HomeMy WebLinkAboutC_Public_Comment_38.b_180430.email.msg1of3From:Todd Andersen
To:Jill Ding
Cc:tharaj@newcastlewa.gov; toddan@gmail.com; info@cense.org
Subject:Email 2 of 2 for Comments on PSE"s Energize Eastside permit application
Date:Monday, April 30, 2018 9:26:41 PM
Attachments:QuestionsCommentsTA-JSPhase2EE-EISJune21.2017 EE EISFinal.pdf
PipelineTechJoural(foundlooking$..EN15280)ptj-1-2015.pdf
Note email2 of 2 assumes 25MB email submission limit by Renton
From: Todd Andersen & Jennifer Steinman & Ryan Andersen residents and homeowners at
4419 138th Ave SE Bellevue WA 98006.
To: Jill Ding – Senior Planner
jding@rentonwa.gov
Department of Community & Economic Development (CED)
Planning Division
1055 South Grady Way
Renton, WA 98057
Submitted April 30, 2018 to City of Renton
Subject: The Massive fraud of PSE’s Energize Eastside Final Environmental Impact
Statement. (EE EIS) and by the EE needs docs, the active lying by EE EIS
staff. Questions/comments on PSE Energize Eastside EIS and Pipeline Safety Reports and
related for 2018. Email 1 of 2 for Comments on PSE's Energize Eastside permit application
Attached in previous email 1of 2 unless attached below:
0. Main doc=RentonSubmissionApril30Final.docx 1.6MB
1. MapDetails6inchWaterMainBreakCompacted.docx 9MB
From Phase 2 EE EIS still not addressed
1. QuestionsCommentsTA-JSPhase2EE-EISJune21.2017 EE EISFinal.pdf 10.5MB (see this
email 2of 2)
2. Energize Eastside and seismic risks in South Bellevue.pdf paper by James Sweet,
1.2MB James is a PE (Professional Engineer) is a retired engineer who moved to South
Bellevue with his family in 1960.
3. P2-43_Fumio 20Kajiyama.pdf A Japanese AC inducted corrosion paper. 1.5MB
4. PipelineTechJoural(foundlooking$..EN15280)ptj-1-2015.pdf 7.6MB (see this email 2of 2)
Expertise: Survivability engineer for the US Navy conducting the most advanced fuel fire
protection testing to date on next generation Navy aircraft. Likely still one of the top five
experts fuel fire suppression. Also highly trained for Long-term corrosion preparedness
including stress corrosion which caused the William Pipeline explosion twice in WA in 2003.
Dear Ms. Ding,
I am writing to ask that the city NOT approve PSE's application to build Energize Eastside
because:
1. It is unnecessary and wasteful of ratepayer funds.
2. It is risky to install tall power poles within feet of two half-century-old petroleum pipelines.
3. It damages communities and the environment by removing thousands of valuable urban
trees.
4. There are less costly ways to enhance the reliability and resiliency of the Eastside power
grid.
Please notify me when any Renton public hearing for this project is announced.
Sincerely,
Todd Andersen & Jennifer Steinman & Ryan Andersen
4419 138th Ave SE Bellevue WA 98006.