HomeMy WebLinkAboutC_Public_Comment_39.b_1800502.email.msg1of2From:Todd Andersen
To:Jill Ding
Subject:Email 2 part 2of 2 resubmitted due to renton"s 19MB size limit Fwd: Email 2 of 2 for Comments on PSE"s
Energize Eastside permit application
Date:Wednesday, May 02, 2018 11:04:10 AM
Attachments:PipelineTechJoural(foundlooking$..EN15280)ptj-1-2015.pdf
Given Renton responded that has a 19MB size limit I am resubmitting email 2 in two parts
Renton's infrastucture is in serious danger as the Olympic pipeline and Seattle City Lights and
PSE power line ALL crossing at one spot 12728 NE 25th St. See on Google map and those
white structure are the pipeline energy shut off valves which take more than 20 minutes to
operate when pipeline is running at full speed. Please note that Energize Eastside increases
the brittleness of Renton future not improving it. One earthquake break here or Energize
Eastside stress corrosion break like happened to William 30" Pipeline in WA TWICE in
2003. Columbia Grid was forced to be created in just 2006 when all other western regions
had grid planning organizations for over 50 to 70 years. FERC force BPA?SCL?PSE to form
Columbia Gris in 2006 but is is done as a nonprofit corp not ISO (Independent system
operator, which California has) nor a RTO a region Transmission Planning organization.
Todd Andersen & Jennifer Steinman & Ryan Andersen
4419 138th Ave SE Bellevue WA 98006.
425-449-8889
Begin forwarded message:
From: Todd Andersen <toddan@gmail.com>
Subject: Email 2 of 2 for Comments on PSE's Energize Eastside
permit application
Date: April 30, 2018 9:20:46 PM PDT
To: jding@rentonwa.gov
Cc: tharaj@newcastlewa.gov, toddan@gmail.com, info@cense.org
Note email2 of 2 assumes 25MB email submission limit by Renton
From: Todd Andersen & Jennifer Steinman & Ryan Andersen residents and
homeowners at 4419 138th Ave SE Bellevue WA 98006.
To: Jill Ding – Senior Planner
jding@rentonwa.gov
Department of Community & Economic Development (CED)
Planning Division
1055 South Grady Way
Renton, WA 98057
Submitted April 30, 2018 to City of Renton
Subject: The Massive fraud of PSE’s Energize Eastside Final Environmental
Impact Statement. (EE EIS) and by the EE needs docs, the active lying by EE EIS
staff. Questions/comments on PSE Energize Eastside EIS and Pipeline Safety
Reports and related for 2018. Email 1 of 2 for Comments on PSE's Energize
Eastside permit application
Attached in previous email 1of 2 unless attached below:
0. Main doc=RentonSubmissionApril30Final.docx 1.6MB
1. MapDetails6inchWaterMainBreakCompacted.docx 9MB
From Phase 2 EE EIS still not addressed
1. QuestionsCommentsTA-JSPhase2EE-EISJune21.2017 EE EISFinal.pdf
10.5MB (see this email 2of 2)
2. Energize Eastside and seismic risks in South Bellevue.pdf paper by James
Sweet, 1.2MB James is a PE (Professional Engineer) is a retired engineer who
moved to South Bellevue with his family in 1960.
3. P2-43_Fumio 20Kajiyama.pdf A Japanese AC inducted corrosion paper.
1.5MB
4. PipelineTechJoural(foundlooking$..EN15280)ptj-1-2015.pdf 7.6MB (see this
email 2of 2)
Expertise: Survivability engineer for the US Navy conducting the most advanced
fuel fire protection testing to date on next generation Navy aircraft. Likely still
one of the top five experts fuel fire suppression. Also highly trained for Long-
term corrosion preparedness including stress corrosion which caused the William
Pipeline explosion twice in WA in 2003.
Dear Ms. Ding,
I am writing to ask that the city NOT approve PSE's application to build Energize
Eastside because:
1. It is unnecessary and wasteful of ratepayer funds.
2. It is risky to install tall power poles within feet of two half-century-old
petroleum pipelines.
3. It damages communities and the environment by removing thousands of
valuable urban trees.
4. There are less costly ways to enhance the reliability and resiliency of the
Eastside power grid.
Please notify me when any Renton public hearing for this project is announced.
Sincerely,
Todd Andersen & Jennifer Steinman & Ryan Andersen
4419 138th Ave SE Bellevue WA 98006.