Loading...
HomeMy WebLinkAbout1989 TIP 4 CITY OF RENTON, WASHINGTON RESOLUTION NO. 2726 A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING THE CITY'S SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1989-1994 WHEREAS, the City of Renton has heretofore adopted a "Six-Year Transportation Improvement Program" pursuant to Chapter 7, Extraordinary Session Laws of the State of Washington, and Chapter 195 of the 1961 Session Laws of the State of Washington, and as same has heretofore been amended from time to time, and such plan and program having heretofore been duly amended and modified from time to time as authorized by law; and WHEREAS, the City Council, after recommendation of its Public Works Department, caused to be held a public hearing thereon on June 20, 1988, and after notice to the public as provided by law, for the purpose of considering adoption, modification and amendments of said , plan and program, and WHEREAS, at such public hearing held on June 20, 1988, due consideration was given to the proposed changes and amendments for the purpose of updating such plan and program, NOW THEREFORE THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I : The City's "Six-Year Transportation Improvement Program" and the City's "Arterial Street Plan" are hereby further amended and modified, all as more particularly shown on the attached Exhibits "A" , "B" and "C" incorporated herein as if fully set forth. 1 • RESOLUTION NO. 2726 SECTION II : The aforestated plan and program, as evidenced by said Exhibits shall be and constitute the City's "Six-Year Transportation Improvement Program" and the City's "Arterial Street Plan" and same to remain in full force and effect until further revised, amended and modified as provided by law. SECTION III : The Director of Public Works and the City Clerk are hereby authorized and directed to file this Resolution together with the Exhibits with the Director of Highways for the State of Washington, and as otherwise provided by law. PASSED BY THE CITY COUNCIL this 27th day of June, 1988 . Maxine E. Motor, City Clerk APPROVED BY THE MAYOR this 27th day of June, 1988 . lam' Earl Clymer, MaVOT Approved as to form: (?Ly-f./.44.4t ia4,114‘. Lawrence J. W ren, City Attorney RES.23 : 6-23-88:as . 2 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1989 TO 1994 June 30, 1988 Last Yr 1989 Priority Priority Annual Element 1989 7 1 Lind Ave SW - SW 10th St to SW 16th St 2 Grady Way - Rainier to Lind 2 3 SW 16th St - Lind Ave SW to Oakesdale Ave SW 3 4 SW 16th St - Oakesdale Ave SW to Monster Rd 5 Garden Ave N - N 6th to N 8th St 6 NE 44th St Interchange 14 7 SW 27th St - SR-167 to SR-181 15 8 SW 43rd St - SR-167 Loop Ramp Improvements 11 9 Miscellaneous Guardrail Improvements 4 10 Miscellaneous Street Overlays 36 11 Bridge Inspection & Emergency Repair 1 12 Park Ave N - Bronson Way N to N 10th ST 5 13 Oakesdale Ave SW - SW 28th St to SW 16th St & Monster Rd to North City Limits 6 14 Lake Wash Blvd NE - NE 44th St to NCL & NE 44th St to 110th Ave NE 9 15 NE 4th St - Union Ave NE to Duvall Ave NE 12 16 School Walkway Program 13 17 SW Sunset Blvd - Stevens Ave SW to WCL 16 18 I-405 /SR-515 Interchange Improvements 17 19 S 192nd St - SR-167 to SR-515 20 Rainier / Airport Way Safety Improvements 21 21 North Renton Interchange - Lk Wash Blvd N to Edmonds Ave NE (WSDOT overlay) ' Second Year 1990 19 22 Mill Ave S Rebuild - Joint W/I405 HOV 20 23 NE 6th St - Monroe Ave NE to Union Ave NE Third Year 1991 24 Lake Wash Blvd N - N Park Dr to I-405 22 25 SE Puget Dr - Jones P1 SW to Edmonds Ave SE 23 26 N/NE 3rd St - I-405 Undercrossing 24 27 Rainier Ave S - S 7th St to S 4th P1 • 4th, 5th & 6th Year 1992, 1993, 1994 25 28 Edmonds Ave NE - NE 4th St to Sunset Blvd NE 26 29 Benson Rd S - Puget Dr S to SCL 27 30 Duvall Ave NE - Sunset Blvd NE to NCL 28 31 Edmonds Ave NE - NE 3rd St to SR-169 29 32 Maple Valley Highway - Maplewood Ave SE to ECL (WSDOT Widening) 32 33 S 7th St - Shattuck Ave S to Smithers Ave S 33 34 Aberdeen Ave NE - NE 20th St to NE 27th St 31 35 Talbot Rd S - S 43rd St to SCL 36 S 4th St & Main Ave S 1 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1989 TO 1994 CITY/COUNTY City of Renton HERRING DATE 06/20/88 EXHIBIT "A" CITY NO. 1070 ADOPTION DATE 06/27/88 , COUNTY NO. 17 RESOLUTION NO. 2?26 --- F 1 ---- 1 UI PROJECT COSTS IN THOUSANDS OF DOLLARS I FEDERAL P M C NI 1 F R A R 01 I OBLIGATION PLAN U I JO R II 1 IE 0 OF R NI EXPENDITURE PLAN I Cl R - R Y 81 SOURCE OF FUNDS I I TI I W TOTAL 0 I FOR ALL FUNDING TYPES 1 I I3 T CO WORK V SI TOTAL I 1ST YRI 03 Y PROJECT IDENTIFICATION/DESCRIPTION OF WORK LR LNGTH E TI I I 1 N AK CODE R RI I 13RD 6 1 5TH 6 I I I RNNUALI R N S TI 1ST I 2ND I 4TH I 6TH LOCAL IRAP/URBIFEDERAL I I 6TH L 0 S X UI YEAR I YEAR I YEARS I YEARS FUNDS FUNDS I FUNDS I FUNDS 1 ELEMT.I SI I I I I I I 1 YEARS lit 01 LIND AVE SW City of Renton 2 BFGH 0.34 H F $350 $950 $350 P.E. $0 60 SW 10TH ST TO 5W 16TH ST R/W $0 $0 Widen existing 2 lana roadway. install signal, curb, UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. $O . $0 gutter. sideualk. storm drainage. channelization & street lighting. (Bridge by WSOOT) TOTAL $0 SO 02 GRADY WAY - - 0.34 F $240 $240 $41 *199 P.E. $8 $0 RAINIER TO LIND R/W SO Widen one east-bound lana to provide access onto LITILITY CODES: F.R. PROJECT NO. - -XXX CONST. $175 $O SR-167 and I-405. TL 11 03 SW 16TH ST 2 BFGH 0.43 X F $867 $867 $867 TPTE. $183 $0 LIND AVE SW TO ORKESORLE AVE SW R/W Widen to 3 lanes S. reconstruction, curb. gutter. LITILITY CODES: F.R. PROJECT NO. - -XXX CONST. sidewalk. illumination, channelization and bridge improvement. TOTAL $0 $O I' 04 SW 16TH ST 2 BFGH 0.28 X P $393 $993 $393 P.E. • ORKESDALE AVE SW TO MONSTER RD R/W • Widen to 3 lands. reconstruction. curb. gutter. UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. sidewalk. street lighting, channelization & storm drainage. • TOTAL $O 10 05 GARDEN AVE N 0.23 F $680 $680 $680 P.E. N 6TH ST TO N 8TH ST R/W Re-alignment and widen by one lane to make four lanes. UTILITY CODES: F.R. PROJECT N0. - -XXX CONST. TOTAL $0 $O 06 NE 44TH ST INTERCHANGE 0.10 P $50 $50 $50 $850 $1,000 $1,000 P.E. INTERCHANGE R/W Widen interchange. including bridge over I-405, by two UTILITY CODES: F.A. PROJECT NO. - -XXX CONST. lanes to make five lanes. TOTAL $O $0 li 07 SW 27TH ST 1 ABOF 1.23 X P $52 $312 $4.830 $5,194 $5.194 P.E. SR-16? TO SR-181 R/W Neu 4 & 5 lane roadway, widen existing roadway between UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. Dakesdale & SR-167. Earth retained approach fill 6 bridge over RR tracks. TOTAL SO $0 14 08 SW 43RD ST 1 BDFH 0.19 X P $86 $184 $365 $245 $880 $880 P.E. SR-167 LOOP RAMP IMPROVEMENTS R/W isi- Construct new southbound to eastbound on/off ramps at UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. SW 43rd St L SR-167. TOTAL $0 $0 09 MISCELLANEOUS GUARDRAIL IMPROVEMENTS City of Renton 4 X P $50 $50 $50 P.E. R/W Replace existing & install new guardrail sections UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. throughtout the city. TOTAL $O $0 10 MISCELLANEOUS STREET OVERLAYS 5 0 X p $300 $300 $300 $900 $1,800 $1.800 P.E. R/W Street division overlays, resurface existing roadway UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. sections. TOTAL $0 11 BRIDGE INSPECTION & EMERGENCY REPAIR p $600 $600 $600 P.E. R/W Inspect & replace or rehabilitate roadway bridges. UTILITY CODES: F.A. PROJECT NO. - -XXX CONST. TOTAL $0 $0 4 12 PARK AVE N 4 BDFG 1.04 X P $1,081 $1,081 $1.081 $3.243 $3.243 P.E. BRONSON WAY TO N 10TH ST R/W Reconstruct roadway. widening, signal modification. UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. curb. gutter. sidewalk. street lighting. channelization & storm drainage. TOTAL $0 $0 6 13 OAK:ESDALE AVE SW 1 RBDF 1.25 X p $3.290 $3.290 SE..58O $6.580 P.E. SW 28TH TO SW 16TH & MONSTER RD TO NORTH CITY LIMITS R/W Construct roadway. curb, gutter. sidewalk. street UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. lighting. storm drainage. TOTAL $0 $O 7 14 LAKE WASH BLVD NE 2 BFGH 0.83 X u $496 $496 $992 $992 P.E. ME 44TH ST TO NORTH CITY LIMITS & NE 44TH'TO 110TH AVE R/W Widen existing roadway to 3 6 5 lanes. signal. curb. UTILITY CODES: F.A. PROJECT NO. - -XXX CONST. gutter-. sidewalk, storm drainage & ohannelization. TOTAL $0 $O 6 15 NE 4TH ST 2 BFGH 1.00 X p $701 $701 $700 $2.102 $2.102 P.E. UNION AVE NE TO DUVRLL AVE NE R/W Roadway widening. curb. gutter. sidewalk. storm UTILITY CODES: F.R. PROJECT NO. - • -XXX CONST. drainage. charrrelization & signal. TOTAL $O $0 16 SCHOOL WALKWAY PROGRAM 9 BFG X p $55 555 $55 $166 $331 $331 P.E. R/W Replace deficient sidewalk sections where necessary & UTILITY CODES: F.A. PROJECT NO. - -XXX CONST. install new curb. gutter. sidewalk & storm drainage. TOTAL $0 _D 4 17 SW SUNSET BLVD 4 BDFG 0.47 X U $864 $864 $864 P.E. STEVENS AVE SW TO WEST CITY LIMITS R/W Concrete plate replacement. add 2-way loft turn lane. UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. signalmod.. nater/sewer extension. street lighting. charm. & undergrownding of existing overhead power lines. TOTAL $0 $0 1 18 I--405/SR-515 INTERCHANGE IMPROVEMENTS 1 X U $35 $60 $350 $2.363 42.805 $2,808 P.E. R/W Construction of new interchange at I-405 & SR-515. UTILITY CODES: F.A. PROJECT NO. - -XXX CONST. TOTAL $0 $0 1' 19 S 192ND ST 4 0.98 X P $50 $250 $350 $2.968 $3.618 $3.618 P.E. SR-167 TO SR-515 R/W Prepare environmental impact statement & develop a UTILITY CODES: _ F.R. PROJECT NO. - -XXX CONST. design report on various design alternatives. TOTAL $0 $0 20 RAINIER/AIRPORT WAY SAFETY IMPROVEMENTS P $90 $90 $9 $81 P.E. $112 . . � .. isf 2n.( H .. .... R/W Relocate signal heads. modify existing channelization UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. $64 and provide overhead lane use signing to improve intersection geometries and eliminate driver confusion. TOTAL $176 $O 14 21 NORTH RENTON INTERCHRNGE City of Renton 5 OH 0.09 H P $34 $34 $34 P.E. LAKE WASH BLVD N TO EDMONDS AVE NER/W - WSOOT overlay - City to provide channelization UTILITY CODES: F.R. PROJECT NO. -XXX CONST. improvements. TOTAL $0 $O 19 22 MILL AVE S REBUILD 4 ROOF 0.32 H P $270 $270 $270 P.E. JOINT W/I-405 HOV RIM - Rebuild. joint with WSOOT. curb, gutter. sidewalk, UTILITY CODES: F.R. PROJECT NO. -XXX CONST. street lighting. channnelization 8 grade revision. TOTAL $0 $0 19 23 NE 6TH ST 2 80FG 0.13 H P $283 $283 $283 P.E. • MONROE RVE NE TO UNION AVE NE R/W Roadway reconstruction. widening to 4 lanes. curb, UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. gutter. sidewalk, street lighting. resurfacing. • channelization i storm drainage. TOTAL $0 $O 24 LAKE WASH BLVD N 2.27 P $250 $4.750 $5.000 $2.500 $2,500 P.E. N PARK DR TO I-405 R/W Reconstruct and widen to 3 lanes. UTILITY CODES, F.R. PROJECT NO. - -H?{N CONST. TOTAL $0 $O 17 25 SE PUGET DR 4 BOFG 0.56 H P $692 $692 $692 P.E. JONES PL 5W TO EDMONDS RVE SE R/W • Resurface, curb. gutter. sidewalk. street lighting. UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. channelization I. storm drainage. TOTAL $0 $O 16 26 N/NE 3RD ST 2 BOFG N P $126 $126 $126 P.E. I--405 UNDERCROSSING R/41 Widening - add two lanes, curb. gutter. sidewalk, UTILITY CODES: F.R. PROJECT NO. - -NMN CONST. channelization. storm drainage. street lighting. modify signal. TOTAL $0 $O 14 27 RAINIER RVE S 2 DFGH 0.19 H p $299 $299 $51 $248 P.E. $18 S 7TH ST TO S 4TH PL R/W Widen cast side of existing roadway to 3 lanes. UTILITY CODES: F.A. PROJECT NO. - -1SNN CONST.. $230 relocate existing street lights 6 modify existing signals. TOTAL $248 $O 17 28 EDMONDS RVE NE 2 BOFG 0.87 N p $1,560 $1.560 $1.560 P.E. NE 4TH ST TO SUNSET BLVD NE R/W Widen, curb, gutter. sidewalk. street lighting. UTILITY CODES: F.R. PROJECT NO. - -1tlSN CONST. resurfacing, channelization I. storm drainage. TOTAL $0 $0 16 29 BENSON RD S 3 BOFG 0.75 N p $1,101 $1,101 $1.101 P.E. PUGET DR S TO SOUTH CITY LIMITS R/W Widen to 4 lanes, curb, gutter, sidewalk, storm UTILITY CODES: F.R. PROJECT NO. - -XXX CONST. drainage. channelization 6 street lights. TOTAL $0 SO 16 30 DUVALL AVE NE 2 BOFG 0.47 N p $1.286 $1.286 $1.286 P.E. SUNSET BLVD NE TO NORTH CITY LIMITS R/W Widen to 5 lanes, curb. gutter. sidewalk, storm UTILITY CODES: F.R. PROJECT NO. - -141414 CONST. drainage. channelization 6 street lighting. TOTAL $0 $0 14 31 EDMONDS AVE NE 1 RBDF 2.27 H p $4.287 $4.28? $4.28? P.E. NE 3RD ST TO SR-169R/W 1 e • Construct now roadway section. curb, gutter, sidewalk. UTILITY CODES: F.R. PROJECT NO. storm drainage. ohannelization. street lighting. - +K CONST. signal i modify existing signal. 32 MAPLE VALLEY HIGHWAY 0.76 p $1,091 $1.091 $1.091 TOTAL $p SO P.E. MAPLEW000 AVE SE TO EAST CITY LIMITS 14500T widening - provide curb, gutter, sidewalk. storm UTILITY CODES: F.R. PROJECT NO. - -XXX R/W drainage. street lighting & channelization. CONST. 33 S 7TH ST City of Renton 0.17 p $100 $100 $100 TOTAL $O $O SHATTUCK RYE S TO SMITHERS AVE S P.E. Reconstruction of roadway, resurfacing, new curb, UTILITY CODES: F.R. PROJECTNSW NO. gutter & sidewalk, street lighting I channelization. - ->iKfS CONST. 34 ABERDEEN AVE NE O_43 p $A93 $493 $493 TOTAL $O ..) NE 20TH ST TO NE 27TH ST P.E. Reconstruct existing roadway. curb. gutter. sidewalk, UTILITY CODES: F.R. PROJECT NO. - -XXX NST street lighting. water & sewer mains, channelization, GIST. signal. 35 TALBOT RD S 0.76 p $675 $675 $675 TOTAL $O $0 S 43RD ST TO SOUTH CITY LIMITSP.E. Widen to 5 lanes. curb. gutter. sidewalk, street UTILITY CODES: F.R. PROJECT N0. - -XXX R/W lighting, storm drainage, water main, channelization & CONST. signal modifications. 36 5 4TH ST & MAIN AVE S 0.10 p $25 $2225 $250 $250 TOTAL f0 t0 P.E. Widen Main Ave S to provide left turn pocket at S 4th UTILITY CODES: F.R. W . PROJECT NO. St. To be installed in conjuction with I-405 NOV - CONST. reconstruction. • 37 MAPLE VALLEY WYE INT. P $250 TOTAL $O $O $250 $250 P.E. Reconstruct I coordinate traffic signals at UTILITY CODES: F.R. ROJECT NO. - -H}{K NSW House /Factory, Sunset/SB on ramp; SR-196/NB off ramp. CONST. Houser/Factory. TOTAL SO $0 Count 37 I--- BRIDGE GUARDRAIL `' Al-y K SIX YEAR TRANSPORTATION ti IMPROVEMENT PROGRAM �, _ �, 1989 TO 1994 ♦ KtNNiDC "TI ,\,. , , t, \ :) �v MI SCELLANEOUS GUARDRAIL IMPROVEMENT MISCELLANEOUS STREET OVERLAYS SCHOOL WALKWAY PROGRAM Se tFT 101 wff#/#,Cro# 34l won °r„° � +„„� 2,1 0 30 ace oot. iA It 21 11— I 4 e —1- S, 7 4,,k( HAs ILL 'T 14A It 1— IT Fs jk— —oo I IE 2-` ST el BRIDGE INSPECTION BRIDGE GUARDRAIL, S �ST 1( cc 6-00L INSPECTION & 'F �'I' I 'BRIDGE INSPECTION UNDERWATER INSPECTION 'I BRIDGE INS-PECTION-•- i It i*;milk BRIDGE GUARDRAIL, Z2' INSPECTION & UNDERWATER INSPECTION 17 s BRIDGE GUARDRAIL 32 33 !"1A 40 -it lit V i TIFFANT PARK PUGET DR 169 BRIDGE GUARDRAIL PONDEROSA ESTATES EDMONDS AVE SEJ EXHIBIT 'B' hi i6jkv lit It It HEARING JJJN9.?,JQa.JAeLd ADOPTED 7 RESOLUTION ..... Z.72k■ ...... 7 F, ji. ­T. 8 IT 4v i ---------- ILI. kk! E 43 P ARTERIAL STREETS 1988 . . . . . . . . . EMMONS PRINCIPAL ARTERIAL NE I DA 111 Ilk MINOR ARTERIAL s, "17 COLLECTOR ARTERIAL O„,I o .k­kk il Nst _ � �`, .N. ,, A _21? ..... SC1001. .1v c 1 UNIC W 1; ,2! IV—lox11444.11, pi Z .4, 8r s lk I all 1131" T IT PRINCIPAL, ARTERIALS T. Ave s 1. Airport way froe Rakn­ Ave S to Logan +,k( kAf 1 eu 2. Bronson way s/ B"T'so., ­ 5 to Sunset Blvd. N /Lo a V 3. Log- AV. S/ 9 n A 0 N f,oka Airport Way to N 6th St. I—- Pa. 4. Log- ASS�- triers port Way to S 7th St. .. ....... Grady Way to BronsonWay S v 5. ".k. Ave East City li-it- 11 6. Map). Valley High. y froa, Sunset Blvd. N to Ave 7. N 3 d St. froze L-9:" AV' N to S. N W li.it. T�i N B. 3'Id PI. IN 4th St. fro, Mouser 4A 9, NE 3rd St. INE 4 N to Ea.t ity Bronson fW y to M lkt Drill kid V Park A a f- D,:. pV:,. Aky- NE r .1 - - WiS.­t Blvd. -ty li-I fr- E -M. AV. NE to E..t z to S Grady Way 3,Ave N/R,Iller AV* S from North city limits frow S to S M.i. AV Rainier R_ M.kh AV. s d 15. S3r St. froak AV. E.t­o,k fr.. Rainier Ave S 11 Nest city I' 6. Renton . t,".it to Rainier Ave S 51. 7. SW Sunset Blvd. fr- W.It La. Sulk' F �kkth,to Bronson Way N 37 ::t Blvd. N fr.. BronsonBr.,,,.n �%.,, AV:1 40 ifr. No --- ------- S 'A South Grady Way fr- Rak,.i., AV. St . Me AV 2(k. SCNOOc "a'.- o Tallest Road S 21. SW 43 d St. IS 43 St. WtV&Iley,Ro d I r:d 2 A. St. 0 at Dr. 4f T.I__ Pug 3. G­­ Dr. S fr at Dr. to South City likaits al fro, S sW 43rd St tSunset 24. O.k.d.l. AV. SW -S. N 6th It. r AveAV. MINOR ARTERIALS PF3 iL 26. B­... Road 'rf- Grady Way to South 0ty It Lil IV* 1w f,7- 1R1th St' to SW 43rd St. 28. sW Grady Way . Rainier AV* S to West "ty "'it' 11 IN` Sr Pugetd rits Puget Dr./ Dr. SE f,m T.1-t Road S to E -.. Ave SE lclo 29. s Pu I LZ dAve"I in A . s 11 32. S 7th St./Sty 7th St. froakl. Ave SW 5,r,:: Houser Wayt'03 to Main Way s 33 ./ 4 A" S to 7 30. E `*"ds A * 5 hf­ Puget Dr, to South city flans 5_1 -IT 11 u., mif 1 3 1 . S 4th PI S t St. f Burnett AveAV- S to (i.,,. St. I Ave 3 ki Ave '4 Mill sl"ll a AV :..N f,.-,,S,Grady Way t Stfith S t. Jr.36Wells I ' Grady May N to Garden NAY. N 37. N 6th St. fr- Park AveAV. rd:n, 38, Darden Ave N fr- Bronson Way N trk Dr. t 3 N ath St, fr- Ave r 4 9. Sualvat V NE 'Al ilt Garden Ave11- (North L.gl 4o. Blvd. fr- 05 to NE Park Dr. ko,, Ave fr_ South ck t y 11"111 to North 41, 'h't Blvd. to ME 27 city 42. Ed--. AveAV�ENE frm WE Su- t h St. limit I 43. NE 30th St./Kon_­k, Pl�,�/NE027th St. -,oe FRI 405 to Ed-M. Ave NE 44. N 30th S t' froe Burnett t N t FRI 4o 7 ak, &a to North City 45. L W h. Blvd. NINE f­ N Park Dr. 46. SW 27th,�3t., 11_ Nest ,�,,yy,o to ..at V%Ii.�y Road ,roak North �:d I Duval NE ort city it. t sou Ity I i.it. COLLECTOR ARTERIALS A 4a. Shattuck Ave S froka 5 4th St. to SSGrady Nay I=K 40th St. froak N 30th t. to Lake Wash. Blvd. N 1 1K2 49. P�,k.A . N/N (S now 5o. Burnett tt Ave N roe L,. W Blvd. N T-.1 to Lk. Wash. Blvd. N(N.T.,..) 51. _ Ave roa S Allard NE s at Blvd. NE to NE 27th St. T v, 1- 5-1. NE 16th St. fr- Jo- Av- NE to Ed..,,d, AV. NE 53. NE 12th St. fr- Ecalokii. Ave WE to Um.. AV. NE 7 I 2th St. 54. No., AveV to AveNE to City y shops ..try A . NE f 55. NE St. from ft S56. NE 10t St. fr- NE Sunset Blvd. to Mo­ Ave NE 7 _7: NE..thsSt. f­ NE Sunset Blvd. to No— Ave NE III d . NE 4th St. e­L. 8 Ed kid Ave NEfl tNESS- Sunset - t S . j. fr- NE 3r t. t .­kk Ave NE 59. BronsonWay NE/NE 4 h ry NE/Taylor PI. NW froe Ra"t," Ave Es. to Nest City lialts 6o . Taylor N to N 4"1 at. !k,- adol,, Av 61. me AV: N fr- BronsonwA 62. Factory AV. N fr- Bronson W y N to N 4th St L,nq,to, Road from SWSunset Blvd. to West city likkit. 3. SW 6 3 9 it. Shattuck S 6 . 't S 65. Shattuck Ave S I- S hd St. a---- 7•of 66. Ave S roak , it - - St. to S 4th St. I. 1� 67, ft,r,. AV. S froe SBurnett Ave 5 frw .2,,d St. to S.4th.St. to t St. 2"d 4S 6s: mokkater Road SW from S I Oth St. to SW 16th St. 70. SW 16th St. fr7 E,:t. V. Iley Road to fth.t., Road SW 7 East Val ley Rod f SW 16th St. to SW 13" St. 72. Tallest Road S fr- S 16th St. to South city lialts t 73 S 41.t St. Ira Ea. V:11:y :.ad tW 4 It t: 0 k AveA 74 SW 34th St. fr- East V y ad Oak." Ave SW i�`,EXHIBIT 11 ­11 IT '7 fcf S' I'LL IL. c I0 ILI. 'OIL" Niglio I Ill _1T HEARING AtANK.N.I..I.No ,J ADOPTED T A., RESOLUTION ..... 2, 7. ...... "o, 7 s To 7, 11 k- m m -a I... ITsi .......... kk`� 'i (41 Iv