HomeMy WebLinkAboutRC 20191118001837 Instrument Number: 20191118001837 Document:COV Rec: $109.50 Page-1 of 7
Record Date:ll/18/2019 4:24 PM
Electronically Recorded King County,WA
Return Address:
City Clerk's Office
City of Renton
�055 S Grady Way
Renton,WA 98057
DECLARATION OF COVENANT
FOR INSPECTION AND MAINTENANrE OF DRAINAGE FACILITIES AND
ON-SITE BMPS
Grantor: Quadrant Corporation
Grantee: City of Renton, a Washin�ton municipal corporation
Legal Description: Lot 9 of Lakeview Crest Subdivision
Records of King County, Washington, Recording No. 20190705000120 Vol. 289 Page: 19
Assessor's Tax Parcel ID#: 414480-0090
IN CONSIDERATION of the appl'oved Clty of Renton (checkoneofthefo/lowing)
❑✓ Residential Building Permit �Commercial Building Permit
❑Clearing and Grading Permit ❑Civil Construction or Utility Permit
for Permit(s)B19004508 (construction/auildiny/utilityPermit#)relating to the real property
("Property") described above, the Grantor(s), the owner(s) in fee of that Property, hereby
covenants (covenant)with the City of Renton ("City of Renton" or"City"), a municipal corporation
of the state of Washington,that he/she(they)will observe,consent to,and abide by the conditions
and obligations set forth and described in Paragraphs 1 through 9 below with regard to the
Property, and hereby grants (grant) an easement as described in Paragraphs 2 and 3. Grantor(s)
hereby grants(grant), covenants(covenant), and agrees (agree) as follows:
1. The Grantor(s)or his/her(their)successors in interest and assigns("Owners")shall at their own
cost,operate, maintain, and keep in good repair,the Property's drainage facilities constructed
as required in the approved construction plans and specifications R-3934 (project
Plan#) on file with the City of Renton and submitted to the City of Renton for the review and
approval of permit(s) U16006676 (Construction/euilding/UtilityPermit#J.The
Property's drainage facilities are shown and/or listed on Exhibit A—Site Plan. The Property's
drainage facilities shall be maintained in compliance with the operation and maintenance
schedule included and attached herein as Exhibit B—Operations and Maintenance. Qrainage
facilities include pipes, channels, flow control facilities, water quality facilities, on-site best
management practices (BMPs) and other engineered structures designed to manage and/or
Page 1 of 8
Instrument Number: 20191118001837 Document:COV Rec: $109.50 Page-2 of 7
Record Date:ll/18/2019 4:24 PM King County,WA
treat stormwater on the Property. On-site BMPs include dispersion and infiltration devices,
bioretention, permeable pavements, rainwater harvesting systems, tree retention credit,
reduced impervious surface footprint,vegetated roofs and other measures designed to mimic
pre-developed hydrology and minimize stormwater runoff on the Property.
2. Ciiy oT Renion shall have ihe righi io ingress and egress over ihose poriions or ihe Properiy
necessary to perform inspections of the stormwater facilities and BMPs and conduct
maintenance activitiet specified in this Declaration of Covenant and in accordance with the
�enton Municipal Code. City of�enton shall provide at least thirty(30) days' written notice to
the Owners that entry on the Property i�planned for the inspection of drainage facilities.After
the thirty(30) days,the Owners shall allow the City of P.enton to enter for the sole purpose of
inspecting drainage facilities. In lieu of intpection by the City,the Owners may elect to engage
a licensed civil engineer registered in the state of Wathington who has expertise in drainage to
inspect the drainage facilities and provide a written report describing their condition. If the
engineer option is chosen,the Owners shall provide written notice to the City of�enton within
fiif�een (i5)days of receivin,g the City's notice o�'inspection.Within thirty(30)days of giving this
notice,the Owners,or engineer on behalf of the Owners,shall provide the engineer's report to
the City of Renton. If the report is not provided in a timely manner as specified above,the City
of Renton may inspect the drainage facilities without further notice.
3. If City of Renton determines from its inspection, or from an engineer's report provided in
accordance with Paragraph 2,that maintenance, repair, restoration, and/or mitigation work is
required to be done to any of the drainage facilities, City of Renton shall notify the Owners of
the specific maintenance, repair, restoration, and/or mitigation work ("Work") required
pursuant to the Renton Municipal Code. The City shall also set a reasonable deadline for the
Owners to complete the Work, or to provide an engineer's report that verifies completion of
the Work. After the deadline has passed, the Owners shall allow the City access to re-inspect
the drainage facilities unless an engineer's report has been provided verifying completion of
the Work. If the Work is not completed within the time frame set by the City, the City may
initiate an enforcement action and/or perform the Work and hereby is given access to the
Property for such purposes. Written notice will be sent to the Owners stating the City's
intention to perform such Work.This Work will not commence until at least seven(7)days after
such notice is mailed. If, within the sole discretion of the City, there exists an imminent or
present danger, the seven (7) day notice period will be waived and Work will begin
immediately.
4. The Owners shall assume all responsibility for the cost of any Work,or any measures taken by
the City to address conditions as described in Paragraph 3. Such responsibility shall include
reimbursement to the City within thirty(30)days of the receipt of the invoice for any such Work
performed. Overdue payments will require payment of interest at the maximum legal rate
allowed by RCW 19.52.020(currently twelve percent (12%)). If the City initiates legal action to
enforce this agreement, the prevailing party in such action is entitled to recover reasonable
litigation costs and attorney's fees.
5. The Owners are required to obtain written approval from City of Renton prior to filling, piping,
cutting, or removing vegetation (except in routine landscape maintenance) in open vegetated
stormwater facilities (such as swales, channels, ditches, ponds, etc.), or performing any
alterations or modifications to the drainage facilities referenced in this Declaration of Covenant.
Page 2 of $
Instrument Number: 20191118001837 Document:COV Rec: $109.50 Page-3 of 7
Record Date:ll/18/2019 4:24 PM King County,WA
fa. Any r�c�fiice a�r ecsr�sent rec{�ired�c� be g'rver� c�r athervsrise prc�vided for by the provisians of this
Agreemer�t shall be�ff�ctive u�c�n persc�naf d�livery,ar three�3�days aft�r maifin�by Certified
IVdail, r�turn receipt r�quested.
T, With r��ard tv the m�tt�rs adefr�s�ed her�in,this agr�em�nfi cc�nstittat�s the entire a�reem�nt
betw��n the partie�, �nd sup�rsedes ��I pric�r d€scussic�r�s, n��c��iakicr�rs, �r�d �II a�r��m�nts
wh�tsaev�r v�rh�th�er c�r�i e�r written.
8. This [7�cfaration e�f Ccrvenasnt is ir�tendee� te► prertect th� �afue and des���bility and prc�mc�te
efficient and effectiv� m�nager�er�t o�sur�ace �rvater drainage c�f the re�l prc�pertr/ described
abr�ve, and shafl i�ure tc►fihe b�ne�it caf aCl the citi�ens af th�City af R�ntcrn anc� �ts successars
�nd asse�ns. Tk�is C�ecCar�ti+an crf �c�v��tan# sl��Il run v+tith th� land and be birrc�in� upcan
�r�anCor(sl, and Gr�n�car`s(s`�s�,c�essor�s i�r int�r�st,and assi�r�s.
9, This C��claratEc�n a��crvenarrt may �e terminated by �ex�c�ut€on of a writt�n agreement by th�
�wners and the�'tt}r that is rece�rded by Kir�g�aunty irr its real property recc�rds.
IN V1JfTIV�SS 1NHEf2EQF, this [�eclara�ticsn af Cerv�r�ant f«�r the lr�specfiion a�nd Maint�nanc� af
Drain�ge Faeilities is�xecuted tFris ., , �, d�y af , '�'��_``t ,�_________, 2Q ��'�
�� �.���
GRANTCIRf owner af the Prc�perty � �R,ANTC7�, own�r of th�F"rcrperty
�TA7°�bF WASHI�fCT(�N }
C�?UNTY i�F ��NC� js�.
t7n fih�is day persc�nally app�ar��d befor� rrre:
�._���"���'�� ��"�.�� �..�...�_.._..a_._.� to me [�nown te� k�e the individualgs)
ciescribed in and wha executed the w�aithin and foregaing instru�aenC �nc�acknaw4eclged th�t they
signed th�same�s the�r�re�e and vcaluntary act arrcf de�d,fa�r the uses�nd purpc�s�s th�rein sta�ked.
C;iven unr�er m}r hanc!�nd c►f€icial seak th'rs,��"�da��f��a.�.fi , �[?�� _
�„�......�.. �:'�� '��t, G�.�.�z:'` ,�.�..
��,���,�,�»�aS�1��t����� �..
�*� �,a��`� ��� ��«���a,.. �• �"��,"�'�
��� °�'�����9��� ���" _.._._.._.._ "" ._._..
� �" Xar,�� +��� �I'It"1"��C� �I�t"Cl�'
� a��'��"� �'� � F�at��yr f�ublic in�nci fi�r the St��e caf
� � � �" ° �� ��� � W'ashi��tcan, residing at
� �
�� � ��' ��,. ���° �.�gp'�.,��"�_�,,���
�� ���a���u�����`�� ,:
��� � ��°4�����"��` NCy app�c�irttm�n�ex��res �,�� �.�.� � �
�t���ittt��'�'�"��" �
Pa�e�of�
Instrument Number: 20191118001837 Document:COV Rec: $109.50 Page-4 of 7
Record Date:ll/18/2019 4:24 PM King County,WA
EXHIBIT A - ON-SITE BMP SITE PLAN
TOTAL LOT/SITE AREA: 7,670 SF PERMIT #: B19004508
ADDRESS: 3950 Wells Ave N PARCEL NUMBER: 414480-0090
NEW/REPLACED IMPERV.AREA: 2734 SF MAX. IMPERV.SURFACE ALLOWED: 4,218.5 SF
ON-SITE BMP(S) USED: Drywell for limited filtration, perforated pipe connection
86� ��' �` � �` N 1°51'41"E 65.00' 94
���- ' aa aa= aa `�'
� Lot Size 7670 SF
___._._ 5' Storm �
- - o i Roof Overhang 1866 SF
_ESMT .. I �— RD —
5.,, Ro — R� � � Paved Areas 868 SF
- � o � I ; Total Impervious 2734 SF
�i'� j � Impervious 36 �
M � aa — aa — aa ,
<:i 1 �ri � o
o, I � �
----- � I o � 29� � ��2�� � ; Lot Size 7670 SF
i� - __� i 25 Rear Setback t i Footprint 1614 SF
� I� i A � Uncovered Patio 100 SF�_ q � Porch/Balcony 171 SF
� q - ---
o � � � a � � i Total Coverage 1785 SF
�itJ- o�o �o ' I � AC Pad 9 5F � ' Lot Coverage 23 �
I q.�� �
� � u _ _ �
__ Z � � �. r...__,—— .__.. .. —= tl i
-- � �_--� ' II o i_ RENTON SHORT PLAT
- __. t�l__._ v �,
" i 35� ' i � i o RECORDING # 20190705000120
o i II� + i VOL. 289 PG. 19
a �I i � I� PROPOSED I,IY 1 �� LAKEVIEW CREST LOT 9
�N °' Q I � N �'I ROOF-1866 SF ��I��i I � I n
�s 35� X 53�-4"
� � ^I i � I �
_ 1614 SF i � i= NOTES
v� � a�
---.._ � I — i N 1.The limita of detmg and
� r , o I_"_ Q - I I �- ---- " � N � �ng ae ihe lot I'nes.
� _ — I II� �� 2 No existing buidings a
� � I •—
i
0
21 2 1 � ��cn o .a°ao �St�,�u�(�iy��
Z � �j \�• 1�� � �Z !r� 000atrustian).
/ � � _ � _ �_ >
7E> �-a o o i ;.� '� -- i � _
�•
f _ _
�I � � Q � � �� i� ..,., � JF� Downspout (typ.)
i c� �o I �,,i o i ---7�(
� ........_ v - — ---- _
�r t�' --_ .� i T�.
Ji p , Porch 9 I
! I � ' � Tightline (typ.)-
Footin drain ,bas n � i � , �Ul�dlfl �I �'� -i --,7O
7� -- 9 � � I � ; 3 sF Envelo_e— i' o , Roof Overhang
see std plan � � f ;; � Footing Drain (typ.)----
_ .s3.4- . , �I , ,
IE:6 .0 � � ; ��� � � �
—. _m.._
i
2Xio' Tr cn ,�` ;;; ......._ --- - ' Fron Setba � o �
__------- ..___._
�g" III wa S`�� � i
7� Perfor ted � � ; `}' � � �8� ' ; 5� Storm
Pipe_(D tai ��i " � � � ' ESMT
.2C) � \' o� � �2% o �
i I � �
�s� � °° 10' E T � �torm
� � - - - -
�. ���_ — —
' O- 8'�la. Drywell �a a a I
a`�-- l o s' ae�tn �6� \ 2'-5 1�2„
f� ��3 detai C. .2:�--
Fi� ,- .�_8_�. ,-- -� --_fi�`3
,,�,, �,,�' , idewalk 1°5�1"E 0.30' � Silt Fence
_. ._ f, ___
--- _
_.._
,,r Concrete / � _...
68'
— - -� ,,�� ���"�� �'� rive 629 SF �
P
. ..
___'_e__'__.�_..-`____�___"__'_' '_ ..
h�'~�-- Wells Ave N - - - 58'-1 1/2"
�}'
LAKEVIEW CREST - LOT 9 Z
SECTION/TOW NSHIP/RANGE:32-24N-5E
c,�cy�,�� , APPROVED BY: SCALE: 1"=20'
������ �� ���� ��`` �, � �`����
� ..� ������� � � .,�� �������;��"��� � ,W� TITLE: DATE:
Instrument Number: 20191118001837 Document:COV Rec: $109.50 Page-5 of 7
Record Date:ll/18/2019 4:24 PM King County,WA
EXHIBIT B
Maintenance Details
DRYWELLS FOR LIMITED INFILTRATION (C.2.3.4)
Drywells for Limited Infiltration
Your property contains a stormwater management flow control BMP (best management
practice) called "limited infiltration," which was installed to mitigate the stormwater
quantity and quality impacts of some or all of the impervious surfaces on your property.
Limited infiltration is a method of soaking runoff from impervious area (such as paved
areas and roofs) into the ground. Infiltration devices, such as gravel filled trenches,
drywells, and ground surface depressions, facilitate this process by putting runoff in
direct contact with the soil and holding the runoff long enough to soak most of it into the
ground. To be successful, the soil condition around the infiltration devise must be able to
soak water into the ground for a reasonable number of years.
The infiltration devices used on your property include the following as indicated on the
flow control BMP site plan: ❑ gravel filled trenches, � drywells. The size, placement,
and composition of these devices as depicted by the flow control BMP site plan and
design details must be maintained and may not be changed without written approval
either from the City of Renton or through a future development permit from the City of
Renton.
Infiltration devices must be inspected annually and after major storm events to identify
and repair any physical defects. Maintenance and operation of the system should focus
on ensuring the system's viability by preventing sediment-laden flows from entering the
device. Excessive sedimentation will result in a plugged or non-functioning facility. If the
infiltration device has a catch basin, sediment accumulation must be removed on a yearly
basis or more frequently if necessary. Prolonged ponding around or atop a device may
indicate a plugged facility. If the device becomes plugged, it must be replaced. Keeping
the areas that drain to infiltration devices well swept and clean will enhance the longevity
of these devices. For roofs, frequent cleaning of gutters will reduce sediment loads to
these devices.
Instrument Number: 20191118001837 Document:COV Rec: $109.50 Page-6 of 7
Record Date:ll/18/2019 4:24 PM King County,WA
PERFORATED PIPE CONNECTION (C.2.11)
Your property contains a stormwater management flow control BMP (best management
practice) called a "perforated pipe connection," which was installed to reduce the
stormwater runoff impacts of some or all of the impervious surface on your property. A
perforated pipe connection is a length of drainage conveyance pipe with holes in the
bottom, designed to "leak" runoff, conveyed by the pipe, into a gravel filled trench where
it can be soaked into the surrounding soil. The connection is intended to provide
opportunity for infiltration of any runoff that is being conveyed from an impervious
surface (usually a roof) to a local drainage system such as a ditch or roadway pipe system.
1. The size and composition of the perforated pipe connection as depicted by the flow
control BMP site plan, Exhibit B, must be maintained and may not be changed
without written approval either from the City of Renton or through a future
development permit from the City of Renton.
2. The soil overtop of the perforated portion of the system must not be compacted or
covered with impervious materials.
Instrument Number: 20191118001837 Document:COV Rec: $109.50 Page-7 of 7
Record Date:ll/18/2019 4:24 PM King County,WA
CONFIGURATIOPI ON SLOPING GROUND
�� � �,�., �.�.,. ���� ��.. �rz �. �:.,�., � � � ��m�� � ��,.�.�.� .�, �..�. �.�.�,. �wa
�I DOWNSPOUT WITH CLEANOUT FILTER,SEE DETAIL q
CLEANQUT PER STD.PLAN 226.00 IX
i.._._. ._,., _..._. .,._,. .,...._ ...._.. _..._.� ,,.. �
....__. __ _..,.,. „_ _. ._ . _.,.,., -µ- 10'MIN.LEVELTRENGHWITH
... ul . PERFORATED PIPE,SEE NOTE 1 �
_. , ..,_ _ .,,_. . . 5� � II
. .,... _ �., � MIN. �,. P
... .._ _ ,_..
� _,. .,.,_., ............� ..„ _.__,�_... .�....,�... �ry ____�._-M5N _—_.____--7 � „
I �.�
I I�
� _ __ . .. ._ � µ. � i 4 Ib
_. . � _ ..__ �I .. � � I�
_ _ _. � . .. a
a
. � ��g
..�..... .. .._ N�� STDAPLOAN 1?.fi 0� Ip
W
�. TO STORM DRAIN SYSTflM �
._ . . �: � �,:»� � � � �.,� �, .�, �.,,.�
FOOTING�DRAINBy �., .� .� .���., .�...,. �,,.:,, �,...,, .�, .�,�., ..»�. .m.... .... .......� w...�.. .o�„ ..,.,.�,..,..8
_"'
.._ .,�_._... .. ...mm I
...._. _ . � t_. _
PASS �' �
�-...�...~ -� �-- � ���.� � MSN. M�N.� CLEANOUT PER IR
. -�-- -�� � - �-�-.�.�. STD.PLAN 226.00 Ip
._.. g ..� �,...... . , ,
�._._ _........ ...._ �W ..._ _..� ._. .__ ....� ..._. Ip
ITO STORM DRAIN SYSTEM �
� Fl�L ER,SOEE DETAILGLEANGUT ' 10'MIN.LEVEL TRENCH WITH I�
PERFORATED PIPE,SEE NOTE 1 �
�� ���� � � ��� ����� .� �. � �� � ��� �� � .� �� �.�� � � �
CONFIGURATION ON FLAT GRpWND
PLAN VIEW OF PARCEL
COMPACTED TOPSOIL OR OTHER CLEAN FILL /
��
NON-WO\/FN GFOTFXTILE FOR SEPARATION 6"MIN.PVC "Y
ON TpP AND SIDES qF TRENCH PER WSDOT PFRFORATFD PIPE
SPECIFICATIONS SECTION 9-33.2(1)TABLE 3 PER ASTM D1785
�.- � SOLIDSI
___..
��� ... 6 MIN'��� ,., �_ -�,..,., � � LEAVES
��
� \V�1,4 .A\��t�. �—
� )-� );-� J � � '�'� ,��"�"" FILTER SCREEN
18"MIN ��� ��"�`"������ �{'��7�'�' 1 1l2"-3/4"WASHED �
\`�.� �p��)C,,""�'S„� ..�.�4�,..t;`t�,-( DRAIN ROCK �
�r�������—������
���.;,� 2'-5'TO
i
�� �����a�.� �( �,,,�
4ROUND
...`1 ��,'i�C..;,.A���;'Cr..-�24"MIN.—� �
UNDISTURBEDNATIVESOIL = TYPICAL DOWNSPOUT
MIN.1'ABOVE SEASONAL HIGH FILTER DETAIL
GROUNDWATERTABLE
SECTIQN A
NOTES:
1. iRENCH LENGTH i0 BE 10 FEE�f IN LENGTH FOR EVERV 5,000 SF OP CONTRIBUTWG IMPERVIOUS SURPACE,OR 35,000 SF
OF NON-NATIVE PERVIOUS SURFACE,OR PORTION THEREOF.
GENERAL NOTES:
1. INFILTRATION TRF_NCHES LIMITFD TO ROOF RIMOFF FROM SINGI..E-FAMILY OR DLIPLFX HOMES OR TO CONTROL.
BASEMENT FLOODING. CONSULT WA DEPARTMENT OF ECOLpGY REGULATIONS FOR UNDERGROUND INJECTION
CONTRO�PROGRAM(UIC)FOR OTNER TYPES OF RUNOFF MANAGEMENT.
2. IMPERVIOUS AREAS LAR6ER THAN 10,000 SF AND NON-NATIVE PERVIOUS AREAS LARGFR THAN 35,000 SF MAY REDUIRE
LARGER PIPE AND SHOULD BE DESIGNED BY A CIVIL EPJGINEER.
3. THE PERFORATED PIPE MAY NOT BE PLACED IN A CRITICA�AREA BUFFER OR ON SLOPES STEEPER THAN 25%.
4. SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS.
UNlE55 OTHERWISE NOTED,DRAWING IS NpT TO SCALE(NTS)
STD.PLAN-263.40
� Pu�uc woRKs PERFORATED STUB-OUT APPR ED:
"� DEPARTMENT CONNECTION �az 9�z$�zp1$ �
DATE