Loading...
HomeMy WebLinkAboutPN_Project Narrative_191113_v1.pdf JON GRAVES ARCHITECTS & PLANNERS, PLLC 3110 Ruston Way, Suite E Tacoma, WA 98402 November 13, 2019 Community & Economic Development – Planning Division Renton City Hall, 6th Floor 1055 South Grady Way Renton, WA 98057 REGARDING: Site Plan Review - Sunset Highlands Mixed Use – Project Narrative The name of the proposed project is Sunset Highlands, located at 4409 NE Sunset Blvd., Renton, WA 98059. The site is a 35,593 square-foot parcel currently zoned Commercial Arterial (CA) and located in the Commercial Mixed-Use district of the City of Renton Comprehensive Plan, and the Highlands Community Planning Area. The site is currently vacant. The Land Use Permit required for the proposed project is Site Plan Approval that will include SEPA review. The proposed mixed-use building will offer 16 residential units with commercial uses to the north of the site. Some vegetation will be removed in preparation of construction. Honey Dew Creek is located off-site near the SE portion and is considered a non-fish seasonal stream. Please see stream delineation and soils report addressing stream location, soil type and drainage conditions. No evidence wetlands soils were found on the site. Honey Creek requires a 50-foot buffer with a structure setback of 15 feet from the buffer. The buffer can be reduced to 40 feet with buffer enhancement, which is what the project team will be pursuing as shown in the wetland mitigation and stream study. Sunset Highlands is proposed to provide 16,763 SF of residential space within 16 multifamily dwelling units and 1,929 SF of commercial space including a potential restaurant and retail space. A total of 29 parking stalls are proposed, 13 of which would be located on the surface parking lot. The remaining 16 stalls would be located on Level 0 of the building in structured parking. The structured parking would be accessed through 16 residential garage doors. 1 bicycle parking stall is provided in the garages of each unit, with two bike stalls located near the commercial components outside the building, for a total of 18 stalls. There are no new plats proposed. Ingress and egress to the site would be provided off of NE Sunset Blvd via two new 30-foot wide curb cuts. There is one-way circulation throughout the project site via an internal driveway that loops around the building that is at least 20 feet wide. The total estimated cost for construction is 3.2million. Off-site improvements would be to provide an 8-foot-wide landscape planter and an 8-foot-wide sidewalk. A right of way dedication would be provided to maintain a 2-foot clear space behind the sidewalk. The developed footprint will be stripped of topsoil which will be exported to an approved location. The same area will have minimal excavation and filling as needed for extension of utilities and preparation of building foundations. We anticipate 1,000 CY to be removed offsite, to include unsuitable soils and 3,000 CY of suitable fill material. There are no proposed job shacks, model homes or sales trailers. Modification requests to deviate from principal arterial street standards, driveway frequency and the code-required 50% commercial square footage will be submitted. Thank you, Ben Childs | Senior Project Manager JON GRAVES ARCHITECTS