Loading...
HomeMy WebLinkAboutR-393012O M M O I w 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 FINISHED GRADE EXISTING GRADE @ PIPE CENTERLINE @ PIPE CENTERLINE ----1 - - - - - - - - -------- ------ ------------ - ------ - - - - - - '0 23 LF 12" @ 0.66% 0 0 0 64 LF 12" @ 0.50% 75 LF 12" @ 0.50% 0 66 LF 8" @ 0.50% � 9 0 B 34 LF 12" @ 0.50% 0 20 LF 12" U @ 0.50% EXIST. 8" SDCB 2 T SDCB 24 SDCB 77 SDCB 1 SEWER CB TYPE 1 SDCB 3 SDCB 40 SDCB 37 CB TYPE 1 48" TYPE 2 CB 60" TYPE 2 CB SOLID LID N 181134.73 48" TYPE 2 CB CB TYPE 1 48" TYPE 2 CB SOLID LID N 181168.55 SOLID LID SOLID LID N 181135.12 E 1302153.50 SOLID LID N 181134.28 SOLID LID N 181133.88 N 181179.28 E M: 35.43.04 RIM: N 130207 21 E E 1302089.12 RIM: 35.80 IE: 31.07 12" (W) E 1302228.56 RIM: 36.83 E 1302294.53 RIM: 35.63 E 1302025.70 RIM: 35.73 .43 1 �� IE: 30.43 12 (SE) M: 36.50.62 RIM: 36.54 RIM: 36.68 IE: 31.07 12" (E) IE: 31.45 12" (W) IE: 31.78 8" (N) IE: 30.33 12 (SE) IE: 30.43 12" (NW) IE: 30.60 12" (SE) IE: 30.75 12" (E) IE: 30.75 12" (NW) IE: 31.07 8" (N) IE: 31.45 12" (S) IE: 31.78 8" (W) IE: 30.33 12" (S) - IE: 30.60 12" (NW) IE: 30.60 12" (E) IE: 30.75 36" (SW) ) IE: 31.57 6" (SE) IE: 31.45 8" (E) I� cV I� 00 O � EXIST. 00 PROPOSED - - � rn 00 M - r- Ln I� I� Ln n ( co r� � GRADE � f GRADE n L6 M M M ELEV. M ELEV. M M M M M FINISHED GRADE @ PIPE CENTERLINE EXISTING GRADE @ PIPE CENTERLINE 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 HORIZONTAL SCALE: 1 "=20' VERTICAL SCALE: 1 "=5' KEYNOTE OURBAN ACCESSORIES STANDARD ADA COVER 2C PROVIDE ETHOFOAM PAD AT CROSSING PROP. 8" _ -------- WATER - - - - - - - - - - - - -----r------------------ _ -- ----� -ice ---------- 6 - - - - - - - - - - - - - - - - - - -- _------- - - -- - - - - - 52 LF 12�� @3.15% 60 LF 42" @ 0.00% 296 LF 8" @ 0.50% b 30 LF 8" @ 2.87% 8 ° PROPOSED LJ SDCB 26 ELECTRICAL 48" TYPE 2 CB DUCT BANK N 180754.36 SDCB 8 E 1302040.12 SDCB 1 SDCB 47 48" TYPE 2 CB RIM: 38.28 60" TYPE 2 CB 54" TYPE 2 CB N 181050.01 IE: 33.08 12" (SW) SDCB 25 SOLID LID SOLID LID E 1302043.81 IE: 33.08 8" (N) CB TYPE 1 N 181135.12 N 181076.12 RIM: 38.13 IE: 33.41 4" (E) N 180719.70 E 1302089.12 E 1302057.68 IE: 31.60 8" (NE) IE: 33.08 8" (S) E 1302001.10 RIM: RIM: 36.61 RIM: 38.09 IE: 31.60 8" (S) IE: 30.75 12" (E) IE: 30.75 8" (SW) IE: 31.77 6" (W) IE: 34.73 12" (NE) IE: 30.75 12" (NW) IE: 30.75 36" (NE) IE: 30.75 36" (SW) - 00 co cfl co cfl o t` o It EXIST. LO PROPOSED (.0 (.0co 0') LO rn Cfl CV � CV O O CO GO GO CO CO 00 O V M ti C r- r- 00 r- c r- r- r- GRADE r- f GRADE r- r- co '� o6 o6 Gp 1-: M M M co M N-) CO M M M ELEV. C0 ELEV. M M rl� M M M M M 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 EXISTING GRADE FINISHED GRADE @ PIPE CENTERLINE @ PIPE CENTERLINE - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - J �. - - - - - - ,� - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 17 155 LF 8" @ 0.50% 79 LF 12" @ 0.50% 61 LF8'@0.50% 0 103 LF 8" @ 0.50% ° 139LF12„ @0.50% O 7SDCB OSDCB 15 SDCB 4 O O - SDCB 14 O N 1 TYPE 1 N 180750.20 SDCB 3 CB TYPE 1 SDCB 12 O CB TYPE 40 CB TYPE 1 E 1302377.18 48" TYPE 2 CB N 180994.82 - E 40 - N 130 N 180752.39 SOLID LID E 1302226.32 NB18 916.04 E 224.1 E 1302222.58 1E34 12 8 (W) N 181134.28 RIM: 36.35 E 1302225.14 M:36. 5 RIM: 36.35 RIM: 36.35 E 1302228.56 IE: 32.15 12" (N) RIM: 36.49 IE: 32.84 8" (N) IE: 33.35 8" (N) RIM: 36.83 IE: 32.15 8 (SW) IE: 32.54 12" (N) IE: 32.84 8" (S) IE: 33.35 8 (E) IE: 31.45 12" (W) IE: 32.15 12" (S) IE: 32.54 8" (S) IE: 31.45 12" (S) - - IE: 31.45 8" (E) N M rn cfl O rn O N 0-) CV cfl LO LO Cl) cfl rn EXIST. 0 It PROPOSED O q O O' (0 O o LO - (.0 n CA M n CM O CM n M L)00 CO c 0 0 G0 0 c c cp (.6 (.6 GRADE f GRADE M M M M M N) C'M M M M M M ELEV. c`) ELEV. M M I M r M M M cr) h% CO AS -BUILT I CERTIFY THAT THE INFORMATION SHOWN HEREON WHICH WAS AS -BUILT BY AHBL ,AND MAY INCLUDE NOTICE LOCATIONS, ELEVATIONS, DEPTHS, PIPE SIZES, AND ALTERAnoNaFTHIS OOaIYENrSHALLNVALDATETHE PROFES90NAL SEAL AND SNp1ATURE PUBLICATION OF AS -BUILT COMMENTS, ACCURATELY REFLECTS EXISTING THIS D0a11ENTD0ESNorUEROGAIEFRONRESERVED ottTa:sxv RIa115 N ff. THIS DOa11E11T 6 Fat USE FIELD CONDICTIONS AS DETERMINED BY ME OR UNDER MY pLYFOR THE PRo�iCTr1ENiFIDlITHE TiIlEBAa( R, RFl10D BITIottAND IS NOT TO BE USED FOR REPAEL OR DIRECT SUPERVISION ON THIS DATE: 08/23/2019. ABTOTMATPRaECTatFaRANTmIExPRo�Ecr. z J J . oV wasH11, _ 5 RAMP REVISION ' 4 STORM DRAINAGE REVISIONS 3 CITY COMMENTS .� 2 ADDENDUM NO. 3 oEC180yll:���ww TACO MA- SEATTLE•SPOKANE•TRI-CITIES 1 ADDENDUM NO. 1 SjONAL E� 2215 North 30th Street, Suite 300 Tacoma, WA98403 NO. REVISION /23/201 9253.383.2422 TEL 253.383.2572 FAX www.ahbl.com NEB CONSTRUCTION RECORD DRAWINGS WJF 2/22/1 8 WJF SURVEYED: D. FOLLANSBEE SCALE: AS SHOWN VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 y O`l fiy CITY OF � ,� ' R E N TO N �r'N`�� WJF 12/13/17 WJF DESIGNED: G. TALISCHECK WJF 4/21/17 WJF DRAWN. WJF 3/17/17 WJF F. KATONA ONE INCH AT FULL SCALE IF NOT ONE INCH DATUM Planning/Building/Public Works Dept. WJF 3/1/17 WJF CHECKED: W. FIERST BY DATE APPR SCALE ACCORDINGLY APPROVED: S. COMFORT APPROVED FOR CONSTRUCTION SUBJECT TO ERRORS AND OMISSIONS BY: DATE: BY: DATE: BY: DATE: BY: DATE: SARTORI ELEMENTARY SCHOOL RENTON SCHOOL DISTRICT STORM DRAINAGE PROFILES I 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 05/04/2017 FIELDBOOK: PAGE: DRANNG NO: C3.4 SHEET: OF: OF:43 a N O O O J M N O O O I R-393012