HomeMy WebLinkAboutPRE_PreApp_Notes_171012_v1designer
plans reviewer about
including w/ building
Update plans,
eliminate 1
stall from
between
street &
builidng. Seek
modification
from stds.
Note: If covered parking included in area of “commercial building” as defined in building code, then
SEPA required. Otherwise office use is 3000 sf. Clarification needed from the city on this point.