Loading...
HomeMy WebLinkAboutR-393027O M 6� M I O I RIM ELEV.= A z_Q d. z n c o .d d d. Qa d.d °ad °:.. OVERFLOW a ELEV.= B N a Q ° q MAX. ELEV.= C o W.S. d d' ORIFICE #2= DO a d ° a. PIPE SUPPORT(S): 3" X .090" 12" RISER 12" OUTLET PIPE c. a d'. IE= E a.d. d.a 1'-0,, b d. MIN. d d. a. Z d RESTRICTOR PLATE ° o o �a , ORIFICE #1= F O c d.a CV a ELEV.= G a .a a. d 60" o MANHOLE TYPE 2 REMOVABLE WATER- TIGHT COUPLING ELEV.= C ORIFICE #2= D 6"ELBOW DETAIL NOT TO SCALE CONTROL MANHOLE NOT TO SCALE 2" O AIR VENT C( CONTROI E DETENTION PIPE SECTION L Z O Q0 o' CV IY NOTES: 1. PIPE SIZES AND SLOPES: PER PLANS. ROUND SOLID COVER 2. OUTLET CAPACITY: NOT LESS THAN COMBINED INLETS. WITH LOCKING BOLTS. 3. EXCEPT AS SHOWN OR NOTED, UNITS SHALL BE CONSTRUCTED IN FRAME & LADDER OR ACCORDANCE WITH THE REQUIREMENTS FOR CATCH BASIN TYPE 2, STEPS OFFSET. SEE 60" MIN. DIAM. NOTE 8. FRAME & COVER ELEV. PER PLAN. 4. PIPE SUPPORTS AND RESTRICTOR/SEPARATOR SHALL BE OF SAME MATERIAL, AND BE ANCHORED AT T MAX. SPACING BY 5/8" DIAM. 2" O AIR VENT STAINLESS STEEL EXPANSION BOLTS OR EMBEDDED 2" IN WALL. IE= H EXTEND TO LANDSCAPE 5. THE RESTRICTOR/SEPARATOR SHALL BE FABRICTED FROM 0.060" AREA FINISHED GRADE. ALUMINUM, OR .064" ALUMINIZED STEEL, OR .064" GALVANIZED STEEL PIPE; IN ACCORDANCE WITH AASHTO M 36, M 196, M 197 AND M 274. GALVANIZED STEEL SHALL HAVE TREATMENT 1. STEPS OR LADDER 6. OUTLET SHALL BE CONNECTED TO STORM PIPE WITH A STANDARD COUPLING BAND FOR CORRUGATED METAL PIPE, OR GROUTED INTO THE BELL OF CONCRETE PIPE. INLET PIPE 7. THE VERTICAL RISER STEM OF THE RESTICTOR/SEPARATOR SHALL BE THE SAME DIAM. AS THE HORIZONTAL OUTLET PIPE, WITH AN 12" MIN. DIAM. 8. FRAME AND LADDER OR STEPS OFFSET SO THAT: A. CLEANOUT GATE IS VISIBLE FROM TOP. B. CLIMB DOWN SPACE IS CLEAR OF RISER AND CLEANOUT GATE. IE=I C. FRAME IS CLEAR OF CURB. CLEANOUT GATE: SHEAR GATE. 9. IF METAL OUTLET PIPE CONNECTS TO CEMENT CONCRETE PIPE: SEE DETAIL 3 OUTLET PIPE TO HAVE SMOOTH O.D. EQUAL TO CONCRETE PIPE I.D. THIS SHEET. LESS 1/4". 10. MULTI -ORIFICE ELBOWS MAY BE LOCATED AS SHOWN OR ALL ON ONE SIDE OF RISER TO ASSURE LADDER CLEARANCE. 11. ACCESS OPENING SHALL BE CLEARLY MARKED WITH CONFINED SPACE WARNING IN ACCORDANCE WITH OSHA AND L&I REQUIREMENTS. PLAN 12" OUT WSDOT SPECIFICATION 9-03.12(3), 95% COMPACTION; OR 3/8" WASHED GRAVEL FOR PIPE BEDDING PER AASHTO GRADATION NO. 8 % NOT TO SCALE 1 J . / y of `YA3fjt AS-BUILT���o��� 1 CERTIFY THAT THE INFORMATION SHOWN HEREON WHICH WAS AS -BUILT BY AHBL , AND MAY INCLUDE NOTICE LOCATIONS, ELEVATIONS, DEPTHS, PIPE SIZES, AND ALTERATION OF THIS MCIRIENTSHALL NVALIDATETNE PROFESSIONAL SEAL AND SIGNATURE PUBLICATION OFF! AS -BUILT COMMENTS, ACCURATELY REFLECTS EXISTING'MIS DO1311ENTDOESNOT DEROGATEFROIIRESERVEO �1.p 41803 w� lal OfL pIIE PRO,EWO CT IDE iBIFED N THE ns1LE FOR USE �'�' �EGI STV, a FIELD CONDICTIONS AS DETERMINED BY ME OR UNDER MY NO eoOTTOBEEUSED FOR FIENINIODELOREcr. �SSIONAL E��l Z DIRECT SUPERVISION ON THIS DATE: 08/23/2019. ADDITION 4 /23/z' MAXIMUM OPENING OF GATE SIX EVENLY SPACED HOLES ON 10 3/8" BOLT CIRCLE FOR BOLTING TO FLANGE CONNECTION. SYSTEM 1 SYSTEM 2 SYSTEM 3 A SEE SHEET C3.1 SEE SHEET C3.2 SEE SHEET C3.1 B 33.75 35.06 34.58 C 31.87 32.95 32.96 D 2.80" 1.44" 0.60" E 30.75 31.60 32.08 F 5.25" 2.44" 0.88" G 28.75 29.60 30.08 H 34.50 35.00 33.40 1 30.75 31.60 32.08 PORTED -RUCTURAL FILL 11,�■ 5 I 4 ■ � 2 T A C O M A - SEATTLE • SPOKANE •TRI-CITIES 1 2215 North 30th Street, Suite 300 Tacoma, WA 98403 NO. 19253.383.2422 TEL 253.383.2572 FAX www.ahbl.com NEB LEVEL LINE 0 O O 0 I :I LIFT HANDLE NOTES: 1. SHEAR GATE SHALL BE ALUMINUM ALLOY PER ASTM B-26-ZG-32a OR CAST IRON ASTM A48 CLASS 30B AS REQUIRED. 2. GATE SHALL BE 8" DIAM. UNLESS OTHERWISE HANDLE WITH SPECIFIED. LOCK PIN. 3. GATE SHALL BE JOINED TO TEE SECTION BY ADJUSTABLE LOCK BOLTING (THROUGH FLANGE), WELDING, OR HOOK WITH LOCK OTHER SECURE MEANS. SCREW. 4. LIFT ROD: AS SPECIFIED BY MFR. WITH 1" ROD OR HANDLE EXTENDING TO WITHIN ONE FOOT OF TUBING, COVER AND ADJUSTABLE HOOK LOCK VARIABLE FASTENED TO FRAME OR UPPER HANDHOLD. LENGTH. 5. GATE SHALL NOT OPEN BEYOND THE CLEAR OPENING BY LIMITED HINGE MOVEMENT, STOP - TAB, OR SOME OTHER DEVICE. 6. NEOPRENE RUBBER GASKET REQUIRED BETWEEN RISER MOUNTING FLANGE AND GATE FLANGE. /Ti 7. MATING SURFACES OF LID AND BODY TO BE MACHINED FOR PROPER FIT. O 8. FLANGE MOUNTING BOLTS SHALL BE 3/8" DIAM. STAINLESS STEEL. SIDE 9. ALTERNATE CLEANOUT/SHEAR GATES TO THE LIFT HANDLE SHALL DESIGN SHOWN ARE ACCEPTABLE, PROVIDED BE ATTACHED PER THEY MEET THE MATERIAL SPECIFICATIONS MANUFACTURER'S ABOVE AND HAVE A SIX BOLT, 10 3/8" BOLT RECOMMENDATIONS. CIRCLE FOR BOLTING TO THE FLANGE CONNECTION. ALTERNATE SHALL BE REVIEWED AND APPROVED BY ENGINEER. SHEAR GATE SYSTEM 1 SYSTEM 2 SYSTEM 3 AA 30.25 31.10 31.58 BB 33.75 35.10 34.58 CC 42" 48" 36" DD 36" 36" 24" NOTES: 1. REFER TO DETAIL 5, THIS SHEET, FOR DETENTION PIPE PLAN. 2. ALL TANKS CMPA, 3" X 1", (14 Ga.), AT S=0.0% 3. ACCESS RISERS ARE 36" CMP, SAME MATERIAL AS TANK, WELDED OR FUSED TO TANK. 4. ACCESS RISER SPACING IS 100' MAXIMUM. 5. ACCESS OPENING SHALL BE CLEARLY MARKED WITH CONFINED SPACE WARNING IN ACCORDANCE WITH OSHA AND L&I REQUIREMENTS. RAMP REVISION STORM DRAINAGE REVISIONS CITY COMMENTS ADDENDUM NO. 3 ADDENDUM NO. 1 REVISION NOT TO SCALE 42" CMPA, 3" X 1 (14 Ga.), \ AT S=0.0% DETENTION SYSTEM 1 120' 0.15 O.D. min. limits of pipe compaction Q 0.65 O.D. min. gravel backfill gravel backfill for ror pipe bedding foundations when specified A. Metal and Concrete Pipe span span 3' max 0.15 ise min. limits of pipe compaction rise min. gravel backfill9ravel backfill for for pipe bedding ill_foundations when specified B. Pipe - Arch Installation Rigid Pipe NOTES: 1. Pipe compaction limits shown on this plan are for pipe construction in an embankment. For pipe construction in a trench, the horizontal limits of the pipe compaction zone shall be the walls of the trench. 2. All steel and aluminum pipe and pipe -arches shall be installed in accordance with design A. 3. Concrete pipe with elliptical reinforcement shall be installed in accordance with design A. 4. Concrete pipe, plain or with circular reinforcement, shall be installed with design A. 5. O.D. !sequel to the outside diameter of a pipe or the outside span of pipe -arch. The dimensions shown as O.D. with 3' maximum shall be O.D. until O.D. equals 3'; at which point 3' shall be used. 1'-0" for diameters 12" through 42" and spans through 50". 2'-0" for diameters greater than 42" and spans greater than 50". W (see note 4) limit of pipe zone bedding material for lexible pipe (see note 6) _ foundation level a " A = 4" min. 27" I.D. and under W min., over 27" I.D. Bedding for Flexible Pipe Flexible Pipe NOTES: 1. Provide uniform support under barrels. 2. Hand tamp under haunches. 3. Compact bedding material to 95 % max. density; directly over pipe, hand tamp only. 4. See "Excavation and Preparation of Trench" in sanitary sewers section of the standard WSDOT/APWA specifications for trench width "W" and trenching options. The pipe zone will be the actual trench width. The minimum concrete width shall be 1 ' I.D. = 18". 5. Trench backfill shall conform to "Backfilling Sewer Trenches" in the sanitary sewers section of the WSDOT/APWA standard specifications, except that rocks or lumps larger than 1" per foot of pipe diameter shall not be used in the backfill material. 6. See "Bedding Material for Flexible Pipe" In aggregates section of the WSDOT/APWA standard specifications for the material specifications. ®Backfill material placed in 0.5' loose layers and compacted to 95 % maximum density. Method B or C compaction (WSDOT/APWA) standard specifications.) Pipe Size Min. dist. between barrels circular pipe conc., LCPE, CMP (diameter) 12" to 24" 12" 30" to 96" diam. / 2 102" to 180" 48" pipe - arch metal only (span) 18" to 36" 12" 43" to 142" span / 3 148"to 199" 48" tiY o STD. PLAN - 220.00 PUBLIC WORKS PIPE COMPACTION DEPARTMENT DESIGN AND BACKFILL MARCH 2O08 PIPE COMPACTION DESIGN AND BACKFILL (COR STD. PLAN 220.00) NOT TO SCALE 36" CMPA, 3" X 1 (14 Ga.), AT S=0.0% (TYP) 48" CMPA, 3" X 1", (14 Ga.), AT S=0.0% DETENTION SYSTEM 2 DETENTION PIPE PLAN NOT TO SCALE WJF 2/22/1 8 WJF SURVEYED: SCALE: D. FOLLANSBEE AS SHOWN WJF 12/13/17 WJF DESIGNED: G. TAUSCHECK WJF 4/21/17 WJF WJF 3/17/17 WJF DROWN: F. KATONA ONE INCH AT FULL SCALE IF NOT ONE INCH WJF 3/1/1 7 WJ F CHECKED: W. FIERST BY DATE APPR SCALE ACCORDINGLY 4PPROVED: S. COMFORT CONSTRUCTION RECORD DRAWINGS VERTIAL:NOR ZONTAL: NAD Di 983/11991 ti,1 U +; CITY OF -�r4 REN TON DATUM Planning/Building/Public Works Dept. 68' 80' 3' (TYP) ■ -I ■ DETENTION SYSTEM 3 APPROVED FOR CONSTRUCTION SUBJECT TO ERRORS AND OMISSIONS BY: DATE: BY: DATE: BY: DATE: BY: DATE: SARTORI ELEMENTARY SCHOOL RENTON SCHOOL DISTRICT STORM DRAINAGE NOTES AND DETAILS I 05/04/2017 FIELDBOOK: PAGE: DRAWING NO: C7.1 SHEET: OF: 31 43 III t: a N Q0 O O O Q0 r Q J 0 O O Q0 r 0- R-393027