND ST 267'
156'171'176'
BEPREPAREDTO STOP
ROADWORKAHEAD
R
O
A
D
W
O
R
K
AH
E
A
D
BE
PR
E
P
A
R
E
D
T
O
S
T
O
P
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
COMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
LIMITSPEED R2-1
25
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
SITE SPECIFIC TRAFFIC CONTROL PLAN
BROADWAY [ PROPOSED WORK UNDER GROUND ]
CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS)
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888TCP-12 54/20/2018TCP PERMITMNJWMFP19005674
FLFLFLFLFLFLFLFLFLFLFL
FL
FL
FL
FL
FLEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOPFLFLFLFLFLFLFLFLFLFLFL
FL
FL
FL
FL
FL
FL
FL FL FLEOPEOPEOPEOPEOPEOP
EO
P
EOP
EOP
EOPEOP EOP EOP EOP EOP EOP EOP EOP EOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFL FLFLFLFLFLFLFLFLFLFLFLFLFLFL
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
FL
EOP
FLEOPEOP104TH PL SES 192ND STEOP
EOPEOPEOP92'150'145'185'200'164'
143'
25
5
'250'BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROADWORKAHEAD 108TH AVE SES 192ND ST
BE
PREPARED
TO STOP
ROADWORKAHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
COMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
LIMITSPEED R2-1
25
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
SITE SPECIFIC TRAFFIC CONTROL PLAN
BROADWAY [ PROPOSED WORK UNDER GROUND ]
CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS)
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888TCP-13 54/20/2018TCP PERMITMNJWMFP19005674
FL FL FLEOP
FL FL FL
EOP
FL FL FL FL FL FL FL FL FL
EOP EOP EOP EOP
FL FL FL FL FL FL FL FL
EOP EOP EOP EOP
EOP
FLFLFLFLFLFLFLEOPEOPFL FL
FL
FL
FL
FL
FL
EOP
EOP
EOP
FL FL FL FLEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOP
EOPEOP108TH AVE SES 192ND ST
107TH AVE SES 192ND ST
106TH AVE SES 192ND STEOPEOP
EOPEOPEOP101'
117'107'86'102'186'134'103'
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
POLICE
OFFICER
FASCOMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
LIMITSPEED R2-1
25
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
SITE SPECIFIC TRAFFIC CONTROL PLAN
BROADWAY [ PROPOSED WORK UNDER GROUND ]
CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS)
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888TCP-14 54/20/2018TCP PERMITMNJWMFP19005674
City of Kent's ROW.
Coordinate with
Kent for work in
their ROW
116TH AVE SES 192ND ST
EOP EOP EOP EOPEOP
EOP
EOPEOPEOPEOPEOP EOPEOPEOP215'46'94'
FL
FL
FL FL
FL FL FL FL FL FL FLFLFLFLFLFLFLFLFLFLFLFL FL FL FL FL FL FL FL FL FL FL FL
EOP EOP EOP
EOPEOPFLFLFLFLFLFLBE
PREPARED
TO STOP
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
POLICE
OFFICER
COMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
LIMITSPEED R2-1
25
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
SITE SPECIFIC TRAFFIC CONTROL PLAN
BROADWAY [ PROPOSED WORK UNDER GROUND ]
CONTROL TYPE: (EXAMPLE - PEDESTRIAN WITH SPOTTERS)
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888TCP-15 54/20/2018TCP PERMITMNJWMFP19005674
City of Kent's ROW. Coordinate with
Kent for work in their ROW
101'117'107'86'102'186'134'103'201'251'92'150'145'185'200'164'143'
255'250'
200'267'156'171'176'273'81'240'238'108'134'263'229'165'250'127'188'215'46'94'
SHEET INDEX:
1 - COVER SHEET
2 - NOTES & LEGEND SHEET
3 TO 5 - DESIGN
THIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONS
PROJECT MAP:
COVER
5900'
PROJECT DESCRIPTION*
SEFNCO:- JUSTIN WITHROW (253)457-2940
COMCAST: - JERRY STEELE
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888PERMIT1 94/16/2018PERMITMNJWCOMCAST
TOTAL FOOTAGE 5900'
=
=
=
OVERLASH NEW 48 CT APPROX 800', OVERLASH 144 CT APPROX 6200',
PULL NEW 48 CT THROUGH EXISTING UG ON PRIVATE PROPERTY, SET
NODE CABINET ON PRIVATE PROPERTY.
-OVERLASH
AERIAL OVERLASH
AREA OF WORK
BILL OF MATERIALS*:
SCOPE OF WORK:
CONTACTS:
JB#59888
4600 DAVIS AVE S, RENTON, WA
RN22D NEW NODE RN59COMCAST
MFP19005674
NOTES & LEGEND
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888PERMIT2 94/16/2018PERMITMNJWCOMCAST
FIBER PLACEMENT NOTES:
GENERAL NOTES:
DISCLAIMER:
1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY
BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.
2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE
BEEN FIELD LOCATED.
3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION
AND IS COLLECTED IN THE AS-BUILT PHASE.
1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY
SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.
2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP
AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT
COMPLETION.
3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,
REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS
ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.
4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE
CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.
5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
PRODUCTS.
6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.
7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE
LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.
8.ALL RISERS WILL BE CAPPED AT ALL TIMES.
9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND
BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.
1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.
2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.
3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS
SPECIFIED OTHERWISE.
4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,
AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.
5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
SPECIFICATIONS.
7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES
WITH BUILDING MANAGEMENT.
8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO
CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).
9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING
PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE
REWORK AT HIS OWN COST.
10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.
11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN
ALLOWED (9AM-3PM) BUSINESS HOURS.
12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.
13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
SHOULD BE ANTICIPATED. ADJUST AS NEEDED.
14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR
ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE
MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE
OR APPROVED EQUIVALENT.
15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,
NOT FIELD VERIFIED.
16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.
17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.
18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.
19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE
CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE
COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.
20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE
SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE
NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE
CLOSURES.
STORM DRAIN
MANHOLE
COMMUNICATIONS
WATER
SEWER
POWER
GAS
6
ROW
R
PROPOSED VAULT
PROPOSED BORE PIT
STREET/SIGNAL/TRAFFIC LIGHT
CONSTRUCTION NOTE
CATCH BASIN
FIRE HYDRANT
EXISTING POLE W/ NEW RISER
BUILDING OUTLINE
TRAFFIC FLOW
LANDSCAPING/TREE
POTHOLE LOCATION
CHANNELIZATION
5+39 STATIONING
(xxx') OPEN TRENCH
PROPOSED DIRECTIONAL DRILL
EXISTING PULL THRU
PROPOSED BORE
PROPOSED OPEN TRENCH
(xxx') EXISTING PULL THRU
(xxx') BORE
(xxx') DIRECTIONAL DRILLRIGHT-OF-WAY
CENTERLINE
TRAFFIC LANE
FENCE
D
CB
S C
GAURD RAIL
AERIAL STRAND
LEGEND:
V
U U U U U U
S
W
P
C
G
D
EOP EDGE OF PAVEMENT
MFP19005674
S 48TH ST TALBOT RD SEOPEOPEOPEOPEOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLTALBOT RD S"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888PERMIT3 94/16/2018PERMITMNJWCOMCAST
OVERLASH 48CT FIBER
MFP19005674
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FLFLFLFLFLFL
FL FLFLFLFLFLFLFLFLFLFLFLFL
FLEOPEOPEOPEOPEOPEOP
EOPEO
P EOPEOPEOPEOPEOPFL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FLFLFLFLFL
FL FLFLFLFLFLFLFLFLFLFLFLFLFL
FL
EOP EOP EOP EOP EOP EOP
EOP
EOPEOPEOPEOPEOPEOPEOPEOP
99TH PL SEOP98TH AVE SS 192ND ST
200'
267'
156'171'176'
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888PERMIT4 94/16/2018PERMITMNJWCOMCAST
OVERLASH 144CT FIBER
MFP19005674
FLFLFLFLFLFLFL
FL
FL
FL
FL
FLEOPEOPEOPEO
P
EO
P
EO
P
EOP
EOPFLFLFLFLFLFLFL
FL
FL
FL
FL
FL
FL
FL FL FLEOPEOPEOPEO
P
EO
P
EOP
EOP
EOPEOP EOP EOPFLFLFLFLFLFLFLFL FLFLFLFLFLFLFLFLFLFLFL
EOP EOP EOP EOP EOPEOP
EOPEOPEOP185'200'164'
143
'
25
5
'
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888PERMIT5 94/16/2018PERMITMNJWCOMCAST
OVERHEAD WORK WILL BE AUBURN PERMIT
OVERLASH 144CT FIBER
MFP19005674
EOP
EOP
EOP
EOP
FL FL FL FL FL FL FL FL FL
EOP EOP EOP
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
EOP
EOP
EOP
EOP
EOP
EOP
EOP
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
EOP
EOP
EOP
EOP
EOP
EOP104TH PL SES 192ND ST
103'201'
251'92'150'
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888PERMIT6 94/16/2018PERMITMNJWCOMCAST
MFP19005674
FLFLFLFLFLFLFLEOPEOPFL
FL
FL
FL
FL
FL
EOP
EOP
EOP
FL FL FL FL FL FL FL FL FL FL FL FL
EOP EOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOP
EOP EOP EOP EOP108TH AVE SES 192ND ST
101'
117'107'86'
127'188'
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888PERMIT7 94/16/2018PERMITMNJWCOMCAST
OVERLASH 144CT FIBER
Kent's ROW
MFP19005674
FL FL FL FL FL FL FL FL FL FL
FL FL FL FL FL FL FL FL FL FL FL
EOP EOP EOP EOP EOP
EOP EOP EOP EOP
SE 192ND STS 192ND ST
EOP
EOP EOP EOP EOP EOPEOPEOP EOP
EOP EOP EOP EOP
EOPEOPEOP EOP
EOP EOP
108'134'263'229'165'
FL FL FL FL FL FL FL FL FL FL FL FL
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FL FL FL
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888PERMIT8 94/16/2018PERMITMNJWCOMCAST
OVERHEAD WORK WILL BE AUBURN PERMIT
OVERLASH 144CT FIBER
MFP19005674
Kents ROW
116TH AVE SES 192ND ST
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOP EOP
EOP EOP EOP EOP EOP
EOP
EOP
EOPEOPEOPEOPEOP EOPEOPEOP273'81'240'
215'46'94'
FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FL FL
FL FL FL FL FL FL
FL FL FL FL FL FL FL FL FL FL FL FLFLFLFLFL FL FL FL FLFLFLFLFLFLFL
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC4600 DAVIS AVE SRENTON, WA59888PERMIT9 94/16/2018PERMITMNJWCOMCAST
OVERHEAD WORK WILL BE AUBURN PERMIT
OVERLASH 144CT FIBER
MFP19005674
Kents ROW
October 18, 2019RE: Aerial Variance Request JB#59888MFP19005674
November 19, 2019
Stefania Spencer
Sefnco Communications, Inc.
4610 Tacoma Ave
Sumner, WA 98390
Via Email: sspencer@sefnco.com
SUBJECT: Request for Undergrounding Exemption (JB#59888, MFP19005674, 4600 Davis Ave S)
Dear Ms. Spencer:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have SEFNCO Communications overlash approximately 450 lineal feet of new 48CT
fiber to existing Puget Sound Energy (PSE) poles beginning on the south side of the entrance to 4600 Davis
Avenue S on the west side of Talbot Road S. Overlashing would then continue south along Talbot Rd S for
approximately 450 lineal feet ending at the pole at the northwest corner of Talbot Rd S and S 48th Street.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(h) ii. Ordinance
5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over,
below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of
Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline
service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility
service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area
are underground, Grantee shall place its Cable System’s distribution cables underground within that area;
provided that such underground locations are actually capable of accommodating Grantee’s cable and
other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and
overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need
to be provided for, any existing obsolete cable will need to be removed; staff recommends these as
conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast
franchise agreement which allows new overhead facilities to be placed overhead provided there are other
similar providers overhead as well.
Comcast Job JB59888
Page 2 of 2
November 19, 2019
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with the Comcast Franchise Agreement.
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any
other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed
by a franchisee within the Project Reach, in which case Comcast shall participate in the joint
use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is
made available within the Project Reach that will accommodate the aerial lines. The new
aerial lines must be undergrounded within one year, or approved otherwise by the City of
Renton Community and Economic Development Administrator or designee, from the first
event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, December 3, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Assistant Development Engineering Manager
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Cody Shackett, Comcast, owen_shackett@comcast.com
Franchise Permits
November 19, 2019
Stefania Spencer
Sefnco Communications, Inc.
4610 Tacoma Ave
Sumner, WA 98390
Via Email: sspencer@sefnco.com
SUBJECT: Request for Undergrounding Exemption (JB#59888-2, MFP19005674, 19201 97th Ave S)
Dear Ms. Spencer:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have SEFNCO Communications overlash approximately 3,600 lineal feet of new
144CT fiber to existing Puget Sound Energy (PSE) poles beginning at 19201 97th Avenue S at the pole
behind the sidewalk on the south side of S 192nd Street. Overlashing would then continue east along S
192nd Street for 3,600 lineal feet ending at the pole at the northeast corner of 19201 108th Avenue SE
before continuing into City of Kent’s right of way.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(h) ii. Ordinance
5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over,
below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of
Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline
service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility
service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area
are underground, Grantee shall place its Cable System’s distribution cables underground within that area;
provided that such underground locations are actually capable of accommodating Grantee’s cable and
other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and
overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need
to be provided for, any existing obsolete cable will need to be removed; staff recommends these as
conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast
franchise agreement which allows new overhead facilities to be placed overhead provided there are other
similar providers overhead as well.
Comcast Job JB59888-2
Page 2 of 2
November 19, 2019
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with the Comcast Franchise Agreement.
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any
other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed
by a franchisee within the Project Reach, in which case Comcast shall participate in the joint
use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is
made available within the Project Reach that will accommodate the aerial lines. The new
aerial lines must be undergrounded within one year, or approved otherwise by the City of
Renton Community and Economic Development Administrator or designee, from the first
event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, December 3, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Assistant Development Engineering Manager
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Cody Shackett, Comcast, owen_shackett@comcast.com
Franchise Permits
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP19005674
Engineering
1 Engineering General Conditions
Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
2 Engineering General Conditions
Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
3 Engineering General Conditions
The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case
Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
4 Engineering General Conditions
A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.