HomeMy WebLinkAboutRS_Techinical Information Report_191107_v1.pdf
Civil Engineers ● Structural Engineers ● Landscape Architects ● Community Planners ● Land Surveyors
Preliminary
Technical Information Report
PREPARED FOR:
Sunset Highlands Mixed Use, LLC
15007 Woodinville-Redmond Road, #A
Woodinville, WA 98072
PROJECT:
Sunset Highlands Mixed Use
Renton, WA
2190210.10
PREPARED BY:
Ryan Inouye, EIT
Project Engineer
REVIEWED BY:
Scott T. Kaul, PE, LEED AP
Project Manager
J. Matthew Weber, PE
Principal
DATE:
November 2019
Preliminary
Technical Information Report
PREPARED FOR:
Sunset Highlands Mixed Use, LLC
15007 Woodinville-Redmond Road, #A
Woodinville, WA 98072
PROJECT:
Sunset Highlands Mixed Use
Renton, WA
2190210.10
PREPARED BY:
Ryan Inouye, EIT
Project Engineer
REVIEWED BY:
Scott T. Kaul, PE, LEED AP
Project Manager
J. Matthew Weber, PE
Principal
DATE:
November 2019
I hereby state that this Technical
Information Report for Sunset Highlands
Mixed Use has been prepared by me or
under my supervision, and meets the
standard of care and expertise that is
usual and customary in this community
for professional engineers. I understand
that City of Renton does not and will not
assume liability for the sufficiency,
suitability, or performance of drainage
facilities prepared by me.
11/08/2019
Preliminary
Technical Information Report
Sunset Highlands Mixed Use
2190210.10
Table of Contents
Section Page
1.0 Project Overview ............................................................................................................................ 1
1.1 Purpose and Scope............................................................................................................. 1
1.2 Predeveloped Conditions .................................................................................................... 1
1.3 Development Conditions ..................................................................................................... 2
2.0 Conditions and Requirements Summary .................................................................................... 2
2.1 Core Requirements ............................................................................................................. 2
2.1.1 C.R. #1 – Discharge at the Natural Location ......................................................... 2
2.1.2 C.R. #2 – Off-Site Analysis .................................................................................... 2
2.1.3 C.R. #3 – Flow Control Facilities ............................................................................ 3
2.1.4 C.R. #4 – Conveyance System .............................................................................. 3
2.1.5 C.R. #5 – Construction Stormwater Pollution Prevention ...................................... 3
2.1.6 C.R. #6 – Maintenance and Operations ................................................................ 3
2.1.7 C.R. #7 – Financial Guarantees and Liability ........................................................ 3
2.1.8 C.R. #8 – Water Quality Facilities .......................................................................... 3
2.1.9 C.R. #9 – On-Site BMPS ....................................................................................... 3
2.2 Special Requirements ......................................................................................................... 5
2.2.1 S.R. #1 – Critical Drainage Areas .......................................................................... 5
2.2.2 S.R. #2 – Flood Hazard Area Delineation .............................................................. 5
2.2.3 S.R. #3 – Flood Protection Facilities ...................................................................... 5
2.2.4 S.R. #4 – Source Controls ..................................................................................... 6
2.2.5 S.R. #5 – Oil Control .............................................................................................. 6
2.2.6 S.R. #6 – Aquifer Protection Area .......................................................................... 6
3.0 Off-Site Analysis ............................................................................................................................ 6
3.1 Downstream Analysis.......................................................................................................... 6
3.2 Upstream Analysis .............................................................................................................. 6
4.0 Flow Control, Low Impact Development (LID), and Water Quality Facility Analysis and
Design ............................................................................................................................................. 6
4.1 Existing Site Hydrology ....................................................................................................... 7
4.2 Developed Site Hydrology .................................................................................................. 7
4.3 Performance Standards ...................................................................................................... 7
4.4 Flow Control System ........................................................................................................... 8
Preliminary
Technical Information Report
Sunset Highlands Mixed Use
2190210.10
4.5 Water Quality System ......................................................................................................... 8
5.0 Conveyance System Analysis and Design .................................................................................. 8
6.0 Special Reports and Studies ........................................................................................................ 8
7.0 Other Permits ................................................................................................................................. 8
8.0 Construction Stormwater Pollution Prevention Analysis and Design ..................................... 8
8.1 ESC Plan Analysis and Design ........................................................................................... 8
8.2 SWPPS Plan Design ........................................................................................................... 8
9.0 Bond Quantities, Facility Summaries, and Declaration of Covenant ....................................... 9
10.0 Operation and Maintenance Manual ............................................................................................ 9
11.0 Conclusion ...................................................................................................................................... 9
Preliminary
Technical Information Report
Sunset Highlands Mixed Use
2190210.10
Appendices
Appendix A
Figures
A-1 ............. Vicinity Map
A-2 ............. Soils Map
A-3 ............. Existing Conditions Map
A-4 ............. Developed Conditions Map
A-5 ............. Downstream Dra6inage Map
A-6 ............. FEMA Flood Map
A-7 ............. Aquifer Protection Map
Appendix B
Not Used
Appendix C
Hydrologic Analysis
C-1............. Drainage Basin Map
C-2............. Preliminary WWHM Report
Appendix D
Geotechnical Engineering Report
Appendix E
Non-Structural BMPs
A-1 ............. Required Best Management Practices (BMPs) for all Properties with
Commercial Activities
A-8 ............. Storage or Solid and Food Wastes (Including Cooking Grease)
A-45 ........... Maintenance of Public and Private Utility Corridors and Facilities
Appendix F
Critical Areas Report
By Sewall Wetland Consulting, Inc., dated March 22, 2018
Note: this report is preliminary and as such has an outdated site plan with similar encroachments
and surfacing proposed
Preliminary
Technical Information Report
Sunset Highlands Mixed Use 1
2190210.10
1.0 Project Overview
1.1 Purpose and Scope
This report accompanies the SEPA application for the Sunset Highlands Mixed Use Project.
The project site is located in the City of Renton in the southwest quarter of Section 3, Township
23 North, Range 5 East, Willamette Meridian in the City of Renton, King County, Washington.
This site is located at 4409 Northeast Sunset Boulevard (see Appendix A, Figure A-1 for Vicinity
Map).
The Sunset Highlands Mixed Use project is located on Parcel 0223059090 totaling approximately
0.82 acres with the proposed disturbed area totaling approximately 0.75 acres. The proposed
project is for a new mixed use commercial and residential building of approximately 8,100 square
feet. An asphalt drive/fire lane is proposed around the building with parking areas at the north
end. The project also includes stormwater improvements, water, sanitary sewer, and dry utilities.
The design for this project meets or exceeds the requirements of the 2017 City of Renton Surface
Water Design Manual (Storm Manual), which establishes the methodology and design criteria
used for this project.
1.2 Predeveloped Conditions
South Sound Geotechnical Consulting evaluated the existing soils (see Appendix D). The onsite
soils were evaluated to be approximately 1 foot of topsoil, followed by sand to approximately 2.5
to 3.5 feet. The geotechnical engineer determined “Bioswales, pervious pavements, or other
shallow dispersion systems could be considered in the upper sand soils, if allowed by the City.”
The remainder of the site is glacial till to the maximum explored depths by the geotechnical
engineer. The glacial till, referred to as hardpan, is considered poor soil for infiltration. The
geotechnical engineer has determined the hardpan below the upper sand is considered
impermeable to vertical groundwater flow.
Existing Vegetation/Cover: The existing site has been cleared in the past , and there are only a
few significant trees located around the perimeter of the site. There are several trees located
adjacent to the western property line. The site consists primarily of light brush and grasses , and
three driveways accessing the site from north end.
An existing sanitary 8-inch sewer main runs along the western portion of the project site with an
existing manhole located near the southwest corner of the parcel. There is an existing 12-inch
water main north of the site on the north side of Sunset Boulevard. Power and other utilities are
located adjacent to the project site. There are several existing driveways at the north end of the
site. The remainder of the site remains undeveloped.
The site slopes to the south from the road at approximately 3 percent. The site sheet flows
stormwater to the existing stream at the south end of the site. See Appendix A, Figure A-5 for the
Downstream Drainage Map beyond the property boundaries.
An evaluation of wetlands, streams, and buffers was conducted by Sewall Wetland Consulting
(see Appendix F). The stream is the upper ditched portion of the Honey Dew Creek, determined
as a Type 4, non-fish bearing stream. The stream has a 50-foot degraded and denuded natural
buffer.
Preliminary
Technical Information Report
Sunset Highlands Mixed Use 2
2190210.10
1.3 Development Conditions
Approximately 0.75 acres of the 0.82 acres plot will be disturbed. A 21-inch fir tree and 24-inch fir
tree along the western property line will be removed to accommodate utilities.
The proposed improvements are for a new mixed use building, an asphalt drive/fire lane, and
parking. The project also includes stormwater improvements, water, sanitary sewer , and dry
utilities. The existing stream will be provided with a 40-foot stream buffer that will be enhanced
with this project. Stream buffer improvements will aid in stabilizing the area next to the stream; a
full stream buffer enhancement plan will be provided by Sewall Wetland Consulting under
separate permit.
A stormwater detention system with an outfall control structure, permeable paving, and bio-
retention cells are proposed to mitigate the impact of the new development.
2.0 Conditions and Requirements Summary
2.1 Core Requirements
2.1.1 C.R. #1 – Discharge at the Natural Location
Currently, runoff from the project site flows south to Honey Creek , which flows through
the southeast corner of the site and continues west. This flow regime is mimicked by
the proposed storm discharge to Honey Creek.
2.1.2 C.R. #2 – Off-Site Analysis
AHBL staff performed a Level 1 off-site drainage analysis in May of 2018. The analysis
included:
Defining and mapping the study area;
Reviewing available information on the study area;
Field inspecting the study area; and
Analyzing the existing drainage system , including its existing and predicted
problems, if any.
The project discharges to Honey Creek where it crosses the southeast corner of the
project site. The stream continues to flow to the west through a 71-inch by 47-inch
elliptical culvert. The streambed just west of the culvert is heavily overgrown with
blackberry vines and other brush.
The stream flows behind neighbor’s outbuilding/shop. The property was marked with
“No Trespassing” signs. Once it passes the building, it immediately flows into two, 36-
inch by 60-inch arched pipe culverts. From this point it flows underground across the
neighboring lot and then across NE Sunset Boulevard to the north where exits the two
arched pipes. From this point, the runoff flows into a ditch line then rounds the corner
and flows north along the east side of Union Avenue. Once it has turned this corner, it
flows a short distance approximately 30 feet to two more arched pipes, and it continues
to flow to the west across Union Avenue. Once across Union Avenue, the creek exits
the culverts and flows into a gravelly streambed that borders the backside of the lots
Preliminary
Technical Information Report
Sunset Highlands Mixed Use 3
2190210.10
that front Sunset Boulevard. This streambed drops in elevation considerably and flows
between a number of apartment complexes, and eventually flows into the Honey Creek
Open Space. This is a treed park -like area approximately ¾-mile downstream from the
subject property. The stream is at the bottom of a very deep canyon at this point.
To our knowledge, there are no existing downstream restrictions; and the project will
maintain the discharge to pre-developed rates. Therefore, the downstream
conveyance system should have adequate capacity to convey the proposed flows from
this project. A floodplain analysis was evaluated to determine the maximum water
surface elevation anticipated for Honey Creek (see Section 2.2.2 below).
2.1.3 C.R. #3 – Flow Control Facilities
Per the Storm Manual, the project requires Flow Control Duration Standard – Matching
Forested Conditions. An underground stormwater detention system is proposed to
meet flow control requirements. Proposed mitigation will meet the predeveloped
conditions as evaluated using the WWHM program from 50 percent of the 2-year up to
the full 50-year flow and matching peaks for the 2- and 10-year return periods.
2.1.4 C.R. #4 – Conveyance System
The project includes the construction of a new conveyance system to direct discharge
to Honey Creek. Closed-pipe conveyance is provided from the detention system to the
discharge to Honey Creek. Roof drains discharge directly to the storm detention
system. Conveyance calculations will be provided with the final site development
plans.
2.1.5 C.R. #5 – Construction Stormwater Pollution Prevention
An erosion and sediment control plan will be included with the site development
submittal package. A Construction Stormwater Pollution Prevention Plan will be
included with the site development submittal package.
2.1.6 C.R. #6 – Maintenance and Operations
A maintenance plan for the stormwater management system will be provided with the
site development permit.
2.1.7 C.R. #7 – Financial Guarantees and Liability
A bond, assignment of funds, or certified check will be provided as required pri or to
construction.
2.1.8 C.R. #8 – Water Quality Facilities
Bioretention cells provide water quality treatment for areas subject to pollution
generating surfaces. Detailed discussion of the water quality system is provided in
Section 4.1.
2.1.9 C.R. #9 – On-Site BMPS
The project falls in the Large Lot BMP requirements based on the size of the property.
Core requirement #9 BMPs have been evaluated in the order described per the Storm
Manual with infeasibility justification provided.
Preliminary
Technical Information Report
Sunset Highlands Mixed Use 4
2190210.10
1. Full Dispersion
Infeasibility Justification: Full dispersion requires that 100’ minimum vegetated flow
path be provided. The small area and site plan do not allow for the required flow path.
Full dispersion also requires a maximum 15% of the site be impervious surfaces. The
project will convert approximately 76% of the site to impervious surfaces.
2. Full Infiltration of Roof Runoff
Infeasibility Justification: Full infiltration of Roof Runoff has been determined infeasible
by the geotechnical analysis performed by South Sound Geotechnical Consulting. The
geotechnical analysis recommends not using trenches or ponds.
3. Option 1 - Full Infiltration
Infeasibility Justification: Full infiltration has been determined infeasible by the
geotechnical analysis performed by South Sound Geotechnical Consulting. The soil
layer that can infiltrate is shallow. The proposed detention system will require
excavation below this layer; therefore, infiltration in the upper soil was determined
infeasible. The detention system proposed will have exposed subgrade to promote
infiltration (to the maximum extent possible).
3. Option 2 - Limited Infiltration
Infeasibility Justification: Limited infiltration BMPs per the Storm Manual are the same
as full infiltration systems but located in poor infiltrative soils that are likely to clog and
work less effectively over time. Infiltration has been determined infeasible by the
geotechnical analysis performed by South Sound Geotechnical Consulting. Shallow
facilities are recommended by the geotechnical engineer. Limited infiltration facilities
would not adequately provide infiltration.
3. Option 3- Bioretention
Bioretention is proposed for the site to meet the On-Site BMP and water quality
requirements. The bioretention facility is proposed in the upper alluvium soils where
small amounts of infiltration are feasible. The shallow bioretention cell and amended
soil mix is proposed to stay 3’ from the hardpan soils. The amended soils should help
to protect and preserve the infiltrative soil layer. All of the pollution generating
impervious surfaces will be directed to the bioretention cells.
3. Option 3- Permeable Pavement
Permeable paving is proposed for the site to meet the On-Site BMP and water quality
requirements. Permeable paving is proposed at the north end of the site in front of the
building and as a portion of the parking area in the northeast corner. The geotechnical
analysis has determined soils in the area meet the suitability criteria.
Soil Amendment:
All disturbed areas will be amended per the soil amendment BMP.
The pollution generating impervious surfaces will be provided with treatment and flow
control.
Preliminary
Technical Information Report
Sunset Highlands Mixed Use 5
2190210.10
2.2 Special Requirements
2.2.1 S.R. #1 – Critical Drainage Areas
The project does not lie within a critical drainage area.
1. Master Drainage Plans (MDPs)
The project does not lie within an area covered by an approved Master Drainage
Plan.
2. Basin Plans (BPs)
The project does not lie within an area with an adopted Basin Plan.
3. Salmon Conservation Plans (SCPs)
The project does not lie within an area with an adopted Salmon Conservation
Plan.
4. Lake Management Plans
The project does not lie within an area with an adopted Lake Management Plan.
5. Hazard Mitigation Plan
The project does not lie within a flood hazard area and is not tributary to any
identified flooding per the City of Renton Hazard Mitigation Plan, April 2010.
6. Shared Facility Drainage Plans (SFDPs)
The project does not propose a Shared Facility Drainage Plan.
2.2.2 S.R. #2 – Flood Hazard Area Delineation
The proposed project is not within or adjacent to a flood hazard area as identified by
the City of Renton in the Hazard Plan per FEMA study. A Minor Floodplain Analysis for
Honey Creek at the discharge will be provided with final site development permit.
Preliminary delineation has determined the 100-year water surface to be 2.94 feet
above the bottom of the stream. The upstream maximum floodplain elevation has been
delineated at 392.05.
To determine the potential flooding elevation the downstream culvert was evaluated
and a preliminary backwater analysis conducted. The upstream culverts have a
maximum combined discharge capacity of 25.2 cfs based on the slope and material
using Manning’s Equation. The combined 100-year flow from the site and upstream
drainage will be effectively conveyed through the downstream elliptical culvert. The
downstream culvert has a capacity of 43.77 cfs.
A preliminary backwater analysis has been utilized to evaluate the ultimate creek level
adjacent to the project based on a 100-year storm flow of 25.7 cfs. The backwater
analysis can expect the water level to reach approximately 2.94 feet at about 150 feet
from the culvert. The anticipated water surface will be 392.05. The discharge for the
site is set at 392.75, to be above the anticipated maximum water level.
2.2.3 S.R. #3 – Flood Protection Facilities
The project does not meet the any of the conditions requiring flood protection facilities.
Preliminary
Technical Information Report
Sunset Highlands Mixed Use 6
2190210.10
2.2.4 S.R. #4 – Source Controls
Source control BMPs as identified in the King County Stormwater Pollution Prevention
Manual and Renton Municipal Code, Title IV, have been incorporated into the layout
and design of the proposed stormwater management system. The site use will require
non-structural BMPs to maintain source control. BMPs A-01, A-08, and A-45 from the
King County Stormwater Pollution Prevention Manual shall be adhered to.
2.2.5 S.R. #5 – Oil Control
The proposed site is not expected to meet the high-use site criteria. No oil control is
proposed.
2.2.6 S.R. #6 – Aquifer Protection Area
The project site is within Zone 2 of Aquifer Protection Area (APA). An Enhanced Basic
Water Quality Treatment system will treat the pollution generating surfaces onsite.
Adverse impacts to the aquifer are not anticipated. Per geotechnical findings , the
onsite soil infiltration rate is less than 9 inches per hour; therefore, no lining is
proposed.
3.0 Off-Site Analysis
3.1 Downstream Analysis
See Core Requirement #2 above for AHBL Downstream analysis of the site.
3.2 Upstream Analysis
The project site does not receive any substantive runoff from offsite properties except for the
flows through Honey Creek, which flows through the southeast corner of the project site. The
current flow pattern will not be modified by this project.
4.0 Flow Control, Low Impact Development (LID), and Water Quality Facility
Analysis and Design
An underground detention system and control structure is proposed to meet flow control
requirements. Bioretention and permeable paving is proposed to meet LID requirements. The
bioretention cells will provide water quality treatment. Preliminary design is based on Appendix
C-1 Basin Map and Basin characteristics below.
The Water Quality Basin is characterized as follows:
Total Area: 0.48 acres
Building Area: 0.00 acres
Asphalt Pavement Area: 0.30 acres
Sidewalk Area: 0.02 acres
Landscape Area: 0.16 acres
The remaining area in the Detention Basin is characterized as follows:
Total Area: 0.26 acres
Building Area: 0.19 acres
Preliminary
Technical Information Report
Sunset Highlands Mixed Use 7
2190210.10
Asphalt Pavement Area: 0.00 acres
Permeable Paving Area: 0.07 acres
Sidewalk and Patio Area: 0.00 acres
Landscape Area: 0.00 acres
4.1 Existing Site Hydrology
The existing site has been previously cleared. Although previously cleared, to meet the area -
specific flow control facility requirements the existing conditions will be modeled as forest. The
threshold discharge area currently directs site runoff to Honey Creek, a stable stream showing no
impacts of high flows and no known drainage problems. The existing basin for modeling is
determined as the same footprint as the developed conditions to provide stormwater
management replicating existing conditions. The geotechnical analysis identifies the potential for
some infiltration at the upper layer of alluvium. To best mimic the observed site conditions the
predeveloped hydrology will be evaluated as type C soils.
4.2 Developed Site Hydrology
All onsite improvements will be provided with flow control and water quality management. A
bioretention facility will provide water quality management for pollution generating surfaces. A
storm- chamber detention system will provide flow control to match predevelopment and post-
development flow duration curves for all flows from 50 percent of the 2-year flow up to the full
50-year flow. All onsite impervious surfaces will be conveyed to the detention system to
effectively mitigate runoff.
The Geotechnical Engineering Study discovered dense till soils ranging from 3.5 to 4.5 feet below
existing ground surface. Therefore, the soils should be modeled as Type C soils.
4.3 Performance Standards
The Area-Specific Flow Control Facility requirement for this project will be the Flow Control
Duration Standard – Matching Forested Conditions. The City has identified the required flow
control standards per the City of Renton Flow Control Application Map.
This project falls under the Large Lot BMP Requirements. Permeable paving and bioretention
cells are proposed to meet on-site BMP requirements. Stormwater from the site will discharge
close to Honey Creek to reduce the impact on site soils and soil stabilization.
To meet conveyance requirements, all new pipe systems will be sized to sufficiently convey and
contain the 25-year peak flow.
Enhanced Basic Water Quality Treatment is required for pollution generating target surfaces.
The pollution generating surfaces will be conveyed to a bioretention cell for treatment before
entering the detention system.
A commercial site development permit is required; therefore, source control BMPs are required.
Structural source controls will be provided based on the use of the site as commercial retail and
housing. Nonstructural source control measures will be provided per special requirement #4.
See Appendix E for Non-Structural BMPs. The site is not considered high-use; therefore, oil
control is not required.
Preliminary
Technical Information Report
Sunset Highlands Mixed Use 8
2190210.10
4.4 Flow Control System
The flow control system schematic layout can be found on the civil plan sheets. See Appendix
C-3 for supporting documentation on the preliminary sizing of the detention system and flow
control structure. Per Storm Manual Table 1.2.9.A on-site BMP credits will be applied to
determine flow control requirements. The on-site BMP credit for bioretention will model tributary
impervious surfaces as 90% impervious and 10% grass. The on-site BMP credit for permeable
pavement (unlined with no underdrain) will model permeable pavement area as 50% impervious
and 50% grass.
4.5 Water Quality System
To treat runoff from pollution generating surfaces bioretention cells are proposed. Soils under the
permeable pavement meet the soil suitability criteria. The bioretention cell has been sized to
meet the 91% infiltration rate (see Appendix C-3 for the WWHM printout). The bottom of the
bioretention soil will be placed to maintain a 3’ separation from the poor soils onsite where
hardpan may be encountered.
5.0 Conveyance System Analysis and Design
Closed-pipe conveyance is provided from the detention system to the discharge at Honey Creek.
Roof drains are conveyed to the detention system.
A conveyance analysis will be provided with final site development plans.
6.0 Special Reports and Studies
A Minor Floodplain Analysis will be provided with final site development plans. A geotechnical
engineering report has been prepared by South Sound Geotechnical Consulting (see
Appendix D). A Critical Areas Report has been prepared by Sewall Wetland Consulting, Inc. (see
Appendix F).
7.0 Other Permits
This project will require a Building Permit and Civil Construction Per mit. A Buffer Enhancement
plan will be required for the existing stream buffer.
8.0 Construction Stormwater Pollution Prevention Analysis and Design
8.1 ESC Plan Analysis and Design
A Construction Stormwater Pollution Prevention Plan will be provided for final site development
plans.
8.2 SWPPS Plan Design
A Temporary Erosion and Sediment Control Plan (TESC Plan) will be provided for the final site
development plans. A CSWPP supervisor will be appointed by the Contractor at the time of
construction to implement and update TESC plans as required. The CSWPP supervisor shall be
a Certified Professional in Erosion and Sediment Control or a Certified Erosion and Sediment
Control Lead. The CSWPP supervisor will be responsible for compliance with all City of Renton
construction stormwater requirements.
Preliminary
Technical Information Report
Sunset Highlands Mixed Use 9
2190210.10
9.0 Bond Quantities, Facility Summaries, and Declaration of Covenant
A bond quantities worksheet will be provided for final site development permit.
All easement requests will be submitted to the City of Renton Community and Economic
Development (CED) Department.
10.0 Operation and Maintenance Manual
An operation and maintenance manual will be provided for final site development.
11.0 Conclusion
This project is designed to meet the 2016 City of Renton Surface Water Design Manual
guidelines for stormwater management.
This analysis is based on data and records either supplied to or obtained by AHBL, Inc. These
documents are referenced within the text of the analysis. The analysis has been prepared utilizing
procedures and practices within the standard accepted practices of the industry. We conclude that this
project, as proposed, will not create any new problems within the existing downstream drainage system.
AHBL, Inc.
Ryan Inouye, EIT
Project Engineer
RI/STK
November 2019
Q:\2019\2190210\10_CIV\NON_CAD\REPORTS\Prelim Storm\20191009 Rpt (Storm TIR) 2190210.10.docx
Preliminary
Technical Information Report
Sunset Highlands Mixed Use
2190210.10
Appendix A
Figures
A-1 .................... Vicinity Map
A-2 .................... Soils Map
A-3 .................... Existing Conditions Map
A-4 .................... Developed Conditions Map
A-5 .................... Downstream Dra6inage Map
A-6 .................... FEMA Flood Map
A-7 .................... Aquifer Protection Map
2215 North 30th Street
Suite 300
Tacoma, WA 98403
253.383.2422 TEL
253.383.2572 FAX
SUNSET HIGHLANDS MIXED USE 2190210.10
VICINITY MAP
A-1
NOT TO SCALE
VICINITY MAP
Soil Map—King County Area, Washington
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/10/2018
Page 1 of 35261480526149052615005261510526152052615305261540526155052615605261570526158052614805261490526150052615105261520526153052615405261550526156052615705261580563190563200563210563220563230563240563250563260
563190 563200 563210 563220 563230 563240 563250 563260
47° 30' 16'' N 122° 9' 39'' W47° 30' 16'' N122° 9' 35'' W47° 30' 13'' N
122° 9' 39'' W47° 30' 13'' N
122° 9' 35'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84
0 25 50 100 150
Feet
0 5 10 20 30
Meters
Map Scale: 1:517 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: King County Area, Washington
Survey Area Data: Version 13, Sep 7, 2017
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 8, 2014—Jul 15,
2014
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—King County Area, Washington
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/10/2018
Page 2 of 3
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
AgC Alderwood gravelly sandy
loam, 8 to 15 percent slopes
0.0 4.5%
RdC Ragnar-Indianola association,
sloping
1.0 95.5%
Totals for Area of Interest 1.0 100.0%
Soil Map—King County Area, Washington
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
1/10/2018
Page 3 of 3
2215 North 30th Street
Suite 300
Tacoma, WA 98403
253.383.2422 TEL
253.383.2572 FAX
SUNSET HIGHLANDS MIXED USE 2190210.10
EXISTING CONDITIONS MAP
A-3
UP
UP
UP NE SUNSET BLVDSTORM CHAMBERDETENTION SYSTEMPERVIOUSCONCRETE40'BUFFERBIORETENTIONW
14"FIR
16"FIR
24"FIR
12"FIR
20"FIR
16"FIR
30"FIR
16"FIR
CATCH BASINRIM 400.1312" CONC SW 397.30 IE177.5 LF
SANITARY SEWER MANHOLE
RIM 396.32
8" PVC S 393.35 IE
8" PVC SE 393.38 IE
8" PVC N 393.27 IE
303.5 LF
WF A3
WF A5
WF A7
WF A8
WF AA8
WF AA6
WF AA5
WF AA2 WF AA1
ROCK
E
R
Y
ROCK
E
R
Y
ROCKERY
-
-
-
--5' HOG WIRE FENCE6' CY
C
L
O
N
E
F
E
N
C
E
LSPVLSLSLS
WF AA7
WF AA4
WF AA1
M ----WATER VALVE WATER MANHOLEASPHALT----------------
-
-
-
-
-
-
-
-----
-
--------------
-
-
-
ASPHALT ASPHALTASPHALTASPHALTGRAVELASPHALT-SIDEWALK
48" P
o
pl
a
r
24" CEDAR
30" Fir
18" MAPLE
30" FIR
WF
A
1
WF A2
WF A6
WF AA3
CATCH BASIN12" CONC NE 394.86 IE12" CONC N 394.84 IE12" CONC SW 394.91 IE SANITARY SEWERMANHOLERIM 400.4312" CONC NE 388.08 IE8" PVC S 388.91 IE12" CONC SW 388.08 IECATCH BASINRIM 399.9312" CONC NE 395.33 IE12" CONC SW 395.21 IESANITARY SEWER12" CONC NE 386.00 IE
12" CONC SW 385.95 IE
SANITARY SEWERMANHOLERIM 400.7112" CONC NE 388.80IE12" CONC SW 388.61IE >SB SIGNAL BOX SBTV
EXISTI
N
G
S
T
R
E
A
M
N63°57'27"E 1423.14' (M)1423.21' (ST)595.07' (C)595.10' (ST)S26°02'33"E 45.00'
48" CMP CULVERT
389.11 IE
8" CONCRETE CULVERT
393.56 IE
48" CMP CULVERT
388.89 IE 20' SEWER EASEMENTBIORETENTIONPERVIOUSASPHALTCONTROLSTRUCTURENGRAPHIC SCALE030601" = 30 FEET15Civil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsSUNSET HIGHLANDS MIXED USE2190210.10Q:\2019\2190210\10_CIV\CAD\EXHIBITS\Developed Conditions.dwgDISCHARGE TOHONEY CREEK
2215 North 30th Street
Suite 300
Tacoma, WA 98403
253.383.2422 TEL
253.383.2572 FAX
SUNSET HIGHLANDS MIXED USE 2190210.10
DOWNSTREAM DRAINAGE MAP
A-5
2215 North 30th Street
Suite 300
Tacoma, WA 98403
253.383.2422 TEL
253.383.2572 FAX
SUNSET HIGHLANDS MIXED USE 2190210.10
FEMA FLOOD MAP
A-6
2215 North 30th Street
Suite 300
Tacoma, WA 98403
253.383.2422 TEL
253.383.2572 FAX
!!!
!
!
!!!!!
!
!
!!
!
!
!!
!
!!
PW-12
PW-11PW-17
PW-4
PW-9
PW-8
RW-3
RW-2
EW-3
PW-5A
PW-12
PW-10
,§-405
,§-405 115544tthhPPllSSEESW 34th StSW 34th St East Valley RdEast Valley Rd114488tthhAAvveeSSEE140th Ave SE140th Ave SE164th Ave SE164th Ave SETalbot Rd STalbot Rd SN 30th StN 30th St
68th Ave S68th Ave SRai
n
i
e
r
A
v
e
S
Rai
n
i
e
r
A
v
e
S
SE 192nd StSE 192nd St
SE May
V
a
l
l
e
y
R
d
SE May
V
a
l
l
e
y
R
d
E Valley HwyE Valley HwySE P
e
t
r
o
v
i
t
s
k
y
R
d
SE P
e
t
r
o
v
i
t
s
k
y
R
d
Forest D
r
S
E
Forest D
r
S
E
S 128th StS 128th St 112th Ave SE112th Ave SE84th Ave S84th Ave SSE 168th StSE 168th St
S 55th StS 55th St
N 10th StN 10th St
NE 2nd StNE 2nd St
SW 41st StSW 41st St 116th Ave SE116th Ave SE140th Ave SE140th Ave SESE 192nd StSE 192nd St
148th Ave SE148th Ave SE114400tthhAAvvee SS EE
SW 27th StSW 27th St Benson Rd SBenson Rd SHouser
Way
NHouser
Way
NLind Ave SWLind Ave SWN 8th StN 8th St
PP uu gg ee ttDDrrSSEERReennttoonnAAvv ee SS
SW 7th StSW 7th St I-405 FWYI-405 FWYRainier Ave NRainier Ave NNNEEPPaa rrkk DDrr
NE 4th StNE 4th St
SW 43rd StSW 43rd St SE Carr RdSE Carr Rd
NE 3rd StNE 3rd StLogan Ave NLogan Ave NDuvall Ave NEDuvall Ave NEI-405 FWYI-405 FWYI-405 FWYI-405 FWYI-405 FW
YI-405 FW
Y I-405 FWYI-405 FWYNE 4th StNE 4th StI-405 FWYI-405 FWYII--440055FFWWYYI-405 FWYI-405 FWYI-405 FWYI-405 FWY I-405 FWYI-405 FWYI-405 FWYI-405 FWY
NE 4th StNE 4th St
BN IncBN IncBN
IncBN
Inc
BN IncBN Inc BN IncBN IncBN
I
n
c
BN
I
n
c BN IncBN IncBN
I
n
c
BN
I
n
c BN
IncBN
Inc
BB NN IInnccBN
I
n
c
BN
I
n
c BN IncBN IncBN In
cBN In
c BN IncBN IncCedar River
Green River
Black River
May Creek
Duwamish Waterway
Springbrook Creek
Lake Washington
Lake Youngs
Panther Lake
Lake Boren
Reference 15-B
Wellfield Capture Zones
One Year Capture Zone
Five Year Capture Zone
Ten Year Capture Zone
Cedar Valley Sole SourceAquifer Project Review Area
Streamflow Source Area
Cedar Valley Sole Source Aquifer
Aquifer Protection Area Zones
Zone 1
Zone 1 Modified
Zone 2
Network Structure
!Production Well
!Springbrook Springs
Renton City Limits
Potential Annexation Area
Groundwater Protection Areas Date: 01/09/2014
µ0 1 2Miles
PROJECT
SITE
SUNSET HIGHLANDS MIXED USE 2190210.10
AQUIFER PROTECTION MAP
A-7
Preliminary
Technical Information Report
Sunset Highlands Mixed Use
2190210.10
Appendix B
Not Used
Preliminary
Technical Information Report
Sunset Highlands Mixed Use
2190210.10
Appendix C
Hydrologic Analysis
C-1.................... Drainage Basin Map
C-2.................... Preliminary WWHM Report
UP
UP
UP NE SUNSET BLVDSTORM CHAMBERDETENTION SYSTEMPERVIOUSCONCRETE40'BUFFERBIORETENTIONW
14"FIR
16"FIR
24"FIR
12"FIR
20"FIR
16"FIR
30"FIR
16"FIR
CATCH BASINRIM 400.1312" CONC SW 397.30 IE177.5 LF
SANITARY SEWER MANHOLE
RIM 396.32
8" PVC S 393.35 IE
8" PVC SE 393.38 IE
8" PVC N 393.27 IE
303.5 LF
WF A3
WF A5
WF A7
WF A8
WF AA8
WF AA6
WF AA5
WF AA2 WF AA1
ROCK
E
R
Y
ROCK
E
R
Y
ROCKERY
-
-
-
--5' HOG WIRE FENCE6' CY
C
L
O
N
E
F
E
N
C
E
LSPVLSLSLS
WF AA7
WF AA4
WF AA1
M ----WATER VALVE WATER MANHOLEASPHALT----------------
-
-
-
-
-
-
-
-----
-
--------------
-
-
-
ASPHALT ASPHALTASPHALTASPHALTGRAVELASPHALT-SIDEWALK
48" P
o
pl
a
r
24" CEDAR
30" Fir
18" MAPLE
30" FIR
WF
A
1
WF A2
WF A6
WF AA3
CATCH BASIN12" CONC NE 394.86 IE12" CONC N 394.84 IE12" CONC SW 394.91 IE SANITARY SEWERMANHOLERIM 400.4312" CONC NE 388.08 IE8" PVC S 388.91 IE12" CONC SW 388.08 IECATCH BASINRIM 399.9312" CONC NE 395.33 IE12" CONC SW 395.21 IESANITARY SEWER12" CONC NE 386.00 IE
12" CONC SW 385.95 IE
SANITARY SEWERMANHOLERIM 400.7112" CONC NE 388.80IE12" CONC SW 388.61IE >SB SIGNAL BOX SBTV
EXISTI
N
G
S
T
R
E
A
M
N63°57'27"E 1423.14' (M)1423.21' (ST)595.07' (C)595.10' (ST)S26°02'33"E 45.00'
48" CMP CULVERT
389.11 IE
8" CONCRETE CULVERT
393.56 IE
48" CMP CULVERT
388.89 IE 20' SEWER EASEMENTBIORETENTIONBASINLIMITSWQ SUBBASINLIMITSNGRAPHIC SCALE030601" = 30 FEET15Civil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsSUNSET HIGHLANDS MIXED USE2190210.10Q:\2019\2190210\10_CIV\CAD\EXHIBITS\Developed Basin Map.dwgPROPOSED BASIN AREASAREAROAD0.30 ACRESROOF0.19 ACRESPERMEABLE PAVING*0.07 ACRESSIDEWALK0.02 ACRESLAWN0.16 ACRESTOTAL0.75 ACRES* PERMEABLE PAVING MODELING CREDIT IS 50%LAWN AND 50% ROADSTORMWATERREQUIREDPROVIDEDDETENTION0.218 AC-FT(9,504 CF)0.218 AC-FT(9,506 CF)BIORETENTION1,056 SF1,180 SFWATERQUALITYSUBBASINWATERQUALITYSUBBASIN
WWHM2012
PROJECT REPORT
Sunset Highlands Mixed Use 11/8/2019 1:21:34 PM Page 2
General Model Information
Project Name:Sunset Highlands Mixed Use
Site Name:Sunset Highlands Mixed Use
Site Address:
City:
Report Date:11/8/2019
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.167
Version Date:2018/03/08
Version:4.2.14
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
Sunset Highlands Mixed Use 11/8/2019 1:21:34 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Predeveloped Basin
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 0.7
Pervious Total 0.7
Impervious Land Use acre
Impervious Total 0
Basin Total 0.7
Element Flows To:
Surface Interflow Groundwater
Sunset Highlands Mixed Use 11/8/2019 1:21:34 PM Page 4
Mitigated Land Use
Roof and Pervious Pave
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.04
Pervious Total 0.04
Impervious Land Use acre
ROADS FLAT 0.03
ROOF TOPS FLAT 0.19
Impervious Total 0.22
Basin Total 0.26
Element Flows To:
Surface Interflow Groundwater
Detention Vault Detention Vault
Sunset Highlands Mixed Use 11/8/2019 1:21:34 PM Page 5
Water Quality
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.16
Pervious Total 0.16
Impervious Land Use acre
ROADS FLAT 0.3
SIDEWALKS FLAT 0.02
Impervious Total 0.32
Basin Total 0.48
Element Flows To:
Surface Interflow Groundwater
Surface `Surface `
Sunset Highlands Mixed Use 11/8/2019 1:21:34 PM Page 6
Routing Elements
Predeveloped Routing
Sunset Highlands Mixed Use 11/8/2019 1:21:34 PM Page 7
Mitigated Routing
Detention Vault
Width:33 ft.
Length:111 ft.
Depth:4 ft.
Discharge Structure
Riser Height:3 ft.
Riser Diameter:18 in.
Notch Type:Rectangular
Notch Width:0.011 ft.
Notch Height:1.350 ft.
Orifice 1 Diameter:0.64034 in.Elevation:0 ft.
Element Flows To:
Outlet 1 Outlet 2
Vault Hydraulic Table
Stage(feet)Area(ac.)Volume(ac-ft.)Discharge(cfs)Infilt(cfs)
0.0000 0.084 0.000 0.000 0.000
0.0444 0.084 0.003 0.002 0.000
0.0889 0.084 0.007 0.003 0.000
0.1333 0.084 0.011 0.004 0.000
0.1778 0.084 0.014 0.004 0.000
0.2222 0.084 0.018 0.005 0.000
0.2667 0.084 0.022 0.005 0.000
0.3111 0.084 0.026 0.006 0.000
0.3556 0.084 0.029 0.006 0.000
0.4000 0.084 0.033 0.007 0.000
0.4444 0.084 0.037 0.007 0.000
0.4889 0.084 0.041 0.007 0.000
0.5333 0.084 0.044 0.008 0.000
0.5778 0.084 0.048 0.008 0.000
0.6222 0.084 0.052 0.008 0.000
0.6667 0.084 0.056 0.009 0.000
0.7111 0.084 0.059 0.009 0.000
0.7556 0.084 0.063 0.009 0.000
0.8000 0.084 0.067 0.010 0.000
0.8444 0.084 0.071 0.010 0.000
0.8889 0.084 0.074 0.010 0.000
0.9333 0.084 0.078 0.010 0.000
0.9778 0.084 0.082 0.011 0.000
1.0222 0.084 0.086 0.011 0.000
1.0667 0.084 0.089 0.011 0.000
1.1111 0.084 0.093 0.011 0.000
1.1556 0.084 0.097 0.012 0.000
1.2000 0.084 0.100 0.012 0.000
1.2444 0.084 0.104 0.012 0.000
1.2889 0.084 0.108 0.012 0.000
1.3333 0.084 0.112 0.012 0.000
1.3778 0.084 0.115 0.013 0.000
1.4222 0.084 0.119 0.013 0.000
1.4667 0.084 0.123 0.013 0.000
1.5111 0.084 0.127 0.013 0.000
1.5556 0.084 0.130 0.013 0.000
1.6000 0.084 0.134 0.014 0.000
Sunset Highlands Mixed Use 11/8/2019 1:21:34 PM Page 8
1.6444 0.084 0.138 0.014 0.000
1.6889 0.084 0.142 0.014 0.000
1.7333 0.084 0.145 0.015 0.000
1.7778 0.084 0.149 0.016 0.000
1.8222 0.084 0.153 0.017 0.000
1.8667 0.084 0.157 0.018 0.000
1.9111 0.084 0.160 0.020 0.000
1.9556 0.084 0.164 0.021 0.000
2.0000 0.084 0.168 0.022 0.000
2.0444 0.084 0.171 0.024 0.000
2.0889 0.084 0.175 0.025 0.000
2.1333 0.084 0.179 0.027 0.000
2.1778 0.084 0.183 0.029 0.000
2.2222 0.084 0.186 0.030 0.000
2.2667 0.084 0.190 0.032 0.000
2.3111 0.084 0.194 0.034 0.000
2.3556 0.084 0.198 0.035 0.000
2.4000 0.084 0.201 0.037 0.000
2.4444 0.084 0.205 0.039 0.000
2.4889 0.084 0.209 0.041 0.000
2.5333 0.084 0.213 0.042 0.000
2.5778 0.084 0.216 0.044 0.000
2.6222 0.084 0.220 0.046 0.000
2.6667 0.084 0.224 0.048 0.000
2.7111 0.084 0.228 0.050 0.000
2.7556 0.084 0.231 0.052 0.000
2.8000 0.084 0.235 0.054 0.000
2.8444 0.084 0.239 0.057 0.000
2.8889 0.084 0.242 0.059 0.000
2.9333 0.084 0.246 0.061 0.000
2.9778 0.084 0.250 0.064 0.000
3.0222 0.084 0.254 0.118 0.000
3.0667 0.084 0.257 0.339 0.000
3.1111 0.084 0.261 0.653 0.000
3.1556 0.084 0.265 1.035 0.000
3.2000 0.084 0.269 1.470 0.000
3.2444 0.084 0.272 1.943 0.000
3.2889 0.084 0.276 2.440 0.000
3.3333 0.084 0.280 2.948 0.000
3.3778 0.084 0.284 3.452 0.000
3.4222 0.084 0.287 3.938 0.000
3.4667 0.084 0.291 4.392 0.000
3.5111 0.084 0.295 4.804 0.000
3.5556 0.084 0.299 5.164 0.000
3.6000 0.084 0.302 5.468 0.000
3.6444 0.084 0.306 5.716 0.000
3.6889 0.084 0.310 5.916 0.000
3.7333 0.084 0.313 6.081 0.000
3.7778 0.084 0.317 6.317 0.000
3.8222 0.084 0.321 6.493 0.000
3.8667 0.084 0.325 6.665 0.000
3.9111 0.084 0.328 6.832 0.000
3.9556 0.084 0.332 6.995 0.000
4.0000 0.084 0.336 7.154 0.000
4.0444 0.084 0.340 7.310 0.000
4.0889 0.000 0.000 7.463 0.000
Sunset Highlands Mixed Use 11/8/2019 1:21:34 PM Page 9
`
Bottom Length: 33.00 ft.
Bottom Width: 32.00 ft.
Material thickness of first layer: 1.5
Material type for first layer: SMMWW 12 in/hr
Material thickness of second layer: 0
Material type for second layer: Sand
Material thickness of third layer: 0
Material type for third layer: GRAVEL
Infiltration On
Infiltration rate:0.4
Infiltration safety factor:1
Total Volume Infiltrated (ac-ft.):73.227
Total Volume Through Riser (ac-ft.):7.108
Total Volume Through Facility (ac-ft.):80.335
Percent Infiltrated:91.15
Total Precip Applied to Facility:5.708
Total Evap From Facility:2.436
Underdrain not used
Discharge Structure
Riser Height:0.5 ft.
Riser Diameter:12 in.
Element Flows To:
Outlet 1 Outlet 2
Detention Vault
Bioretention Hydraulic Table
Stage(feet)Area(ac.)Volume(ac-ft.)Discharge(cfs)Infilt(cfs)
0.0000 0.0311 0.0000 0.0000 0.0000
0.0275 0.0310 0.0003 0.0000 0.0000
0.0549 0.0309 0.0006 0.0000 0.0000
0.0824 0.0307 0.0009 0.0001 0.0001
0.1099 0.0306 0.0012 0.0001 0.0001
0.1374 0.0305 0.0015 0.0002 0.0002
0.1648 0.0304 0.0019 0.0003 0.0003
0.1923 0.0302 0.0022 0.0005 0.0005
0.2198 0.0301 0.0025 0.0006 0.0006
0.2473 0.0300 0.0028 0.0009 0.0009
0.2747 0.0299 0.0031 0.0011 0.0011
0.3022 0.0297 0.0034 0.0014 0.0014
0.3297 0.0296 0.0038 0.0017 0.0017
0.3571 0.0295 0.0041 0.0021 0.0021
0.3846 0.0294 0.0044 0.0025 0.0025
0.4121 0.0292 0.0047 0.0030 0.0030
0.4396 0.0291 0.0051 0.0035 0.0035
0.4670 0.0290 0.0054 0.0040 0.0040
0.4945 0.0289 0.0057 0.0047 0.0047
0.5220 0.0287 0.0061 0.0053 0.0053
0.5495 0.0286 0.0064 0.0060 0.0060
0.5769 0.0285 0.0067 0.0068 0.0068
0.6044 0.0284 0.0071 0.0077 0.0077
0.6319 0.0282 0.0074 0.0085 0.0085
0.6593 0.0281 0.0078 0.0095 0.0095
0.6868 0.0280 0.0081 0.0098 0.0098
0.7143 0.0279 0.0084 0.0098 0.0098
0.7418 0.0277 0.0088 0.0098 0.0098
Sunset Highlands Mixed Use 11/8/2019 1:21:34 PM Page 10
0.7692 0.0276 0.0091 0.0098 0.0098
0.7967 0.0275 0.0095 0.0098 0.0098
0.8242 0.0274 0.0098 0.0098 0.0098
0.8516 0.0272 0.0102 0.0098 0.0098
0.8791 0.0271 0.0105 0.0098 0.0098
0.9066 0.0270 0.0109 0.0098 0.0098
0.9341 0.0269 0.0113 0.0098 0.0098
0.9615 0.0267 0.0116 0.0098 0.0098
0.9890 0.0266 0.0120 0.0098 0.0098
1.0165 0.0265 0.0123 0.0098 0.0098
1.0440 0.0264 0.0127 0.0098 0.0098
1.0714 0.0262 0.0131 0.0098 0.0098
1.0989 0.0261 0.0134 0.0098 0.0098
1.1264 0.0260 0.0138 0.0098 0.0098
1.1538 0.0259 0.0142 0.0098 0.0098
1.1813 0.0257 0.0145 0.0098 0.0098
1.2088 0.0256 0.0149 0.0098 0.0098
1.2363 0.0255 0.0153 0.0098 0.0098
1.2637 0.0254 0.0157 0.0098 0.0098
1.2912 0.0252 0.0160 0.0098 0.0098
1.3187 0.0251 0.0164 0.0098 0.0098
1.3462 0.0250 0.0168 0.0098 0.0098
1.3736 0.0249 0.0172 0.0098 0.0098
1.4011 0.0247 0.0176 0.0098 0.0098
1.4286 0.0246 0.0180 0.0098 0.0098
1.4560 0.0245 0.0183 0.0098 0.0098
1.4835 0.0244 0.0187 0.0098 0.0098
1.5000 0.0242 0.0190 0.0098 0.0098
Bioretention Hydraulic Table
Stage(feet)Area(ac.)Volume(ac-ft.)Discharge(cfs)To Amended(cfs)Infilt(cfs)
1.5000 0.0311 0.0190 0.0000 0.2987 0.0000
1.5275 0.0312 0.0198 0.0000 0.2987 0.0000
1.5549 0.0313 0.0207 0.0000 0.3041 0.0000
1.5824 0.0314 0.0215 0.0000 0.3095 0.0000
1.6099 0.0316 0.0224 0.0000 0.3148 0.0000
1.6374 0.0317 0.0233 0.0000 0.3202 0.0000
1.6648 0.0318 0.0241 0.0000 0.3256 0.0000
1.6923 0.0319 0.0250 0.0000 0.3309 0.0000
1.7198 0.0321 0.0259 0.0000 0.3363 0.0000
1.7473 0.0322 0.0268 0.0000 0.3417 0.0000
1.7747 0.0323 0.0277 0.0000 0.3471 0.0000
1.8022 0.0324 0.0286 0.0000 0.3524 0.0000
1.8297 0.0326 0.0295 0.0000 0.3578 0.0000
1.8571 0.0327 0.0304 0.0000 0.3632 0.0000
1.8846 0.0328 0.0313 0.0000 0.3685 0.0000
1.9121 0.0329 0.0322 0.0000 0.3739 0.0000
1.9396 0.0331 0.0331 0.0000 0.3793 0.0000
1.9670 0.0332 0.0340 0.0000 0.3847 0.0000
1.9945 0.0333 0.0349 0.0000 0.3900 0.0000
2.0220 0.0334 0.0358 0.0000 0.3954 0.0000
2.0495 0.0336 0.0367 0.0000 0.4008 0.0000
2.0769 0.0337 0.0376 0.0000 0.4062 0.0000
2.1044 0.0338 0.0386 0.0000 0.4115 0.0000
2.1319 0.0339 0.0395 0.0000 0.4169 0.0000
2.1593 0.0341 0.0404 0.0000 0.4223 0.0000
2.1868 0.0342 0.0414 0.0000 0.4276 0.0000
2.2143 0.0343 0.0423 0.0000 0.4330 0.0000
Sunset Highlands Mixed Use 11/8/2019 1:21:34 PM Page 11
2.2418 0.0344 0.0433 0.0000 0.4384 0.0000
2.2692 0.0346 0.0442 0.0000 0.4438 0.0000
2.2967 0.0347 0.0452 0.0000 0.4491 0.0000
2.3242 0.0348 0.0461 0.0000 0.4545 0.0000
2.3516 0.0349 0.0471 0.0000 0.4599 0.0000
2.3791 0.0351 0.0480 0.0000 0.4653 0.0000
2.4066 0.0352 0.0490 0.0000 0.4706 0.0000
2.4341 0.0353 0.0500 0.0000 0.4760 0.0000
2.4615 0.0354 0.0509 0.0000 0.4814 0.0000
2.4890 0.0356 0.0519 0.0000 0.4867 0.0000
2.5000 0.0356 0.0523 0.0000 0.4889 0.0000
Sunset Highlands Mixed Use 11/8/2019 1:21:34 PM Page 12
Surface `
Element Flows To:
Outlet 1 Outlet 2
Detention Vault `
Sunset Highlands Mixed Use 11/8/2019 1:21:34 PM Page 13
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.7
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.2
Total Impervious Area:0.54
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.027346
5 year 0.045084
10 year 0.058549
25 year 0.077367
50 year 0.092629
100 year 0.108912
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.012299
5 year 0.020184
10 year 0.027161
25 year 0.038409
50 year 0.048859
100 year 0.06137
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.033 0.009
1950 0.039 0.012
1951 0.056 0.038
1952 0.019 0.007
1953 0.016 0.009
1954 0.023 0.011
1955 0.035 0.012
1956 0.029 0.013
1957 0.026 0.011
1958 0.026 0.011
Sunset Highlands Mixed Use 11/8/2019 1:22:13 PM Page 14
1959 0.023 0.010
1960 0.044 0.029
1961 0.022 0.011
1962 0.015 0.007
1963 0.021 0.011
1964 0.027 0.010
1965 0.020 0.012
1966 0.018 0.009
1967 0.042 0.012
1968 0.024 0.009
1969 0.023 0.009
1970 0.020 0.010
1971 0.025 0.012
1972 0.043 0.018
1973 0.020 0.011
1974 0.023 0.011
1975 0.033 0.012
1976 0.023 0.011
1977 0.008 0.009
1978 0.019 0.011
1979 0.012 0.007
1980 0.061 0.032
1981 0.018 0.009
1982 0.042 0.022
1983 0.029 0.012
1984 0.018 0.007
1985 0.011 0.010
1986 0.046 0.014
1987 0.042 0.021
1988 0.018 0.008
1989 0.011 0.008
1990 0.117 0.027
1991 0.053 0.032
1992 0.022 0.011
1993 0.021 0.009
1994 0.009 0.006
1995 0.028 0.012
1996 0.067 0.038
1997 0.053 0.040
1998 0.019 0.009
1999 0.073 0.019
2000 0.020 0.012
2001 0.005 0.007
2002 0.028 0.018
2003 0.039 0.009
2004 0.045 0.047
2005 0.030 0.012
2006 0.031 0.011
2007 0.087 0.060
2008 0.092 0.047
2009 0.041 0.014
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.1171 0.0601
2 0.0921 0.0473
3 0.0866 0.0467
Sunset Highlands Mixed Use 11/8/2019 1:22:13 PM Page 15
4 0.0729 0.0400
5 0.0668 0.0384
6 0.0612 0.0375
7 0.0562 0.0318
8 0.0528 0.0315
9 0.0527 0.0293
10 0.0457 0.0268
11 0.0451 0.0215
12 0.0436 0.0208
13 0.0429 0.0189
14 0.0425 0.0183
15 0.0420 0.0178
16 0.0416 0.0144
17 0.0414 0.0141
18 0.0391 0.0132
19 0.0389 0.0122
20 0.0355 0.0121
21 0.0335 0.0121
22 0.0326 0.0121
23 0.0307 0.0120
24 0.0296 0.0120
25 0.0292 0.0120
26 0.0289 0.0117
27 0.0284 0.0115
28 0.0284 0.0115
29 0.0268 0.0115
30 0.0265 0.0112
31 0.0261 0.0110
32 0.0249 0.0109
33 0.0243 0.0109
34 0.0234 0.0108
35 0.0232 0.0108
36 0.0230 0.0108
37 0.0229 0.0108
38 0.0225 0.0106
39 0.0220 0.0106
40 0.0218 0.0099
41 0.0214 0.0099
42 0.0213 0.0098
43 0.0204 0.0096
44 0.0203 0.0095
45 0.0199 0.0094
46 0.0197 0.0093
47 0.0195 0.0093
48 0.0188 0.0093
49 0.0188 0.0089
50 0.0184 0.0089
51 0.0181 0.0088
52 0.0178 0.0087
53 0.0177 0.0086
54 0.0159 0.0084
55 0.0148 0.0083
56 0.0121 0.0073
57 0.0113 0.0072
58 0.0108 0.0069
59 0.0087 0.0066
60 0.0080 0.0065
61 0.0053 0.0058
Sunset Highlands Mixed Use 11/8/2019 1:22:13 PM Page 16
Sunset Highlands Mixed Use 11/8/2019 1:22:13 PM Page 17
Duration Flows
The Facility PASSED
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0137 18450 4785 25 Pass
0.0145 16091 3401 21 Pass
0.0153 14328 2979 20 Pass
0.0161 12694 2697 21 Pass
0.0169 11182 2398 21 Pass
0.0177 9882 2162 21 Pass
0.0185 8825 1968 22 Pass
0.0193 7843 1795 22 Pass
0.0201 7005 1652 23 Pass
0.0209 6288 1528 24 Pass
0.0216 5679 1434 25 Pass
0.0224 5172 1369 26 Pass
0.0232 4697 1296 27 Pass
0.0240 4278 1213 28 Pass
0.0248 3910 1132 28 Pass
0.0256 3527 1042 29 Pass
0.0264 3183 955 30 Pass
0.0272 2862 865 30 Pass
0.0280 2594 794 30 Pass
0.0288 2353 713 30 Pass
0.0296 2138 649 30 Pass
0.0304 1951 595 30 Pass
0.0312 1796 516 28 Pass
0.0320 1669 476 28 Pass
0.0328 1514 446 29 Pass
0.0336 1343 417 31 Pass
0.0344 1223 391 31 Pass
0.0352 1123 366 32 Pass
0.0360 1042 341 32 Pass
0.0368 969 313 32 Pass
0.0376 910 278 30 Pass
0.0384 838 259 30 Pass
0.0392 766 234 30 Pass
0.0400 704 210 29 Pass
0.0408 635 187 29 Pass
0.0416 570 169 29 Pass
0.0424 488 155 31 Pass
0.0432 425 141 33 Pass
0.0440 376 127 33 Pass
0.0448 341 113 33 Pass
0.0456 307 98 31 Pass
0.0464 270 80 29 Pass
0.0472 235 62 26 Pass
0.0480 196 55 28 Pass
0.0488 171 52 30 Pass
0.0496 145 50 34 Pass
0.0504 125 46 36 Pass
0.0512 107 44 41 Pass
0.0520 95 43 45 Pass
0.0528 84 40 47 Pass
0.0535 71 37 52 Pass
0.0543 61 35 57 Pass
0.0551 55 32 58 Pass
Sunset Highlands Mixed Use 11/8/2019 1:22:13 PM Page 18
0.0559 45 28 62 Pass
0.0567 40 22 55 Pass
0.0575 37 20 54 Pass
0.0583 35 17 48 Pass
0.0591 29 14 48 Pass
0.0599 25 7 28 Pass
0.0607 22 0 0 Pass
0.0615 17 0 0 Pass
0.0623 15 0 0 Pass
0.0631 11 0 0 Pass
0.0639 9 0 0 Pass
0.0647 8 0 0 Pass
0.0655 8 0 0 Pass
0.0663 8 0 0 Pass
0.0671 7 0 0 Pass
0.0679 7 0 0 Pass
0.0687 7 0 0 Pass
0.0695 7 0 0 Pass
0.0703 7 0 0 Pass
0.0711 7 0 0 Pass
0.0719 7 0 0 Pass
0.0727 6 0 0 Pass
0.0735 5 0 0 Pass
0.0743 5 0 0 Pass
0.0751 5 0 0 Pass
0.0759 4 0 0 Pass
0.0767 4 0 0 Pass
0.0775 4 0 0 Pass
0.0783 4 0 0 Pass
0.0791 4 0 0 Pass
0.0799 4 0 0 Pass
0.0807 4 0 0 Pass
0.0815 4 0 0 Pass
0.0823 4 0 0 Pass
0.0831 4 0 0 Pass
0.0839 3 0 0 Pass
0.0847 3 0 0 Pass
0.0855 3 0 0 Pass
0.0862 3 0 0 Pass
0.0870 2 0 0 Pass
0.0878 2 0 0 Pass
0.0886 2 0 0 Pass
0.0894 2 0 0 Pass
0.0902 2 0 0 Pass
0.0910 2 0 0 Pass
0.0918 2 0 0 Pass
0.0926 1 0 0 Pass
Sunset Highlands Mixed Use 11/8/2019 1:22:13 PM Page 19
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0 acre-feet
On-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Off-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Sunset Highlands Mixed Use 11/8/2019 1:22:13 PM Page 20
LID Report
Sunset Highlands Mixed Use 11/8/2019 1:22:40 PM Page 21
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
Sunset Highlands Mixed Use 11/8/2019 1:22:40 PM Page 22
Appendix
Predeveloped Schematic
Sunset Highlands Mixed Use 11/8/2019 1:22:42 PM Page 23
Mitigated Schematic
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 24
Predeveloped UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 Sunset Highlands Mixed Use.wdm
MESSU 25 PreSunset Highlands Mixed Use.MES
27 PreSunset Highlands Mixed Use.L61
28 PreSunset Highlands Mixed Use.L62
30 POCSunset Highlands Mixed Use1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 10
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Predeveloped Basin MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
10 C, Forest, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
10 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
10 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 25
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
10 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
10 0 4.5 0.08 400 0.05 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
10 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
10 0.2 0.5 0.35 6 0.5 0.7
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
10 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
END IWAT-STATE1
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 26
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Predeveloped Basin***
PERLND 10 0.7 COPY 501 12
PERLND 10 0.7 COPY 501 13
******Routing******
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
END SPEC-ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1.167 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1.167 IMPLND 1 999 EXTNL PREC
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 27
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 501 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
END MASS-LINK
END RUN
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 28
Mitigated UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 Sunset Highlands Mixed Use.wdm
MESSU 25 MitSunset Highlands Mixed Use.MES
27 MitSunset Highlands Mixed Use.L61
28 MitSunset Highlands Mixed Use.L62
30 POCSunset Highlands Mixed Use1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 16
IMPLND 1
IMPLND 4
IMPLND 8
GENER 2
RCHRES 1
RCHRES 2
RCHRES 3
COPY 1
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Detention Vault MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
2 24
END OPCODE
PARM
# # K ***
2 0.
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
16 C, Lawn, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 29
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
16 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
16 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
16 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
16 0 4.5 0.03 400 0.05 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
16 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
16 0.1 0.25 0.25 6 0.5 0.25
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
16 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
1 ROADS/FLAT 1 1 1 27 0
4 ROOF TOPS/FLAT 1 1 1 27 0
8 SIDEWALKS/FLAT 1 1 1 27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
1 0 0 1 0 0 0
4 0 0 1 0 0 0
8 0 0 1 0 0 0
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
1 0 0 4 0 0 0 1 9
4 0 0 4 0 0 0 1 9
8 0 0 4 0 0 0 1 9
END PRINT-INFO
IWAT-PARM1
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 30
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
1 0 0 0 0 0
4 0 0 0 0 0
8 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
1 400 0.01 0.1 0.1
4 400 0.01 0.1 0.1
8 400 0.01 0.1 0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
1 0 0
4 0 0
8 0 0
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
1 0 0
4 0 0
8 0 0
END IWAT-STATE1
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Roof and Pervious Pave***
PERLND 16 0.04 RCHRES 3 2
PERLND 16 0.04 RCHRES 3 3
IMPLND 1 0.03 RCHRES 3 5
IMPLND 4 0.19 RCHRES 3 5
Water Quality***
PERLND 16 0.16 RCHRES 1 2
PERLND 16 0.16 RCHRES 1 3
IMPLND 1 0.3 RCHRES 1 5
IMPLND 8 0.02 RCHRES 1 5
******Routing******
PERLND 16 0.04 COPY 1 12
IMPLND 1 0.03 COPY 1 15
IMPLND 4 0.19 COPY 1 15
PERLND 16 0.04 COPY 1 13
RCHRES 2 1 RCHRES 3 7
RCHRES 2 COPY 1 17
RCHRES 1 1 RCHRES 3 7
RCHRES 1 COPY 1 17
RCHRES 1 1 RCHRES 2 8
RCHRES 3 1 COPY 501 16
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
GENER 2 OUTPUT TIMSER .0011111 RCHRES 1 EXTNL OUTDGT 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 31
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
1 Surface ` 3 1 1 1 28 0 1
2 ` 2 1 1 1 28 0 1
3 Detention Vault 1 1 1 1 28 0 1
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
1 1 0 0 0 0 0 0 0 0 0
2 1 0 0 0 0 0 0 0 0 0
3 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
1 4 0 0 0 0 0 0 0 0 0 1 9
2 4 0 0 0 0 0 0 0 0 0 1 9
3 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
1 0 1 0 0 4 5 6 0 0 0 1 0 0 0 2 1 2 2 2
2 0 1 0 0 4 5 0 0 0 0 0 0 0 0 2 2 2 2 2
3 0 1 0 0 4 0 0 0 0 0 0 0 0 0 2 2 2 2 2
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
1 1 0.01 0.0 0.0 0.5 0.0
2 2 0.01 0.0 0.0 0.5 0.0
3 3 0.02 0.0 0.0 0.5 0.0
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
1 0 4.0 5.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2 0 4.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3 0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
*** User-Defined Variable Quantity Lines
*** addr
*** <------>
*** kwd varnam optyp opn vari s1 s2 s3 tp multiply lc ls ac as agfn ***
<****> <----> <----> <-> <----><-><-><-><-><--------> <><-> <><-> <--> ***
UVQUAN vol2 RCHRES 2 VOL 4
UVQUAN v2m2 GLOBAL WORKSP 1 3
UVQUAN vpo2 GLOBAL WORKSP 2 3
UVQUAN v2d2 GENER 2 K 1 3
*** User-Defined Target Variable Names
*** addr or addr or
*** <------> <------>
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 32
*** kwd varnam ct vari s1 s2 s3 frac oper vari s1 s2 s3 frac oper
<****> <----><-> <----><-><-><-> <---> <--> <----><-><-><-> <---> <-->
UVNAME v2m2 1 WORKSP 1 1.0 QUAN
UVNAME vpo2 1 WORKSP 2 1.0 QUAN
UVNAME v2d2 1 K 1 1.0 QUAN
*** opt foplop dcdts yr mo dy hr mn d t vnam s1 s2 s3 ac quantity tc ts rp
<****><-><--><><-><--> <> <> <> <><><> <----><-><-><-><-><--------> <> <-><->
GENER 2 v2m2 = 775.
*** Compute remaining available pore space
GENER 2 vpo2 = v2m2
GENER 2 vpo2 -= vol2
*** Check to see if VPORA goes negative; if so set VPORA = 0.0
IF (vpo2 < 0.0) THEN
GENER 2 vpo2 = 0.0
END IF
*** Infiltration volume
GENER 2 v2d2 = vpo2
END SPEC-ACTIONS
FTABLES
FTABLE 3
92 4
Depth Area Volume Outflow1 Velocity Travel Time***
(ft) (acres) (acre-ft) (cfs) (ft/sec) (Minutes)***
0.000000 0.084091 0.000000 0.000000
0.044444 0.084091 0.003737 0.002346
0.088889 0.084091 0.007475 0.003317
0.133333 0.084091 0.011212 0.004063
0.177778 0.084091 0.014949 0.004692
0.222222 0.084091 0.018687 0.005245
0.266667 0.084091 0.022424 0.005746
0.311111 0.084091 0.026162 0.006206
0.355556 0.084091 0.029899 0.006635
0.400000 0.084091 0.033636 0.007037
0.444444 0.084091 0.037374 0.007418
0.488889 0.084091 0.041111 0.007780
0.533333 0.084091 0.044848 0.008126
0.577778 0.084091 0.048586 0.008458
0.622222 0.084091 0.052323 0.008777
0.666667 0.084091 0.056061 0.009085
0.711111 0.084091 0.059798 0.009383
0.755556 0.084091 0.063535 0.009672
0.800000 0.084091 0.067273 0.009952
0.844444 0.084091 0.071010 0.010225
0.888889 0.084091 0.074747 0.010491
0.933333 0.084091 0.078485 0.010750
0.977778 0.084091 0.082222 0.011003
1.022222 0.084091 0.085960 0.011250
1.066667 0.084091 0.089697 0.011492
1.111111 0.084091 0.093434 0.011729
1.155556 0.084091 0.097172 0.011961
1.200000 0.084091 0.100909 0.012189
1.244444 0.084091 0.104646 0.012413
1.288889 0.084091 0.108384 0.012632
1.333333 0.084091 0.112121 0.012848
1.377778 0.084091 0.115859 0.013061
1.422222 0.084091 0.119596 0.013270
1.466667 0.084091 0.123333 0.013476
1.511111 0.084091 0.127071 0.013678
1.555556 0.084091 0.130808 0.013878
1.600000 0.084091 0.134545 0.014075
1.644444 0.084091 0.138283 0.014269
1.688889 0.084091 0.142020 0.014736
1.733333 0.084091 0.145758 0.015511
1.777778 0.084091 0.149495 0.016461
1.822222 0.084091 0.153232 0.017542
1.866667 0.084091 0.156970 0.018729
1.911111 0.084091 0.160707 0.020007
1.955556 0.084091 0.164444 0.021361
2.000000 0.084091 0.168182 0.022781
2.044444 0.084091 0.171919 0.024259
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 33
2.088889 0.084091 0.175657 0.025788
2.133333 0.084091 0.179394 0.027361
2.177778 0.084091 0.183131 0.028973
2.222222 0.084091 0.186869 0.030618
2.266667 0.084091 0.190606 0.032292
2.311111 0.084091 0.194343 0.033992
2.355556 0.084091 0.198081 0.035712
2.400000 0.084091 0.201818 0.037450
2.444444 0.084091 0.205556 0.039202
2.488889 0.084091 0.209293 0.040965
2.533333 0.084091 0.213030 0.042737
2.577778 0.084091 0.216768 0.044514
2.622222 0.084091 0.220505 0.046294
2.666667 0.084091 0.224242 0.048196
2.711111 0.084091 0.227980 0.050338
2.755556 0.084091 0.231717 0.052521
2.800000 0.084091 0.235455 0.054743
2.844444 0.084091 0.239192 0.057005
2.888889 0.084091 0.242929 0.059306
2.933333 0.084091 0.246667 0.061644
2.977778 0.084091 0.250404 0.064020
3.022222 0.084091 0.254141 0.118030
3.066667 0.084091 0.257879 0.339130
3.111111 0.084091 0.261616 0.653381
3.155556 0.084091 0.265354 1.035716
3.200000 0.084091 0.269091 1.470318
3.244444 0.084091 0.272828 1.943301
3.288889 0.084091 0.276566 2.440852
3.333333 0.084091 0.280303 2.948784
3.377778 0.084091 0.284040 3.452683
3.422222 0.084091 0.287778 3.938390
3.466667 0.084091 0.291515 4.392693
3.511111 0.084091 0.295253 4.804191
3.555556 0.084091 0.298990 5.164284
3.600000 0.084091 0.302727 5.468282
3.644444 0.084091 0.306465 5.716611
3.688889 0.084091 0.310202 5.916115
3.733333 0.084091 0.313939 6.081438
3.777778 0.084091 0.317677 6.317430
3.822222 0.084091 0.321414 6.493643
3.866667 0.084091 0.325152 6.665158
3.911111 0.084091 0.328889 6.832330
3.955556 0.084091 0.332626 6.995476
4.000000 0.084091 0.336364 7.154871
4.044444 0.084091 0.340101 7.310764
END FTABLE 3
FTABLE 2
56 5
Depth Area Volume Outflow1 Outflow2 Velocity Travel Time***
(ft) (acres) (acre-ft) (cfs) (cfs) (ft/sec) (Minutes)***
0.000000 0.031061 0.000000 0.000000 0.000000
0.027473 0.030986 0.000305 0.000000 0.000000
0.054945 0.030861 0.000612 0.000000 0.000031
0.082418 0.030736 0.000921 0.000000 0.000069
0.109890 0.030611 0.001231 0.000000 0.000129
0.137363 0.030486 0.001542 0.000000 0.000213
0.164835 0.030361 0.001856 0.000000 0.000326
0.192308 0.030236 0.002170 0.000000 0.000469
0.219780 0.030112 0.002487 0.000000 0.000644
0.247253 0.029987 0.002805 0.000000 0.000855
0.274725 0.029862 0.003124 0.000000 0.001104
0.302198 0.029737 0.003445 0.000000 0.001391
0.329670 0.029612 0.003768 0.000000 0.001720
0.357143 0.029487 0.004092 0.000000 0.002093
0.384615 0.029362 0.004418 0.000000 0.002510
0.412088 0.029237 0.004745 0.000000 0.002973
0.439560 0.029113 0.005074 0.000000 0.003485
0.467033 0.028988 0.005404 0.000000 0.004047
0.494505 0.028863 0.005736 0.000000 0.004660
0.521978 0.028738 0.006070 0.000000 0.005326
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 34
0.549451 0.028613 0.006405 0.000000 0.006047
0.576923 0.028488 0.006742 0.000000 0.006823
0.604396 0.028363 0.007080 0.000000 0.007656
0.631868 0.028238 0.007420 0.000000 0.008547
0.659341 0.028114 0.007761 0.000000 0.009499
0.686813 0.027989 0.008104 0.000000 0.009778
0.714286 0.027864 0.008449 0.000000 0.009778
0.741758 0.027739 0.008795 0.000000 0.009778
0.769231 0.027614 0.009143 0.000000 0.009778
0.796703 0.027489 0.009492 0.000000 0.009778
0.824176 0.027364 0.009843 0.000000 0.009778
0.851648 0.027239 0.010195 0.000000 0.009778
0.879121 0.027115 0.010549 0.000000 0.009778
0.906593 0.026990 0.010905 0.000000 0.009778
0.934066 0.026865 0.011262 0.000000 0.009778
0.961538 0.026740 0.011621 0.000000 0.009778
0.989011 0.026615 0.011981 0.000000 0.009778
1.016484 0.026490 0.012343 0.000000 0.009778
1.043956 0.026365 0.012706 0.000000 0.009778
1.071429 0.026240 0.013071 0.000000 0.009778
1.098901 0.026116 0.013438 0.000000 0.009778
1.126374 0.025991 0.013806 0.000000 0.009778
1.153846 0.025866 0.014175 0.000000 0.009778
1.181319 0.025741 0.014547 0.000000 0.009778
1.208791 0.025616 0.014919 0.000000 0.009778
1.236264 0.025491 0.015294 0.000000 0.009778
1.263736 0.025366 0.015670 0.000000 0.009778
1.291209 0.025241 0.016047 0.000000 0.009778
1.318681 0.025117 0.016426 0.000000 0.009778
1.346154 0.024992 0.016807 0.000000 0.009778
1.373626 0.024867 0.017189 0.000000 0.009778
1.401099 0.024742 0.017573 0.000000 0.009778
1.428571 0.024617 0.017958 0.000000 0.009778
1.456044 0.024492 0.018345 0.000000 0.009778
1.483516 0.024367 0.018734 0.000000 0.009778
1.500000 0.024242 0.039832 0.000000 0.009778
END FTABLE 2
FTABLE 1
38 6
Depth Area Volume Outflow1 Outflow2 outflow 3 Velocity Travel
Time***
(ft) (acres) (acre-ft) (cfs) (cfs) (cfs) (ft/sec)
(Minutes)***
0.000000 0.024242 0.000000 0.000000 0.000000 0.000000
0.027473 0.031185 0.000855 0.000000 0.298706 0.000000
0.054945 0.031310 0.001713 0.000000 0.304078 0.000000
0.082418 0.031435 0.002575 0.000000 0.309451 0.000000
0.109890 0.031560 0.003441 0.000000 0.314823 0.000000
0.137363 0.031685 0.004309 0.000000 0.320196 0.000000
0.164835 0.031810 0.005182 0.000000 0.325568 0.000000
0.192308 0.031935 0.006057 0.000000 0.330940 0.000000
0.219780 0.032060 0.006936 0.000000 0.336313 0.000000
0.247253 0.032184 0.007819 0.000000 0.341685 0.000000
0.274725 0.032309 0.008705 0.000000 0.347058 0.000000
0.302198 0.032434 0.009594 0.000000 0.352430 0.000000
0.329670 0.032559 0.010487 0.000000 0.357802 0.000000
0.357143 0.032684 0.011383 0.000000 0.363175 0.000000
0.384615 0.032809 0.012283 0.000000 0.368547 0.000000
0.412088 0.032934 0.013186 0.000000 0.373920 0.000000
0.439560 0.033059 0.014092 0.000000 0.379292 0.000000
0.467033 0.033183 0.015002 0.000000 0.384665 0.000000
0.494505 0.033308 0.015915 0.000000 0.390037 0.000000
0.521978 0.033433 0.016832 0.034569 0.395409 0.000000
0.549451 0.033558 0.017752 0.116539 0.400782 0.000000
0.576923 0.033683 0.018676 0.225672 0.406154 0.000000
0.604396 0.033808 0.019603 0.355486 0.411527 0.000000
0.631868 0.033933 0.020534 0.501498 0.416899 0.000000
0.659341 0.034058 0.021468 0.659695 0.422271 0.000000
0.686813 0.034182 0.022405 0.826090 0.427644 0.000000
0.714286 0.034307 0.023346 0.996598 0.433016 0.000000
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 35
0.741758 0.034432 0.024290 1.167052 0.438389 0.000000
0.769231 0.034557 0.025238 1.333311 0.443761 0.000000
0.796703 0.034682 0.026189 1.491422 0.449133 0.000000
0.824176 0.034807 0.027143 1.637810 0.454506 0.000000
0.851648 0.034932 0.028101 1.769522 0.459878 0.000000
0.879121 0.035057 0.029063 1.884482 0.465251 0.000000
0.906593 0.035181 0.030027 1.981777 0.470623 0.000000
0.934066 0.035306 0.030996 2.061968 0.475995 0.000000
0.961538 0.035431 0.031967 2.127417 0.481368 0.000000
0.989011 0.035556 0.032942 2.182633 0.486740 0.000000
1.000000 0.035606 0.033333 2.263538 0.488889 0.000000
END FTABLE 1
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1.167 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1.167 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
WDM 2 PREC ENGL 1.167 RCHRES 1 EXTNL PREC
WDM 1 EVAP ENGL 0.5 RCHRES 1 EXTNL POTEV
WDM 1 EVAP ENGL 0.76 RCHRES 2 EXTNL POTEV
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
RCHRES 3 HYDR RO 1 1 1 WDM 1000 FLOW ENGL REPL
RCHRES 3 HYDR STAGE 1 1 1 WDM 1003 STAG ENGL REPL
COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 2
PERLND PWATER SURO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 2
MASS-LINK 3
PERLND PWATER IFWO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 3
MASS-LINK 5
IMPLND IWATER SURO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 5
MASS-LINK 7
RCHRES OFLOW OVOL 1 RCHRES INFLOW IVOL
END MASS-LINK 7
MASS-LINK 8
RCHRES OFLOW OVOL 2 RCHRES INFLOW IVOL
END MASS-LINK 8
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
MASS-LINK 15
IMPLND IWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 15
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 36
MASS-LINK 16
RCHRES ROFLOW COPY INPUT MEAN
END MASS-LINK 16
MASS-LINK 17
RCHRES OFLOW OVOL 1 COPY INPUT MEAN
END MASS-LINK 17
END MASS-LINK
END RUN
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 37
Predeveloped HSPF Message File
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 38
Mitigated HSPF Message File
Sunset Highlands Mixed Use 11/8/2019 1:22:43 PM Page 39
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2019; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
Preliminary
Technical Information Report
Sunset Highlands Mixed Use
2190210.10
Appendix D
Geotechnical Engineering Report
South Sound Geotechnical Consulting
February 12, 2018
ADF Properties, LLC
15007 Woodinville Redmond Road, Suite A
Woodinville, WA 98072
Attention: Mr. Dale Fonk
Subject: Geotechnical Engineering Report
Sunset Highlands Mixed Use Development
4409 NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
Mr. Fonk,
South Sound Geotechnical Consulting (SSGC) has completed a geotechnical assessment for the planned
mixed use development at the above address. Our services have been completed in general conformance
with our proposal P17092 (dated November 27 2017) and authorized per signature of our services
agreement. Our scope of services included completion of five test pits and two infiltration tests,
laboratory testing, engineering analyses, and preparation of this report.
PROJECT INFORMATION
Mixed use development is planned on property at 4409 NE Sunset Boulevard in Renton, Washington.
The property is on the south side of the street and encompasses approximately 0.8 acres. We understand
two multi-family buildings are planned with two separate retail spaces. Residential buildings will be
three-story structures, with retail buildings anticipated to be one- to two-story structures. Buildings will
be supported on conventional spread footing foundations with concrete slab-on-grade floors. Porous
pavements are being considered to facilitate stormwater control.
SITE CONDITIONS
The property is currently vacant and covered with principally grass and weeds. It slopes gently down to
the south (from street grade of Sunset Boulevard) with overall elevations change on the order of 5 (+/-)
feet. A wetland borders the southern property boundary.
SUBSURFACE CONDITIONS
Subsurface conditions were characterized by completing five (5) test pits on the site on January 24, 2018.
Test pits were advanced to final depths between about 5 and 6 feet below existing ground surface.
Approximate locations of the explorations are shown on Figure 1, Exploration Plan. Logs of the test pits
are provided in Appendix A. A summary description of observed subgrade conditions is provided below.
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
2
Soil Conditions
Surface topsoil and/or fill was observed in all test pits and ranged in depth from about 1 to 1.5
feet at the test pit locations. We understand the site was previously developed as a single-family
residence, and therefore thicker fill sections may locally be present in other areas.
Native soil below the topsoil/fill was fine-medium sand with silt, to silty sand. These soils were in
a loose to medium dense condition and extended to depths between 2.5 to 4 feet in the test pits.
These soils are interpreted to represent alluvium outwash or reworked sandy glacial till. Below
these soils was silty sand with gravel in a medium dense to dense condition that extended to the
bottom of the test pits. This soil is considered sandy glacial till.
Groundwater Conditions
Seepage was observed in all of the test pits at depths between about 2.5 to 3.5 feet. The dense
glacial till below the upper sand is considered impermeable to vertical groundwater flow and can
cause perched groundwater conditions during the wetter seasons of the year. Groundwater levels
will fluctuate due to seasonal precipitation variations and on- and off-site drainage patterns.
Geologic Setting
Soils within the project area have been classified by the NRCS in the Soil Survey of King County
Area, Washington. Surface soils on the site are mapped as Ragnar -Indianola Association. This
soil is described as fine sandy loam and loamy fine sand that formed on glacial terraces near
streams. Glacial till (Alderwood and Everett soils) are mapped nearby the property. Upper sand
soils observed in the test pit appear to confirm the mapped soil type, with dense glacial till below.
GEOTECHNICAL DESIGN CONSIDERATIONS
The development is considered feasible based on observed soil conditions in the test pits. Properly
prepared native soils can be used for support of conventional spread footing foundations, floor slabs, and
pavements.
Infiltration to assist in stormwater control will be difficult at this site. The dense glacial till at fairly
shallow depth will create a barrier to vertical groundwater flow as observed by shallow seepage in test
pits. Some infiltration potential is present in the looser upper sands, but the limited thickness of these
layers will most likely only support porous pavements or shallow dispersion type infiltration facilities.
Recommendations presented in the following sections should be considered general and may require
modifications when earthwork and grading occur. They are based upon the subsurface conditions
observed in the test pits and the assumption that finish site grades will be similar to existing grades. It
should be noted that subsurface conditions across the site may vary from those depicted on the
exploration logs and can change with time. Therefore, proper site preparation will depend upon the
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
3
weather and soil conditions encountered at the time of construction. We recommend SSGC review final
plans and further assess subgrade conditions at the time of construction, as warranted.
General Site Preparation
Site grading and earthwork should include procedures to control surface water runoff. Grading the site
without adequate drainage control measures may negatively impact site soils, resulting in increased export
of impacted soil and import of fill materials, thereby potentially increasing the cost of the earthwork and
subgrade preparation phases of the project.
Site grading should include removal (stripping) of topsoil and any fill encountered, or very loose or soft
soils in building and pavement areas. Subgrades should consist of firm, undisturbed native soils
following stripping.
General Subgrade Preparation
Subgrades in building footprints and pavement areas should consist of firm, undisturbed native soil. We
recommend exposed subgrades in building and conventional pavement areas are proofrolled using a large
roller, loaded dump truck, or other mechanical equipment to assess subgrade conditions following
stripping. Proofrolling efforts should result in the upper 1 foot of subgrade soils in building and
conventional pavement areas achieving a compaction level of at least 95 percent of the maximum dry
density (MDD) per the ASTM D1557 test method. Wet, loose, or soft subgrades that cannot achieve this
compaction level should be removed (over-excavated) and replaced with structural fill. The depth of
over-excavation should be based on soil conditions at the time of construction. A representative of SSGC
should be present to assess subgrade conditions during proofrolling.
Subgrade preparation guidelines for porous (pervious) pavements typically recommend limiting or
eliminating compaction of subgrade so densification and reduction of infiltration capacity will not occur.
Subgrades in porous (pervious) pavement areas should not be proofrolled following stripping. Probing of
porous pavement subgrades should be completed to identify soft or loose areas that should be remediated.
Grading and Drainage
Positive drainage should be provided during construction and maintained throughout the life of the
development. Allowing surface water into cut or fill areas, utility trenches and building footprints should
be prevented.
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
4
Structural Fill Materials
The suitability of soil for use as structural fill will depend on the gradation and moisture content of the
soil when it is placed. Soils with higher fines content (soil fraction passing the U.S. No. 200 sieve) will
become sensitive with higher moisture content. It is often difficult to achieve adequate compaction if soil
moisture is outside of optimum ranges for soils that contain more than about 5 percent fines.
Site Soils: Topsoil or organic rich soils are not considered suitable as structural fill. Native soils
observed could be suitable for use as structural fill provided they can be moisture conditioned to
within optimal ranges. Some of the native soils have considerable fine (silt) content and therefore
will be moisture sensitive and difficult to use as structural fill. Optimum moisture is considered
within about +/- 2 percent of the moisture content required to achieve the maximum density per
the ASTM D-1557 test method. If moisture content is higher or lower than optimum, soils would
need to be dried or wetted prior to placement as structural fill.
Import Fill Materials: We recommend import structural fill placed during dry weather consist of
material which meets the specifications for Gravel Borrow as described in Section 9-03.14(1) of
the 2016 Washington State Department of Transportation (WSDOT) Specifications for Road,
Bridge, and Municipal Construction (Publication M 41-10). Gravel Borrow should be protected
from disturbance if exposed to wet conditions after placement.
During wet weather, or for backfill on wet subgrades, import soil suitable for compaction in
wetter conditions should be provided. Imported fill for use in wet conditions should conform to
specifications for Select Borrow as described in Section 9-03.14(2), or Crushed Surfacing per
Section 9-03.9(3) of the 2016 WSDOT M-41 manual, with the modification that a maximum of 5
percent by weight shall pass the U.S. No. 200 sieve for these soil types.
Structural fill placement and compaction is weather-dependent. Delays due to inclement weather
are common, even when using select granular fill. We recommend site grading and earthwork be
scheduled for the drier months of the year. Structural fill should not consist of frozen material.
Structural Fill Placement
We recommend structural fill is placed in lifts not exceeding about 10 inches in loose measure. It may be
necessary to adjust lift thickness based on site and fill conditions during placement and compaction. Finer
grained soil used as structural fill and/or lighter weight compaction equipment may require significantly
thinner lifts to attain required compaction levels. Granular soil with lower fines contents could potentially
be placed in thicker lifts if they can be adequately compacted. Structural fill should be compacted to
attain the recommended levels presented in Table 1, Compaction Criteria.
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
5
Table 1. Compaction Criteria
Fill Application Compaction Criteria*
Footing areas 95 %
Upper 2 feet in pavement areas, slabs and sidewalks, and utility trenches 95 %
Below 2 feet in pavement areas, slabs and sidewalks, and utility trenches 92 %
Utility trenches or general fill in non-paved or -building areas 90 %
*Per the ASTM D 1557 test method.
Trench backfill within about 2 feet of utility lines should not be over-compacted to reduce the risk of
damage to the line. In some instances the top of the utility line may be within 2 feet of the surface.
Backfill in these circumstances should be compacted to a firm and unyielding condition.
We recommend fill procedures include maintaining grades that promote drainage and do not allow
ponding of water within the fill area. The contractor should protect compacted fill subgrades from
disturbance during wet weather. In the event of rain during structural fill placement, the exposed fill
surface should be allowed to dry prior to placement of additional fill. Alternatively, the we t soil can be
removed. We recommend consideration is given to protecting haul routes and other high traffic areas
with free-draining granular fill material (i.e. sand and gravel containing less than 5 percent fines) or
quarry spalls to reduce the potential for disturbance to the subgrade during inclement weather.
Earthwork Procedures
Conventional earthmoving equipment should be suitable for earthwork at this site. Earthwork may be
difficult during periods of wet weather or if elevated soil moisture is present. Excavated site soils may
not be suitable as structural fill depending on the soil moisture content and weather conditions at the time
of earthwork. If soils are stockpiled and wet weather is anticipated, the stockpile should be protected with
securely anchored plastic sheeting. If stockpiled soils become wet and unusable, it will become necessary
to import clean, granular soils to complete wet weather site work.
Wet or disturbed subgrade soils should be over-excavated to expose firm, non-yielding, non-organic soils
and backfilled with compacted structural fill. We recommend the earthwork portion of this project be
completed during extended periods of dry weather. If earthwork is completed during the wet season
(typically October through May) it may be necessary to take extra measures to protect subgrade soils.
If earthwork takes place during freezing conditions, we recommend the exposed subgrade is allowed to
thaw and re-compacted prior to placing subsequent lifts of structural fill. Alternatively, the frozen soil
can be removed to unfrozen soil and replaced with structural fill.
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
6
The contractor is responsible for designing and constructing stable, temporary excavations (including
utility trenches) as required to maintain stability of excavation sides and bottoms. Excavations should be
sloped or shored in the interest of safety following local and federal regulations, including current OSHA
excavation and trench safety standards. Temporary excavation cuts should be sloped at inclinations of
1.5H:1V (Horizontal:Vertical) or flatter, unless the contractor can demonstrate the safety of steeper cut
slopes. Permanent cut and fill slopes should be inclined at 2H:1V, or flatter.
A qualified geotechnical engineer and materials testing firm should be retained during the construction
phase of the project to observe earthwork operations and to perform necessary tests and observations
during subgrade preparation, placement and compaction of structural fill, and backfilling of excavations.
Foundations
Foundations can be placed on native subgrade soils or on a zone of structural fill above prepared
subgrades as described in this report. The following recommendations are for conventional spread
footing foundations:
Bearing Capacity (net allowable): 2,500 pounds per square foot (psf) for footings
supported on firm native soils or structural fill over
native subgrades prepared as described in this report.
Footing Width (Minimum): 18 inches (Strip)
24 inches (Column)
Embedment Depth (Minimum): 18 inches (Exterior)
12 inches (Interior)
Settlement: Total: < 1 inch
Differential: < 1/2 inch (over 30 feet)
Allowable Lateral Passive Resistance: 325 psf/ft* (below 12 inches)
Allowable Coefficient of Friction: 0.35*
*These values include a factor of safety of approximately 1.5.
The net allowable bearing pressures presented above may be increased by one -third to resist transient,
dynamic loads such as wind or seismic forces. Lateral resistance to footings should be ignored in the
upper 12-inches from exterior finish grade unless restricted.
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
7
Foundation Construction Considerations
All foundation subgrades should be free of water and loose soil prior to placing concrete , and
should be prepared as recommended in this report. Concrete should be placed soon after
excavating and compaction to reduce disturbance to bearing soils. Should soils at foundation
level become excessively dry, disturbed, saturated, or frozen, the affected soil should be removed
prior to placing concrete. We recommend SSGC observe all foundation subgrades prior to
placement of concrete.
Foundation Drainage
Ground surface adjacent foundations should be sloped away to facilitate drainage. We recommend
footing drains are installed around perimeter footings. Footing drains should include a minimum 4-
inch diameter perforated rigid plastic or metal drain line installed along the exterior base of the
footing. The perforated drain lines should be connected to a tight line pipe that discharges to an
approved storm drain receptor. The drain line should be surrounded by a zone of clean, free-draining
granular material having less than 5 percent passing the No. 200 sieve or meeting the requirements of
section 9-03.12(2) “Gravel Backfill for Walls” in the 2016 WSDOT Standard Specifications for
Road, Bridge, and Municipal Construction manual (M41-10). The free-draining aggregate zone
should be at least 12 inches wide and wrapped in filter fabric. The granular fill should extend to
within 6 inches of final grade where it should be capped with compacted fill containing sufficient
fines to reduce infiltration of surface water into the footing drains. Alternately, the ground surface
can be paved with asphalt or concrete. Cleanouts are recommended for maintenance of the drain
system.
On-Grade Floor Slabs
On-grade floor slabs should be placed on native soils or structural fill prepared as described in this report.
We recommend a modulus subgrade reaction of 225 pounds per square inch per inch (psi/in) for native
soil or compacted granular structural fill over properly prepared native soil.
We recommend a capillary break is provided between the prepared subgrade and bottom of slab.
Capillary break material should be a minimum of 4 inches thick and consist of compacted clean, free-
draining, well graded course sand and gravel. The capillary break material should contain less than 5
percent fines, based on that soil fraction passing the U.S. No. 4 sieve. Alternatively, a clean angular
gravel such as No. 7 aggregate per Section 9-03.1(4) C of the 2016 WSDOT (M41-10) manual could be
used for this purpose.
We recommend positive separations and/or isolation joints are provided between slabs and foundations,
and columns or utility lines to allow independent movement where needed. Backfill in interior trenches
beneath slabs should be compacted in accordance with recommendations presented in this report.
A vapor retarder should be considered beneath concrete slabs that will be covered with moisture sensitive
or impervious coverings (such as tile, wood, etc.), or when the slab will support equipment or stored
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
8
materials sensitive to moisture. We recommend the slab designer refer to ACI 302 and/or ACI 360 for
procedures and limitations regarding the use and placement of vapor retarders.
Seismic Considerations
Seismic parameters and values in Table 2 are recommended based on the 2015 International Building
Code (IBC).
Table 2. Seismic Parameters
PARAMETER VALUE
2015 International Building Code (IBC)
Site Classification1 D
Ss Spectral Acceleration for a Short Period 1.408
S1 Spectral Acceleration for a 1-Second Period 0.530g
Fa Site Coefficient for a Short Period 1.00
Fv Site Coefficient for a 1-Second Period 1.5
1 Note: In general accordance with 2015 International Building Code, Section 1613.3.1 for risk categories
I,II,III. IBC Site Class is based on characteristics of the upper 100 feet of the subsurface profile. Ss, S1, Fa, and
Fv values based on the USGS US Seismic Design Maps website using referenced site latitude and longitude.
Liquefaction
Soil liquefaction is a condition where loose, typically granular soils located below the
groundwater surface lose strength during ground shaking, and is often associated with
earthquakes. The King County “Liquefaction Susceptibility” Map (Map 11-5, dated May 2010)
depicts the site in an area with very low to low liquefaction potential. Native soils at fairly
shallow depth consist of dense to very dense glacial till. The risk of liquefaction at this site is
considered low for the design level earthquake.
Infiltration Characteristics
We understand stormwater control will be provided by infiltration facilities, if feasible. Assessment of
infiltration was completed per the 2016 King County Surface Water Design Manual (and 2014 DOE
Stormwater Management Manual for Western Washington. Two small-scale Pilot Infiltration Tests (PIT)
were attempted on the site. However, shallow seepage into the PIT-1 test hole prevented accurate
measurements. Seepage was not observed in the PIT-2 test site. Results of the infiltration test is provided
in Table 3.
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
9
Table 3. Infiltration Rates
Test Site and
Depth (ft) Soil Type Field Infiltration Rate
(in/hr)
Corrected
Infiltration
Rate
(in/hr)
Correction
Factors*
(Fg/Ft/Fp)
PIT-1, 2 ft Alluvium N/A N/A (0.7/0.5/0.8)
PIT-2, 2 ft Alluvium 1.5 0.42 (0.7/0.5/0.8)
*Correction Factors from the 2016 King County Surface Design Manual.
Calculated and corrected infiltration rates are considered appropriate for the upper soil tested. Gradation
tests completed on samples from two of the test pits suggests the upper sand soils are similar across the
site and would provide similar infiltration rates. We recommend a preliminary long-term design rate of
0.4 inches per hour (in/hr) is used for design of infiltration facilities located in soils above dense
unweathered till. Other correction factors should be applied to the above recommended long-term rate, as
required for the type of infiltration system selected.
It should be noted that infiltrated water will migrate down to the denser till and then flow laterally
downslope towards the wetland (to the south). Shallow perched groundwater was observed in all of the
test pits. Infiltration facilities such as trenches or ponds are not considered feasible on this site.
Bioswales, pervious pavements, or other shallow dispersion systems could be considered in the upper
sand soils, if allowed by the City.
Cation Exchange Capacity (CEC) and organic content test were completed on a sample from the base of
the PIT-2 site. Test results are summarized in the table below.
Table 4. CEC and Organic Content Results
Test Location, Sample Number,
and Depth
CEC Results
(milliequivalents)
CEC Required*
(milliequivalents)
Organic
Content
Results (%)
Organic
Content
Required*
(%)
PIT-2, S-1, 2 ft 12.1 ≥ 5 4.11 ≥1.0
*Per the 2016 DOE Stormwater Management Manual for Western Washington
Organic content and CEC test results satisfy King County and DOE requirements.
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
10
Conventional Pavement Sections
Subgrades for conventional pavement areas should be prepared as described in the “Subgrade
Preparation” section of this report. Subgrades below pavement sections should be graded or crowned to
promote drainage and not allow for ponding of water beneath the section. If drainage is not provided and
ponding occurs, the subgrade soils could become saturated, lose strength, and result in premature distress
to the pavement. In addition, the pavement surfacing should also be graded to promote drainage and
reduce the potential for ponding of water on the pavement surface.
Minimum recommended pavement sections for conventional pavements are presented in Table 5.
Pavement sections in public right-of-ways should conform to City of Edgewood requirements for the road
designation.
Table 5. Preliminary Pavement Sections
Traffic Area
Minimum Recommended Pavement Section Thickness (inches)
Asphalt
Concrete
Surface1
Portland
Cement
Concrete2
Aggregate
Base
Course3,4
Subbase
Aggregate5
Access Drive 3 - 6 12
Parking 2 - 4 12
1 1/2 –inch nominal aggregate hot-mix asphalt (HMA) per WSDOT 9-03.8(1)
2 A 28 day minimum compressive strength of 4,000 psi and an allowable flexural strength of at least 250
psi
3 Crushed Surfacing Base Course per WSDOT 9-03.9(3)
4Although not required for structural support under concrete pavements, a minimum four-inch thick base
course layer is recommended to help reduce potentials for slab curl, shrinkage cracking, and subgrade
“pumping” through joints
5 Native granular soils compacted to 95% of the ASTM D1557 test method, or Gravel Borrow per
WSDOT 9-03.14(1) or Crushed Surfacing Base Course WSDOT 9-03.9(3)
Conventional Pavement Maintenance
The performance and lifespan of pavements can be significantly impacted by future maintenance.
The above pavement sections represent minimum recommended thicknesses and, as such, periodic
maintenance should be completed. Proper maintenance will slow the rate of pavement
deterioration, and will improve pavement performance and life. Preventative maintenance consists
of both localized maintenance (crack and joint sealing and patching) and global maintenance
(surface sealing). Added maintenance measures should be anticipated over the lifetime of the
pavement section if any existing fill or topsoil is left in-place beneath pavement sections.
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
11
Porous Pavements
Porous (pervious) asphalt pavements could be considered to facilitate stormwater control provided
subgrades consist of the upper sand (alluvium) soil. We recommend pervious pavements are only
considered in light duty traffic areas. Porous pavements are not recommended in heavy duty traffic areas,
or areas directly underlain by dense glacial till.
Infiltration characteristics of site soils are discussed in the “Infiltration Characteristics” section of this
report. Porous pavement sections typically use a storage bed of free–draining imported granular material
under the surface pavement. The thickness of the storage layer should be sized for the amount of
stormwater to be stored and infiltration characteristics of the soil, and can range from about 6 inches to
over 18 inches. Storage bed material should conform to the gradation criteria presented in Section 9-
03.9(2) “Permeable Ballast” of the WSDOT Specifications for Road, Bridge, and Municipal Construction
(Publication M 41-10). A thin (approximately 2-inch) choker course layer of material meeting criteria of
Section 9-03.12(4) of the WSDOT manual should be placed above and below the storage bed material. A
geotextile separation fabric could be used in lieu of the lower choker course material. Gradations of the
storage bed and choker course layers are presented in Table 6.
Table 6. Storage Bed and Choker Course Materials
US Standard Sieve Size
Total Percent Passing Sieve
Storage Bed
WSDOT
9-03.9(2)
Choker Course
WSDOT
9-03.12(4)
2 ½” 99-100
2” 65-100
1 ½”
1” 100
3/4” 40-80 80-100
3/8” 0-40
#4 5 0-4
#200 0-1.5 0-2
We recommend the pervious asphalt layer have a thickness of at least 3-inches.
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
12
The lower choker course layer and initial lift of storage bed material should be compacted with non-vibratory
rollers to limit densification of subgrade soils. The upper storage bed and the choker course layer should be
compacted to a firm and unyielding condition achieving a compaction level of approximately 92 percent of
the maximum dry density per the ASTM D-1557 test method.
Porous Pavement Maintenance
The performance and lifespan of porous pavements is highly dependent on maintenance.
Maintenance of porous pavements will be necessary to retain the drainage characteristics of the
asphalt. Regular cleaning of the surface will be required for the porous pavement. Typically, this
is completed using vacuum equipment to remove fine sediment and vegetation that will collect on
the asphalt surface. It is not practical at this time to estimate the amount of cleaning required for
this site as it will be dependent on the amount of vehicle traffic, surrounding vegetation, and
cleanliness of adjacent road surfaces leading into the site. However, at least annual cleaning of
the surface via vacuuming should be completed with more frequent cleaning if excessive dirt or
vegetation is observed collecting on the pavement surface during particular times of the year.
Regular sweeping of the asphalt surface could help in maintaining a cleaner surface.
Porous pavements typically have slightly coarser average aggregate size (fewer fines) to achi eve
the porosity of the asphalt. As such, they have the tendency to ravel and not wear as well as
conventional asphalt sections, particularly in high traffic areas and in areas where repetitive
short radius turns occur. Regular maintenance will improve the lifespan of the porous
pavement section.
REPORT CONDITIONS
This report has been prepared for the exclusive use of ADF Properties and their agents for specific
application to the project discussed, and has been prepared in accordance with generally accepted
geotechnical engineering practices in the area. No warranties, either express or i mplied, are intended or
made. The analysis and recommendations presented in this report are based on observed soil conditions
and test results at the indicated locations, and from other geologic information discussed. This report
does not reflect variations that may occur across the site, or due to the modifying effects of construction
or weather. The nature and extent of such variations may not become evident until during or after
construction. If variations appear, we should be immediately notified so that further evaluation and
supplemental recommendations can be provided.
This report was prepared for the planned type of development of the site as discussed herein. It is not
valid for third party entities or alternate types of development on the site without the express written
consent of SSGC. If development plans change we should be notified to review those changes and modify
our recommendations as necessary.
N
South Sound Geotechnical Consulting
P.O. Box 39500
Lakewood, WA 98496
(253) 973-0515
Figure 1 – Exploration Plan
Sunset Highlands Mixed-Use
Renton, WA SSGC Project #18003
Approximate Test Pit Location
PIT - 1
TP - 1
PIT-1
PIT - 1
Approximate Infiltration Test
Location
Scale: NTS
Base map from drawing “Profile Exhibit”, by AHBL,
Inc)
TP-2
Legend
TP-4
TP-1
TP-3
TP-1
TP-1
TP-1
PIT-2
TP-5
TP-1
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
A-1
Appendix A
Field Exploration Procedures and Test Pit Logs
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
Field Exploration Procedures8
Our field exploration for this project included five test pits and one infiltration test completed on January
24, 2018. The approximate locations of the explorations are shown on Figure 1, Exploration Plan. The
exploration locations were determined by pacing from site features. Ground surface elevations referenced
on the logs were inferred from Google Satellite imagery. Test pit locations and elevations should be
considered accurate only to the degree implied by the means and methods used.
A private excavation company subcontracted to SSGC dug the test pits. Soil samples were collected and
stored in moisture tight containers for further assessment and laboratory testing. Explorations were
backfilled with excavated soils and tamped when completed. Please note that backfill in the explorations
will likely settle with time. Backfill material located in building areas should be re-excavated and
recompacted, or replaced with structural fill.
The following logs indicate the observed lithology of soils and other materials observed in the
explorations at the time of excavation. Where a soil contact was observed to be gradational, our log
indicates the average contact depth. Our logs also indicate the approximate depth to groundwater (where
observed at the time of excavation), along with sample numbers and approximate sample depths. Soil
descriptions on the logs are based on the Unified Soil Classification System.
Project: Sunset Apartments SSGC Job # 18003 TEST PIT LOGS PAGE 1 OF 2
Location: Auburn, WA
TEST PIT LOGS FIGURE A-1
South Sound Geotechnical Consulting TP-1 TO TP-5 Logged by: THR
Test Pit TP-1
Depth (feet)
Material Description
0 – 1
1 – 3.5
3.5 - 5.5
Fill/Topsoil: Silt, sand, and gravel over about 3 inches of
topsoil.
SAND with some silt: Loose to medium dense, moist to wet,
reddish brown. (Sample S-1 @ 2 feet)
Silty SAND with gravel: Medium dense to dense, moist,
gray. (Sandy Glacial Till)
Test pit completed at approximately 5.5 feet on 1/24/18.
Seepage observed at about 3.5 feet at time of excavation.
Approximate surface elevation: 398 feet
Test Pit TP-2
Depth (feet)
Material Description
0 – 1
1 – 4
4 - 6
Topsoil: Silty sand with organics: Loose, moist, dark brown.
SAND with some silt: Loose to medium dense, moist to wet,
reddish brown.
SAND with silt and gravel: Medium dense to dense, moist,
gray. (Sandy Glacial Till)
Test pit completed at approximately 6 feet on 1/24/18.
Seepage observed at about 3.5 feet at time of excavation.
Approximate surface elevation: 396 feet
Test Pit TP-3
Depth (feet)
Material Description
0 – 1.5
1.5 – 2.5
2.5 - 5
Fill: Silt, sand, and gravel with some organics: Loose, moist,
dark brown.
SAND with some silt: Loose to medium dense, moist to wet,
reddish brown.
SAND with silt and gravel: Medium dense to dense, moist,
gray. (Sandy Glacial Till)
Test pit completed at approximately 5 feet on 1/24/18.
Seepage observed at about 2.5 feet at time of excavation.
Approximate surface elevation: 396 feet
Project: Sunset Apartments SSGC Job # 18003 TEST PIT LOGS PAGE 2 OF 2
Location: Auburn, WA
TEST PIT LOGS FIGURE A-1
South Sound Geotechnical Consulting TP-1 TO TP-5 Logged by: THR
Test Pit TP-4
Depth (feet)
Material Description
0 – 1.5
1.5 – 3.5
3.5 - 6
Fill: Silt, sand, and gravel with some organics: Loose, moist,
dark brown.
Silty SAND with some gravel and occasional cobble:
Medium dense, moist, grayish brown.
SAND with silt and gravel: Medium dense to dense, moist,
gray. (Sandy Glacial Till)
Test pit completed at approximately 6 feet on 1/24/18.
Seepage observed at about 3 feet at time of excavation.
Approximate surface elevation: 397 feet
Test Pit TP-5
Depth (feet)
Material Description
0 – 1
1 – 2.5
2.5 - 5
Fill: Silt, sand, and gravel with some organics: Loose, moist,
dark brown.
Silty SAND with some gravel and occasional cobble:
Medium dense, moist, grayish brown.
SAND with silt and gravel: Medium dense to dense, moist,
gray. (Sandy Glacial Till)
Test pit completed at approximately 5 feet on 1/24/18.
Seepage observed at about 2.5 feet at time of excavation.
Approximate surface elevation: 398 feet
Geotechnical Engineering Report SSGC
South Lawrence Avenue Self Storage
South Lawrence Avenue at South 19th Street
Tacoma, Washington
SSGC Project No. 17051
July 18, 2017
B-1
Appendix B
Laboratory Testing and Results
Geotechnical Engineering Report SSGC
Sunset Highlands Mixed-Use Development
NE Sunset Boulevard
Renton, Washington
SSGC Project No. 18003
February 12, 2018
B-1
Laboratory Testing
Select soil samples were tested for organic content and cation exchange capacity (CEC) by Northwest
Agricultural Consultants of Kennewick, Washington. Gradation tests were completed by Construction
Testing Laboratories (CTL) of Puyallup, Washington. Results of the laboratory testing are included in this
appendix.
Report shall not be reproduced except in full without the written approval of the Laboratory. Report pertains only to the material tested.Tested By: B. Rowden Checked By: C. Pedersen
Particle Size Distribution Report ASTM C-117,C136
PERCENT FINER0
10
20
30
40
50
60
70
80
90
100
GRAIN SIZE - mm.
0.0010.010.1110100
% +3"Coarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 3.8 5.1 49.8 31.1 10.26 in.3 in.2 in.1½ in.1 in.¾ in.½ in.3/8 in.#4#10#20#30#40#60#100#140#200SIEVE PERCENT SPEC.*PASS?
SIZE FINER PERCENT (X=NO)
Material Description
Atterberg Limits
Classification
Remarks
Source of Sample: TP-5
Sample Number: 18-098 Date:
Client:
Project:
Project No:Figure
Grab Sample, S-1
Sampled at 2'3/4"
1/2"
3/8"
#4
#8
#16
#30
#50
#100
#200
100.0
99.5
98.4
96.2
92.2
84.6
61.0
24.0
13.9
10.2 Report: #02
Sampled by: Client
South Sound Geotechnical
Sunset Apartments (JO #18003)
7073
PL=LL=PI=
USCS=AASHTO=
*(no specification provided)
01-31-18
Construction Testing Laboratories
400 Valley Ave. NE, Suite #102
Puyallup WA, 98372 Tel. (253) 383-8778
Report shall not be reproduced except in full without the written approval of the Laboratory. Report pertains only to the material tested.Tested By: B. Rowden Checked By: C. Pedersen
Particle Size Distribution Report ASTM C-117,C136
PERCENT FINER0
10
20
30
40
50
60
70
80
90
100
GRAIN SIZE - mm.
0.0010.010.1110100
% +3"Coarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 0.6 2.6 47.8 39.5 9.56 in.3 in.2 in.1½ in.1 in.¾ in.½ in.3/8 in.#4#10#20#30#40#60#100#140#200SIEVE PERCENT SPEC.*PASS?
SIZE FINER PERCENT (X=NO)
Material Description
Atterberg Limits
Classification
Remarks
Source of Sample: TP-1
Sample Number: 18-097 Date:
Client:
Project:
Project No:Figure
Grab Sample, S-1
Sampled at 2'3/8"
#4
#8
#16
#30
#50
#100
#200
100.0
99.4
97.6
91.6
70.8
28.0
13.0
9.5
Report: #01
Sampled by: Client
South Sound Geotechnical
Sunset Apartments (JO #18003)
7073
PL=LL=PI=
USCS=AASHTO=
*(no specification provided)
01-31-18
Construction Testing Laboratories
400 Valley Ave. NE, Suite #102
Puyallup WA, 98372 Tel. (253) 383-8778
2545 W Falls Avenue
Kennewick, WA 99336
509.783.7450
www.nwag.com
lab@nwag.com
Sample ID Organic Matter Cation Exchange Capacity
IT-2, S-1 4.11% 12.1 meq/100g
Method ASTM D2974 EPA 9081
South Sound Geotechnical Consulting
PO Box 39500
Lakewood, WA 98496
Report: 43567-1
Date: February 5, 2018
Project No: 18003
Project Name: Sunset Highlands
UNIFIED SOIL CLASSIFICATION SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Soil Classification
Group
Symbol
Group NameB
Coarse Grained Soils
More than 50% retained
on No. 200 sieve
Gravels
More than 50% of coarse
fraction retained on
No. 4 sieve
Clean Gravels
Less than 5% finesC
Cu 4 and 1 Cc 3E GW Well-graded gravelF
Cu 4 and/or 1 Cc 3E GP Poorly graded gravelF
Gravels with Fines
More than 12% finesC
Fines classify as ML or MH GM Silty gravelF,G, H
Fines classify as CL or CH GC Clayey gravelF,G,H
Sands
50% or more of coarse
fraction passes
No. 4 sieve
Clean Sands
Less than 5% finesD
Cu 6 and 1 Cc 3E SW Well-graded sandI
Cu 6 and/or 1 Cc 3E SP Poorly graded sandI
Sands with Fines
More than 12% finesD
Fines classify as ML or MH SM Silty sandG,H,I
Fines Classify as CL or CH SC Clayey sandG,H,I
Fine-Grained Soils
50% or more passes the
No. 200 sieve
Silts and Clays
Liquid limit less than 50
inorganic PI 7 and plots on or above “A” lineJ CL Lean clayK,L,M
PI 4 or plots below “A” lineJ ML SiltK,L,M
organic Liquid limit - oven dried 0.75 OL Organic clayK,L,M,N
Liquid limit - not dried Organic siltK,L,M,O
Silts and Clays
Liquid limit 50 or more
inorganic PI plots on or above “A” line CH Fat clayK,L,M
PI plots below “A” line MH Elastic SiltK,L,M
organic Liquid limit - oven dried 0.75 OH Organic clayK,L,M,P
Liquid limit - not dried Organic siltK,L,M,Q
Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-in. (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles
or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW -GM well-graded
gravel with silt, GW -GC well-graded gravel with clay, GP-GM poorly
graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW -SM well-graded
sand with silt, SW -SC well-graded sand with clay, SP-SM poorly graded
sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
6010
2
30
DxD
)(D
F If soil contains 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
HIf fines are organic, add “with organic fines” to group name.
I If soil contains 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with
gravel,” whichever is predominant.
L If soil contains 30% plus No. 200 predominantly sand, add
“sandy” to group name.
M If soil contains 30% plus No. 200, predominantly gravel,
add “gravelly” to group name.
N PI 4 and plots on or above “A” line.
O PI 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
Preliminary
Technical Information Report
Sunset Highlands Mixed Use
2190210.10
Appendix E
Non-Structural BMPs
A-1 .................... Required Best Management Practices (BMPs) for all Properties with
Commercial Activities
A-8 .................... Storage or Solid and Food Wastes (Including Cooking Grease)
A-45 .................. Maintenance of Public and Private Utility Corridors and Facilities
Stormwater Pollution Prevention Manual • King County 27
A-1 Required Best Management Practices for all Properties with Commercial Activities
The following Best Management Practices (BMPs) are required for all commercial, industrial,
agricultural, public, or residential properties with commercial activities in unincorporated King County.
Best Management Practices (BMPs) are required by King County Code 9.12. If the BMPs included here
are not enough to prevent contamination of stormwater, you will be required to take additional
measures.
Required BMPs:
Clean and Maintain Storm Drainage System
• Evaluate the condition of the catch basin by checking the amount of sediment in the bottom of the sump.
Catch basins must be cleaned out when the solids, trash, and debris in the sump reaches one–half of the
depth between the bottom of the sump and the bottom of the lowest inflow or outflow pipe connected to
the catch basin or is at least 6 inches below this point.
• Hire a professional drainage contractor to inspect and maintain your system or clean the system yourself. If
there is sediment or other debris in the drainage pipes, then a professional contractor must be hired to flush
or jet out the pipes.
• Small amounts of floating oil can be soaked up with oil absorbent pads, bagged and disposed of as solid
waste.
• Up to one cubic yard of nonhazardous solid material may be disposed of as solid waste in your regular
garbage. If you exceed this threshold hire a professional drainage contractor. All of the solids and stagnant
water collected from catch basin sumps must be disposed of properly. None of the sump contents can
be flushed into the catch basin outflow pipe. Depending on the nature of the pollutants in the sump, and
the associated types of activities taking place on the site, the sump contents may need to be handled
as contaminated waste. Contractors who perform catch basin clean–out services are required to follow
appropriate disposal requirements.
• Clean and maintain catch basins annually. Sites with activities generating a lot of sediments and other debris
will have to inspect and clean out their catch basins more often. Frequent sweeping of paved parking and
storage areas will save time and money in maintaining the drainage system.
• Other components of drainage systems such as ponds, tanks, and bioswales must also be maintained. If this
maintenance is beyond your ability, contractors are available to complete this work.
Label All Storm Drain Inlets on Your Property
• Stencil or apply storm drain markers adjacent to storm drains to help prevent the improper disposal of
pollutants. If the storm drain grate is stamped with warnings against polluting, then additional marking may
not be required if there is no evidence of pollutants being dumped or washed into the storm drain.
Stormwater Pollution Prevention Manual • King County28
Eliminate Illicit Connections to the Storm Drainage System
• Connections to the storm drainage system that convey substances other than stormwater are prohibited.
Examples are connections from internal floor drains, HVAC systems, industrial processes, sinks, and toilets.
• Illicit connections must be immediately removed, permanently plugged or re–plumbed.
• The discharge must be re–plumbed so that it goes to the sanitary sewer, a septic system, an on–site
treatment system, or a holding tank for off–site disposal. There are restrictions on what can be disposed of
to the sanitary sewer and septic systems. You may be required to do additional investigation to determine
where all stormwater and non–stormwater discharges go. This may include smoke, dye, and chemical
testing or closed circuit television inspection.
Additional Information:
• Drainage System Maintenance Contractors Information Sheet
• For stencils and instructions or to determine if you have an illicit connection, contact King County
Stormwater Services at 206–477–4811 or kingcounty.gov/stormwater.
Stormwater Pollution Prevention Manual • King County 35
A-8 Storage or Solid and Food Wastes (Including Cooking Grease)
This refers to garbage dumpsters and outdoor waste containers such as cooking oil/grease receptacles.
Best Management Practices (BMPs) are required by King County Code 9.12. If the BMPs included here
are not enough to prevent contamination of stormwater, you will be required to take additional
measures.
Required BMPs:
• Store wastes in leak–proof containers with solid lids.
• Keep dumpsters closed except when adding waste.
• Used cooking oil/grease containers should be labeled with their contents.
• Clean up any spills immediately using dry methods. Grease cannot be left on the ground.
• Have spill cleanup materials nearby.
• Use a lid or cover when transporting cooking oil/grease containers from kitchens to outside grease
containers.
• Ensure that drip pans or absorbent materials are used whenever grease containers are emptied by vacuum
trucks or other means.
• Dispose of collected cooking oil/grease as garbage if it is not being recycled. Do not dispose of fats, oils or
grease (FOG) into the sanitary sewer or septic system.
Required Routine Maintenance:
• Keep the area around the grease container clean and free of debris.
• Check storage containers frequently for leaks and to ensure that lids are on securely.
• Replace leaking or damaged containers. Contact waste hauler for replacements.
• Sweep and clean the storage area as needed if it is paved. Do not hose down waste storage areas.
• When cleaning or rinsing waste containers, dispose of all wastewater into a sanitary sewer. If no sewer is
available, store in a holding tank, dead end sump, or truck o site to an approved disposal location.
Additional Information:
• Disposal Information Sheet
For more information or assistance contact the King County Stormwater Services at 206–477–4811 and
visit kingcounty.gov/stormwater.
Stormwater Pollution Prevention Manual • King County 77
A-45 Maintenance of Public and Private Utility Corridors and Facilities
This covers maintenance activities associated with the transmission and distribution of public and
private utilities such as petroleum products, natural gas, water, sewage, and electrical power. This
includes the maintenance of underground utility vaults, pump stations, and similar facilities.
Best Management Practices (BMPs) are required by King County Code 9.12.
If the BMPs included here are not enough to prevent contamination of stormwater, you will be required
to take additional measures.
Required BMPs:
• Minimize the amount of herbicides and other pesticides used to maintain access roads and facilities.
• Stabilize access roads or areas of bare ground with gravel, crushed rock, or another method to prevent
erosion. Use and manage vegetation to minimize bare ground/soils that may be susceptible to erosion.
• Provide stormwater drainage for roads and maintenance areas. Grade roads with a crown or slope to
minimize the potential for erosion from runo. Provide ditches, swales, and culverts to convey stormwater
runo.
• Keep ditches and culverts clear to reduce the possibility of the drainage becoming plugged or blocked,
causing overows and erosion.
• Check utility vaults or other underground structures for oil prior to pumping out any collected water.
Contaminated water must be collected for proper disposal. Small amounts of oil may be captured with
absorbent material. Never discharge contaminated water, including high or low pH, to storm drainage
facilities or surface waters.
• When removing water and/or sediment from electrical transformer vaults, determine from records or testing
if the transformers contain PCBs.
• Clean up any debris or spilled material immediately after completing maintenance and repair activities.
Additional Information:
• Landscaping Activities and Vegetation Management – Activity Sheet A-26
• Erosion and Sediment Control Standards – King County Surface Water Design Manual, Appendix D
• Work in public road right of ways requires permission from King County Utility Inspection Program
(206) 296–8122.
Preliminary
Technical Information Report
Sunset Highlands Mixed Use
2190210.10
Appendix F
Critical Areas Report
By Sewall Wetland Consulting, Inc., dated March 22, 2018
Note: this report is preliminary and as such has an outdated
site plan with similar encroachments and surfacing proposed
March 22, 2018
ADF Properties, LLC
15007 Woodinville Redmond Road, Suite A
Woodinville, Washington 98072
RE: Sunset Highlands Critical Areas Report – Parcel # 0323059093
SWC Job #18-108
This report describes our observations of any jurisdictional wetlands,
streams and buffers on or within 200’ of Parcel # 0323059093, located off
NE Sunset Way, in the City of Renton, Washington (the “site”).
Above: King County iMap of site
Specifically, the site is a 0.81 acre irregular shaped parcel located in the
SW ¼ of Section 3, Township 23 North, Range 5 East of the Willamette
meridian in King County Washington.
Sewall Wetland Consulting, Inc.
Po Box 880 Phone: 253-859-0515
Fall City, WA 98024
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 2
METHODOLOGY
Ed Sewall of Sewall Wetland Consulting, Inc. inspected the site on
February 20, 2018. The site was previously delineated by Sewall
Wetland Consulting on May 17, 2007. The site was reviewed using
methodology described in the Washington State Wetlands Identification
Manual (WADOE, March 1997). This is the methodology currently
recognized by the City of Renton and the State of Washington for wetland
determinations and delineations. The site was also inspected using the
methodology described in the Corps of Engineers Wetlands Delineation
Manual (Environmental Laboratory, 1987), and the Western Mountains,
Valleys and Coast region Supplement (Version 2.0) dated June 24, 2010,
as required by the US Army Corps of Engineers. Soil colors were
identified using the 1990 Edited and Revised Edition of the Munsell Soil
Color Charts (Kollmorgen Instruments Corp. 1990).
]
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 3
Soil colors were identified using the 1990 Edited and Revised Edition of
the Munsell Soil Color Charts (Kollmorgen Instruments Corp. 1990).
OBSERVATIONS
Existing Site Documentation.
Prior to visiting the site, a review of several natural resource inventory
maps was conducted. Resources reviewed included the National Wetland
Inventory Map, WADNR Fpars, and the NRCS Soil Survey online mapping
and Data.
Soil Survey
According to the King County Soil Survey, the soils onsite are completely
comprised of the Ragnar Indianola soil association, sloping (RDC).
Ragnar soils are not considered to be hydric (wetland) soils, according to
the publication Hydric Soils of the United States (USDA NTCHS Pub
No.1491, 1991).
Above: USDA Soil Survey Map of the site
National Wetlands Inventory (NWI)
According to the NWI map for the site there are no wetlands on or near
the site.
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 4
Above: National Wetlands Inventory Map of the site.
WADNR Fpars Stream Mapping
The Washington Department of Natural Resources Fpars stream type
mapping website depicts no streams on or near the site.
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 5
Above: WADNR Fpars stream mapping
City of Renton Water Resource Map
The US Fish and Wildlife online wetland mapper and the Department of Natural
Resources FPARS maps do not show any wetlands or streams located onsite. However,
there is a non-fish bearing portion of Honey Dew Creek mapped offsite to the northeast.
According to the City of Renton flood hazard and wetlands maps, there are no known
flood hazards or wetlands within 100-feet of the site (Figures 4-3-050Q2 and 4-3-050Q5).
The City of Renton Water Class Map in RMC 4-3-050Q4 shows Honey Dew Creek
extending across NE Sunset Boulevard, at which point it becomes a Class 4 stream, and
then entering the site.
City of Renton Water Class Map
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 6
Sewall Wetland Consulting, Critical Areas Study Sunset Property
November 7, 2007
Our company prepared a critical areas study and restoration plan for the
stream buffer in November of 2007. At that time, a Type 4 stream was
found along the south edge of the site. This is a ditched upper portion of
Honey Dew Creek. At that time this stream had a 35’ buffer which was
reduced to 25’ with enhancement and a split rail fence. The mitigation
area was installed and initially monitored until transient use of the site
destroyed and eliminated much of the plantings in the area.
Above: Previously approved mitigation plan sections showing stream and 25’ buffer.
Field observations
Uplands
The site is generally devoid of vegetation as the blackberry and giant
knotweed thicket that was a transient encampment has been kept
mowed down. The only existing vegetation is along the property
boundaries and along the stream at the southern end of the property.
Dominant vegetation within the vegetated uplands included red alder
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 7
(Alnus rubra), Japanese knotweed (Polyganum cuspidatum), and
Himalayan blackberry (Rubus armeniacus).
Soils within the uplands generally revealed a compact 16-inch gravelly
sandy loam layer with a color of 10YR 3/3. Soils within the uplands
were dry at the time of our May 17th site visit.
Wetlands
No areas meeting wetland criteria are found on the site.
Streams
A ditched stream, identified as Stream A, flows eastward across the
southeast property corner of the site between two culverts. Stream A
was flagged with white with blue dot boundary flagging labeled A1
though A8 on the north ordinary high water mark (OHWM) and AA1
through AA8 on the south OHWM. The onsite section of the stream is
assumed to be part of the mapped Honey Dew Creek, as previously
described.
The City of Renton Aquifer protection map (RMC Figure 4-3-050Q1)
shows that this stream flows subsurface within a pipe from the north
side of NE Sunset Boulevard onto the site, surfaces across the site, and
then exits via a second culvert which discharges at the west side of
Duvall Avenue NE, approximately 1000-feet to the east of the site.
The banks of the ditch and associated stream buffers contain forested
and scrub-shrub vegetative communities. Dominant vegetation adjacent
to the stream includes red alder (Alnus rubra), Himalayan blackberry
(Rubus armeniacus), and giant knotweed (Polyganum cupsodatum).
Stream A has an average channel with of approximately 2 -feet and an
average depth of approximately 12-inches. At the time of site visit, the
channel contained flowing water approximately 8-inches deep. The
stream bed was unconsolidated and comprised of a mixture of sand and
gravel.
Due to the long distances in which this stream is located within
subsurface pipes, the segmented portion of stream and stream buffer
located onsite provide very little hydrologic or ecologic function. The site
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 8
is totally surrounded by urban development, and no evidence of wildlife
presence was observed onsite during our field visit.
Stream A would be considered a Type Ns stream, due to lack of fish use
and season flow.
Typically, Type Ns streams have a 50’ buffer as well as a 15’ building
setback for structures.
Proposed Project
The proposed project is the construction of a multifamily apartment
complex. Due to the diagonal configuration of the site forcing struct ures
on an angle across the site, as well as the fact the buffer was a previously
fenced 25’ area and now includes a degraded area, a reduced buffer is
proposed.
Under RMC 44-3-050-I.1, Type Ns streams can have their buffer reduced
to 40’ if it meets the following criteria;
a. Criteria for Reduction of Degraded Stream Buffer Width with Enhancement: A
reduced buffer will be approved in a degraded stream buffer only if:
i. It will provide an overall improvement in water quality; and
Response: Removal of existing trash and use by transients will greatly
improve water quality. Planting with native trees and shrubs will help
filter any runoff and improve stream function.
ii. It will provide an overall enhancement to fish, wildlife, or their habitat; and
Response: The reduced and enhanced buffer will improve water quality
and shading of the stream, which will improve overall functions of the
stream. Removal of transients and trash will greatly improve water
quality and create a safe habitat area that doesn’t exist today.
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 9
iii. It will provide a net improvement in drainage and/or stormwater detention
capabilities; and
Response: The proposed reduced buffer and site stormwater facilities
will improve stormwater functions of the site.
iv. It will not be materially detrimental to any other property or the City as a whole;
and
Response: The proposed reduced buffer will not be detrimental to any
property and will be an improvement over current heavily degraded
conditions.
v. It will provide all exposed areas with stabilized native vegetation, as appropriate;
and
Response: The proposed enhancement of the reduced buffer will
stabilize the buffer with native vegetation.
vi. The request is not made in conjunction with buffer reduction, an
vii. It will provide, as part of the buffer reduction request, buffer enhancement plan
prepared by a qualified professional and fund a review o f the plan by the City’s
consultant. The plan shall assess habitat, water quality, stormwater detention,
groundwater recharge, shoreline protection, and erosion protection functions of the
buffer; assess the effects of the proposed modification on those fu nctions; and
address the six (6) criteria listed above.
Response: A stream buffer enhancement plan will be provided to the
City as required after this reduction request is approved.
The impacted buffer area for the structure will be averaged as shown on
the plan.
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 10
If you have any questions in regards to this report or need additional
information, please feel free to contact me at (253) 859-0515 or at
esewall@sewallwc.com .
Sincerely,
Sewall Wetland Consulting, Inc.
Ed Sewall
Senior Wetlands Ecologist PWS #212
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 11
REFERENCES
Cowardin, L., V. Carter, F. Golet, and E. LaRoe. 1979. Classification of
Wetlands and Deepwater Habitats of the United States. U.S. Fish and
Wildlife Service, FWS/OBS-79-31, Washington, D. C.
Environmental Laboratory. 1987. Corps of Engineers Wetlands
Delineation Manual, Technical Report Y-87-1. U. S. Army Corps of
Engineers Waterways Experiment Station, Vicksburg, Mississippi.
Muller-Dombois, D. and H. Ellenberg. 1974. Aims and Methods of
Vegetation Ecology. John Wiley & Sons, Inc. New York, New York.
Munsell Color. 1988. Munsell Soil Color Charts. Kollmorgen
Instruments Corp., Baltimore, Maryland.
National Technical Committee for Hydric Soils. 1991. Hydric Soils of the
United States. USDA Misc. Publ. No. 1491.
Reed, P., Jr. 1988. National List of Plant Species that Occur in
Wetlands: Northwest (Region 9). 1988. U. S. Fish and Wildlife Service,
Inland Freshwater Ecology Section, St. Petersburg, Florida.
Reed, P.B. Jr. 1993. 1993 Supplement to the list of plant species that
occur in wetlands: Northwest (Region 9). USFWS supplement to Biol.
Rpt. 88(26.9) May 1988.
City of Renton Code
USDA NRCS & National Technical Committee for Hydric Soils, September
1995. Field Indicators of Hydric Soils in the United States - Version 2.1
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 12
Above and below: stream as it passes through the site.
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 13
Above and below: Looking north across the site.
ADF/#18-108
Sewall Wetland Consulting, Inc.
March 22, 2018
Page 14
Above and below: Stream as it passes off -site to the west
14"FIR
16"FIR
24"FIR
12"FIR
20"FIR
16"FIR
30"FIR
16"FIR
303.5
L
F
ROCK
E
R
Y
ROCK
E
R
Y
ROCKERY
-
-
-
-
-5' HOG WIRE FENCE6' CY
C
L
O
N
E
F
E
N
C
E
LS
PV
LS
LS
LS
-
SIDE
W
A
L
K
48" P
o
pl
a
r
24" CEDAR
30" Fir
18" MAPLE
30" FIR
-
>
SB
SIGNAL BOX
SB
TV
N63°5
7'
2
7
"
E
1423.
1
4'
(
M
)
1423.
2
1'
(
S
T)
595.0
7'
(
C
)
595.1
0'
(
S
T)S26°02
'33
"E
45
.00
'
NE SU
N
S
E
T
B
L
V
D
N0° 00' 25"E174.68'N89° 37' 58"W
164.55'S0° 15' 59"W256.71'N63°
5
7'
2
7
"
E
184.4
5'
400
397
398
399
401
400
396
397
398
399
400
396397398
3
9
9
STORM
CHAMBER
DETENTION
SYSTEMSTORM
CHAMBER
DETENTION
SYSTEM
PERVIOUS
PAVERS (TYP.)
PERVIOUS
PAVERS (TYP.)
PERVIOUS ACCESS
PATH
40' BUFFER
BUFFER AVERAGING
IMPACTED AREA 331 SF
BUFFER
AVERAGING
REPLACEMENT
AREA 331 SF 32'
31'
Civil Engineers
Structural Engineers
Landscape Architects
Community Planners
Land Surveyors
Neighbors
SUNSET HIGHLANDS
2140679.10