Loading...
HomeMy WebLinkAboutM_Hazardous_Materials_Management_Statement_191206_v1Hazardous Materials Management Statement LANE Flatiron -Lane, a Joint Venture plans to refuel trucks/equipment on site via Fuel Truck delivery as/when needed. Necessary procedures to refrain from contamination are address in the Spill Prevention Plan. This plan addresses procedures for secondary containment and environmental monitoring during construction activities. The Spill Prevention Plan will also include information on a "Designated Person" responsible for supervising the use, storage, and handling of hazardous materials. Also addressed in the Spill Prevention Plan: Security of Hazardous Materials Removal of Leaking Vehicles and Equipment Flammable and Combustible Liquids Clean -Up of Equipment and Supplies Unauthorized Releases Application of Pesticides and Fertilizers X N1_ -- DJ Mosier Environ ntaI Compliance Manacler STATE OF WASHINGTON SS COUNTY OF KING ) j� I certify that I know or have satisfactory evidence that 4� I> -f signed this instrument and acknowledge it to be his/her/their free and voluntary act for the use nd purpose mentioned in the instrument. LZLz-> i Dated Notary Public in and for the State of Washington Notary (Print): RACHEL L GEHRLEIN Notary Public State of Washington. My appointment expires: My Appointment Expires Jun 11, 2020