RE: Energize Eastside permit application # LUA1B-000055/Hearing Examiner
Thank you for the opportunity to review and publicly comment on the Energize Eastside Project.
Please accept this letter as our support of this Project and it's Renton Segment at the fanuary Bth
hearing. We have been following its process and progress, given the significance of its
contribution to the economic vitality and continued health of the Eastside community by way of
improving the delivery and reliability of power. A safe, reliable electricity infrastructure for the
long term [beyond 2024) is imperative to not only to Renton but that of Issaquah and our region
as a whole.
We remain very concerned about a pending critical failure in the system and hope the Project will
continue to be treated with a sense of urgency. Failure is not an option nor is risk for rolling
blackouts. We trust in our local jurisdictions to balance supply and land use with PSE's local
needs, federal mandates, and service delivery requirement as a regional electrical utility. Working
together for the greater good is paramount.
We appreciate everyone's commitment and the thorough study required to reach this final
decision.
Respectfully,
fu*f-tdfl,uel
Kari Magill, CEO Skip Rowley, Chairman of
i 595 NW fiilr¡an Blvcl., 5te. L, lssaquah \N A 980'¿7
w y¿_r,-v_, i: t¿Wl_ç y fì u_A p ç t t i eS.ç Q l'11
c: fill Ding, City of Renton
oard