HomeMy WebLinkAbout20191202142659.pdf'5o I Utio U
1VWt��:
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
To: RJ Development
401 Central Street SE
Olympia, WA 98501
Attn: Mr. Duane Meyer
Email: duane(aOaccrete.build
No. of
Date: December 2, 2019
ESNW No.: ES- 895.06
Project: Weatherly Inn
copies Date Description
1 11/22-11/27/19 Daily Field Re ort s # 81-84
Comments:
CC:
1: John Wilson
2. Mark Richardson
3 Jeff Brain
4: Jennifer Vogele
5: Jonathan Chavez
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
ATTN: iohnwO-rinocon.com
ATTN:
mark accrete build
ATTN:
lerf(r�accrete.build
ATTN:
Jennifer accrete. build
ATTN:
jchavez@1entonwa.gov
1805 — 136" PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions NWLLC ESNW Rep. Project No. Page Report No.
15365 NE 901' Street, Suite 100 AK 0895.06 1 of 1 81
Redmond, WA 98052 Time On Site Time Off Site Date 1 Day of Week
Main (425) 449-4704 i Fax (425) 449-4711 Saturday
www.esnw com 9:00 AM 10:30 AM 11/22/19
DAILY FIELD REPORT l
Travel Time Weather
1.25 Hr. RT 40s°F, Overcast
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1
Rino Construction
Contact
Mike
Field Supervisor
LAC
Reviewed
L"t)L/1
Contractor #2
Contact
Project Manager
Reviewed
Ray
Are approved plans/permits on site?
Project No.
Permit No.
Supplementary Report:
At the client's request, ESNW rep was onsite to observe or test vault excavation
and backfill.
Vault Excavation and Backfill
While onsite, rep observed contractor working near or in the vault
excavation. Rep observed south slopes of the excavation to be near
vertical. Rep observed that the west slopes of the excavation were near
a 1.5:1 (H:V) slope. Although over -steepened, slopes are stable in
current configuration and stable to work within. Rep observed that
contractor had covered the exposed slopes with plastic sheeting. The
contractor is responsible for providing all safety measures in accordance
with state and federal regulation. Rep will return to observe the
conditions of the slopes while contractor is working in the excavation.
Rep observed contractor use a medium sized excavator to excavate and
place native brown silty sand with gravel material for the vault storm
drain. Rep observed contractor place 6" perforated storm pipe at the toe
of the excavation embedder in a 12" lift of 1 %2" wash rock. Rep observed
contractor wrapping both drain pipe and wash rock in a geo-textile. Rep
will return Monday, November 25, 2019, to observe and test the
compaction of the backfill as needed.
ESNW rep will return to observe earthwork activities when requested by
client.
Andrew Kimn, Senior Technician, 206-430-9183
ti Earth Solutions NWLLC
15365 NE 90" Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw com
DAILY FIELD REPORT
ESNW Rep. Project No.
AK 10895.06
Time On Site Time Off Site
8:15 AM; 9:30 AM;
2:00 PM; 2:45 PM;
3:45 PM 4:15 PM
Travel Time
1.25 Hr. RT x2
Page 1/2 Report No,
82
Date Day of Week
11/25/19 Monday
Weather
40s°F, Overcast
Project Name Job Location I Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1
Rino Construction
Contractor #2
Contact
Mike
Contact
Field Supervisor Reviewed
LAC L4,11./I
Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Test
Test Location
Reference
Maximum
Fill
Test
% of
Number
(See Ma }
Elevation
Compaction
Curve
Dry Density
Moisture
Dry Density
Maximum
Loa -re Wa�1�
(pcf)
(%)
(pcf)
Dry Density
83
See map for approximate location
SG
3
122.0
11,8
116.3
95
84
See map for approximate location
SG 1
3
122.0
11.7
116.6
96 E
Supplementary Report:
At the client's request, ESNW rep was onsite to observe and test lock and load wall, vault excavation and backfill
Lock and Load Wall
While onsite, rep observed wall contractor install the first and second tier
of the lock and load wall. Rep observed contractor grade and place import
gray 5/8" minus crushed recycled concrete in loose—6"--12" lifts. Rep
observed contractor place geo-grid as per plan. Once lifts were placed, rep
observed contractor use a medium sized plate compactor or a medium
sized double drum roller for compaction. Rep took compaction tests on fill
and observed material to be adequate of at least 95% of its maximum dry
density (122.0 lbs./cu. ft.).
Behind the first panel of the second tier, rep observed contractor place a 4"
corrugated drain pipe.
Rep observed the south slopes of the lock and load wall to be near vertical.
Although over -steepened, slopes are stable in current configuration and
stable to work within. Rep observed that contractor had covered the slopes
with plastic sheeting to minimize stormwater on exposed surfaces.
Vault Excavation and Backfill
Rep observed contractor working near or in the vault excavation. Rep
observed south slopes of the excavation to be near vertical. Rep observed -
that the west slopes of the excavation were near a 1.5:1 (H:V) slope. Although over -steepened, slopes are stable
in current configuration and stable to work within. Rep observed that contractor had covered the exposed slopes
with plastic sheeting. The contractor is responsible for providing all safety measures in accordance with state and
federal regulation. Rep will return to observe the conditions of the slopes while contractor is working in the
excavation.
ESNW rep will return to observe earthwork activities when requested by client.
f
Andrew Kimn, Senior Technician, 206-430-9183
10 Earth Solutions NWLLC
ESNW Rep,
Report No
AK
15365 NE 90" Street, Suite 100
82
t Redmond, WA 98052
Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
8:15 AM;
www esnw com
2:00 PM;
DAILY FIELD REPORT3:45
PM
4:15 PM
Travel Time
1.25 Hr. RT x2
Project No.
Page
Report No
0895.06
2/2
82
Time Off Site
Date
Day of Week
9:30 AM;
Monday
2:45 PM;
11/25/19
4:15 PM
,_._ ............
Project Name
.
..................
Job Location
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
Contractor #1
Contact
Rino Construction
Mike
Contractor #2
................
Contact
Weather
40s°F, Overcast
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC
Project Manager Reviewed
Ray
[Are approved plans/permits on site? Project No Permit No.
Supplementary Report:
}
83 84
Earth Solutions NWLLC
t 15365 NE 90"' Street, Suite 100
Redmond. WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
ESNW Rep. Project No, Page 1�2
AK 0895.06
Time On Site Time Off Site I Date
10:30 AM
Travel Time
1.25 Hr. RT
11:30 AM 1 11/26/19
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Weather
40s°F, Clear
Report No
83
Day of Week
Tuesday
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC WY,
Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Test
Test Location
Fill
Number
(See Map)
Elevation
Dry Density
Moisture
Dry Density
85
See map for approximate location
-6-
86
See map for approximate location
-6
Supplementary Report
Reference
Maximum
Fill
Test
% of
Compaction
Dry Density
Moisture
Dry Density
Maximum
Curve
(pcf)
(%)
(pcf)
Dry Density
3
122.0
11.3
116.8
96
3
122.0
10.5
117.3
96
At the client's request, ESNW rep was onsite to observe and test lock and load wall, vault excavation and backfill.
Lock and Load Wall
While onsite, rep observed wall contractor install the second tier of the lock and load wall. Rep observed contractor
grade and place import gray 5/8" minus crushed recycled concrete in loose -6"--12" lifts. Rep observed contractor
place geo-grid as per plan. Once lifts were placed, rep observed contractor use a medium sized plate compactor
or a medium sized double drum roller for compaction. Rep took compaction tests on fill and observed material to
be adequate of at least 95% of its maximum dry density (122.0 lbs./cu. ft.).
Rep observed the south slopes of the lock and load wall to be near vertical. Although over -steepened, slopes are
stable in current configuration and stable to work within. Rep observed that contractor had covered the slopes with
plastic sheeting to minimize stormwater on exposed surfaces.
Vault Excavation and Backfill
Rep observed contractor working near or in the vault excavation. Rep observed south slopes of the excavation to
be near vertical. Rep observed that the west slopes of the excavation were near a 1.5:1 (H:V) slope. Although over -
steepened, slopes are stable in current configuration and stable to work within. Rep observed that contractor had
covered the exposed slopes with plastic sheeting. The contractor is responsible for providing all safety measures
in accordance with state and federal regulation. Rep will return to observe the conditions of the slopes while
contractor is working in the excavation.
ESNW rep will return to observe earthwork activities when requested by client.
j
Andrew Kimn, /Senior Technician, 206-430-9183
Earth Solutions NW«C ESNW Rep. Project No. Page Report No
AK 0895.06 2/2 83
t I 15365 NE 901" Street, Suite 100 Time On Site Time Off Site Date Da of Week
Redmond, WA 98052 Y
Main (425) 449-4704 1 Fax (425) 449-4711 Tuesday
www esnw com 10:30 AM 11:30 AM 11/26/19
DAILY FIELD REPORT Travel Time Weather
1.25 Hr. RT 40s°F, Clear
............. .............. -
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No Permit No.
Supplementary Report:
we .«�.� • r ... ,
w 1 ,
86 F . 3...
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Earth Solutions NWLLc
15365 NE 90" Street, Suite 100
Redmond. WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw.com
DAILY FIELD REPORT
ESNW Rep.
Project No,
Page
Report No.
AK
0895.06
1/2
84
Time On Site
Time Off Site
Date
Day of Week
Dry Density
Moisture
Dry Density
Wed
9:00 AM
11:30 AM
11/27/19
Curve
Travel Time
1.25 Hr. RT
Weather
40s°F, Clear
Job Location Client/Owner
4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contact Field Supervisor upervisor Reviewed
Mike LAC LtZ/)
Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No Permit No
Test
Test Location
Reference
Maximum
Fill
Test
% of
Number(Ses
Map)
Elevation
Compaction
Dry Density
Moisture
Dry Density
Maximum
r ���
Curve
(pcf)
N
(pcf)
Dry Density
87
See map for approximate location
-4'
3
122.0
11.0
116.6
96
88
See map for approximate location
-4'
3
122.0
10,8
117.0
gg
89
See map for approximate location
_2'
3
122.0
10.9
117.1
96
90
See map for approximate location
-2'
3
1 122.0 1
1121
116.8
96
Supplementary Report:
At the client's request, ESNW rep was onsite to observe and test lock and load wall backfill.
Lock and Load Wall Backfill
While onsite, rep observed wall contractor install the second tier of the lock and load wall. Rep observed contractor
grade and place import gray 5/8" minus crushed recycled concrete in loose -6"--12" lifts. Rep observed contractor
place geo-grid as per plan (8XT). Once lifts were placed, rep observed contractor use a medium sized plate
compactor or a medium sized double drum roller for compaction. Rep took compaction tests on fill and observed
material to be adequate of at least 95% of its maximum dry density (122.0 lbs./cu. ft.).
Rep observed the south slopes of the lock and load wall to be near vertical. Although over -steepened, slopes are
stable in current configuration and stable to work within. Rep observed that contractor had covered the slopes
with plastic sheeting to minimize stormwater on exposed surfaces.
Rep met with ESNW's Ray and Key -West's Steve to discuss possible changes to the slope. ESNW observed that
the slope approximately 100' from the east end was very dense and unyielding. ESNW recommended that bank
also be cut to fit at least 4' of geo-grid for the first --4' of the third tier and the top -4' of the third tier be cut back to
fit 8' of geo-grid. For the third tier, contractor expressed plans that were confirmed by ESNW to use all 5/8" minus
crushed recycled concrete for backfill instead of the clean crushed behind the panels.
ESNW rep will return to observe earthwork activities when requested by client.
4-1-1. �_
Andrew Kimn, Senior Technician, 206-430-
" Earth Solutions NWLLC
ESNW Rep.
Report No.
AK
15365 NE 90"' Street, Suite 100
84
1 I Redmond, WA 98052
Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw corn
9:00 AM
DAILY FIELD REPORT
11/27/19
Travel Time
1.25 Hr. RT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Project No.
Page
Report No.
0895.06
2/2
84
Time Off Site
Date
Day of Week
Wed
11:30 AM
11/27/19
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Weather
40s°F, Clear
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC
Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report: