Friday, October 25, 2019
City of Renton
Dept. of Community and Economic Development
1050 S. Grady Way
Renton, WA 98057
RE: Construction Mitigation
Site: 1625 Duvall Ave NE KC Parcel #: 516970-0129
Permit #: PRE 17-000639
Project Name: 1625 DUVALL AVE NE OFFICE BUILDING
• Proposed Construction Dates: Start April 2020, End September 2020
• Hours and Days of Operation: M-F 7am – 6pm.
• Proposed hauling/transportation routes: Not determined at this time.
• Measures to be implemented to minimize dust, traffic and transportation impacts,
erosion, mud, noise, and other noxious characteristics: TESC measures proposed.
• Special work hours: No special work hours.
• Preliminary traffic control plan: To be provided by contractor at time of construction.