Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_191026_v1 55 South Atlantic Street • Suite 301 • Seattle, WA 98134 • 206.682.7525 / Fax. 206.682.7529 Friday, October 25, 2019 City of Renton Dept. of Community and Economic Development 1050 S. Grady Way Renton, WA 98057 RE: Construction Mitigation Site: 1625 Duvall Ave NE KC Parcel #: 516970-0129 Permit #: PRE 17-000639 Project Name: 1625 DUVALL AVE NE OFFICE BUILDING • Proposed Construction Dates: Start April 2020, End September 2020 • Hours and Days of Operation: M-F 7am – 6pm. • Proposed hauling/transportation routes: Not determined at this time. • Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics: TESC measures proposed. • Special work hours: No special work hours. • Preliminary traffic control plan: To be provided by contractor at time of construction.