Loading...
HomeMy WebLinkAboutC_Public_Comment_38.b_180430.email.msg1of3From:Todd Andersen To:Jill Ding Cc:tharaj@newcastlewa.gov; toddan@gmail.com; info@cense.org Subject:Email 2 of 2 for Comments on PSE"s Energize Eastside permit application Date:Monday, April 30, 2018 9:26:41 PM Attachments:QuestionsCommentsTA-JSPhase2EE-EISJune21.2017 EE EISFinal.pdf PipelineTechJoural(foundlooking$..EN15280)ptj-1-2015.pdf Note email2 of 2 assumes 25MB email submission limit by Renton From: Todd Andersen & Jennifer Steinman & Ryan Andersen residents and homeowners at 4419 138th Ave SE Bellevue WA 98006. To: Jill Ding – Senior Planner jding@rentonwa.gov Department of Community & Economic Development (CED) Planning Division 1055 South Grady Way Renton, WA 98057 Submitted April 30, 2018 to City of Renton Subject: The Massive fraud of PSE’s Energize Eastside Final Environmental Impact Statement. (EE EIS) and by the EE needs docs, the active lying by EE EIS staff. Questions/comments on PSE Energize Eastside EIS and Pipeline Safety Reports and related for 2018. Email 1 of 2 for Comments on PSE's Energize Eastside permit application Attached in previous email 1of 2 unless attached below: 0. Main doc=RentonSubmissionApril30Final.docx 1.6MB 1. MapDetails6inchWaterMainBreakCompacted.docx 9MB From Phase 2 EE EIS still not addressed 1. QuestionsCommentsTA-JSPhase2EE-EISJune21.2017 EE EISFinal.pdf 10.5MB (see this email 2of 2) 2. Energize Eastside and seismic risks in South Bellevue.pdf paper by James Sweet, 1.2MB James is a PE (Professional Engineer) is a retired engineer who moved to South Bellevue with his family in 1960. 3. P2-43_Fumio 20Kajiyama.pdf A Japanese AC inducted corrosion paper. 1.5MB 4. PipelineTechJoural(foundlooking$..EN15280)ptj-1-2015.pdf 7.6MB (see this email 2of 2) Expertise: Survivability engineer for the US Navy conducting the most advanced fuel fire protection testing to date on next generation Navy aircraft. Likely still one of the top five experts fuel fire suppression. Also highly trained for Long-term corrosion preparedness including stress corrosion which caused the William Pipeline explosion twice in WA in 2003. Dear Ms. Ding, I am writing to ask that the city NOT approve PSE's application to build Energize Eastside because: 1. It is unnecessary and wasteful of ratepayer funds. 2. It is risky to install tall power poles within feet of two half-century-old petroleum pipelines. 3. It damages communities and the environment by removing thousands of valuable urban trees. 4. There are less costly ways to enhance the reliability and resiliency of the Eastside power grid. Please notify me when any Renton public hearing for this project is announced. Sincerely, Todd Andersen & Jennifer Steinman & Ryan Andersen 4419 138th Ave SE Bellevue WA 98006.