HomeMy WebLinkAboutC_Public_Comment_09_180327.email_attch2of212819 SE 38th Street #294 • Bellevue, WA 98006 • http://cense.org
Coalition of Eastside Neighborhoods
for Sensible Energy
12819 SE 38th Street #294 • Bellevue, WA 98006 • http://cense.org
12819 SE 38th Street #294 • Bellevue, WA 98006 • http://cense.org
12819 SE 38th Street #294 • Bellevue, WA 98006 • http://cense.org
12819 SE 38th Street #294 • Bellevue, WA 98006 • http://cense.org
70%
80%
90%
100%
110%
120%
20,000,000
20,500,000
21,000,000
21,500,000
22,000,000
2011 2012 2013 2014 2015 2016 2017 Heating days, percent of normalConsumption in MWhElectricity use by PSE customers
Electricity consumed Heating degree days
12819 SE 38th Street #294 • Bellevue, WA 98006 • http://cense.org
12819 SE 38th Street #294 • Bellevue, WA 98006 • http://cense.org
12819 SE 38th Street #294 • Bellevue, WA 98006 • http://cense.org
12819 SE 38th Street #294 • Bellevue, WA 98006 • http://cense.org
12819 SE 38th Street #294 • Bellevue, WA 98006 • http://cense.org
In conclusion, due to the 14-day time constraint imposed on our analysis of LUA18-000055 for
Energize Eastside in conjunction with the 4818-page Final EIS, our comments at this time are
necessarily limited. We look forward to presenting more complete comments and testimony at
the Administrative Hearing.
10 Renton Comprehensive Plan June 22, 2015 amended November 2017 Business Plan Mission Statement
11 Renton Comprehensive Plan June 22, 2015 amended November 2017 p2.
https://edocs.rentonwa.gov/Documents/0/edoc/955864/Comprehensive%20Pl an.pdf
12 Ibid.