Loading...
HomeMy WebLinkAboutCivil Plans.pdfDEVELOPMENT ENGINEERINGjchavez 11/12/2019Condition of approval:Retaining walls shall bebuilt per this civil plan set. CURRENT PLANNINGvdolbee 11/13/2019 Mulch is required tobe placed inside thefence.CURRENT PLANNINGvdolbee 11/13/2019 DEVELOPMENT ENGINEERINGjchavez 11/12/2019Condition ofapproval: Silt fenceshall align with thetree protectionfencing.Conditions of Approval: Tree protection technicians identified in the provided arborist report shall befollowed when grading within the drip line of the protected trees. Including but notlimited to having an Arborist on site during these activities. Please note if trees aredamaged during construction this would be considered a code violation, and fineswould be assessed.Prior to site clearing tree protection fencing shall be installed to ensure that alltrees identified for saving are protected prior to heavy equipment being brought ontothe site. Please contact Vanessa Dolbee at vdolbee@rentonwa.gov to schedule thisinspection. This is a special inspection and would not go through the city’s inspectionline.CURRENT PLANNINGvdolbee 11/13/2019 DEVELOPMENT ENGINEERINGjchavez 11/12/2019walls above 6 ft. are not permittedCURRENT PLANNINGvdolbee 11/13/2019 DEVELOPMENT ENGINEERINGjchavez 11/12/2019CURRENT PLANNINGvdolbee 11/13/2019 DEVELOPMENT ENGINEERINGjchavez 11/12/2019 DEVELOPMENT ENGINEERINGjchavez 11/12/2019 DEVELOPMENT ENGINEERINGjchavez 11/12/2019 DEVELOPMENT ENGINEERINGjchavez 11/12/2019 DEVELOPMENT ENGINEERINGjchavez 11/12/2019