Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout1972 Correspondence •
. • July 27,...,1971 ., , . .
•
• •.Wa'shington'.•State Highway•. Commission
. •
- Department of .Highways . . .
•
•01ympia, 'Washington- 9850I . ..
At to e; •F1r. ..G. ...H. Andreas . .
. - . . •- . • ".Director of Highways • '
Re: Six-Year Comprehensive Street
.. -Constr.uction . Plan and Atterial - '
• = • Street ,Plan for City of Renton - '
Gentlemen:
.. Purs'uan't to requirements of Chapter 7, extraordinary • .
Session. Laws, of 1961. of .the State of Washington and
•
Chapters 195 of the '1961 Sea' Laws, we .file herewith
. • two . certifi,edcopies of City of Renton:'Resolution No. -
• •1753''adopti;ng amended andmodified .Six-Year Street
Construction Program and, the City's Arterial_ Street.
Plan: • ' •
. ,.The Resolution extends _the' City' programs to , 1977- as , ..
•
• - per 'exhibits attached, to, and •made a part of .Resolution
.. .,No. •1753 adopted. •by the Renton City Council at its.
regular meeting:.of July 26, 1971. ..
• Yours very truly,
' • CITY •OF RENTON
- Helmie •W. Nelson '
. City Clerk , . .
• FTWN/din
Encloserds (2) `
CC', • Citi; iee •
_ ".ub l 1 e; obkc"g
I
y , -.;
. .."57./---/..t.„ce..i ---- c .-4A-ii,4„.4--E--,--7,74_42-7,--t).,4
i. 2� 7ter`-'
TRANSPORTATION COMMITTEE REPORT
JULY 19 , 1971 7C�—,76-,t6--,->(1/7:1-7,J---
/-&-'---7"----)
The Transportation Committee held a public hearing on
Wednesday , July 14 , 1971 , in .the fourth floor conference
room on the Six-Year Street Construction Program, and
Arterial Streets Plan , and hereby concurs in the plan as
submitted at the public hearing.
L'
Chairman Wi11iai J. Grant
111
Ri re o, c e
WJG.I •
r
RESOLUTION NO. &,-5".7
WHEREAS the City of Renton, Washington, has heretofore
adopted a Comprehensive Six Year- Street Program pursuant to
the requirements of Chapter 195 of the 1961 Session Laws , which
Program has heretofore been amended from time to time, and
WHEREAS the City, by and through its City Engineer and
Traffic Engineer have heretofore proposed certain revisions , modi-
fications and amendment to said Six Year Street Program, and
WHEREAS a public hearing has been held on December 22 , 1969 ,
after prior notice thereof as required by law, to consider the
adoption, modification and division of a new Comprehensive
Six Year Street Program and all parties having been heard in
support .thereofor in opposition thereto at said public hearing;
NOW THEREFORE
BE IT RESOLVED BY THE MAYOR AND THE CITY COUNCIL OF THE '
CITY. OF RENTON, WASHINGTON, AS FOLLOWS: .
SECTION I : The aforesaid recitals and findings are hereby
found to be true and correct in all respects. The City' s Compre-
hensive Street Program for the ensuing six years, as annually
reviewed and modified, is hereby adopted, and a copy thereof,
labeled "Exhibit A" is incorporated herein and made a part hereof
as if fully set forth. Said Six .Year Comprehensive Street Program,
as evidenced by said exhibit , shall be and constitute the City' s
Comprehensive Program until reviewed annually, thereafter and as
otherwise provided by law.
SECTION I'I: A copy of said Comprehensive Street Program
shall be filed with the Director of Highways not more than sixty (.60)
days after adoption of this Resolution, together with a certified
, •
copy hereof.
PASSED AND APPROVED BY. THE CITY COUNCIL this 6 — day
of January, 1970 .
Helmie Nelson, City Clerk
APPROVED BY. THE MAYOR this 3"-- K4., day ofJanue.ry,'1970'I iA4
-.
144.44.04:4;f---
v er Larr-tt, ayor
APPRS-V D AS TO FORM:
40
'Gz ard M. S :4 an, ity it orney
Dff&-ena**Tit50
•
• ,
•
Submitted T2
-8-6g SIX YEARR TRC[IOt PRI Page 1
G uv Gov01--/2 -26-G9 1970 - 1975
• (CITY)
HEARING DATE NEie DATE JAN 5 19/0 RESOLUTLONr. NO. /.(57 (TOWN`- OF -- —RENTON___ —
ROAD F C U R LENGTH COST ESTIMATE
" ITEM LOCAL NAME OF OR U L R UIN
"TREET N A B R TYPE OF WORK
NO. ROAD OR STREET-- NO. S A A MI . 1970 1971 1972 1973-75 TOTAL- f - -
S
1 Edmonds Ave. N.E. 9330 C X Widening, grading, curbs, storm 1 .1 350,000 140,000 490,000
Sunset Blvd: N.E. to sewer, drainage, sidewalk, paving ,
N.E. 27th traffic control , street lighting
2 Houser Way S. 9360 C X Widening, grading, curbs , storm 0.5 150,000 150,000
Main Avenue S. to sewer, drainage, sidewalks, pav-
Bronson Way N. ing, traffic control , street
lighting
3 Main Avenue S. 9220 : C X Retaining wall , storm sewer, 0.2 161 ,500 . 161 ,500
S. Grady Way to Houser - drainage, curbs, paving, traffic
' Way S. control , street lighting
4 N. 6th St. 9201 C , X , Widening, storm sewer, drainage, 0.3 184,000 184,000
Logan Ave. N. to Park curbs, sidewalks, R.R. Crossing,
Ave. N. - traffic control , street lighting,
right-of-way
r
5 N 27th 9320 C X Widening, grading, paving, storm 0.5 ' 206,000' 206,000
Edmonds Ave. N.E. to N.E G sewer, drainage, curbs, sidewalks
28th-Kennewick P1 . N.E. traffic control , street lighting -
a
.
.
SIX YEAR Q`ETTIOl MOM
1470 - 1975
• Page 2
ITEM LOCAL NANO OF ROAD_ E 4 LENGTHr —_.-
OR U L COST E`TIMATF
NO. ROAD OR STREET .TREET N A .A-,1 TYPE OF WORK IN
NO. S ' MI . 1970 1971 1972 1973-75 TOTAL
i
6 N.E. 30th Freeway to 9320 C I Widening, gradingstorm 0_
Kenn2wick P1 . N.E. & sewer, drainage, curbs,nsidewalks
2 60,000 60,000
N.E. 28th traffic control , street lighting e
IIIIII
7 a S. W. 43rd 900 f S .Jidenin , grading, curbs, storm 1 .3 230,000 987,650 1 ,217,650.
East Valley Hwy to W. sewer, drainage, sidewalks,paving
Valley Hwy traffic control , street lighting,
Rwy right-of-way, structures.
11111 .
7 b S.W. 43rd dao! S King County & Kent portion of -- 230,000 ` 1 ,037,351 1 ,267,350
E. Valley Hwy to W. Vail: above
Hwy.
ill
8 S.W. Grady Way 9110 Widening,,grading, curbs, storm 0.25 41 ,50033,501°` IIIII 75,000
Rainier Ave. S. to Lind sewer, drainage, sidewalks, paving.,
Avenue S.W. traffic control , street lighting. ;
9 Ss.a4WA s ,LangstonLl�O. W RoadTo 9362 : C II Widening, regrading, storm sewer, 0.6 200,000• 20,001 220,000
drainage, street lighting, paving
w, c„,77-- z-/. irs traffic control
f
10 Union Ave. N.E. . - Widening, grading, curbs, storm 1 .8 215,000. 50,000 ; 50,000 100,000 415,000
G
N.E. 4th to N. city limi 9340 . 0 X sewer, drainage, sidewalks, E
t paving, traffic control
. .
, .
SIX YEAR CONSTRUZTION PRIM
Page 3
M70 - 1975
ROAD F C U R ' LENGTH
COST ESTIMATE NAME OF
ITEM LOCALOR ti L R U
NOSTREET N AB R TYPE OF WORK IN
ROAD OR STREET.
MI . 1970 1971 - 1972 11973-75 1 TOTAL
NO. L sS _NA 1A
11 Garden Ave. N. 9181 A. X Jidening, grading, curbs, storm 0.5 50,000 100,000 100,000 250,000
. 4th St. to N. 8th St. sewer, drainage, sidewalks, pav-
ing, street lighting and traffic
control .
•
12 . 3rd St. 9360 M Paving, curbs, storm sewer, 0.6 260,000 ! 260,000
Rainier Ave. S. to Main drainage, sidewalks , traffic I
NOTE: JOINT PRI ECT WITH SATE HIGHWA DEPARTMENT
Avenue S. control and street lighting.
. , .
. .
13 est Val ley Road M idening, grading, paving, drain- 0.6 • .
si.e.i,?4:t• 7z7 4/7r -4//tf/r3 age, Traffic Control . NOTE: S ,,TE HIGHWAY PROJECT - :0 COST DATA
. .
, .
111 I
14 ' .E. 12th St. & Sunset 7:)g 3 ,X .Traffic Signal • 24,000 24,000
_ Blvd
- ,
15 Main Ave. S. 9220 ' M •X - Paving, storm sewer, sidewalks, ' 6.1 : 70,000 . 70,0Q0
,
S. 2nd to Houser Way S. : curbs, traffic control , street
lighting i
. .
. -----
16 Park Ave. N. 9200 M X Paving, storm sewer, sidewalks, 1 .1 : 330,000 , ' 330,000
Bronson Way N. to curbs, traffic control , street
N. 8th St. lighting
•
. I .
. --.,-.... ,
. - —
.,.
Page 4
SIX WA OnTRIICTIOri P(OGRf
1970 - 1975
ROAD F L-U Ft-
11-Fm LOCAL NAME OF OR U L R U LENGTH COST ESTIMATE
STREET N A B . R TYPE OF WORK IN
N0. ROAD OR STREET NO. 5 A A MI . 1970 1971 1972 1973-75 , TOTAL
T S 1 .
17 Wells Avenue 9191 S X Bridge, widening, alinement 0.8 300,000 ' 300,000 600,000
S- 2nd to N. 6th adjustment,. curbs, sidewalks ,
storm sewer, drainage, paving
traffic control and street
lighting. . _I
18 Logan Avenue C X Storm sewer, drainage, sidewalks, 14,000 14,000 28,000
N. 6th to N. 9th traffic control . .
. 19 Airport Way 9400 M X Widening, sidewalks, curbs , storm 0.4 210,000 210,000
Rainier Ave. to Logan Ave. sewer, paving, traffic control ,
street lighting, right-of-way.
r
. 20(a)Sunset Blvd. N.E. 9363 M ;X Widening, paving, curbs and side- 1 .6 STATE - STATE STATE
Edmonds Ave. N.E. to walks, drainage and traffic
. E city limits-State control . .
20(b) Sunset Blvd. N.E. • 9363 M . X . Curbs, sidewalks, storm sewer, 1 .6 200,000 200,000 400,000
Edmonds Ave. N.E. to . drainage, traffic- control & .
E. city limits-City " . street lighting.
t
21 (a) Talbot Road 9042 S X Widening, paving, traffic control 0.5 STATE STATE STAGE
Grady Way to Puget Drive
1
.
SIX YEAR OM-RUCTION :PR ` .
7 970 - 7 975
Page 5
LOCAL NAME OF ROAD F C U R
LENGTH
ITEM OR U L R U' COST ESTIMATE
_-___----
STREET N A R TYPE OF WORK I'N
NO. ROAD OR STREET j
N0. 4 A MI. 1970 1971 j 1972 1 1973-75 TOTAL
21( ) Talbot Road 9042 S )t Sidewalk, curb, storm drain, 0..'5 150,.000 , j .
750,000
Grady Way to Puget Dr. and street lighting.
22 N. 6th St. -- --- X Grading, paving, widening, storm 0..1 60,000 • _ 60,000
Park Ave. N. to Garden 9 sewer,_ curbs, sidewalks, street ; t -
Ave. N. -Z66 ,Q lighting. V V
,
4.
23 S.- 2nd St. 9350 ' M X Paving, curbs, drainage, storm 0..6 290,000 290,000
Main Ave. S. to Rainier sewer, traffic control , and
Ave. S. street lighting. NOTE: JCi,nt iCity-State Highway 'Department .'roject
24 Lind Avenue S.W. ' 9103 -- X Right-of-way, structure, curb, ' 0.4 10,000 240,000 ' 1 ,450,000 1 ,700,000
S.W. Sunset Blvd. to storm sewers, sidewalks, paving -
S.W. 7th traffic control , street F
R.R. Crossing. I
, c
25 Talbot Road 9042 ' C X Widening, curbs, sidewalks, storm 1..6 30,000 200,000.. 250,000 ; 480,000
Puget Drive to south city sewer, drainage, traffic control '
limits and street lighting.
► ,
26 S. 4th St. 9444 C X ' Right-of-way, widening, grading, 0.6 10,000 , '250;000` 300,000 560.,000
Main Avenue S. paving, storm sewer, traffic
to Rainier Ave. S. control_ and street lighting
1 4 1
Page 6
SIX YEAR COUSTRUCTIOU PROGRAM
1470 - 19-75
i_._ `______..� 4 ,
�- LOCAL NAME OF ROAD F ill—
OR LENGTH
I ���� U COST ESTIMATE
TREET N TYPE OF WORK IN - -
+0 ROAD OR STREET NO. MI . 1970 . 1971 1972 1973-75 TOTAL
27 Benson Highway 9045 S X Relocation, grading, drainage, j 1 .8 STATE STATE STATE STATE
storm sewer, paving, curbs, side
walks, street lighting and
traffic signals.
28 Benson Highway (Existing) 9045 S X Drainage, storm sewer, paving, 1 .8 ; 900,000 900,000
curbs , sidewalks, street light-
ing and signals -
29 Lake Ave. S. 9p o iT 4 X Curbs, grading, paving, storm 0.25 _ 75,000 75,000
Airport Way to S. 2nd drainage, right-of-way, street -
lighting. -
30 Puget i 706--/ s X Sidewalks 1 0.5 50,000 1 50,000
Talbot Road to Benson .
31 N. 4th St. -- - ' X Widening, curbs , sidewalks, 0.3 90,000 90,000
Edmonds Ave. N.E. 9/579 A storm sewer, street lighting &
to Jefferson St. paving.
32 N. 4th St. Jefferson St. fironi X Sidewalks, street lighting 0.9 10,000 10,000 20,000 100,000 140;000
E. City limits
33 N.E. 3rd St. —9-1-50 M X Sidewalks, street lighting and • 0.9 100,000 100,000 200,000
Sunset Blvd. N. to "traffic control .
I N.E. 4th St. ?/-9-15,
1
x •
SIX YEAR CONSTRUCTIOR PRJGRAM Page 7
197'' - 1975
ROAD F C R LENGTH COST ESTIMATE
17, 11 t_GC:+� fdi'.'tE OF OR u L R U
I TREET '! ABR TYPE OF WORK IN
+O. ROAD OP STREET N0. S A A MI . 1970 1971 1972 1973-.75 TOTAL
34 Taylor AVe. & Taylor P1 . 9130 C X Widening, grading, curbs, side- 0.6 180,000 100,000 280,000
N.W. Renton Ave. Ext.9121 walks, paving, storm sewer,
to N.W. 7th & Stevens Ave. . street lighting. .
N.W.
Curbs , sidewalks, street lightin. 1 .8 10,000 20,000 648,000 678,000
35 Rainier Ave. -N. city
limits to Grady Way y°"° 'Y paving, traffic control.
36 l_ind Ave. S.W. 9103 C
X Curb, sidewalks, storm sewer, 0.7 220,000 220,000
IGrady to S. J. 16th pavement, grading.
37 Sunset Blvd. W. 9361 M X Curbs, grading, paving, sidewalk 0.8 240,000 240,000
storm sewer, street lighting.
38 ,.ogan Avenue 9406 M X Bridge, widening, grading, drain . 0.3 40,000 360,000. 400,000
Airport Way to N. 4th St. age, curb, sidewalks, paving,
traffic control , street lighting. p
39 Logan Avenue Widening, grading, paving, curbs 0.4 20,000 180,000 200,000
S. 3rd to Airport Way 9406 S X sidewalks, street lights, traffi •
control , right-of-way.
40 Smithers Ave. S. 9406 -- X Grading, drainage, storm sewer, 0.5 60,000 540,000 600,000
S. Grady to S. 3rd. . - /f ' paving, sidewalks, street lights .
widening, R.R. Crossing, right-
of=way.
SIX YEAR CONSTRUCT:IOU WA A Rage `,8
1970 - 1975
--..
' ROAD , F CLENGTH,
ITEM LOCAL NAVE OF
OR u LL R , u' 1 lin COST ESTIMATENO.
NO. ROAD OR STREET
.TREET ,n A 4 , R' TYPE OWORK F 1W 1 i , ...
;
Ira_ 1970 ! 1973 1 1972 ' 1973-75 I 'TOTAL
NO. S I A
..
41 S.W. Grady Way S X' Wii
denng, paving, curb, side- i 0.9 i I; ? 60,00E4 54B400.01 6004000
../a ,
Lind Ave. S. to Nest , walks, storm ,drainage, struct- 1 !
i !
city limits ; ures, street lighting_
42 Renton Avenue Ext. , 11 X1 paving, sidewalks, storm sewers.; 0_15 i 10%0E10 ! ' 300;0300
Y...1-C7
Rainier Ave. N. to west , street lighting.
city limits
• , ii
43 Edmonds Ave.- N.E. A .X' Paving, sidewalks, (curbs, widen 1 0_9 1, . , .30,0001 240,000; 270,000
.77.3c., - I 1,
N.E. 4th to Sunset ing, storm sewer, street light-1
Bl vd. N.E.- ing. 1 ; ,
!! '
( ,r i,
... ,
44(a) Maple Valley Highway .7Y.7/ PI X Widening, relocation, grading, .. 2_l ; ' STATE :STATE ' STATE .STATE
Bronson Way to East ' i drainage, storm sewer, paving,
city liMitS ,, , ' sidewalks, street lighting
i,
44(b) See above , Y:?.9..7 N Y City portion ;of bove ,: 2_1 200;3000 ! 200,000 i _ -400;000
• I:
.
, i•
45 Wells Avenue S. - , 9191 ,, S X ;• Sidewalks, stormdrain, sewer„ ,; 014 ,
1 ' 280„000; 280,000
S. Grady to S. 2nd ' paving, street bghtling and
c !*
traffic control , i I
1
1
46 Kirkland Ave. N.E. N.E -- A / Curb, sidewalks, paving, , 0.25 26,000*
1 1
26„DDO
.,,
sunset Blvd N.E. to 10th F.30,/ storm sewer
1 ''
'•
SIX,YEAR CONSTRUCTION P OGR (1 Page 9
1970 - 1975
ITEM LOCAL NAME OF ROAD OR Ij L R U LENGTH COST ESTIMATE
STREET N A B R TYPE OF WORK IN
NO. ROAD OR STREET _
NO. S �A A
C mi. 1970 1971 1972 1973-75 TOTAL
47 Houser Way - Main Ave. -- A X curbs, sidewalks, paving, traffic 0.2 60,000 60,000
S. to Burnett Ave. S. y,?%‘) control
48 Monroe Ave. N.E. -- C X Curbs , sidewalks, paving, storm 1 .0 - 380,000 380,000
N.E. 4th to N.E. 12th 3;. 3 sewer, traffic control and street •
lighting.
49 S. Puget Dr. 9052 C X Widen, curbs, sidewalks, storm. 1 .0 380,000 380,000
Benson Rd. S. to Edmonds - sewer and traffic control .
Avenue S.E.
50 S.W. 16th St. 9003 C X Widening, grading, structure, 1 .1 200,000 600,000 800,000
E. Valley Hiway to west right-of-way, storm sewer,
City limits drainage, curbs, sidewalks,
paving, traffic control and
street lighting. .
51 N.E. 7th Curbs, storm sewer, paving, 0.8 320,000 320,000
Sunset Blvd. to Monroe 9364 A X sidewalks , traffic control and
street lighting
52 Sunset Blvd. N.E. /36 Z S X Widening, grading, drainage, 1 .7 680,000 680,000
Bronson Way N. to storm sewer, sidewalks, curbs,
Edmonds Ave. N. paving, traffic signals and
.street lighting
1
SIX YEARSTRUCTION PROGRAM Page 10
1970 - 1975
LOCAL NAME OF ROAD F CUR LENGTH
1TFrl OR U L R U COST ESTIMATE
NO. ROAD OR STREET STREET N ABR . TYPE OF WORK
IN
N0_ c SAA M1 . 1970 1971 1972 1973-75 TOTAL
s1V _
53 Aberdeen Ave. N.E. A X Widening, grading, drainage, 1 .7
Sunset Blvd. N.E. to 9-�''h , storm sewer, curbs, sidewalks , 680,000 680,000
N.E. 27thpaving and street lighting. -
54 N. 4th St. - _ 9182 X. R.R. overcrossing, grading, pav- 0.15 300,000 300,000
•
Sunset B#,W. to 4 ing, r/wy, curbs , storm sewer,
Factory'Ave..: N. sidewalks, street lighting and
traffic control
55 N.E. 12th 9333 C X Widening, grading, curbs , side- .1 .25 50,000 450,000 500,000
Aberdeen Ave. N.E. to walks, sewer, drainage, street
Union Ave. N.E. -- lighting and traffic control
56 Houser Way Sidewalk, curb, storm sewer, 1 .1 - 40,000 400,000 440,000
N. 4th to Lake Wash Blvd. 9203 C X drainage, paving, street- light-
ing, and traffic control ,
57 Williams Avenue 9394 S X Structure, widening, grading, 1 .2 - 40,000 880,000 920,000
S. Grady Way to N. 6th St paving, curb, sidewalk, storm
sewer, street lighting and
traffic control
58 Morris Ave. S. 9366 A X Curb, storm sewer, paving 0.5 150,000 150,000
S. 2nd to S. 7th street lighting & traffic control
,
1
d
SIX YEAR OIETRUCTION PI XRANf Page 11.
1970 - 1975
I. ...._.T_. -- . - -----
I TEM M - LOCAL NAME OF ROAD C U R LENGTH
OR U L R l: COST ESTIMATE
REET N A B R TYPE OF WORK IN
T
NO. ROAD OR STREET A B R
N0. HI . 1970 1971 1972 1973-75 TOTAL
X i - 1
59 Whitworth Ave. S. 9369 A X curb, storm sewer, paving 0.4 125,000 - 125-,000
2nd to S. 7th street lighting and traffic cont.
•
60 .Shattuck Ave. S. 9007 A X curb, storm sewer, sidewalks, 0.5
S . 2nd to S. 7th paving, undercrossing, street 20,000 258,000 278;000
lighting and traffic control
61 S. 4th P1 . 9006 A X curb, storm sewer, sidewalk, ,0.1 60,000 60,000
Shattuck Ave. S. to paving, & street lighting
Rainier Ave. S. ._
r.
_
62 Lake Wash. Blvd. N. 9280 S . X widening, grading, storm sewer, 2.5 - : 120,000 1 ,200,000 1 ,320,000
Houser Way to N.E. 44th curb, paving, street lighting,
Street I bridge structure
63 Burnett Ave. N. 9300 C X widening, grading, storm sewer, 0.6 20,000 240,000 26Q,000
N. 28th to N. 37th curb, paving, street lighting,
& traffic control
64 N.E. 10th 9999 C X Widening, grading, right-of-way, . 0.75 50,000 300,000 350,000
Sunset Blvd. N.E. to storm sewer, curbs, paving,
Union Ave. N.E. street lighting, & Traffic Cont.
65 N. 30th St. Park Aven. 9300 C X Widening, grading, curbs, storm 0.25 100,000 100,000
_ N. to Burnett Ave. N. sewer, paving, traffic control & .
' street lighting
TOTAL x$23,710,500
r
RESOLUTION NO . 1694
WHEREAS the City of Renton, Washington, has heretofore
adopted a Comprehensive Six Year Street Program pursuant to the require-
ments of Chapter 195 of the 1961 Session Laws , which Program has hereto-
fore been amended from time to time, and
WHEREAS the City of Renton acting by and through its
City Engineering Department , has heretofore proposed certain revisions ,
modifications and amendments to said Six Year Street Program including
the designations of certain arterial projects as specified in Chapter
83 Laws of 1967 , Extraordinary Session, and
WHEREAS a public hearing has been held on June 15 , 1970 ,
/and which was continued until June 22nd, 1970
after prior notice thereof as required -by law, to consider the adoption,
modification and division of a new Comprehensive Six Year Street Program
and all parties having been heard in support thereof or in opposition
thereto at said public hearing; NOW THEREFORE
BE IT RESOLVED BY THE MAYOR AND THE CITY COUNCIL OF THE
CITY OF RENTON , WASHINGTON , AS FOLLOWS :
SECTION I : The aforesaid recitals and findings are hereby
found to be true and correct in all respects . The City' s Comprehensive
Street Program for the ensuing six years , as annually reviewed and
modified , is hereby adopted, and a copy thereof, labeled Exhibit "A" is
incorporated herein and made a part hereof as if fully set forth. Said
Six Year Comprehensive Street Progam, as evidenced- by said exhibit, shall
be and constitute the City ' s Comprehensive Program until reviewed annually
thereafter and as otherwise provided by law.
SECTION II : A copy of aid Comprehensive Street Program
shall be filed with the Director of Highways not more than sixty (60)
days after adoption of this Resolution, together with a certified copy
'4
hereof.
PASSED AND APPROVED BY THE CITY COUNCIL this Z2 y pday
. of June, 1970 .
,/iii' ,CJ " t . /
IIC «� Pd�l����, Ci Ly Clcrk
Gw Marshall, Deputy City Clerk
APPROVED BY THE MAYOR this 2ZNw1ay of _June , 1970 .
OP
r .: 4JI_A
Avery Gare-tt, Mayor
APPROVED AS TO FORM:
, :57?-r",(14' /41
Gerard M. Shellan, City Attorney
SA.E - 7.02 - 9/69
1 . I
NOTE: Urban Arterial Board Approved Projects. SIX YEAR STREET COIJSTRUCTION PROGRAM.
REVISED 6/22/70
1971-1976 (1970-1971 THIS SHEET ONLY) .
HEARING DATE 6/15 £ 22/70 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 (CITY) OF PENTON
(TOWN)
ROAD FCUR
LOCAL NAME OR ULRU. LENGTH COST ESTIMATE
. ITEM OF STREET N A B RIN
NO, . ROAD OR STREET NO. CSAA: TYPE OF WORK MILES 1970 1971 1972 I 1973-75 TOTAL
TSNL
t 1 . Edmonds Ave. N.E. 9330 C Widening, grading, curbs, storm 1.1 290,000 200,000 ; 490,000
6 Sunset Blvd. N.E. to sewer, drainage, sidewalk, paving,
! N.E. 27th traffic control, street lighting
i 2 , Houser Way S. 9360 . Widening, grading, curbs, storm I
r Main Avenue S. to Bronson ' sewer, drainage, sidewalks, pav- 0.5 50,000 150,000 200,000
i Way N. . ing, traffic control, street
' lighting. 1
3 Main Avenue S. 9220 C Retaining wall, storm sewer, 0.2 150,000 11,700 161,700
S. Grady Way to Houser drainage, curbs, paving, traffic
Way S. control, street lighting
4 N.E. 27th 9320 C Widening, grading, paving, storm 0.5 87,000 119,000 206,000 .
Edmonds Avenue N.E. to N. sewer, drainage, curbs, sidewalks
28th-Kennewick P1. N.E. . traffic control, street lighting .
I 5 ; N. 6th St. 9201 S X Widening, storm sewer, drainage, 0.3 163,400 163,400
iLogan Ave. N. to Park curbs, sidewalks, R.R. crossing,
I Avenue N. traffic control, street lighting,
$ Right-of-way.
f
f;
r
1. r
NOTE: PROPOSED URBAN ARTERIAL BOARD PROJECTS - MAJOR
. 2.
•
REVISED 6/22/70 •
SIX-YEAR STREET CONSTRUCTION PROGRAM
1971 - 1976 •
HEARING DATE 6/15&22/70 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 CITY OF RENTON
•
ROAD F C U R
LOCAL NAME . OR U L R U - LENGTH COST ESTIMATE
ITEM OF STREET N A B R TYPE OF WORK IN
NO. ROAD OR STREET NO. T S N L MILES 1971 1972 1973 1974-76 TOTAL
6 Renton Ave. , Airport Way, Logan 9500 M X widening, sidewalks, curbs, storm 0.9
Ave. N. from West City limits sewer, paving, traffic control, 368,852 550,000 561,080 1,496,000
. to N. 4th St. street lighting, right-of-way,
bridge.
7 Sunset Blvd. N.E. from Edmonds 9363 M X curbs, sidewalks, traffic control, 1.6 230,000 238,300 468,300
Avenue .N.E. to East City limits street lighting, undergrounding .
• . (grading & paving by State Highway)
8 . Maple Valley Highway 9371 M X sidewalks, drainage, street light- 2.1 130,000 275,000 405',000,
Bronsn Way to East ing (grading and paving by State '
City limits Highway Department)
9 Park Avenue N. from Bronson 9200 M X paving, storm sewer, sidewalks, ,000.
Way N. to N. 8th Street P g1.1 401,000 401.
curbs, traffic control, street
' lighting
•
10 Rain ier Avenue ;
North City limits to Grady Way , 9000 M . X curbs, sidewalks, street lighting, 1.8 •
486,000 1.:]x,000 660,000
paving, traffic control and
storm sewer (paving participation . .
by State Highway)
11 S. 3rd Street from Rainier 9360 M X sidewalks, traffic control, 0.6 _ 38n nnnl I I - 3'10',600-
Avenue S. to Main Ave. S. street lighting, undergrounding v�vvv v -
(paving by State Highway Dept.)
•
NOTE: PROPOSED URBAN ARTERIAL BOARD PROJECTS - MAJOR 3. t
REVISED 6-22-70 SIX-YEAR STREET CONSTRUCTION PROGRAM
1971 - 1976 •
1970
HEARING DATE 6/is &22 ADOPTION DATE 6-22-70 RESOLUTION NO. 1694 CITY OF RENTON
ROAD F CUR
LOCAL NAME OR U L RU LENGTH COST ESTIMATE
ITEMOF STREET N A B R TYPE OF WORK IN
Na ROAD OR STREET NO. T S NL MILES 1971 1972 1973 I 1974-76 TOTAL
12 S. 2nd Street, Main Avenue S. 9350 M X. traffic control, street lighting, 0.60 300,000 300,000
to Rainier Ave, S. sidewalks, undergrounding (paving
by State Highway Department)
13 Main Avenue S. 9220 M X paving, storm sewer, sidewalks, 60,000 60,000
S. 2nd to Houser Way S. curbs, traffic control, street
lighting.
4. -7
SIX-YEAR STREET CONSTRUCTION PROGRAM
NOTE: PROPOSED URBAN ARTERIAL BOARD PROJECTS - SECONDARY 19 71 - 1976
REVISED 6/22/70 HEARING DATE6/15 & 22,70 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 - CITY OF RENTON
ROAD F C U R
LOCAL NAME OR U L R U LENGTH COST ESTIMATE
ITEM STREET N A B R
OFl YPE OF WORK IN
li
NO. i ROAD OR STREET NO. Cr S N L MILES 1971 1972 1973 1974-76 TOTAL
S.W. 43rd Street 9001 S X widen, grading, curbs, storm sewers 1 .3 127,000 1,700,000 1,696,000 3,523,000
14 East Valley Highway to Spring- sidewalks, paving, traffic control,
.rook Road street lighting, right-of-way,
structures, drainage.
15 .W. Grady Way - Rainier Ave. S. 9110 S X widening, regrading, curbs, storm 0.3 125,000 68,000 193,000
o Lind Avenue S.W. sewer, drainage, sidewalks, paving
traffic control, street lighting.
widening, sidewalks, storm sewers,
16 ells Avenue from S. Grady Way 9191 S X drainage, paving, street light- 1.2 520,000 330,000 201,000 1,051,000
to N. 6th Street
ing, traffic control, curbs,
alignment adjustment, bridge,
and right-of-way.
i
17 illiams Avenue 9394 S X structure, widening, grading, 1.2 270,000 ;, x.,030,000 1,300,000
from S. Grady Way to N. 6th St. paving, curb, sidewalks, storm
sewer, street lighting, traffic I
control, railroad adjustment.
18. Talbot Road from Grady Way to 9041 S X widening, paving, traffic signals, 0.5 15,000 129,000 144,000
Puget Drive traffic control, sidewalks, street
lighting, storm drains (City work
in conjunction with State Proj.)
19 S.W. Grady Way from Lind Ave. S 9100 S X widening, paving, curbs, sidewalks, 0.9 400,000 1,040,000 1,440,000
to West City limits storm drains, structures, street
lighting, traffic control.
f
•
SIX-YEAR STREET CONSTRUCTION PROGRAM 5 .
NOTE: PROPOSED URBAN ARTERIAL BOARD PROJECTS - SECONDARY
1971 - 1976
REVISED 6-22-70 6/15 22/70 6-22-70 1694 RE NTON
HEARING DATE _ ADOPTION DATE —_-- RESOLUTION NO. CITY OF
- - v ROAD FCUR
ITEM LOCAL NAME OR U L R U LENGTH COST ESTIMATE
OF STREET N A B R TYPE OF WORK IN t. —.....-- ----._....�
NO. ROAD OR STREET NO C S A A a,�ll E5 19i i 19721974-76 --
T S N L 19: 3 TOTAL
20 Logan Avenue from S. 3rd to 9406 S X widening, grading, paving, curbs, 0.4 355,600 355,600
Airport Way sidewalks, street lights, traffic
control, right-of-way.
21 Lake Washington Boulevard from 9280 S X widening, grading, storm sewer, 2.5 200,000 4,000,000 4,200,000
Houser Way to N.E. 44th St. curb, paving, street lighting,
bridge structure, traffic control.
6. -t"
•
NOTE: PROPOSED URBAN ARTERIAL BOARD PROJECTS- SIX-YEAR STREET CONSTRUCTION PROGRAM
COLLECTOR
1971 - 1976
REVISED 6/22/70 6/15 & 22/70 1684 RENTON
HEARING DATE ADOPTION DATE 6-22-70 RESOLUTION NO._ CITY OF
ROAD IF C U R
ITEM LOCAL NAME OR U L RB U LENGTH COST ESTIMATE
OF STREET C S A A TYPE OF WORK IN
NO. ROAD OR STREET NO. T S N L MILES 1971 I 1972 1973 1974-76 TOTAL
-
22 Union Avenue N.E. from N.E. 4th 9340 C X widening, grading, curbs, storm 1.1 253,000 323,500 38,500 615,000
St. to Sunset Blvd. E. sewer, drainage, sidewalks,
paving, traffic control, street
lighting.
23 Taylor Avenue N.W. & Taylor Pl. 9130 C X widening, grading, curbs, sidewalks 0.6 16,000 598,000 614,000
N.W. paving, storm sewers, street light-
ing, traffic control
24 Monroe Ave. N.E. from N.E. 4th 9343 C X widening, curbs, sidewalks, paving, 1.0 114,000 450,000 564,000
Street to N.E. 12th ST. traffic control, street lighting,
drainage, grading. .
l
25 Shattuck Avenue S. from S. 2nd 9007 C X curbs, storm sewers, sidewalks, 0.5 16,000 318,000 36,000 370,000
to S. 7th Street paving, structure, street lighting,
traffic control.
26 N. E. 12th Street from Edmonds 9333 C X widening, grading, curbs, sidewalks 1.25 47,000 663,000 710,000
Avenue N.E. to Union Ave. N.E. storm sewers, drainage, street
lighting, traffic control.
27 S. 4th Street from Main Avenue S right-of-way, widening, grading, 0.6. 227,000 378,000 605,000
to Rainier Avenue S. 9444 C X paving, storm sewers, traffic
control, street lighting.
28 East Valley Highway from C X grading, paving, storm sewers, 1.9 1,175,000 705,000 1,880,000
S.W. 16th St. & Lind Avenue S.W. curbs, sidewalks, traffic control,
to S.W. 43rd St. street lighting, undergrounding.
•
NOTE: PROPOSED URBAN ARTERIAL BOARD PROJECTS - COLLECTOR
REVISED 6/22/70 SIX-YEAR STREET CONSTRUCTION PROGRAM 7.
1971 - 1976
HEARING DATE 6/15& 22/70 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 CITY OF RENTON
ROAD F C U R
OR U L R U
LENGTH --'
COST ESTIMATE
ITEM
LOCAL NAME �� A R
OF STREET N f3 TYPE OF WORK IN
NO' ROAD OR STREET NO. T S AL
MILES 1971 1972 1973 1974-76 TOTAL
29. Edmonds Avenue N.E. from N.E. 4th 9335 C paving, sidewalks, curbs, storm 0.9 50,000 540,000 590,000
St. to Sunset Blvd. N.E. sewers, street lighting, traffic
control.
I
30 Talbot Road from Puget Drive to 9042 C X widening, curbs, sidewalks, storm 1.6 244,000 440,000 382,000 300,000 1,366,000
S. City limits sewers, drainage, traffic control,
street lighting, utility adjust-
ments.
31 N.E. 10th St. from Sunset Blvd. 9999 C X widening, grading, right-of-way, 0.75 25,000 240,000 221,000 486,000
N.E. to Union Avenue N.E. storm sewers, curbs, paving,
street lighting and traffic control
32 N. 30th St. from Lake Washington 9300 C X widening, grading, curbs, storm 0.6 305,000 305,.00(
Blvd. N. & Burnett AVe. North sewer, paving, traffic control,
to N. 30th St. & Freeway #405 street lighting.
33 S.W. 16th Street from E. Valley 9003 C X widening, grading, structures 1.1 43,000 687,000 730,000
Highway to E. City limits right-of-way, storm sewer,
drainage, curbs, sidewalks,
paving, traffic control and
street lighting. -
•
1 t
MISCELLANEOUS PROJECTS - FUNDING TO BE DETERMINED
REVISED 6/22/70
SIX-YEAR STREET CONSTRUCTION PROGRAM 8.
1971 - 1976
HEARING DATE6/15 &22/70 ADOPTION DATE 6-22-70 RESOLUTION NO. 16g4 CITY OF RENTON
ROAD F CUR
LOCAL NAME OR U L R U LENGTH COST ESTIMATE
ITEMOF STREET N A B R
C S A A TYPE OF WORK IN
NO. ROAD OR STREET NO. MILES 1971 1972 1973 1974-76 TOTAL
34 N.E. 30th - Freeway to Kennewick 9320 C X widening, grading, paving, storm 0.2 25,000 85,000
Pl. N.E. & N.E. 28th sewer, drainage, curbs, sidewalks, (1970-60,000)
traffic control, street lighting
35 S. W. Langston Road 9362 C X widening, regrading, storm sewer, 0.6 (1970-160,G30)
drainage, street lighting, paving,
20,000 30,000
traffic control.
36 Garden Avenue N. 9181 A X widening, grading, curbs, storm 0.5 100,000 100,000 50,000 250,000
N. 4th St. to N. 8th St. sewer, drainage, sidewalks, pav-
ing, street lighting and traffic
control.
C X storm sewer, drainage, sidewalks, 0.3 14,000 14,000 I
37 Logan Avenue g 28,000
N. 6th to N. 9th traffic control.
38 N. 6th St. ---- -- X grading, paving, widening, storm 0.1 60,000 60,000
Park Ave. N to Garden Ave. N. sewer, curbs, sidewalks, street
lighting.
39 Lind Avenue S.W. 9103 -- X right-of-way, structure, curb, 0.4 10,000 240,000 1,450,000 657,000 2,357,000
S.W. Sunset Blvd to S.W. 7th storm sewers, sidewalks, paving
traffic control, street R.R.
crossing.
40 Benson Highway (Existing) 9045 S X drainage, storm sewer, paving, 1.8 900,000 900,000
• curbs, sidewalks, street lighting
and signals.
•
MISCELLANEOUS PROJECTS - FUNDING TO BE DETERMINED /
REVISED 6/22/70
SIX-YEAR STREET CONSTRUCTION PROGRAM 9.
1971 - 1976 --
•
•
HEARING DATE 6/15 &22/70 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 CITY OF RENTON
ROAD F CUR
ITEM LOCAL NAME OR U L R U LENGTH COST ESTIMATE
OF STREET N A B R TYPE OF WORK IN
NO. ROAD OR STREET NO. T S N L MILES 1971 1972 1973 1974-76 TOTAL
41 Lake Ave. S. X . curbs, grading, paving, storm 0.25 75,000 75,000
Airport Way to S. 2nd drainage, right-of-way, street
lighting. -
42 Puget Drive X sidewalks 0.5 50,000 50,000
Talbot Road to Benson
43 N. 4th St. -- -- X widening, curbs, sidewalks, storm 0.3 90,000 90,000
Edmonds Ave. N.E. sewer, street lighting & paving
to Jefferson St.
44 N. 4th St. Jefferson St. X sidewalks, street lighting 0.9 10,000 30,000 100,000 140,000
east City limits •
45 N.E. 3rd St. 9150 M X sidewalks, street lighting & 0.9 100,000 100,000 200,00(
Sunset Blvd. N. to - traffic control
N.E. 4th St.
46 Lind Ave. S.W. 9103 C X ( curbs, sidewalks, storm sewer, pav-i 0.7 220,000
ling, grading, Hiway overcrossing 100,000 900,000 1,220,000
Grady to S.W. 16th structure, widening to 44' & St. li9hting.
47 Sunset Blvd. W. 9361 M X curbs, grading, paving, sidewalks, 0.8 240,000 240,000
storm sewer, street lighting.
48 Smithers Ave. S. 9406 -- X grading, drainage, storm sewer, 0.5 60,000 540,000 600,000
S. Grady to S. 3rd. paving, sidewalks, street lights,
widening, R.R. crossing, right-of-
way.
MISCELLANEOUS PROJECTS - FUNDING TO BE DETERMINED 10. '
SIX-YEAR STREET CONSTRUCTION PROGRAM
REVISED 6/22/70
1971 -.1976
HEARING DATE 6/15 & 22/70ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 CITY OF RENTON
ROAD F C U R
ITEM LOCAL NAME OR U L R U LENGTH COST ESTIMATE
OF STREET N A B R TYPE OF WORK NO. ROAD OR STREET NO. T S A A MILES 1971 1972 1973 1974-76 TOTAL •
A
49 Kirkland Ave. N.E. - N.E. -- A X curb, sidewalks, paving, storm 0.25 26,000 26,`000
Sunset Blvd. N.E. to 10th sewer
50 Houser Way - Main Avenue S. -- A X curbs, sidewalks , paving, traffic 0.2 60,000 60,000
tfl.Burnett Ave. S. control
51 S. Puget Dr. widen, curbs, sidewalks, storm 1.0 380,000 380,000
Benson Rd. S. to Edmonds Ave. S E. 9052 ; C X sewer and traffic control
521. N.E. 7th
Sunset Blvd. to Monroe 9364 A X curbs, storm sewer, paving, side- 0.8 320,000 320,000
walks, traffic control and
street lighting
53 Sunset Blvd. N.E. S X widening, grading, drainage, 1.7 680,000 680,000
Bronson Way N. to Edmonds storm sewer, sidewalks, curbs,
Avenue N. paving, traffic signals and
street lighting
54 Aberdeen Ave. N.E. A X widening, grading, drainage,
Sunset Blvd. N.E. to N.E. 27th storm sewer, curbs, sidewalks, 1.7 680,000 680,000
paving and street lighting
f
55 N. 4th St.
Sunset Blvd. to Factory Ave. N. 9182 X R.R. overcrossing, grading, pav- 0.15 300,000 300,000
ing, Railroad, curbs, storm
sewer, sidewalks, street lighting
and traffic control
• MISCELLANEOUS PROJECTS - FUNDING TO BE DETERMINED .f
REVISED 6/22/70 . 11 .
SIX-YEAR STREET CONSTRUCTION PROGRAM
1971 - 1976
HEARING DATE 6/15 & 22/70 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694 CITY OF RENTON
ROAD FCUR
ITEM LOCAL NAME OR U L R U LENGTH COST ESTIMATE
OF STREET N A B R TYPE OF WORK IN - -
NO. • ROAD OR STREET NO. Y S - N L MILES 1971 1972 1973 1974-76 TOTAL
56 Houser Way sidewalk, curb, storm sewer, 1.1 40,000 400,000 440,000
N. 4th to Lake. Wash. Blvd. 9203 C X
drainage, paving, street lighting
. and traffic control
57 Morris Ave: S. 9366 A X curb, storm sewer, paving
S. 2nd to S. 7th
street lighting & traffic controL 0.5 150,000 150,000
58 Whitworth Ave. S. 9369 A X curb, storm sewer, paving, street 0.4
2nd to S. 7thg 125,000 125,000
lighting and traffic control
59 S. 4th Pl. 9006 A X curb, storm sewer, sidewalk, 0.1 60,000 60,00(
Shattuck Ave. S. to Rainier paving, and street lighting
Ave. S.
60 Burnett Ave. N. 9300 C X widening, grading, storm sewer, 0.6 20,000 240,000 260,000
N. 28th to N. 37th curb, paving, street lighting
and traffic control
•
PREVIOUSLY FUNDED REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM /z f
CITY OR COUNTY
I ON i HEARING DATE1
6 5 & 6/22, 1970 ADOPTION DATE 6/22/70 _ RESOLUTION NO. 1694
REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD
FUNCTIONAL CLASS OF ARTERIAL URBAN
COLLECTOR f ARTERIAL 1971 1972 1973 V
TRUST
FUNDS 1/1 7'l 1 /1 1 lit 7,1 1974 1975 1976
to to to to to to
- I.•.,•- l Nante .d Arterial \rt.-n..l s... . Priority. No 6/30 12/31 6/30 12/31 6/30 - 1 2!31
Edmonds Avenue N.E. . 9330 5 PP
1)ct:,ilrJ [,oealion of Proieet and Termini I englh .n \hl..
• Sunset Boulevard N.E. to 1.1 R%
N.E.• 27th St.
I)e."•ripi.,'c "! Promised Work widen, grade, curbs, storm sewer,
sidewalks, paving, traffic control, street lighting. cont. I
ESTIMATE OF TOTAL COST • 200,000
Pwlirn. Fnt:. Right of l\:1% 1 I •m,trn.-tion Total Total •-
44,700 — 401,700
446,400 200,00C .- -
Lncirl Name or Arterial Arterial No. Priority No. 5. P.E.
Houser Way S. 9360 • 2,50C
•
Detailed Loca lion 01 Project and Termini • Length in Miles R'W
. Main Avenue S. to Bronson Way N. 0.5
Description of Proposed Work widen, grade, curbs, storm sewers, Const. _
• sidewalks, pave, traffic control, street lighting. >- '
113,301
•
o .
ESTIMATE OF TOTAL COST Total „t
I-
Prelim. Eng. Right of Way t Construction Total U
115,8Qg ' ' .
0
12,500 -- 113,300 125,800 as . '
Local Name of Arterial
Arterial Nn. Priority No. 5. P.E. to
> .
Main Avenue So. 9220 - 0 -
a
a
Detailed Location of Project and Termini Length in Miles R'sµ Q .
S. Grady Way to Houser Way S. 0.20 _ o .
LL
Description of Proposed Work retaining wall, storm sewer, Const. Z
drainage, curbs, paving, traffic control, street 16,O0a .
lighting. o
it
• ESTIMATE OF TOTAL COST Total r„ V
'Prelim. Eng. Right of Way Construction Total I=„ .
16,200 145,500 ' 161,700 16,0011, .
m - - - .__ V
T
FUNDED PREVIOUSLY REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM 13
CITY OR COUNTY
• I— - -- - --- ---- —__ HEARING DATE 6/15 & 6/22, 1970 ADOPTION DATE 6/22/70 — RESOLUTION NO. 1694
REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD
FUNCTIONAL CLASS OF ARTERIAL URBAN
ARTERIAL 1971 1972 1973
COLLECTOR _ J TRUST 1974 1975 1976
FUNDS 1/1 7 '1 1 /1 7, 1 1/1 711
to to to IG to to
I l.',al Name .,i \rlenal \rl. n,,1 N,' Pnontt, No 6 /30 12 /31 6%30 12 '31 6/30 1 2/31
N.E. 27th Street 9320
5 P.P.
Urloil,•,1 Location .,I Prol.•,l ,mil l-•imini Length in Mil:.
Edmonds Ave. N.E. to0.5 li '\\
N.E. 28th St.-Kennewick P1. N.E. •
D.•.,tipl, . P,,,I,o•- 'I \\,,,k widening, grading, paving, storm -
sewers, drainage, curbs, sidewalks, traffic control, (.,,I.,<t -
street lighting.
68,300
ESTIMATE OF TOTAL COST
l. Preto,. I o.•. Iluvhl ,.I \1,m , .,.lrim In'n Total ThIai
18,700 -- 168,300 187,000 68,300
I. d.,,,di Nan:. of \itoital Arterial No. I'riorily No. 5. pt. ,
. • i
'-
ticImm L I LU,ca lnm; ,,I Prui,',.t .and 1.rtumI Length in Miles R '\\
3. Description of Proposed \\nrk Const.
>-
J
Z I
Q • I
ESTIMATE OF TOTAL COST Total v'
I-
4. Prelim. ling. Rlghl'o1\1a\ construction Total U
w
O
Cr
W
I. Local Name of Arlr,i:II Arterial No. Priority No. 5. P.E. fl
> .
O
ce
a
a
?. Petalled I oe:itron of Protect anti lemon, Length in Miles R,'\\ < '
Cr
O
tL
3. Description of Proposed Work Const. Z . •
J
O
I1 }
ESTIMATE OF TOTAL COST Total en
4. Prelim. Eng. Right of Way Construction Total I--
w
i
D
UAB-1 REV 1X70
/-
• FUNDED PREVIOUSLY REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM /4
• CITY OR COUNTY HEARING DATE_6/15 & 6/22, 1970. ADOPTION DATE 6/22/70 _ RESOLUTION NO. 1694
RENTON
REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD
• FUNCTIONAL CLASS OF ARTERIAL URBAN
ARTERIAL 1971 1972 1973
SECONDARY TRUST 1974 1975 1976
FUNDS 1/1 . 7/1 1 /1 7.1 1/1 7%1
to to to to to to
I, Loral Name of Aiterial Arterial No. Priority No. 6/30 12/31 6/30 12/31 6 /30 1 2 X31
N. 6th Street 9201 , P.E.
10,000
2. Detailed Location of Project and Termini Length in Miles
LOGAN AVENUE. N. TO PARK AVENUE N. 0.30 R X11
• 3 Description of Proposed Work widening, storm sewers, drainage,
curbs, sidewalks, railroad crossing, traffic control, f.,,tist —
street lighting, right-of-way. 121,500
ESTIMATE OF TOTAL COST
4. Prelim. Frig. Right of\1'a' ('onf•truction Total 'total
14,850 - 133,700 148,550 131,500
I. Local Name of Arterial Arterial No. Priority No. 5. P.E.
2.
Detailed Location of Pioject and Termini Length in Miles R •W •
{
13. Description of Proposed Work Const.
• J
Z
O
ESTIMATE OF TOTAL COST Total v)
I-
4.
4. Prelim. Eng. Right of Lkay Construction Total t U
w .
• O
a
1 I I
1. Local Name of Arterial -- --Arterial No. Priority No. 5. P.E. w
(
R;15' a▪.
ct.2. Detailed Location of Project and Termini Length in Miles Q
Cc •
O
U_
3. Description of Proposed Work Const. Z •
D
J •
O
(1 '
ESTIMATE OF TOTAL COST Total w
• 4. 'Prelim. Eng., Right of Way Construction Total H
., w
REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM /31
CITY OR COUNTY HEARING DATE_6/15 & 6/22, 1970 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694
I.. .......... ia'i -.--]
REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD
FUNCTIONAL CLASS OF ARTERIAL URBAN
1-- - - ---- - ----1 ARTERIAL 1971 1972 1973
MAJOR ARTERIAL TRUST 1974 1975 1976
L_ -- -------- - - ----- -----
FUNDS 1 '1 7 '1 1 '1 7 '1 1/1 7 '
to to to to to to
I
Io, aI Nmm. of :\ricitalRenton Ave. 9500\r i,tial No Priority No 6 /30 12 '31 6 '30 12.31 6130 12/31
Airport Way 9400 1 5 P•I:
Logan Ave. N. 9406 67,320
-. 1)�1.,il,d 1.0catnm .0 ProieL t and Trrinint I.ngih in Mil., 67,320
W. City Limits to Airport Way 0.9 R `\\
Airport Way to Logan Ave. N.-Logan Ave. N.to 4th St.
Draiiptinn nl P,„Iw:-. I mirk widening, sidewalks, curbs, storm 18,000 18,000
sewer, paving, traffic control, street lighting, l.ii„t
right-of-way,bridge. 1,261,080 250,000 250,000 250,000 250,000 261,080 .
ESTIMATE OF TOTAL COST
.4- I'i, lint. I-nn. Right iil 11ao. I in.tnir.lron "Intel h.'i:il
335,320 250,000 250,000 250,000 261,080
74,800 20,000 1,401,200 1,496,000
1,346,400
_ r- ) 1 -
1 1 • A \,r•ne ni :\rictrul \rtrnal No. Priority No.. 5. P.R w .
> i
Sunset Boulevard East 9363 2 18,315 U 18,315
Q. 1
i It,'11
Drt.,•1 ,l Location of I'tojcct anti Irnuin] Length in Milos Q -
Edmonds Ave. N.E. to 1.6 ce
0
East City Limits .
1 3. Dent.riplion of Proposed Work curbs, sidewalks, traffic control Const. Z
1 street lighting, undergrounding. (Grading & paving by D
403,155 -1 200,000 203,155
State Highway Dept.) to
I ESTIMATE OF TOTAL COST Total
. 4. Prelim. Eng. Right of Way Construction Total I-
20,350 -- 447,950 468,300 421,470
w 218,315 203,155
UAB-1 REV..1/70
I t .-
'1. Local Name of:\rt vital .\ri tial No. Priority No 5. P.E. �I
Maple Valley Highway 9371 3 18,225 18,225
i
2. Derailed Location of Pml<<I anti 're rm iii Length in Miles R '\4
I Bronson Way to East City Limits 2.1
'3. Description of Proposed Work Const.
sidewalks,4street'lighting (Grading & paving by 346,275 3 100,000 100,000 146,275
State Highway Dept.) o
ESTIMATE OF TOTAL COST Total ,n
1--
4. Ptcltm. Eng. Right of 1\av Construction Total U 118,225 100,000 146,275
1 20,250 -- 384,750 405,000 1 o .
i
REVISED 6/22/70 • URBAN AREA SIX YEAR CONSTRUCTION PROGRAM �6 •
HEARING DATE__6/15, & 6/22 , 1970 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694
CITY OR COUNTY
1--- RENTON I - REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD
_-' URBAN
FUNCTIONAL CLASS OF ARTERIAL ART
1971 1972 1973
r--- -- -- - 1974 1975 1976
MAJOR ARTERIAL FUNDS 1!1 7 1 1 7. 1 til 7 1
to too tootc to to
-"- - - _.�
6 %30 12 '31 6.30 12 31 6 '30 12/31
II I . t.11 Name of \mortal \rt-•n,i No. Priori t‘. No 5. I'.1( w
>
Park Avenue N. 9200 0
4 17,370 a 17,370
0
' I)clatictl I...c.ition „I Prato'.I ,n I Is-nunl, Length in Miles R"'" Q
Bronson Way N. to 1.1 ce
N. 8th Street 4,500 0 4,500
De'itt MI) of Pl,gpn.r,l \\fill. (.011a Z
paving, storm sewer, sidewalk, '•
curbs, traffic control, street lighting. 339,030 Jo 113,500 225,530
L
ESTIMATE OF TOTAL COST 1„i.tl "'
4. 1'o-lm,. Fng. Right of Way (on:lrnctorn Total F
135,370 225,530
360,900 w
19,300 5,000 376,700 401,000
UAB-1 REV'..1/70 _
I. Local Name of Arterial Arterial Ni. Priority No. 5,. Pt..
Rainier Avenue 9000 5 27,090 27,090
2 Dct.ru ed LocaIton of 1'nt1et..t ,aril Icrnunt Length in Miles R 'W
North City Limits to 1.8 - -
Grady way
3. Description of Proposed Work curbs, sidewalks, street Con-.
lighting, paving, traffic control and storm sewer. 566,910 Z 200,000 214,710 152120`0'
(paving participation by State Highway Dept.) o _
ESTIMATE OF TOTAL COST Total co
I-. .
4. Prelim. Frig. Right of 11a r u, Ito Total tU •
30,100 -- o 227,090 214,710 152' 200 '
• 629,900 660,000 594,000 (x • :
1. Local N:nnr of Arterial Arterial No. Priority No, 5. P.B. I
S. 3rd St. 9360 6 15,930 15,930
2. brluiled Location of Project and Ternunt Length in Miles R,1\r
Rainier Avenue S. to 0.6
Main Avenue S.
3. Description of Proposed Work sidewalks, traffic control, street Const.
•
lighting, undergroun ding. (Paving by State Hwy. Dept.) 326,070 Z 173,400 152,670
0
• ESTIMATE OF TOTAL COST Total ,o
1-
4. Prclim. Eng. Right of Wav ('nnslru. tow Total U
342,000 3.r26 088 152,670
17,700 - 362,300 380,000 „
•
REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM / 7
• CITY OR COUNTY
HEARING DATE__6/15 & 6/22 , 1970 ADOPTION DATE 6/22/70 _ RESOLUTION NO. 1694
REN TON
• REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD
FUNCTIONAL CLASS OF ARTERIAL URBAN
IMAJOR ARTERIAL ATRUST IAT L 1971 1972 1973
FUNDS 1/1 7,11 1 /l 7.1 1/1 7/1
1974 1975 1976
to to to to to to
I Local Nanta of Arterial Arterial No. Priority No. 6/30 1 2/3 1 6/30 12/31 6 /30 12/31
South 2nd St. 9350 7 5 P.E.
Detailed Loeatum of Projvcc and Termini Length in Miles 13,500 13,500
Main Ave. So. to
0.60 RV
Rainier Avenue So.
Dr.'"'"""r rif I'r"'"''`! °"'k traffic control, street lighting,
sidewa.j s _
undergroun ing. (paving by State Highway Dept.) Cont_
ESTIMATE OF TOTAL COST 256,500 256,500
r. Prelim. Prig. Right ,of 11,ry .'onstrur.tmn Total Total
15,000 -- 1
285,000 300,000
270,000 270,000
. - . - - TI 4
o
I Local Name f Arterial Arterial No. Priority-No.
Main Avenue So. 9220
8 5. P.E.
2. Drt,n!ed Location of Project and Termini Length in Miles 5,400 5,400
South 2nd St. to .
0.1 12/W
Houser Way So. -
3. Description of Proposed Work paving, storm sewer, sidewalks,
' curbs, traffic control, street lighting. Const.
•
ESTIMATE OF TOTAL COST 48;600 148,660
—
4. Prelim. Eng. Right of 11ay Construction Total Total
6.,9g0 __ 160,000 54,000 54000 54;000
i. Local Nameof Arterial Arterial No. Priority No. 5. P.E. w ,
> . .
0
a
a - .
1. Detailed Location of Project and Termini Length in Miles " Q
ce
O
LL
3. Description-of Proposed Work Const, Z
O •
J
0 •
. tL
i ESTIMATE OF TOTAL COST Total „t
14.'... .31Eng. Right of Way Construction Total =
N
Li
REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM• ��
CITY OR COUNTY HEARING DATE 6/15 & 6/22 , 1970 ADOPTION DATE 6/22/70 RESOLUTION NO. . 1694
1TON•
DATE_
REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD
FUNCTIONAL CLASS OF ARTERIAL- URBAN
ARTERIAL 1971 1972 1973
SECONDARY ARTERIAL TRUST 1974 1975 1976
FUNDS 1/1 7, 1 1 /1 7/1 1/1 7. 1
• to to to to to to
1 Loral Name of \rtertat Arterial Ni Priority No. 6/30 12/31 6 /30 12/31 6 '30 12/31
S.W. 43rd St. 9001 1 V 5. P L.
135,000 55,000 80,000
2. Detailed Location of Project and 'Termini Length in Miles
E. valley Highway and Renton portion of
W. Valley Highway to Springbrook Road. • 1.3 1t'\\'
D,•-iiiptton „t Propo.,ed Work Widen, grading, curbs, storm 108,000 60,000 48,000
sewers, drainage, sidewalks, paving, traffic control, - _ -
street lighting, right-of-way, structures 2, 977 , 926
400,000 1,000,00C 500,000 577,926
ESTIMATE OF TOTAL COST
4. Prelim. ktig. Right of 1\ay Construction - Tots I Total . .
150,000 120,000 3,253 , 251 3 , 523 , 251 3, 220, 926 115,000 528,000 1,000,000 500,000 577,926
l.. Local Name of Attetial Arterial No. - Priority No. 5. P.F. --
S.W. Grady Way 9110 •
14,400
2 N• 14,400
2. Detailed Location of Project and 'termini Length in Miles R '1P •
Rainier Ave. S. ' to 0.25 -
Lind Ave. S.W. •
•3: Description of Proposed Work widening, regrading, curbs, storm Cons"
.sewer, drainage, sidewalks, paving, traffic control, 159,300 Z 100,000 59,300
• street lighting. ,ti
ESTIMATE OF TOTAL COST Total ,n
1-
4. Ptclim. ling. Right of Way Construction Total I u
173,700 w 114,400 _ 59,300
0
16,000 -- 177,000 193,000 a
I. Local Name of Arterial Arterial.No. Priority No., '5. P.E. - -
WELLS AVENUE 9191 3 72,000 o 72,000 ' I
2. Detailed Location of Project and Termini Length in Miles Ra
S. Grady Way to North 6th St. 1.20 40,500 0 40,500
3. Description of Proposed Work widening, sidewalks, storm sewers Const.
• drainage, paving, street lighting and traffic control _ -
'curbs, alignment adjustment, Bridge. 833,400 0 368,500 150,000 150,000 164,900
. ESTIMATE OF TOTAL COST Total w
-4: Prelim. Eng. Right of Way Construction Total 1-
80,000 45,000 926,000 1,051,000 945,900 w 481,000 150,000 •� 150,000 164,900 •• -
n is
•
REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM- - lc
CITY OR COUNTY t.
HEARING DATE & 6/22, 1970 ADOPTION DATE 6/22/70 ____` RESOLUTION NO. 1694.
REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD
FUNCTIONAL CLASS OF ARTERIAL URBAN
SECONDARY ARTERIAL ARTERIAL 1971 1972 1973
TRUST
; FUNDS 1/1 7/1 1 /1 .7/1 1/1 7/1
1974. 1975 1976
to to to to to to
6/30 12/.31 6/30 12/31 6/30 12/31
i •
I. Local Name of Arterial Arterial No. Priority No. 5. P.F. •
Williams Avenue . • 9394 4 � 135,000 35,000 100,000
2 Retailed Location of Project and lei-mini •
Length in Miles R 11 .
South Grady Way to • .1.2 27,000 27,000
N_ 6-1-h StrPPt' • -
3. Description of Pieposed Work structure, widening, grading, pay- Const.
•
ing, curb, sidewalk, storm sewer, street lighting, 1,008,000 98,000 910,000
traffic control . z
. •o. _
ESTIMATE OF TOTAL COST " Total ,,
4. ['felon. Eng. Right of RaN Cons UAW lion Total u 62,000 198,000 910,000
1,170,000 w . .
. 1 ' 150,000 ' 30,000 1;120,000 1,300,000 m .
a
I. Local Name of Arterial Arterial No. Priority No.
Talbot Road 9041 5 5, P.E.
2. Derailed Location of Project and Termini Length in Miles 12,600 12,600
•
Grady Way to.
0.5 R'W
Puget Drive • •• . -
3. Description of'Proposed Work - .
widening, paving,traffic signals, • •
Traffic control (STATE) -sidewalks, street lighting Const.
storm drains (City work in conjunction with State pro ) .
ESTIMATE OF TOTAL COST 117,000 67,000 50,000
4. Prelim. Eng. Right of Way Construction Total Total
,000 --
030,000 144,000 129,600 12,600 67,000 50,000
I. Local Name of Arterial Arterial No. Priority No. 5. P.E. Cr
S.W. Grady Way 9100 0
6 117,000 a 90,000 27,000
ai.
2. Detailed Location of Project and Termini Length in Miles 11/ Q
Lind Avenue S. tom- o - •
.West City Limits LL _
3. Description of Proposed Work widening, paving, curb, sidewalks, Const.
storm drainage, structures, street lighting, traffico
1,179,000 0
control. • 279,000 900,000 .
ESTIMATE OF TOTAL COST Total ,n • •
4: Prelim. Eng. Right of Way , Car-traction Total 1-
H •
130,000 -- 1,3]:Q,000 ••1,441,000 1,296,000 w 90,000 ao ,000 900;000
• REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM go •
CITY OR COUNTY •
RENTON HEARING DATE 6/15 & 6/22, 1970 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694
•
FUNCTIONAL CLASS OF ARTERIAL REQUESTED REQUESTED U. A. TRUST FUNDS BY PERIOD
URBAN .
SECONDARY ARTERIAL ARTERIAL 1971 1972 1973 .
TRUST 1974 1975 197b
FUNDS 1/1 7/1 1/1 7/1 1/1 7/1
to to to to to to
• 6/30 12/31 6/30 12/31 6/30 12/31
I. Local Name Of Arterial Arterial No. Priority Na. 5. P.E. •
Logan Avenue 9406 7 27,000 27,000
2.- Detailed Location of Project and Tcrmini Length in Milos R/W
South 3rd to - 0.409 •
Ai ,000 9,000 •
port Way •
3._Description of Proposed Work widening, grading, paving, curbs, Const.
sidewalks, street lights, traffic control ri right-of- 284,040 Z $44.04Q 200,000
way.
ESTIMATE OF TOTAL COST Total
•
4. Prelim. Eng. Right of Way Construction Total U
w 120,040 200,000
30,000 10,000 318,600 355,600 320,040
a
• u
l.. Local Name of Arterial Arterial No. Priority No. 5- P.E. w
Lake Washington Boulevard 9280 8 180,000 o
ce
100,000 80,000
2. Detailed Location of Project and Termini Length in Miles R/W Q 90,000
Houser Way to ce
2.5 90,000
w
N.E. 44th Street -
3. Description of Proposed Work widening, grading, storm sewer, Const. z
curb, paving, street lighting, bridge structure, 3,510,000 D 1,600,000 1,910,000
traffic control o -
ESTIMATE OF TOTAL COST Total w •
4. Prelim. Eng. Right of Way Construction Total H 100,000 80,000 1,690,000 1,910,000
200,000 100,000 3,909,00o 4,2.00,000 3'780,000 LL,
UAB-1 REVJ/70
t
REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM �l
CITY OR COUNTY HEARING DATE__6/15 & 6 22 , 1970 ADOPTION DATE _6/22/7ORESOLUTION NO. 1694
RENTOR •
REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD
FUNCTIONAL CLASS OF ARTERIAL URBAN
COLLECTOR AR REJRIAL 1971 1972 1973
FUNDS 1/1 7 '1 1 /1 7/1 1i1 7/1 1974 1975 1976
to to to to to to
I. Local Name of Arterial Artc nal No l'ironty No. 6 X30 12/.31 6 %30 12/31 6 /30 12 X31
Union Avenue N.E. 9340 1 5 P.E.
2. Retailed Location of Project and Termini Length in \hlc.s 31,500 31,500
•
N.E. 4th St. to
Sunset Boulevard East 1.1 Iz \\
3 Description of Prt,ht,:.ed Wort: widening, grading, curbs, storm
9,000 9,000
saver, dra,nage s dewalks, paving, traffic control (••„tt,t_
ESTIMATE OF TOTAL COST 513,000 189,500 200,000 123,500
.4. Pell,,. ling. Right of l\:1, ( on:.Iruction •Total Total
35,000 10,000 570,000 615,000 553,500 230,000 200,000 123,500
1 Lneal Name of Aireiiiii Arterial No Priority No.
Taylor Avenue N.W. & 9130 P.E.
Taylor Pl.N.W. 9121 2
32,850 16,000 16,850
2. I),taticd Location of Project and Termini Length in Miles
Renton Ave. Extension to N.W. 0.6 it'w
7th St. & Stevens Ave. N.W.
13,500. 13,500
3. Dcscrintion of Proposed Work widening, grading, curbs, side-
walks, paving, storm sewer, street lighting, traffic const:
control •
ESTIMATE OF TOTAL COST 506,250 300,000 206;254
4. Prelim. Fog. Itighl of Nay Construction Total Total
16,000 330,350 206;250
36,500 15,000 562,500 614,000 552,600
1. 'Local Name of Ai lei ial Arterial No. Priority No. 5. P.E. •
Monroe Avenue N.E. 9343 3 25,200 12,000 13,200 ,
2. Urtailed Luealion of I'ioteri and Termini Length in Miles R.'W' - .
N.E. 4th St. to 1.0 9;000 9,000
N P. 17th fit
3. Description of Proposed Work widening, curbs, sidewalks, paving •
const•
traffic control, street lighting. r 69,800 200,000 20 ,60Q
473,400 Z
o
ESTIMATE OF TOTAL COST Total yr
•
q. Prelim. Eng. Right of Way Construction Total 507.;600 Q3 .
12,000 92,000 200,000 , .Pp
28,000 10,000 526,000 564,000 ____..•,
REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM ;t'�
CITY
�O�R�COUNTY HEARING DATE_ 6226/15 & , 1970 ADOPTION DATE 6/22/70 _Y
RENTON I RESOLUTION NO. 1694
f1ON r
REQUESTED REQUESTED U. A, TRUST FUNDS BY PERIOD
FUNCTIONAL CLASS OF ARTERIAL URBAN
ARTERIAL 1971 1972 1973
COLLECTOR TRUST
FUNDS 1/1 7/1 1 /1 7/1 1/1 7/1 1974 1975 1976
to to to to to to
6/30 12/31 6 .30 12/31 6/30 1 2/31
I. 1_0r:1l N:tnie of Ark-sial Arterial No. Priority No. 5. P.F.
Shattuck Avenue So. 9007 4
14,850 14,850
2 Detailed Location of Prole(t :rod Termini Length in Miles R.."
South 2nd to 0.5 9,000 9,000
South 7th Streets -
1.
I)e:.riptiuit ,ii 1',-h,..,,',I \'.,,,k curbs, storm sewers, sidewalks, Coosa`
paving, structure, street lighting, traffic control. 309,150 309,150
z
0
ESTIMATE OF TOTAL COST Total1-
4. I'rrlini. l-.ng. R yht of\\av Cons true lion Total 000 w 14,850 9,000 309,150
16,500 10,000 343,500 370,000 o
a
1 Local Name of Arteri.il Arterial No Priority No.
N.E. 12th Street 9333 5 5 P.E.
12,000 18,600;
2. Detailed Location of Project and Termini Length in Miles 30;600
Edmonds Avenue N.E. to 1.25 R.'W
Union Avenue N.E. 9,000
3.. Description of Proposed Work widening, grading, curbs, side- 9,000 .
walks, storm sewer, drainage, street lighting, traffic Const.
control. 300,000 299,400 1
ESTIMATE OF TOTAL COST 599,400
4. Prelim. Eng. Right of Way Construction Total Total
34,000 10,000 6WQQ0 710,000 1639,000 12,000 27,600 ] 300,000 1 299,400
n - - -
1. Lo,.al Name of Arterial Arterial No. Priority No. 5. P.E. w
South 4th Street 6 26,550 26,550
ec
R;N' cl'
2. Detailed Location of Project and Termini Length in Miles Q
Main Avenue South to 0.6
ce
Rainier Avenue So. 180,000 0 180,000
11_ •
3. Description of Proposed Work right-of-way, widening, grading, Const. z
• paving, storm sewer, traffic control, street lighting 337,950 n 200,000 137,950
0
,, -
ESTIMATE OF TOTAL COST Total ,n •
4. Prelim. Eng. Right of Way Construction Total - I-
544,500 w 206,550 200,000 i37F95O
2q_ ' I 200.000I 375,_500 5,000 "'
REVISED 6/22/70 URBAN AREA SIX YEAR CONSTRUCTION .PROGRAM Z.
CITY� OR
COUNTY HEARING DATE 6/15 & 6/22, 1970 ADOPTION] DATE .6/22/70 , . ' RESOLUTION'Na. ,16947
•
WA
I V4Y
REQUESTED REQUESTED-U-. A. TRUST. FUNDS. BY PERIOD
FUNCTIONAL CLASS OF ARTERIAL
COLLECTOR ARTERIAL
1971 1972 1973
FUNDS1/1 7/1 1/1 7/1 1/1 7!1 •
1974 1975- 1976
to to to to to to _
6/30 12/31 6/30 12/31 6/30 12/31 .. '
'Local•Name of Arterial Arterial No. Priority No.
:.l E. Nalley Highway
.7. 84,600
betail,gd•Location of Project and Tcrmini Length in Miles
S.W. 16th St. and Lind Avenue S.W. to 1.9 90,000 '90,000 ..
S.:W_ 43rd :4t_ _ --
Deseription:of Proposed Work Grading, paving,storm sewers, Const.
-
curbs, sidewalks, traffic control, street lighting, 1,517,400 500,000 500,000 517,400 .
uridergroundinq. o .
0
•
ESTIMATE OF TOTAL COST Total w .
I-
. Prelim'. Eng. Right of-Way Construction Total w � .
674,600 500;000 517,400
94,000 100,000 1,686,000 1,880,000 1,692,000 . o
a .
Local Name of Arterial Arterial No. Priority No. 5. P.E. w
Edmonds Ave. N.E. 9335 > 26.550 •
. o
8 26,550 a
R '14 0_
,
. Detailed Location of Project and Termini Length-in Miles Q
N.E. 4th Street to Sunset Blvd. N.E. • 0.9 w
18,000 • 0 • 18,000
. Description of Proposed Work Const: Z
paving, sidewalks, curbs, storm • 290,000 196,450
sewers, street lighting, traffic control. 486,450 .i
0
•
tt
ESTIMATE OF TOTAL COST Total '^
. Prelim. Eng. Right of Way construction Told!
44,,35b 290,000 196,450
29,500 20,000 540,500 590,000 531,000 ? t
. Local Name of Arterial
\rterial No. Priority No 5, P.E. - .-'
Talbot Road 9042 9 46,125 46,125
•
Detailed Location of Project and Termini Length in Miles R'11 .
Puget Drive to1.6 36,000 36,000 .
Cnnth City limits
Description of Proposed Work Widening, curbs, sidewalks, storm Cont.
sewers, drainage, traffic control, street lighting. 883,575 Z 140,000 200,000 200,000 1343,575
G
ESTIMATE OF TOTAL COST Total w •
I-
Prcljm. Eng. Right of 11av construction Total 965,700 w 222,125 200,000 200,000 343,575
51,250 40,000 1, 274,750 1, 366, 000 1 o
± V15.LiL 0/ LL/ /V U 1ttS/IIN Alts iA b1A. Y Ei Alt L UN b :ItUUTIUNrnUUUAM ,"-T
CITY OR COUNTY
0N HEARING DATE_6/15 & 6/22 , 1970 ADOPTION DATE 6/22/70 RESOLUTION NO. 1694_
. 1-
FUNCTIONAL CLASS OF ARTERIAL REQUESTED REQUESTED U. A. TRUST FUNDS BY PERIOD • r
URBAN
ARTERIAL 1971 1972 1973
COLLECTOR i TRUST 1974 1975 1976 •
FUNDS 1/1 7 '1 1 /1 7/1 1/1 7/1
to to to to to to
' 6/30 12./31 6/30 12/31 6/30 12/31 •
Local Name of Arterial Arterial No. Priority No. 5. P.F. w _
w
N.E 10th Street 9999 23,400 > 23,400 •
10 a
• R''" a
De'nnted Location of Project and Termini Length in Miles Q
Sunset Blvd. N.E. to 0.75 18,000 w 18,000
Union Avenue N.E. w
Description of Proposed Work widening, grading, right-of-way, Const, Z
storm sewer, curbs, paving, street lighting, and 396 000 D 200,000 196,000
•
traffic control. o
t,
ESTIMATE OF TOTAL COST 'Total v>
I. Prelim. Eng. Right of Way Construction Total Fz- 23,400 18,000 200,000 396,000
437,400 w
26,000 20,000 440,000 . 486,000
!AB-1 REV,1/70 •
I 'Local Name of Arterial • Arterial No. Priority No.
'N. 30th Street 9300 11 5. P.E. -
?. Detailed Location of Project and Termini tO Lenstltin Miles 13,725 ! 13,725
;:><urne /Avenu !N . Lae Wash. Blvd N. /N.30th 0.3 _
t :F' A.I. #405 R.tiv
3. Description of Proposed Work widening, grading, curbs, storm 4,500 • 4,500
sewer, paving, traffic control, street lighting. const: '
ESTIMATE OF TOTAL COST 256,275 256,275
4. Prelim. Eng. Right of Way Construction Total Total .
15,250 5,000 284,750 305,000 274,500 18,225 256,275
I. Local Name of Arterialw
Arterial No.• Priority No. 5. P.E. inr
LL,
S.W. 16th St. 9003 >
lg 32,850 re16,000 16,850
a . .
2. Detailed Location of Project and Termini Length in Miles R/W Q
E. Valley Highway to 1.1 18,000 0 10,000 8,000
3. Description of Propose Work widening, grading, structures, Const. Z -
right-of-way, storm sewer, drainage, curbs, sidewalks, m 606,150
.paving, traffic control and street lighting. 606,150 0
ESTIMATE OF TOTAL COST Total In
4.. Prelim. Eng. Right of Way Construction Total
657,000 t„ 16,000 26,850 614,150
36;500 20,000 673,500 730,000 j
•
Rev. 6-22-70 Exhibit A2 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM f -'25CITY OR COUNTY . Item 1 $
HEARING DATE 6/15 & 22, 1970 - ADOF1ION DATE __- 6/22/70 RESOLUTION NO. 1694 ,
-__ Renton -
REQUESTED REQUESTED U. A TRUST FUNDS BY PERIOD
FUNCTIONAL CLASS OF ARTERIAL URBAN 1 _______ _-
ARTERIAL 1971 1972 1973
L - COLLECTOR TRUST - - - -- - - -- - - -- - 1974 1975 1976
FUNDS 1/1 7 '1 1 /1 7i1 1/1 1 7/1
-- - -- - to to to tc, to to
I. I.c,cal Nona of Arterial Arterial No Priority No. 6.130 12.131 6/30 12/31 6/30 1 1 2/31
Proposed Route 9103 13 5 P.E. - - - -- --
Lind Ave. S.W.
_. I)rmil,J 1.et ah,n of Project and Termini Length in Mules 153,000 10,000 20,000 20,000. 50,000 53,000
S.W. Sunset Blvd. to S.W. 7th 0.4 IZ \l - - - - - r
•
--- 297,000 100,000 100,000. 97,000
De::,ripljon „I Purposed Work right-of-way, structure, curb,
storm sewers, sidewalks, paving, R.R. crossing, traffic
- - --
ESTIMATE OFTOTAL COST 1,671,750 ---- - - - 500,000
control, and street lighting 580,000
- -- - - -- 591,750
4. Prelim. Lug. Right of l\av i f'un.alnt,-line j Total 'I-olal r
170,000 - _ t 330,000 1,857,500 2,357,500
2,121,750 10,000 120,000 120,000 147,000 553,000 580,000 591,750
-- - -- - - -
I. Loco! Name of:\iteral Arterial Ni. i'lioriq No, 5. P.E. - - '1 ,
i.
Lind Avenue S.W. 9103 14 108,000 20,000 88,000
2. Detailed Location of Project and 'termini Length in Miles Il "W -
90,000 90,000
Grady Way to S.W. 16th 0.7
3. Description of Proposed Work curb, sidewalk, widen to 44' , Const. i
hhwyovcrossi�g sem sewer, paving, grading, 900,000 400,000street lighting an tea is signals Sn0 000Z
ESTIMATE OF TOTAL COST Total „l ' 7.
I-
4. Prelim, Eng. Right of Way Construction Total U
1'20,000 100,000 1,000,000 1,220,000 1,098,000 0 20,000 178,000 500,000 400,000
w
I. •Local Name of Artett:if Arterial No. Priority No, 5- P.C. w
0 •
ced
a
2. Detailed Location of Project and Termini Length in Miles R/W Q
tY
0
I •
3. Description of Proposed Work Const. Z
•_1
O
ESTIMATE OF TOTAL COST Total N
4. Prelim. Eng. Right of Way Construction Total I-
H
w
)
•
IIAO 1 maw /ten ---
COPY
RESOLUTION NO. ( o / y
WHEREAS the City of Renton has heretofore adopted an Arterial
Street Program in addition to its comprehensive estreat program forthe
ensuing six years, all pursuant to Chapter 7, Extraordinary Session
Laws of 1961 of the State of Washington, and Chapter 195 of the 1961
Session Laws of the State of Washington, and such programs having been
duly amended and modified from time to time, and
WHEREAS it is now deemed advisable, as recommended by the
City Engineer, to update such programs by the designation of Arterial
Streets and highways, NOW THEREFORE
BE IT RESOLVED BY THE MAYOR AND THE CITY COUNCIL OF THE CITY
OF RENTON, WASHINGTON, AS FOLLOWS:
SECTION I The City's Arterial Street Pagram, as-heretofore
adopted and amended, is hereby further amended and modified by designating
the streets and highways as specified on the attached Exhibit, labeled
"Exhibit A" and incorporated herein as if fully set forth, as arterial
streets and highways. Furthermore, the City's Comprehensive Street
Program fcr the ensuing six years as last adopted under date of July
15 , 1968, 'Is further amended to include and designate the arterial streets
and highways as specified on the attached Exhibit..
S CTIOM II : The City Engineer and City Clerk are hereby
authorized and directed to file this amendment with the Director of Highways
for the State of Washington, together with a certified copy of this.
Resolution, and as otherwise provided by law.
PASSED BY THE CITY COUNCIL this ,P/.571- day of April, 1969.
xe ma e ' son;_-- y er
APPROVED BY THE MAYOR this l ay of Aril, 1969. J -
ions • TM. uster, ayor
Approved es to Form:
Gerar• M. Shellan, City Attorney
EXHIBIT A
RESOLUTION #1619 4-15-69 ,
ARTERIAL STREET DESIGNATIONS
1 . Taylor P. N.W. & Taylor Ave. N.W. from West City limits to Renton Ave. Ext.
2 . Rainier Ave. N. - Rainier Ave. S. from North City limits to S. Grady Way
3. Airport Way from Rainier Ave. N. to Logan Ave. S.
4. Smithers Ave. S. , Logan Ave. S.-Logan Ave. N. from S Grady Way to North 8th St.'
5. North 6th St. from Logan Ave. N. to Garden Ave. N. - ';.-
N Ave. N. to' Houser'Way
6. N. 4th St. N. St. one-way couplet from Logan
7. Garden Avenue N. from Bronson Way N. to,.Lake Wash. Blvd.
8. Houser Way S .-Houser Way N . from Smithers Avenue S. to Lake Washington' Blvd. N.
9. Williams Ave. S. -Williams Ave. N. from S. Grady Way to N. 6th St. .
10. Wells Ave. S.-Wells Ave. N. from S. Grady Way to N. 6th St.
11 . Park Ave. N . from Bronson Way N. to N. 8th St.
12. Bronson Way S .-Bronson Way N, from Main Avenue Sato Sujrset Blvd. N.
13. Mill Avenue S. from Houser Way S. to Bronson Way S.
14. S. Second St. from Rainier Ave. S. to Main Ave. S.
15. S .W. Langston Rd. from S .W. Sunset Blvd. to West City limits '
16. S.W. Sunset Blvd. from West City limits to Rainier Ave. S.
17. S . 3rd St. from Rainier Ave. S. to Main Ave. S.
18. Main Ave. S. from S. Grady Way & Benson Road S. Intersection to Bronson Way S.
19, Benson Road S . (Main Ave. S . and S. Grady Way) to S. City limits
20. S. Grady Way from Rainier Ave. S. to Main Ave. S.
21 . S.W. 7th St. from S . Grady Way to Lind Ave. S.W.
22. S.W. Grady Way from Rainier Ave. S. to West City limits
23, Lind Ave. S .W. from S .W. Sunset Blvd. to South City limits
24. S.W. 113rd St. from East City limits to West City limits
25. Renton Ave. Ext. from Rainier Ave. N. to West City limits
26. Talbot Road S . from S. Grady Way to South City limits
27. West Valley Road from S .W. 43rd St. to North City limits
28. S . Puget Dr. , Puget Dr. S.E. from Talbot Road S. to Edmonds Ave. S.E.
29'. Edmonds Ave. S .E. from Puget Dr. S.E. to S. City limits (formerly 116th Ave.S.E.)
30. Maple Valley Highway from Sunset Blvd. N. to East City limits
31 . Sunset Blvd. N.-Sunset Blvd. N.E. from Maple Valley Highway to East City limits
2. Arterial Street Des; mations .(Continued)
32. N.E. 3rd St. -N. E. 4th St. from Sunset Blvd. N. to East City limits
33. Monroe Ave. N.E. from 4th St. to N.E. 12th St.
34. Union Ave. N.E. from N.E.
4th St. to North City limits
35. N .E. 12th St. from Aberdeen Ave.
N.E. to Union Ave. N.E. ' "
•
36. Edmonds Ave. N.E. from Sunset Blvd. N.E. to N.E. 27th St.
37. Aberdeen Ave. N.E. from Sunset Blvd. N.E. to N.E. 27th St.
38. N.E. 27th St. ,-Kennewick P1 . N.E. and N.E. 30th St. from Edmonds Ave. N.E. to I 405
39. N. 30th St. from Burnett Ave. N. to Park Ave. N.
40. Burnett Ave. N.-Lake Washington Blvd. N. (Vic. N. 28th St. ) to Lake Wash. ABlvd.
N.
City Limits
West 41 . S.U. 16th St:. from Fast Valley Road to (Vic. N. 37th St. )
!1 ? . I;. V.lI Iov ,,i,1 I .r'c ri .' .W. IIH '1r,1 ,.. .: .
3 . 1nali It), :11 i.11t',I. n Bonin rd Norlh 7(''Y'i'tril Iiolu,;(,; , l.
! ;! r Inlay I o Nor I:hst•'
(on
RESOLUTION NO. _
.L.
WHEREAS the City of Renton has heretofore adopted an Arterial
Street Program in addition to its comprehensive street program for the
ensuing six years, all pursuant to Chapter 7 , Extraordinary Session
Laws of 1961 of the State of Washington, and Chapter 195 of the 1961
Session Laws of the State of Washington, and such programs having been
duly amended and modified from time to time, and
WHEREAS it is now deemed advisable, as recommended by the
City Engineer, to update such programs by the designation of Arterial
Streets and highways, NOW THEREFORE
BE IT RESOLVED BY THE MAYOR AND THE CITY COUNCIL OF THE CITY
OF RENTON, WASHINGTON, AS FOLLOWS:
SECTION I: The City's Arterial Street Prgram, as heretofore
adopted and amended, is hereby further amended and modified by designating
the streets and highways as specified on the attached Exhibit, labeled
"Exhibit A" and incorporated herein as if fully set forth, as arterial
streets and highways. Furthermore, the City's Comprehensive Street
Program fcr the ensuing six years as last adopted under date of July
15 , 1968, is further amended to include and designate the arterial streets
and highways as specified on the attached Exhibit.
SCTION II : The City Engineer and City Clerk are hereby
authorized and directed to file this amendment with the Director of Highways
for the State of Washington, together with a certified copy of this .
Resolution, and as otherwise provided by law.
PASSED BY THE CITY COUNCIL this ,V.5t day of ,April, 1969.
/.
xe m: a ` e ` son, 'y er
APPROVED BY THE MAYOR this ,i / siday of aril, 1969."
""
ae
Donald ti. Custer, ayor
Approved es to Form:
Geirar M. Shellan, City Attorney
EXHIBIT A
RESOLUTION #1619 4-15-69
ARTERIAL STREET DESIGNATIONS
1 . Taylor P. N.W. & Taylor Ave. N.W. from West City limits to Renton Ave. Ext. '. . ,
2. Rainier Ave. N. - Rainier Ave. S. from North City limits to S. Grady Way
3. Airport Way from Rainier Ave. N. to Logan Ave. S.
4. Smithers Ave. S. , Logan Ave. S.-Logan Ave N. from S. Grady Way to North 8th St
5. North 6th St. from Logan Ave. N . to Garden Ave. N. `>:,:';Y
6. N . 4th St. N. 3rd St. one-way couplet from Logan Ave. N: to Houser Way N ': -`>s;'="
7. Garden Avenue N. from Bronson Way N. to ,Lake Wash. Blvd.
8. Houser Way S. -Houser Way N . from Smithers Avenue S. to Lake Washington Blvd. N.
9. Williams Ave. S. Williams Ave. N. from S. Grady Way to N. 6th. St.
10. Wells Ave. S.-!-Jells Ave. N. from S. Grady Way to N. 6th St.
11 . Park Ave. N . from Bronson Way N. to N. 8th St.'
12. Bronson Way S.-Bronson Way N. from Main Avenue Sato Su,pset Blvd. N.
13. Mill Avenue S . from Houser Way S. to Bronson Way S.
14. S. Second St. from Rainier Ave. S. to Main Ave. S.
15. S.W. Langston Rd. from S .W. Sunset Blvd. to West City limits
16. S.W. Sunset Blvd. from West City limits to Rainier Ave. S.
17. S . 3rd St. from Rainier Ave. S. to Main Ave. S.
18. Main Ave. S. from S . Grady Way & Benson Road S. Intersection to Bronson Way S.
19. Benson Road S . (Main Ave. S. and S . Grady Way) to S. City limits . •
20. S. Grady Way from Rainier Ave. S. to Main Ave. S.
21 . S .W. 7th St. from S . Grady Way to Lind Ave. S.W.
22. S .W. Grady Way from Rainier Ave. S. to West City limits
23. Lind Ave. S .W. from S.W. Sunset Blvd. to South City limits
24. S.W. 43rd St. from East City limit:: to West City limits
25. Renton Ave. Ext. from Rainier Ave. N. to West City limits
26. Talbot Road S . •from S. Grady Way to South City limits
27. West Valley Road from S .W. 43rd St. to North City limits
28. S . Puget Dr. , Puget Dr. S.E. from Talbot Road S. to Edmonds Ave. S.E.
29'. Edmonds Ave. S .E. from Puget Dr. S.E. to S. City limits (formerly 116th Ave.S.E.)
30. Maple Valley Highway from Sunset Blvd. N. to East City limits
31 . Sunset Blvd. N.-Sunset Blvd. 'N.E. from. Maple Valley Highway to East City limits
2. Arterial Street Des-Hnntinns (Continued)
32. N.E. 3rd St. -N.E. 4th St. from Sunset Blvd. N. to East City limits
33. Monroe Ave. N.E. from 4th St. to N.E. 12th St.
34. Union Ave. N .E. from N.E. 4th St. to North City limits
35. N .E. 12th St. from Aberdeen Ave. N.E. to Union Ave. N.E.
36. Edmonds Ave. N.E. from Sunset Blvd. N.E. to N.E. 27th St.
37. Aberdeen Ave. N.E. from Sunset Blvd. N.E. to N.E. 27th St.
38. N.E. 27th St. ,-Kennewick P1 . N.E. and N.E. 30th St. from Edmonds Ave. N.E. to I 405
39. N. 30th St. from Burnett Ave. N. to Park Ave. N.
40. Burnett Ave. N.-Lake Washington Blvd. N. (Vic. N. 28th St. ) to Lake Wash. ABlvd. N.
41 . S.W. 16th St. from East Val leJ West City Limits Road to (Vie. N. 37th St. )
02 . 1'. Volloy Nood Ipom I: .W. IBI
I.,iik Wo::h l.l'1t'' uo,, Botj I.nv,lr'/1 Nor'I h Prom I:OW.;L'.r' Woy I O Norl:heastt
is III
•
•
•
. i
:' STATE•OF WASHINGTON ,- '{. s
'.1:,,:.';:•:-.:','.::'...'•;••:::',:,'.)---
,
',..DAN NI J.EL' EVA AN
T�: rr..
�'� GOVER
NOR ;:l....:;:),.,;::,;.::::,
�Il.r:�
le` h�
�k8i
r^
I11
.y'
'i
�I,
_i.
Ii I . ' LI,t. ," I i, '44.,,,7,4,•,,,..„', O.A .'''.:,•1':...-:,:',::::: ',i . �i' JI } f
• • • ,I,• • , I 1 ,' w ' 'i� ' '} - I, ' � 1� i i 1889 ,r1 I , I ,
•
•
WASHINGTON
A r{ ,, STATE.' HIGH
HWAX :COMMISSION 'f �, '-r,
, .DEPAR ..
,;. ';, 1 TMENT,OF �HIGHWAYS '{ ..,...!,....,,,..•„-, :-,-.' II `''�
''!,:f:;•;;.•;;
L;.•
Ilr
• i'
�lr
r
rI'
OFFIC
E OF• DIS
TRICT
ENGINEER
I.
1+ J:;",',*:„,..,,,:,'-:::', ...,,,;;;.:',P..:.,
rr+J :• I.,'' r DISTRICT:NO.'.0 .-,.,,,;•;•,,:;.7.;;;1,;,:7;,,•;,';,•,;:,•;;;',.,,•,,,••,,,.; ,I
i i� r ` ,6431'CORSON AVENUE,'SOUTH 1
r' SEATTLE 98108
1
I 1 ,r ,
•
• .�),'r'f' „ 'sir+'�',i'I'n,.,'7::.:' ,I� r'i. 'rl: ; �;'
:1:
,1'., June 30, 119.70 s; ,, r } r 1 7 l
1 .'t. i' l
,1:
is
I';
r r '
{
�t'
.I I.1, ! I '7',r Ci'•
r ' 1 I Y 'u;„-r' '•;• .� 7f '1 ' "I il !l i,
Miss'`,.Gwen'Mars•hall s,"' • ,,. ;' ` `
Deputy;;City .Clerk i - • •• • ;i
City;' of 'Rentoif •" '` '
L'J
Municipal:'Building,'r' .`' r r} r :
•
• I
Rento•n,_.Washington. 98055, v�!'• - ”` i,''''''''''.:-;',•;:;;.!:.!,,•:;.::.,,.,..-..f
,
i,.' ''-':,•.:-..•.',;;..;),„;,,''',:;1'•'.:; L. SixYear,,ProgramRevieui'i,; 'it ; ; 11,.
Dear'Miss' Marshalls'' ,,
I ' Irl ' " ,ll �,�p , i :. 1. ,-` 'f I, `''��
We hereby acknowledge :receipt of.your,•":.,Six=Year: Program and return.'herewith'
" the''"!Certificarte of Review.'!
1..
r
n,
r�, ;• , We :'are 'no�a..in`�the `proaess.'ofreviewing;your, program as it"relates •to State•;....,:;•••,...';:',,,;.;',',.„..".„;,`,.;f ,a{ ,;'
,
:highwa'ys' and:as: it'.may.',affect,.'our own program, which is.',nota;-in the; initial; :;'= +:'..,,::
” phase of":preparation.'
r
f
{
rr
' ', "We' will:advise''you:Plin' 'the' near future 'of those: items in, your'•,program'in
which:we'have an interest.
;,,, , ,Very,'`truly• yours,'` ,3 ;
r'.
„
'1
Wr C.'''BOGART P.E;`:
,r
r .
• I
; District':En • eer
Ca' '',r ,'A'i .T' • �..I��.' :y,
: ;: „i'. ;,": Byz'I T. T. MC LEOD, P.E.•
`., f District Stae;Aid Engineer.'
,TTM':IC'el l
achen•e !t',;..;;.r�
�Att n
F
• nt
"1:!::.:'''';)
, •
r•
N Il .
11
cc.: 'Mr.:. J.t,L.'"'Thornton „;`,;',',!:::::?;•.:
;II , ,`, •• • • V_,'r,
t
ant i 7
�Gr D
`Mr` H. W' ..'
.
.�rai
,
4'
';':.i,1!.:::::4. 'i i ifs^.i. .,• t :.'4.',.;':4:;j:', rl l'+ 1+LL ).::;‘..P..;''';'..;,::.':,'.-.:•,
, 'I.
•
11 rt.. !. .R.
1,
6
i, tet'
,rl 1•
•
, — '.,.' .I.:.'•',.'.' •,,..''',..:-:-.,::r ':::,', '::.,..,:'.;:`.-:,1,;:,''..,',' 'P. '':LY.:,;,..::;;;,...,,,,,,..-,.':C,1,1.,:,:i,.:,-,,,,,'!•:,.ry'.,,i,',i'1,;;',,.•.1.::...1",':','.1-1 4''.'"';',1';:;',.It';:t2..,'"";','P'
I7,•:!;',
". 1. • 'I.
CERTIFICATION OF REVIEW OF PREPARING 'AGENCY'' S
• SIX YEAR CONSTRUCTION I
ON 'PR
OGRAM
BY,
ADJACENT AGENCY
•
:City, county and state highway officials are.
directed by .RCW47. 26 . 230 to jointly program
related" arterial,'.improvement projects.. This
,requirement :is intended to insure . that inter- ,
.;,governmental cooperation' and coordination occurs. •
order to develop an integrated arterial and .
highway .network in each urban area. . :The.'.follow.=
ging certification of review by an adjacent agency , ,
does not indicate approval or disapproval of the
preparing agency proposed six year,' construction
program. It is intended instead-‘to 'insure that'
each adjacent agency has• been provided an oppor ' •
tunity to: evaluate new arterial ,projects by
Other, agencies and to considerproposing related
,improvements within the limits, of its own :•-
jurisdiction.
` CERTIFICATION TO URBAN ARTERIAL BOARD '.'
The City of Renton proposed six year
(Preparing: Agency)
construction program for urban arterials
'_ u o
,requesting urban arterial. trust funds for •,
proposed, new projects has been evaluated:
• as :it relates toi .our 'needed arterial .
,improvement needs
/ .. ,
(Adjacent Agenc , . .
District No:. 1
State laid Engineer
Department. of Highways ; .;
OPERATING INSTRUCTIONS
•
' " CERTIFICATE OF. ;REVIEW OF ',PREPARING'AGENCY' S'
;SIX YEAR CONSTRUCTION PROGRAM
BY
ADJACENT 'AGENCY
•. ' '!
1 . `ActionbyPreparing Agency: Furnish :coPY ofProPosed,;
six year construction program to each adjacent agency
•
by certified mail; along with blank certification' form.,
,,.if the preparing agency'' s' proposed ;projects' .affect,: ; •
,:, the'ladjacent agency. . ; '
2) " `Action" by Adjacent; Agency: Review preparingagency' s
six year construction program to determine if. related
arterial improvements should be considered' for
programming. Provide written acknowledgement of ,
' review on certification form to adjacent agency. • :
„
3')', • 'P'reparing 'Agency:- Submit 'certificate of; review „by
adjacent agency to Urban Arterial ,Board along with
adopted six year construction program. If certificate'
of review by adjacent agency is' not reviewed by the
date the preparing :agency',s'.•six year construction ,
program is submitted to the :Urban:'Arterial Board, ';,:,;•',;;
and if; at least 15 days have elapsed .from the date
: • ,of mailing of the proposed program to the adjacent
agency, , the preparing`' 'agency may provi,de evidence'
of delivery of a copy of its, 'proposed six 'year.
con'struction .program to the Urban 'Arteri'al: Board " „!
• in place of the certificate of review. ' '
•
•
n
NOTICE OF PUBLIC HEARING
BY
RENTON CITY COUNCIL
NOTICE IS HEREBY GIVEN that
the Renton City Council has fixed
the 15th day of June, 1970, at 8:
00 p.m. in the Council Chambers
of the Renton Municipal Building,
Renton, Washington as the time
and place for a public hearing to
consider the following:
' Proposed revisions to the Six-
Year_ Comprehensive S1t_
Program for ie City of Renton
• Any and all Interested persons
are invited to be present to voice
approval, disapproval or opinions
on same.
CITY OF RENTON
Helmie Nelson,City Clerk
P brshed in Record-Chronicle)
June 0, 1970. R-431.
NOTICE OF. PUBLIC HEARING
BY
RENTON CITY COUNCIL
NOTICE IS HEREBY GIVEN that the Renton City Council has
fixed the 22nd day of December , 19 69 , at
8:00 p.m. in the Council Chambe.ts of the Renton Municipal
Building, Renton, Washington as the time and place for a
public hearing to consider the following:
Proposed revisions to the Six-Year Comprehensive Street
Program for the City of Renton.
Any and all interested persons are invited to be present
to voice approval , disapproval or opinions on same.
CITY OF RENTON
/41.914-4-}9--1
Helmie Nelson , City Clerk
DATE OF PUBLICATION
59�� -6-V la Jnt
•
^ 411"
- 1
•
January €3, 2970
Waabington State Highway Commission
Department nt of Highways
Clyapia, Washington 98501
Director of Highways
Re �:ix-Year Comprehensive ..
Street Program - ftnton _,._ °''
gran tlemen s
Pursuant tag requiri enta-.of Chapter 83, b4'xtraordinary
Session Laava, 1967, per RCt? 35.77.010, we file herewith
taro certified copies of City of Renton Resolution .Mo.
1859, adopting revis.d• Six-rear 'Cosprehtnsive R.tr,met
Program for the City of Renton, Washington. '
The Resolution extends. to 3975 and revises city arterial
and street programa .is per exhibit 'attached to. And gado
a part of said Resolution No. 1659 adopted: by. the Renton
City Council at its regular meeting of January. . 5, 1970.
Yours. ,very :tarul y,
• CS 'Y or RRNT0N•
Helmick N. Ralson
City Clerk
Rnolasures (2)
. .
. . ,
. . . . . .
. . . . .
. . . . .
. • . , . .. .
, .
. .
, .
• . . . ..
. • . .
•
. . . . S . ..., .. .
. ,
., ..., . . .. . . , .
. .
. . . . . . ,
. .
. , ..
. .
. . . .
. . . .
. .• .
. .
. . .
. .
. .
., . .
. . . . .
. .
. .. . • .
. • .
. • ... . .
. .
. . , . .
. • . .. . . .
. . . .. . . . . •
. , . . .
, .
. . _ . . . . • . . •
_ . .
. .
• , .
. ., . . . .
. •
,
. . ._.. .. . „. . . . .. .. ., . . , •
. . . • . :. . ... . .
. . . .
. .. •
. . .
. .
. . .
. ..
, . . ..
. . . ... •.
. .. . .
. .
. • .• • . . . . • . .
. . .
. , ,. . . . . .. .
. .
. .
. . .
. .
. . •
. . . .
. . .
.. .
•
. . .
. ..
. • .
. . . .. . .
. • . : .. . •.
,. . .
. . .
. . .
. . . .
. .
. .
. . . • . .
, . .
. .
. . . .
. .. . •. .
- . . .• . • . .
. . . . .. . .
. .
. . , . . .
. . . . .
. .
. , .
. . . . .
. . .
.. .. .
. . . . .
. . . . .
. • ..., . . .
.. . .
•
. • • . . . . . . . . .
. . . . • .
. •• . . . . . . . .
, • . . . .
. .. • . . • , ..
. . . . . .
. .
, • .
. . . . .. •
. . . . • .
. .
• . .
. . .
. ... .
. . .
• ... . . .. .. . . . . .
. . , .
. .
• . , . .. . . . . . .
. . • . . . . .
. . . , • •.. . .
. . . . . . .
.. .
. .
. • .
..
,
. .. .. .
. .
. . .
. • .. . .
. . •.
• ,
.., . , .
. .
. . . .
. ,
. ,
. . . .
. . .
. .
. , .
. . ..
. .
. • . . ..
•
.. .
• .
• . • • .. ''''4,.: ,..,,:..;'::,'
•
,,:-::.:;•;••••.'::f.,',,,:••',."'-•-.:.'.'•, ., . •,''.:. •.:..•••.,... ,•••'...,'',":' .-!- .T. '•7;;_'-:..'•'-'•",-,/•.•.:. 'i "' ' . . ' • ' •
. .
.. .
. . .
. . .
. .
. .
, . .
. . „
-.. ......
. ,
. .
. .
. . .
. .
. .
• .
. ,
. .
•
. .
. ,
,...., • •
. .
. .
. ,
. . ,
. .
, .' 7....'-,,,,,, ...;'.4.-''r.,,' "':. '''.• :;".:: ...C' '-' 's`..'•:".'','„• •-..',''. ''. •:',.':.'.'.'':'..'t1.-c.'''.."‘; .''.....';::",,-=-::?.3..'''s ''.-- . ..,.' , "': ,...:;;1': . . .
. . .'. .-.'•. , .. . :,.. -, ..f..,'",,.:z.`,.,".'„.'"..%',i1. :7.;...3,;::.'..' ''.''I -.. i:‘`....'.:i . 7 ,'.'''.'.. % ...''. "''... ;• -..' . C'...-..1':'".:. . ,, . .''.: .',:':-:..*... .'.'.C:'• : .- .
' ;; ,,, ,. . ?,,,.J ,... :.c.1.'''2:.--':::., .f••......•_!:?! .1 •'.: ..''....,.. ;'•i.'. ..':',.• '.'. .•-•.'. ', ,•.'• 1:,. ,'•':‘',".:••. :•...,••. ''..''''• -';...,'...•...,".: ';'•''-.,::•.• . ' : ' •
. . • .- ... •':''!',,:--•..1.'''' I '.....7 r:;.: .-.'.".s.',*.:•-Y1...':.,'.', . ,"'.1.F-• ..',.."••\`) ''........;_•.. . 2..':'i....,. .-` , ''s --,"..•..,;:. ..' ,.j...--.. ., ' '2 ;''' .L , ' .. . .
. .
. . .
- . . . , ci•".',''.•;..,.:',. ''S.',-. ,,,.,'..:(:' . ... ':,..':'... 1'.':', •.- '''.''','; '.:-.., .'",'•'• '•'.' ''''. ';.,.. '`, '''' .,',',.'-fl.",.
. .
. . .
. . .
:
,
. . ,
,'.. ,s,.,',.-,.',..:.'!.....,, .1...'..:. ''';.-:.,.1:..`.: . ":',.._,',,'i.'. '.!`. •„.. i...,'.,.'-'. . 7'...',...' .1, '.-:', ..24 7'!:.',...I'l":`,':. .:)';".,,''.....?.':',I:,'.—',.--:'. '';. '_',','.. . , ..
.. ' . .:: 1',....,....! ....:....A.;....:. ..,,,.-.' ''...•C.,.,::,`:•:•.2-4'; ',-;,:•. .'-`.i'1.°,...'....• ''.'... —....•..--,.. '":. . •'.•••":;:''-.'''::'',.':•lc-.1 :-,•'r' : ' .::. '..' '•:'-',...,'' .'. ' '
. . ., '''''.. ''...:,...,.._,,, ..:'•••,.:,',..•,,',...3'...,•''!"--...". ''''.'..'." : •...•,;.•..•' . . ." 'Y'. ,-•;•-:.. •.'. ';-:'..;,',.. ''i:i • •::; :,••••.:-.':'''',-;'''.. '-:••; : :.,_ . • • - :
. .
' . .
. .
.
.
•
. .
. . . .
•
..
. •
. .
. .
. .
. . .
. .
•. ... -.. •.. • . ,T . „ .1 .
..
. .
,
. .
..
. . .
, . .
. .
• • .
• ,
. .
• .
. • , . .
. . . . .
,
.. . . . . .
. . . ..
• . . . , . .
' . • . ,
• . .
- . . . .
• . . . . . .
. .
. . . .
. .
. .
. .
• . . 2'....•f.'. ';.....• '-'• .-• ,', 1.:,••..• '.••Y.t.,',r-•"., . , . • , . . , ,. .
,
. .
•
‘ '
. .
. • • .
. .
. . ,
. ,
. .
. . . .. . . r . .
-
. . .
. .
. . . ..
. . .
• .
. • , .
. . . . . . . . .
. . .
-. . .
• • ,
. ..
. .
. , .
. . ' . . .
. ,
. .
. .
. , . . .
. • . . . .
. .
. .
. . • , • .. • .
. . , . . .
. . .
•. • • . .
. ,
: .
• . . • , .. •
. .. • .
. . •. . . .
. . . . . . .
,
. .
• .
. . • . . . . . , . . •
. . . . .
..
. . .
• .
,.
. .
. ..
. .
. . .
..
. .
. . . • .
. .
. .
. .
. .
,
. • .. . . . , . . . . .
. .
•
. . . . . .
.. . . ,
. . .
. . .. .
. . . . ,
. . .
. . • , . . . .
.. ,
- • . .
. . .
. . . . .
. . . . , . .
. .
. . , .
. .
• . . . . .
• . .
. .
, • . . . • . ,
. .
. . .
. .
. .. .
. .
. . . ,
. • . . . . .
. .
, . • .• ..
. . .
. ., .
. • . . . • . . .
. . . . , . • . .•
. •
,
• •
• •
• . . . .
. .
\ . .
!
INTER-OFFICE MEMO
TO: Helmie Nelson, City Clerk DATE December 30 , 1969
FROM; Gerard M. Shellan
RE: Six Year Street Program REsolution
Dear Helmie:
Enclosed you will find original and two copies of the proposed
resolution for the adoption of a new Six Year Street Program.
This has been dictated without the benefit of your file but I
presume you will find it in standard form. Would you please be
sure that the Engineer attaches a complete copy of said program
to this resolution and have same labeled "Exhibit A" . Thereupon
it should be submitted to the Law and Ordinance Committee for
processing.
If any changes or modifications are to be made to the resolution
after you discuss it with the Engineer , please let me know right
away and prior to the next council meeting.
We remain,
cc: Mayor Y.ur- ver 'u .y,
Pres. Council
• St. 6 Alley Comm. Ger.:ro M. Shel an
Traffic Engineer
NOTICE OF PUBLIC HEARING
BY
RENTON CITY COUNCIL
NOTICE IS HEREBY GIVEN that the Renton City Council has
fixed the 22nd day of December , 19 69 , at
8:00 p.m. in the Council Chambers of the RentOn Municipal
(fi Building, Renton, Washington as the time and place for a
public hearing to consider the following:
Proposed revisions to the Six-Year Comprehensive Street
Program for the City of Renion.
Any and all interested persons are invited to be present
to voice approval , disapproval or opinions on same.
CITY OF RENTON
Helmie Nelson , City Clerk
DATE OF PUBLICATION
DEC 1 2 1969
rte. .e- .. - .:r ., ..g15."•'r'" r.^::aes;a ij;z ,;•r--.., - - - ' _. - ...._. . - .:.<,. _,.«Y. _.
... . .C'`�_':=.:'.`_��....a`,:^zf:..._ .,. ..,... _ -� .. ,r,.u..+ ...� ... _�.._ r._._... - ._
•
•
4OFR� V'
A,o 0 • ••
U• CITY ENGINEER'S OFFICE • RENTON, WASHINGTON
0 •
MUNICIPAL BUILDING, RENTON, WASHINGTON NNW BAldwln SOW - EXT. !7S
mium
o
��ysA 4 December 22, 1969
ORT CAPI9Ak•DE
6°243
•
Honorable Avery Garrett, Mayor
Members of the City Council
Re: City's Comprehensive Six Year Street Program
Gentlemen:
State law requires that Cities adopt a 6 Year Comprehensive Street
Improvement Program and to file same with the Director of Highways. The
law also requires the City to revise the plan each year to keep it up
to date. In addition, the City has the option to amend the plan at any
time upon holding a public hearing. The main purpose of the plan as
far as the state is concerned is to have information concerning the
various City programs to provide coordination between agencies ,especially
where state funds are involved.
It is important to the• City of Renton in respect that several
funds for street construction are tied directly to the 6 Year Program.
These fund sources include:
1. Arterial Street Fund
2. Urban Arterial Fund
3. Street Forward Thrust Funds to a degree.
The effect of this is that if a proposed arterial improvement is
not included within the 6 Year Plan, funds cannot be allocated.
It should be pointed out that the program as submitted is not a
priority program and the availability of funds played an important part
in its formulation. The program also includes projects that will in
all probability be constructed by the state, but they are included
in our program to emphasize their importance and to allow the City to
use the funds listed above for improvements above state requirements
at the time of construction.
. ........ ... .:. .: :....' ..c -'. .. - .. .eu....a..a.._...a.d.Li.......
•
Page 2
Funding for this complete program has not been provided and
cannot be anticipated from the funds available at this time. That
is to say that money the City might receive from the Arterial" Street
Fund, Urban Arterial Fund and Street Forward Thrust Fund would not
a be sufficient to fund the 6 Year Program as presented. But due to the
necessity of having a project within the program before certain
• funds can be authorized, it is desirable to include .any arterial improve-
;4 ment that can reasonably be anticipated within the next 6 years.
1
The routine maintenance program of the City's Street Department is
not included within this program nor are streets that would be
constructed by private developers.
The estimates of costs included within the program are very prelimi-
nary and are not based upon any detailed analysis. The program was •
prepared with the cooperation of the Board of Public 'Works, and I or •
any member of the board present would be happy ,to answer any questions
you might have.
.
Very truly yours, •
Ja Wilson
Engineer
JW:m
•
•
`=a
`-"i.
•
•
•
•
=i
NOTICE OF PUBLIC HEARING
•
BY
RENTON CITY COUNCIL
NOTICE IS HEREBY GIVEN that the Renton City Council has
fixed the 22nd day of December , 19 $9 , at
8 :00 p.m. ,in the Council Chambe.ts of the Renton Municipal
Building, Renton, Washington as the time and place for a
public hearing to consider the following:
,Proposed .revisions to' the Si1cYear' Comprehensive .Street
..Program for the City of Renton.
•
•
•
•
Any and all interested persons are invited to be present
to voice approval , disapproval or opinions on same.
CITY OF RENTON
1f_ Yogv"
Helmie Nelson , City Clerk
DATE OF PUBLICATION
DEC 1: 2 1969
CERTIFICATION
•
•
STATE OF WASHINGTON)
ss .
COUNTY OF KING ) {t
I, 16.;10‘0010� "')thereby certify that
three (3) copies of the above notice were posted by Me -in
three conspicuous places on the property described and one
„Copy was posted at the City Municipal Building, Renton.,
Washington on", date of te, , 19 4,5P .
•
• . Sfned
• ATTEST:'
Not ry, Public, in and for the State
. of- .Washington , 'residing at Renton .
40 .<
4,
. .
•
Affidavit of Publication
0 ii /
(0. 7r)
,VAliP117).. f (1),y/T .
STATE OF WASHINGTON ss. /
COUNTY OF KING
Janice SAlstrQm being first duly sworn on1.-
, "ViliV i 4
oath, deposes and says that S.fles the Chief••Clerk of
THE RENTON RECORD-CHRONICLE,a weekly newspaper.That said iiii4 """
newspaper,is a legal newspaper and it is now and has been for more
than six months prior to the date of publication referred to, printed
and published in the English language continually as a weekly news- -
paper in Kent,King County,Washington, and it is now and during all
of said time was printed in an office maintained at the aforesaid place ,
of publication of said newspaper. That the Renton Record-Chronicle
has been approved as a legal newspaper by order of the Superior
Court of the County in which it is published, to-wit, King County,
Washington.That the annexed is a Not hearing — rem.
6 yr comp. street pprogram
as it was published in regular issues (and — —not in supplement form of said newspaper)once each week for a period NOTICE OF PUBLIC HEARING
I
BY-
RENTON CITY-,COUNCIL
of PM consecutive weeks, commencing on the ";
I ' NOTICE IS HEREBY+GIVEN that'
', the Renton-City Council has-fixed.
12 day of Dec , 19 ...69..., and ending the the 22nd day of December,1969,at
i 8:00-p.m.'in the Council,Chambers
of the Renton Municipal Building,
sRenton, Washington as the time
day of , 19 ,both dates and place for a-public hearing to
inclusive, and that such newspaper was regularly distributed to its consider the following:
subscribers during all of said period.That the full amount of the fee . Proposed revisions to the Six-
Year Comprehensive Street -Pro-
gram for.the City of Renton:
charged for the foregoing publication is the sum of$.... ■11 Any and all interested persons which are invited to be'present to voice
has been paid in full at the rate of$3.20 per folio of one hundred words approval, 'disapproval or opinions
for the first insertion and$2.40 per folio of one hundred words for each ' on.same.. • CITY OF RENTON
•
subsequent insertion. Helmie Nelson, ,
City Clerk
,DATE OF PUBLICATION
�u-c 'Dec:12, 1969
1,10,-
Published in the Record-Chroni-
Chia C1erif. cle December 12, 1969:'R 115.
Subscribed and sworn to before me this 12 day of 1 , - -
Dec ,19 69 - — —
, , ac,ti;
Nota ,Pu I lie in and for the State of Washington,
esiding at ing County.
—Passed by the Legislature, 1955,known as Senate Bill 281,effective
June 9th,1955:-:, , -
-Western Union Telegraph Co. rules for counting words and figures,
adopted by the newspapers of the State.
p
_ .
. ,
, .
--z .....,
, •
-....•-: .
4 .
A..... ,,,
-..'t•
- , •\) c c,, - —
....
. ?, c:.... , a
0 i '2. •:-' --
, .,...:
- -..-;
•
\,r, ---,
--:
: .1
r
y illjt)- y I ,
r �, lis/
ofriptt
IAA-
ed14974;Ar
r 4,1/0/4".' .
"Ai RESOLUTION NO. 1% / y
WHEREAS the City of Renton has heretofore adopted an Arterial
Street Program in addition to its comprehensive Street program for the
ensuing six years , all pursuant to Chapter 7 , Extraordinary Session
Laws of 1961 of the State of. Washington, and Chapter 195 of the 1961 '
Session Laws of the State of Washington, and such programs having been
duly amended and modified from time to time, and
WHEREAS it is now deemed advisable, as recommended by the
City Engineer, to update such programs by the designation of Arterial
Streets and highways, NOW THEREFORE '
BE IT RESOLVED BY THE MAYOR AND THE CITY COUNCIL OF THE CITY
RENTON, WASHINGTON, AS FOLLOWS:
SECTION I: The City's Arterial Street Prgram, as' heretofore
opted and amended, is hereby further amended and modified by designating
e streets and highways as specified on the attached Exhibit, labeled
khibit A" and incorporated herein as if fully set forth, as arterial
sets and highways. Furthermore, the City's Comprehensive Street
gram fcr the ensuing six years as last adopted under date of July
1968, :'s further amended to include and designate the arterial streets
highways as specified on the attached Exhibit.
SECTION II : The City Engineer and City Clerk are hereby
prized and directed to file this amendment with the Director of Highways
\the State of Washington, together with a certified copy of this .
lution, and as otherwise provided by, law.
PASSED BY THE CITY COUNCIL this ,/'S7e- day of :April, 1969. r..
--
--
/.
e m e a ,.son,--- y es,t.
APPROVED BY THE MAYOR this , / s ,day of Aril, 1969
1
0
I
tone I`. ust©r, Mayor
jfed as to Form:
' ri ' .1(<;;,-7---
M. Shellan, City Attorney . ,
•
\/
I _
EXHIBIT A
RESOLUTION #1619 4-15-69
iARTERIAL STREET DESIGNATIONS
1 . Taylor P. N.W. & Taylor Ave. N.W. from West City limits to Renton Ave. Ext.
I
2. Rainier Ave. N. - Rainier Ave. S. from North City limits to S. Grady. Way
3. Airport Way from Rainier Ave. N. to Logan Ave. S.
4. Smithers Ave, S. , Logan Ave. S.-Logan Ave N. from S. Grady Way to North 8thSt.
North 6th St. from Logan Ave. N. to Garden Ave.' N. -` •.`;y';,:;;,
5. '-, : .: :.
a.
j 6. N . 4th St. N. 3rd St, one-way couplet from Logan Ave: N. to Houser'-Way"N:=1;''', -,-',-'. '. ,
7. Garden Avenue N. from Bronson Way N. to,Lake Wash. Blvd.
8. Mouser Way S.-Houser Way N. from Smithers Avenue S. to Lake Washington Blvd. .N
9. Williams Ave. S. -Williams Ave N. from S. Grady Way to N. 6th St.
10. Wells Ave. S.-Wells Ave. N. from S. Grady Way to N. 6th St.
11 . Park Ave. N. from Bronson Way N. to N. 8th St.'
12. Bronson Way S .-Bronson Way N. from Main Avenue S. to Su,pset Blvd. N.
13. Mill Avenue S. from Houser Way S. to Bronson Way S.
14. S. Second St. from Rainier Ave. S. to Main Ave. S.
15. S.W. Langston Rd. from S .W. Sunset Blvd. to West City limits
16. S.W. Sunset Blvd. from West City limits to Rainier Ave. S.
17. S . 3rd Si:. from Rainier Ave. S. to Main Ave. S.
18. Main Ave. S . from S. Grady Way & Benson Road S. Intersection to Bronson Way S:.
19. Benson Road S . (Main Ave. S. and S. Grady Way) to S. City limits ;. • '
20. S. Grady Way from Rainier Ave. S. to Main Ave. S.
21 . S.W. 7th St, from S. Grady Way to Lind Ave S.W.
122. S.W. Grady Way from Rainier Ave. S. to West City limits
23. Lind Ave. S .W. from S.W. Sunset Blvd. to South City limits
24. S.W. 43rd St. from East City limits to West City limits
25, Renton Ave. Ext. from Rainier Ave. N. to West City limits
26. Talbot Road S. from S . Grady Way to South City limits
27. West Valley Road from S .W. 43rd St. to North City limits
28e S. Puget Dr. , Puget Dr. S.E. from Talbot Road S. to Edmonds Ave: S.E.
29•. Edmonds Ave. S .E. from Puget Dr. S.E. to S. City limits (formerly 116th Ave.S.E.)
I
30. Maple Valley Highway from Sunset Blvd. N. to East City limits
I1 . Sunset Blvd. N.-Sunset Blvd. N.E. from Maple Valley Highway to East City limits
I
I
,
2. Arterial Street Desist (Continued)
32. N.E. 3rd St. -N.E. 4th St. from Sunset Blvd. N. to East City limits
33. Monroe Ave. N.E. from 4th St. to N.E. 12th St.
34. Union Ave. N.E. from N.E. 4th St. to North City limits
35. N.E. 12th St. from Aberdeen Ave. N.E. to Union Ave. N.E.
36. Edmonds Ave. N.E. from Sunset Blvd. N.E. to N.E. 27th St. ‘ •
37. Aberdeen Ave. N.E. from Sunset Blvd. N.E. to N.E. 27th St.
38. N.E. 27th St. ,-Kennewick P1 . N.E. and N.E. 30th St. from Edmonds Ave. N.E. to I 405
39. N. 30th St. from Burnett Ave. N. to Park Ave. N.
40. Burnett Ave. N.-Lake Washington Blvd. N. (Vic. N. 28th St. ) to Lake Wash. ABlvd. N.
(Vic. N. 37th St. )
41 . S.W. 16th St. from East Valley Road to West City Limits
10 . I:. VH , R. i1 I .rom W. Hi 1 h 1.0 , W 1 `3rl
3 . ijjkr W.1:; 1ingt llotfirvord North trcmi Itolui,./, Way to Nort.he.as-t
11 el t `cit t
•
•
•
NOTICE OF. PUBLIC HEARING
BY
RENTON CITY COUNCIL
NOTICE IS HEREBY GIVEN that the Renton City Council has
fixed the 22nd day of December , 19 69 , at
8 :00 p.m. in the Council Chambers of the Renton Municipal
Building, 'Renton, Washington as the time and place for a
public hearing to consider the following:
Proposed revisions to the Six-Year Comprehensive Street
Program for the City of Renton
Any and all interested persons are invited to be present
to voice approval , disapproval or opinions on same.
CITY OF RENTON
Helmie Nelson , City Clerk
- DATE OF PUBLICATION
UEC 1. 2 196g
CERTIFICATIO N
STATE OF WASHINGTON)
) • ss .
COUNTY OF KING )
I, Vp,hereby certify that
three (3) copies of the above notice were posted by me ,in
three conspicuous places on the property described and one
,copy was posted at the City Municipal Building, Renton.,
Jashington on ' date of Doc.. tkeigt, , 19
Si}ned � sy Y• .�i
ATTEST:
'NOtar-, Public- inand for the State
of- W=sh.ington , 'residing at Renton .
NOTICE OF PUBLIC HEARING
•
BY
RENTON CITY COUNCIL
NOTICE IS HEREBY GIVEN that the Renton City Council has
fixed the 22nd day of December , 19 .69 , at
8 :00 p.m. in the Council Chambers of the Rentbn' , Municipal
Building, • Renton, Washington as the time and place for a
public hearing to consider the following:
Proposed revisions to the Six-Year comprehensive Street
Program for. alae City of Renton.
Any and all interested persons are invited to be present
to voice approval , disapproval or opinions on same .
CITY OF RENTON
y.6��sfl✓L',W�I
Helmie Nelson , City Clerk
DATE OF PUBLICATION
DEC121969
CERTIFICATIO -N
STATE OF WASHINGTON)
) . ss .
COUNTY OF KING )
T, hereby certify that
three (3)' copies of the above notice were posted by me ,in
three .conspicuous places on the property described and one
,copy was posted at the City Municipal Building, Renton.,
Washington on : date of , 19
Sf ned
ATTEST:'
Notary, ,P;ublic, in and for the State
. of- .Wash.ingtan, 'resi.ding at Renton .
NOTICE OF PUBLIC HEARING
•
BY
RENTON CITY COUNCIL
NOTICE IS HEREBY GIVEN that the Renton City Council has
fixed the 22nd day of December , 19 69 , at
8 :00 p.m. in the Council Chambers of the Renton Municipal
Building, Renton, Washington as the time and place for a
public hearing to consider the .following:
Proposers revisions to the Six-Year Comprehensive Street
Program cor the CItyi of Renton.
•
•
•
•
•
Any and all interested persons are invited to be present
to voice approval , disapproval or opinions on same.
CITY OF RENTON
Helmie Nelson , City Clerk
DATE OF PUBLICATION
1z1S
CERTIFICATION
STATE OF WASHINGTON)
) • ss .
COUNTY OF KING )
I, hereby certify that
three (3) copies of the above notice were posted by Me ,in
three conspicuous places on the property described and one
,.copy was posted at the City Municipal Building, Renton.,
Washington on date of , 19
Si "ned
ATTEST
Notary .Public, in and for the State
'of- Wash.ingtor , 'resi.ding at Renton .
•
•
•
� ' . ' . . .. � -• ..jam, . .. . •
- 13ac� rab�r. IFS ;
i-liariorpbie Aver.y, `Garroito .. styor ::• .
Ilern r^s of :the f� y ,Cc�itrtic:3 1 -
• • • • Re a ix.:7-Year S.treel- ..Pronram •-I 97.O-;..,•I:.97;• _,
•
•
ontlr;en ....
�L L ' sly- �o
T-fie 'Board,. � , dub d,i Works hp.s c:Qr,7p t-etai S f� w..' f `.thy
proposed ,$ x--.Year S.trec-d• •Program for `.� ,hs CI :y Of Ron.i•Or.`'for. .i-hb •
• per Io cf •I97O- 75,; -Tire S s ro t .;Progr`� i :is rcavi: •ed ' oral• 'suh,,rii .l.ted •
i'o,•-the a tater of Wish I ngtc,n on err , nnua I' ::b si a I fi: I rie�.c ass rr.y. .:. ,
th r •pr.lv,r .to •.ap•prcv_0'6 .'.o;. a":.p•ulxrr'Irnr„'pe,,•h9Ic£,• ' . .. , ,
t,y ,� h€• CIty .Coun I'.I.� .. . . It Is • of ••tha • E3o.ard that-., . •
• a pupa i I c,: 'hpa rii'nq • b.e :hold or • th l nla�rt r .zit th :, ce rs r.'22 • _opo I n•g • '
9f _the ty. i.{ : .
•
: Cordon' •_Y• "Estek'$ran
. 4.', '�' hY'.G �'-'•t S ra"'�" ids:��i�- �Y'•?•�; -
,a.• ,�,,.,�r .'T. ,r;:* }' 'i"�r�'�. kms r•• _
. • .rs. . .' ..a`.`' :' 'Ys' r + •.-
4'. "�:.`,y�r•'?: .b'.t P�1i» � ,•;ke ';^gig..`�,, .��;r` ;"��;; • 4- +.
' ..iU•�..�. 1 �4:.�^i"5'y',, ir' t� �h.�. '..j... �'1F•�•'."rri'- 3m
� r .}.- i 'r: r&,'^.+r..','} {dt•: i'f:.'..a'.+a''?'tri;', At. .r: jig• -
•,.t� `s� .�'�;";i0.:':, '•.3 ilir:v;�•�'F rev. - "�'.i�'?.,'' ti `�ss` ter' - •