HomeMy WebLinkAboutR-393006DRAINAGE GRATE GRATE FRAME v SEDIMENTAND DEBRIS ova FILTERED WATER 5" MAX. TRIM a 4 OVERFLOW BYPASS �vt> BELOW INLET GRATE DEVICE n A I A SECTION VIEW DRAINAGE GRATE - REC' ISOMETRIC VIEW NOTES 1. Size the Below Inlet Grate Device (BIGD) for the storm water structure it will service. 2. The BIGD shall have a built-in high -flow relief system (overflow bypass). 3. The retrieval system must allow removal of the BIGD without spilling the collected material. 4. Perform maintenance in accordance with Standard Specification 8-01.3(15). -M (TYP.) ti`�Y o PUBLIC WORKS CATCH BASIN FILTER STD. PLAN - 216.30 DEPARTMENT MARCH 2O08 CATCH BASIN FILTER (COR STD. PLAN 216.30) NOT TO SCALE EROSION CONTROL NOTES: 1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS: 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER. 3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. 5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE. 6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE vOPO INSTALL DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT, AS PER CITY ROAD STANDARDS 4"-8" QUARRY SPALLS GEOTEXTILE DRIVEWAYS SHALL BE PAVED TO THE EDGE OF R-O-W PRIOR TO INSTALLATION OF THE CONSTRUCTION ENTRANCE TO AVOID / DAMAGING OF THE ROADWAY IT IS RECOMMENDED THAT THE \ ENTRANCE BE CROWNED SO THAT RUNOFF DRAINS OFF THE PAD oo. ?i2 12" MIN. THICKNESS �� PROVIDE FULL WIDTH OF NOTES INGRESS/EGRESS AREA 1. CONDITION OF USE 1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. GRAB TENSILE STREBNGTH (ASTM D4751) 200 PSI MIN. GRAB TENSILE ELONGATION (ASTM D4632) 30% MAX. MULLEN BURST STRENGTH (ASTM D3786-80A) 400PSI MIN. AOS (ASTM D4751) 20-45 (U.S. STANDARD SIEVE SIZE) 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN ARES THAT WILL BOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 2.2. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. 2.3. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE. 3. MAINTENANCE STANDARDS 3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. 3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF THE WHEEL WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASHED WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND. 3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY. IF IT NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONDUCTED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. 3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 3.5. IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC. zY PUBLIC WORKS DEPARTMENT STABILIZED CONSTRUCTION ENTRANCE STD. PLAN - 215.10 MARCH 2O08 STABILIZED CONSTRUCTION ENTRANCE (COR STD. PLAN 215.10) NOT TO SCALE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES. 8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST THROUGH SEPTEMBER 30) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). 9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS. 10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL. 11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS DURING NON WET SEASON. 12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. 13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT- LADEN WATER INTO THE DOWNSTREAM SYSTEM. AS -BUILT I CERTIFY THAT THE INFORMATION SHOWN HEREON WHICH WAS AS -BUILT BY AHBL ,AND MAY INCLUDE NVALDATETNE PROFES90NAL SEAL AND SNp1ATURE PUBLICATION OF AS -BUILT COMMENTS, ACCURATELY REFLECTS EXISTING TNISD0a11E11TDOESNorUEROGAIEERONRESERVED OINERSIIP RNiliS III ff. THIS DOa11E11T 6 Fat USE CONDICTIONS AS DETERMINED BY ME OR UNDER MY pLYFORTNEPRo,iCTr1ENiFIDlITNETi1lEBAa( AND IS NOT TO BE USED FOR REPAIR, RFl10DEL OR ABBInoNTOTMATPRo�cTaREaRANTmIERPRo�Ecr. W z DIRECT SUPERVISION ON THIS DATE: 08/23/2019. r �l J . r tiy�� pF wAsHf��� 41803 �S`S-tONAL GISTER9 14. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. 15. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW. 16. ALL TESC MEASURES MUST BE REMOVED AFTER CONSTRUCTION AND SITE IS STABILIZED. 17. DISTURBED AREAS UNWORKED FOR 7 CONSECUTIVE WORKING DAYS SHALL BE STABILIZED WITH COVER MEASURES EXCEPT DURING THE WET SEASON. DURING THE WET SEASON DISTURBED AREAS UNWORKED FOR TWO CONSECUTIVE WORKING DAYS SHALL BE STABILIZED WITH COVER MEASURES. 18. STOCKPILES AND STEEP CUT AND FILL SLOPES SHALL BE PROTECTED IF UNWORKED FOR MORE THAN 12 HOURS. 19. COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED ON SITE. 20. ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. 21. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS. 22. FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF DISTURBANCE SHALL BE STOCKPILED ON SITE. 23. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL SITES UNLESS THE SITE IS UNDERLAIN BY COARSE -GRAINED SOIL. 24. ANY RUNOFF GENERATED BY DEWATERING SHALL BE REQUIRED TO DISCHARGE TO THE SANITARY SEWER (WITH APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE SAND FILTER SYSTEMS, OR HOLDING TANKS. NON _ 5 RAMP REVISION I 4 STORM DRAINAGE REVISIONS N = 3 CITY COMMENTS 2 ADDENDUM NO. 3 TA C O M A - SEATTLE • SPOKANE •TRI-CITIES 1 ADDENDUM NO. 1 2215 North 30th Street, Suite 300 Tacoma, WA98403 NO. REVISION 19253.383.2422 TEL 253.383.2572 FAX www.ahbl.com NEB Y ROCK MUST COMPLETELY COVER THE m BOTTOM AND SIDES OF THE DITCH 6" MIN. � D o Daoao oCSO oa 24" MIN. DDo�ooDo Dam o a�oo�oo 000� 2:1 SLOPES Q�Qa��a 2"-4" ROCK L = THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION A B IIIII I L aow aa� I I I -III = I I; ,III oDa�O000 IIIIII1 I II I �a�oo�� III -III= IIII NOTES 1. CONDITION OF USE 1.1. WERE CONCENTRATED RUNOFF FROM DISTURBED AREAS TO AND FROM PONDS OR TRAPS. 1.2. TO CONVEY RUNOFF INTERCEPTED FROM UNDISTURBED AREAS AROUND THE SITE TO A NON -EROSIVE DISCHARGE POINT. 2. MAINTENANCE STANDARDS 2.1. ANY SEDIMENT DEPOSITION OF MORE THAN 0.5 FEET SHALL BE REMOVED SO THAT THE CHANNEL IS RESTORED TO ITS ORIGINAL DESIGN CAPACITY. 2.2. THE CHECK DAMS SHALL BE EXAMINED FOR SIGNS OF SCOURING AND EROSION OF THE BED AND BANKS. IF SCOURING AND EROSION HAS OCCURRED, AFFECTED AREAS SHALL BE PROTECTED BY RIPRAP OR AN EROSION CONTROL BLANKET. 'SY � /®� + PUBLIC WORKS CHECK DAMS SPACING AND STD. PLAN - 217.40 DEPARTMENT CROSS SECTIONS MARCH 2O08 CHECK DAM SPACING AND CROSS SECTIONS (COR STD. PLAN 217.40) NOT TO SCALE GENERAL NOTES: INSPECTION SCHEDULE: 2:1 MAX. SLOPE LEVEL BOTTOMm_--f 77_1 1' MIN. .� � I I I I I I I I I I IIIIIII � II I I J I I-1 2' MIN. SWALE SPACING DEPENDS ON SLOPE GRADIENT NOTES 1. CONDITION OF USE 1.1. REQUIRED AT: 1.1.1. THE TOP OF ALL SLOPES IN EXCESS OF 3H:1 V AND WITH MORE THAN 20 FEET OF VERTICAL RELIEF. 1.1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELLOW. AVERAGE SLOPE SLOPE PERCENT FLOWPATH LENGTH 20H:1V 3-5% 300 FEET (10TO20)H:1V 5-10% 200FEET (4TO10)H:1V 10-25% 100FEET (2TO4)H:1V 25-50% 50FEET 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. FOR SLOPES STEEPER THAN 2HA V WITH MORE THAN 10 FEET OF VERTICAL RELIEF, BENCHES MAY BE CONSTRUCTED OR CLOSER SPACED INTERCEPTOR SWALES MAY BE USED. THE DESIRE MEASURE MOST BE DESIGNED BY AN ENGINEER TO EFFECTIVELY INTERCEPT THE HIGH VELOCITY RUNOFF TO A SEDIMENT POND OR TRAP. 2.2. CONSTRUCTION TRAFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED. 3. MAINTENANCE STANDARDS 3.1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY. 3.2. IF THE FACILITY DO NOT REGULARLY RETAIN STORM RUNOFF, THE CAPACITY AND/OR FREQUENCY OF THE SWALES SHALL BE INCREASED. zY PUBLIC WORKS INTERCEPTOR SWALE STD. PLAN - 217.10 DEPARTMENT 'F'�N toy MARCH 2O08 INTERCEPTOR SWALE (COR STD. PLAN 217.10) NOT TO SCALE MULCHING NOTES: 1. CONTRACTOR SHALL PERFORM ADDITIONAL 1. ALL ESC MEASURES SHALL BE MAINTAINED AND REVIEWED ON A REGULAR CLEARING TO CONSTRUCT ONSITE AND OFFSITE BASIS. IMPROVEMENTS IF NECESSARY. 2. THE ESC SUPERVISOR SHALL REVIEW THE SITE AT LEAST WEEKLY AND 2. GENERAL CONTRACTOR SHALL PROVIDE AN ESC WITHIN 24 HOURS OF SIGNIFICANT STORMS. A SIGNIFICANT STORM IS ONE SUPERVISOR WHO IS A CERTIFIED EROSION AND WITH MORE THAN 0.5 INCHES OF RAIN IN 24 HOURS OR LESS. SEDIMENT CONTROL LEAD. 3. THE CITY MAY REQUIRE THAT A WRITTEN RECORD OF THESE REVIEWS BE KEPT ON SITE WITH COPIES SUBMITTED TO THE CITY WITHIN 48 HOURS. 3. CONTRACTOR SHALL CONFORM TO ALL REQUIREMENTS OF THE NPDES UNDER THE DOE'S GENERAL PERMIT FOR STORMWATER DISCHARGE HYDROSEEDING NOTES: FROM CONSTRUCTION ACTIVITIES AND THE SWPPP. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL REQUIRED RECORDS. 1. HYDROSEEDING SHALL BE APPLIED TO ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES UNLESS OTHERWISE NOTED. 4. SEE LANDSCAPE PLANS FOR FINAL VEGETATED SURFACING. 2. HYDROSEEDING TO BE AS SPECIFIED IN LANDSCAPE SPECIFICATIONS. 5. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE 3. APPLICATION TO BE 100 LBS/ACRE. CONDITIONS CHANGE THE EROSION CONTROL IS ALWAYS IN ACCORDANCE WITH THE MINIMUM CITY 4. 500 LBS/ACRE 10-20-20 FERTILIZER, 2000 LBS/ACRE MULCH AND 40 OF RENTON TESC REQUIREMENTS. LBS/ACRE SOIL STABILIZER TO BE APPLIED WITH SEED MIXTURE. 6. CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE 5. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL OF TESC FACILITIES. CONTRACTOR IS REQUIRE IRRIGATION AND OTHER MAINTENANCE AS NECESSARY RESPONSIBLE FOR CONSTRUCTION OF ADDITIONAL TO FOSTER AND PROTECT THE ROOT STRUCTURE. CONTRACTOR FACILITIES INCLUDING BUT NOT LIMITED TO FILTER SHALL ENSURE PROPER ROOT GROWTH REGARDLESS OF FENCE, CATCH BASIN PROTECTION, SWALES, PLANTING SCHEDULE. MULCHING AND SEEDING. 6. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30, 7. CONTRACTOR SHALL INCLUDE IN BID REMOVAL OF ARMORING OF THE SEED WILL BE NECESSARY. (EG, GEOTEXTILES, ALL TESC MEASURES AT COMPLETION OF PROJECT. JUTE MAT, CLEAR PLASTIC COVERING.) 8. REMOVE EXISTING SOD AND TOPSOIL AS 7. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL NECESSARY TO PROVIDE IMPROVEMENTS. MEASURES SUCH AS GRADIENT TERRACES, INTERCEPTOR DIKES, CONTRACTOR SHALL DISPOSE OF EXCESS SOD SWALES, LEVEL SPREADERS AND SEDIMENT BASINS. OFFSITE. 8. THE SEEDBED SHALL BE FIRM WITH A FAIRLY FINE SURFACE, 9. SEDIMENTS TRACKED ONTO PAVED SURFACES FOLLOWING SURFACE ROUGHENING. PERFORM ALL OPERATIONS SHALL BE REMOVED BY SWEEPING. SEDIMENTS ACROSS OR AT RIGHT ANGLES TO THE SLOPE. SHALL NOT BE WASHED DOWNSTREAM. SPRAY EXPOSED SOILS WITH WATER TO PREVENT DUST. 9. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS RUNOFF SHALL NOT BE CREATED BY SPRAYING. RECOMMENDATIONS. AMOUNTS USED SHOULD BE MINIMIZED, EROSION CONTROL MEASURES SHALL BE ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS. PROVIDED THROUGHOUT CONSTRUCTION. t6R 9 MU 0fI FAURbFURAWINGS WJF 2/22/18 WJF SURVEYED: D. FOLLANSBEE SCALE: AS SHOWN VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 CITY 0 F ' RENTONDRAWN. �r'N`� WJF 12/13/17 WJF DESIGNED: G. TALISCHECK WJF 4/21/17 WJF WJF 3/17/17 WJF F. KATONA ONE INCH AT FULL SCALE IF NOT ONE INCH DATUM Planning/Building/Public Works Dept. WJF 3/1/17 WJF CHECKED: W. FIERST BY DATE APPR SCALE ACCORDINGLY APPROVED: S. COMFORT BY: BY: BY: BY: 1. MULCH MATERIALS USED SHALL BE HAY OR STRAW, AND SHALL BE APPLIED AT THE RATE OF 2 TONS/ACRE. 2. MULCHES SHALL BE APPLIED IN ALL AREAS WITH EXPOSED SLOPES GREATER THAN 2:1. 3. MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON. 4. ALL AREAS NEEDING MULCH SHALL BE COVERED BY NOVEMBER 1. SOIL NOTES: A. THE SOIL MOISTURE HANDLING CAPACITY OF ALL NEW PERVIOUS SURFACING THAT, AT PROJECT COMPLETION, WILL NOT BE COVERED BY IMPERVIOUS SURFACING OR INCORPORATED INTO A DRAINAGE FACILITY MUST BE PROTECTED. THE DUFF LAYER AND NATIVE TOPSOIL SHALL BE RETAINED IN AN UNDISTURBED STATE TO THE MAXIMUM EXTENT FEASIBLE. B. ANY DUFF LAYER OR TOPSOIL REMOVED DURING GRADING SHALL BE STOCKPILED ONSITE IN A DESIGNATED, CONTROLLED AREA NOT ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS. THE MATERIAL SHALL BE REAPPLIED TO OTHER PORTIONS OF THE SITE WHERE FEASIBLE. C. THE SOIL IN ANY AREA THAT HAS BEEN COMPACTED OR THAT HAS HAD SOME OR ALL OF THE DUFF LAYER OR UNDERLYING TOPSOIL REMOVED SHALL BE AMENDED TO MITIGATE FOR LOSS OF MOISTURE HOLDING CAPACITY. THE AMENDMENT SHALL TAKE PLACE BETWEEN MAY 1 AND OCTOBER 1. REPLACED TOPSOIL SHALL BE A MINIMUM OF 8 INCHES THICK. REPLACED TOPSOIL SHALL HAVE AN ORGANIC MATTER CONTENT BETWEEN 8 AND 13 PERCENT DRY WEIGHT AND A PH SUITABLE FOR THE PROPOSED LANDSCAPE PLANTS. SEE LANDSCAPE PLANS APPROVED FOR CONSTRUCTION SUBJECT TO ERRORS AND OMISSIONS DATE: DATE: DATE: DATE: SARTORI ELEMENTARY SCHOOL RENTON SCHOOL DISTRICT TESC NOTES AND DETAILS I 05/04/2017 FIELDBOOK: PAGE: DRAWNG NO: C2.3 SHEET: OF: 6 43 M 0 O 0 R-393006