HomeMy WebLinkAboutF_Southport Office U15005273_Civil Record Drawings_20191025.pdfEngineerVicinity MapArchitect1083 LAKE WASHINGTON BLVD NSurveyorRENTON, WASHINGTONSOUTHPORT OFFICERECORD DRAWINGS - 10/25/2019OwnerSiteHorizontal DatumVertical DatumUtility Providers: Legal DescriptionSite InformationBasic of BearingsBenchmarkSheet IndexSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.CIVIL COVER SHEET
Construction Sequence:Erosion Control NotesStorm Water Drainage Notes And SpecificationsGeneral Paving NotesDemolition NotesSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.GENERAL NOTES
TRUE NORTHg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SHEET x01BOEING PROPERTYBRISTOL PROPERTYBRISTOL PROPERTYLAKE WASHINGTONPUGET SOUND ENERGY PROPERTYSHEET x02 THE HOTEL AT SOUTHPORTSHEET x03
CONTRACTOR TO PROTECT EXISTING T.E.S.C. MEASURESIN PLACE FROM HOTEL PROJECTSHEET x04
SOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.OVERALL DEMOLITION PLAN
PIVLegendSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.DEMOLITION PLANSEE SHEET - C102g. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C103
LegendSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.DEMOLITION PLANg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C101SEE SHEET - C103
PIVLegendSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.DEMOLITION PLANSEE SHEET - C102
SEE SHEET - C101g. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C104
PIVPIVSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.DEMOLITION PLANg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C103
TRUE NORTHg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)BOEING PROPERTYBRISTOL PROPERTYBRISTOL PROPERTYLAKE WASHINGTONPUGET SOUND ENERGY PROPERTYTHE HOTEL AT SOUTHPORTSOUTHPORT OFFICELAYDOWN/DELIVERYLAYDOWN/DELIVERYCONTRACTOR SHALL COORDINATIVE WITH OWNERAND HOTEL CONTRACTOR TO NEGOTIATE WORKLIMITS AND LOGISTICS INVOLVING THE CONSTRUCTIONPROXIMITY OF THE TWO PROJECTSSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.OVERALL T.E.S.C. PLAN
1Catch Basin Insert Detail12Baker Tanks10Building Pad Section8Interceptor Swale7Moveable 55 Gallon Drum and Pump64" Gravel Parking Section4Rock Check Dam2ATB Paving Section21AASOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.T.E.S.C. DETAILS
TRUE NORTHg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SHEET x01BOEING PROPERTYBRISTOL PROPERTYBRISTOL PROPERTYLAKE WASHINGTONPUGET SOUND ENERGY PROPERTYSHEET x02 THE HOTEL AT SOUTHPORTSHEET x03
SHEET x04
SOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.OVERALL GRADING AND STORM DRAINAGE PLAN
PIVABCDEFGHLegendGARAGE ENTRYFF=32.00FF=35.00FF=35.00LOADINGDOCKFF=22.00FF=33.50SD#1, CB TYPE 2-48"DISCHARGE TO LAKE WASHINGTONSD#4, CB TYPE 2-48"SOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.GRADING AND STORM DRAINAGE PLANSEE SHEET - C302g. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C303
12345678910114.26.810.2GARAGEENTRYFF=22.00GARAGEENTRYFF=22.00LegendSD#2, CB TYPE 1SD#3, CB TYPE 1SD#Z1, CB TYPE 1SOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.GRADING AND STORM DRAINAGE PLANg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C301SEE SHEET - C303
PIV1212.813141515.216171817.8JKLMNPQRSTFF=33.50GARAGEENTRYFF=22.00LegendSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.GRADING AND STORM DRAINAGE PLANSEE SHEET - C302
SEE SHEET - C301g. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C304Sewer Trench Detail
PIVPIVSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.GRADING AND STORM DRAINAGE PLANg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C303
12Trench Drain Section11Storm Drain Cleanout Details7Pipe Backfill6Catch Basin Type 28Catch Basin Type 110Office/Hotel Seismic Joint1Not Used9Not Used5Not UsedSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.DRAINAGE DETAILS
TRUE NORTHg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SHEET x01
PIVPIVPIVPIVBOEING PROPERTYBRISTOL PROPERTYBRISTOL PROPERTYLAKE WASHINGTONPUGET SOUND ENERGY PROPERTYSHEET x02 THE HOTEL AT SOUTHPORTSHEET x03
SHEET x04
SOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.OVERALL UTILITY PLAN
PIVABCDEFGHLegendGARAGE ENTRYFF=32.00FF=35.00FF=35.00LOADINGDOCKFF=22.00GREASE INTERCEPTOR #1GREASE INTERCEPTOR #2FF=33.50(PRIVATE)SS#1, 60" MANHOLESOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.UTILITY PLANSEE SHEET - C402g. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C403
12345678910114.26.810.2GARAGEENTRYFF=22.00GARAGEENTRYFF=22.00LegendWater Main Trench w/ CDF BackfillIRRIGATION METER INSTALLATION - 1-INCH METER TOBE INSTALLED BY CITY FORCES. CITY TO PROVIDE ALLMATERIALS FOR METER INSTALLATION. CONTRACTORSHALL PROVIDE ALL EXCAVATION TO EXPOSE THEWATER MAIN AND PERFORM ALL BACKFILL ANDRESTORATION WORK AFTER INSTALLATION OF METERBY CITY FORCES.SOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.UTILITY PLANg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C401SEE SHEET - C403
PIV1212.813141515.216171817.8JKLMNPQRSTFF=33.50GARAGEENTRYFF=22.00LegendSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.UTILITY PLANSEE SHEET - C402
SEE SHEET - C401g. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C404Sewer Trench Detail
PIVPIVSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.UTILITY PLANg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C403
’“” “” “” “” ’’UTILITY DETAILSSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.
UTILITY DETAILSSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.
TRUE NORTHg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SHEET x01BOEING PROPERTYBRISTOL PROPERTYBRISTOL PROPERTYLAKE WASHINGTONPUGET SOUND ENERGY PROPERTYSHEET x02 THE HOTEL AT SOUTHPORTSHEET x03
SHEET x04
SOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.OVERALL PAVINGAND HORIZONTAL CONTROL PLAN
PIVABCDEFGHLegendGARAGE ENTRYFF=32.00FF=35.00FF=35.00LOADINGDOCKFF=22.00FF=33.50CONCRETE VEHICLE ACCESS ON STRUCTURESOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.PAVING PLANSEE SHEET - C502g. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C503
12345678910114.26.810.2GARAGEENTRYFF=22.00GARAGEENTRYFF=22.00LegendCurb Section A-ASOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.PAVING PLANg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C501SEE SHEET - C503
PIV1212.813141515.216171817.8JKLMNPQRSTFF=33.50GARAGEENTRYFF=22.00LegendSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.PAVING PLANSEE SHEET - C502
SEE SHEET - C501g. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C504Sewer Trench Detail
PIVPIVSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.PAVING PLANg. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C503
8Thickened Asphalt Edge12Concrete Vertical Curb7Concrete Sidewalk11Concrete Extruded Curb4Asphalt / Concrete Transition3Heavy Asphalt Pavement2Light Asphalt Pavement52" Asphalt Overlay10Rolled Concrete Curb9Reinforced Concrete Slab-on-grade6Curb and Gutter DetailSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.PAVING DETAILS
8Curb Ramps12Concrete Driveway4Depressed Curb Ramp At CornerSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.PAVING DETAILS
128" Concrete Paving11Concrete at Building Face10Not Used9Not Used8Roundabout Curb Details7Not Used6Not Used5Not Used3Not Used2Not Used1Not Used5"3"8" R1.8'12"10"7"SEE NOTE 2MATCH ROADWAY SLOPE1/2" (IN) R. (TYP)2VARIES
FACE OF CURBMATCH ROADWAYSLOPE29"9"VARIES
4"1/2" (IN) R. (TYP)FACE OF CURBR12"R4"CURB 1ROUNDABOUT TRUCK APRONCEMENT CONCRETE CURB & GUTTER(ROLLED CURB)CURB 2(OUTSIDE, RIGHT SIDE OR SPLITTER ISLAND)ROUNDABOUT TRUCK APRONCEMENT CONCRETE CURB & GUTTER(ROLLED CURB)4Not UsedLEGENDMATCH ADJACENT PAVEMENT THICKNESSBUT NOT LESS THAN 6 INCHES2NOTE:SEE LANDSCAPE PLANS FOR COLOR, TEXTURE,AND FINISH OF CONCRETE OF PAVING.CONCRETE SIDEWALKSEE DETAIL1/2"Ø x 8" SMOOTH DOWEL@ 24" O.C.BUILDING FACESEE L'SCAPE PLANSFOR CONCRETE SCORINGAND DETAILSEXISTING BUILDING3/8" EXPANSION JOINT W/PREMOLDED JOINT FILLERAND FLEXIBLE POLY SEALERWHERE BAND IS ADJACENTTO ALL BUILDING FACES- FULL DEPTH4"4"SOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICE33708STATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER CORB.BYHTOMITYAWKCOUGHLIN LUNDEEN PORTER E N G I N E E R I N G S E I S M I C C I V I L S T R U C T U R A L CONSTRUCTION RECORD DRAWINGThis construction record drawing is a copy of a cad file prepared byCOUGHLIN PORTER LUNDEEN and has been edited to reflect fieldverified invert and rim elevations of the storm, sanitary sewer and watermain systems. Field verified invert and rim elevations were obtained byEXXEL PACIFIC IN AUGUST 2019The on-site private storm drainage facilities and public/private water andsewer systems were installed in accordance with the approved plans andthe documented field revisions and function as intended.PAVING DETAILS