Loading...
HomeMy WebLinkAboutKC Metro Comment Reminder re City of Renton DNS Issuance KC Comments Brown Bear Auto Sentry Building Addition LUA19-000201Hello Angelea, King County Metro has received the attached document and has the following comment/reminder regarding Project #: LUA19-000201 (Brown Bear Auto Sentry Building Addition). Please keep in mind that this is not an appeal, but a reminder that King County Metro needs to be informed/updated should the project impact Metro’s operation in any way. Please let me know if you have any questions. Thank you. “The contractor will need to communicate with both construction coordinator and Route Transit Facility well in advance of any construction work so that we can either remove the bus stop so that Service Quality can place a delineator nearby to relocate the bus stop post for the duration of the construction, depending on the length of the work. For any project updates or changes, please contact Metro via email at Construction.Coord@kingcounty.gov <mailto:Construction.Coord@kingcounty.gov> , plansreview@kingcounty.gov <mailto:plansreview@kin gcounty.gov> , and David Korthals at David.Korthals@kingcounty.gov. Refer to https://www.kingcounty.gov/transportation/kcdot/MetroTransit/Construction.aspx <https://www.kingcounty.gov/transportation/ kcdot/MetroTransit/Construction.aspx> for more information.” Best Regards, Lawrence Chung Transit Environmental Planner II King County Metro Transit 201 South Jackson St., MS KSC-TR-0431 Seattle, WA 98104-3856 (206) 263-5504 lachung@kingcounty.gov <mailto:lachung@kingcounty.gov> From: Coord, Construction <Construction.Coord@kingcounty.gov> Sent: Wednesday, November 20, 2019 1:06 PM To: Chung, Lawrence <lachung@kingcounty.gov> Subject: RE: City of Renton DNS Issuance: Brown Bear Auto Sentry Building Addition, LUA19-000201 Hello Lawrence, Please include the standard language about the requirement that the contractor will communicate with both construction coordinator and Route Transit Facility well in advance of any construction work so that we can either removal the bus stop so that Service Quality can place a delineator nearby to relocate the bus stop post for the duration of the construction, depending on the length of the work. Best, David Freeman King County Metro Construction /Trolley Impact Coordinator SQV-TR-0100 1500 6th Av S.Seattle WA. 98134 Mon. -Fri. 7AM – 3PM Wk.206.477.1140 Fax 206.684.2686 From: Chung, Lawrence Sent: Thursday, November 14, 2019 12:07 PM To: Coord, Construction <Construction.Coord@kingcounty.gov>; PlansReview <plansreview@kingcounty.gov>; Korthals, David <David.Korthals@kingcounty.gov> Cc: Greene, John <jgreene@kingcounty.gov> Subject: City of Renton DNS Issuance: Brown Bear Auto Sentry Building Addition, LUA19-000201 Hello, Environmental Planning has received the attached SEPA Notification regarding Brown Bear Auto Sentry Building Addition in Renton. Please see project details below and email me your comments no later than Nov. 20, 2019 (Wednesday). Thank you. Project Location: 1823059131 (77 RAINIER AVE S) Project Details: The applicant is requesting Administrative Site Plan Review and Environmental (SEPA) Review in order to remove an existing Chevron gas station which includes dispensers, pipping, canopy, cashier’s kiosk, and underground storage tanks, and construct a new Auto Sentry pay station for the existing 1,820 square foot car wash on site. The project site is 21,913 square feet and located at 77 Rainier Ave S (parcel number 1823059131). The project proposal includes a new canopy, auto cashiers and gates, new landscaping and relocation of the trash/recycling enclosure. The existing car wash building is proposed to remain. No tree removal is proposed with the project. Potential Impact: Bus route 106 Local run on Rainier Ave S. Bus zone # 46430 is to the east of the parcel. Best Regards, Lawrence Chung Transit Environmental Planner II King County Metro Transit 201 South Jackson St., MS KSC-TR-0431 Seattle, WA 98104-3856 (206) 263-5504 lachung@kingcounty.gov <mailto:lachung@kingcounty.gov> From: Jennifer Cisneros <JCisneros@Rentonwa.gov> Sent: Friday, November 8, 2019 4:36 PM To: 'Karen.walter@muckleshoot.nsn.us' <Karen.walter@muckleshoot.nsn.us>; 'Laura.murphy@muckleshoot.nsn.us' <Laura.murphy@muckleshoot.nsn.us>; 'separegister@ecy.wa.gov' <separegister@ecy.wa.gov>; 'sepaunit@ecy.wa.gov' <sepaunit@ecy.wa.gov>; 'misty.blair@ecy.wa.gov' <misty.blair@ecy.wa.gov>; 'Sepadesk@dfw.wa.gov' <Sepadesk@dfw.wa.gov>; 'sepacenter@dnr.wa.gov' <sepacenter@dnr.wa.gov>; 'Minnie.Dhaliwal@TukwilaWA.gov' <Minnie.Dhaliwal@TukwilaWA.gov>; Greene, John <jgreene@kingcounty.gov>; 'steveo@newcastlewa.gov' <steveo@newcastlewa.gov>; 'andy.swayne@pse.com' <andy.swayne@pse.com> Cc: Angelea Weihs <AWeihs@Rentonwa.gov> Subject: City of Renton DNS Issuance: Brown Bear Auto Sentry Building Addition, LUA19-000201 [EXTERNAL Email Notice! ] External communication is important to us. Be cautious of phishing attempts. Do not click or open suspicious links or attachments. Hello, Please see attached for City of Renton DNS issuance and related documents for Brown Bear Auto Sentry Building Addition, LUA19-000201. Thank you, Jenny Cisneros | Planning Technician City of Renton | CED | Planning Division 1055 South Grady Way | 6th Floor | Renton, WA 98057 Phone: (425) 430-6583 | Fax: (425) 430-7300 | jcisneros@rentonwa.gov Work Schedule: Tuesday – Friday