Loading...
HomeMy WebLinkAboutR-393023a::.. a.... a. — — — v . I OP OP OP -- v 'v. I — / p �X—X X—X�X— _TC X• — — — —� _ _ — — — — _ _ — — _ _ _ _ _ — — — — — a� cn a: SDCB 70 N �� Mo �� 0 o z w n n z a o t o m � z o m t I jj II w Q II::: z C4 CA w w w N0 V C "i �JNNJ J Cn I 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 CD n 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 M N 6 CY) cM 40+50 41+00 41+50 42+00 42+50 43+00 43+50 VERTICAL SCALE: 1 "=2' Ln It 0 I U) Lau (0 SDCB 58 CO � CB TYPE 1 w it STA 41 +62.87, 19.92' LT Q > RIM- �3-37.22 SDCB 59 � _j O w IE:35.13r12" (N) CB E 1 FINISHED GRADE @ FLOWLINE 35.17 STA 43P+12.87, 19.92' LT : 36 8 3 6.44 1,.LEXIST. GRADE @ SAWCUT LINE EXIST. GRADE @ CENTERLINE EI 3. (S)34.42 — — — / IE:34.38-12" (N)34.41 -- — — — --------------------04$° — — — — — — — — — — — — — — — — — — — — 150 LF 12" DIP @ 0.500,lo ------------------- EXIST. GAS MAIN FINISHED GRADE ELEVATION Li @ FLOWLINE EXISTING GRADE ELEVATION @ CENTERLINE EXISTING / FINISHED GRADE ELEVATION @ SAWCUT LINE _ OR CO r-� C.0 0- N M M Q0 C0 0) N 0 Ln N O Ln Ln 5) Q0 r) M M DO N ti DO Q0 O M C.0 LLB v. r` 00 Ln 00 LO 0) It M 00 ti M CO � r- CO co r- M co � r` M M � r— CO M � r` M cM (6 ti M � (6 CO M M (6 CO M M (6 Cfl r CM co � CO M M CO CO M C6 I.r� I.r� ro KEYNOTES O CROSS WALK PUSH BUTTON FOR ACCESSIBLE PEDESTRIAN SIGNAL, SEE SIGNAL DESIGN FOR EXACT LOCATION. O TYPICAL TRANSVERSE PATCH FOR FLEXIBLE PAVEMENT, SEE DETAIL 4 ON SHEET C7.10, TYP. Z GRAPHIC SCALE 0 10 20 40 1" = 20 FEET A� J • �' CONSTRUCTION RECORD DRAWINGS ��y� OF TTASg,4 AS-BUILT y �A 61 , 5 RAMP REVISION WJF 2/22/18 WJF SURVEYED: SCALE: CIP D. FOLLANSBEE VERTIAL: AV"ORZONTAL: NAD D1983/11991 �� CITY 0 F I CERTIFY THAT THE INFORMATION SHOWN HEREON 4 STORM DRAINAGE REVISIONS WJF 12/13/17 WJF DESIGNED: AS SHOWN a WHICH WAS AS -BUILT BY AHBL , AND MAY INCLUDE NOTICE W Hj B] L3 CITY COMMENTS WJF 4/21/17 WJF G. TAUSCHECK R E N TO N LOCATIONS, ELEVATIONS, DEPTHS, PIPE SIZES, AND ALTERAIIONOFTHIS DDDIYENTSHALL NVALIDATETHE _`2 ADDENDUM NO. 3 WJF 3/17/17 WJF °�'"'"` )�'��'N�O PROFESSIONAL SEAL AND SIGNATURE. PUBLICATION OF �/ F. KATONA AS -BUILT COMMENTS, ACCURATELY REFLECTS EXISTING THIS DoCAUTDOES NOT OEROGNIFROM RESERvm .P 41803 sv� o"E'"c" DATUM 4; aOINDWIP NL RIGHTSJINIT.THISDOECT IOEIITIFIED NTMTISFOE 17LE USE 0 �ECISTBVL �TACOMA SEATTLE SPOKANE TRI-CITIES 1 ADDENDUM NO. 1 WJF 3/1/17 WJF CHECKED: pT FULL SCALE Planning/Building/Public Works Dept. LOM a FIELD CONDICTIONS AS DETERMINED BY ME OR UNDER MY N�oTMTO�cTa�Fa�iAIR,FOAM HERVRacr. �SSIONAL W. FIERST IF E ACCORDINGLY p W DIRECT SUPERVISION ON THIS DATE: 08/23/2019. 2215North30thStreet,Sulte300 Tacoma, WA N0. REVISION BY DATE APPR APPRovED: J �23�201 9213.313.2422 TEL 253.383.2572 FAX www.ahbl.com WEB S. COMFORT APPROVED FOR CONSTRUCTION SUBJECT TO ERRORS AND OMISSIONS BY: DATE: BY: DATE: BY: DATE: BY: DATE: SARTORI ELEMENTARY SCHOOL RENTON SCHOOL DISTRICT GARDEN AVENUE NORTH FRONTAGE IMPROVEMENTS 05/04/2017 PAGE: DRAWING NO: C6.5 SHEET: OF: OF:43 �• • • 44 O O 0 Q J M CV CD O C9 R-393023