Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPavilion Building (2000-2004) - 1
Presentation of Findings
For
The Pavilion Building
Renton, Washington
Prepared by:
1.H O' : P is T.A:"L..L.T Y
2205 Alaskan Way
Seattle, WA 98121
Phone: (206) 239-1800
Fax: (206) 239-1801
March 20th, 2000
TABLE OF CONTENTS
I. EXECUTIVE SUMMARY 3
II. MARKET AND COMPETITIVE ANALYSIS 17
OVERVIEW 17
A. MEETING AND EVENT PLANNER OPINIONS 18
Renton/SeaTac Meeting and Event Planners 18
Seattle/Bellevue Meeting and Event Planners 18
B. CURRENT MEETING ROOM USAGE IN RENTON/SOUTH KING COUNTY 20
Overall Meeting Room Usage in Renton 20
Renton Hotel Facilities Meeting Room Usage 20
Renton Non-Hotel Facilities Meeting Room Usage 20
South King County Meeting Room Usage 21
C. MEETING SIZE,REQUIRED FEATURES,AND COMPETITIVE PRICING 21
Meeting Size 21
Requested Features Within Meeting Venues/Banquet/Exhibition Halls and Pricing Details for
Meetings/Banquets 22
Parking Requirements 22
Meetings-Food and Beverage Average food expenditures per day per person 23
D. BANQUETS-EVENINGS AND RECEPTION PREFERENCES 25
Exhibition and Consumer Shows 29
Meeting and Event Planner Statements 29
III. MARKET NICHE AND POSITIONING 30
A. VISION FOR THE PAVILION BUILDING 30
B. ARCHITECTURAL CONSIDERATIONS 32
Building schematic and occupancy capabilities 32
C. MEETING OCCUPANCY CALCULATIONS 32
Considerations before determining occupancy 33
D. MEETING ATTENDEE USAGE/ANTICIPATED OCCUPANCY/PRICING 34
Pricing for Full Day Conferences(Conference Meeting Package) 34
E. BANQUET OCCUPANCY AND CHECK AVERAGES 35
Cover count estimates and check averages 35
IV. PRE-OPENING MARKETING OUTLINE&OPERATIONAL EXPENSES 36
V. FURNITURE FIXTURE AND EQUIPMENT SUMMARY OF EXPENSES 40
SECTION 4. RENTON PROFORMA FFE FORECASTED MINIMUM NEEDS FOR AUDIOVISUAL 44
VI. PRELIMINARY ARCHITECTURAL DIAGRAM AND ESTIMATED 45
ARCHITECTURAL REPORT AND BUILD-OUT 45
VII. FIVE YEAR PROFORMAS 50
A. SCENARIOS 50
B. ADDITIONAL STATEMENTS AND EXPLANATIONS ABOUT THE PROFORMA 51
C. PRE-OPENING EXPENSES SUMMARY 52
VII. COLUMBIA HOSPITALITY OVERVIEW 55
COLUMBIA HOSPITALITY COMPANY BACKGROUND 55
DISTINGUISHED CLIENTELE 55
HOSPITALITY MANAGEMENT SERVICES 56
2
I. EXECUTIVE SUMMARY
The Pavilion Building in downtown Renton is an important landmark and key to the
city's long-term success. Analysis as to its highest and best use has been conducted by a
number of outside consultants.
The City of Renton has retained Columbia Hospitality, a hospitality management and
consulting firm, to conduct a feasibility study,which will determine the viability of
renovating and operating the Pavilion Building as a banquet/meeting/exhibition space.
This assessment includes:
• Market and Competitive Analysis
• Market Niche and Positioning Recommendation
• Pre-Opening Marketing Outline and Operational Expenses
o Marketing Outline
o Furniture/Fixture/Equipment Expenses
o Estimated Build-out expenses and Preliminary Architectural Diagram
o Pre-Opening Expenses Summary
• Five-Year Operating Proformas: One with aggressive growth, the other with
moderate growth
Statistics have been gathered through personal interviews with major conference
planners, exhibition organizers, and convention and visitors bureaus in the cities of
Seattle,Bellevue, Renton, and SeaTac. Hotels and stand-alone meeting venues in the
same general area were surveyed. The additional reports and studies completed by and
for the City of Renton relating to the building have been reviewed and taken into
consideration.
This current information combined with our own experience in the meeting/banquet and
exhibition business has been the basis for our findings, conclusions, and
recommendations.
We conclude that Renton is properly positioned for a new banquet and meeting center for
two main reasons. There is a growing, unfulfilled need for professional, affordable and
large meeting space expressed by meeting and event planners as well as the hotel
community in the south King County/Renton area.
3
Renton has the potential to emerge as a distinct sub-market within the meeting and
banquet industry assuming the revitalization of its downtown core continues. The
Pavilion Center would add to the hospitality infrastructure of Renton and have a positive
economic impact on the hotels, restaurants, and shops in the area. The Seattle King
County Convention and Visitors Bureau records the economic impact of each regional
conference attendee at$725. Although we do not know the economic impact of each
attendee for the Pavilion Building, it stands to reason that it would be a significant
amount.
With the broader impact of community wide economic and fiscal benefits, including tax
revenues from lodging, retail purchases, and tax revenues from the building itself,
economic return from the building should not be the only the consideration for making
this long-term investment.
Public venues of this type typically require a subsidy to sustain their viability. Some
buildings require as much as 30-50% subsidy, according to a separate report done by
E.D. Hovee& Company*. Our proforma predicts an 8.35% subsidy requirement by the
fifth year of operation. We feel that this amount of support is within reason for an
investment in a conference and banquet center when considering the total economic
benefits the city will receive. If the economic development team for City of Renton feel
that there are positive economic benefits to creating this venue we would concur.
What follows is a summary of our finding and recommendations.
Market and Competitive Analysis
Meeting planner opinions and needs
Corporate meeting and event planners near Renton and south King County expressed a
need for professional meeting and banquet space in their area. There were repeated
comments about the difficulty in finding an affordable meeting center,particularly when
the group requires break out rooms, along with a large,main meeting room. The desire
to meet in Renton was overwhelmingly expressed by those planners who were in Renton
or south of Renton. In fact, 100% of the planners from this area stated that Renton was
an excellent or average location for meetings. Conversely, meeting planners in the
Bellevue and Seattle areas did not express this same opinion. Seventy percent of the
planners interviewed stated that Renton was below average and 15% stated they would
not consider it.
Association and government groups,however,were more interested in holding a
conference in Renton if the pricing was competitive. These meeting and event planners
generally cannot afford the prices in the Bellevue and Seattle areas. Therefore, they are
accustomed to organizing their meeting needs at venues outside of these large cities.
*Report dated December 1998 entitled Renton Conference/Convention Center Feasibility Assessment prepared for
the City of Renton
4
We conclude that the market for a new meeting venue in Renton lies within the
Renton/south King County corporate market and the regional association and government
markets.
Meeting/Banquet Room Size and Required Features
Nearly 46% of meeting and event planners interviewed stated they need meeting space
for 76 or more people, 20% stated they need meeting space for 250 or more, and 16%
stated they book meetings for 26 - 75. In addition, 45% of meeting and event planners
stated they book banquet events for groups of 300 or more at least once a year. This
information was considered in recommending the build-out of the space. The next few
points were also taken into consideration regarding recommendations for the design of
the building.
Break-out room needs
In addition to an expressed need for a large meeting room and banquet room, 96% of
planners who book meetings for 100 people or more require break-out rooms. 60%
stated they need break-out rooms for 30-60 people. We have recommended the inclusion
of four break-out rooms which would accommodate 20-60 people.
Parking Needs
A repeated need was for ample free parking. In fact, 100% of the meeting planners
interviewed from the Renton and south King County areas stated that available parking
would be a major factor in their decision to book a meeting at the Pavilion site.
It was stated by 75% of the meeting planners that for full day meetings, they expect at
least one parking space per 1.5 attendees. We are recommending that a minimum of 150
dedicated parking spaces be located no more than one block from the building at no more
than two major lot sites. In addition, 100 more parking spaces will be needed for evening
banquet events. If parking is difficult to find,poorly labeled, and spread among many
parking areas, clients will have a negative experience from the first contact with the
Pavilion Building center. This will be a negative blow to the long-term viability of the
building and will affect the aggressive proforma. Without parking,we would assume
only a moderate growth of occupancy and revenues.
Audiovisual needs
Meeting planners stated that their presenters frequently request access to the internet and
the option to make computer presentations. Ninety percent stated they use PowerPoint
and need online access. In addition, 50% stated they used rear or front projection units.
We are therefore recommending that certain audiovisual equipment be built into the
building as well as a sound system in the large meeting space. Newer meeting centers
are expected to offer these items. It is also a major marketing advantage.
5
Additionally,we are recommending that limited, stand-alone audiovisual pieces be
purchased for use. Rental fees will apply for some equipment,but overhead projectors,
screens, microphones,podiums, slide projectors and flip charts packaged into the
conference meeting package and therefore should be onsite. Other major purchases such
as LCD panels and front projection screens cost thousands of dollars. These items can be
rented through an audiovisual company and can be charged additionally. They can also
be purchased at a later date when there is income to the building.
In the estimated build-out report, the costs of building in internet access lines and cabling
is included, however a built-in sound system, electronic screens,podiums and the other
items listed above are not. We are estimating an additional $80,000,plus tax, to purchase
and install these items beyond the basic FFE costs. See the pre-opening cost estimates
for complete details.
Meeting room occupancy in Renton/south King County
Meeting room usage in the Renton and south King County area has been strong, similar
to the hospitality market over the past four years. Directors of sales for Renton Hotel
meeting rooms reported an average of 65% occupancy Monday through Friday. This
meeting room occupancy is considered very strong in the conference center industry.
Because conference centers are built to accommodate the largest possible group size,
there will be many days where a maximum occupancy is not achieved. In addition, days
used for set-up and tear down must also be considered. For example, the Washington
State Convention and Trade Center reports a utilization of 40—60 %. Other stand-alone
facilities report a utilization of 25 —30%. Specifically looking at what is believed to be
our closest competitor and partner in the future, the Holiday Inn Select, they report an
85%meeting room occupancy usage. They also state that they are turning away groups
who request meeting and banquet space for 200 people or more.
In addition to meeting room usage,we also calculate estimated meeting attendees per day
and guests per meal function in order to come up with a projected occupancy and gross
revenue. This is outlined in the Occupancy Calculations section.
Recommendations for Build-out
Based on the information above we conclude that there is an under-served need for
meetings of 200 or more. These groups need a large meeting area which can
accommodate the whole group at one time. Additionally, they need break-out spaces.
This space should be designed so that it can accommodate large banquet and reception
events of 200 - 500. This space would accommodate 95% of the banquet events
organized by these meeting planners. The building also needs to have appropriate spaces
for meal service, storage, staff offices, and lobby areas. It should be designed and
finished competitively with the higher end meeting and banquet venues in the
Renton/South King County area. It should be able to accommodate modern audiovisual
needs for conferences and banquet events.
6
Competitive pricing and recommendations
Pricing from banquet menus and information from banquet sales managers indicates that
meeting planners are paying from $10 to $30 per day on food and from $19 to $35 on
evening receptions and dinner events. For a full day meeting with complete meal and
break service, standard A/V supplies and equipment, and meeting room rental,
competitive Renton venues are charging from$34.50 to $39.50 per person. In the Seattle
area, a full day meeting package is from$62 to $70 per person and in Bellevue, the same
full day package ranges from$41to $54. In SeaTac, it ranges from$39 to $50 per
person.
We are recommending a$40 per person conference package price for the Pavilion
Building. This positions the center at the high-end of Renton, but below the other nearby
major meeting areas. Pricing for banquet events follows the same pattern and will be
positioned competitively with Renton's high-end centers such as Maplewood Greens,
Fairwood Golf and County Club and the Holiday Inn Select.
Occupancy Calculations
Our occupancy calculations take into consideration two different uses for the Pavilion
Building: 1) Meeting usage 2) Banquet/reception usage
This provides us a more accurate method for calculating revenue.
We have calculated 50,000 meeting attendees per year as a 100% occupancy using 250
available days for meetings and 200 conference attendees per day as a reasonable
maximum occupancy. We are anticipating a first year day-use occupancy of 28.6%, or a
total of 11,500 conference attendees and 2,800 non-conferencing breakfast and lunch
attendees.
For banquet events,we have calculated the potential number of weekend and mid-week
evenings available. We have then estimated the number of guests and average check
based on the trends in the Renton and south King County area. We are anticipating
serving 14,675 total guests for meals. (Removing the breakfast and lunch guests counted
in the day use occupancy, we are anticipating serving 11,875 evening guests.) Revenue
for evening functions varies based upon the type of function. Under section"El. E"there
is a breakdown of guests per meal function and the anticipated revenue per guest.
Catering Recommendations
After reviewing three separate operating proformas for food service, we are
recommending that food service be managed and controlled in-house by the onsite
management company. This affords the greatest flexibility and profitability as well as
provides for quality control.
7
The scenarios reviewed were the following:
1)In-house catering done by the center's management company
2)A limited number of catering companies whereby a commission would be paid
to the center for sales and services and whereby all employees were contracted
under the catering company
3)Catering provided by any company selected by the client and no commission
paid
Loss to the Pavilion Building was greatest under scenario three, less under scenario two,
but lowest under scenario one in the first year of operation. Subsequent years did not
yield significant changes in profitability under scenarios two and three, however,
significant gains in profitability were seen when catering was done completely in house.
Although a larger amount of initial cash outlay is required for in-house catering, the
profits are significant enough to warrant doing the service. We, therefore,recommend
keeping catering services in-house and the five-year proformas show this scenario.
Market Niche and Positioning Recommendations
Based on the findings stated above,the market niche for the Pavilion Building is that of
filling the needs of the Renton/SeaTac/Kent/south King County corporate market and
regional non-profit, government, and association markets. It should be positioned as the
number one, moderately priced, meeting focused,multi-purpose venue in south King
County that can accommodate large groups for business and association meetings,
banquets, and special events. It should be moderately finished, yet competitively priced
with properties in the Renton/south King County areas such as Maplewood Greens, the
Holiday Inn Select, and the Doubletree and Marriott Hotels at SeaTac.
Its lack of luxuries should be capitalized upon. An untapped market within the Renton
and south King County area do not need or want to pay for frills,but who want a modern
and comfortable environment for their group events. Advertising and image creation will
capitalize on the Pavilion Building's filling the need of the south King County/Renton
meeting planner needs. The building will be positioned as efficient, modern, affordable
and in their neighborhood.
The Pavilion's pricing position should equal Renton's high-quality meeting and banquet
facilities (Maplewood Greens, Fairwood Golf and Country Club, and the Holiday Inn
Select) and fall just below the SeaTac major hotel market(Doubletree and Marriott).
Pricing should remain substantially below the Bellevue and Seattle markets. There will
be the availability for large meetings of 200 or more,break-out rooms, and meal service
areas to accommodate these groups.
For banquet functions it should be able to accommodate over 400 and up to 500 people if
possible.
8
Pre-Opening Marketing Outline and Operational Expenses
Marketing Outline
To achieve a first-year occupancy equivalent to the projected first-year proforma,we
have assumed that 12 months of pre-opening marketing and operational planning will be
done.
Most conferences and banquet events fitting the proposed space configurations of the
Pavilion Building will be booked from one year to two months out. Elements of pre-
opening marketing include,marketing collateral development, logo and image design and
development, advertising,public relations and direct mail campaigns,policy and
procedure development, hiring and training all staff and purchasing and receiving all
furniture and equipment.
Essential staff which must be brought on in advance of opening include a sales manager,
a director of operations and sales, a meeting planner, and a chef and banquet manager.
Most front-of-house staff, such as concierge and banquet staff, needs to be brought on at
least a few days in advance of opening for training and orientation.
In addition, there is an assumption/recommendation that a Grand Opening event and
building dedication be organized. This serves as a major marketing opportunity and
allows for city officials to state their position and long-term mission for the building in a
public forum thus gaining public buy-in and support.
Total cost of pre-opening marketing, management services, staff salaries
and grand opening event: $185,580
A detailed outline of specific programs, staff and management company responsibilities
is in the pre-opening marketing outline section following.
Furniture/Fixtures and Equipment (FFE)
Two scenarios for FFE have been developed. One scenario assumes that the Kitchen will
be built-out and furnished for complete catering in house. The other scenario assumes
that the kitchen will not be built-out for complete catering but rather it would serve as a
staging kitchen for outside caterers.
There are three separate sections of the FFE, and each section has two scenarios as
described above. In addition there is an audiovisual break down sheet.
Section one itemizes the specific costs of furnishing the service/kitchen with all necessary
items for food preparation. •
9
Section two itemizes the specific costs of purchasing the necessary small-wares, or dishes
and service utensils necessary for food preparation in the service/kitchen area.
Section three itemizes furnishing the public areas, china glass and silverware, office
furniture, computer systems and telephones and audiovisual supplies.
Full Kitchen Staging Kitchen
Section One $140,246 $136,510
Section Two $155,559 $140,993
Section Three $402,939 $358,698
Audiovisual* $ 86,880 $ 86,880
Contingency 5% $ 39,281 $ 36,154
Total FFE $824,905 $759,235
Prices are based on 2000 purchases. Increases in prices may occur over the next year
and therefore some adjustments may need to be made.
*Some audiovisual purchases may be postponed or deleted,however we do not recommend it.
Architectural Report and Build-Out
The architectural firm of GGLO was retained to develop an initial floor plan and build-
out cost estimates. They were asked to develop a plan that allowed for maximum
flexibility and maximum occupancy within the space within the existing shell of the
building. Our request outlined the need for a single meeting space able to accommodate
up to 200 people along with up to four break-out rooms. The space should also be able to
accommodate larger banquets for up to 400 or 500 and therefore, removable walls should
be used when possible.
Key elements of the design were the challenges of accommodating these requests and
creating areas for various support functions and staffing. The design, therefore, calls for
locating the administrative offices in a 1000 square foot mezzanine above the service end
of the building.
Other factors considered in the floor plan included the orientation of the building. Most
of the parking is oriented north of the building and therefore, the most logical entry/lobby
space.is from the north. The public plaza is oriented toward to south, however and
would also make an attractive entry point. It has been decided that having an entry most
convenient for attendees is the most important aspect. Windows and double doors
opening out on the plaza can be incorporated into the building and will lend itself well for
banquets and meetings during the day.
GGLO used the preliminary cost estimates prepared by the City and others including the
Code Compliance Reports as a basis for their costing.
10
Total improvement costs, not including furniture Fixtures or equipment
are estimated at $2,328,445
Pre-opening expenses summary
Prior to operating, total expenses to open, market and staff the Pavilion Building are
estimated as follows:
Full Kitchen Staging Kitchen
Building improvement costs: $2,328,445 $ 2,328,445
Marketing/staffing/FFE mngmnt $ 185,580 $ 185,580
FFE $ 824,905 $ 759,235
Totals $3,338,930 $3,273,260
Five-year proforma Assumptions
As stated, both five-year proformas use a first year occupancy of 28.6%with a$40 per
person conference day rate. It assumes a banquet operation that will serve 11,875 guests.
In our aggressive scenario, years two and three assume a 15%-22% occupancy increase
as well as a 3% increase in prices in year three. In addition some staff positions become
full-time rather than part-time as business warrants. In the fourth year,we anticipate
adding an additional meeting and banquet planner. This is a transitional year whereby
volumes of business are no longer serviceable by one individual. In years four and five, a
4.9%to a maximum of 10.9%revenue growth is anticipated.
The aggressive scenario assumes the following:
a. Ample free parking is available, well marked and reserved for attendees of the
Pavilion Building. A minimum number of 150 parking stalls is assumed. An
optimum level of 200 is recommended. Another 100 spaces for banquet
events need to be nearby and available in the evenings. Parking needs to be
clearly marked and within one block of the building. Parking also needs to be
located on no more than two adjacent sides of the building. Clients will not
have to drive to three or four locations looking for potential parking spaces.
b. Costs associated with interest and debt service are not factored in the
proforma
c. Decor of the building is current and in keeping with the competitors named in
this report.
d. A minimum of nine months and an optimum of 12 months is given for pre-
opening marketing, collateral development, sales efforts, FFE purchasing and
staff hiring and training.
11
e. A minimum of$40,000 is allocated for pre-opening marketing efforts not
including salaries and benefits. A minimum of 4% of gross revenue is
allocated to marketing each subsequent year. See the marketing plan section
for clarification on marketing expenses and direction.
f. Basic yet modern audiovisual equipment is built into the building such as
electronic screens and a sound system. Other basic audiovisual is onsite and
available for use such as flip charts,podiums, microphones, slide projectors
and overhead projectors. This equipment is included in the Conference
Meeting Package and serves as a marketing tool. Other types of audiovisual
equipment can be rented and charges passed along to the customer.
g. Sales staff is hired four to six months prior to opening to develop business
h. Renton continues to invest in its infrastructure. A growing base of business
locates in Renton and its economic vitality continues to develop. New hotels
and office space open and fill with significant business over the next two
years.
The moderate five-year proforma assumes a revenue of growth of 4.5%to a maximum of
15.8%per year over the five-year proforma. Assumptions made under this scenario are
the following:
a. Parking is located in numerous areas around the building and is not dedicated to
conference attendees
b. Costs associated with interest and debt service are not factored in the proforma
c. Decor of the building is current and in keeping with the competitors named in this
report
d. A minimum of nine months is given for pre-opening marketing, collateral
development, sales efforts,FFE purchasing, staff hiring and training
e. A minimum of$40,000 is allocated for pre-opening marketing efforts not including
salaries and benefits
f Audiovisual services within the building do not meet basic current needs of meeting
planners. All audiovisual equipment is rented from an outside source and charged
back to the meeting and event planners.
g. Sales staff is hired four to six months prior to opening for pre-selling space
12
h. Renton's infrastructure does not continue to grow. No significant new businesses are
located in Renton. Renton's economy,marketing image, and number of businesses
stays the same as current statistics indicate.
Five Year Proformas
Please see the following 2 pages for detailed proformas.
•
13
RENTON CONFERENCE CENTER
5 YEAR PRO-FORMA
(15%growth in 2nd&3rd year,5%growth in 4th&5th year
PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED
2001 2002 2003 2004 2005
MEETING ATTENDEES 11,500 13,225 15,121 15,872 16,661
CORP/SOCIAL ATTENDEES 14,675 17,466 22,622 22,622 22,622
REVENUE
CONFERENCE SERVICE PACKAGE 175,375 201,681 230,595 321,408 337,385
FOOD 574,850 661,240 842,197 883,918 928,018
BEVERAGE 49,732 96,526 149,852 157,103 164,946
MEETING ROOM RENTAL 13,800 15,870 18,145 19,046 19,993
AN RENTAL 16,573 19,059 21,791 22,874 24,011
BUSINESS CENTER 2,990 3,439 3,931 4,127 4,332
ALA CARTE MEETING ROOM REV. 26,136 30,057 34,366 36,073 37,866
OUTSIDE SERVICE 5,750 6,613 7,561 7,936 8,331
MISCELLANEOUS REVENUE 7,243 10,874 14,988 15,720 16,504
TOTAL GROSS REVENUE 872,449 1,045,358 1,323,427 1,468,205 1,541,386
COST OF SALES
FOOD 160,958 185,147 235,815 247,497 259,845
BEVERAGE 10,528 20,434 31,722 33,257 34,918
TOTAL COST OF SALES 171,486 205,581 267,537 280,754 294,763
DIRECT EXPENSES
CONFERENCE SERVICES P/R&RELATED 128,372 134,246 221,488 240,051 233,251
CONFERENCE SERVICES OTHER DIRECT 22,244 24,935 27,775 37,998 39,343
FOOD&BEVERAGE PR&RELATED 288,155 343,012 375,763 433,952 467,169 -
FOOD&BEVERAGE OTHER DIRECT 56,137 56,198 72,210 75,638 87,115
TOTAL DIRECT EXPENSES 494,908 558,391 697,236 787,640 826,879
DEPARTMENT PROFIT 206,055 281,386 358,653 399,811 419,744
UNDISTRIBUTED OPERATING EXPENSES
PROPERTY OPERATION&MAINTENANCE 33,783 38,443 42,836 46,216 48,470
ENERGY COSTS 27,929 36,658 38,493 40,399 42,419
ADMINISTRATIVE&GENERAL EXPENSE 125,632 134,269 168,204 191,796 200,420
MARKETING EXPENSE 83,665 93,212 106,836 114,998 120,427
TOTAL UNDISTRIBUTED OPERATING EXPENSES 271,009 302,582 356,370 393,409 411,736
FIXED EXPENSES
GENERAL INSURANCE 24,000 25,200 26,400 27,600 28,800
MANAGEMENT FEE 61,071 73,175 92,640 102,774 107;897
GROSS OPERATING PROFIT (150,026) (119,571) (116,757) (123,972) (128,689)
CAP RESERVE(NOT FACTORED INTO GOP) 26,173 31,361 39,703 44,046 46,242
14
RENTON CONFERENCE CENTER
5 YEAR PRO-FORMA
(5%growth in year 2&3,4&5)
PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED
2001 2002 2003 2004 2005
MEETING ATTENDEES 11,500 12,075 12,674 13,339 14,547
CORP/SOCIAL ATTENDEES 14,675 17,466 22,622 22,622 22,622
REVENUE
CONFERENCE SERVICE PACKAGE 175,375 184,144 193,279 270,115 294,577
FOOD 574,850 570,442 677,603 697,110 751,928
BEVERAGE 49,732 79,300 102,404 107,448 112,009
MEETING ROOM RENTAL 13,800 14,490 15,209 16,007 17,456
AN RENTAL 16,573 17,402 18,265 19,223 20,964
BUSINESS CENTER 2,990 3,140 3,295 3,468 3,782
ALA CARTE MEETING ROOM REV. 26,136 27,443 28,805 30,316 33,061
OUTSIDE SERVICE 5,750 6,038 6,337 6,670 7,274
MISCELLANEOUS REVENUE 7,243 9,357 11,062 11,621 12,339
TOTAL GROSS REVENUE 872,449 911,755 1,056,258 1,161,978 1,253,390
COST OF SALES
FOOD 160,958 159,724 189,729 195,191 210,540
BEVERAGE 10,528 16,787 21,678 22,746 23,711
TOTAL COST OF SALES 171,486 176,511 211,407 217,937 234,251
DIRECT EXPENSES
CONFERENCE SERVICES P/R&RELATED 128,372 134,246 221,488 240,051 233,251
CONFERENCE SERVICES OTHER DIRECT 22,244 23,941 25,659 34,854 36,720
FOOD&BEVERAGE PIR&RELATED 288,155 316,829 325,592 375,127 407,804
FOOD&BEVERAGE OTHER DIRECT 56,137 48,869 58,534 60,141 70,968
TOTAL DIRECT EXPENSES 494,908 523,885 631,273 710,174 748,743
DEPARTMENT PROFIT 206,055 211,358 213,578 233,867 270,396
UNDISTRIBUTED OPERATING EXPENSES
PROPERTY OPERATION&MAINTENANCE 33,783 35,951 38,969 41,903 44,352
ENERGY COSTS 27,929 31,797 38,493 40,399 42,419
ADMINISTRATIVE&GENERAL EXPENSE 125,632 133,200 166,067 189,346 198,116
MARKETING EXPENSE 83,665 87,868 96,150 102,749 108,907
TOTAL UNDISTRIBUTED OPERATING EXPENSES 271,009 288,816 339,679 374,397 393,793
FIXED EXPENSES
GENERAL INSURANCE 24,000 25,200 26400 27,600 28,800
MANAGEMENT FEE 61,071 63,823 73,938 90,000 90,000
GROSS OPERATING PROFIT (150,026) (166,480) (226,439) (258,130) (242,198)
CAP RESERVE(NOT FACTORED INTO GOP) 26,173 27,353 31,688 34,859 37,602
15
Summary
The information that follows details the opinions of the meeting planning market in the
Renton/south King County area. It details the statistics used in calculating pricing and
occupancy. It also outlines our pre-opening marketing and operational projects and
suggestions. Attached is a FFE summary, the GGLO space design and build-out costs as
well as our two five year proformas which show projected operating income and
revenues.
The findings and conclusions of these deliverables represent solely the opinion of
Columbia Hospitality and it's associates. Information has been drawn from sources
deemed to be reliable, but accuracy is not guaranteed.
Columbia Hospitality is ready to move forward with this project and believes that the
Pavilion Building will be a stimulus to Renton's economy, its hospitality and restaurant
markets and its future ability to attract major businesses to its downtown core. Our
experience and successful history with venues similar to the Pavilion building lead us to
believe we are the company best positioned to manage this new meeting and event venue.
16
II. Market and Competitive Analysis
Overview
Surveys of over 50 corporate and government meeting planners show that demand
for special events and conferences in the city of Renton is generated mainly from
those organizations that are based within the Renton/SeaTac area and those who
are price conscious (government, non-profit, and association groups). This
market is looking for a`good value, yet at the same time, they do not want to
reduce the experience for the attendee. They are looking for state-of-the-art
audiovisual services, quality food, and a comfortable meeting environment,but
they cannot afford the prices charged in the larger cities, namely Bellevue and
Seattle. Statistics show there is a void in Renton and in the south King County
area in general for a new venue that has all of these features.
All of the meeting planners interviewed within Renton or the south King County
area stated that Renton was either an excellent or average location. One hundred
percent of the planners stated that they would consider Renton for a meeting.
Conversely, 70% of meeting planners further away from Renton
(Seattle/Bellevue) stated the reverse opinion, that Renton was below average as a
meeting site, and 15% said they would not consider it.
In addition, the need for meeting space that can hold over 100 people, including
break-out rooms,was stated repeatedly. Over 45% of the interviewed planners
book meetings of 75 people or more, and over 50% of them need additional
break-out rooms for those meetings. Sales managers and directors of hotels and
meeting venues in Renton also stated the need for a large meeting and banquet
space that can accommodate more than 300 people at one time.
Hotels in Renton are reporting a 65%meeting room usage Monday through
Friday. Specifically, the Holiday Inn Select, the only major meeting venue with
food and beverage services and large meeting space, reports an 85%meeting
room occupancy. Stand-alone meeting facilities are reporting 45%meeting room
usage Monday through Friday, including their own club and community events.
When compared to hotel occupancy,meeting room occupancy of 45-65%may
seem lower than required for profitable operation. However, due to turn time-
setup and tear down time-a 65%meeting room occupancy is above average and
enough for a profitable operation. With proper booking policies, a room
occupancy of even 50% can be profitable according to our own statistics and the
experts from the International Association of Conference Centers.
With this information,we feel there is a market for a new Renton Meeting Center
with the localized market and the regional non-profit government markets.
17
A. Meeting and Event Planner Opinions
The following statistics and graphs illustrate opinions and market needs in the
Renton area including current trends, food and beverage preferences, audiovisual
preferences, per person average charges, and meeting and banquet head count
estimates in the south King County/Renton area.
Renton/SeaTac Meeting and Event Planners
Results from the meeting planners we interviewed in the greater
Renton/SeaTac area are as follows:
• 60% said Renton was an average location for meetings
• 40% said it was excellent location for meetings
• 50% said that Renton's accessibility was excellent
• 50% said that Renton's accessibility was average
• 100% said that they would consider Renton for a meeting
• 0% said that it was below average
The most frequently mentioned challenges to booking a meeting in Renton
by event and meeting planners who know the Renton/SeaTac area were:
1. Lack of available parking
2. Lack of good restaurants
3. Lack of large, inexpensive meeting venues
Seattle/Bellevue Meeting and Event Planners
Results from the preliminary interviews with meeting planners in the
Seattle/Bellevue area as follows:
• 70% said that Renton was below average as a meeting site
• 15% said that they would not consider it
• 15% said that Renton was average as a meeting site
• 58% said Renton's freeway accessibility was below average
• 32% said its freeway accessibility was average
• 10% said its freeway accessibility was excellent
The most frequently mentioned challenges to booking a meeting in Renton
by event and meeting planners in Bellevue/Seattle who do not frequent the
area were:
1. Lack of things to do
2. Lack of good restaurants
3. Lack of large hotels which can accommodate groups
18
tilr
'rrr
`r
41110
1-1
• ° "
zoo =
• � coa)
a E
•
• w `°
0 0
0 0 E. ai
• M > t s
N >,
• CD CDa)
o c2
o
• CO omQ
• as a) to
•
+� CD
ft
■ z 3
U
C L
t _
• C C
•
a. a s
f w 0
• 4.0 .> s U W
Q) _ Q
• > cI
• W o
C) ( o_
Y
• C co _ X O
I-
- E
• C .0
•
a) U
CD 0
• !
C I•
• ■ m > o
•• o 0 0 0 0 0 0 0 0 o a
0 0 0 o O o 0 0 0 0 0
0 o O o O O O O O O O
• O O O O O O 'I" CO O N O O
c-
•
•
•
•
•
B. Current Meeting Room Usage in Renton/South King County
Overall Meeting Room Usage in Renton
A majority of Renton hotel meeting rooms can accommodate less than 40
people and therefore statistically the average number of attendees per
meeting is small (28-33 attendees). If we specifically look at the property
most similar in meeting room size to the Pavilion Building, the Holiday
Inn Select, the statistics reported by their sales manager indicate there is a
larger share of meetings in the 100+person category which is currently
being under-served in the Renton area.
Monday-Friday room usage 85%
Weekend usage N/A
Average number of attendees in
meetings during the week 45 people*
Average size of groups in banquets
during the weekends 180 people*
• Most large meetings are turned away because of a lack of break-out
rooms
• Approximately three banquet requests of over 200 people are turned
away each month due to lack of available space
*Average meeting room attendees is driven by the smaller meeting rooms within the hotels.
Renton Hotel Facilities Meeting Room Usage
Monday-Friday usage 65%
Weekend usage 8%
Average number of attendees in
meetings during the week 33 people*
Average number of attendees in
meetings during the weekend 13 people*
*Average meeting room attendees is driven by the smaller meeting rooms within the hotel.
Renton Non-Hotel Facilities Meeting Room Usage
Monday-Friday usage 45%*
Weekend usage 10%
Average number of attendees in
meetings during the week 28 people
Average number of attendees in Statistics Not
meetings during the weekend Available
*If you remove the meetings for private club events held at community centers,the actual
usage of paying customers during the week is closer to 30%.
20
South King County Meeting Room Usage
Surveys within the south Seattle area indicate that the SeaTac/Renton
hotel meeting room occupancies are above the Renton hotel properties.
However, these properties are primarily booked by organizations also
using guest rooms and flying people into the area for brief periods of
time. They may not be a primary factor to the Renton area meeting
market.
Monday-Friday usage 67%
Weekend usage 35%
Average number of attendees in
meetings during the week 75 people
Average number of attendees in
meetings during the weekend 43 people
C. Meeting Size, Required Features, and Competitive Pricing
Meeting Size
The average size of meetings the Renton meeting facility operators report
is much smaller than the size meeting planners in Renton and the south
King County area indicate they actually book. This, we conclude, is
because the majority of meeting venues in Renton do not readily
accommodate the needs of meeting planners who require a large main
meeting room and multiple break-out rooms, thereby causing the planners
to look elsewhere for their events.
25% 20.8% 25% 20.8%
i,..;:•*
20% $ 16% i=5;7':;:i 16% '.':;:i:-1.
r
N „
4� j' e'fillilli�
i : tI
° $ :i 5 P" , •-..-4.1.
5% ,' i':`!;.1'
fr? '. a 0.083%
�1 S ::j I
No Off 0-10 11-25 26-75 76-150 151-250 251+
Site
Below is the frequency of off-site bookings reported by Renton/SKC
meeting planners:
1 per week 1 per month 4 per year 1-2 per year
18% 12% 4% 31%
21
Of the meeting planners we talked to, 16% said they currently do not book meetings at
off-site locations. All of these planners indicated that at some point they might need to
use an outside venue. These same planners book off-site banquet events for their
companies and were therefore kept in the survey.
Requested Features Within Meeting Venues/Banquet/Exhibition Halls and Pricing
Details for Meetings/Banquets
Meetings-Audiovisual Requirements
• 90%of all meeting planners interviewed stated that they use Internet,
PowerPoint, and computers for their presentations. These types of
presentations require lighting which can be controlled and even
removed from the room, ample electricity, and telephone or T1 lines
for Internet access and quick download time
• 50% state they use rear/front projection systems
• 20% stated that they used overhead projectors and flip charts
Break-Out Room Needs
• 96%of meeting planners who coordinate meetings of 100 or more
people require break-out rooms along with the main meeting room
• 50% of meeting planners who coordinate meetings of 41-99 people
require break-out rooms
• 40% stated that they need break-out rooms for 10-30 people
• 30% stated that they need break-out rooms for 31-60 people
• 30% stated they need break-out rooms for 61-100 people
Parking Requirements
Of the meeting planners interviewed:
• 100% stated that free, available parking would be a major factor in
their decision to book a meeting at the Pavilion site
• 75% of the meeting planners stated that they look for 1 1/2 parking
spaces for every two attendees when they book events
• 80% of the meeting and event planners in the Renton area who know
the general location of the Pavilion Building asked about the parking
plans
• 8% stated that if a group were staying at a hotel, they would consider
busing them to the site,but this method is not preferred
22
Meetings-Food and Beverage-Average food expenditures per day per person
Meeting planners were asked how much money they spent per day,per
attendee when they planned a meeting. The responses were as follows:
Attendees are their own for meals 30%
$10 or less per day allotted for food 25%
$11-$20 per day allotted for food 15%
$31-$40 per day allotted for food 15%
$40 or more per day allotted for food 15%
• 60% stated that they prefer pizza or sandwiches or something simple
for lunch. There was no definitive preference for plated or buffet style
Meetings-Average Food Expenditures(per person/per day)
®Attendees on their own for Food
15% and Beverage
30% 0$10 or less spent per day
15% '> `•'•.`•';.•. 1E$11420 spent per day
?itiiii»:!�:�:�»:�:�:�:•>.•.'.:..;.:.
En$
31- 40 per spentday
15%
M$40 or more spent per day
25%
lunches.
Meetings-Pricing Requirements
Within the greater Renton area,meeting planners require a lower-per-day
meeting cost than those within the Bellevue, Seattle, and SeaTac areas.
Preliminary information shows that Renton captures an average of$35-
$40 per person for a full day meeting including food and beverage,
meeting room rental, and limited audiovisual supplies. This is $15 less per
person,per day than Bellevue, and$30 less than Seattle.
23
low
4tro
d+
4.,
`r
40
460
• '
•
• C r d O O O 0
a O O O 0
• a)
O N e- 6 0
• a
• C
• •-
• a v
• 2 o ( \
a) u.
• c.Q -a a 0 0 0 0
C Cl. 0 0 0 0
C• � M 0 coo er er M
• N 4,1) co !A !A
• Aill
• V 13
CD
• °' }'
• L
•
42)
• Q
• 0 0 or, in 0 M
to io to to
• E
- I
W
• 1 r
® o 0 o c 0
0 0 M 0 C
• O o O o ci, o 0 0 - d 0
r, cou7 -� c� v*
toeA n (I) �,, W v�
• N CD m N tZ
■ ■ ❑ ❑
•
•
•
•
•
•
D. Banquets-Evenings and Reception Preferences
Size of venues was mentioned repeatedly. Planners stated that they are forced
into using only a handful of places because of the lack of large banquet spaces in
the area for their events. In the Renton area, the largest banquet space can
accommodate approximately 300 people. Hotel sales departments and non-hotel
venues in the Renton area also stated that they turn away business frequently
because they do not have large enough banquet rooms.
• 70% of the meeting planners interviewed stated that they prefer
windows, views, and interesting settings for their evening events
• 50% stated that they prefer to have dinners and special events away
from general meeting rooms, however they realize that a large
ballroom will double for both uses.
Banquets-Overall Size of Banquet Events Stated by Meeting Planners
• 45% of the meeting planners interviewed state they have banquets
larger than 300 people
50 people or less 35%
51-250 people 20%
251-400 people 30%
Over 400 people 15%
•
Size of Social Events/Banquets
(Data provided by Planners in S.King County/Renton area)
15%
la 50 or less people
35%
1751-250eo le
P P
••••••••••••• •
®251-400 people
30%
0401-500 people
..:...... .................
•
20%
25
Banquets-Room Use Statistics-Stand-Alone Venues
Ballroom use(Saturdays) 77%
Ballroom use(Fridays) 38%
Ballroom use (Sundays-Thursdays) 15%
Average size of weekend banquets 150 people
Average size of weekday evening
events 47 people
• Renton stand-alone banquet facilities report that booking requests are:
• Increasing-38%
• Staying the Same-62%
Banquets-Sizes and Usage-Hotel Venues
Ballroom use(Saturdays) 90%
Ballroom use (Fridays) 70%
Ballroom use (Sundays-Thursdays) 40%
Average size of Friday banquets 50 people
Average size of Saturday banquets 100 people*
Average size of Sunday-Thursday events 40 people
*Holiday Inn Selects report an average of 180 people on Saturday night.
• Renton hotels reported that booking requests are:
• Increasing:17%
• Staying the Same-50%
• Decreasing-33%
•
26
Banquets-Event Planner Expenditures
Banquets in Renton cost$10-$15 less per person than in Bellevue and
Seattle.
•
• 9% of event planners stated they spend$20 per person on dinners and
receptions*
• 36% stated they spend$30 per person on dinners and receptions*
• 36% stated they spend$40 per person on dinners and receptions*
*tax and gratuity were generally included in these figures according to the planners
Size of Social Events/Banquets
(Data provided by Planners in S.King County/Renton area)
•
•
15%
111150 or less people
•0
35/0
51-25
El0eo e
•
P P
2
® 51-400eo le
p P
30%
/o
113401-500 people
20%
Banquet Pricing-Hotel Venues
Average menu prices range from$16.96 to $28.95 per person for dinner
and a salad. Beverages are approximately$3.50-$4.50 per alcoholic
beverage. Generally,planners reported spending $19-$24 per person plus
tax and gratuity at hotel venues. The graph on the following page
illustrates the difference in costs between Renton, Seattle, and Bellevue.
27
'fir.
ilir 00
kw 4 CI) 7-1
411, � CD CO
m in
• ■ ■ ❑
• [-T------1 ,,
• ,,,„ „ ..... , „... , ..„ 4 _ .4. ,.... _4_, 4,4 __ ,
1
_.
• .
c„
• x
x
•
La ' LLn L o
• Tic4 - O
• Z
• CO
•
c �
• .1L
• 0.
• }'
aw
M 1•
2 0 co 0
• O (NJ
• co
E9
COAA'+ N
• } !
• c
•
z
•
• ( °'
o)
• a)
I a) O O O
• m Ln Ln Ln
• C
(0 ER ER ER
• I
O
O
• i
O O O O O O I -i
OO O O O O O O OO• Ln O Ln O Ln O onO Eft 6A ER Efk 40 ER D m fA
• ■ ■ ❑
•
•
•
•
•
Exhibition and Consumer Shows
Interviews and statistics indicate that the Pavilion Building will not be
large enough for the average consumer show or exhibition. According to
event planners and the directors at the Meydenbauer Center and the
Washington State Convention Center, clients generally need space for
over 200 booths to hold a cost-effective show,regarding the most
requested sizes and needs from clients who are holding exhibitions and
consumer shows.
We estimate, at best, the Pavilion Building will be able to hold 50-70
regular size booths. According to the Executive Directors and Sales
Managers at both the Washington State Trade and Convention Center and
the Meydenbauer Center, unless show organizers can get over one
hundred booths into their show, they will not produce the revenue needed
to put on the event.
Meeting and Event Planner Statements
• The Renton Pavilion should be as accommodating as Bell Harbor, not
as sterile as the convention center,make it a facility that works with
the neighborhood and get control of the parking issue, no paying
parking meters
• Parking is a concern, could be nice for a summer retreat with a park
• Roads need to be easy to get in and out of. Access is important.
Visually appealing area,near parking lot, soundproof areas with
corridors in between
• Good catering,parking a must, appealing(like hotel facilities),would
be good for the city of Renton
• Free parking, reasonable cost, close to eating facility, some amenities-
pop machines, vending machines, telephone access, responsive
management system, good intelligent service, and customer service
• Good lighting,business environment, staff availability, good food,
some break-out rooms, elegant but darker wood, rich looking, onsite
availability for voice mail and computers
• Flexibility on planners,rooms that don't get stuffy,windows, A/V
ease, internet access, formal boardroom,break-out rooms, something
comfortable and appealing, upscale or casual
29
III. Market Niche and Positioning
A. Vision for the Pavilion Building
We believe the market niche for the Pavilion Building is to fill the needs of the
Renton/SeaTac/Kent/South King County corporate market and regional non-
profit, government, and association markets. It should be positioned as the
premiere, moderately priced,meeting savvy,multi-purpose venue in south King
County that can accommodate large groups for business and association meetings,
banquets, and special events. It should be able to accommodate large meetings of
200 people or more with break-out rooms and meal areas to accommodate these
groups. It should also be able to accommodate banquets from 200-400. This will
allow the building to produce revenue during weekdays,weekday evenings and
weekends. Our pricing position will equal Renton's high-quality meeting and
banquet facilities (Maplewood Greens,Fairwood Golf&Country Club, the
Holiday Inn Select). Pricing should fall just below the SeaTac major hotel market
(DoubleTree&Marriott). Pricing will remain below the Bellevue and Seattle
market.
As stated, there is an under-served market looking for professional meeting
services, state of the art audiovisual supplies, quality food services and a
comfortable meeting environment in the south King County area. However, the
market in the south King County area does not want to pay the higher prices of
Bellevue and Seattle. The large hotel venues in the SeaTac area do not accept
these meeting planners bookings until lodging space is nearly full or the event
date very close at hand. This makes it difficult for planners to organize their
events and leaves them booking at venues less desirable. This is a golden
opportunity for the Pavilion Building.
We recommend that the marketing message for the Pavilion Building complement
the city's new marketing campaign"Ahead of the Curve." The Pavilion's lack of
luxuries should be capitalized upon. Although not refined, the marketing message
might say something similar to: "You asked for it, and we listened. Finally a
fresh new venue that gives you what you need and nothing you don't"
Benefits for business organizations that are simple and professional should be
highlighted. For meetings an ad campaign might state: "No chandeliers. No
butlers. Just quick response to your audiovisual needs. Or for Banquets: No
Chandeliers. No butlers. But large enough for every person to have their own
seat...and a spot on the dance floor.
Along with developing an image and advertising campaign which would reflect
the market needs, our goal at Columbia Hospitality is to create life-long clients for
our venues. We strive to build credibility and profit for our owners and this will
only be achieved when customers not only use but return to the Pavilion Building.
30
To develop initial interest and pre-opening bookings for the Pavilion Building, we
would infiltrate the meeting event planner markets by organizing and implementing
the following:
1) Schedule speeches and make individual presentations to VIP organizations and
individuals about the plans for the building including organizations such as
Meeting Planners International, Renton Chamber of Commerce and South side
Chambers of Commerce, Society of Government Meeting Planners, East King
County Convention and Visitors Bureau, Southwest King County Chamber of
Commerce and Convention and Visitors Bureau, Washington Society of
Association Executives and others.
•
2) Developing and implementing a Public Relations campaign targeted to the east
and south side newspapers, regional business publications such as the Puget
Sound Business Journal, Daily Journal of Commerce, and business sections of the
Seattle PI and Times.
3) Create a further reaching Public Relations campaign that targets the Regional
association markets including eastern Washington.
4) Develop relationships with government organizations in the region and negotiate
for multiple use year-round contracts when possible
5) Cross market with Columbia Hospitality's data base of banquet and event
planners in the Puget Sound area
6) Develop relationships with the Convention and Visitors Bureaus in Bellevue,
southwest King County and Seattle
7) Develop relationships with hotel sales directors and general managers in the
SeaTac/south King County/Renton and Bellevue areas
Each of these activities will be implemented in conjunction with the overall
marketing plan and vision for the building. This vision will be initially directed
through the City of Renton with input from Columbia Hospitality.
31
B. Architectural Considerations
With this information, the architectural firm of GGLO was retained to consult
with us and design the best space plan for the Pavilion Building. Under our
direction, GGLO has developed a preliminary space plan for the Pavilion. The
proposal and the estimated costs for renovating and finishing the building are
provided under the Architecture Tab.
Building schematic and occupancy capabilities
The schematic design for the Pavilion Building allows for a maximum of
five separate rooms with subdividing walls to divide the spaces. These
rooms can be divided into four, three, or two rooms. They can also
become one solid room when all of the subdividing walls are retracted. In
order to preserve space, the building will have a second floor mezzanine
where staff will be located. The kitchen area will be located on the main
floor with storage located in two sections of the building.
With the space plan provided,we have made calculations regarding the
occupancy, combined with revenue potentials for the building. We have
also calculated the associated expenses and gross profit potential. See the
Architectural Tab for more details and a diagram.
C. Meeting Occupancy Calculations
The conference center industry calculates occupancy based on conference
attendees, not simply room occupancy(hotels use occupied rooms).
Revenue calculations are based on income or attendees. Maximum
occupancy takes into account the need for break-out rooms,weekday vs.
weekend meeting business, and turn-around/set-up times for conference
rooms.
The maximum meeting attendee occupancy for the Pavilion Building has
been calculated at 200 people per day. This will allow for the largest
room to be used as the main conference room. It will allow for three to
four break-out rooms, and it will allow for lunch service to occur in the
main reception/pre-function area. In essence, a group of 200 people will,
often times, take over the entire space. We refer to this scenario as a
"buy-out".
Exceptions to the Maximum Occupancy
On occasion, a group may need only the large conference room without
break-out rooms. When this happens, the smaller rooms may be sold,
32
however, there are a number of considerations that must be taken into
account. Issues such as where and when the large group has coffee breaks
and meals and the seeping of sound through air-walls are a factor. The
flow of attendees as they arrive and depart must be coordinated or all
parties may have an unproductive experience. Because of the potential
hazards around these issues, only a small percentage of the time would a
second, smaller group be able to successfully hold a conference
simultaneously with a group of 200.
In addition, it is noted that the Pavilion Building will be able to
accommodate meetings of 300 and possibly 400 if the group does not
require break-out rooms and if they will agree to have food service in
multiple areas.
These two scenarios will not be the norm and therefore, we are not using
these higher attendee figures to base our calculations.
Maximum Occupancy Calculations
As stated above, we are using 200 as a reasonable calculation for the
maximum number of meeting attendees per day in the Pavilion Building.
We are using 250 available weekdays as our inventory. (Ten holiday days
per year on average are not considered available to book for conferences
and are therefore removed from the calculation).
200 attendees X 250 week days=50,000 maximum attendees per year
The annual maximum meeting attendee occupancy for the building has
been calculated at 50,000 attendees. (50,000=100% occupancy)
Having a maximum occupancy to use as a base,we calculated the
estimated first year occupancy taking into consideration statistics from the
Renton hotel and stand-alone meeting venues and our own professional
and historical experience and the following considerations:
Considerations before determining occupancy
• While there is a stated need for larger and additional meeting space,
the actuality of how much these planners will use the facility at the
rates projected is unknown.
• The property most similar in size to The Pavilion Building seems to be
maintaining a high meeting room usage. (Holiday Inn Select states an
85% occupancy of their meeting rooms at a 45 attendee average which
equals a total of 9562 meeting attendees per year). Half of these
customers are using guest rooms in conjunction with their meeting
space. The number of meetings booked in their center by local
organizations that do not use guest rooms is approximately 4,781.
33
Those who are using guest rooms will more than likely not choose to
take their meeting out of the hotel as meeting room charges and
transportation costs could increase.
• The number of large meetings turned away by our competitors does
seem to be of significance, however,no accurate tracking of this lost
business is done. Corporate meeting planners say they are booking
meetings larger than the average size reported in Renton. Therefore,
we conclude that there is a market currently undefined, going to a
variety of meeting venues scattered in the south King and Pierce
County areas. This is a perfect market niche for the Pavilion Building
to capture.
D. Meeting Attendee Usage/Anticipated Occupancy/Pricing
Based on previous experience in opening facilities and on the considerations and
statistics above, we are anticipating that in the first full year of operation, the center
will be able to capture 28.6% of the its maximum occupancy(50,000) during the
weekdays or a total of 11,500 meeting attendees and 2,800 breakfast and lunch
attendees over the first full 12 months of operation. (Some corporate breakfast and
lunch business events will not include a full-day meeting and are therefore calculated
and priced differently in the proforma).
The proforma outlines by month the meeting attendees and associated revenues.
Pricing for Full Day Conferences (Conference Meeting Package)
Pricing recommendations are based on competitive estimates for the
Renton/SeaTac and Bellevue areas. The chart on the following page indicates
that a full day conference meeting package(CMP)will cost from$70 in the
Seattle area to just under$35 in the Renton area. The price includes the meeting
room rental, if any, a continental breakfast, and an afternoon coffee and soft drink
refreshment service with snacks, a lunch, along with a limited supply of
audiovisual services such as an overhead projector, flip chart, screen,paper, and
pencils.
We are recommending that a$40 (plus tax)per person CMP be used. (This
package price assumes that catering will be done in house).
This $40 CMP price positions the Pavilion Building beneath the Bellevue and
Seattle markets,yet keeps it competitive with SeaTac and Renton's quality
meeting venues. Using this pricing structure,we are assuming that the food
service, decor, and business services will be in line with our competitors. Staff,
including food service and banquet staff,will be needed to sell and service all
meeting business.
34
E. Banquet Occupancy and Check Averages
As with our meeting occupancy, banquet occupancy is also based on a per person
calculation called"covers".
We have broken the various types of covers into breakfast, lunch, dinner, and
reception segments. They are also broken into:
• Corporate business (booked by a company in association with a meeting
or in place of a meeting for the company)
• Social business (weddings and other events not associated with a meeting
The reason for breaking out the cover counts in this manner is to more accurately
calculate revenues. Our internal statistics confirm that each type of event will
generate a different check average. For example, a social event organized by an
individual such as an anniversary reception will generate less food revenue per
person than a corporate dinner.
Cover count estimates and check averages
Based on the above competitive information and on our own experience in this
market, we are projecting that the Pavilion Building will generate the following
covers in the first year of operation at the prices indicated.
Breakfast Covers:* 700 Average Check: $ 7.00
Lunch Covers:* 2100 Average Check: $12.00
Corporate Dinner Covers: 2400 Average Check:. $22.00
Corp. Dinners in December) 500 Average Check: $28.00
Social Dinner Covers: 2125 Average Check: $19.00
(Soc. Dinner in December) 900 Average Check: $25.00
Corporate Reception Covers: 2100 Average Check: $22.00
(Corp. Receptions in December) 500 Average Check: $25.00
Soc. Reception Covers: 1150 Average Check: $15.00
Soc. Reception Cover: 1700 Average Check: $20.00
(Soc. Receptions in Dec) 1000 Average Check: $30.00
Total Cover Counts: 14,675
Prices do not include taxes and gratuities. Beverage revenue is additional and is
included in the proforma.
*Corporate and social check averages are the same and therefore there is no need
to break these into separate categories.
35
IV. Pre-Opening Marketing Outline & Operational Expenses
Market studies indicate that the Pavilion Building will be a viable venue for meeting and
banquet space in the city of Renton with certain assumptions. To achieve a first-year
occupancy equivalent to the projected first-year proforma, we have assumed that 12
months of pre-marketing and operational planning will be done. Most conferences and
banquet events fitting the proposed space configurations of the Pavilion Building will be
booked from one year to two months out. A minimum of six to nine months of pre-
opening marketing and planning is essential,however, it may not yield the same revenue
in the first year as anticipated in the submitted proforma.
Columbia Hospitality has experience in opening a number of venues in the Greater
Seattle area including Bell Harbor International Conference Center, The World Trade
Center and Aljoya Conference Center of Seattle. In addition,we have re-opened the
Heron Beach Inn and the Resort at Deer Harbor after pre-opening consulting and
assisting with extensive changes in market positioning including a name change and a$3
million dollar renovation.
The outline below states various pre-opening projects Columbia Hospitality would
manage for marketing and organizing the operations of the Pavilion Building prior to
opening. Columbia Hospitality management fees are listed as well.
Image Development and initial introduction to community( 12—6 months out)
1) Naming and dedicating the building, conference rooms and other
significant areas reflective of long-term mission stated by the City of
Renton
2) Developing a mission statement for all employees to follow reflective
of the building's long-term mission in conjunction with the city
council and city officials
3) Logo development reflective of the agreed upon market niche
4) Development of letterhead,business cards, and all printed office needs
5) Development of pre-opening marketing collateral,rate sheets, room
diagrams and capacity charts and subsequent development of four-
color marketing brochure
6) Development of web pages/web links and an internet marketing
program
7) Write and implement the opening marketing plan
8) Initial contacts with meeting and event planners and other important
city organizations and interested parties
9) Develop and implement direct mail, advertising and public relations
programs including schedule public speaking opportunities at
organizations and community events around the city of Renton
36
Sales Development and Market Introduction (6—3 months out)
1) Hire and train director of sales and operations and a sales manager
2) Join organizations such as the Southwest King County Chamber of
Commerce and Convention and Visitors Bureau and the East King
County Convention and Visitors Bureau and other organizations where
south King County event planners and business leaders are present
3) Develop relationships with area hotels and meeting venues
4) Develop booking policies and internal sales policies for operation
5) On-going direct mail campaign,public relations and advertising
6) Develop reservations and booking system for sales activities
confirmed bookings and contract creation
7) Begin contracting for business
Final Pre-opening/Grand Opening/ ( 3 months—Opening)
1) Organize Hard hat tours for city groups and event planners
2) Develop Grand Opening theme in conjunction with City needs
3) Manage/create invitations and invitee list and reservations
4) Manage all operations of Grand Opening including Public Relations
5) Implement final stages of pre-opening marketing plans
6) Set sales goals and begin reporting sales figures to city council
Pre-Opening Operational planning and Purchasing
1) Assess all FFE needs and develop RFP's for equipment, small-wares,
and public area needs
2) Order all FFE and develop plan for receiving and installation
3) Develop menus for pre-marketing
4) Hire chef and revise menus
5) Prepare all Kitchen FFE
6) Develop Relationships with vendors and food purveyors
7) Hire and train banquet manager and banquet staff
8) Hire and train front-of-the-house staff/receptionist and accounting
clerk
9) Hire and train meeting planner and other inside staff
Pre-opening marketing and management fees
Columbia Hospitality will manage all areas of pre-opening needs for a management fee
of$5000 per month or$60,000 total,whichever is greater. This is for the professional
staff time required to implement the above listed services and does not include the hard
costs associated with the above. It is assumed that a minimum of one year will be given
to complete pre-opening marketing and operations. Other scenarios for fees associated
with opening a meeting or hospitality center might include a flat marketing management
fee which can range from$20,000 to $40,000, and an assessed fee of 10% of total gross
37
purchases for managing the FFE. Our proposal of a flat fee, we believe, will help the
City better manage its pre-opening expenses.
Hard costs for opening the building not including FFE, build-out of building, kitchen and
furnishing of kitchen supplies and front of house FFE are below.
Pre-opening Marketing Costs per our preliminary meetings and assumptions
Logo Development: $ 3,000
Stationary/Letterhead
Office supplies $ 4,000
Brochure development
including drawings,photography
Copywriting and printing $15,000
Web site Development $ 2,000
Public Relations $ 2,000
Advertising $ 5,000
Direct Mail $ 6,000
Directory Listing/Web Links $ 3,000
Total $40,000
Grand Opening Costs (based on 500 people)
Food and Beverage Costs $10,000
Entertainment/Decorations $ 5,000
Invitations/Printing Mailing $ 5,000
Photography/gifts $ 2,500
Name Badge/Registration $ 1,500
Labor $ 1,500
Total $25,500
Pre Opening Staff Costs
Time Prior Salary Total
Sales Manager six months $19,000
Director of Sales and Operations four months $15,000
Meeting Planner/Sales Assist eight weeks $ 6,000
Receptionist/Admin Assist four weeks $ 2,000
Accounting Clerk four weeks $ 2,080
Chef and F&B Manager six weeks $10,000
Banquet/cooks/kitchen staff five-ten days $ 4,000
Other $ 2,000
Total $60,080
38
Total pre-opening, marketing and staffing charges
Columbia Hospitality Management Fees: $60,000
Marketing Costs $40,000
Pre-opening Staffing $60,080
Grand Opening Event $25,500
Total $185,580
39
V. Furniture Fixture and Equipment Summary of Expenses
Attached is our recommended summary of furniture, fixtures and equipment needed to
complete the Pavilion Building and make it operational for conference and banquet
events.
As stated previously, there are two scenarios listed. One in which the kitchen is used
only as a service kitchen and the food is brought in by an outside catering company. The
other scenario is one in which the kitchen is used as a full service kitchen where all food
is prepared and served.
Our studies have indicated that using the kitchen for full service is the most profitable
scenario although the initial cash out-lay is greater when creating a full service kitchen.
In addition,we have listed audiovisual equipment which we highly recommend
purchasing for the marketability of the building as a new meeting and event center. In
general, conference and meeting centers are able to produce a greater profit when
packaging their prices and including various audiovisual pieces. The alternative is to use
an outside audiovisual company to provide all necessary equipment. The client will then
have to pay additionally to rent all of the needed equipment. This service will need to be
coordinated by the meeting planner and it will be time consuming.
The conference meeting package, suggested at $40 per person,will need to be reduced as
the services included will be reduced.
We highly recommend both building out the full kitchen and purchasing the audiovisual
we have listed.
Below are the combined total FFE costs.
Full Kitchen Staging Kitchen
Back of House Kitchen Smallwares $155,559 $140,993
Back of House Kitchen $140,246 $136,510
Front of House and Administration $402,939 $358,698
Audiovisual $ 86,880 $ 86,880
Subtotal $785,624 $723,081
Contingency 5% $ 39,281 $ 36,154
Grand Total $824,905 $759,235
40
F.F.E. Back of the House Kitchen Items Section 1
Full- Staging
Service Kitchen
Kitchen Only
ITEM Quantity Unit Cost Total Quantity Total
Hood System 1 $11,700.00 $11,700.00 1 $11,700.00
Control Panel 1 $6,800.00 $6,800.00 1 $6,800.00
Walk-In Cooler 1 $15,600.00 $15,600.00 1 $15,600.00
Remote Condenser 1 $7,300.00 $7,300.00 1 $7,300.00
Convection Oven Gas 2 $8,700.00 $17,400.00 2 $17,400.00
Steamer Gas 1 $9,400.00 $9,400.00 1 $9,400.00
Fryer Gas 1 $3,400.00 $3,400.00 1 $3,400.00
Refrig. Counter 1 $3,400.00 $3,400.00 1 $3,400.00
Work Table 1 $3,700.00 $3,700.00 1 $3,700.00
SS. Shelf 1 $2,000.00 $2,000.00 1 $2,000.00
3 Comp. Sink 1 $3,700.00 $3,700.00 1 $3,700.00
Dirty Dish Sink 1 $3,900.00 $3,900.00 1 $3,900.00
Pre-Rinse Assembly 1 $200.00 $200.00 1 $200.00
Disposer 1 $2,100.00 $2,100.00 1 $2,100.00
Dishwasher Conveyor 1 $17,200.00 $17,200.00 1 $17,200.00
Booster Heater 1 $1,700.00 $1,700.00 1 $1,700.00
Dish Table 1 $2,200.00 $2,200.00 1 $2,200.00
Range Gas 1 $4,900.00 $4,900.00 1 $4,900.00
Undercounter Refrig. 1 $2,900.00 $2,900.00 $0.00
Ice Maker 1 $8,300.00 $8,300.00 1 $8,300.00
Hand Sink 1 $200.00 $200.00 1 $200.00
Mop Sink 1 $600.00 $600.00 1 $600.00
Heat Lamps 4' 4 $134.90 $539.60 $0.00
Sub-Total $129,140 $125,700.00
Tax $11,106 $10,810
TOTAL $140,246 $136,510
41
Back of the House Smallwares--SECTION#2
Full Service Staging Kitchen
Kitchen Only
Item Quantity Unit Cost Total Quantity Total
Slicing Machine 1 $3,500.00 $3,500.00
Cutting Boards 6 $12.41 $74.46 6 $74.46
Saute Pan 12" 4 $50.00 $200.00
Saute Pan 14" 4 $30.00 $120.00
Fry Pan 12" 2 $25.00 $50.00
Fry Pan 14" 2 $25.00 $50.00
Sauce Pot 8 qt. 3 $38.00 $114.00
Sauce Pot 14 qt. 2 $75.00 $150.00
Sauce Pot 3 qt. 3 $20.00 $60.00
Roast Pan 3 $105.00 $315.00
1 Gal.Measure 2 $15.00 $30.00
Sheet Pan 18x12 120 $5.00 $600.00
Sheet Pan 18x24 200 $6.48 $1,296.00
Food Storage Cont. 6 $30.00 $180.00
Bain Marie 6 $25.00 $150.00
ss Full Pan 36 $9.73 $350.28 36 $350.28
ss Half Pan 36 $12.00 $432.00 36 $432.00
Stock Pot 2 $120.00 $240.00
Mix Bowl 4 qt. 4 $10.29 $41.16
Perf Pan 24 $12.00 $288.00 24 $288.00
2 oz.Laddie 12 $2.19 $26.28
Tongs 6 $3.89 $23.34
Perf Spoon 12 $2.27 $27.24
Slot Spoon 12 $2.27 $27.24
Ice Scoop 6 $4.50 $27.00 6 $27.00
Skimmer 2 $12.00 $24.00
Wire Whip 3 $15.00 $45.00
Edlund Can Opener 1 $75.00 $75.00 1 $75.00
Pastry Tube Set 2 $12.00 $24.00
Carving Knife 3 $30.00 $90.00
Fork 3 $15.00 $45.00
Peelers 6 $2.50 $15.00
Measure Spoons 3 $4.00 $12.00 3 $12.00
Rolling Pin 1 $35.00 $35.00
Spatula 6 $15.59 $93.54
4"Hotel Pan 18 $12.23 $220.14 18 $220.14
Solid Spoon 12 $2.27 $27.24
Rondeau 18" 2 $115.61 $231.22
Prep Table 8' 1 $255.17 $255.17 1 $255.17
Plate dollies 4 $398.00 $1,592.00 4 $1,592.00
Bus Tubs 12 $4.18 $50.16 12 $50.16
4 oz.Laddie 8 $2.58 $20.64
6 oz.Laddie 4 $3.24 $12.96
12 oz.Laddie 2 $7.22 $14.44
Ceramic Platters 24 $48.50 $1,164.00
Ceramic Bowles 24 $33.50 $804.00
0-22 Temps 4 $4.22 $16.88
ss.Hooks 24 $2.05 $49.20 24 $49.20
China Cap 2 $23.98 $47.96
Fry Baskets 2 $16.85 $33.70 2 $33.70
1/3 ss pan 6 $8.41 $50.46 6 $50.46
1/9 pan ss 6 $3.84 $23.04 6 $23.04
Section Sub-Total $13,443.75 $3,532.61
Section 1 &2 Sub-Total $142,583.35 $129,232.61
Tax $12,975.08 $11,760.17
Grand Total Page#1 $155,558.43 $140,992.78
42
CONFIDENTIAL
The results stated in the proposal use our best judgement,however no guarantees should be anticipated or implied.
Columbia Hospitality's research is presented,subject to the attached assumptions and limiting conditions.
F.F.E.RENTON Front of the House Section#3
STAGING/
FULL SERVICE STORAGE
KITCHEN ONLY
ITEM Quanity UNIT COST TOTAL Quantity TOTAL
Creamer 55 $6.05 $332.75 55 $332.75
Sauce Boat 55 $28.00 $1,540.00 55 $1,540.00
Bud vase 55 $3.50 $192.50 55 $192.50
Sugar boat 55 $4.41 $242.55 55 $242.55
sugar jar 55 $7.31 $402.05 55 $402.05
Salad plate(Under) 220 $5.65 $1,243.00 220 $1,243.00
salt&pepper 55 $12.11 $666.05 55 $666.05
Salad Plate 550 $5.65 $3,107.50 550 $3,107.50
Dinner Plate 550 $14.39 $7,914.50 550 $7,914.50
Dessert Plate 550 $8.50 $4,675.00 550 $4,675.00
B&B plate 550 $4.58 $2,519.00 550 $2,519.00
Coffee Saucer 550 $3.43 $1,886.50 550 $1,886.50
Coffee Cup 550 $5.15 $2,832.50 550 $2,832.50
Tea Pot 55 $19.39 $1,066.45 55 $1,066.45
Dinner Knife 550 $5.90 $3,245.00 550 $3,245.00
Dinner fork 550 $2.51 $1,380.50 550 $1,380.50
Dessert Fork 1650 $3.33 $5,494.50 1650 $5,494.50
Dessertspoon 770 $2.51 $1,932.70 770 $1,932.70
coffee spoon 550 $1.53 $841.50 550 $841.50
Demi spoon 55 $1.84 $101.20 55 $101.20
B&B knife 550 $2.88 $1,584.00 550 $1,584.00
Iced Tea Glass 550 $1.67 $918.50 550 $918.50
Wine Glass 1100 $1.98 $2,178.00 1100 $2,178.00
Champ Glass 550 $1.67 $918.50 550 $918.50
Roll Basket 55 $12.10 $665.50 55 $665.50
Coffee Pitcher 55 $80.00 $4,400.00 55 $4,400.00
Water pitcher 55 $75.00 $4,125.00 55 $4,125.00
Tray Jack 55 $26.14 $1,437.70 55 $1,437.70
Oval tray 55 $23.91 $1,315.05 55 $1,315.05
ss plate cover 550 $8.40 $4,620.00 $0.00
Rack Water 30 $39.00 $1,170.00 30 $1,170.00
RackWine 48 $39.00 $1,872.00 48 $1,872.00
Rack champ 16 $39.00 $624.00 16 $624.00
rack coffee 24 $20.00 $480.00 24 $480.00
Dolly for rack 13 $620.00 $8,060.00 13 $8,060.00
Silver rack 32 $10.00 $320.00 32 $320.00
Misc.Rack 16 $20.00 $320.00 16 $320.00
Shelving 40 $128.00 $5,120.00 40 $5,120.00
Coat Racks 6 $175.00 $1,050.00 6 $1,050.00
Display Mirror 10 $150.00 $1,500.00 $0.00
Chaffing dish 15 $1,100.00 $16,500.00 $0.00
Coat Hangers 500 $0.50 $250.00 500 $250.00
Podium 1 $1,000.00 $1,000.00 1 $1,000.00
Skirting 300 $6.38 $1,914.00 300 $1,914.00
Risers 6 $1,100.00 $6,600.00 6 $6,600.00
Hot Boxes 3 $3,000.00 $9,000.00 $0.00
Dance floor 1 $7,000.00 $7,000.00 $0.00
Cocktail Tables 12 $180.00 $2,160.00 12 $2,160.00
Vacum Cleaner 1 $400.00 $400.00 1 $400.00
Trash Can 6 $30.00 $180.00 6 $180.00
Utility Cart 2 $125.00 $250.00 2 $250.00
Mop&Buckets 3 $15.00 $45.00 3 $45.00
Floor Mats 10 $35.00 $350.00 10 $350.00
Table stands 55 $30.00 $1,650.00 55 $1,650.00
Chairs 550 $213.00 $117,150.00 550 $117,150.00
Tables 55 $250.00 $13,750.00 55 $13,750.00
Table Dollies 7 $300.00 $2,100.00 7 $2,100.00
Chair dollies 3 $150.00 $450.00 3 $450.00
30x96 tables 40 $160.00 $6,400.00 40 $6,400.00
Permits 1 $3,300.00 $3,300.00 1 $3,300.00
Delivery and Install 1 $12,000.00 $12,000.00 1 $12,000.00
Administrative Offices buildout $65,000.00 $65,000.00
(includes FFE plus a computer&telephone system) sub-total $351,743.00 $313,123.00
freight(5%; $17,587.15 $15,656.15
sub-total $369,330.15 $328,779.15
tax(9.1%) $33,609.04 $29,918.90
Total $402,939.19 $358,698.05
43
Section 4. Renton Proforma FFE forecasted minimum needs for
Audiovisual
ITEM QUANTITY COST
Podiums 2 $5600
Microphones 3 $420
Flip Chart/Stands 12 $2148
Portable Sound System 1 $3000
Overhead Projectors 2 $4000
Slide Projectors 2 $2400
Microphone Stands 6 $270
Microphone Desk Stands 6 $108
Wireless Microphones 2 $2000
Lavaliere Microphones 4 $1200
TV Monitor 2 $1400
VCR 2 $400
TV/VCR Stands 2 $1200
SUB-TOTAL $24,146
BUILT-IN ADDITIONAL A/V $55,854
TOTAL $80,000
TAX $6,880
GRAND TOTAL * $86,880
*The above audiovisual equipment will provide the minimum guest needs to outfit an
entry level Conference Center. We estimate an additional $55,000+would be necessary
to raise the audiovisual capabilities to a competitive level with other Conference Centers.
44
VI. Preliminary Architectural Diagram and Estimated
Build-Out Costs
Attached is the original letter from Columbia Hospitality with the recommendations for
the build-out and other comments for consideration when designing the building. In
addition,the cost estimates and diagram provided by GGLO are attached as well as the
letter of explanation from Jim Moore with GGLO.
Architectural Report and Build-Out
The architectural firm of GGLO was retained to develop an initial floor plan and build-
out cost estimates. They were asked to develop a plan that allowed for maximum
flexibility and maximum occupancy within the space within the existing shell of the
building. Our request outlined the need for a single meeting space able to accommodate
up to 200 people along with up to four break-out rooms. The space should also be able to
accommodate larger banquets for up to 400 or 500 and therefore, removable walls should
be used when possible.
Key elements of the design were the challenges of accommodating these requests and
creating areas for various support functions and staffing. The design, therefore, calls for
locating the administrative offices in a 1000 square foot mezzanine above the service end
of the building.
Other factors considered in the floor plan included the orientation of the building. Most
of the parking is oriented north of the building and therefore, the most logical entry/lobby
space is from the north. The public plaza is oriented toward to south, however and
would also make an attractive entry point. It has been decided that having an entry most
convenient for attendees is the most important aspect. Windows and double doors
opening out on the plaza can be incorporated into the building and will lend itself well for
banquets and meetings during the day.
GGLO used the preliminary cost estimates prepared by the City and others including the
Code Compliance Reports as a basis for their costing.
Total improvement costs, not including furniture Fixtures or equipment
are estimated at $2,328,445
45
•
•
COLUMBIA HOSPITALITY
Mr. Jim Moore
GGLO
1191 2nd Ave, Suite 1650
Seattle, WA 98101
RE: Renton Preliminary Study Results
Dear Jim:
Based on interviews with business, meeting venues and hotels in the city and surrounding
areas below are our recommendations for building out of the Pavilion Building: In
addition to these recommendations I will pass along the most prevalent comments for
consideration.
The build out should include a large space for auditorium style events. This space should
include a stage area. It should be able to hold more than 300 people, as that is the cut off
for the size of meetings which currently fit in Renton meeting space.
Windows and natural lighting are important. However, lighting also has to be subdued
when AV is required.
In addition, it will need at least four to ideally six break out rooms for the large space.
These rooms should hold from 20—60 people.
These rooms should be able to be used as individual meeting rooms as well.
These rooms should have the ability to adjust into larger rooms of 40,-60 and 100 with
the use of very sound proofed air walls.
Food service is important. The availability for a kitchen and/or foodservice prep areas
on site is important, however, they may not be used on a daily basis, so they need not be
too large.
Ideally, if all the walls from the break out rooms could be removed, a large banquet space
for up to 500 would be useful. There are currently no facilities in the Renton area that
hold up to 500 people for a banquet. There are only three on the Eastside that can
accommodate more than this. And there are about three in the SeaTac area.
•
High tech is essential. Audiovisual should include Internet access, computer hook up
availability, and appropriate lighting for these types of presentations.
The ambiance of the center should be warm but not pretentious or gaudy. There needs to
be a nice entrance/receiving area and small lobby with an area for guest services/copy
machine/fax and computer availability.
There needs to be space for at least four or five staff with storage space and space for
office and business machines.
There also needs to be storage space for chairs and tables.
We would have on-site possibly 600-700 chairs and conference and round tables to serve
up to the maximum which would fit into the large auditorium/banquet space.
Parking is essential. The general request is 1 parking stall per two attendees. If the
maximum meeting space can accommodate 500, then we would need 250 spaces at
minimum.
There should be easy access to serving stations. Probably at least two or three serving
stations might be considered (to refresh breaks, make coffee etc.).
Basically, we would want to provide the largest room possible,however, we want the
availability to break the building into other meeting spaces. So, air walls would be the
answer. They do need to be locked into a ceiling so that noise would not travel over top. F;
Can it be done with the available ceiling is the question! ;' -
This is preliminary information for you to get started, Jim. Thanks for you help!
Call me if you have questions.
l _J
- _ e ey A 'erg
Director of Sales and Marketing
Columbia Hospitality. k
206-269-4117
Stomberg@columbiahospitality.com
C1
r(Fk3
a'.
.t,
• .
.....,„:.. ,
. G GGLO,LLC
Architecture and Interior Design
1
1101 Second Avenue,Suite 1860
•
� �
(�' Seattle,Washington 98101 3426 .
f Telephone(206) 467-5828
Facsimile(206)467-0627
Ogglo@gglo.com
www.gglo.com
Preliminary Architectural Report
For The Adaptive Re-Use Of The
Pavilion Building
February 21, 2000 , ,
Introduction
GGLO has been working with Columbia Hospitality to determine the feasibility of . ,
rehabilitating the Pavilion Building at 233 Burnett Avenue South, Renton,for a
• banquet/meeting/exhibition facility.
The preliminary floor plan accompanying this report reflects our efforts to meet the
programmatic and technical requirements of the project within the existing shell.
Columbia Hospitality's report explains the functioning of the spaces.
Design Challenges
One of the key design challenges is to accommodate not only the requirements for
meeting facilities, but the various support functions as well. Given the desire to
maximize the potential revenue, and given the high structural ceilings, the current space
plan calls for locating administrative offices in a 1,000 square foot mezzanine above the
- service end of the building. •
i
Another challenge of this project is the relationship of the building to the site. Earlier
schemes developed for the Pavilion Building maintained a strong relationship between "' •�
the internal functions of the building and the public plaza to the south. This is certainly
understandable, considering the south orientation and the high quality and public nature.
of the improvements currently under way in the plaza.
However, considering the fact that most parking for users of the facility lies to the north,
and considering the importance of a clearly visible entry for users,we have oriented the
main entry to the north. This will also allow us to take advantage of the proposed
parking bay between the transit mall and the Pavilion Building. .
Preliminary Estimated Costs
We have reviewed the detailed cost estimated prepared by the City and others for
previous studies of the rehabilitation of the Pavilion Building. The Code Compliance
Report provided an estimate for shell and core improvements to bring the building up to
structural and energy code compliance, provide a new exterior skin, and provide
minimal interior improvements such as rest rooms. Though the specific improvements
may differ from those that will be eventually proposed, they were well documented and
provide a good basis for planning purposes.
lc,
GPreliminary Architectural Report
Pavilion Building
.." ! 1 February 21, 2000
T
.L_ O
Based on those previous estimates, the following is a rough, preliminary estimate of the
renovation costs represented by the enclosed plans:
Code Compliance Report $1,214,135
Scenarios 1 &2 simultaneously
, Included 15% contingency,NE fees,permits, sales tax
One Year Escalation (10%) $121,414
Tenant Improvement for Conference Center $992,896
Hard Costs $515,910
Allowances(front desk, operable partitions) $200,000
Subtotal $715,910
Contingency(15%) $107,387
Subtotal $823,297
NE Fees(12%) $98,796 .
Sales Tax(8.6%) $70,803
• TOTAL $2,328,445
Tenant Improvement costs do not include cost of furniture, fixtures, or equipment.
•
I 2 a 4 - g • I 7 I a • F a F 12 III 15 p 15 I 0 p alo to a 22 as 24 ,• •
• G
r,
N...7
u - u
-
_XP .
-.
T •
T
o _
... - _
GGLO
0,404•1444•/44mbe Pro.
. %Mal Mang.04.414,
a - .
um oar on.44...1
...........New-m•
- JUNE CM,MMES
-, *NMI m•aer
fr:i=
. ..=..
-
o
NL &1
.
o
../ & -
...
,
P P PAVILION
.
4-- . BUILDIING -
— .
•
o ---->- o
—4- II . '
.
-
•
_
"-- EN 11117ZI ATM NOM
E—5.7-7 r —.7-7 1110021212161107011
1 MI 1 1 1 1 1 i I I I i 1 SEMMEM Mil NM.MEM Mi.IA I— 7
I
1 i i 1 I i 111I 1111111111 • L'"9 .tr IF___I III - •• 5 MI - - " . • N sower,
- . 4 101011107 . .
..... I .... ..••••••
- MINIM
..... ....
•
1 • '' all 11161. 4RINIMM•1211
II : I LA iiii I _,i 1 lig 1. la ;07ZZolprounr
. .‘ ••••=11/1w
ia,41:ill 1,1111E1 - 11•74311110m•En
- -
I
I BAKE= iginvai., wim....
............
Man l'ORME.0,1
L ' • 1 250 50 FT 150.13212a21=g1 LA
:=0 50 PT L
'''.,:.='Mr •
ill is .
11(111,
III 1 13 -
31 . tess_Kat .___ ,,
ovical 11: ml
.
..,,,,... R *
x =midi=
.........-.-.......la lid Pill"
. ....
. .... , OFERAIELINALL......" 1111111111 =1•67
- •••4- I I
••••
I . I
I I
CiRCULA1105 .SERAGE EMII
. - .
A I
, ,, ILD'j. .
....... _
_ L E mow 2222021.122212
1:61 50 FT SISMIN2212
00 55 FT Risams2211
zamsorr BN71.1011.2021
CD 00 Fr 13102221.11221
NO 50 PT
E • .
• - -
. • ..- -
• ME 0F.-NO occupams I tA-b0 OCCIPANT5 I 200-ZO CCOPANIS . 65-.22 020.P/MS 60-AO OC.O.FAMS . ' - . .
. - • .AR1145TRANVE 0990.5 '
N
-' 111 ' . . .,.
..WOO 52 FT 11
• . 1.: -
:
•
_ .. _
. • I .
.
. • . . . . ._
42 E .
. .. - , . - .• . stasadascai t =ZS .1 , mwal.ii-_ia. xi RWRIIIII
- .
. I . . . .
, .
- .- • . I- . . . 56 50 FT 1 1.155 50 FT IC
- 1105PITALITT CO.NTER I .. '-- 1=•=11111
- • - I . - r•r-lt-7-=.1•_3_,._1_,..,,
• ISVERIVIDONSILL ' MIL = WAMINCET
01.1.111•SMEIC
- EA...
-. --/
- MIR. !MNN - !PREEMIE -- ' MIMIIMIR ' E1111151
. MERIIIILWIR_ mimomm••• •• -
M11212A11.221211
'(71, NiniiMiiiiiii....414:1110.1firailaTediki itiniiiiiiir WIAPIAllitaillaTA211114L*4140"""Al MM.. IMMIM".
- r I/M MiiiMENEWEIMMII NEM hin.iiiiiMai......ii.....Mir 4PAilkA..,epplikw— 1111"04tWM1.1111110111111IIIIIIIIIIIIIIIIIIIIIIIIIImmlaill.1111111111 _ lirm7INMNIIMI
,-,-..-•.,:11.4.1_,-,1-.1
maiMINIMMIEMMEMEMENIMEMEMMEMEMMIUMMEMBIIIIIMMIN, ,.#7P-Apro.-- immi nommemwrAmoi
- Nwstrammommosommomimiimmismimiimmir . ,d0Ogimmariittp -ws*SSVimilammomminumminumisammimeimmaimamismummir. iiiiNNII=
a • 11111111111111111111MIMMIRMIRCIMIIIIRMIRMONIIIIMIIIIIMMEW ‘4 e#0°-V I ril I I 111 III II ilf II 11 ell I/4 S**** INIMIRMIRNIIIIIIIIMIREIRMINIIIMMIIMMINIMMIIIMINNIIMIRIIIC g rrit-a.-7,... at_g__.•_-s__,,
. Ill•••••••••••••••••••••••••••••••••••••••••: •••MinT2=Mi
11.11111111=11
r
o - lir'
=1..M111.1=
- MINM104.••=
-
MI
----'--12...11.111.11111.
C , __,imiiiiimm.11/ 111.11111:111
)
.-- Miff DAIS PEN 21 2000
PREIRAINARY
) . . •
•
PRELIMINARY FLOOR PLAN •
. FLOOR PLAN
,
'
(ID •111.15551LS 4440
-... 4, ..... .
li if
.• . .
A I ....
, 1 A
.•
I •
VII. Five Year Proformas
A. Scenarios
As has been stated previously in this report, Columbia Hospitality has developed two
proformas. One five-year proforma assumes that Renton continues to invest in its
downtown infrastructure and that new businesses continues to locate in and around the
city. The second scenarios assumes that growth is relatively stagnant and no new
businesses locate in the city.
The aggressive scenario assumes the following:
a) Ample free parking is available,well marked and reserved for attendees of the
Pavilion Building. A minimum number of 150 parking stalls is assumed. An
optimum level of 200 is recommended. Another 100 spaces for banquet events need
to be nearby and available in the evenings. Parking needs to be clearly marked and
within one block of the building. Parking also needs to be located on no more than
two adjacent sides of the building. Clients will not have to drive to three or four
locations looking for potential parking spaces.
b) Costs associated with interest and debt service are not factored in the proforma
c) Decor of the building is current and in keeping with the competitors named in this
report.
d) A minimum of nine months and an optimum of 12 months is given for pre-opening
marketing, collateral development, sales efforts, FFE purchasing and staff hiring and
training.
e) A minimum of$40,000 is allocated for pre-opening marketing efforts not including
salaries and benefits. A minimum of 4% of gross revenue is allocated to marketing
each subsequent year. See the marketing plan section for clarification on marketing
expenses and direction.
f) Basic yet modern audiovisual equipment is built into the building such as electronic
screens and a sound system. Other basic audiovisual is onsite and available for use
such as flip charts,podiums, microphones, slide projectors and overhead projectors.
This equipment is included in the Conference Meeting Package and serves as a
marketing tool. Other types of audiovisual equipment can be rented and charges
passed along to the customer.
g) Sales staff is hired four to six months prior to opening to develop business
h) Renton continues to invest in its infrastructure. A growing base of business locates in
Renton and its economic vitality continues to develop. New hotels and office space
open and fill with significant business over the next two years.
50
The moderate five-year proforma assumes a revenue of growth of 4.5%to a maximum of
15.8%per year over the five-year proforma. Assumptions made under this scenario are
the following:
a) Parking is located in numerous areas around the building and is not dedicated to
conference attendees
b) Costs associated with interest and debt service are not factored in the proforma
c) Decor of the building is current and in keeping with the competitors named in this
report
d) A minimum of nine months is given for pre-opening marketing, collateral
development, sales efforts, FFE purchasing, staff hiring and training
e) A minimum of$40,000 is allocated for pre-opening marketing efforts not including
salaries and benefits
f) Audiovisual services within the building do not meet basic current needs of meeting
planners. All audiovisual equipment is rented from an outside source and charged
back to the meeting and event planners.
g) Sales staff is hired four to six months prior to opening for pre-selling space
h) Renton's infrastructure does not continue to grow. No significant new businesses are
located in Renton. Renton's economy, marketing image, and number of businesses
stays the same as current statistics indicate.
B. Additional statements and explanations about the proforma
1. All revenue sources indicate their percentage of total sales within the year.
2. The revenue difference between the aggressive growth pro-forma and the moderate
growth pro-forma over 5 years is $287,996. On the aggressive growth pro-forma
years two and three show a growth rate of 15-22%year on year. In the 4th and 5th
year the rate of growth moderates down to 4.9 -10.9%per year. The less aggressive
pro-forma shows revenue growth rates ranging from 4.5%to a maximum of 15.8%
year on year.
3. Cost of sales for food and beverage is listed in dollars and percentages. The total cost
of food and beverage sales is divided by the grand total sales which then shows a
lower overall cost than the individual costs associated with just food and beverage.
4. Direct expenses for Conference Services and Food and Beverage breakout labor and
Other Direct expenses separately.
51
5. Undistributed expenses break out payroll expenses and other expenses separately in
Marketing and A&G.
6. A separate statistics area was created to show conference meeting and
corporate/social attendee head-counts.
7. A grand total payroll and related expenses area are located in the area listed as
statistics.
8. Conference Service payroll growth in year 3 is a result of adding an additional inside
planner/salesperson. The reason for doing this is that we believe the sales/planning
workload will grow beyond the ability of one inside sales/planners capabilities. The
center has the capability to be running seven days a week. It is very likely it will be
consistently running at least six days a week. In addition, the projected continued
growth warrants keeping a well trained, consistent staff who are on site at all times
when guests are in the building.
9. Administration and General payroll expenses grow in year 3 &4 as a result of part-
time administrative and accounting support positions changing to full time to
facilitate the additional revenues.
10. Yearly wage reviews are calculated on 100%retention rate of all employees plus a
5%wage increase year on year for all positions. This may be a conservative stance
but we believe it to be prudent. We believe that the 5th year management staffing
level should be able to manage the proposed Conference Center up to the 9th year of
operation. This should significantly improve the GOP outlook.
11. In year four, the management fee changes to a minimum of$90,000 or 7%
whichever is greater. There are no other anticipated management fee increases.
Under different scenarios where a property were producing income, management
companies generally work with an incentive management fee in addition to a flat
management fee. In this pro-forma, no incentive management fee has been outlined,
however, under a long-term contract we would create this line.
C. Pre-opening expenses summary
Prior to operating, total expenses to open, market and staff the Pavilion Building are
estimated as follows:
Full Kitchen Staging Kitchen
Building improvement costs: $2,328,445 $ 2,328,445
Marketing/staffing/FFE mngmnt $ 185,580 $ 185,580
FFE $ 824,905 $ 759,235
Totals $3,338,930 $3,273,260
52
RENTON CONFERENCE CENTER
5 YEAR PRO-FORMA
(15%growth in 2nd&3rd year,5%growth in 4th&5th year
PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED
2001 2002 2003 2004 2005
MEETING ATTENDEES 11,500 13,225 15,121 15,872 16,661
CORP/SOCIAL ATTENDEES 14,675 17,466 22,622 22,622 22,622
REVENUE
CONFERENCE SERVICE PACKAGE 175,375 201,681 230,595 321,408 337,385
FOOD 574,850 661,240 842,197 883,918 928,018
BEVERAGE 49,732 96,526 149,852 157,103 164,946
MEETING ROOM RENTAL 13,800 15,870 18,145 19,046 19,993
AN RENTAL 16,573 19,059 21,791 22,874 24,011
BUSINESS CENTER 2,990 3,439 3,931 4,127 4,332
ALA CARTE MEETING ROOM REV. 26,136 30,057 34,366 36,073 37,866
OUTSIDE SERVICE 5,750 6,613 7,561 7,936 8,331
MISCELLANEOUS REVENUE 7,243 10,874 14,988 15,720 16,504
TOTAL GROSS REVENUE 872,449 1,045,358 1,323,427 1,468,205 1,541,386
COST OF SALES
FOOD 160,958 185,147 235,815 247,497 259,845
BEVERAGE 10,528 20,434 31,722 33,257 34,918
TOTAL COST OF SALES 171,486 205,581 267,537 280,754 294,763
DIRECT EXPENSES
CONFERENCE SERVICES P/R&RELATED 128,372 134,246 221,488 240,051 233,251
CONFERENCE SERVICES OTHER DIRECT 22,244 24,935 27,775 37,998 39,343
FOOD&BEVERAGE P/R&RELATED 288,155 343,012 375,763 433,952 467,169
FOOD&BEVERAGE OTHER DIRECT 56,137 56,198 72,210 75,638 87,115
TOTAL DIRECT EXPENSES 494,908 558,391 697,236 787,640 826,879
DEPARTMENT PROFIT 206,055 281,386 358,653 399,811 419,744
UNDISTRIBUTED OPERATING EXPENSES
PROPERTY OPERATION&MAINTENANCE 33,783 38,443 42,836 46,216 48,470
ENERGY COSTS 27,929 36,658 38,493 40,399 42,419
ADMINISTRATIVE&GENERAL EXPENSE 125,632 134,269 168,204 191,796 200,420
MARKETING EXPENSE 83,665 93,212 106,836 114,998 120,427
TOTAL UNDISTRIBUTED OPERATING EXPENSES 271,009 302,582 356,370 393,409 411,736
FIXED EXPENSES
GENERAL INSURANCE 24,000 25,200 26,400 27,600 28,800
MANAGEMENT FEE 61,071 73,175 92,640 102,774 107,897
GROSS OPERATING PROFIT (150,026) (119,571) (116,757) (123,972) (128,689)
CAP RESERVE(NOT FACTORED INTO GOP) 26,173 31,361 39,703 44,046 46,242
53
RENTON CONFERENCE CENTER
5 YEAR PRO-FORMA
(5%growth in year 2&3,4&5)
PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED
2001 2002 2003 2004 2005
MEETING ATTENDEES 11,500 12,075 12,674 13,339 14,547
CORP/SOCIAL ATTENDEES 14,675 17,466 22,622 22,622 22,622
REVENUE
CONFERENCE SERVICE PACKAGE 175,375 184,144 193,279 270,115 294,577
FOOD 574,850 570,442 677,603 697,110 751,928
BEVERAGE 49,732 79,300 102,404 107,448 112,009
MEETING ROOM RENTAL 13,800 14,490 15,209 16,007 17,456
AN RENTAL 16,573 17,402 18,265 19,223 20,964
BUSINESS CENTER 2,990 3,140 3,295 3,468 3,782
ALA CARTE MEETING ROOM REV. 26,136 27,443 28,805 30,316 33,061
OUTSIDE SERVICE 5,750 6,038 6,337 6,670 7,274
MISCELLANEOUS REVENUE 7,243 9,357 11,062 11,621 12,339
TOTAL GROSS REVENUE 872,449 911,755 1,056,258 1,161,978 1,253,390
COST OF SALES
FOOD 160,958 159,724 189,729 195,191 210,540
BEVERAGE 10,528 16,787 21,678 22,746 23,711
TOTAL COST OF SALES 171,486 176,511 211,407 217,937 234,251
DIRECT EXPENSES
CONFERENCE SERVICES FIR&RELATED 128,372 134,246 221,488 240,051 233,251
CONFERENCE SERVICES OTHER DIRECT 22,244 23,941 25,659 34,854 36,720
FOOD&BEVERAGE P/R&RELATED 288,155 316,829 325,592 375,127 407,804
FOOD&BEVERAGE OTHER DIRECT 56,137 48,869 58,534 60,141 70,968
TOTAL DIRECT EXPENSES 494,908 523,885 631,273 710,174 748,743
DEPARTMENT PROFIT 206,055 211,358 213,578 233,867 270,396
UNDISTRIBUTED OPERATING EXPENSES
PROPERTY OPERATION&MAINTENANCE 33,783 35,951 38,969 41,903 44,352
ENERGY COSTS 27,929 31,797 38,493 40,399 42,419
ADMINISTRATIVE&GENERAL EXPENSE 125,632 133,200 166,067 189,346 198,116
MARKETING EXPENSE 83,665 87,868 96,150 102,749 108,907
TOTAL UNDISTRIBUTED OPERATING EXPENSES 271,009 288,816 339,679 374,397 393,793
FIXED EXPENSES
GENERAL INSURANCE 24,000 25,200 26400 27,600 28,800
MANAGEMENT FEE 61,071 63,823 73,938 90,000 90,000
GROSS OPERATING PROFIT (150,026) (166,480) (226,439) (258,130) (242,198)
CAP RESERVE(NOT FACTORED INTO GOP) 26,173 27,353 31,688 34,859 37,602
54
VII. Columbia Hospitality Overview
Columbia Hospitality Company Background
Since 1980, co-founder of Columbia Resource Group (CRG), John Oppenheimer, and his
team have organized thousands of conferences and events in 35 countries and over 2000
conference centers and hotels across the United States. In 1995, Columbia Hospitality
was formed by John Oppenheimer and is now a major Pacific Northwest venue-
management and consulting company. Columbia Hospitality employs over 250 highly
energetic people in the Puget Sound region.
Distinguished Clientele
Columbia Hospitality is proud to manage distinctive properties renown for their
individuality,regional charm and superior guest experiences.
Columbia Hospitality successfully opened, and continues to operate, the only two
dedicated conference centers in Washington state: Bell Harbor International Conference
Center and Aljoya Conference Center of Seattle. In addition, Columbia Hospitality
opened and operates the World Trade Center Seattle. These highly acclaimed centers
have been the chosen conference sites for international leaders,presidents and prime
ministers, and for the business and social needs of Fortune 500 companies.
Columbia Hospitality also manages the Northwest Waterfront Inns and Resorts, a
collection of four luxury waterfront properties,each with unique personal character.
Critically acclaimed in Bon Appetit, Gourmet, Sunset, Conde Nast Traveler and Coastal
Living,Northwest Waterfront Inns and Resorts have hosted celebrities and guests from
around the world, and have endeared themselves to their communities as well.
In addition to managing this diverse group of Pacific Northwest properties, Columbia
Hospitality has done consulting work and produced various feasibility and market studies
for the Port of Seattle, the City of Bellevue, Stellar International, Center Point and Aljoya
Conference Center of Seattle.
In addition, Columbia Hospitality has prepared proformas and completed budget analyses
for projects in Leavenworth,Bainbridge Island, Kent, and Portland, Oregon.
55
Hospitality Management Services
With its staff of seasoned professionals, Columbia Hospitality has a work force
experienced in a wide variety of venue management and consulting services including
these areas:
Consulting& Pre-opening Ongoing Management
Market research & feasibility studies Sales &marketing
Economic impact analysis Operations management
Proformas Food &beverage management
Structural &interior FF&E requirements Conference services & operations
Image and collateral development Catering services &operations
Hiring &training of opening staff Complete HR services
Marketing plan development &implementation Expenses management
Grand opening event planning Public relations and promotions
Opening public relations and media coverage Accounting procedures & systems
56
Viewing Record
Title ACQUISITION, 233 BURNETT AV S/ADAMS/PICINI 97
Effective Date 10/17/1997 Created By User CC4
Date Entered 11/5/1997 Modified By User CMoya
Last Modified 4/23/2015
Scheduled Destroyed Date
Destruction Date
Narrative
10/17/97 - Offer to purchase agreements for property located at 233 Burnett Ave. So.
by City from Elizabeth J. Picini and from John W. Adams & Emily J. Adams.
10/31/97 -Addendum to above re: eminent domain; also Escrow Instr.
SEE ALSO: Acquisition-Sheridan; Deeds: 9711030509, 9711030510
4/24/2001 - Deed of Gift for household artifacts from the Hugh & Gertrude Adams
house, donated to Historical Museum
Keywords
ACQUISITION 97
AC-031
ADAMS JOHN W 97
PICINI ELIZABETH J 97
PIAZZA PROJECT 97
DOWNTOWN PUBLIC SQUARE 97
BURNETT AVS 97
ADAMS EMILY J 97
GOOD CHEVROLET 97
SOUND MAZDA.97
ADAMS HUGH & GERTRUDE 97
DEED OF GIFT 2001
HISTORICAL MUSEUM 2001
Location BANK Category
6/LASERFICHED
Viewing Record
Title ACQUISITION, PIAZZA/LAJOY - BIG 5 PARCEL 98
Effective Date 12/3/1997 Created By User CC4
Date Entered 4/24/1998 Modified By User CMoya
Last Modified 4/23/2015
Scheduled Destroyed Date
Destruction Date
Narrative
12/3/97 -Acquisition of property from Michael J & Mary LaJoy family, for transit hub as
part of piazza development PID # 569000105.
See Also: 9801120426 Warranty Deed
1/98 - Acquisition of 18 ft. strip from Big Five for purpose of traffic circulation, parking
and pedestrian use as part of piazza development, downtown Renton.
5/26/99 - Stipulated Judgment & Decree of Appropriation and Settlement Agreement
for city condemnation of strip of property owned by Big 5 Corp. at cost of$46,000; PID
000720014406 Recording # 9906020688
4/16/2012 - added copy of Permit Agreement (Seattle) Recording #8401061023
See Also: ORD 4713
Keywords
ACQUISITION 98
LAJOY MICHAEL J & MARY 98
PIAZZA 98
BIG FIVE 98
DOWNTOWN PUBLIC SQUARE 98
TRANSIT HUB 98
BIG 5 CORP 99
AC-031
MORRIS AV S 99
S 2ND ST 99
9906020688
GATEWAY 2012
Location BANK Category
6/LASERFICHED
Viewing Record
Title ACQUISITION, JASPER YOKEL & GRIMM/204 LOGAN AVE S 99
Effective Date 7/12/1999 Created By User CC4
Date Entered 3/10/2000 Modified By User CMoya
Last Modified 4/23/2015
Scheduled Destroyed Date
Destruction Date
Narrative
7/12/99 - Council approval of condemnation in Superior Court for acquisition of
property at 204 Logan Avenue South from Alvin John Yokel, John C. Grimm Jr., David
W. Grimm, Gary L. Grimm, Lorraine G. Jasper and Kristi Lee Grimm, for purposes of
public parking. $90,000. PID 5696000085
See Also: ORD 4787, Deed: 19991230000543
4/18/2000 - Purchase & Sale Agreement
Keywords
AC-031
PID 5696000085
204 LOGAN AVS 99
PIAZZA PROJECT 99
DOWNTOWN PUBLIC PARKING 99
JASPER LORRAINE G 99
GRIMM JOHN C 99
YOKEL ALVIN JOHN 99
•
Location BANK Category
6/LASERFICHED
Viewing Record
Title ACQUISITION, SHERIDAN/DOWNTOWN PUBLIC SQUARE 95
Effective Date 5/12/1995 Created By User CC5
Date Entered 5/22/1995 Modified By User SWeir
Last Modified 1/14/2016
Scheduled Destroyed Date
Destruction Date
Narrative
5/12/95 - Real Estate Purchase and Sale Agreement with Howard & Diane Sheridan in
the amount of$900,000 for five parcels in the downtown Renton area, at 528 S. 3rd
Street, 210 Morris Ave. South, 219, 233, 333 & 339 Burnett Ave. South, and 255 Logan
Ave. South.
See also: Good Chevrolet, Sound Mazda; ORD 4516
Rec# 9507071003 Statutory Warranty Deed, PH file regarding sale of 339 Burnett Ave.
Rec# 9507071004 Memorandum of Ground Lease (aka LAG-95-001)
12/7/98 - PH scheduled to consider surplus of property located at 339 Burnett Ave S.;
Surplus authorized by RES 3365
See Also: SA-99-068, LAG-95-001
Keywords
ACQUISITION 95
AC-031
BURNETT AVS 95
GOOD CHEVROLET 95
LOGAN AVS 95
MORRIS AV S 95
S 3RD ST 95
SHERIDAN HOWARD 95
SOUND MAZDA 95
DOWNTOWN PUBLIC SQUARE 95
GOOD PROPERTIES INC 95
SHERIDAN PROPERTIES 95
PIAZZA PROJECT 95
Location BANK Category
6/LASERFICHED
Viewing Record
Title ACQUISITION, SOUND MAZDA/BURNETT AV S/LYCETTE/BLUME 96
Effective Date 11/8/1996 Created By User CC5
Date Entered 11/8/1996 Modified By User CMoya
Last Modified 4/23/2015
Scheduled Destroyed Date
Destruction Date
Narrative
2/5/97 - Option to Purchase agreement from John P. Lycette, Jr. and University
Enterprises, Inc. to acquire property on Burnett Avenue South between S. 2nd Street
and S. 3rd Street adjacent to the Downtown Transit Center (formerly site of Sound
Mazda car dealership).
Includes: Policy of Title for property
See also: CAG-96-143, STATUTORY WARRANTY DEED 9705020406
- See Also: SA-99-068
Keywords
ACQUISITION 96
AC-031
PIAZZA 96
SOUND MAZDA 96
S2NDST96
S 3RD ST 96
LYCETTE JOHN P JR 96
UNIVERSITY ENTERPRISES 96
LYCETTE-BLUME 96
BURNETT AVS 96
BLUME 96
Location BANK Category
6/LASERFICHED
Viewing Record
Title ACQUISITION, WILLIAMS/HIATT & JASPER/603 S 2ND ST 99
Effective Date 7/12/1998 Created By User CC4
Date Entered 3/8/2000 Modified By User CMoya
Last Modified 4/23/2015
Scheduled Destroyed Date
Destruction Date
Narrative
7/12/99 - Council approval of condemnation in Superior Court of property for
acquisition on S. 2nd St. between Burnett & Logan from Gladys Hiatt and Thomas H.
Williams for purposes of public parking. (603 S. 2nd St. - former Sound Mazda used car
lot) $407,531.97 PID 5696000090
See Also: ORD 4787, CAG-00-071
See Also: Deed, SW 19991214001441
Keywords
AC-031
603 S 2ND ST 99
PIAZZA PROJECT 99
HIATT GLADYS 99
WILLIAMS THOMAS H 99
DOWNTOWN PUBLIC PARKING 99
SOUND MAZDA USED CAR LOT 99
Location BANK Category
6/LASERFICHED
P(AA
Pm( ) I
i)-/3-4009
. ..
0 'f
%.,/ 41
ti. CD
+ +wilL
1\TrV
.
Pavilion
z .. ... .. ,„..,,...x.,zrf
:,..7....1. 1,-V:"4.e,",, •
Building
4-4-,41.''.:-.1-'....''442:' ';',%r.1.4
,..,., .T4.%.7....:44''V '44'
4
• L.497,..,••••,41., ... -41-.*; ...„*.,,e2
A.,*-•"4';':-‘70.,..tiqWW$t/LI r..01,Z4. '4---3.'1,57i;-'-
!''' .I•g,-••-.;•-•.; '.;4%--s. ir*;.•""1-‘,.,1=:'..11--.. ;.U• i
..;,..s*,0 ..t' cill Li.7:6 ' ''jii'V Vv.:- (.4-its-lit%,
6.2iii.! *1.r,:;...-.1..,.,„ ifv,4,4v1,4;k:tiiti:0,,,:,,.1i . --;
.1..?Ilfir 7- •4:: C1'," ktrf, •:: ''''INixqi.::•:6.ark,-.t.kl• --fte...J•"-' 1-,-h iii I,v
.,..., .=4,-. f, ••• mi.,,,,i_._. 1 ' . . '
t—i—11 "t, '''''• ''
1-," ''
1}:=4t,t-,-.1.- 1_, „V,-- -1.--p.._m.,,,;,---— . , - ,,!'...-:.:2,7••• A
v•itylfx.,%,'' -1 'F-t--4,-- -7/.....'.'.,----.;-,-,--',1;:::::,.,-,-.ii 71111111 .1' ‘,1.•
','‘:,,1,_--i.- ,-1' 1.=.-..•''.4-'- ... .. t T LI'.1 It 11 111=1::'A -, -Itl''.; k•-;::-' ''''
p/Wit74.4.-2. `"— — 14 - . i 14:111±1.-•I- ,,,,- S-_,.:. -1" ,
1
:--Ji. ..... ,,,_....---- ,_ „4-. 11-14- — ------ ' ,.....Vt`•`,"'-*
..,14.0` ' ___ '-''' .- ----,,.....„4*---' i,j`7•TrtriY,.:•"7.7:...rw,;','''"'i"ti''t,hr31.n".4."'"W:.",,,.._I--tAId1„.,,,-:4,,-`—'--••"•'_•—:';-4-,-..,'.',..—",,-.-.•„•--.1.-.,=-'rY.9.r'..-4.-4,•"i.t..f...,.z4-..4..",",,,.“.,"'..4(,,,,'• N.41. 3.,..','.'.7'„.tr.,•,e:f-r........,..."7
._",.4..
' *r,:,,,• ' ''''N*.'.'•A';'''',,.'",..7:41,71 .V.tAz: *,,,-,-'"....tt:-
"":,%t.=—•,,,k--77,-''.";."',77' ..,t... i::'''. ',.47:-W;;-e 7$:::3,e4y,,t-43•494-,
x.,-4.&k-rt--;!,;.-;.,
..c.,* e
„..t tat,„,-,- ; ,...„.„.. ..,..,.-111-y..2,;.; ..z.„4„,..
;,i14z_iroV444,..", ,. ,,7rse ''' 1041
. %.i A. -4 ,,,,b ---r*Tirt•-3,4,4,t1/4`4.„*---,,, ..,,,,-ft..„ . ..,
' ' ''''''—'''''',1-' •11::•..-__ m"", ,.ej-c--;> :p3,.,
.....,,,,,..v,413
. 45.14.27
_.„7...:..ke..L""ead4,.....
,._•
Pavilion Building
Marketing Efforts
• Renovation completed April 2004
• Targeted primarily "anchor" restaurants or
other retail uses
• Goal - Draw people to downtown Renton
and generate energy in the area
Pavilion Building
Proposals from Potential Tenants
• "National Fitness Center"
• Shelby's Restaurant and Ice Creamery
& Shelby's Meeting and Banquet Facility
• International Museum of Carousel Art
(IMCA) — Carousel Museum
International Museum of
Carousel Art (IMCA)
• 501 (c)(3) non-profit educational
organization established in 1983
• Dedicated to the preservation, restoration
& exhibition of the world's antique
carousels & carousel related art
• Dream & assion of NW residents ext
Duane & Carol Perron — founders '=}
• www.carouselmuseum.org
Perron Family Carousel
Collection.
• "the largest, most comprehensive collection
of carousels & carousel art in the world"
• Includes nearly 1000
carousel animals &
g r
chariots, hundreds of
artifacts & 23 carousels M`
r e7 --
• Collection valued at over
$8 million
International Museum of
Carousel Art (IMCA)
•Operate a 6,000-sf carousel museum in
Hood River, OR established in 1999 — not
large enough for an operating carousel
jw r p "s 8 As`�.. +
i,, t iii i-e4' v .t a ,.
fit €}.it t r - S : i i
•s ,. 6
l
t4 f c ,j-'1, s
International Museum of
Carousel Art (IMCA).
■ Traveling exhibit with carousel displayed
in various cities, including Seattle at the
Pacific Science Center in 2003
The Magic of the Carousel z' ^
., (*.,----r- :•: . ' . j.f.w,,* tel r ROI MI C i
(6`, 1,,,'"--'V .,,,, ,-.-4.,„.;� �ry 4:!a td Sc,r..rra.tlet an
�{ �4}i.. y\'� i Y � Q �rif �h
c,,,,
'"
F �` c Special 3lcdia Previ<nIt
•
!� PACIFIC SCIEPICE CEN EW
"' A trav lmgexhibit :£..,.-' ,- r t.
Presenter!by the International Museum of Carousel Art ,It.-., lC_.c.i.L—a - - _-.:.,,,..t e!
•
•
•
aigi
s yS-+4''"�, sem':;�, tt^ �.,� p�. exp TTS k� 3i, w s4
T S_ me.y.M , "xw a'1 .ie rt A';F E� ` -4'.'-l',---•*.
..'l f 3• -.'.'[ �.+ ;;.: �
R� j0 - ,# • u r M # C ro,� , QL
0 yg• 5.e ,„04..il' •t ly11, •€f ;31 s a� .,�.w�.,a,• ,,,._._ ,""....mN x .i° ��.
.f ({'..r..
{
•
sr'
•
lt_ r r�'�i ' `r
%}#
tt
VA
'q t y " x •,, _ i R� `,as l ` 4%.2
Y t‘...-r'• ''. ( te -..,11.0......,............rt.......
N' L 3.r , -ti��hA 'o • a A ; " '.- .' } ' ix b 'raS �. clc.--ti , "'�.il + • s, - C. i s .AylqAi ,da' !...'%•...:
Q. ay `� • * ` �1 • i a $ ,O' ^ F'. 'Cvr^ „ fvf ` N r> t
14
•
Yrkst.K
•
, i` .s 't 3 A',..,..,&14",;,.711W.; , a i,�cr Lc�1 ', tn P7� , „” "" ! ( { 1F •t�'` -� y'twa "y pxj a s . ti Fxn� • `' 41 !�;' cd% ,h. ' yr�I i; rF .0 . , F4 -Y1l ' ¢1fi � 'X ,/`ry pco. } ., a,F7 _ t 9, t t— i _tt t, _
. N t
-c-
• ;�' •
t#K ,ler 1:'°[:";:.i .�at I' ''v r ,"E^"f .''t'r5.
�. r }.t,s �i "'!* { + A�tA• r '"f t ill7;+,iJ �� ',' 51 (Yj ^„ c_zgi.:;,,,,‘,;---ii,,,,,.:4.;...it.,,,
1 1`r.,,.• k u-M. \. s ✓ "s'
�. F},.: ld�#i"5't .{ 0,_.,..__004'''.--:;zMph t .s', a..a4.. ::::::::„., „'„..*:..
( ° .+ .'„
1
Mw...Ji' - D—" �y��' `r : Y' a
Ivf
t" �g "f ' � '' I t s ?{, K`&
• \*;}
y C 'S�„-.fq'. ` '�:�e ...) •?i .y . ‘-',,,5
41'...;,,,(4,4,......., �.t
"44
3.r.-----44.
.p '' ''._41:-"......4.IT ' k ^° } '� T Ate' �I
Operating Carousels
- t ,.. ,, t7,„-:.,..+.,.._ �� 3t .Trp•
r, 2 '*'G,V., {,1 • 1'`wii,r 6 '."1'
4 Olkit+�. Y'"rCY n�,. .'
" o Kii"� t • � ipit -4 rq ` .I ^ F ,
{ ; j?s3,,,, ba e yy � ""J -"Ie '"
ttf _ 1+�• a
'a .-1 •-E.y
Y
<-m s,« „L:.'� 1.' • r"zr�- n3 h, -r y7 7•'''''''.. .'"' .w, A"- ,q
II" qs'rS t y4,1 =h3 y j?'",ii t
f tt6l�r" cz
t3 f i e�R .
Potential Carousel Museum
at Pavilion Building
■ Many prospective tenants noted limitations
of current downtown Renton marketplace
for targeted retail uses
• Carousel museum is a unique opportunity
to utilize building for a potential regional
attraction
• IMCA likes the opportunity to achieve a
permanent home for its core collection in a
densely populated urban area near Seattle
Overview of Potential
Carousel Museum
■ IMCA proposes to lease the entire Pavilion
Building for 10 years withoptions for 20
more years
• Within the building, the area would include
two general areas:
• The museum portion
• The carousel area
Potential Building Layout
for Carousel Museum
PAI(D MID R11URE
EXPANSICN
ACTIVITY AGTINTY MEN LOBBY 0101'1ETl ACTIVITY ACTIVITY'
R.VVI n ROOM 4 ROOM Ti ROOM M
p15P1 AY DISPLA7 I ' DISPLAY DISPLAY I I DISPLAY
DI Y DISPL Y
kiLli
QaN 4
a 11175E101
` p DISPLAY
ACHY t�LUTCN � 26
41I
'` E'"' eY
RENTON CAROUSEL CENTER PIAZZA PARK
RENTON WA
Targeted Audiences &
Projected Attendance
■ The proposed carousel museum caters to
two basic audiences:
• The first group is interested in children
• The second group is interested in carousels
■ 3rd year attendance projections range from
123K to 146K per year, depending upon
which financial model is used for the
operation
Potential Deal Structure
for Carouser Museum
Conceptual business plan includes a rent
structure based on a tiered percentage of
the annual gross income (AGI):
.Beginning with no rent for the first$100K of AGI
.15% rent on the next$1 00K of AGI
.20% rent on the next$100K of AGI
.25% rent on anything over$300K of AGI
Tenant Improvements &
Pre-Opening Expenses
Depending upon the financial model, the
amount of funds contributed by the IMCA &
the success of other fundraising, the City-paid
portion of the TI & other pre-opening
expenses could run between $150K & $500K
.Tenant improvements include modifying the floor to
support the carousel, lighting & security improvements &
the.build out of office & birthday party room spaces, a
ticket counter, food & gift areas & a catering prep area
.Pre-opening expenses include IMCA staffing &
• marketing costs, plus exhibit lighting, staging & signage
Rent & TI Comparisons
with Other Proposals
■ The "National Fitness Center" proposed '$16.00/sf
($153K/year) for rent & "Shelby's".proposed no
rent for the first two years, $12.00/sf for the 3rd
year ($115K/year) & 5% of total sales when sales
reach $2.5 million ($125K+/year rent)
■ Over the first five years, average rent for the
carousel museum would range from $83K to
$108K per year versus $69K for "Shelby's"
■ The "National Fitness Center" proposed $250K in
City-paid tenant improvements & "Shelby's"
projected $600K to $1.2 million in City-paid TI
versus $150K to $500K for the carousel museum
Benefits of Carousel
Museum
• Unique opportunity for a public-oriented use that
has the potential to draw people to downtown
Renton from throughout the Puget Sound region
& beyond
• The carousel art builds on Renton's craftsman
history & adds to the entertainment opportunities
&collectibles theme in downtown Renton
• The carousel museum would also utilize & benefit
from the expansive open architectural style of the
Pavilion Building
Conclusion
■ Although the City would need to contribute funds
for tenant improvements, the economics of the
carousel museum are comparable to or better
than other potential deals for targeted uses
• Consequently, the Administration plans to
negotiate a lease with the IMCA to use the
Pavilion Building for a carousel museum
• The lease will be subject to the review and
approval by the City Council
• If the City can come to an agreement with IMCA,
the goal would be to have the carousel museum
open at the Pavilion Building by summer 2005
Daniel Clawson - Re: Pavilion Building Page 1
From: Daniel Clawson
To: DLaw@ci.renton.wa.us
Date: Mon, Aug 16, 2004 3:35 PM
Subject: Re: Pavilion Building
Denis,
I agree that we should look into hiring a broker who knows local conditions and possible lessees. We can
discuss at emerging issues.
Dan
>>> Denis Law 08/12/04 10:12 AM >>>
Dear Colleagues,
During the open house at the Pavilion Building yesterday, an attendee, who I assume is in the commercial
real estate business, asked a question why we haven't listed this building with a broker. Marcie Maxwell
later commented to me that not having a broker is like trying to sell your home on your own in hopes of
reducing sales costs, which rarely is successful. Since we are anxious to find a good tenant for this site as
soon as possible, and we are spending a lot deal of money in the form of staff time and marketing efforts,
it might be time to list this building with a broker with strong regional connections. At the very least, this will
likely provide us with some additional options to consider.
Just a thought for your consideration
Denis
MEMORANDUM
(ED
rLL
.111‘
x ECE1VED
CITY OF RENTON JUN X 4. IJti
COMMUNITY SERVICES
FENTONC9TY UNCII_
0 Committed to Enriching Lives 0
GUY OF RENTON
TO: Don Persson, Council President
AUG 1 6 2004
RECEIVED Renton City Councilmembers CITY CLERK'S OFFICE
VIA: r--0) Kathy Keolker-Wheeler, Mayor1
FROM: Dennis Culp, Community Services Administrator IS"Kvkm,
r
SUBJECT: Update on Pavilion Costs
DATE: June 23, 2004
PURPOSE:
This memorandum provides Councilmembers with an update on the total funds spent on
the Pavilion. This total does not include normal operations and maintenance activities
that are funded from operating accounts.
BACKGROUND:
• The attached memoranda to Council (dated November 25, 2002; September
17, 2001; and July 2, 2001) identify a total of$328,414.80 spent on the
Pavilion building as of November 25, 2002.
• Included in the above amount is $39,648.63 from project funds to renovate the
building.
• In addition to the above expenditures,the City will end up spending:
➢ $2,774,236.92 ($2,813,885.55,project cost minus $39,648.63 accounted
for above) for the renovation itself.
➢ $2,083.00 for Tenant improvement related conduit work.
➢ The cost of the land purchase, by Council memo dated January 8, 2001,
was approximately$230,000. An exact figure is not possible since the
cost of the Pavilion property was subsumed in the purchase of several
parcels.
• The total spent on the Pavilion,therefore, is $3,330,000 (rounding off)
• The square footage in the Pavilion is 9,000 sf under the roof and the 2,000 sf
on the patio.
Attachments
•s •
Y
,�°+ Community Services Department • Facilities Division
•DATE: November 25, 2002
TO: Toni Nelson, Council President
Renton City Councilme ► . •
VIA: Jesse Tanner, Mayor
c
FROM: James Shepherd, Commu ty Services Administrato t'
STAFF: Dennis Culp,Facilities Director,x6606
SUBJECT: Update on Pavilion Costs
PURPOSE:
This memorandum responds to Councilmember Kathy Keolker-Wheeler's request for an update on the
funds spent to date on the Pavilion.
BACKGROUND:
• In addition to the funds identified in the memorandum to Council, dated September 17,2001
(copy attached),the Administration has spent funds for the following Pavilion work:
> Three studies were undertaken in an effort to determine a commercial use for the g;
facility. The Retail Group use study at$36,794.00;the Columbia Hospitality Study at
33,861.00; and the Terranomics Building use study at$3,500.00.
> To finish the earthquake-related work,we spent an additional$4,068.90 from the 502
Fund.
> To prepare the building for the Farmer's Market,staff spent$6,746.86 from the 316
Fund. This work made the doors operable,spot-painted the exterior,repaired some
windows,and made access ramps.
> In April,2002 the Administration spent$22,905.41 from the non-departmental account
of the General fund on a feasibility study that supported the decision to renovate the
Pavilion.
> To date,we have paid$39,648.63 for design and engineering services related to the
Pavilion Renovation Project. The 316 Fund account for the Pavilion is used for this
purpose per authorization by Council action on October 21,2002. These are the only
expenditures to date from the $2.3 million originally appropriated for the Pavilion
project.
• The current total expended on the Pavilion from all fund sources is $328,414.80.
• We have not included in this update any funds spent on activities that occurred at or near the
Pavilion. This report is limited to studies,engineering,design,and construction related to
physical building changes.
•
CITY OF RENTON
MEMORANDUM
DATE: September 17,2001
TO: Dan Clawson,Council President
City Council Members
VIA: �•
Mayor Jesse Tanner
FROM: Jim Shepherd,Community Services Administrator
STAFF CONTACT: Dennis Culp,x6606
SUBJECT: Pavilion Building Costs to Date,LOG #0105 -
The purpose of this memorandum is to inform the City Council of the funds spent to date on the Pavilion
building. This total does not include the original purchase price of the property since the Pavilion site
itself was part of a larger property purchase.
DESCRIPTION COST
EARTHQUAKE RELATED WORK
Initial engineering assessment of structural stability 789
Initial earthquake repairs to remove wing walls and some parapet 19,371
Engineering to redesign gutter system 1,641
Bid price to complete parapet repairs • 20,563
SUB TOTAL __ S42,364*
• Note the Earthquake repairs costs are less than estimated in memo to Council,dated July 2,
2001 (copy attached).The engineering to re-design the gutter system cost less than expected and the
competitively bid repair work was less than estimated($20,563 versus$37,507).
PRE 1999 CONSTRUCTION WORK
Asbestos Abatement 3,500
Vehicle lift and contaminated soil removal 64,256
Repair/replace concrete floor 7,185
Sewer and water extensions 7,737
Interior building cleanup 6,293
Structural improvements 4,339
Electric service for police security 3,474
Roof repair 21,720
Exterior painting 8,880
SUB TOTAL S127,384**
** A large portion of this work was identified by Level II environmental assessment that the City
performed before the property was purchased. The city negotiated a lower purchase price for the
property to offset some of these costs.
CITY OF RENTON
MEMORANDUM
DATE: July 2, 2001
TO: Dan Clawson, Council President
City Council Members
VIA: Mayor Jesse Tanne�� n.
FROM: Jim Shepherd, Comm ity Services Administratgr
STAFF CONTACT: Dennis Culp,x6606
SUBJECT: Pavilion Earthquake Repair Costs, LOG# 6-C
The purpose of this memorandum is to inform the City Council the current status of earthquake
repair costs to the Pavilion building.
BACKGROUND:
• Council memorandum,dated June 18,2001,Subject:Pavilion Earthquake Repairs,informed
the council of actions underway to repair the Pavilion. Repair costs were not included in this
earlier memo since we were still deciding to replace or repair the gutter system. We have
decided it is more cost effective to repair the gutter system.
• Cost of repairs.
➢ Remove wing walls,planters, &3 rows of parapet bricks $17,188
> Remove remaining 5 rows of parapet bricks $9,737*
➢ Engineering to re-design gutter system $2,500
Repair gutter system(cheaper than replacing system) $27,770*
Total Repairs $57,195
* We have delayed the start of these two repair projects pending a decision of whether the
Pavilion building will be renovated or torn down to accommodate development at that site.
• Source of funds
➢ The 502 insurance fund is being used to pay for earthquake repair work while we await re-
imbursement from FEMA and others. Any rc-imbursements received are placed in the 502
Fund.
➢ FEMA is expected to pay 75%v of the cost of repairs. They will also consider allowing us to
apply the cost of repairs to building demolition,provided the state accepts demolition as an
alternative solution to building repair.
➢ In past disasters where FEMA funds were involved,the state also contributed 12.5%of the
cost of repair. For the Nisqually Earthquake the state has not yet made any determination
concerning state funding.
➢ WCIA insurance pool has limited funds to allocate to the pavilion project, and we are
submitting the project for funding consideration.
➢ If any residual funds are required, the 502 Fund absorbs the loss.
• The$2.3 Million currently authorized for a Pavilion project will not be used to fund
earthquake repairs.
ti-
-
CONSULTING SERVICES
Engineering consultants for code compliance report 4,424
CJA cost estimate report-1998 4,993
CJA cost estimate update - 2001 1,725
SUB TOTAL $11,142
TOTAL CONSTRUCTION AND ENGINEERING FUNDS
SPENT TO DATE ON THE PAVILION BUILDING $180,890
As the Council knows,there is also a proposal from CENTEX to develop the site. The Administration
has been talking with CENTEX since early August about the possibilities of developing the site into a
new,mixed-use facility. Any actual development work on site,however,would not start for at least six
months,if at all,because of CENTEX's due diligence requirements. Since the building is currently
unsafe,the Administration felt it was necessary to complete the repairs in order to remove the fencing and
the building's"Red Tag".
RECEIVED
AUG 1 6 2004
CITY OF RENTON �E1�i't•CN�Crt'Y�UNC�
ECONOMIC DEVELOPMENT, NEIGHBORHOOD
AND STRATEGIC PLANNING DEPARTMENT
MEMORANDUM c1TY OF RENTON
QU6 6 2044
REcElvt° F1cE
DATE: August 16, 2004 CITY CLERK S
TO: Don Persson, Council President
Members of the Renton City Council
VIA: Mayor Kathy Keolker-Wheeler r
FROM: Alex Pietsch, Administrator poke
Economic Development, Neighborhoods,
and Strategic Planning Department
SUBJECT: PAVILION BUILDING MARKETING STRATEGIES
The following memorandum is an outline of the Administration's strategy related to the leasing
of the Pavilion Building and recommendations on how the City may proceed if current efforts
prove unsuccessful.
Potential Users
EDNSP has been working in earnest since April (when renovation was completed) to identify
and contact potential tenants to lease space in the Pavilion Building. Staff has attempted to
focus on "anchors" for the space (i.e., those that can use 40% or more)rather than spend time
on smaller tenants. Pursuing the latter would take an inordinate amount of time and would be
inefficient. For example, while the terms of a deal may not be as complicated, it would likely
take a similar amount of time to negotiate a lease with a 500-square foot tenant as it would a
5,000-square foot tenant. And, even if we were successful at securing a deal with the smaller
user, the building would still lack a theme and sense of direction. Once an anchor is secured,
remaining space (if any) would be marketed to compatible smaller tenants.
The primary focus has been on destination restaurants and other retail uses that would draw
people to downtown Renton and generate energy in the area. A secondary goal would be to
provide amenities to the people who are and will be living in downtown Renton as more
residential projects move forward.
Staff has had discussions with several potential parties interested in utilizing the building as
private exhibition and meeting space. While the Administration is open to discussing it, the
event space concept has not been a preferred use due to the lack of regular activity in the space
(one of the users suggested 130 events per year), the private nature of events, etc. However, if
current strategies are unsuccessful, we may look at this option more closely. Additionally,
there has been some community interest in establishing a collection of smaller food-oriented
August 16,2004
Page 2
shops (e.g. Pike Place Market or Granville Island). To date, the proponents of these concepts
have not provided the Administration with a proposal on how such an operation would be
managed or how a lease might be structured.
As of last week, EDNSP has contacted more than 100 potential tenants (see attached matrix)
since renovation was completed. Staff has toured the renovated building with 13. Of those,
staff continues to work with roughly half to determine if the Pavilion Building is an appropriate
for their use. If and when discussions with these users moves forward positively, staff will
bring them to the City Council for consideration.
Rent
Per City Council's direction, Staff has been pursuing a "market rate" deal. The Council has
expressed concern about undercutting other private landowners in the area. The question that
then arises is, "What is market rate in Renton?" Current asking rent for new or newly
renovated space in downtown Renton (e.g. Metropolitan Place and the Norwest Financial
Building) is $18 to $20 per square foot per year triple net (e.g.,not including expenses such as
utilities, insurance, etc). Current asking rent in older space downtown is approximately
$12/sf/yr NNN. As is clear by the number of empty storefronts in the area, there is significant
vacancy at those rates in both building types.
Meanwhile, area landowners realize that the Pavilion Building is different than other available
space in downtown Renton. Several, including Don Dally, Armondo Pavone, and Kimberly
Searing, have stated that they are less concerned about the terms of a deal as they are with
getting a high-quality tenant in the building. There is a real concern from property owners
about the City giving below-market deals to businesses that would directly compete with
existing downtown businesses.
Staff's approach has been to pursue rent within the range of current market rates in Renton, but
not preclude a deal with an attractive potential user who would prefer a below market rate or a
percentage rent structure (e.g., the user agrees to pay a lower or even no base rent, then pay a
percentage of gross receipts).
Tenant Improvements (TIs)
The higher the rent (and, the more attractive the user, generally), the more the City should
expect to have to pay to improve the space for a tenant. It is common practice for landlords to
contribute a portion of the cost of the TIs. For example, the restaurant Palomino was given $1
million toward its build out at the US Bank Center in downtown Seattle. Ruth's Chris Steak
House was given $750,000 in its more recent deal with Bellevue Square. Generally, a user will
expect to receive a TI allowance in the$10 to $20/sf range. With the unique nature of the
Pavilion Building and the City's desire to attract a top-notch tenant, it is conceivable that the
City will be asked to contribute in excess of these rates.
Staff has offered flexibility on this topic in its discussions with potential users. As has been the
practice at the 200 Mill Building, the City has made improvements for tenants and recouped
that amount from the tenant over the term of the lease. It is likely that a similar deal structure
would be pursued with the Pavilion Building with the added likelihood of a non-recoupable TI
allowance contribution.
August 16, 2004
Page 3
Real Estate Brokerage Services
To date, the Administration has not retained a commercial real estate broker to market space in
the Pavilion Building. This decision was made after carefully evaluating the City's experience
with brokers and the Pavilion Building in the past. Given the unique nature of the Pavilion
Building, the flexibility the City has in regard to the structure of a potential lease, and the
restrictions that have been set on the type of use, the Administration believes that a broker will
add little value to our search and would most likely become quickly frustrated with the City.
A broker's motivation will be to secure potential tenants for the space as quickly as possible.
To do that, he/she will need to know the parameters within which a deal may be acceptable to
the City. With our current flexibility and the complexity of all the issues previously discussed,
those parameters have been difficult to nail down. Further, a broker may identify tenant(s) that
may meet the financial aspects of a deal, but not be acceptable to the City Council. For
example, a broker might identify an auto parts store that is eager to use the building and is
willing to pay market rent and require little or no TI. That type of retailer is not what the
Administration, nor the City Council, have envisioned for the property, yet the broker will feel
as if he/she has completed their job. Depending of the structure of the brokerage contract, the
broker may even expect to be paid for bringing that user to the City, even if the offer is cast
aside as unacceptable.
A secondary consideration related to retaining a broker is cost. The standard broker
commission on a 10-year retail deal in the Puget Sound area is equal to 6% of the value of the •
first five years of the lease and 3% of the second five years. Thus, a 10,000 square foot lease at
$20/sf, would require a$90,000 commission.
Staff has consulted with and received assistance from several real estate professionals in
developing its leasingstrategy for the Pavilion Building already. We intend to bring on a
broker on an hourly contract basis to assist us with structuring the terms of a lease, when we get
to that point.
Timing
Staff has been working hard to find tenants to use the Pavilion Building as soon as possible.
However, even if a suitable interested tenant emerged today, it would likely take at least four to
six months for that user to come to terms with the City, make its TIs, and be open for business.
It is the Administration's goal to have the building open for use by Summer 2005 or sooner.
If we have not been able to come to terms with any users prior to the end of October, or if a
user(s) is in negotiations or has the building under contract but is not able to begin its TI work
by that time, the Administration will recommend that the building be utilized for community
holiday functions this year. At that time, the Administration will pursue additional use types
including the possibility of public or private event space.
Attachment
cc: Jay Covington
Dennis Culp
Ben Wolters
Mark Santos-Johnson
Pavilion Building
Potential Anchor Tenant Targets-Status Report
August 16,2004
Not
Interested in Interested in
Interested in Other Toured No Expansion Expanding in
Pavilion Opportunities Pavilion Plans at this Renton at Still Exploring
Entity Building in Renton Building Time this Time Potential Interest
DEVELOPER
,'RpnShaii'MetrcvatiC.h.: ' - 7 .. `7'; A
2 Jack Alhadeff,JDA Group LLC X
l'73° Keii`Alhadeff Alhadeff CcimpanleS7' - • 777-- • • 7 (FilierioVal On) " X
4 Bob Parks,TRF Pacific,Inc. X (pre-renovation)
S Melvyn Poll,'Poll 1M/est-tents(owner of Alto Market) : ,
6 Darrell Vange,Ravenhurst Development,Inc.(see Historic Carousels,Inc.below) X X _
'Kurt baMraarar;Sugar„,M0irjtain,Capita1(oWner of FaSta,&-Ca.and Beecher's , - :' , - ,;•.; " " • • „
',HOiTjmade 0166"sertijdf.iciCichoider.6f15yraTid.bieries ':" '‘: • '"' ?-; ' ''',"
8 Al Copeland,Al Copeland Investments X
RESTAURANT/BREW PUB
r9 mcftigh's 136-steurarits(F XMcRbrO;LesOhi,Lakecafe;T.S.4McHugh't) . ,possibly jjer- : to bescheduled - ' ' 7 ' ,
10 McMenamins
. - —r" X
Schwartz
(Daniels Broiler Chandler's Crabhciuse Spazio - ' - — • '"
11,"Atriin Cate Piazza'lialian " " • -
12 Jak's Grill X scheduled
X : ; , ' "1 7-7'
14 Tutta Bella Neapolitan Pizzeria(former Salumeria on Hudson) possibly later to be scheduled
115''"Old Spaghetti FactorYtriteinatioriar. ." , • - • „ - „,.". '
16 Chili's Grill&Bar X
" -77 777 77777777 X-7"7777777-+ `,,777.71777777:777n-1
18 California Pizza Kitchen,Inc. X
Canyoris.Restaurant,,„„• r;:'y - •, „ _X 77:1,,Spre=reriovatibfl)". , ' „
Chow Restaurant Group(Chow Foods-The 5 Spot,Coastal Kitchen,Atlas Foods
20 &The Jitterbug) X
Consolidated Restaurants(Metropolitan GnU Elbotts Oyster House Union Square
21Gnll DC s Gnu Steamers Seafood:Cafes'.SidiiiiidjeavChartliilled Burgers) ',
22 Portland Brewing CompanyX
42777
24 Tom Douglas Restaurants(Dahlia Lounge,Etta's Seafood,Palace Kitchen) possibly later X -
D5_,I.Mitchelli.:Farhily Restabrali'ffraltOiliTVIitChelli,ttell,A.Tr"attiiri6y L X XL . ' A
26 Circa(Grill&Alehouse-West Seattle) X
, x TJ
28 Ruby's Diner(Redmond,Woodinville,Alderwood Mall) X
;77°Z.7777.17, 7.; 77:7777:77
•
30 Pyramid Breweries X
31 actus(Madison ParKXlriciancl) „X
32 Sam's Sushi(Queen Anne) X
1A4MCCOritlief&Safirnick's.(Saifood;Fish,111aUleikBar,WirtgaCafe:at Museum of 77717777777, ' ,Y;
34 Pike Place Brewery X
L35-;filitiaC SuShi ' . ".1.„; possibly,later; t ,bescheule'dj.:1
Page 1 of 3
Not
Interested in Interested in
Interested in Other Toured No Expansion Expanding in
Pavilion Opportunities Pavilion Plans at this Renton at Still Exploring
Entity Building in Renton Building Time this Time Potential Interest
RESTAURANT/BREW PUB(continued)
36 Big Time Brewery&Alehouse
3Pagliaccl Pizza ; ..... ; .
38 Elliott Bay Brewery
r39:,Red RobiriGOiirinelBurgerS ;; X
40 Elysian Breweryu
HaJesAIeBrew
ryub
42 Souplantation&Sweet Tomatoes , X
F3 Gene 7Tr: : '7777,7 :1'.„ 7:777:7;.YX' 7.757.7. 7777 '7,7777:771
44 Armondo Pavone-Armondo's X
CciKsoligaiecfReitauraii.Operations(d b a The S'a hetti WarOhOUSe',EI Chico ' • .
L45 Good Eats barifine:(0.te-do;liuciDr's Care,tetd.y,• 1:";'-- : , ; , -„ X
46 Larry Dixon-°Unspecified Restaurant"
P47 Kahl Internationg(The Rain STenaTiiiiiiretc „J.:. X
Restaurants Unlimited Inc.(d.b.a.Cutters Bayhouse,Palisade,Palomino, X
48 Kincaid's,etc.)
49, Trie.TDL Group Ltodjthb,as:Tim Hortons) _ '
Mackay Restaurant Group(d.b.a.El Gaucho,Waterfront Seafood Grill,Troiani& X
50 Rippe's) . ,
51 Collins Pub : — ; '77777', X X 7,
52 Gordon Biersch Brewery Restaurant Group,Inc.
F53:14OCI7Tortom Restaurariti iri"c".77- :" " 7 17777 ________________
x777:77771
54 I Love Sushi X
,71;ArirriFi6-0igiiptsATIAC (a151:§110ii'llina3° 777 ; , , 7716WiciRiiiiCE : 77:
: r : ' 1
56 Wasabi Bistro
57 I-lana Restaurant s - , ,,;, 4 •, X
58 Mashiko
a 7,-67 7, :7777_ :7-777 7777771
60 Azuma Sushi
[61,:'!KAL16"dthi'0 '4; "
La Hacienda Mexican Restaurant X to be scheduled
62
63 Potential ' ^
Holland Restaurant(d.b.a.Burgerville U.S.A.,Beaches and Noodlinrestaurants)
64
;The Ivre'lting PO17-7„, : X
66 Monchu Wok
Orin;Planet SmoothKMArr4 Fu s :%; ' '
, , : ; „ ,
68 White S.ot Restaurants
69-,,yjou6tainMike*Pizz4.066taprApt 4! „_ 'ss
70 Chicago Pizza&Brewery X
771 APPletibi'CNOTO:borhtiOd Grill&Bar-7-77 77-,7 ‘7,77.77 7.77-77 7:7777 —Y(7777:77721
Page 2 of 3
...
Not -
Interested in " Interested in
Interested in Other Toured No Expansion Expanding in
Pavilion Opportunities Pavilion Plans at this Renton at Still Exploring
Entity Building in Renton Building Time this Time Potential Interest
GROCERY/FOOD •
72 Trader Joe's X
C773 PCC Natural Markets
.;.„
74 City Fish Co, X X
78 Pasta'&OPT;7:77:777:71,7i-, . :7--77-:,7:7piiiiii?Jitier :.: ' 1 7 7, '-7- '777 :77777CCE'''"
76 Madison Market Central Co-op X
„ „
1777 metropotan makket:'-,,' ,,: , " :-, " , ,....,, " : ,, - i, ,,;y, ;.,...:,, , : ;:::: /.:
78 Uwajimaya X
77777 7]
80 Beecher's Handmade Cheese X
7e-17ik.7670 baidoTI:'Pbfei-itEal Year Round Produce Market 777"' ":;77: ,.::::.2-2- :„ X Ipse-ren9vatio„91 „ ,,
82 Delaurenti Specialty Food Markets X
,...,.
F Efd7:6 re-at Harvest Bread CompanytCompany „.;:Possibly later:: possibly later . . ;-';X : • ' ' 2
; ,,,11:72+, - :
84 Wild Oats Markets Inc.(d.b.a.Wild Oats Markets,Sunshine Markets,Sun Harvest,
Beans&Things,People's Market&Uptown Whole Foods) X
BOOKSTORE
rkThinfPlaceBooks ,-
' , ,
... ,
„ „ : .,- LI
86 Borders Books X
07,,'Uniyersity,Bookstora_77,----”,_,
DRUG STORE
88 Bartell Drugs X
MUSIC/ARTS/ENTERTAINMENT/RECREATION
89 Easy:,Stre61FiedOidi(Ballarct,West Seattle Lower Queen Anne) ,,
: X:
90 Cellophane Square(Records) X
...
92 Seattle Art Supply X
66 Jiiiiailli birligiii club ' ' ';';,7,:: , 7 :' '' : ' ' ''''':' )f7
94 Belltown Billiards X
'777'
96 Gregg's Greenlake Cycle X
977"'Hiitorio CarouselS,'Inc.--",,B7, :7 2: .7-,, , „;,..;" „,'--,: 6-_-, ''7,'7,:,'7,:z.:-,,,,, 7 :':E,f, 1 4,, , . ,:' %:: ,,L', " k;<"' ;..'/':, , ' ::I,, - ;;„7 ; .A.:. i ;‘,,..
98 World Stage Ministries X
x ;;-- 7, ,. "7' ' -,;x,::,-,: , :, '77. , 7 :: ::,,',;n - r; :,;; ;,,,, 1
...;.;2%...,:..z.:,..,.. .,,,, ,,, ..i
FURNITURE
L-100,Capers: ;73_,--__L ::,',,.:: :,.;,_ :>,''7' , 777„, „ ,;,, .. 7" ,, posiiiii7,7:,;„
101 Kasala(Furnishings for Modem Living) X
902 Seraen'i Rife Horne Fumiihirtga(plynLipia),: _ : : X /7 '‘, 777:7 :,'' ,..-77-777-7777-77
103 Drees(Olympia) X
"EVENT"USES
f164bine7-S---eni&biarie715-osiraiNvaii-;tiofentlai'Ou-6116 Market 7'" ,7: -- 777:--.757:E:'-'.5(7,7 7 , 1 7 . 7, 777—-5(:'—'77
Spirit of Washington Dinner Train-Potential Banquet/Meeting/Special Events
105 Venue° X X
Page 3 of 3
CITY OF RFNTON
AUG 1 6 2004
RECEIVED
CIN CLERK'S OFFICE
irk
4-
•
•
111W,ILr •
A Presentation of
World Stage Ministries
August 5, 2004
.i
Contents
Overview of performing arts café — Sunago Café
What's happening at the café:
• Stage for local artists
• Art gallery
• Computer/Internet lab
• Coffee bar
• Family events
• Training classes
• Available space for Community
A Calendar of Events
Physical location and layout of café
• Pros and Cons
• Traffic flow within café
• Availability to outside patrons
• Working with other businesses
General operation of café
• Oversight and management from WSM
• Day to day management
• Operating hours
• Working with community events
• Hired help and volunteers
• Security
Financing of café
• Community support
• Grants
• Local foundations
Welcome to
,..". 0 -„ n 0- c
0, ' o ,
,„,
r% I
e ,, , -,____.
In the bygone era of the 40's and 50's, families used to gather for dinner and perhaps
watch a TV show or listen to a radio program, enjoying a quiet evening together as a
family. How times have changed over the past 50 years! Not only are there few truly
family-oriented shows on our televisions,just getting our kids to sit still long enough to
watch one seems hardly possible. Our children
are hanging out with their friends, looking for ;.
fun and exciting places to be- and usually l',--, -
coming up short. Here in Renton, when teens i h . .-
and young adults look for safe and healthy `�' ` 4
places to frequent in the late evening,they have °f !M; ,N
very few options other than a movie or game A.
' A ,_ - t,, 00 �_
of bowling- and if money is tight, choices �.� ,,
narrow even further. Our children and the young
adults of our community often end up spending their time at questionable locations and
being involved in less than healthy activities.As a community, wouldn't it be great to
have a safe, healthy, and fun place to spend time in the evening hours? World Stage
Ministries would like to provide that!
Welcome to Sunago Café
t ,. (pronounced 'soon-AH-go,' meaning "a gathering place").
-,f k T. ' : A gathering place for our community, youth, and families,
w '> t ` ,r r..$,, ' or -as some have suggested- a "Living Room for the
4.,', :,-,..,--_-,..,::,':. , , ` . Community." Sunago Café's format follows more along
;t 4 f .°` - the lines of a performing arts coffee house than an eatery,
xh r:� ,\I ',1#� _. offering a variety of performances mixed with great
' ` ''`r:r4„: 1:;,- s drinks (all non-alcoholic of course! and a non-smoking
3 ° ' y '.' :! t environment, creating a safe and healthy place just to
c t x � _t -.....4.-,,;`"\\s \>., _ A' hang out. If you were to walk inside Sunago Café, you a >rr :fi `( I
= ;, "_ might find a jazz ensemble, stand up comedian, or
. r YZ ••t maybe even a local high school band, depending on
`` � f*t the night. Walking around the café you find areas for
1 sitting and talking, an eclectic collection of tables
.-.".:'i scattered around the performing stage, a few computers
..., ``Yfor on-line studying, and even a
for students to utilize n i y g,
reading area. Art from a local painter hangs on the walls
and the delicious aroma of coffee wafts through the air. Suddenly,
you notice the time is creeping toward 9:00 and you begin to head for the door to beat
the closing time crowd - but no one else is moving! Then you remember that Sunago Café
is open late so you won't have to leave anytime soon. So sit back and enjoy the music and
the café that is Sunago!
u nag*:
4 Cafe , _,
Activities at Sunago Cafe
As you can see by the activities offered and available café space, we are planning a venue
that will provide for the needs of the community on several levels, not just a hang-out for
kids. Here are some of the areas we are attempting to address:
1.A stage for local artists— Sunago café will provide an inexpensive and readily available
stage for musicians and actors from around the community. Renton boasts of several
wonderful theaters, and, while Sunago is not trying to replace them,we will offer musicians
and actors a performance venue and outlet to the community without the large amount
of time and money involved with professional theater.
2. Sunago Café will also feature the work of local artists (paintings, photos, drawings,
etc.) on a rotating basis to give the community a place to see the talent right in our own
backyards.
3. For those who want to hang out at the café and do a little surfing on the net, Sunago
will have a limited number of computers and a wireless network available with school
level filtering. These computers and the network will be available free of charge within
a time limit.
4. What would a café be without a beverage bar? Sunago is a smoke, alcohol, and drug
free area, but we will still enjoy great coffee or an Italian soda - and with fresh pastries
too!
5. Sunago Café will also cater to the needs of families of our community by offering great
family and children's programs at convenient times during the weekends.
6. The staff of World Stage Ministries includes some of the area's top directors and actors
and we would like to flesh out the performing community by offering a selection of
professional level acting classes for both students and adults.
7. Sunago Café will also have a limited amount of open time slots where the premises
will be available for groups to conduct meetings or other events. Non-profit groups and
community groups will have priority for these times.
With all the possibilities, what might a typical event calendar look like?
On the following page you will find a fictitious calendar, possibily an example of one you
might see at Sunago Café.
Welcome to
u n o
I. Cafe
(J
Calendar of events
Here are a few of the activities that are scheduled at Sunago this month.
• This next Friday we are featuring local bands from Hazen High school including
"Total Volume," "Hallway Madness," and "Blue Ripp'n." The concert starts at
8:00 and you must have a current high school ASB card to attend.
• This Saturday afternoon we are proud to present our very own children's puppet
theater, Zak & Company. Families and children of all ages are encouraged to come
and watch our newest show, 'The Good,The Bad and the Buckleys.'The show starts
at 2:00pm here in the Café.
• Saturday evening, we will be featuring a local jazz ensemble from 8:00 to 10:00pm.
• Sunday evening will be open mic night, so bring your best jokes to share. Material
must be pre-approved so sign up by 3pm Thursday. The mic opens at 9:00pm and
goes till 12:00am.
• This month Sunago will be featuring watercolor paintings from a local artist, George
Milkin. His artwork is for sale, with part of the proceeds going to The Salvation
Army's food bank. Next month we will be featuring another local artist, Gary Nelson.
• Sunago Café is proud to announce that we have just finished setting up our internet
lab. There are two computer terminals ready to use, where patrons can access the
web for 30 minute sessions. We also have wireless network which can be accessed
via your own laptop computer for up to three hours. Please contact the café manager
for access codes.
• Our featured drink of the week at the beverage bar is our own Sunago café blend.
Italian sodas and other non-alcoholic beverages are also available, as well as fresh
pastries.
• If you are interested in drama or puppetry training classes,please sign up at the front
desk. Classes start in two weeks and will last for 12 weeks. There will be two
professional level acting classes and one introductory puppetry class. Prices are
listed along with.the class descriptions at the front desk.
• If you have a group that is looking for space to utilize during the week, applications
are being taken now for the next month. We have two 3-hour spots open right now
and would love to help your group out with their meeting space. Non-profit and
community groups will receive top priority.
5uia :o
yL
46
a e
,„
Physical location and layout of café
Much of the success of the café will be due to the layout and physical construction of
the building itself. We want to generate both a feeling of comfy, intimate setting and
an open-aired performing area. The comfy, intimate feeling will be generated by the
layout and traffic flow with in the café, while the open air theater feel will be due to
the design of the building itself. Below is a case study involving the Pavilion building
located in-between the Piazza Park and the transit center in downtown Renton. While
every location has its pros and cons, we believe that the Pavilion building's benefits
outweigh the negative aspects in this case. Below are listed several of the items we
have considered:
Pros of the Pavilion:
• The Pavilion is centrally located, giving easy access to patrons from Renton and
the surrounding area. It is in the heart of Renton and would be an excellent place for
a "Community Living Room"
• The building is right next to the transit center and the city's new parking facility,
giving easy access to bus riders and ample parking for patrons.
• The building can be sectioned off for smaller uses such as this café, but has a large
vaulted roof line which would give the café a wonderful open feeling.
• The Pavilion building has large roll-up doors, which would allow high-volume
access to the performing area for large public events.
• A performing arts cafe will enhance the "Arts Community" with local performers,
artists, and professional level training classes.
• The café is designed to draw a wide age bracket of patrons.
• The late hours of the café will work well with other businesses that close early in
the evening, making for minimal competition.
Cons of the Pavilion:
• The café will be more of"public" venue and generation of funds will go toward
sustaining the operation of the café, negating the possibility of immediate financial
returns for the City.
• The café would start with limited hours of open operations to the general public,
reducing the overall constant flow of foot traffic.
s.
Working with other businesses and the public
Sunago cafe is determined to not only be "people and community" friendly, but business
friendly as well. Our business goal is to increase the over traffic flow to both the general
area of the downtown transit/pavilion/Piazza area and in the building itself.. As an ends
to that goal, here are a few ideas that we would like to pursue.
• Provide for both evening and daytime activities to attack clientele at a variety of
times
• Weekday hours will include both "pubic" and private use times with public times
slated for more evening hours.
• Weekend hours will include family events to encourage younger families to frequent
the area
• Private use times (for cubs and community groups) will be scheduled for lower
traffic times when general shoppers are least likely to be out in the area.
• Interior design will allow for a cross flow of foot traffic to get patrons and general
public from one side of the Pavilion to the other.
• Security will be provided at larger events to ensure the safety of the local residents
and businesses
• the cafe staff will work with other local business to schedule events that would help
their business as well.
We realize that the success of the area depends not only on increasing foot traffic and
customers to the downtown area, but also in businesses working together to help each
other accomplish their goals as well.At Sunago Cafe, we hope to be both a great community
asset as well as a good business partner.
..
Sunago
-,- Cafe /,'''.---
. -
-, „
Suggested layout for cafe
use of Pavilion
office storage \
\ --., ,,,,--
stage
I
0
000 0 _
000
=
o � o ° O° o �Oo
...
0.0
O
.
o O =
.moi
o = o U0o 000 0 =0
0
o
= _
1100 � 0�� o0�
-r E \ o 0 0
° general
,
enterance
V \\ internet area from plaza
_ _ .general traffice flow _
^ quiet area ——— \
N
0 beverage bar
North
4
u n a 0 *
Ca e
i '
General operation of Sunago Café
Oversight and Management
Oversight and Management of Sunago café will be provided by World Stage Ministries
in a variety of ways. Our board of directors will give long term vision and stability to the
management team set up to run the café, but the day to day operation will be provided by
our executive director and Café Management team.
• Day to Day Management
Sunago café will be served by World Stage Ministries' Executive Director for community
relations, fundraising, and development of operating guidelines. The café will employ a
manager who will oversee day-to-day operations and act as a creative director as well as
oversee program development. In addition to the management,the café will offer employment
opportunities and internships for students and young adults for daily operations.
• Operating Hours
Initially the café will have a Friday through Sunday operating schedule for the general
public, with the possibility of opening for additional nights which will vary by event. The
general time of operations will be 5pm to l 1pm or 12am, depending on the evening
program. The café may stay open later during special events, such as concerts. Sunago
café will also be open on some Saturday afternoons for family programs such as children's
theater. Theater training classes will be held during the week in evening or daytime hours,
depending on the classes being offered and the availability of teachers.At times when the
above events are not scheduled, the café will offer its space to other community groups
for meetings or other proceedings. We will put a high priority to give time to non-profit
community groups. Certain time slots will also be available through an application process
for long term use of the space.
• Working with Community Events
Sunago Café will be a venue for the community, and as such we want to work with
community events whenever possible. Such events may include Renton River Days,
fundraising auctions and award ceremonies.
• Utilizing Volunteers
One of the keys to our success will be the integration of volunteers into Sunago Café.
There will be opportunities for volunteers during general operating hours, special events,
and possible ongoing programs, such as a children's theater or after school tutoring. We
are hoping a positive respose from both the general community and the community of
faith to help fill these volunteer positions. Volunteers will go through a screening process,
which includes a criminal record and background check.
General operation of Sunago Café, con't
• Security
General Security for Sunago Café will be provided by a staff of volunteers trained in
security matters. Guidelines for security will be designed and set up to ensure utmost
safety for both patrons and the community. In the case that certain events may attract
large crowds, professional security personnel may be hired to oversee safety concerns
• Financing of Cafe
One of the biggest questions we are always asked concerns the financing of an operation
of this size and magnitude. We believe, based on our conversions with residents and local
business people, that financing will be available from several sources:
• The café will be run on a business model to ensure working funds for daily
expenditures such as the beverage bar.
• Community help will be sought as residents, businesses and churches of the
area realize the value and possibilities of the café.
• Grants from both local and national foundations will be pursued, giving the
café the ability to expand and develop additional programs and events to further
benefit the community of Renton.
r ,i,/
Locate your next restaurant in Renton's fast revitalizing downtown core
/ I !r� ,
�`ti. It �.I. 4•....r--PVdftflDuddinUr
1;4,i:,jlllr- _"L'I ''_,_� 11i_I 11 7 1 i�Ti��1) IP_ +tl]llliN i� . 1r., 4 ....,.. „
a-
,..
,.. , 1
i
f-7-71[;,;11.--'p,IIIT:
Ij.`4-
411,101 — ti
1 i1 y i.
k,�-I
Utjthti !
1111/1110 ii
ill1 I �,rl•D. L_' .■■" 1 For More Information Contact:
_ ..� .+, ;�- �» '� Mark Santos-Johnson
i,p r• _ }•,' y=•— rte' J City of Renton
., ' \-� s
waf•rl �'�Y� r __( — p1I� Z v ...,.; (425) 430-6584
• A.
,4 ,;,ti,, --_4 , - i1, msantosjohnson@ci.renton.wa.us
�---""� __ '"_�--__ _ - Loo y..--""- .. . ,'.4-4441.1144;„'trlorti.6v,+, ?`.< www.rentonmarket.com
1 -- ti a &,,..• „� �_ -
- M-' 0
l
RENTON
Now Available for Lease ”`""D O`r""CURVE '..=."���
• Owned by City of Renton-renovated in Spring 2004. Ideal • Public parking available at adjacent 563-stall City parking
for one or more restaurants, retail and specialty shops garage
• Flexible lease rates and negotiable broker commissions for • Three-mile population of 86,083 and median household
strong tenant(s) income of$70,078
• Architecturally unique building with 11,783 sf of usable area, • Surrounded by new mixed-use retail and housing
including a 9,595 sf open hall,plus 3,360 sf of patio space developments, Renton Piazza urban park, Metro Park&
Ride,Renton Transit Center and City Center Parking Garage
Washington Restaurant Association
510 Plum Street SE,Suite 200 PRSRT STD
WASHINGTON Olympia,WA98501-1587 US POSTAGE
Restaurant 360.956.7279 PAID
800.225.7166 OLYMPIA,WA
360.357.9232 fax PERMIT NO 668
www.WRAhome.com
Change Service Requested
•
. I
Located oast Ci 'enton's -rev talizing downtown core ' i:,,,,
... .„,„,, ,, ,,; (
mi. . . .
') ' _::
Pavillon BUIlid111110
ote\
;\
-.;1"'. ' I
!ry e ( 1Tatne a!l = _. ,k'it1 CsitL_
4 \\
IC I[„"'- '.I , L{ I i7,
Ili
�� r _a,•r� 1 ly,. •
Tit; -,`-r, I t' • ', - ��.. • - r. rt.-;
il
1 ri , t 4;:t',,'�t Ri l n2! „ ■gill ■I 'ran 1iit'' ~ - 11,71:171-1-1
l-yy i :— -�t`_:S , � .IL
1 ( F, 1 - I `�� _Ai�`d.� t, 'F`a,� �t!r,II '�:2�■ i■ r ■I i f1a 1 I_ + t
11111
? x l _ .s.' t4*`�..`,; -�1Y'S 'i`'[�i'�uv:4411,3:11 11.
._I` - - _`� •' __.__ ��,, �I�.., .� ' r i l a
} I -j�.!{}� ,h e.:tl # 3.w,, �°}K' •-�.t1 '�.t']_yj),f111', y.,-% - ,,.
S'l+l w`v4.1'',;. .. d• " r'�: ,,
ri x t ='i '.. # i 1't'v r,, -, tie•li. !'1S +.rax -`rte+';aktOke.t, 41,, rj — 1,, l ,C ti '• / "+.ams
yy •
l'- -- V---$ *'x�+ �44f--te, .-- -1".Z n -'>.A
> 1 �, µ . \- :�,
• * �r 4
'�tcr
` .•,' ff•/ y�am,;'�*, —.�. i ,p'„. �]'."]-t -''' +
'l, 1 _ "-1.- c t=-'"tea„ 4-1', ;...,-,,,,, ,,,,-.4,,,„:,,,,.1.-:. `-1' . ,.p...•'�„'•.'�)•�” 'J. `-A
•_.�. ',\ \` _____.':4 ��4 .�.___ �_.._____ .. 43:-f.t. . .A'fr'�.r`•cR .eft '' .' N's. aFi.,R'. .' , , :*, a..{ c! T'� �"`�_.
Avasm ilable for lease 1' � v 7J
A
qt.,t, t. -•ten Y fit_-/.
• Owned by City of Renton - renovated in
lig.. .....,..;W �' �. ' _ -
Spring 2004. Ideal for restaurants, retail " � "' `~ '-=_' 55 W,IGems. C`t
, i▪ i+.'10 -t
.�; '�;y "` ,,. 37 condominiums ✓'
and specialty shops •.•,,,,,,;•:•..,,,....:4,-.•:„. .. ,- .
_'°**:i ,..1, `~1-11,.; ,,:%:':..i Tobin `'ESP e`j.\
• Flexible lease rates and negotiable broker .<•- ;t,: ,� j,r°1' r,4;
commissions for strong tenant(s)
•
Parkside et menu
95 Burnett; 'Gardens
•1 Renton High 110 units 150 units
• Architecturally unique i' School • (proposed), (proposed)
building with 11,783 sf of .� .,. a,\`,,
usable area, including a •
,. '=`w,' "� Chateau de Ville
---" .3' 50 condominiums
9,595 sf open hall, plus -.L.,.::,9 �, T'a % .
3,360 sf of patio space ,t ftlllt7 a 9 Renton IKEA a
ilEl Y I_ ofl� _-A--
Renton
h Arts
Center
1 9.• Mclendoes
ISYt Arts gt, i Hardware
• Public parking includes 12 is ` ` 'w — ,
spaces and adjacent 563- k. t: 'I; °= { s_nd St - _ 1 'S 2nd St i z
Parking '4 Y'� 7 t .+,V , ,`,.�y _ ,,•i l_ _I j Parking Garage) ' Bank
of
s 1 •
stall CityCenter 9
ii d Bank of Renton
r. 1 I Lv-_.—A'.i'i'1f .t _ - _ 1 I expansion
Garage 1~ 1 'i. Renaissance et Me
ropoh en
J - '1t t s '"'- ` Renton Renton Transit Center plyog ¢ 1>
e. *,� 110 units 90 units '^ y
• Oen wood bowstringtruss _ ,, r--5..r -, - •' 1 �- ;150PStas .h (. ,
Open r'. F - d' 1- ' Public Parking 1 Pa,~(non Bulldlrg Ride Starts i,
roof with 17' walls and 26' '� _`-. Piga { ! I
ridge line with glazing on ______-__%:-0( _ - - - 1 iUrban Park .
r t
g�,�.- / ;_' ;,..:,n, S 3rd St — _ S 3rd St
the south, east and west Renton Civic : -
Theater
sides of structure from floor to roof - , -
1:-•-•-• - _Burnett toad I
• -t'' 15odndominiums � i1ag5,
• Modern HVAC with a unique 18" • �'°°0
i'1''''r A c�e t-� } ;-.`n)11.0 ;Perlin -
under-floor plenum for flexible air A '�',7; , Yt. 'V i -lir, it s 9 j
and utilitydistribution SB units
° ;' ,� s 4th St
• Three-mile population of 86,083 - �; _( y SO lit W, on
and median household income of '"' : `~ �
$70 078 - -..�k
1 . r t
fY 4\N../ ti L
l ( ,iN 1 r f,r t., L i \ ,
. . ,' : .. ,''',& : '''N t ,i.' / '
''''',..1 C \1 \\::. '\.11V .I I 1 \ fr ,
,
4- F ,.1,---c-
,� `,, , \ I { 1. ti / / f f r . 1 'r
y
:4''
\^7.�--• c ( ,�15' c. \. fix, - 1 TT .i (iv,- -- ^rh .. . fir.-1/4 _ -:^--' -', ..2,S.'%.
�_ t a :.1�II dh\Ik�lta�.: A, >r+ ^J� 1 c� ,
,.""".i _ i �.'!Ilady,
1 � ,J.ti,
=c
4 J F
', I-' it
I; 'I 7,1 j-- :_ s . Tlt
r , • ri, .,,,
:a� _ .ter `l� C'. l�-I_ x.._ - , , I t 4
id
J /'//"Ii.. ,'l ,\ \ 4.\' ..'39* ,„.„,,Jl�..,,„,+;.4 t ;„.2a ''',14.,
!•,' ii ' • -.y. «,
s !,',,,t1,`,1•:— .:
,2.16;,p +k.
J
1 i tr.
3r"� 10,_
. IoNIPM n ' 1e1 . x .ff � .
i11--� _ 'lir!, v —
ieeun atm/service a """ - _' I� VJ - t^
ram.,/ �p.rJ P stor/servIca corer}
�— —___ ;'IAA7.-11; _— FI'I I�r�'� �� i- ` �jl •�jl ,L , � ' -}� ._i' i
Barden kitchen I (- f-_. ,_ - -L . Ya,�---•---- ,,.
r I
restaurant 1 tenant I i I \"_ -
Location/Amenities
Ptazae • Located in the heart of Renton's fast-revitalizing downtown
core
1_ _ _ _ _ • Surrounded by new mixed-use retail and housing
,ew.rl_. star/service ;1,p�gn.fl-veet-i v neva.Je°y atm/service chuwrr, developments, Metro Park & Ride, Renton Transit Center and
1------",'`-- 9 f S6ht_a,...Lr : 1 I.
Barden Mahon Center Parking Garage
r
I`I • Near a growing number of new and established dining and
restaurant I pubes tenant tenant I
I ' vi--1 1 I; ` entertainment venues
I -. --.. - --, I r=A'N AN A . .-.-r
• Adjacent to the Renton Piazza urban park, site of the Renton
piazza Farmers Market&Cinema on the Piazza outdoor movie series
- • One block from new Renton IKEA Performing Arts Center
1
'eon.. -- et°r/servlca--Wr en 07.st.'4 -r ; star/maim. °°t,°r • Fronts SR 900 (connecting 1-5 to Issaquah)with +1-30,000
�garden L passing vehicles daily
I • Close to Rainier Avenue S with 60,000+ vehicle trips per day
WHIM tenant tenant tenant E and near 1-405 and SR 167 with 148,000 and 105,000+
....L'..^_____,N. -AN AN 'AI----1—'---r vehicle trips per day, respectively
piazza
Leasing Contact:
The Pavilion Building will accommodate a Mark Santos-Johnson C,s` get,
variety of tenant configurations from single City of Renton «�
R E N T O N (425) 425-430-6584 •
occupancy to four or more smaller spaces. AHEAD 01 THE CURVE msantosjohnson@ci.renton.wa.us 'f'‘j\Tr1`o .
www.rentonmarket.cnm
1
? yrs 16Itii
SPIRIT OF WASHINGTON INC .
625 SOUTH FOURTH STREET
RENTON , WASHINGTON 98055 .
425 . 277 . 8408
425 . 277 . 8839 CITY OFRENTON
C-CCun61141(1 1363 JUL 2 3 2004
3;J-e_in ��U I UI CiN GLERK'S O7SrEDfric 'n' ,,- OFFICE
PAVILION BUILDING
PROPOSAL
BRINGING BUSINESS DOWNTOWN
A STORY IN THE MAKING
� ��
LuJ
•
PAVILION BUILDING
PROPOSAL
BRINGING BUSINESS DOWNTOWN
PAST AND PRESENT BROUGHT TOGETHER,
THE STORY BEGINS
THE INTRODUCTIONS - SPIRIT OF WASHINGTON INC.
In 1992, Spirit of Washington Inc. made the City of Renton its new home and began the
process of crafting a reputation of excellence in the South Puget Sound area. Combining a
sense of old fashioned romance along with a commitment to provide a first class experience
for visitors and locals alike, the Spirit of Washington seeks to reaffirm its dedication to
working within its community to support the revitalization efforts of that community. In the
years following the move to Renton, Spirit of Washington Inc. completed a two million
dollar renovation which included a new kitchen facility to house Spirit of Washington
Catering, enhanced landscaping at the Renton Depot and upgraded the railway track
structure.
Since that first trip in 1992, the Spirit of Washington Dinner Train has brought more
than 1.2 million visitors to downtown Renton. These visitors have come from every state in
the union, as well as countless other countries. In addition to the many individuals that have
experienced our unique version of five-star dining and service, we have also hosted over
4,000 group events on the train. It is, in many ways, due to the requests of many of our
group contacts that we made the decision to add something new into our mix, Spirit of
Washington Catering.
AND, SPIRIT OF WASHINGTON CATERING
Spirit of Washington Catering was formed in 1999 to not only provide in-house food
service for the train, but to expand our business model into new markets. Our state of the
art kitchen facility was built to service offsite events in excess of 1,000 guests, allowing us an
extraordinary opportunity to move into new venues and further our already sterling
reputation.
We continue to develop and cultivate our off-site business by providing the highest
quality food and professional services to our clients. As part of our commitment to our
clients, Spirit of Washington Catering assists with complete event coordination. Our services
include site selection, menu creation and preparation, photography, floral arrangements,
audio visual needs, entertainment and everything in between. We have, at our disposal, the
ideal staff, equipment and expertise to create, transport and present a first class catered
event.
2
PAVILION BUILDING PROPOSAL
BRINGING BUSINESS DOWNTOWN
RAVE REVIEWS
Spirit of Washington Catering has served over 50,000 guests since its inception in 2000.
Our client list includes: Microsoft, Vulcan NW, Boeing, Seattle Art Institute, Spacelabs
Medical, Nordstrom, The Seattle Advertising Show, Group Health, Centex Homes, Seattle
Pacific University, Seattle Humane Society and Wachovia Securities. We are an exclusive
caterer for the Seattle Aquarium and Seattle Center and have also catered events at the
Woodland Park Zoo, numerous office buildings, private residences, tour boats and art
museums.
But we're not asking you to take our word for it. Much of our story can be told by
listening to what our clients have to say about us.
We were thrilled with our event the other night—thank your wonderful team!
Becky Gimbel-Microsoft
I want to express my deepest gratitude for the wonderful job that your staff did at our
function. The food was terrific!
Mike Russo—University of Oregon
I will always recommend you to my friends. The food was great and the service was warm
and friendly!
Joanne Dahne—Wedding Reception at Seattle Center
3
PAVILION BUILDING PROPOSAL
BRINGING BUSINESS DOWNTOWN
AND SO IT CONTINUES ...
SETTING THE SCENE
The Pavilion Building is an attractive and architecturally unique facility. In considering it
as a potential meeting and banquet venue,promising details include:
• Renovated by the City of Renton in Spring of 2004
• Adjacent to 563 stall City Center Parking Garage and the very attractive Renton
Piazza Urban Park
• Open 17 foot wood bowstring truss ceiling
• Modern HVAC system
• Modular flooring system
• 9595 square foot open hall and 3360 square foot patio area
LOCATION, LOCATION, LOCATION
The physical location of the Pavilion Building is yet another appealing aspect in making
this a top venue of choice.Just consider the potential of:
• A three-mile population of 86,083 with a median household income of$70,078
• Located in the heart of Renton's fast-revitalizing downtown core, surrounded by
new mixed use retail and housing
• Adjacent to the Renton Transit Center
• Fronts SR 900 with +/- 30,000 vehicles passing daily
• In close proximity to Rainier Avenue South with 60,000 vehicle trips per day
• Near I-405 with 148,000 trips daily
• Near SR 167 with 105,000 trips daily
4
PAVILION BUILDING PROPOSAL
BRINGING BUSINESS DOWNTOWN
THE ORIGINAL STORYLINE
The key stated goals of the City of Renton in purchasing and refurbishing the Pavilion
Building as outlined in the 1999 study performed by The Retail Group titled Directional
Positioning Strategy For The Pavilion Building are:
1. Make downtown a desirable location for businesses and residential development
in Renton
2. Maximize access to and movement to and movement within downtown for
downtown residents, consumers and employees
3. Promote an improved downtown identify through quality design of the
streetscape,buildings and amenities
4. Foster the redevelopment of downtown into a revitalized urban center.
ROADBLOCKS IN ACHIEVING THE GOALS
While the City of Renton has made significant progress towards meeting their stated
goals of improving the downtown corridor, the "unknown" status of the Pavilion Building in
the community remains a gaping hole in the revitalization of the downtown core. Ideas
under consideration for Pavilion Building utilization currently include using the space for
retail or for a signature restaurant. However, studies commissioned by the City have reached
the conclusion that this is simply not a viable option in the near future. The downtown core
has yet to establish a true identity as a "destination" for either visitors or locals. Progress has
been made in the areas of transportation and access, improved streetscapes and buildings
and the addition of various amenities, but much remains to be done before anyone sees
Renton as a"desirable location." It could, quite possibly,be in excess of ten years before the
option of retail or a restaurant operation would be a successful solution for use of the
Pavilion Building.
This then begs the question, why waste the next ten years struggling to force a solution
in an unworkable situation?
5
PAVILION BUILDING PROPOSAL
BRINGING BUSINESS DOWNTOWN
THE VISION OF THE FUTURE -WHAT COULD BE
OUR GRAND VISION
We are lucky enough, here in South King County, to have an ideal market in place for
developing a local meeting and banquet center in Renton. With the growing interest of the
City, businesses and residents in revitalising Renton as an urban center and the progress that
has been made to-date, Spirit of Washington Inc. believes that we can provide a solution that
will result in a positive outcome for everyone involved. Studies commissioned by the City
have found that there is a growing need for a well managed, affordable meeting and banquet
center in South King County and that the local market can and will support such a venue.
The vast market of groups and individuals seeking meeting and banquet space is simply
staggering- corporate and private clients, nonprofits, foundations, associations, government
agencies and schools. All types of clients looking for one thing - efficient, modem,
affordable, LOCAL solutions. Many of these clients cannot afford the big city prices that
meeting and banquet sites in Seattle and Bellevue charge for basic events and are forced to
trim from their events to afford just the room. We have the opportunity to provide these
individuals exactly what they need in a more convenient location, with affordable or free
parking and at an affordable price.
We believe that Spirit of Washington Inc. is the best possible solution to providing the
necessary services to run a first rate meeting and banquet center in the Pavilion Building. We
have an extensive array of professional services available to service most any client need.
With our local team of responsive, professional sales, event and management personnel,
extensive client contacts and the fact that our state of the art catering facilities are housed
less than two blocks away from the building, Spirit of Washington Inc. offers everything the
City of Renton needs to make the Pavilion Building a successful meeting and banquet center.
6
PAVILION BUILDING PROPOSAL
BRINGING BUSINESS DOWNTOWN
COUNTING THE WAYS
With locally based Spirit of Washington Inc. managing the Pavilion Building, the City of
Renton can rely on us to make every effort to partner with community leaders, nonprofit
organizations, charities, schools, businesses and individuals to both spotlight and promote
the Pavilion Building and Renton as a venue of choice. We feel we have an obligation to not
only promote the business of the Pavilion Building, but to work within the community to
make this a true community center with a sense of both the history and purpose of Renton.
The natural question begs to be asked, "What other benefits can the City recognize by
allowing Spirit of Washington Inc. to manage the Pavilion Building?" In 2001, the Seattle-
King County Convention and Visitor's Bureau reported that the approximate economic
impact of each registered attendee at a multi-day conference is approximately $725 per
attendee. The City of Renton could expect to see increases in taxes from the
conference/meeting attendee expenditures, lodging, food and beverage, transportation,
entertainment and retail. Other anticipated gains include an increase in taxes from employees
through increased local jobs, employee business tax, B & 0 taxes and, if applied, a special
hotel/motel tax. Tax revenues from rent, food, beverage and associated services would
begin to climb immediately after opening the Pavilion Building up for meetings and events.
As Spirit of Washington Inc. begins its aggressive marketing campaign to increase
awareness of not only the venue, but the professional services available, eventually both the
community and local individuals would benefit from the increased tax revenues from visitors
who stay and shop locally. A recent economic impact study completed in the Puget Sound
area estimated that meeting attendees and their spouses spend an average of$82 per night
for lodging, $76 per day for food and beverage, $8 per day for transportation, $5 per day for
entertainment and recreation and $30 per day in the retail market. That averages out to
approximately $201 per day per registered attendee. When combining these numbers with
revenue that could be recognized through parking and tax revenues through local event
services such as audio-visual, photography, floral, etc., the deal begins to have a rosier
outlook.
Upon studying documented "lost business" through various meeting and banquet
facilities in and around Seattle, King County and Bellevue, we find that in the past 18
months, there have been 200 plus inquiries for meeting/banquet space for groups averaging
in size of 100 people or less, groups that would be ideal for the Pavilion Building. Most of
this business was lost to these larger venues due to the overwhelming cost of utilizing such
facilities for smaller events. With large corporations shedding excess office space, the local
need for meeting and banquet space is growing at a healthy rate. Local companies often no
longer have the space within their own facilities to hold large meetings or events for
employees, customers, or outside contractors.
7
•
PAVILION BUILDING PROPOSAL
BRINGING BUSINESS DOWNTOWN
COUNTING THE WAYS (CON'T)
After reviewing these "lost business" figures, other local meeting/banquet venue
numbers, Convention and Visitors Bureau statistics and Spirit of Washington Catering
business data, we believe that an average of 130 events per year could be booked into the
Pavilion Building, bringing approximately 14,300 visitors to Renton. We believe the Pavilion
Building is ideal for hosting four basic types of gatherings: Corporate Meetings, Weddings
& Parties, Dances & School Events and Community Events. The Pavilion Building is well
suited for these types of events by its very structure and by the availability of needed services
such as close-by parking (yet another revenue source for the City), lodging, full-service
catering,and local contacts and management.
By booking these types of events into the Pavilion Building, anticipated revenues for the
City would be coming from multiple streams — the City's portion of rental revenues,
attendee expenditures and associated taxes, employee business taxes, parking and increased
retail sales. As for revenues directly generated from the Spirit of Washington Inc.'s
management of the Pavilion Building, the following table identifies anticipated revenues
from rental and catering (food and beverage) for the first five years of operation. We have
figured that the City of Renton can expect to collect 50% of space rental fees and 15% of
the catering (food and beverage) charges. These figures are based on 130 revenue generating
events the first year and a 5% increase each following year.
R-w' ��, 2 s�� s�3 �� rK 'x�2�. �xdt rcrz<c �r ��`�in" C�. �. ,�• `# �'"'.r-°fc.`" '� sr,�..
5.',� rr-r ++s- i"' i „a t ^, Ys , • - i �" i 1",y �,M.. Rx •Via'`^
;1,:7'41;;;*
r� n $37,267 $25,896 $875 $64,038 14,300
YY
zqy ,z2 S.
4 $39 131 $27 191.fi
fi� $919 $67,241 15,015
4 r. ' :q� , "i:%"4 ...._....._._....._._...-._.__._.......-..,_�_-......................_...__._.._._._.._._,.-.. _...._ - __- .. _ ..
§{ $41,088 $28,551 $965 $70,604 15,766
.=y
$43,142 $29,979 $1,013 $74,134 16,554
$45,299 $31,478 $1,064 $77,841 17,382
PAVILION BUILDING PROPOSAL
BRINGING BUSINESS DOWNTOWN
COUNTING THE WAYS (CON'T)
If the City were to impose a special hotel/motel tax of 2 to 2.25% (an average of what
other cities with public venues are charging), revenues would experience an even more
significant increase. For example, if the Pavilion Building groups were to generate 500 one-
night hotel stays over the period of a year at an average of$87.50 per one-night stay, the City
would stand to collect $875 in hotel/motel tax for the Pavilion Building event attendees
alone. We propose that Pavilion Building generated hotel/motel tax revenues be reinvested
into a combined effort with the Convention and Visitors Bureau to market the Pavilion
Building to the public.
Please keep in mind that the table on the previous page did not take into account the
anticipated revenues that would be generated from taxes — Attendee generated taxes from
their lodging, outside food and beverage, transportation, entertainment and retail sales;
Employee generated taxes from both direct (Pavilion Building staff) and indirect (new
positions created outside the Pavilion Building due to increased local business); the City's
Employee Business Tax for both direct and indirect employees; and the B &0 Tax.
As we look further into the future uses of the Pavilion Building as a true community
center, events that we've listed on the following page such as a Halloween Haunted House,
Easter Egg Hunt,Job Fairs and other such community service types of events would see the
City increasing its revenues even more significantly while offering the citizens of Renton and
surrounding areas an opportunity to truly become an active part of their community.
As you can see, the economic impact of utilizing the Pavilion Building as a meeting and
banquet space could be substantial. Spirit of Washington Inc. is offering the City of Renton
a unique opportunity to partner to provide not only a first class meeting and banquet facility
in South King County,but to bolster and encourage the sense of community that is just now
coming to light in Renton.
9
PAVILION BUILDING PROPOSAL
BRINGING BUSINESS DOWNTOWN
OPPORTUNITY ABOUNDS
As a community center, we are excited about all the possibilities the Pavilion Building
can offer to the community. We have the desire and the means to coordinate some
wonderful community events, such as:
• Haunted House/Easter Egg Hunt — big, public, fun events that would serve to
strengthen the sense of community while increasing the number of visitors
coming to the downtown core.
• Wine Tasting/Beer Tasting Events—Use the local"flavor" to draw both visitors
and locals to the downtown core. Coordinate "meet the winemaker" or "meet
the brewmaster" nights.
• Charity Events/Auctions — many nonprofit organizations in our area are
frequently looking for fundraising event sites, the location and affordability of
this venue for these organizations is superb.
• Job Fairs — a perfect opportunity to build ongoing relationships with local
schools, businesses and service organizations. With the increased accessibility to
bus transportation, this makes this an even more promising type of event.
• Seminars/Lecture Series — by bringing local experts in to speak on a variety of
topics, we would increase not only awareness of the facility, but awareness of
many of society's biggest and most serious issues.
• Public Education/Display - Sponsorship of a permanent display detailing the
history of Renton, major figures in the history of Renton, etc. would give a
certain sense of connection to residents and visitors alike. Rotating or changing
displays chronicling the various ethnic groups and their work in Renton could be
another opportunity to serve Renton's highly diverse community with
educational projects.
• Chef Demos/Art Demos/School Showcases — an opportunity for locals to
promote their particular skills in a wider market.
10
PAVILION BUILDING PROPOSAL
BRINGING BUSINESS DOWNTOWN
THE FINAL CUT
BACK TO THE BEGINNING
In the final review of our proposal to you, we would like to take this opportunity to
review some of the points we've introduced for your consideration.
Spirit of Washington Inc. is a locally owned company committed to supporting the
efforts of the City of Renton to revitalize the downtown core while offering a far-reaching
community assistance program for its local citizens. We are presenting a plan for your
consideration that includes options to not only assist the City in reaching its stated goals, but
to offer the citizens of Renton a strong partner in building and strengthening community
ties. We have an established local presence of professional sales, event and management
personnel with extensive service provider contacts to respond to any client need.
By combining the ever-growing need for meeting, conference, and banquet space in
South King County with a strong desire to operate a facility with great potential as a true
community center, we feel Spirit of Washington Inc is uniquely positioned to provide all the
services the City of Renton will need to reach its goals of making downtown Renton a
desirable location for both businesses and individuals.
In utilising the Pavilion Building as a meeting and banquet venue, the City would see
near immediate increases in tax revenues from the meetings themselves, lodging, food,
beverage, transportation, retail, entertainment and other business taxes. If implemented, a
special hotel/motel tax similar to the tax the State of Washington uses for the Washington
State Convention & Trade Center and the City of Lynnwood uses for the new Lynnwood
Convention Center (2% for attendee lodging expenditures), the City could raise thousands of
dollars alone in just the first year. Add to this the potential for both direct and indirect jobs
created by the business the Pavilion Building could be bringing in and the taxes that would
be collected through these new jobs, the City is in the enviable position of having many
positives with few negatives.
We look forward to the challenge of forging a long-term business relationship with the
City and continuing our work within the community to reinforce the positive strides the City
has made in its revitalization efforts. We would be pleased to discuss any questions you may
have with regards to our proposal and thank you in advance for your time and consideration.
11
July 19,2004 Renton City Council Minutes Page 238
ADMINISTRATIVE Chief Administrative Officer Jay Covington reviewed a written administrative
REPORT report summarizing the City's recent progress towards goals and work
programs adopted as part of its business plan for 2004 and beyond. Items noted
included:
* IKEA Renton River Days begins this week at Liberty Park and other
locations. This annual festival celebrates all the amenities and activities
that make Renton a great community in which to live, work,and play.
* As of June 13th,34 states plus Puerto Rico reported the presence of the
West Nile Virus. The only western.states with no detection are
Washington,Oregon,Montana,Nevada, and Utah. Peak activity for the
West Nile Virus is from late July through early September.
* Beginning June 20th,nine members of the Police Department's Patrol
Services Division will be assigned to "Quality of Life" issues in the
Highlands. The areas between NE 7th St.to NE 27th St. and Edmonds
Ave.NE to Monroe Ave. NE have been targeted and will be saturated with
police patrols, animal control, and parking enforcement. This effort is a
beginning to the strong nuisance abatement and City Code enforcement
initiatives discussed by the Mayor earlier this year.
Community Services: "Into the Mayor Keolker-Wheeler reported that she attended the opening performance of
Woods"Teen Musical the teen musical "Into the Woods" at Carco Theatre,and she encouraged
everyone to attend this fantastic show.
AUDIENCE COMMENT Bob Wenzl,Vineyards Construction,PO Box 2401,'Kirldand, 98083, stated
Citizen Comment:Wenzl- that he has had the pleasure of working with the City of Renton since
City Development Process approximately 2000. Noting that he has worked with every city along the I-405
Appreciation corridor,Mr.Wenzl stressed that Renton is the best city for a builder to work in
and complimented the Planning/Building/Public Works Department staff. He
pointed out that the City gets things done,is reasonable,and is proactive.
Citizen Comment: Johnson- Arland "Buzz"Johnson,334 Wells Ave. S.,#221,Renton,98055, stated that he
Bus Shelter Installation,Main agreed with the potential removal of the bus shelter located on the.east side of
Ave S &S 4th St Main Ave. S. at S. 4th St. However,he indicated that a bus shelter is needed on
the west side of Main Ave. S. In pursuing this matter,he learned that if 20
people use the bus stop every day,it may beeligible for a..shelter. Mr. Johnson
said that he has been trying to get more people to use the bus, and requested the
City's support in helping to get a bus shelter at that location.
CONSENT AGENDA Items on the consent agenda are adopted by one motion which follows the
listing. At the request of Councilwoman Briere,item 6.f. was removed for
separate consideration.
Council Meeting Minutes of Approval of Council meeting minutes of July 12,2004. Council concur.
July 12,2004
City Clerk: 2004 Renton City Clerk reported the official population of the City of Renton as of April 1,
Population 2004,to be 55,360 as calculated by the State of Washington Office of Financial
Management. Information.
Community Services: Pavilion Community Services Department recommended approval to allow Mithun
Bt_ ildin enovation,Mithun Architects to extend its repayment schedule to June,2006,from the currently
Architects Repayment agreed to date of December 31,2004,for the design irregularities on the
Extension Pavilion Building renovation project. Refer to Finance Committee.
CIL _ 3F RENTON COUNCIL AGENDA__LL
(�Al#: (i7 • c • �)
SUBMITTING DATA: FOR AGENDA OF: 7/19/04
Dept/Div/Board Community Services Department
Staff Contact Dennis Culp x 6606 AGENDA STATUS:
Consent XXX
SUBJECT: Public Hearing
Mithun Architects Repayment Plan Extension Correspondence
Ordinance
Resolution
Old Business
New Business
EXHIBITS: Study Session
Issue Paper—Mithun Repayment Plan Extension Information
Other •
RECOMMENDED ACTION: Approvals
Refer to Finance Committee Legal Dept
Finance Dept x
Other
FISCAL IMPACT:
Project Expenditure Required None Transfer/Amendment
Amount Budgeted None Revenue Generated $110,403.12(includes interest)
SUMMARY OF ACTION:
Mithun Architects agreed on March 30,2004 to pay the City$108,135.84(excluding interest)by December ,
31,2004 for design irregularities on the Pavilion Project. The City accepted Mithun's offer at the Renton City
Council Meeting on April 5,2004. Since then,Mithun has requested a time extension to June,2006 in order to
make the repayment schedule consistent with their expected cash flow. The repayment schedule includes an
interest rate they must pay that covers the cost of money to the City.
STAFF RECOMMENDATION:
Staff recommends Council concurrence with the time extension requested by Mithun.
c:Uiles\deanna\Agenda Bill.Mithun repayment plan extension.doc
CITY OF RENTON
MEMORANDUM
DATE: July 19,2004
TO: Don Persson, Council President
Renton City Councilmembers
VIA: JC-L„)Kathy Keolker-Wheeler,Mayor
I�
FROM: Dennis Culp, Community Services Administrator �Q NN•)
SUBJECT: Mithun Repayment Plan Extension
ISSUE:
Should the City Council concur in allowing Mithun Architects to extend its repayment
schedule to June 2006 from the currently agreed to date of December 31,2004?
RECOMMENDATION:
That the Council concur with the time extension requested by Mithun.
BACKGROUND:
• By letter dated March 30, 2004 (copy attached)Mithun agreed to pay the City
$108,135.84 by December 31,2004.
• The City Council accepted Mithun's proposal on April 5,2004.
• Subsequently,Mithun asked for a time extension to June 2006, citing cash flow
difficulties with trying to make the entire payment by the end of 2004.
• The interest rate being charged Mithun covers the cost of money to the City.
The City neither makes any money from Mithun's misfortune nor subsidizes
their repayment.
• The City could push Mithun to take out a 3`a party loan if they could Ret
complete their repayment by the original schedule. This approach has the
advantage of minimizing our exposure should bankruptcy occur. Mithun,when
faced with our determination to hold them to their original agreement,could
choose to continue with an extended payment plan. The City would be hard
pressed to force collections.
• Mithun has made two payments on the extended payment schedule and is
current as of July 2004. The extended payment schedule is attached.
• If the City Council agrees to the time extension, City Staff would write Mithun
indicating that no City work would be available to them until the debt has been
paid.
CONCLUSION:
The chance of Mithun going bankrupt is real,but small. They are:a respected firm that has
been in business for decades. The City is not losing any money with the extended
repayment schedule.
Attachment
C: Jay Covington
Dennis Culp
Yf .�
•
>+ t t )
JSP t j�3,g•Y
MITHUN
Pier 56,1201 Alaskan Way,Ste.200 Seattle,WA 98101 TEL 206 623.3344. FAX 206 623.7005 W W W.MITHUN.COM
March 3o,2004
Mr. Dennis Culp
Administrator
Community Services
City of Renton
Renton City Hall
1055 South Grady Way
Renton,Washington 98055
Re: Renton Pavilion: Construction Cost Settlement
Mithun Project No.0237300
Dear Mr.Culp:
•
As a follow on to our recent discussions,the design team has agreed to assist the City with its
efforts to close out the change orders and resultant costs for the Pavilion project. To that end,the
team is willing to pay$1o8,135.84•
This payment to the City is contingent upon receipt of a full release of all daims between all
parties to the project which were known,or should have been known,as of the date of this letter in
any way related to the project,with the only exception being claims for unknown latent deficits.
Mithun further accepts the City's offer to establish a payment plan for the amount due which will
be paid in monthly installments with the balance paid in full,no later than December 31,2004.
Please have your finance department contact our Ms.Cathy Goldberg,Mithun CFO,to finalize
arrangements.Please draft an appropriate agreement to reflect this understanding.
Sincerely, -
:AYIlisA
111.7
er B. illiams,FAIA •
Prin.".al
Agreed Release: •
7fotif
Dennis K.Culp
Administrator Date
•
cc: Cathy Goldberg
Mithun, Inc
Amortization of Payment to City of Renton
Annual Monthly Beginning Interest Principal Total Ending Due
Int Rate Int Rate Balance Payment Balance Date
1 2.00% 0.17% 108,135.84 180.23 4,419.90 4,600.13 103,715.94 6/1/2004
2 2.00% 0.17% 103,715.94 172.86 4,427.27 4,600.13 99,288.67 7/1/2004
3 2.00% 0.17% 99,288.67 165.48 4,434.65 4,600.13 94,854.02 8/1/2004
4 2.00% 0.17% 94,854.02 158.09 4,442.04 4,600.13 90,411.98 9/1/2004
5 2.00% 0.17% 90,411.98 150.69 4,449.44 4,600.13 85,962.54 10/1/2004
6 2.00% 0.17% 85,962.54 143.27 4,456.86 4,600.13 81,505.68 11/1/2004
7 2.00% 0.17% 81,505.68 135.84 4,464.29 4,600.13 77,041.39 12/1/2004
8 2.00% 0.17% 77,041.39 128.4 4,471.73 4,600.13 72,569.66 1/1/2005
9 2.00% 0.17% 72,569.66 120.95 4,479.18 4,600.13 68,090.48 2/1/2005
10 2.00% 0.17% 68,090.48 113.48 4,486.65 4,600.13 63,603.83 3/1/2005
11 2.00% 0.17% 63,603.83' 106.01 4,494.12 4,600.13 59,109.71 4/1/2005
12 2.00% 0.17% 59,109.71 98.52 4,501.61 4,600.13 54,608.10 5/1/2005
13 2.00% 0.17% 54,608.10 91.01 4,509.12 4,600.13 50,098.98 6/1/2005
14 2.00% 0.17% 50,098.98 83.5 4,516.63 4,600.13 45,582.35 7/1/2005
15 2.00% 0.17% 45,582.35 75.97 4,524.16 4,600.13 41,058.19 8/1/2005
16 2.00% 0.17% 41,058.19 68.43 4,531.70 4,600.13 36,526.49 9/1/2005
17 2.00% 0.17% 36,526.49 60.88 4,539.25 4,600.13 31,987.24 10/1/2005
18 2.00% 0.17% 31,987.24 53.31 4,546.82 4,600.13 27,440.42 11/1/2005
19 2.00% 0.17% 27,440.42 45.73 4,554.40 4,600.13 22,886.02 12/1/2005
20 2.00% 0.17% 22,886.62 38.14 4,561.99 4,600.13 18,324.03 1/1/2006
21 2.00% 0.17% 18,324:03 $0.54 4,569.59 4,600.13 13,754.44 2/1/2006
22 2.00% 0.17% 13,754.44 22.92 4,577.21 4,600.13 9,177.23 3/1/2006
23 2.00% 0.17% 9,177.23 1'53 4,584.83 4,600.13 4,592.40 4/1/2006
24 2.00% 0.17% 4,592.40; 7.65 4,592.48 4,600.13 -0.08 5/1/2006
2,267.20 108,135.92 110,403.12
;4 1 /i
/e;"e //a
3/6. otoo 000, ozo . 3! 70- moeoo. oo, 0000c9 o
I Don Persson - Re: Pavilion Budding plans Page 1
From: Don Persson
To: clawson28@comcast.net
Date: Fri, Jul 2, 2004 8:11 AM
Subject: Re: Pavilion Building plans
I think we need to discuss this, I know Eric Temple is still interested in taking the building for a while to do
catered events, maybe you and I could go meet with him and listen to his plans and see if he would be
interested in a short term(3 or 4 years) lease. I guess I know they are trying hard to work on this, but don't
think they have the right expertise that is needed. We need to talk to some people in the business and
see what we as a council could be doing to help
>>> "Dan & Laura Clawson" <clawson28@comcast.net> 07/01/04 8:20 AM >>>
BlankDon,
You probably saw the article in the King County Journal this morning about the Kent Station opening and
the restaurants and theatres they have. We have been trying to market the Pavilion Building actively for 6
months and at a lower level for at least a year under Tanner, but no real success so far. Maybe downtown
Renton does not have the traffic or population at this point to support the intensity needed to bring users to
the Pavilion Building. When the Boeing property develops and Logan is improved,the downtown will be a
short and attractive drive from a regional shopping destination and it may make the Paviliion Building a lot
more desireable. Maybe we should consider an interim use such as a year-round farmer's market, renting
out for events, etc. until there are more residents and more traffic downtown. Even though that is not our
ultimate goal, it would bring more people downtown and that alone is worth something for marketing.
Also, it would be better to have some income from the builiding than none at all. If tenants don't
materialize by the end of the summer, I think we should consider shifting gears. I'm not criticizing Alex, as
he has done a great job of promoting the building, it is just a question of timing, being too far ahead of the
market.
Dan
June 28,2004 Renton City Council Minutes Page 222
transfer and 592 direct deposits totaling$1,873,372.66. MOVED BY
CORMAN, SECONDED BY LAW, COUNCIL CONCUR IN THE
COMMITTEE REPORT. CARRIED.
CAG: 03-005,Pavilion Finance Committee Chair Corman presented a report concurring in the staff
Building Renovation,Edifice recommendation to approve the completed Pavilion Building renovation
Const Co project, commencement of the 60-day lien period, and release the retained
amount of$119,272.70 to Edifice Construction Company,Inc.,contractor,once
all required taxes have been paid, and all liens have been resolved and releases
obtained. The Committee further recommended that the Pavilion Building
renovation project appropriation be increased by$11,772.68 as part of the year-
end appropriation ordinance. MOVED BY CORMAN, SECONDED BY
NELSON, COUNCIL CONCUR IN THE COMMITTEE REPORT.
CARRIED.
Development Services: Finance Committee Chair Corman presented a report concurring in the staff
Building Permit Fees Revision recommendation to approve adoption of the revised building permit fees.
MOVED BY CORMAN, SECONDED BY LAW, COUNCIL CONCUR IN
THE COMMITTEE REPORT. CARRIED.
RESOLUTIONS AND The following ordinances were presented for second and final reading and
ORDINANCES adoption:
Ordinance#5087 An ordinance was read amending Section 4-4-080 of Chapter 4, Citywide
Planning: Downtown Core Property Development Standards, of Title IV(Development Regulations)of
Off-Street Parking City Code by creating parking standards for development in the downtown
Requirements core. MOVED BY CLAWSON, SECONDED BY CORMAN, COUNCIL
ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES.
CARRIED.
Ordinance#5088 An ordinance was read amending Section 1-3-2.C.1.e(1) of Chapter 3,
Legal: Fireworks Ban Remedies and Penalties,of Title I(Administration); and Section 4-5-070.C.69
Ordinance Change from UFC of Chapter 5,Building and Fire Prevention Standards, of Title IV(Development
Reference to IFC Regulations) of City Code by adopting the amendments to the International Fire
Code that outlaw all fireworks and that establish penalties for violation of the
fireworks laws. MOVED BY LAW, SECONDED BY CLAWSON, COUNCIL
ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES.
CARRIED.
Ordinance#5089 An ordinance was read adding Section 10-12-28 of Chapter 12,Traffic Code, of
Police: Motorized Scooters Title X(Traffic)of City Code to regulate the use of motorized foot scooters by
Regulations eliminating or prohibiting their use on sidewalks, streets, and in parks;
prohibiting their operation by those under 13 years of age; prohibiting their
operation from a half hour after sunset until a half hour before sunrise;
requiring operators to wear helmets;requiring the devices to be muffled;
requiring the safe operation of such vehicles; and providing a penalty for
violation. MOVED BY LAW, SECONDED BY CLAWSON, COUNCIL
ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES.
CARRIED.
ADJOURNMENT MOVED BY LAW,SECONDED BY NELSON, COUNCIL ADJOURN.
CARRIED. Time: 8:07 p.m.
BONNIE L WALTON, City Clerk
Recorder: Michele Neumann,June 28, 2004
APPROVE*1 BY 1
CiTY COL
Date 4.4r-Rooy
FINANCE COMMITTEE
COMMITTEE REPORT
•
June 28,2004
Pavilion Building Renovation; CAG-03-005
(Referred June 21, 2004)
The: Finance Committee concurs in the staff recommendation to approve the completed
Pavilion Building Renovation project, commence the 60-day lienperiodand. release the
retained amount of$119,272.70 to Edifice Construction Company, Iric.r, contractor,:once all
required taxes have been paid, and all lienS?bs.o., -ii-e:eii:re§91cied and releases:obtained..,
The Committee further recommends that the Pavilion Reiiiiratign project appropriation be
increased by $11,772.-6g as part of the year-end appropriation ordiDafice.
. :
andy Corrnari;Chair . • ' . :
Denis Law Vice Chair
•
oni Nelson,
Member -
' -
•
cc: Dennis Culp
•
, .
Pavilion final.doc\ Rev O1/04 bh • :: —
. -lune 28,2004 Renton City Council Minutes Page 221
43rd St./S. 180th St. Pointing out that the chances of an accident are small but
the dollar amount of a judgment is high,Mr. Warren advised that this aspect be
analyzed as well.
*MOTION CARRIED.
UNFINISHED BUSINESS Community Services Committee Chair Nelson presented a report
Community Services recommending concurrence in the Mayor's appointments of Pat Auten(to fill
Committee the position vacated by Sylva Coppock), and new members Theresa Clymer and
Appointment: Nishiwaki Sister Nancy Osborn to the Nishiwaki Sister City Committee. MOVED BY
City Committee NELSON, SECONDED BY PALMER,COUNCIL CONCUR IN THE
COMMITTEE REPORT. CARRIED.
Committee of the Whole Council President Pro Tem Nelson presented a Committee of the Whole clean-
Council: Committee of the up report for the following six items listed on the Committee's referral list and
Whole Agenda Item Clean-Up recommended that the referrals be closed:
Report 6 • Referral 1634-Community Involvement in Budget Process. There was a
��� public hearing held on 8/19/2002 and the Committee recommended no
U changes be made at this time.
• Referral 1665 -Review of Current Council Meeting Policies and
Procedures. Council's Order of Business Policy(800-03)was revised on
5/17/2004 and the Committee recommended no further changes be made at
this time.
• Referral 1748 -Residency Requirement for Future Department
Administrators. Council discussed this at their March 2004 Retreat and
recommended no changes be made at this time.
Referral 1755 -Pavilion Building Lease/Alhadeff Correspondence. The
Economic Development,Neighborhoods and Strategic Planning
Department has been in contact with Mr.Alhadeff. At this time,Mr.
Alhadeff has not submitted any proposals. The Committee,therefore,
recommended that this item be closed.
• Referral 1807-Off-Leash Dog Park. Since the City participated in an off-
leash dog park with King County,the Committee recommended that no
further action be taken on this item at this time.
• Referral 1917-Maple Valley Hwy.Widening Project/King County
Mitigation Funds. Since the design for Phase I of this project is complete
and the project is moving forward already, the Committee recommended
that this item be closed.
MOVED BY NELSON, SECONDED BY CORMAN,COUNCIL CONCUR IN
THE COMMITTEE REPORT*
Regarding the closure of Referral 1807, Councilman Clawson stated that the
City is not going to open an off-leash dog park as there are other priorities. He
indicated that there is still a need for an off-leash dog park within the City
limits however,and asked that the Council be open minded if an opportunity
arises and the City is able to accommodate that need.
*MOTION CARRIED.
Finance Committee Finance Committee Chair Corman presented a report recommending approval
Finance: Vouchers of Claim Vouchers 227688 -228162 and one wire transfer totaling
$1,787,649.56; and approval of Payroll Vouchers 51138 -51519,one wire
a. APPROVED BY
COMMITTEE OF THE WHOLE AP COUNCIL
'COMMITTEE REPORT
June 28', 2004 Date, 6'-�S7-aO'9V s
: . ...:':"`= ;CLEAN-UP REPORT:.
The Committee of the Whole recommendsthat the following Committee Referrals be
closed:
#1634—Community Involvement in Budget Process-There was a public hearing held
on 8/19/2002 and Committee recommends nochanges be made this time.
`
#1665—Review of Current Council,Meeting Policies and.Procedures—Council's •
Order`of Business Policy (800-03) was revised on 5/17/2004 and Committee-recommends
no furtherchanges be made at this time.
'
` #1748=Residency.Requirementfor,Future Department Administrators—Council ; . .
discussed at their March 2004 kOtreaf and recommends no changes be made at this time:
#1755—Pavilion B.uilding':Lease-Alhadeff Correspondence..-The.Economic ,
Development,.Neighborhoods and Strategic planning Department has been in contact . "
with Mr:Alhadeff. At this•time,14-Alhadeff has not submitted any proposals. The
Committee;therefore, recommends'that"this item be closed_ ``x .
Re-fermi #1$ =Vision ouse Re est for Bui `ng Permit ee Wawe for Chil n
e `on ends this i b
dot closed illage ince th eonstrucho ,,as complet ,the Cowin', ee r e
Pe Nelson. - .
clo d,
#1807 Off-Leash Dog Park—Since the City participated in=an off-leash park with,.
. King County,the Committee'.recommer ds that nofurther actionbe,taken on this item at
this time,
#19171-Maple Valley Hwy Widening Project,King.County Mitigation Funds- '
Since the design for Phase I of this project is complete,and the project is moving forward
already,the Committee recommends that this item be closed. •
Don Persso Council President "
C:' Dennis Culp
Gregg Zimmerman
Alex Pietsch
Victoria Runkle
-RECEIVED
JUN 4 2004
CITY OF RENTON RENTCNCITYC®UNCIL
ECONOMIC DEVELOPMENT,
NEIGHBORHOODS AND STRATEGIC PL4NNING
MEMORANDUM
DATE: June 24, 2004
TO: Don Persson, Council President
Members of the Renton City Council
VIA: ;IL/a,,)Mayor Kathy Keolker-Wheeler
FROM: Alex Pietsch, Administrator PSIVe
STAFF CONTACT: Mark Santos-Johnson, Economic Development Specialist
(ext. 6584)
SUBJECT: Pavilion Building Marketing - Update
For your information and review, attached please find the following items related to the
EDNSP Department's current marketing efforts for the Pavilion Building:
• Pavilion Building marketing flyer
• Pavilion Building Potential Anchor Tenant Targets - Status Report
• Pavilion Building advertisement for the Washington Restaurant Association's July
newsletter
As you may recall, in April EDNSP issued Pavilion Building marketing letters and flyers (see
attached flyer) to 94 people from 67 entities, including:
8 developers/investors
34 restaurants/brew pubs
11 grocery/food stores
1 bookstore
1 drug store
8 music/arts/entertainment businesses
4 furniture/home furnishings/accessories stores
The above entities are primarily potential "anchor tenants" - those that EDNSP believes could
be a good first tenant in the building and would bring about other subsequent and perhaps
smaller users.
H:\EDNSP\Council\City Council\Pavilion Building Council Update 6-24-04.doc
EDNSP has subsequently sent Pavilion Building marketing letters and flyers and/or had
personal contact with a number of additional people related to the above original entities, plus
individuals from 11 additional entities (noted in bold on the attached status report), including
5 restaurants/brew pubs
1 grocery/food store
2 bookstores
1 music/arts/entertainment/recreation(i.e., an historic carousel museum)
2 "event" uses (i.e., a public market and a banquet/special event/meeting space)
Staff also recently had an inquiry from a Renton resident interested in using the space for an
indoor dog park, but this is not included in the attached list of potential targeted tenants.
During the last two months EDNSP has worked to personally contact representatives from the
above 78 entities to learn more about their expansion plans and to explore potential uses for the
Pavilion Building.
As noted on the attached status report, a number of the entities have expressed an interest in
considering the Pavilion Building, including:
• Gene Sens -potential "blues and jazz" restaurant
• Armondo Pavone -potential new location for Armondo's, along with a "public market"
• Tutta Bella Neapolitan Pizzeria
• Consolidated Restaurants (d.b.a., Metropolitan Grill, Steamers Seafood Cafes, etc.)
• Mitchelli Family Restaurants (d.b.a. Trattoria Mitchelli & Stella's Trattoria)
• City Fish Co.
• Roger Baldoz -potential year-round produce market
• Historic Carousels, Inc. -potential international historic carousel museum
• Gene Sens & Diana Postlewait-potential "public market"
• Spirit of Washington Dinner Train-potential banquet/meeting/special events venue
In addition, a number of entities indicated that they were not interested in the Pavilion Building
(for a variety of reasons including, for example, location and size), but they were interested in
other opportunities in downtown Renton or other Renton locations. These entities include, for
example:
• Chow Restaurant Group (Chow Foods -The 5 Spot, Coastal Kitchen, Atlas Foods &
The Jitterbug)
• Cactus
• Red Robin
EDNSP has provided tours and/or other information to assist the above entities in further
exploring their interest in the Pavilion Building and/or other opportunities in Renton. Although
a couple of the entities have expressed an interest in submitting a proposal for use of the
Pavilion Building for the City's consideration, none have been received to date. Staff will
continue to work with these entities regarding their potential use of the Pavilion Building.
As noted on the attached status report, many entities either do not have expansion plans at this
time or are not interested in expanding in Renton at this time. However, staff is still working
H:\EDNSP\Council\City Council\Pavilion Building Council Update 6-24-04.doc
with 33 of the 78 entities to determine their expansion plans and/or potential interest in the
Pavilion Building.
To increase awareness of the Pavilion Building opportunity, EDNSP has made arrangements
with the Washington Restaurant Association to include an ad (attached) on the back page of
their July newsletter. The material will be mailed shortly to more than 3,100 restaurant, allied
and educational association members, plus approximately 250 prospective members.
Please feel free to call if you have any questions or ideas of other potential targets.
cc: Jay Covington
Garry Anderson
Dennis Culp
Vik Runkle
Mike Webby
Lee Wheeler
Gregg Zimmerman
H:\EDNSP\Council\City Council\Pavilion Building Council Update 6-24-04.doc
.� localte 1 oil ni heart cf0 Renton's'I -revilttalizing downtown Lull
im • .....: ..::-i. / i '..,•,.., „,.,
Pavillitid' Buildirio ) , .. „.\.1 ,, i ,, /....
..:.,, ,,:.., , ,,i , •.
, .„, ,. ...
_., ...,„,
Inik
Ltu ffCi i.k a l Dc. Len , i .4
L) �..I
-_..,_.I. I t �d�_ ,1 \�.�\�{��\w_\`!` ..:'tis 'L.jJ a. I -a
. .5-.;---.--.;-,, - : imiliniiiiw.
{-
--
�. ,- �� "" I III!.��, ti"l �'�i I. ?' 11111....
— .ri�i mil.Nfir,- -I!( .� ..--1-1-4.41_2_1,1:124_.b.
_`'^ �•�._+r:l .":-
To,
r 1 ,1:r, 1, I, __.. .-..,,, ,,i.....,,,� I 'a,•-.,11,.:3,,
t ■m■ ;/1 t !r ,•— ��. L
L, . •t s ,,` „,-,1,..-....i , • ����eil Imo` '' ■ J.,
°� ..i.„._ .� gm. ,, n1j_..=vP7-�. r ,frw �1.A. i -1i kAif .t434 "',:r , '' - •-� _ _ A'''''-), b_�.'�. .fl ;Nig _ ;• `J . :' .�h {.
'� f,j u( ',' 1 1; r'J t�'` 4'. I ;,t.y t` 0A ' ".1 YCtz..4� ,t �f ..
•
,,;,11 rty' '...-=,-`15;'`;111%.414A ��\ `r '{ A , _ „yyri �1x i`, .1 • +. .c.:
• ;[ Sa
4"..1 I t �,`` : , _ .tea -- '. .'•�.✓ a*?. � S.:l• `'t 'a,,. `'�` ”- '_� �-
r ' Fk�SIj•/.....� ,-.t--4.-_:-,-tir'-.,-. .. —. -ti's y ':,3- rtZA ,
'1P,.`�_* ,X - .... ,;e' -' y .z{#`� r. �. _•..._ l'Y;` "• �t- r- �,s1
Fr''''' • - -- ,'- `-., -- . �.__ __ --- �� ig .}•r.e� .�1. �d`,J-fit.._ .•e.X. •''` .i . 'R':.. V4 .:``.�r..
Available for lease 4 a �' •L
? =u -.
• Owned by City of Renton - renovated in _ -0, _ ;- cor
Spring 2004. Ideal for restaurants, retail '_ ,:,-.. ,',..77-...7.•t, . _,
_.',_:'24&i-----4E.,.--, 55 Williams. r/
^ t I 37 condominiums- /-
and specialty shops - ,. ;=' _s tiff. .
f�
'�' i`e" �6 a�'!, ,-1,,,_Y ,-..'''',3; Tobin
eq,.. .1-,
Fj.\
• Flexible lease rates and negotiable broker y t : -;•-•.=,,,....,,--1.-.5-.-,.- : .4,
commissions for strong tenant(s)
' Parkside at Merrill
95 Burnett; Gardens
•s,:•1 Renton High , 110 units 150 units
• Architecturally unique I. r'`6,,•, . School 1 (proposed) (proposed)
building with 11,783 sf of ,,;,. ii-
usable area, including a , ;
- ,f
/
•
*.` ,� ,, / '�� \ L J . f N
,` –, , ' �/
_ r rt+rw�t_ L.. i _
/, \I. r: 'ilt ^ „Jr- ,
f. r_...,___
,_,,, ,., , ,„,„, ,. 7 - ' / ; , .__
, \,/1 \- . .4Z, It 1,....-4 ,-)rt`.!• / / r ,
;� y " ,../..,,, �\is \, li ' �L { 1 f J I /n,y �f , �" - ,_ r - { ,
Tr
~t T *,..c _LI , C k _ .LL.t t 7S j .r 7'7/T �, ^ ' ' ..i,.`ti tr-t r
4, i • r
r'IT' `c�„ r C �.141 dA\\\Ir1`�� . s .� 11 f
""rVlt.
c r 7k aC r — tini +i.�l
1 f
4 1
f k s Al,.' IIS } I- - Ft: it —+ --Lap Iri( 1.�_.., fin: i,�
f~ I �' _ s3 ll';4
— -- . 1I-- s.s ,
i i
. . ,,,,, ..,. ,.........
}.� ;II Zer c= 1 I
!sow.' alorl°ervice .4.1.T�'P e°t.l1�,��rt� _(*-'f Tpp{` °tor/servlc° q(cum.rll '- `r' y 'I .'�'
1 ^f:lrl-l.-L� I%I'Lilnl'I 1 I r'lt J I � i B_.� 1 , � `11 , `
{
[ „, Qom. s1 ,
1 garden kitchen 1„.
mont �
`S1 restaurant tenant I i -7 - _---L1- —.W610. —
Location/Amenities
ptaxze • Located in the heart of Renton's fast-revitalizing downtown
core
( .,_. ..�._.I _, 7,� -,..7...:'I— i_1 • Surrounded by new mixed-use retail and housing
'...I tor/service pen vest .,;4x,1,; star/service1rhm.., developments, Metro Park & Ride, Renton Transit Center and
--- -G–knit_1 t--» I
1 City Center Parking Garage
garden kitchen G L
1 I F • Near a growing number of new and established dining and
restaurant ,public tenant tenant !
71ji I ( ` entertainment venues
• Adjacent to the Renton Piazza urban park, site of the Renton
prax_a Farmers Market&Cinema on the Piazza outdoor movie series
• One block from new Renton IKEA Performing Arts Center
sonsrl r°I`°�'1,,j6-an- ! vest i." ;L °t°"°°r°'°°(ter' • Fronts SR 900 (connecting 1-5 to Issaquah)with +1-30,000
I garden
L passing vehicles daily
I • Close to Rainier Avenue S with 60,000+vehicle trips per day
,anent tenant tenant tenant. [ and near 1-405 and SR 167 with 148,000 and 105,000+
--"_—"" '^" N •--r vehicle trips per day, respectively
piazza
. _:,<„_ • ' Leasing Contact:
The Pavilion Building will accommodate a - Mark Santos-Johnson
` o�SY o�
R E N T O N (425) 425-430-6584
variety of tenant configurations from single city of Renton • •
e
occupancy to four or more smaller spaces. AHEAD or THE CURVE msantosjohnson@ci.renton.wa.us �:Nr O
www.rentonmarket.com
Pavilion Building
Potential Anchor Tenant Targets-Status Report
June 24, 2004
Note: New potential anchor tenant targets added since the original April report are listed in bold below.
Interested in Not
Interested in Considering Interested in
Considering other Toured No Expansion Expanding in
Pavilion Opportunities Pavilion Plans at this Renton at Still Exploring
Entity Building in Renton Building Time this Time Potential Interest
DEVELOPER _
(, 1 Ron"Sher;Metroyation;'' man"... 77,7 (pre=renovation)._._, 27— s —777
2 Jack Alhadeff,JDA Group LLC X
�3 Ken Alhadeff;Alhadeff Companiesu , _, A ;` _ (pre-renovation) _ ; ";` , .. X
4 Bob Parks,TRF Pacific,Inc. X pre-renovation)
5.Meivjrn Poll;Poll"Investments(owner of°Alki Market) •^- • , _ • • _ f, ., . X _.. •„M
6 Darrell Vange,Ravenhurst Development,Inc.(see Historic Carousels,Inc.below) X X r
Kurt;Dammeier,Sugar"MountainCapital(owner of-Pasta&-Co.and Beecher'-s—
7 Homemade Cheese;major stockholder of amid Breweries Inc: " •
X
8 Al Copeland,Al Copeland Investments X
RESTAURANT/BREW PUB
;'9,McHughysRestaurants FX`McRo s TLesclii Lakecafe,T S:McHugh's) ° ' ossibl later:', to be scheduled.
10 McMenamins -..._._._._.,._...__ .._____...___�....._._ X
Schwartz Brothers Restaurants.(Darnel's;Broiler;Chandler's Crabhouse,Spazzo; ''.77.77:77
F11 Atrium Cafe'•Piazza Italian Cafe .,
12 Jak's Grill X
Y
0..
a13Salumi •.r= .
., r-` X`
14 Tutta Bella Neapolitan Pizzeria(former Salumeria on Hudson) X to be scheduled
L15...Old S a hett.Fact�.International;
RSA,';'':'. ° : :,: ,.,. ... .v. �.W. . ... .
16 Chili's Grill&Bar X X
17Ches: $-
18 California Pizza IGtchen,
Inc.m.19;Can `, /`
s"Restaurant . st .r
,.,,. nyo ..- : �tr .......5 ,.�. ,. ,,,.. '4 ." J
Chow Restaurant Group(Chow Foods-The 5 Spot,Coastal Kitchen,Atlas Foods _
20&The Jitterbug)
,nsolidatesRestaurants Metro olitan:Grill Elliott's Oyster'Hou a"Un on Stitiare.. '-
121-0rill;DCs"Grill;Steamers Seafood Cafes .Qgrnc?s Chargrilled Burgers) '`X scheduled "-
22 Portland Brewing Company X
,23^Auke�Mosc ri Duke's Chowder,HouseiDukes.Bar&Gr
ll , . .� , ., . � .,. ,,.. ,.. .. _ _�,..�.�.�.�,�....... ..�,..°,X..
L'774773
24 Tom Douglas Restaurants(Dahlia Lounge,Etta's Seafood,Palace Kitchen) possibly later X
`_25.Mitchells Family Restaurants(Trattoria Mitchelli,Stella's Trattoria)•,,, . ; "';. :-` ::'X : cheduled ' -7'77-71
26 Circa(Grill&Alehouse-West Seattle) X
127.T.G.1:Fndays..e __. ,,.....__ , �-�-.W ._777 ,777:7177:77.777. __.--" ,.. .,,, ..._ ;777 � ' '- X,%; '
•
•
•
•
28 Ruby's Diner(Redmond,Woodinville,Alderwood Mall) X
1129:,DisChLitea;BreWeiy 7-777 , 72— 7-7 X;: '
30 Pyramid Breweries X
1971:;;CactUirMadisoiiPaik,Kirkland);. • „ 7 ;‘ X. 7,• 71
32 Sam's Sushi(Queen Anne) X
-„MdCorMick&SchrniCk's,.(Seaf64:Fish House&Bar;Wings Café.,at Museum of : . ; • ; .
34 Pike Place Brewery5 Blue C Sushi TT X
,„ • "7'7:- 77 7: •
36 Big Time Brewery&Alehouse X
[67,7Ragliaaci.Pizia,17.7,577 "•, 77
38 Elliott Bay Brewery X
39 Gourmet Burgers' "- '7'1 ' 7 . , .777 ,7,,; :77 7-77-77:77,: 7.5F,7.777.7777,A
40 Elysian Brewery X
1'4111-iale'i'Ale EieWety&;Pul?,
42 Souplantation&Sweet Tomatoes
[43 Genens213iit'ential1'13juei'&Jazz Restaurant ' -777777 )777,7777",,, 7777777-77.77777;i'=,7, '7771777-7777= :
44 Armondo Pavone-Armondo's
Consolidated RestaLir;thi:COperatiOni(d.b*The Spaghetti Warehouse,El
145 Chico Good Eats,Cantina Laredo Lucky'' Care,` t ) 111 % " ;'" ,1': "' ' - '1 '•
46 Larry Dixon-"Unspecified Restaurant" X
ri.47 RanfInternational(The-Ram;:t1herianigaiii,,elck2 , . Y,1
GROCERY/FOOD
48TradetToei7 = ' . • ; - „7777
49 PCC Natural Markets X
, :;)77 „ •
51 Pasta&Co. possibly later
152 Madison Market Central Cp : • 11 f:
53 Metropolitan Market X
F47-trvigedaVa"';' = ,
55 Dean&Deluca _
Lt-0: Beechers Handmade Cheese ; , 77:7=,::: 1; :X
57 Roger Baldoz-"Potential Year-Round Produce Market" (pre-renovation)
F,6767elatire.nliSPecialtY:Fiffod 47:777 77 , „ tl?, ,?11 ,7,•;77
-671,1,
59 Great Harvest Bread Company possibly later possibly later X
BOOKSTORE X
L6o.TflirdWaTe'boolTi777 , .
61 Borders Books
1b2 UniVersity BiSektOicer,77-7,- < 7 ;
DRUG STORE
f64.Baifell'Dybg - ; 77-77777,` 7,
MUSIC/ARTS/ENTERTAINMENT/RECREATION
West Seattle;Colkei,ben,Atiner: ' ""-• '77'' = ' 7:51;1A,7 ;,! 7,7-31a177,,
65 Cellophane Square(Records) X
1301OniRecOids5.. .:771-7.7,3;777,7" 7/1 77 77-77; 7
67 Seattle Art Supply X
ClUbT 7,
69 Belltown Billiards X
1...70Th6Garage : ":• 7,777777
71 Gregg's Greenlake Cycle X
t7727HiSforicCarcitiseli,Inc.;::"PotentialidiFou"sel =.= i7 ,```7: ' „,„ 77°`
FURNITURE
[7-97Ca7peia ' • •:';777.7 ; •":„. 277 rig :61"s
74 Kasala(Furnishings for Modem Living) X
t76•S•eldeii'i FUrniShitta .: :•• " , tjr:7
76 Drees(Olympia) X
"EVENT"USES
49110:8'0Aqqg 7130tOntialIPUblic IVIiiker"27 :*:„7,„
Spirit of Washington Dinner Train-"Potential Banquet/Meeting/Special
78 Events Venue" X X
Locate your next restaurant in Renton's fast revitalizing downtown core
Pavilion uiNI
in1. f .. -
V63.ilOI1i-it,1eu tkcI`ITID,-3Bl l- it rib0�) 1 t � isle 1 ,4 i ..:, ...
r u.1 Mill h {---:-I---,- ! _.�.:� ; I i1;7-Hi �J rI l' 1 11 4
,
'� m
11.1" 111
;..
7It
A 14' 46 rEli J s
...__,..]
p g r1=, ■ !■■� T :.1 For More Information Contact:
, '•�•,. jd oaf .. , - ...,,,p.-.,` - ,4" •.��d ' ' Mark Santos-Johnson
',/4� : _!'"1 'r ►. '- - - - - City of Renton
1111-'
1- 1 * ... yi, i - (425) 430-6584
__. • pI .ZA.,;
.1,44sr-. 1 ___;...L.-7-_ _ --',4—,------7,----
�` c ' msantosjohnson@ci.renton.wa.us
= trti ` iron .1
__---_-_--. — ^".��;:; ---
� 4 � ;,2+ a www.rentonmarket.com
-- RENTON •�
Now Available for Lease """°O`THE CURVE r,,M��
• Owned by City of Renton-renovated in Spring 2004. Ideal • Public parking available at adjacent 563-stall City parking
for one or more restaurants,retail and specialty shops garage
• Flexible lease rates and negotiable broker commissions for • Three-mile population of 86,083 and median household
strong tenant(s) income of$70,078
• Architecturally unique building with 11,783 sf of usable area, • Surrounded by new mixed-use retail and housing
including a 9,595 sf open hall,plus 3,360 sf of patio space developments, Renton Piazza urban park, Metro Park&
Ride, Renton Transit Center and City Center Parking Garage
Washington Restaurant Association
510 Plum Street SE,Suite 200 PRSRT STD
Olympia,WA 9850 I-1587 US POSTAGE
WASHINGTON
Restaurant 360.956.7279 PAID
800.225.7166 OLYMPIA,WA
360.357.9232 fax PERMIT NO 668
www.WRAhome.com
Change Service Requested
r
I
9
June 21,2004 Renton City Council Minutes Page 210
place to live,work and play. He expressed his appreciation for the City's
support of the foundation.
Ms.Maxwell announced that in honor of the Mayor's 50th birthday,members
of the public made donations to the foundation which amounted to over$5,000.
Ms.Maxwell and Mr.Kellogg presented a plaque to the Mayor to
commemorate the occasion.
Citizen Comment: Griggs - Chuck Griggs,658 Shelton Ave.NE,Renton, 98056,expressed his appreciation
Emergency Response to the emergency response personnel who saved his life when he was involved
Personnel Appreciation in a car accident. _
Citizen Comment: DeMastus- Sandel DeMastus,Highlands Community Association(HCA)President, 1137
Highlands Community Harrington Ave.NE,Renton, 98056,announced that there will be a
Association,Firefighter presentation about the Public Access Channel at the next HCA meeting,and
Appreciation she invited everyone to attend. Additionally,Ms.DeMastus thanked
firefighters for their assistance during her time of crisis.
CONSENT AGENDA Items on the consent agenda are adopted by one motion which follows the
listing. At the request of Council President Persson, item 6.d. was removed for
separate consideration.
Council Meeting Minutes of Approval of Council meeting minutes of June 14, 2004. Council concur.
June 14, 2004
CAG: 03-005,Pavilion Community Services Department submitted CAG-03-005,Pavilion Building
Building Renovation,Edifice Renovation,and requested approval of the project,commencement of 60-day
(Const Co lien period, and release of retained amount of$119,272.70 to Edifice
Construction Company,Inc.,contractor, if all required releases are obtained.
Refer to Finance Committee for discussion of funding.
Development Services: KKS Development Services Division recommended acceptance of the dedication of
Short Plat,ROW Dedication at additional right-of-way of approximately 952 square feet for NE 21st St.to
NE 21st St, SHP-03-051 fulfill a requirement of the KKS Short Plat(SHP-03-051). Council concur.
Legal:Fireworks Ban Legal Division recommended adoption of an ordinance that changes the
Ordinance Change from UFC ordinance banning fireworks(Ordinance 5078)to reference the 2003
Reference to IFC International Fire Code instead of the Uniform Fire Code. Council concur.
(See page 213 for ordinance.)
MOVED BY PERSSON, SECONDED BY PALMER,COUNCIL APPROVE
THE CONSENT AGENDA AS AMENDED TO REMOVE ITEM 6.d.FOR
SEPARATE CONSIDERATION. CARRIED.
Separate Consideration Economic Development,Neighborhoods and Strategic Planning Department
Item 6.d. recommended adoption of an ordinance creating parking standards for
Planning: Downtown Core development in the downtown core. (The public hearing was held on 1/27/2003
Off-Street Parking and the Planning and Development Committee report was approved that same
Requirements date).
Council President Persson inquired about the revisions made to the ordinance
since its presentation to Council in 2003. Economic Development
Administrator Alex Pietsch explained that the matter has now undergone SEPA
(State Environmental Protection Act)review, and as part of that process there
were some structural changes made to the ordinance language. Mr.Pietsch
confirmed that the changes only affected the formatting.
CI' OF RENTON COUNCIL AGENDi__ILL
• AI#:
SUBMITTING DATA: FOR AGENDA OF: 6/21/04
Dept/Div/Board Community Services Department
Staff Contact Dennis Culp x 6606 AGENDA STATUS:
Consent )00(
SUBJECT: Public Hearing
Construction of the Pavilion Building Correspondence
Ordinance
Resolution
Old Business
New Business
EXHIBITS: Study Session
Issue Paper—Completion of Pavilion Project Information
Certificate of Substantial Completion Other
Notice of Completion of Construction
RECOMMENDED ACTION: Approvals
Refer to Finance Committee Legal Dept
Finance Dept x
Other
FISCAL IMPACT:
Project Expenditure Required $2,813,885.55 Transfer/Amendment
Amount Budgeted $2,802,112.87 Revenue Generated
SUMMARY OF ACTION:
Edifice Construction Company has substantially completed the renovation of the Pavilion Building located at
233 Burnett Avenue South,Renton, WA,98055. The work has been accomplished in accordance with
contract plans and specifications. Although the project has been substantially complete since April 8, 2004,
the project closeout was delayed pending receipt of final billings. The Certificate of Substantial Completion
contains two items: (1) completion of the sunscreen and(2)installation of the exterior lights for the sign
armature. These items have been taken out of the basic construction contract and placed under separate
contract(same price)with Edifice. The project is over budget by$11,772.68 due a payment to PSE for a gas
line extension($12,132.57). Funds are available from the interest on the Pavilion funds being accumulated in
the 316 Fund.
STAFF RECOMMENDATION:
Staff recommends acceptance of the completed project and start of the 60-day lien period. After the 60-day period the
retained amount of$119,272.70 will be released upon verification that all taxes have been paid and all liens resolved.
c:\tilesldeanna\Agenda Bill-Edifice FinaLdoc
CITY OF RENTON
MEMORANDUM
DATE: June 21,2004
TO: Don Persson, Council President
Renton City Councilmembers
VIA: Kathy Keolker-Wheeler,Mayor �C'"
FROM: Dennis Culp, Community Services Administrator .3)
SUBJECT: Completion of the Pavilion Renovation
ISSUE:
Should the City Council accept the Pavilion Renovation Project as substantially complete
and authorize the start of the 60-day lien period?
RECOMMENDATION:
That the Council concur in the acceptance of the completed project and the start of the 60-
day lien period. After the 60-day period the retained amount of$119,272.70 will be
released upon verification that all taxes have been paid and all liens resolved.
BACKGROUND:
• The Pavilion Renovation Construction Project was started on May 1, 2003, and
was substantially complete on April 8,2004.
• The Contractor completed the work in accordance with the plans and
specifications, according to both the City Inspectors and the Architect's
construction supervision reports.
• There are two punch list items remaining: (1)completion of the sunscreen and
(2)installation of the exterior sign armature lights. Completion of these items
was delayed due to manufacturing and shipping delays on the part of suppliers.
The interim solution is to remove these items from the construction contract and
receive a credit. Simultaneously,they will be put under separate contract with
Edifice for the same amount of money.
• The original construction contract amount was $2,242,077.91 and the final
contract amount was$2,595,373.03.
• The 41 Change Orders total$353,295.14,which represents 16%worth of
change orders. Mithun absorbed over 30.1%of the cost of these change orders
t a
($108,135.84), so the City's cost of change orders was under 11%of the
construction amount.
• The final project amount was over the project budget by$11,772.68. This
overage was discovered during fmal project cost reconciliation. During this
reconciliation, staff noted that we had not budgeted for one PSE charge for a
gas line extension($12,123.57).
• The previously approved contingencies of$52,000 were spent on the following
items:
D Design costs(including reproduction,printing of plans and specifications,
travel, etc.) are paid by the owner on an actual cost basis. By the time the
project was done,these reimbursables totaled$26,757. We expected to pay
for them from the contingency.
> Other soft costs,principally testing and permitting,were over the project
budget by$16,308, due to the extended construction period,which
generated additional soft costs.
> The final change order costs came in$8,936 over the change proposal
estimates,which is not unusual since proposals are made before all costs are
known.
• Funds are available from interest savings on the Pavilion account to cover the
shortfall.
• See the attached spreadsheet for project cost summary and change order details.
CONCLUSION:
The project was built according to the final plans and specifications. The work has been
inspected and complies with City Code.
Attachment
C: Jay Covington
Dennis Culp
Pavilion Project Budget Reconciliation 7-Jun-04
Construction Contract $2,242,077.91
Change Orders(CO's) $353,295.12 See attached Change Order Log
Final Const. Contract Amount $2,595,373.03 See CO number 41 (attached)for final contract amount
NOTES:
Change Orders Represent 16% of original contract amount
Project Costs
Design fees $173,256.54 Includes reimbursibles
Permits, testing , admin $40,784.87 Soft Costs
Conduit runs for tenants -$2,083.00 Paid by Fund 316, pending recovery by future tenants
Small works contract $6,554.11 Complete the sun-screen and install exterior lights
PROJECT TOTAL $2,813,885.55 Includes the glass at the gable ends of the building
Funds Appropriated $2,672,112.87 Includes additional authorization of$80,000 ($30,000 in contingency)
2nd Authorization Increase $130,000.00 Includes$22,000 in contingency
Total Appropriation $2,802,112.87
Variance Analysis
Additional Funds Required $11,772.68 $12,133 Unbudgeted Gas Line payment to PSE
Previous contingency allocation
$52,000 Previously approved Contingencies
$26,757 Reimbursibles
$16,308 Soft Costs over budget
$8,936 Changes in final CO costs
Change Order Log
•
DATE DESCRIPTION COST C.O.# ' . '
6/18/2003 Builder's Risk Insurance $8,060.57 1
7/23/2003 PR 3 (Plywood Deduct) ($617.80) 2
7/23/2003 Subsurface Concrete $8,829.99 2
7/7/2003 PR 1 (Gas Line Modifications) $0.00 3
7/30/2003 Sprinkler Density and Dry System $29,502.93 3
8/13/2003 Roof Sheathing and shear nailing $19,422.60 4
10/22/2003 PR 2 Transformer Addition $33,612.53 5
8/13/2003 Purlin repair $342.46 6
10/8/2003 PR#5 (Add Height to Door 101C) $4,307.17 7
10/8/2003 PR#6 (Add additional louvers) $1,713.00 7
10/8/2003 PR#4 rev(Minor infrastructure for DN) $5,970.94 7
10/8/2003 Prep Spandrels for Storefront $3,447.47 7
10/8/2003 Conduits for future tenants $1,582.74 7
10/8/2003 PR#7 (Change details at GL 5 and OVHD's) $21,076.42 8
11/12/2003 Revisions per RFC 67: Soffit at 105 $4,413.51 9
11/19/2003 Zero Value time extension $0.00 10
11/19/2003 Schedule Extension for HVAC support work $21,266.26 11
11/19/2003 PR9 $23,738.28 12
11/19/2003 Additional Roof Furring (sub strata finishing) $13,738.05 13
11/19/2003 PR8 $16,066.44 14
12/10/2003 Shaftwall at 201,202 $3,241.91 15
12/10/2003 Misc. Steel Adds $16,221.80 16
1/7/2004 Add floor drain at Room 109 $2,660.48 17
10/30/2003 Modify RA ducting as required. - $2,244.04 18
10/30/2003 Revise 70" Plenum as required. $1,424.79 18
12/2/2003 Cost adjustments for Hawk on CP 13, PR-4R ($32.46) 18
12/2/2003 Ductwork Revisions at EF-2&3 $3,140.58 18
1/30/2004 Delete FRP at Room 103 ($307.05) 19
4/6/2004 Misc. Metal Studs and Drywall $4,634.54 20
4/6/2004 Waterproofing Issues at 203 $7,562.43 21
4/6/2004 ASI 7 Revisions $1,515.41 22
2/20/2004 Credit Walkoff Mat per RFC 123 ($826.74) 23
2/20/2004 Aluminum Rafter Painting $4,472.86 24
4/6/2004 One week schedule extension $6,033.23 25
4/6/2004 Misc. Electrical Revisions $111.31 26
4/6/2004 Misc. Flashings $4,179.59 27
4/6/2004 Misc. Flashings $3,087.59 28
4/6/2004 S. Elevation Spandrel Issues $13,630.37 29
4/6/2004 ASI 6 Revisions $1,472.84 30
4/6/2004 Pilaster Ducting Issues $7,481.99 31
4/6/2004 Additional work on Concrete Prep $2,342.05 32
4/6/2004 Additional work on Gable Furring $3,371.46 33
4/6/2004 Temporary Heat $9,592.01 34
4/6/2004 Additional Exit Signs $1,254.04 35
4/6/2004 Additional door hardware $847.93 36
4/6/2004 pressure relief valve $1,002.78 37
4/6/2004 Curtain wall system revisions $20,195.88 38
4/6/2004 Overhead Door Structural Issues $26,830.02 39
5/19/2004 Zero Value Time Extension $0.00 40
5/19/2004 Edifice Credit ($4,010.00) N/A
5/19/2004 Credit for sun-screen and exterior signage lights ($6,554.11) 41
Total $353,295.12 0
6/2/2004
Ma;*..2Q 04 07: 56a ED---CE CONSTRUCTION INC (2 I 322-8594 p. 2
•
CHANGE Distribution to:
ORDER Owner X
Field X
Architect X File X
Contractor X Accounting X
PROJECT: Renton Pavilion
CHANGE ORDER NO.: 41
233 Burnett Avenue South DATE: 5/19/04
Renton, WA 98055 EDIFICE PROJECT NO.: 3107
TO (Contractor): CONTRACT DATE: 4/22/03
EDIFICE CONSTRUCTION CO., INC. CONTRACT FOR: Renton Pavilion
1417-31ST AVENUE SOUTH
SEATTLE, WA 98144
The Contract is changed as follows:
1. Scope Deduction - Deduct incomplete work from project as described in
Certificate of Substantial Completion dated 4/8/04:
a. Deduct completion of sunscreens
b. Deduct exterior lighting < 1<$1,5 .00>
,50000.00>
Subtotal
WSST @ 8.8% < 6,024.00>
< 530.11>
TOTAL THIS CHANGE
<$6,554.11>
Not valid until signed by the Owner,Architect and Contractor.
The original Contract Sum was
Net change by previously authorized Change Orders 2,242,077.91
The Contract Sum prior to this Change Order was $ 359,849.25
The Contract Sum will be decreased 2,601,927.16
by this Change Order in the amount of
The new Contract Sum including this Change Order will be $ <6,554.11>$
The Contract Time will be increased by 0 calendar days. $ 2,595,373.05
The Date of Substantial Completion as of the date of this Change Order therefore is 4/12/04.
NOTE: The compensation allowed by this Change Order reflects only the direct cost of the changed work described above.
It does not include any amounts for changes in the sequence of the work,delays,acceleration or impact costs. Edifice
Construction Co.,Inc. reserves the right to request compensation for any and all of these and related items of cost prior to
any final payment of this contract.
ARCHITECT: CONTRACTOR:
OWNER:
Mithun Architects Edifice Construction Co., Inc. City of Renton
1201 Alaskan Way, Suite 200 1417-31st Avenue South
Seattle, WA 98101 Seattle, WA 98144 Renton,South 805 Way
� WA 98055
1�
By By
r Ir'
Date t i/ .h It Z. ^.
•
2000 Edition - Electronic Format
AIA Document G704 - 2000
•
Certificate of Substantial Completion
PROJECT: Renton Pavilion PROJECT NUMBER: 02373.00 OWNER a
(Name and addrrss) CONTRACT FOR:_GeneralARCHITECT
Gl Construction ARC
233 Burnett Avenue South
Renton.WA CONTRACT DATE:April 22. 2003 CONTRACTOR El
TO OWNER: TO CONTRACTOR:_ FIELD —
City of Renton Edifice Construction Co. •
Renton City Hall-5th Floor 1417 31st Avenue South
1055 South Grady Way Seattle.WA 98144
Renton.WA 98055
(Name and address) (Name and address)
OTHER n
PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR AUTHENTICATION OF THIS
USE SHALL INCLUDE: ELECTRONICALLY DRAFTED AIA
Renovation and new construction of the Renton Pavilion and environs DOCUMENT MAY BE MADE BY
USING AIA DOCUMENT D40I.
-The Work performed under this Contract has been reviewed and found,to the Architect's best
knowledge,information and belief,to be substantially complete.Substantial Completion is the stage
in the progress of the Work when the Work or designated portion is sufficiently complete in
accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its
intended use.The date of Substantial Completion of the-Project or portion designated above is the
date of issuance established by this Certificate,which is also the date of commencement of
applicable warranties required by the Contract Documents,except as stated below:
Suncreens: June 15th.2004
.i - i.• I•i • u- s h 2,j
ap
ratON NI ta April 8.2004
ARCHITECT - DATE OF ISSUANCE
A list of items to be completed or co 1 ed ' is attached hereto.The failure to include any items on
such list does not alter the responsibili the Contractor to complete all Work in accordance with
the Contract Documents. Unless otherwise agreed to in writing;the,date of commencement of
warranties for items on the attached list will be the date of issuance of the final Certificate of
Payment or the date of final payment
•: 21 -tr .1 1V- _ 1 • -t. -I' I - • - • - Ily ''s •
Exterior Lighting by May 10th.2004. mom
"'kit
Cost estimate of Work that is incomplete or defective: A 2000 AIA
Sunscreen-$4.524.00 CERTIFICATE OF SUBSCUMENT TANTIAL
A TIAL
Exterior Lighting-$1.500.00 • COMPLETION
The American Institute of
• Architects
The Contractor will complete or correct the Work on the list of items attached hereto within 1735 New York Avenue,N.W.
seventy(68 )days from the above date of Substantial Completion. Washington,D.C.20006-5292
•
O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation
of its provisions without written permission of the AIA violates the copyright laws of the United States and
will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S.copyright
laws and will subject the violator to legal prosecution. This document was electronically produced with
permission of the AIA and can be reproduced in accordance with your license without violation until the
date of expiration as noted below.User Document:G704 cert of comp.aia—4/6/2004.AIA License Number
1027208,which expires on 12/3V2004.
1
(74:(efyn
NTRAI.TOR BY
DA
The Owner accepts the Work or desi na • rtion as bstantially complete and will assume full
possession at ( ' e)on (date). / /
OWNER BY DA
The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage
to the Work and insurance shall be as follows:
(Nott Owner's and Contractor's legal and insurance counsd should determine and reviewinsurance requirements and
coverage)
•
•
•
2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation
of its provisions without written permission of the AIA violates the copyright laws of the United States and
will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S.copyright
laws and will subject the violator to legal prosecution. This document was electronically produced with
permission of the AIA and can be reproduced in accordance with your license without violation until the
date of expiration as noted below.User Document:G704 cert of comp.aia—4/6/2004.AIA License Number
1027208,which expires on 12/31/2004.
2
4, sure 0.4 State of Washington Reg.No.:
• o° .� Department of Revenue r . .
• Audit Procedures&Administration Date:
ay PO Box 47474
iaee
Olympia,Washington 98504-7474
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
From: AP niTStfl reDN
City of Renton Assigned To
1055 South Grady Way
Renton, WA 98055-2132 Date Assigned
Notice is hereby given relative to the completion of contract or project described below.
Description of Contract Renovation of the Pavilion Building 233 Burnette Ave. South,
Renton, WA 98055
Contractor's Name Edifice Construction Phone No. 206-328-2700
Contractor's Address 1417—31m Ave. South, Seattle,WA 98144
Date Work Commenced Date Work Completed Date Work Accepted
May 1, 2003 April 8, 2004 June 7, 2004
Surety or Bonding Co. SAEFCO
Agent's Address PO Box 34670, Seattle,WA 98124 ATTN: Jim S Kuich
Contract Amount: $2,044,775.05 Amount Disbursed: $2,476,100.33
Additions or Reductions: $322,205.15 Amount Retained: $119,272.70
Sales Tax: $228,392.83 Total: $2,595,373.03
Total • $2,595,373.03
By
(Disbursing Officer)
Phone No:
The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue,Olympia,Washington 98504-
7474,immediately after acceptance of the work done under this contract. NO PAYMENTS SHALL BE MADE FROM RETAINED FUND until
receipt of Department's certificate,and then only in accordance with said certificate.
Notice of Completion(Filled in).doc
ttm
RECEIVED
CITY OF RENTON MAR 31 2004
ECONOMIC DEVELOPMENT, NEIGHBORHOODS,
AND STRATEGIC PLANNING DEPARTMENT
MEMORANDUM RENTON C 0OUNCIL
DATE: March 30, 2004 CITY OF RENTON
TO: Don Persson, President APR 0 2 2004
City Councilmembers RECEIVED
'`,nl CITY CLERK'S OFFICE
VIA: Mayor Kathy Keolker-Wheeled\V"
FROM: Alex Pietsch, Administrator
Economic Development, Neighborhoods,
and Strategic Planning Department
STAFF CONTACT: Mark Santos-Johnson (x 6584)
SUBJECT: PAVILION BUILDING LEASING STRATEGY
Per City Council direction, staff is targeting restaurant and retail tenants that will attract activity and
vibrancy to the Downtown core. Therefore, please find the attached documents related to the
Administration's strategy toward leasing the Pavilion Building:
1) Leasing Flyer —Staff has produced a marketing flyer that will be widely distributed to both
target tenants as well as the commercial brokerage community.
2) Potential Anchor Tenant Targets —Staff has targeted this list of tenants who would act as
anchors to the building. These tenants will be the focus of recruitment efforts. As you can
see, this list contains a number of high-profile establishments that we would consider long
shots for the Downtown Renton market in its current state. However, we feel that it is
certainly worth making the availability of this building known to them.
3) Other Potential Tenants —Staff has also produced this additional list of tenants who might be
willing to lease space in the building if one or more of the other anchor tenants execute a
lease. These businesses would likely not be interested in leasing space by themselves, nor
would the Administration consider breaking up the larger available space with a lease in
isolation.
If you have any questions about any of these establishments, or have any additional ideas to add to
either of these lists, please feel free to pass them along.
Attachments
cc: Jay Covington
Dennis Culp
H:\EDNSP\Council\City Council\Pavilion targets and flyer.doc
Pavilion Building
Potential Anchor Tenant Targets
March 31, 2004
DEVELOPER
Ron Sher, Metrovations
Jack Alhadeff,JDA Group LLC
Ken Alhadeff, Alhadeff Companies
Bob Parks,TRF Pacific, Inc.
Melvyn Poll, Poll Investments (owner of Alki Market)
Darrell Vange
RESTAURANT/BREW PUB
Consolidated Restaurants (Metropolitan Grill, Elliott's Oyster House, Union Square Grill, Hiram's at the Locks)
Deschutes Brewery
McHugh's Restaurants (F X McRory's, Leschi Lakecafe,T.S. McHugh's)
McMenamins
Schwartz Brothers Restaurants (Daniel's Broiler, Chandler's Crabhouse, Spazzo, Atrium Café, Piazza Italian Café)
Portland Brewery
McCormick&Schmick's (Seafood, Fish House&Bar,Wings Café at Museum of Flight)
Duke Moscrip (Duke's Chowder House, Dukes Bar&Grill)
Tom Douglas Restaurants (Dahlia Lounge, Etta's Seafood, Palace Kitchen)
Pike Place Brewery
Chow Restaurant Group (Chow Foods-The 5 Spot, Coastal Kitchen, Atlas Foods &The Jitterbug)
Mitchelli Family Restaurants (Trattoria Mitchelli, Seattle Angelina's Trattoria, Stella's Trattoria)
Circa(West Seattle)
Jak's Grill
Pyramid Breweries
Cactus (Madison Park, Kirkland)
Sam's Sushi (Queen Anne)
Blue C Sushi
Salumi
Big Time Brewery&Alehouse
Pagliacci
Former owner of Salumeria on Hudson &Le Medusa (Columbia City)
Tutta Bella Neapolitan Pizzeria (former Salumeria on Hudson)
Old Spaghetti Factory International
Elliot Bay Brewery
Canyons Restaurant
T.G.I. Friday's
Red Robin
Hale's Ale Brewery&Pub
Chili's Grill &Bar
Chevy's
Souplantation &Sweet Tomatoes
Elysian Brewery
California Pizza Kitchen, Inc.
Ruby's Diner(Redmond, Woodinville, Alderwood Mall)
GROCERY/FOOD
Trader Joe's
PCC Natural Markets
Central Coop Madison Market
Metropolitan Market
Uwajimaya
Dean & Deluca
City Fish Co.
Pasta&Co.
Beecher's Handmade Cheese
BOOKSTORE
Third Place Books
DRUG STORE
Bartell Drugs
MUSIC/ARTS/ENTERTAINMENT/RECREATION
Easy Street Records (Ballard;West Seattle, Lower Queen Anne)
Cellophane Square (Records)
Sonic Boom Records
Seattle Art Supply
Jillian's Billiard Club
Belltown Billiards
The Garage (Billiards)
Greenlake Cycle
FURNITURE
Kasala (Furnishings for Modern Living)
Capers
Selden's Fine Home Furnishings (Olympia)
Drees (Olympia)
Pavilion Building
Other Potential Tenants
March 31, 2004
RESTAURANT
Coyote Creek Pizza
Pizza Schmizza
Pallino Pastaria
Chipotle
Pagliacci
George&Dragon (Fremont- English Pub&Restaurant)
Zao Noodle Bar(University Village)
Maltby Café
Brown Bag (Redmond/Kirkland; previously in Carnation)
Schlotzsky's Deli (Olympia, Issaquah, Redmond)
Bear Creek Brewing Company
Original Pancake House
Café Appasionato
Corsi Enterprises
BREAD/BAKERY/BAGELS
Great Harvest Bread Company
Simply Desserts
Larson's Bakery
Sweet Lorraine's Bakery
Cupcake Royale (Madrona)
Peggy's Organica
Renton Technical College-bagel, donut and/or bread baking school
Noah's Bagel
Zatz a Better Bagel
Cinnabon
ICE CREAM/FROZEN YOGURT
Ben &Jerry's
Cold Stone Creamery
TCBY
WINE
Castle Bridge Winery(wine maker)
Pete's Supermarket(Lake Union)
JUICE
Jamba Juice
Juice Plant
BOOKSTORE
Hullabaloo Books (West Seattle)
HOME &GARDEN
"Home&Garden Store"
"Soap Boutique"
Flower World (Woodinville)
BEADS
World Beads (University District& Pike Place Market)
Beadworld
Beads &Beyond (Bellevue)
,kms' ' .+"� .' ^t ` � : i• . , lam` �. .
F
Y
u ,
'k;'F s ..j..; 3Y. �N 4 a• s ,t.ww+-+,. {
•
r�Sa+4A. l.�� � .tet ,r^ Y.1""�""'. .�+s+e..�..-.,.-�,.,, a.< - l ""
,... - ,,,f, . „7.:‘4,-,-),., .,:.-.. ;'n,‘„,--'''.."'--` 1, ',:....;t t.C,, " < f Y .•C I ' / -'.:' ...' ''', ', . .
tik
•
•
.•_.�t 'ryI r - „ , +� ,4 .,' '''. ~ � .... ,~. w .v ',7-'.-7-'*".4
�R474..... 7—'i-'''",-4,
. 'ta . s r r ti a " ari" t . f ' !.,� :^� y ^�
.V.i. - kk
i.
i -
}
' r<
El
VIA
jig A
04
.� ,x f 1., o'.� 'StLy�������ret��� .5 ,tr � �. l� . r v �s'..i : rA�. . ! . i tt3 1u7 .,-,1 : t�4^ w 4rY .i ;off '„g I > '',--7"7--:':'---.-''---^ . ,� = } N4 } i -y $
FA
-.. e -1 a !t
x ?� 5 �a`1 �
,,.,-•.Te.r,.N: .YxF,''(..'+-,.., s-...f..
.
a` _ 4 .s.F„ ys „x 'r A
'
•
•
'al
ig gym iz �A -4`4e �s`�9a' #'" 't +fr: ``.tr t0 � ` ,, sT,,, ` ,a1,` �f irq. urrn � & e ' -Y+t' r � ; e wrr:aV '' > ;s.,.. � , -r # k, ti' 5„ry %!:: Mtetr > , l: �*rr,, ,c,,t,`a , ,,,„f„ , z 17!14 � C� .1_ x,e1 , s; :s � ( }�cl.. '` ` ii �` gY k r' t-i ^v ,rt ? -L=`' ; FrMCA3f:1/( --: 'r°3m' 1,kxy _ y � wing s { - tl. .. > s ur ! 1 .�. ' ' ir;; tezc .ff: :Q' :r • 7 JI1t-i . a s r:-..,...,J., ! l' a .4 !iE ” tai �j." ' --,Nt .,- _; Ai - :7-2.....--:_._----- . -; -- tF rol , ,� r- . , vti 't h`` �'t ..� � - :!i- '-v:�ats } tt.i-L-tl__ wr5I -, ;,e;r »?„ m _ . .<; i.ea. 4ar .4..-...—�� _'zei ' %" aa �;: ' ' ,# _ .:';':',,--44'-':::y ,• = s`" : ` u ; r1. mu :fix.:. ::;,---•,:,.,,,4%.4,-,,,,,,--4,- ..„ � .
•
•
III
1 t � .i-i' , Y. ,yti 'v0-
Sr' i" 1, . "''; v``. t�k;*=-::pk{ �?TM�`'!{' - _ ;`
Location/Amenities;r � . _i t- "9`i:'.ti: . d -
°!aa=a Located in the heart of Renton's fast revitalizing downtown
core
'' • Surrounded by new mixed use retail and housing
vah�4 j+ •Cyr Fav-mT..�_.. _ -�,cc,-,4''.'.E^'i'a .
;Slor[ 1 `�' ! 1i'rresi. 1 F g"sto/Te4T4 cw.L
:- rat 1 ._-�"11 �1- - developments, Metro Park& Ride, Renton Transit Center and
4 _, �• „ ;.'": � City Center Parking Garage
y ,,R• ,, b -----','- v:'tea ' .,
'--' - K,. 1._ l .,.,' ft t y i x
,. ,K „ :.,fr; F r r t • Near a growing number of new and established dining and
.l ;».z,`„�eslati;,,?, (•R.+ prmm r^wi„,'„,,:� ”,,T., tenanri,:,,•x
t.yt.;y'' '3^>«'', vatt.,,,0 I`LL: ,,'!;;;:i ';i.;;''4L::.- �,_. :.5.,i'• entertainment venues
- -,4; 4.: ' f•.�.� rat! ,, ,,..a,-r '..ti-:•.'.r.'
=1L' ' "'hx�-o-".1.+.hN .11i�Ryl'=?:.i.- F..:-.f•,`:�.;1.:�,r fir'
piazza • Adjacent to the Renton Piazza urban park, site of the Renton
a.
Farmers Market& Cinema on the Piazza outdoor movie series
• One block from new Renton IKEA Performing Arts Center
;mw Yo�ifc ? est.!1 [ap;tl.; cnm...�
`:r::: ,".14.°4131'41....t.'�` ,.=;`gmi'l mte-. �__ • Fronts SR 900 (connecting 1-5 to Issaquah)with +1-30,000
. :, ''...':'''''''''''Z''''' ''
, = ;{ �,:. ``r`na s passingvehicles daily
:'7i'-7 '3
to .-:.< = i..
:; , `,...''.•','!".)",.:', . Close to Rainier Avenue S with 60,000+vehicle trips per day
. •
:zteoan? ,+lenant..,..;z'. Atat :,,i,:t`'.,E-,`,'event:::;
r >' and near 1405 and SR 167 with 148 000 and 105,0 00+
vehicle trips per day, respectively
piazza
Leasing Contact:
The Pavilion Building will accommodate a ` Mark Sa itos-d01mmson 6s' °�,
variety of tenant configurations from single City of Renton * ..� +
R E N T O N (425) 425-430-6584 '�`��
occupancy to four or more smaller spaces. ;f,,:.a„ ,,: .,,,; ,`�•rV,:. msantosjohnson@ci.renton.wa.us ��NTo�
www.rentonmarket.com
Amends ORD 4720
CITY OF RENTON, WASHINGTON
ORDINANCE NO. 50 71
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON,
AMENDING SECTION 4-4-100.H.9.b OF CHAPTER 4, CITY-WIDE
PROPERTY DEVELOPMENT STANDARDS, OF TITLE IV
(DEVELOPMENT REGULATIONS) OF ORDINANCE NO. 4260
ENTITLED "CODE OF GENERAL ORDINANCES OF THE CITY OF
RENTON, WASHINGTON" TO ALLOW ROOF SIGNS WITHIN THE
CITY CENTER SIGN REGULATIONS AREA SUBJECT TO AN
ADMINISTRATIVE MODIFICATION.
THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO ORDAIN
AS FOLLOWS:
SECTION I. Section 4-4-100.H.9.b of Chapter 4, City-Wide Property
Development Standards, of Title IV (Development Standards) of Ordinance No. 4260 entitled
"Code of General Ordinances of the City of Renton, Washington"is hereby amended as follows:
b. Review Criteria: If the Development Services Director determines that the intent
of the proposed sign accomplishes one of the above purposes, the Development Services
Director may grant a modification request provided the proposed sign also meets all of the
following criteria:
i. The modification will not create a significant adverse impact to other
property or improvements in the immediate vicinity of the subject property; and
ii. The modification will not'increase the number of signs allowed by this
Chapter;and
iii. The modification will not increase the allowed height or area of any wall,
projecting, awning/canopy/marquee/traditional marquee, or secondary sign by more than twenty
five percent(25%);and
1
ORDINANCE NO. 5 071
iv. The modification will not increase the allowed height or area of any
freestanding or ground sign; and
v. The modification does not create a public safety hazard.
SECTION II. This ordinance shall be effective upon its passage, approval, and
30 days after publication.
PASSED BY THE CITY COUNCIL this 26th day of April , 2004.
.J WlZ
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this 2 6th day of Ap r i l , 2004.
Don Persson, Mayor Pro Tem
Approved as to form:
�t
Lawrence J. Warren,City Attorney
Date of Publication: 04/30/2004 (summary)
ORD.1096:4/2/03:ma
2
April 26,2004 Renton City Council Minutes Page 130
MOVED BY CLAWSON, SECONDED BY NELSON,COUNCIL ADOPT
THE RESOLUTION AS READ. CARRIED.
The following ordinance was presented for first reading and referred to the
Council meeting of 5/03/2004for second and final reading:
Transportation:Fund 317 An ordinance was read amending the 2004 Transportation Capital Improvement
Allocation(King County Fund 317 to allocate$2,216,000 in King County mitigation revenue to specific
Mitigation Funds) projects. MOVED BY BRIERE,SECONDED BY LAW,COUNCIL REFER
THE ORDINANCE FOR SECOND AND FINAL READING ON 5/03/2004.
CARRIED.
The following ordinances were presented for second and final reading and
adoption:
Ordinance#5071 An ordinance was read amending Section 4-4-100.H.9.b of Chapter 4,Citywide
Development Services: City Property Development Standards,of Title 1V(Development Regulations)of
Center Area Roof Signs City Code to allow roof signs within the City Center Sign Regulations Area
711- subject to an administrative modification. MOVED BY BRIERE,SECONDED
_-- 1'f BY NELSON, COUNCIL ADOPT THE ORDINANCE AS READ; ROLL
CALL: ALL AYES. CARRIED.
Ordinance#5072 An ordinance was read increasing the 2004 Budget for various funds in the total
Budget: 2004 Adjustments amount of$9,400,000,increasing the total number of positions by 4.5 in 2004,
and increasing the'City's reserves. MOVED BY BRIERE,SECONDED BY
NELSON, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL:
ALL AYES. CARRIED.
NEW BUSINESS Reporting that Council has received a number of e-mails regarding safety and
Police: Motorized Scooters noise concerns pertaining to the use of motorized scooters,it was MOVED BY
PALMER,SECONDED BY BRIERE, COUNCIL REFER THE SUBJECT OF
MOTORIZED SCOOTERS TO THE PUBLIC SAFETY COMMITTEE.
CARRIED.
Fire: DUI Simulation Drill Councilman Law stated that he and Ms.Palmer attended a DUI simulation drill
at Hazen High School last Friday. He suggested videotaping the next DUI
simulation drill and showing it on Renton's cable channel 21.
Development Services:Vacant Mayor Pro Tem Persson reported overgrown vegetation on the vacant lot
Lot Vegetation,Whitworth located at 424 Whitworth Ave. S.
Ave S
Development Services: Auto Mr.Persson also reported possible auto repair facility operation at residence
Repair Facility,Illegal Use located behind the vacant lot,on Morris Ave. S.
Streets: Grocery Cart Mayor Pro Tern Persson relayed citizen complaints regarding abandoned
Abandonment grocery carts in the downtown area. Councilwoman Briere noted that this topic
is currently in Planning and Development Committee and she requested a status
report.
Community Services: MOVED BY NELSON,SECONDED BY PALMER,COUNCIL REFER
Commercial Activities in COMMERCIAL ACTIVITIES (PRIMARILY RETAIL SALES)IN RENTON
Renton Parks . PARKS TO THE COMMUNITY SERVICES COMMITTEE. CARRIED.
Comprehensive Plan:West Mayor Pro Tern Persson inquired as to the timing of possibly adding the West
Hill,Potential Annexation Hill area to Renton's potential annexation area(PAA). Economic
Area Addition Development,Neighborhoods and Strategic Planning Administrator Alex
Pietsch explained that in order to amend the City's PAA this year,staff would
April 19,2004 Renton City Council Minutes Page 120
reading. MOVED BY LAW,SECONDED BY CLAWSON,COUNCIL
CONCUR IN THE COMMITTEE REPORT. CARRIED. (See later this page
for ordinance.)
ORDINANCES AND The following ordinances were presented for first reading and referred to the
RESOLUTIONS Council meeting of 4/26/2004 for second and final reading:
Development Services: City An ordinance was read amending Section 4-4-100.H.9.b of Chapter 4,Citywide
Center Area Roof Signs Property Development Standards,of Title IV(Development Regulations)of
City Code to allow roof signs within the City Center Sign Regulations Area
subject to an administrative modification. MOVED BY BRIERE,SECONDED
BY CLAWSON,COUNCIL REFER THE ORDINANCE FOR SECOND AND
FINAL READING ON 4/26/2004. CARRIED.
Budget: 2004 Adjustments. - An ordinance was read increasing the 2004 Budget for various funds in the.total
amount of$9,40Q,000, increasing the total number of positions in 2004,and
increasing the City's reserves. MOVED BY LAW, SECONDED BY NELSON,
COUNCIL REFER THE ORDINANCE FOR SECOND AND FINAL
READING ON 4/26/2004.*
Finance and Information Services Administrator Victoria Runkle confirmed
that language in the ordinance will be revised to reflect the placement of the
$225,000 in reserve for the REACT and RENSTAT programs, as stated in the
Finance Committee report,as well as the change in position counts.
Councilman Clawson noted that it is not clear if funding will be available for
the REACT and RENSTAT programs,thus more information is being sought.
*MOTION CARRIED.
The following ordinance was presented for first reading and advanced for
second and final reading:
Community Services: Henry An ordinance was read amending Chapter 5-1,Fee Schedule,of Title V
Moses Aquatic Center Fees (Finance and Business Regulations)of City Code by setting the Henry Moses
Aquatic Center admission fees. MOVED BY PERSSON, SECONDED BY
NELSON,COUNCIL ADVANCE THE ORDINANCE FOR SECOND AND
FINAL READING. CARRIED.
Ordinance#5067 Following second and final reading of the above-referenced ordinance,it was
Community Services: Henry MOVED BY PERSSON, SECONDED BY NELSON, COUNCIL ADOPT
Moses Aquatic Center Fees THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED.
The following ordinances were presented for second and final reading and
adoption:
Ordinance#5068 An ordinance was read annexing approximately 28.2 acres located west of
Annexation: Stoneridge, 148th 148th Ave. SE and north of NE Sunset Blvd. (Stoneridge Annexation).
Ave SE&NE Sunset Blvd MOVED BY BRIERE, SECONDED BY CLAWSON, COUNCIL ADOPT
THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED.
Ordinance#5069 An ordinance was read establishing the zoning classification of approximately
Annexation: Stoneridge,R-5 28.2 acres located west of 148th Ave. SE and north of NE Sunset Blvd.
Zoning annexed within the City of Renton from R-4(Urban Residential-four dwelling
units per acre;King County zoning)to R-5 (Residential-five dwelling units
per acre);Stoneridge Annexation. MOVED BY BRIERE,SECONDED BY
CLAWSON,COUNCIL ADOPT THE ORDINANCE AS READ. ROLL
CALL: ALL AYES. CARRIED.
RENTON CITY COUNCIL
Regular Meeting
April 19,2004 'Council Chambers
Monday,7:30 p.m. MINUTES Renton City Hall
CALL TO ORDER Mayor Kathy Keolker-Wheeler led the Pledge of Allegiance to the flag and
called the meeting of the Renton City Council to order.
ROLL CALL OF DON PERSSON,Council President;MARCIE PALMER;TERRI BRIERE;
COUNCILMEMBERS DENIS LAW;DAN CLAWSON;TONI NELSON;RANDY CORMAN.
(Councilman Corman left at 8:26 p.m.)
CITY STAFF IN KATHY KEOLKER-WHEELER,Mayor;JAY COVINGTON,Chief
ATTENDANCE Administrative Officer;ZANETTA FONTES,Assistant City Attorney;
BONNIE WALTON,City Clerk; GREGG ZIMMERMAN,
' Planning/Building/Public Works Administrator;JASON JORDAN,Senior
Planner;ALEX PIETSCH,Economic Development Administrator;DON
ERICKSON,Senior Planner;SYLVIA ALLEN,Recreation Director;
VICTORIA RUNKLE,Finance and Information Services Administrator;
ELAINE GREGORY,Fiscal Services Director;MIKE WEBBY,Human
Resources Administrator;DEREK TODD,Assistant to the CAO;CHIEF
GARRY ANDERSON,Police Department.
SPECIAL PRESENTATION Sylvia Allen,Recreation Director and Municipal Arts Commission staff liaison,
Community Services: City Art stated that she conducted an inventory of the City's art collection and learned
Collection that the City has over 100 pieces of art. She grouped the art into two categories
-wall art(approximately 65 paintings at City Hall)and public art(everything
- except the paintings). She displayed photographs of all the art pieces in the
public art category,describing each piece of artwork and its location. For many
of the pieces, she gave a brief overview of the artist and how the artwork
became part of the City's collection.
In response to Council inquiry,Ms. Allen stated that a brochure is available that
identifies the location of the public artwork, she is working on a book on this
subject that will be available at the Renton library,and the information will
soon be posted on the City's website.
Finance: 2002 CAFR Award Victoria Runkle,Finance and Information Services Administrator,explained
that the Comprehensive Annual Financial Report(CAFR)is a summation of the
City's financial records for the end of the year. The financial records are
audited by the State,and are given to the Government Finance Officers
Association to review and analyze to make sure that the records are comparable
to other cities of similar size. She stated that the CAFR is completed every
year,and every year the City receives an award.
Ms.Runkle presented Fiscal Services Director Elaine Gregory with an award,
and Ms. Gregory stated that the CAFR represents an extraordinary amount of
work that is put together all year long by the accounting staff. She expressed
her appreciation to staff,saying they take great pride in the accuracy of the
data. She also thanked Ms.Runkle for her day-to-day guidance and inspiration.
PUBLIC HEARINGS This being the date set and proper notices having been posted and published in
Development Services: City accordance with local and State laws,Mayor Keolker-Wheeler opened the
Center Area Roof Signs public hearing to consider a City Code amendment to allow roof signs within
the City Center area subject to an administrative modification.
April 19,2004 Renton City Council Minutes Page 116
Jason Jordan, Senior Planner,explained that the City Code currently specifies a
list of prohibited signs,or those which are specifically not allowed throughout
the City. Outside the City Center area,the sign code regulations allow
prohibited signs subject to an administrative modification;however,within the
City Center area,the modification criterion prevents the allowance of
•
prohibited signs.
Mr.Jordan pointed out that the newly remodeled Pavilion Building was
designed with a support structure intended to display hanging banners on its
southern facade. He explained that this type of sign is categorized as a roof
sign,and as a result of the prohibition, the City cannot place any sign text into
the sign support structure. Therefore, staff recommends amending the City
Center sign regulations to allow prohibited signs in the City Center area subject
to the granting of a modification by the Development Services Division
Director. The modification must take into account the City's Comprehensive
Plan,precedence setting, and neighborhood impacts.
Public comment was invited. There being none,it was MOVED BY
PERSSON,SECONDED BY NELSON,COUNCIL CLOSE THE PUBLIC
HEARING. CARRIED.
Stating that the matter was reviewed in Planning and Development Committee,
Councilwoman Briere noted that the amendment does not drastically change
anything and there are still limits as to the types of signs allowed. (See page
120 for ordinance.)
Annexation:Johnson, 142nd This being the date set and proper notices having been posted and published in
Ave SE accordance with local and State laws,Mayor Keolker-Wheeler opened the
public hearing to consider the 60%Direct Petition to annex and R-8 prezoning
for the proposed 18.24-acre Johnson Annexation located between 142nd Ave.
SE and 144th Ave.SE,if extended, south of NE 9th St.,if extended,to a line
approximately 110 feet south of SE 121st St.
Don Erickson, Senior Planner,reported that the signatures on the petition were
certified by King County on March 3,2004. He described the location and
existing conditions of the site,noting the existence of eight single-family
• dwellings. The site slopes from west to east, a wetland is located near the
southeast corner, and Honey Creek flows north beyond the eastern edge of the
site. Reviewing the public services,Mr.Erickson noted that the site is served
by Fire District#25 and the Renton School District,and is within the Renton
water and sewer utility service area.
Continuing,Mr.Erickson stated that the site's zoning under King County is R-4
(four units per gross acre). Renton's Comprehensive Plan designates this area
Residential Single Family,for which R-8 (eight units per net acre)zoning is
proposed. Regarding the fiscal impact of the proposed annexation,he indicated
that the City will realize a$44 surplus at full development,assuming an
increase to 106 single-family homes and an assessed home value,of$300,000.
There is an estimated one-time parks acquisition and development cost of
$60,743.
Mr.Erickson concluded that the proposed annexation is within the best
interests and general welfare of the City,and is consistent with City policies.
He noted that the Surface Water Division indicated some potential flooding in
the area,suggesting mitigation with future development.
TY
Gti Oe
�LNTOe
City of Renton
PUBLIC INFORMATION HANDOUT
April 19, 2004
City Center Sign Code Revision
For additional information, please contact: Jason Jordan, Project Manager; City of Renton
Development Services Division;(425)430-7219
ISSUE:
Current code specifies a list of prohibited signs, or those which are specifically
not allowed throughout the City. Outside of the City Center area, the sign code
regulations allow prohibited signs to be approved subject to granting of an
administrative modification. However, when located within the City Center, the
modificatio i criterion prevents prohibited signs (i.e. rooftop signs) from being
allowed. For example, the newly remodeled Pavilion Building was designed with
a support structure intended to display hanging banners on its southern façade,
near the southeastern corner of the building facing the Piazza Park. This type of
•
sign is categorized as a roof sign per code definition. As a result of this
prohibition, the City has not been allowed to place any sign text onto the sign
support structure.
RECOMMENDATION:
The Development Services Division recommends amending the City Center sign
regulations. The amendment would allow prohibited signs to be located in the
City Center area subject to a modification being granted by the Development
Services Division Director. The modification would need to take into
consideration the City's Comprehensive Plan, precedence setting and
neighborhood impacts.
Q 6„,,-„ ; k:,--0,-, a tc
6",.
STATE OF WASHINGTON, COUNTY OF KING }
AFFIDAVIT OF PUBLICATION
PUBLIC NOTICE
Lily Nguyen,being first duly sworn on oath that she is a Legal Advertising
Representative of the
King County Journal
a daily newspaper, which newspaper is a legal newspaper of general
circulation and is now and has been for more than six months prior to the date CITY OF RENTON
Oof publication hereinafter referred to, published in the English language NOTICE NOTICE I PUBLIC HEARING
IS HEREBY GIVEN
continuously as a daily newspaper in King County, Washington. The King that the Renton City Council has
County Journal has been approved as a Legal Newspaper by order of the fixed the 19th day of April,2004, at
Superior Court of the State of Washington for KingCount 7:30b cphearingm. as tt dateandtime for a
P g Y• public to be held in the sev-
The notice in the exact form annexed was published in regular issues of the enth floor Council Chambers of
King County Journal (and not in supplement form) which was regularly Renton City Hall,1055 S.Grady Way,
Renton, WA 98055, to consider the
distributed to its subscribers during the below stated period. The annexed following:
notice,a Amendment to Renton Municipal
Code to allow roof signs within the
City Center sign regulation area
Notice of Public Hearing subject to an administrative modi-
fication.(Pavilion Building roof sign)
All interested parties are invited to
attend the hearing and present writ-
was published on Friday,4/9/04 ten or oral comments regarding the
proposal.Renton City Hall is in com-
plianceThe full amount of the fee charged for said foregoing publication is the sum with the American
g g g Disabilities Act, and interpretive
of $60.25 at the rate of$15.50 per inch for the first publication and N/A per services for the hearing impaired will
inch for e se • ertion.7
be provided upon prior notice. For
information,call 425-430-6502.
Bonnie I.Walton
i City Clerk
LilyN u e Published in the King County
g Y Journal April 9,2004.#841115
Legal Adv ising Representative,King County Journal
Subscribed and sworn to me this 9th day of April,2004. \‘0.11111I1l/l////
-j7/44 kt -\\ - m A //
7 f�\ssion F.p/.• ,a�,p /i
Tom A.Meagher = f NOTARY"••�
Notary Public for the State of Washington,Residing in Redmond,Washing.on —o— i z _
Ad Number: 841115 P.O.Number: J''• '°J B LAG
Cost of publishing this notice includes an affidavit surcharge.
-_-:- -7 am �.q Y 2 °A \
,,/10111 I,I I IFs 0\\\\
April 5,2004 Renton City Council Minutes Page 100
Community Services: Pavilion Community Services Department recommended approval to use City Center
Bt_ Fund Transfer from Parking garage project fund savings to increase the Pavilion Building project
City Center Parking Savings budget by$130,000 to cover design irregularities ($108,135.84) and to restore a
small contingency($21,864.16). The architect will reimburse the City for the
design irregularities. Council concur.
MOVED BY BRIERE, SECONDED BY LAW, COUNCIL APPROVE THE
' CONSENT AGENDA AS PRESENTED. CARRIED.
OLD BUSINESS Council President Pro Tem Briere presented a Committee of the Whole report
Committee of the Whole regarding the DASH(Downtown Action to Save Housing)Fifth and Williams
Human Services: Fifth& Apartments development proposal. The Committee discussed this proposed 92-
Williams Apartments,DASH unit affordable housing project at its March 15th and April 5th meetings.
Development Proposal DASH, a non-profit affordable housing developer, and Sherman Homes asked
the City to communicate support for this project to the Renton Housing
Authority(RHA), so that RHA will issue the tax-exempt bonds necessary to
finance the project. The Committee recommended authorizing the
Administration to send a letter to RHA indicating support for the project.
MOVED BY BRIERE, SECONDED BY NELSON, COUNCIL CONCUR IN
THE COMMITTEE REPORT. CARRIED.
Planning &Development Planning and Development Committee Chair Briere presented a report
Committee regarding the City Center area roof signs. The Committee reviewed potential
Development Services: City revisions to the City Center sign code regulations established in Title IV of City
Center Area Roof Signs Code. Currently, City Code limits the ability to modify prohibited signs
throughout the City. However, in an effort to allow a roof sign on the Pavilion
Building, staff has proposed to amend the sign modification process section of
Title IV. The Committee recommended that Council schedule a public hearing
to discuss the sign code amendments on April 19, 2004. MOVED BY
BRIERE, SECONDED BY CLAWSON, COUNCIL CONCUR IN THE
COMMITTEE REPORT. CARRIED.
Public Safety Committee Public Safety Committee Chair Law presented a clean-up report for the
Public Safety: Public Safety following six items listed on the Committee's referral list and recommended
Committee Agenda Item that the referrals be closed:
Clean-up Report
• Referral 869-Animal Ordinance Issues. The Committee recommended
that no changes be made to the current ordinance at this time.
• Referral 1790-Alarm Registration. The Committee recommended that no
changes be made to the current ordinance at this time.
• Referral 1804-Renton Transit Center Safety. Additional staffing and
coordination with King County Metro has been discussed. The Regional
Transit Committee has been apprised of the situation in Renton. Given that
the police sub-station at the transit center is nearing completion with plans
of deploying proactive units on a consistent basis, the Committee
recommended that this item be removed from the active referral list but that
a status briefing be given to the Committee in June, 2004.
• Referral 1847 -Musicians Hall Safety Concerns. The hall was recently
sold to a church and no further weekend rental agreements are planned.
Therefore, the Committee recommended that no further action be taken on
this issue at this time
CI y. OF RENTON COUNCIL AGENDA DILL
SUBMITTING DATA: FOR AGENDA OF: April 5, 2004
Dept/Div/Board Community Services
Staff Contact Dennis Culp Ext 6606 AGENDA STATUS:
Consent yJ(
SUBJECT: Public Hearing
Second Pavilion Building Budget Increase Correspondence
Ordinance
Resolution
Old Business
New Business
EXHIBITS: Study Session
Issue Paper—Second Pavilion Project Budget Information
Increase
Other
RECOMMENDED ACTION: APPROVALS:
Council Concur Legal Dept
Finance Dept
Other
FISCAL IMPACT:
Expenditure Required $130,000 Transfer/Amendment $130,000 from Fund 301
Amount Budgeted $0 Revenue Generated
SUMMARY OF ACTION:
Several construction contract changes have surfaced during construction that require an increase in
the project budget. Specifically, in addition to those changes contained in the first project budget
increase, there were additional design difficulties encountered. These changes were necessary to
make the final project usable. No change in the originally approved scope has occurred. These
additional funds are available from the garage project savings.
STAFF RECOMMENDATION:
Council concur in authorizing the Mayor to use the garage fund savings to increase the Pavilion
budget by $130,000 to cover design irregularities ($108,135.84) and to restore a small contingency
' ($21,864.16). It is understood that funds for the design irregularities will be re-imbursed to the City
by the Architect.
rev.9/13/93
AGENDA Bill-2nd Pavilion Budget Increase.DOC
MEMORANDUM
a"ti ®
ru
CITY OF RENTON
COMMUNITY SERVICES
0 Committed to Enriching Lives 0
TO: Don Persson, Council President
Renton City Councilmembers
VIA: ' Kathy Keolker-Wheeler, Mayor
024
FROM: Dennis Culp, Community Services Administrator•
STAFF: Dennis Culp, Ext 6606
SUBJECT: Second Pavilion Project Budget Increase
DATE: April 5, 2004
ISSUE:
Should the City of Renton increase the Pavilion Project budget by$130,000 to pay
the General Construction Contractor for work required while the City is being re-
imbursed by the Project Architect? This sum will also restore a small contingency
to provide funds for any additional "within scope" changes.
RECOMMENDATION:
That the Renton City Council authorize the Mayor to increase the Pavilion Project
budget by $130,000 to cover expenses being reimbursed by the Architect
($108,135.84) and to restore a small contingency ($21,864.16).
BACKGROUND SUMMARY
• On February 16, 2003, Council authorized and appropriated $2,592,112.81
to renovate the Pavilion Building. The scope of this work included air-
conditioning, a raised floor, and glass at the gabled ends of the building.
• The original project budget included $186,352 in contingency funds to
cover construction change orders and design change orders.
• During construction unforeseen site conditions and design clarifications
surfaced that required the use of the original project contingency.
• On September 22, 2003 the Council authorized a project budget increase
of$80,000 to cover unforeseen site conditions ($50,000) and to restore a
small contingency ($30,000). The site conditions identified included:
> Additional concrete was found under the floor slab and removed.
> Work was required to prepare the curvilinear roof structure to accept the
metal roofing.
> The seismic roof sheathing required adjustment due to uneven roof
trusses.
• At the same time, additional design changes were surfacing which
eventually led to the basis of this second request. These design changes
are required to complete the project in a usable condition.
• The Architect has agreed to fund those additional changes for which they
have responsibility. TAB A has a copy of the letter from the Architect
identifying their commitment to help the City and outlining the repayment
plan. The City Attorney concurs with the letter provided by the Architect.
• The role of the city is to act as a conduit for the transfer of funds. The
project team and City Attorney concur that this is an appropriate procedure
considering the fact that the City holds contracts with both the Architect and
the General Contractor. There is no contractual relationship between the
two of them.
• The proposed settlement among the Architect, Contractor and the City
results in following distribution of costs:
> City pays change orders in the amount of$255,723.17, which
represents 9.8% of the cost of construction. The breakdown of these
costs are as follows:
✓ Unforeseen site conditions at $68,008.52 (2.6%)
✓ City requested changes at $117,322.10 (4.5%)
✓ Design anomalies at $70,392.54 (2.7%)
➢ Typically, with a renovation project there are design irregularities that
must be expected since no design is perfect. Having less than 3% fall
into the "design anomaly" category is acceptable.
> The Architect pays (through the City) $108,135.84, which represents
4.2%,of the cost of construction. This payment represents design
difficulties over and above that normally expected on a project of this
nature. The Administration will work out the details of the repayment
schedule such that the payments are complete by the end of 2004 and
that the interest rate charged equals the cost of funds to the City. The
Finance Administrator agrees with this approach.
> The General Contractor absorbs $42,423.26 in costs not allowed under
the contract, which represents 1.6% of the cost of construction. These
costs were incurred by the General Contractor but not accepted by the
City since contractor responsibility was involved.
> Change order details are included at TAB B.
• The result of the above settlement is that the City will not pay more money
than is currently budgeted once repayment is received from the Architect.
• An additional contingency of$20,000 is requested, however, to cover any
additional "within scope" changes required during final project turnover.
• The funds are available from the parking garage savings. If authorization is
given to proceed with project closeout, the funds will be appropriated during
the end of year"clean up" ordinance for 2004.
CONCLUSION
Settling this project with the proposed staff arrangement results in a project within
the final City budget. The concluding payments provide a fair distribution of costs
among the owner, architect, and contractor for changes that resulted from a
complicated, but creatively designed, project.
TAB A
.y. .µ ��x` r ro�2
I 'll
1 p y '
, c., 11 • - Jia' a '� -.� T,
$ Sb? 5
MITHUN �it:,F= .s
Pier 56,1201 Alaskan Way,Ste.200 Seattle,WA 98101 TEL 206 623.3344 FAX 206 623.7005 WWW.MITHUN.COM
March 3o, 2004
Mr. Dennis Culp
Administrator
Community Services
City of Renton
Renton City Hall
1055 South Grady Way
Renton,Washington 98055
Re: Renton Pavilion: Construction Cost Settlement
Mithun Project No. 0237300
Dear Mr,Culp: .
As a follow on to our recent discussions,the design team has agreed to assist the City with its
efforts to dose out the change orders and resultant costs for the Pavilion project. To that end,the
team is willing to pay$1o8,135.84.
This payment to the City is contingent upon receipt of a full release of all claims between all
parties to the project which were known,or should have been known,as of the date of this letter in
any way related to the project,with the only exception being claims for unknown latent deficits. .
Mithun further accepts the City's offer to establish a payment plan for the amount due which will
be paid in monthly installments with the balance paid in full,no later than December 31,2004.
Please have your finance department contact our Ms.Cathy Goldberg, Mithun CFO,to finalize
arrangements. Please draft an appropriate agreement to reflect this understanding.
Sincerely,
deo 1A)f /. q ,
to;er B. illiams,FAIA
Prin.'.al
Agreed Release:
Dennis K. Culp
Administrator Date
cc: Cathy Goldberg
TAB B
DESCRIPTION COST Owner Responsibility Mithun and ECCI
Consultants
Unforeseen Site City Requested Design Total Owner TOTAL TOTAL
Conditions Changes Anomalies Cost
Builder's Risk Insurance I $8,060.57 $8,060.57
Roof Sheathing for seismic membrane $19,422.60 $19,422.60
PR 3 (Plywood Deduct) ($617.80)1 ($617.80) 1 1 I I
'Subsurface Concrete $8,829.991 $8,829.99 1 I I I
Sprinkler Density and Dry System $29,502.931 I $29,502.93 I I I I
PR 2 Transformer Addition $33,612.53 1 $33,612.53 I I
Purlin repair $342.461 $342.461 I I
PR#5 (Add Height to Door 101C) $4,307.17 I $4,307.171
PR#6 (Add additional louvers) $1,713.00 I I $1,713.00
PR#7 (Change details at GL 5 and $21,076.42 $21,076.42
OVHD's)
PR#4 rev(Minor infrastructure for I $5,970.94 $5,970.94 I
Prep Spandrels for Storefront I $3,447.471 $3,447.471 I I I
Conduits for future tenants I $1,582.74 1 $1,582.74 I ,
PR8 I $16,066.44 1 I $16,066.441
PR9 I $23,738.281 I I I $23,738.28
Additional Roof Furring (sub strata $13,738.05 $13,738.05
finishing)
Revisions per RFC 67: Soffit at 105 I $4,413.511 $4,413.511 I I
Curtain wall system revisions I $20,195.881 I I $20,195.88 I
One week schedule extension $6,033.001 $6,033.00 I I I I
Add floor drain at Room 109 $2,680.09 $2,680.09
Misc. Electrical Revisions $111.31 $111.31
Modify RA ducting as required. $2,244.041 I I $2,244.04 J I _
Revise 70" Plenum as required. j $1,424.791 I I $1,424.79 I
Shaftwall at 201,202 $3,241.91, $3,241.91
Ice and Watershield upgrade $6,055.79 $6,055.79
Zero Value Schedule Extension $0.00 $0.00
Schedule Extension for HVAC support $21,266.26 $21,266.26
work.
Misc. Steel Adds I $16,221.801 $16,221.80
1/2
3/29/2004
DESCRIPTION COST Owner Responsibility Mithun and ECCI
Consultants
Unforeseen Site City Requested Design Total Owner TOTAL TOTAL
Conditions Changes Anomalies Cost
Misc. Metal Studs and Drywall I $4,634.54 $4,634.54
Misc. Flashings -RFC 70 I $4,179.591 $4,179.591
Misc. Flashings-RFC 86 I $3,087.591 $3,087.591
S. Elevation Spandrel Issues $13,630.37 $13,630.37
Cost adjustments for Hawk on CP 13, ' ($32.46) ($32.46)
PR-4R
Ductwork Revisions at EF-2&3 $3,140.58 $3,140.58
Credit for Sewer Line per RFC 21 ($19.61). ($19.61)
ASI 6 Revisions $1,472.84 $1,472.84
Overhead Door Structural Issues $26,830.02 $26,830.02
Ductwork/Floor System Conflicts $0.00 _
Waterproofing Issues at 203 $7,562.43 $7,562.43
•
Pilaster Ducting Issues $7,481.99 $7,481.99
ASI 7 Revisions $1,515.41 $1,515.41
Credit Walkoff Mat per RFC 123 ($826.74) ($826.74)
Delete FRP at Room 103 ($307.05) ($307.05)
Aluminum Rafter Painting $4,472.86 $4,472.86
Additional work on Concrete Prep $2,342.05 $2,342.05
Additional work on Gable Furring $3,371.46 $3,371.46
Additional Temporary Heat $9,592.01 $9,592.01
14 Day schedule Extension $36,367.47 $36,367.47
Additional Exit Signs $1,254.04 $1,254.04
Additional Door Hardware $847.93 $847.93
Add PRV at Chiller $1,002.78 $1,002.78
Totals: $406,282.27 $68,008.52 $117,322.10 $70,392.54 $255,723.17 $108,135.84 $42,423.26
PERCENTAGE OF
CONSTRUCTION (TOTAL 15.61% 2.61% 4.51% 2.71% 9.83% 4.16% 1.63%
CONSTRUCTION
2/
3/29/2004
_April 5,2004 Renton City Council Minutes , Page 100
Community Services: Pavilion Community Services Department recommended approval to use City Center
Building Fund Transfer from Parking garage project fund savings to increase the Pavilion Building project
City Center Parking Savings budget by$130,000 to cover design irregularities($108,135.84)and to restore a
small contingency($21,864.16). The architect will reimburse the City for the
design irregularities. Council concur.
MOVED BY BRIERE, SECONDED BY LAW,COUNCIL APPROVE THE
CONSENT AGENDA AS PRESENTED. CARRIED.
OLD BUSINESS Council President Pro Tem Briere presented a Committee of the Whole report
Committee of the Whole regarding the DASH(Downtown Action to Save Housing)Fifth and Williams
Human Services: Fifth& Apartments development proposal. The Committee discussed this proposed 92-
Williams Apartments,DASH unit affordable housing project at its March 15th and April 5th meetings.
Development Proposal DASH, a non-profit affordable housing developer, and Sherman Homes asked
the City to communicate support for this project to the Renton Housing
Authority(RHA), so that RHA will issue the tax-exempt bonds necessary to
finance the project. The Committee recommended authorizing the
Administration to send a letter to RHA indicating support for the project.
MOVED BY BRIERE, SECONDED BY NELSON,COUNCIL CONCUR IN
THE COMMITTEE REPORT. CARRIED.
Planning&Development Planning and Development Committee Chair Briere presented a report
Committee regarding the City Center area roof signs. The Committee reviewed potential
Development Services: City revisions to the City Center sign code regulations established in Title 1V of City
Center Area Roof Signs Code. Currently, City Code limits the ability to modify prohibited signs
11- throughout the City. However, in an effort to allow a roof sign on the Pavilion
Building, staff has proposed to amend the sign modification process section of
Title N. The Committee recommended that Council schedule a public hearing
to discuss the sign code amendments on April 19,2004. MOVED BY
BRIERE,SECONDED BY CLAWSON, COUNCIL CONCUR IN THE
COMMITTEE REPORT. CARRIED.
Public Safety Committee Public Safety Committee Chair Law presented a clean-up report for the
Public Safety: Public Safety following six items listed on the Committee's referral list and recommended
Committee Agenda Item that the referrals be closed:
Clean-up Report • Referral 869-Animal Ordinance Issues. The Committee recommended
that no changes be made to the current ordinance at this time.
• Referral 1790-Alarm Registration. The Committee recommended that no
changes be made to the current ordinance at this time.
• Referral 1804-Renton Transit Center Safety. Additional staffing and
coordination with King County Metro has been discussed. The Regional
Transit Committee has been apprised of the situation in Renton. Given that
the police sub-station at the transit center is nearing completion with plans
of deploying proactive units on a consistent basis,the Committee
recommended that this item be removed from the active referral list but that
a status briefing be given to the Committee in June,2004.
• Referral 1847-Musicians Hall Safety Concerns. The hall was recently
sold to a church and no further weekend rental agreements are planned.
Therefore,the Committee recommended that no further action be taken on
this issue at this time
� , r
APPROVED BY 1
CiTY COUNCIL
PLANNING AND DEVELOPMENT COMMITTEE
Date 11-6--,206$1
COMMITTEE REPORT
April 5,2004
City Center Sign Code Amendments
(Referred March 8, 2004)
The Planning and Development Committee met to review and discuss potential revisions to the City
Center sign code regulations established in Title IV.
Currently,City code limits the ability to modify prohibited signs throughout the City. However, in an
effort to allow a roof sign on the Pavilion Building, staff has proposed to amend the sign modification
process section of Title IV.
The Committee recommends that the Council schedule a public hearing to discuss the sign code
amendments for April 19,2004.
gri/10A.Li ,
•Terri riere, Chair
Dan Clawson, ice Chair
Denis Law,Member •
cc: Gregg Zimmerman
Alex Pietsch
PLANNING AND DEVELOPMENT COMMITTEE public hearing report#l.doc\
Rev 01/02 bh
March 8,2004 Renton City Council Minutes Page 70
•
ADMINISTRATIVE Chief Administrative Officer Jay Covington reviewed a written administrative
REPORT report summarizing the City's recent progress towards goals and work
programs adopted as part of its business plan for 2004 and beyond. Items noted
included:
* In 2003,an estimated 2,052 volunteers contributed 63,676 hours of service
to the City of Renton,ranging from administrative support to special
eventi.
l.
* 2003 Grammy Award winners Eric Tingstad and Nancy Rumbel will
perform at Carco Theatre on March 13th,providing an evening of award-
- winntl g instrumental music.
* The City is in the process of building the sidewalk along the east side of
Smithers Ave. S. that will connect to the sidewalk being constructed by the
developer of the Park Lane Short Plat along Smithers from S. 23rd St. to
their northern property line. The City is also installing drainage
improvements, and the street will receive an asphalt overlay this summer.
AUDIENCE COMMENT Mike O'Halloran,4420 SE 4th St.,Renton, 98059, suggested that the City
Citizen Comment: O'Halloran- locate its Parks Maintenance Facility on the Department of Transportation lot
Parks Maintenance Facility on NE 3rd St.,rather than on an existing park property. If the use is not
Location _ compatible on that particular site due to noise reasons, he suggested that the
City compel King County to give up some of its land located in the Highlands
area for the facility.
CONSENT AGENDA Items onl the consent agenda are adopted by one motion which follows the
listing. Council President Persson requested that item 6.e.be removed for
separate,consideration.
Council Meeting Minutes of Approval of Council meeting minutes of March 1, 2004. Council concur.
March 1,2004
Appeal: Maple Valley Hwy City Clerk submitted appeal of Hearing Examiner's decision on the request to
Card Room,RaMac Inc,LUA- designate property located at 2217 Maple Valley Hwy, as a card room; appeal
04-013 filed by Charlie Shane,PO Box 578,Mercer Island,98040,representing
RaMac;Inc.on 2/19/2004,accompanied by required fee(File No.LUA-04-
013). Refer to Planning&Development Committee.
Development Services: City Development Services Division recommended an amendment to the.City Center
Center Area Roof Signs sign code regulations to allow roof signs within the City Center Sign
Regulations Area subject to an administrative modification. Refer to Planning
&Development Committee.
Police: Kenneling Service Police Department recommended approval of the kenneling service agreement
Agreement,Human Society with The Humane Society for Seattle/King County. Council concur.
MOVED BY PERSSON,SECONDED BY NELSON, COUNCIL APPROVE
THE CONSENT AGENDA AS AMENDED TO REMOVE ITEM 6.e.FOR
SEPARATE CONSIDERATION. CARRIED.
Separate Consideration Transportation Systems Division recommended approval of Supplemental
Item 6.e. Agreement No. 1 to CAG-04-013,contract with W&H Pacific for the North
CAG: 04-013,North Renton Renton infrastructure improvements,for South Lake Washington roadway
Infrastructure Improvements, improvements engineering,design,and survey services in the amount of
• W&H Pacific $1,258,321.39.
•
4
Cll t OF RENTON COUNCIL AGENDA DILL
Al#: jp ,
Submitting Data: Planning/Building/Public Works For Agenda of:
Dept/Div/Board.. Development Services - March 8, 2004
Planning
Staff Contact Jason Jordan (7219) Agenda Status
Consent X
Subject: Public Hearing..
Text Amendments to City Center Sign Code Correspondence..
Regulations Ordinance
Resolution
Old Business
Exhibits: New Business
Issue Paper Study Sessions
City Center Sign Code Regulation Boundaries Information
Recommended Action: Approvals:
Refer to the Planning and Development Committee Legal Dept
Finance. Dept
Other
Fiscal Impact: None
Expenditure j Transfer/Amendment
Required...
Amount Budgeted ! Revenue
Generated
Total Project Budget ! City Share Total Project..
SUMMARY OF ACTION:
Amend the existing City Center Sign Code regulations in order to allow the Development
Services Division greater flexibility in approving City Center Sign Code modifications for
rooftop signs.
STAFF RECOMMENDATION:
Amend Title IV Zoning Code City Center Sign regulations RMC 4-4-100H9b (Review
Criteria) to allow roof signs within the City Center Sign Regulations Area subject to an
Administrative Modification.
Rentonnet/agnbilh/ bh i
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: February 26, 2004
TO: Don Persson, Council President
Members of the Council
VIA: Mayor Keolker-Wheeler
_{;(r-f-
FROM: Gregg Zimmerm6r, fidministrator
Planning/Building/Public Works
STAFF CONTACT: Jason E. Jordan (x7219)
SUBJECT: City Center Sign Code Amendments
ISSUE ,
Current code prohibits roof signs in the City Center sign code area' (attached). The
regulations allow for modifications to the City Center Sign Code; however, the specified
modification language further prevents modifications to prohibited signs (i.e. rooftop
signs). For example, the newly remodel Pavilion Building was designed with a support
structure intended to display hanging banners on its southern façade near the
southeastern corner of the building facing the Piazza Park. This type of sign would be
categorized as a roof sign per code definition. As a result of this prohibition, the City
has not been allowed to place any sign text onto the sign support structure.
RECOMMENDATION
Amend Title IV Zoning Code;City Center Sign regulations RMC 4-4-100H9b (Review
Criteria) to allow roof signs within the City Center Sign Regulations Area subject to an
Administrative Modification.
BACKGROUND
Current sign regulations prohibit roof signs within the City Center Sign Regulation Area
(RMC 4-4-100C11). RMC 4-4-100H9b stipulates: If the Development Services Director
1 The City Center Sign Code Area as depicted in RMC 4-4-100H3 is generally described as: land
which is zoned Center Downtown (CD), excluding lots located on Logan Avenue South, north of
the intersection at Airport Way; land zoned Commercial Arterial (CA)which lies east of Lake
Avenue South, and between Tobin Street South and South Second Street; and land zoned
Commercial Arterial (CA)which lies between South Second Street and-South Third Place, and
east of Rainier Avenue South, excluding parcels which have frontage on Rainier Avenue South
and lie more than one hundred sixty feet(160) north of South Third Street; and land zoned Multi-
Family—Urban which lies between the Cedar River, and South Second Street and between
Houser Way South and South Fifth Street.
H:\Division.s\Develop.ser\Dev&plan.ing\lej\Downtown Sign Code Amendments\agenda bill issue paper#l.doc\cor
•
•
determines that the intent of the proposed sign accomplishes one of the following
purposes:
• Respond to the needs of the public in locating a business establishment; or,
• Assist business in contributing to the economic well-being of the community; or,
• Install a sign that is considered to be historic or of historic value by the
advertising industry or a recognized historic preservation organization, provided
that such entity was not involved in the use, design or production of the proposed
sign; or,
• Result in a reduction of signs on a site; or,
• Result in a reduction in the number of freestanding or ground signs otherwise
allowed; or,
• Result in a coordinated sign plan for a multi-tenant building or multiple building
complex.
Then, the Development Services Director may grant a modification request provided the
proposed sign also meets all of the following criteria:
• The modification will not create a significant adverse impact to other property or
improvements in the immediate vicinity of the subject property; and,
• The modification will notincrease the number of signs allowed by this Chapter or
allow a type of sign which is prohibited by this Chapter in subsection C
(prohibited signs and devices) of this Section (emphasis added); and,
• The modification will not increase the allowed height or area of any wall,
projecting, awning/canopy/marquee/traditional marquee, or secondary sign by
more than twenty five percent (25%); and,
• The modification will not increase the allowed height or area of any freestanding
or ground sign; and, ',
• The modification does not create a public safety hazard.
The second bullet above does not allow the Development Services Director the ability to
permit roof signs through a modification process, within the City Center Sign Regulation
Area. Instead, this modification criteria clearly states that the Director cannot approve a
roof sign or any other prohibited sign. Therefore, staff recommends that the following
text "or allow a type of sign which is prohibited by this Chapter in subsection C of
this Section" be eliminated from the code's modification criteria. By eliminating this
text the Development Services Division Director would have more flexibility in approving
other types of permanent signs within the City Center Sign Regulation Area.
H:\Division.s\Develop.ser\Dev&plan.ing'Jej\Downtown Sign Code Amendments\agenda bill issue paper#1.doc\cor
•
CONCLUSION
Staff recommends amending the City Center Sign Regulation requirements (RMC 4-4-
100H9b) in order to permit roof signs in the downtown area on a case-by-case basis
subject to a modification request. The ability to construct roof signs, will provide
business owners with more options for signage. Therefore, the City Center sign
regulations should be amended!to allow the Development Services Director the ability to
grant a modification, permitting roof signs, provided the remaining criteria for a
modification as outlined above, can be achieved.
cc: Gregg Zimmerman
Neil Watts
Jennifer Henning
H:\Division.s\Develop.ser\Dev&plan.ing\Jej\Downtown Sign Code Amendments'agenda bill issue paper#I.doc\cor
4-4-100H
3. Map of CITY CENTER SIGN REGULATION BOUNDARIES: •
1, Tiff —119 lilt ICTT Ili 1 b exp iiflu.=. --
i S. 'EN Illowt
sir.— raw C
ki mum.. m.�wcl;
Renton Mudd* Mo1 \ a___
"SMI MB `=-
. i 1 n i um„,,
I ■■
�Port Yah �` . — M ■ l,a� -
morli
moni
`‘ *#*4
g rob, E4 II II
II l minim f : , am m•`� i#1. 1 f: re*13 •
' --I 1 II I► _— a ii.1.1.ix A i a rii r iim 2 %,,, A&
.\,,, ,
..„,,, to =I. •
in
.. . 4 Illgz
1 =1.1 /W.." ILI ■■ ■I, ■■
• • / I i Ink "IP l aildod% tL cb Bibb _ ■■ MW1 i do.:.
0 011
■■I+� I 1II11111 _11■ ■
IHr iiii"� ► +tow* /� Al •
111) I' 1I'I1J .ttit 1 ./.1 —EN li
$,
NM MI
III'" ��,I■�. �.�- IX la rata �' ,� � V.
ill
va
jr' w w II =11 ._r_ st. �/►
,.....---,___.=:.go I =,... == —
_— ��. •lam.immo:ffim.... 1 iME MI 4ism, MIMI
NI `M IItj;
.....,
. ..
.1_4„,IS
.1■=MEW Amiu--, ri- • Hivitimi A
=I - '1= IMI.Ligl. Nt=ff ddiendom „A:: , .. ..MI MN Ind"
(Ord.4720,5-4-1998)
•
•
•
• 4-50.1 (Revised 8/02)
4-4-100H
H. SIGNS WITHIN CITY CENTER— -
SPECIAL REQUIREMENTS: -
1. Purpose of Special Regulations:The
purpose of the City Center sign regulations is
to provide sign standards and regulations
which recognize and strengthen the unique
character of the City Center area businesses
and streets,provide for appropriate signage
which contributes to the economic vitality of •
the area and which complements its environ- • •
ment,and to enhance the pedestrian orienta-
tion of the district.
•
2. Applicability:The sign standards of this
subsection shall apply to the property con-
tained within the City Center sign regulation
boundaries as shown in the following figure,
generally described as including:land which
is zoned Center Downtown,excluding lots lo-
cated on Logan Avenue South,north of the
intersection at Airport Way;land zoned Com-
mercial Arterial which lies east of Lake Ave •
-
nue South,and between Tobin Street South
and South Second Street;and land zoned •
Commercial Arterial which lies between
South Second Street and South Third Place,
and east of Rainier Avenue South,excluding
parcels which have frontage on Rainier Ave-
nue South and lie more than one hundred
sixty feet(160')north of South Third Street
and land zoned Multi-Family—Urban which
lies between the Cedar River and South Sec-
ond Street,and between Houser Way South
and South Fifth Street.(Orel.4720,5-4-1998)
(Revised 8/02) 4-50
• September 15,2003 Renton City Council Minutes Page 329
contractor, if all required releases are obtained. Approval is also sought to
transfer$8,000 from the Reservoir Recoating project budget to the
Replacement of Water Well EW-3 project budget in order to close out the
project. Council concur.
MOVED BY KEOLKER-WHEELER, SECONDED BY CLAWSON,
COUNCIL APPROVE THE CONSENT AGENDA AS AMENDED TO
REMOVE ITEM 8.i.FOR SEPARATE CONSIDERATION. CARRIED.
Separate Consideration Community Services Department recommended approval to use City Center
Item 8.i. Parking garage fund savings to increase the Pavilion Building renovation
Community Services: Pavilion project budget by$80,000 due to unforeseen site condition expenses.
Bui� ldin�Renovation,Budget At the request of Council President Keolker-Wheeler, Community Services
Increase, CAG-03-005 Administrator Dennis Culp explained that the additional$80,000 is necessary
to cover unforeseen site condition expenses found during construction
($50,000)and to restore a small contingency fund($30,000). A decision is
needed this evening on whether to increase the project budget or to reduce the
project scope to stay within budget by replacing the glass at the east and west
ends of the building with siding(the glass procurement must be cancelled by
September 17 in order to receive the credit).
Mr. Culp,;stated that funds are available from the City Center Parking garage
project savings to cover the increase in budget, and he estimated that the garage
project realized a savings of$1.3 to$1.7 million.
Councilman Parker indicated that he was a proponent of the Pavilion Building
remodel,but was disappointed to learn of the need for a budget increase.
However,he acknowledged that glass siding would enhance the architecture of
the building and agreed with the staff recommendation to increase'the budget.
MOVED BY KEOLKER-WHEELER, SECONDED BY NELSON, COUNCIL
APPROVE THE PAVILION BUILDING PROJECT BUDGET INCREASE AS
PRESENTED. CARRIED.
OLD BUSINESS Council President Keolker-Wheeler explained that the matter concerning the
Annexation: Hendrickson,NE 10%Notice of Intent to Annex Petition for the proposed Hendrickson
Sunset Blvd&SE 112th P1 Annexation,continued from the Council meeting of 9/08/2003,requires a
Council decision tonight as to whether the 10%petition should be accepted,
rejected,or modified. She added that questions arose concerning the mobile
home park located on the eastern portion of the site,and the displacement of the
mobile home residents if the park closes.
Councilwoman Nelson recommended that Council accept the 10%petition and
authorize circulation of the 50%petition to annex. She stated her belief that the
owner of the property will develop the mobile home park site regardless of
whether the site is annexed to the City or not.
Councilman Clawson expressed concern regarding the mobile home residents
and questioned whether they have been informed of the proposed annexation.
Economic Development,Neighborhoods and Strategic Planning Department
Administrator Alex Pietsch explained that if the mobile home park residents are
registered voters,they can choose to sign or not sign the petition supporting the
annexation. In order for the petition to be successful, it must be signed by 50%
of the registered voters and 50% of the owners of the taxable property.
Added - V/5/0003
CITY OF RENTON COUNCIL AGENDA, o.LL
.
lee Jelreljalti- • Al#:
490411a eete,xcei dorteAdA,
SUBMITTING DATA: ! FOR AGENDA OF: September 15, 2003
Dept/Div/Board Community Services
Staff Contact Dennis Culp Ext 6606, AGENDA STATUS:
Consent XX
SUBJECT: Public Hearing
Pavilion Building Budget Increase Correspondence
Ordinance
Resolution
Old Business
New Business
EXHIBITS: Study Session
Issue Paper— Pavilion Building Budget Information
Other
•RECOMMENDED ACTION: 1 APPROVALS:
Refer to Commi of the Whole 1 Legal Dept
Finance Dept
Other
FISCAL IMPACT:
Expenditure Required $80,000 Transfer/Amendment
Amount Budgeted $80,000 Revenue Generated
SUMMARY OF ACTION:
Several unforeseen site conditions have surfaced during construction that require either a change in
project scope or an increase in the project budget. Specifically, additional concrete was found under
the floor slab; additional work was required to prepare the curvilinear roof structure to accept the
metal roofing; additional sprinklers were required; and the seismic roof sheathing needed
adjustment because the roof thrusses,'were uneven. No change in the originally approved scope
has occurred. The staff has identified the glass gable ends as a candidate for scope reduction
should an increase in funding not be possible. Additional funds, however, are available from the
garage project savings.
STAFF RECOMMENDATION:
That the Council concur in authorizing the Mayor to use the garage fund savings to increase the
Pavilion appropriation by $80,000 to cover known site conditions ($50,000) and to restore a small
contingency ($30,000).
rev.9/13/93 •
•
•
AGENDA Bill Pavilion Budget Increase.DOC
MEMORANDUM
CITY OF RENTON
COMMUNITY SERVICES
0 Committed to Enriching Lives 0
TO: Kathy Keolker-Wheeler, Council President
Renton City Councilmembers
VIA: Jesse Tanner, Mayor
FROM: Dennis Culp, Community Services Administrator , 31)\NANJ
STAFF: Dennis Culp, ext 6606
SUBJECT: Pavilion Project Appropriation Increase
DATE: September 15, 2003
ISSUES:
Should the City of Renton increase the Pavilion Project appropriation by$80,000 to
cover unforeseen site condition expenses found during construction ($50,000) and to
restore a small contingency ($30,000)?
RECOMMENDATION:
That the Renton City Council, authorize the Mayor to increase the Pavilion Project
budget by $80,000 to cover unforeseen site condition expenses ($50,000) and to
restore a small contingency ($30,000).
BACKGROUND SUMMARY
• On February 16, 2003, Council authorized and appropriated $2,592,112.81 to
renovate the Pavilion Building. The scope of this work included air-
conditioning, a raised floor, and glass at the gabled ends of the building.
• The project budget included $186,352 in contingency funds to cover
construction change orders and design change orders.
• During construction several unforeseen site conditions and design
clarifications surfaced that required the use of the project contingency.
• The attached budget breakdown identifies the expenditures required. Note
that none are considered scope increases.
• In order to stay within the original budget some scope will have to be reduced.
The most reasonable scope reduction is to replace the glass at the East and
West ends of the building (above the store front) with siding. This action will
not preclude the city from installing the glass siding at some future time. The
savings is estimated to be $50,000, which will cover the known changes but
leave the project with no contingency for future unknowns.
• Should the Council authorize an increase in the project budget to cover the
known changes ($50,000), the Administration would also propose a small
contingency ($30,000) to provide a means to deal with other unforeseen
situations. These funds would not be used for scope changes.
• This additional appropriation represents a 3.1% increase in the project budget.
• Keeping the glass at the gable ends of the building will, however, improve the
visibility of the space and allow the aesthetic value of the bow string trusses to
be more fully appreciated from the street level.
• Funds are available for the garage project savings to cover this increase in
cost to the Pavilion project.
• The sense of urgency in deciding this issue quickly relates to the timing of our
ability to cancel the glass procurement. The general contractor has stated that
we need to cancel the glass procurement by September 17, 2003, in order to
receive the credit.
CONCLUSION
The value of being able to see more fully the interior of the building from the street
level at both Logan and Burnett is more important than reducing the scope of the
project to keep the effort within the budget. There are funds available from the
garage project to cover the additional requirement.
•
Pavilion Project Budget
Construction Contract $2,242,077.91
Change Orders $190,107.90 (See next sheet for details)
Project Costs
design fees $127,500.00
CO#1 $19,000.00
CO#2 $35,000.00
permits $15,266.;94
testing $7,440.00
contingency $0.00
PROJECT TOTAL $2,636,392!75 Includes the glass at the gable ends of the building
Funds Appropriated $2,592,112.87
Shortfall -$44,279.88
PROJECT TOTAL WITH GLASS AT THE GABLE ENDS REMOVED FROM PROJECT: $2,586,392.75
Funds remaining $5,720.12
I _
CHANGE ORDER LOG
Description Cost
Builders risk insurance $8,061
Roof sheathing $19,423
Credit(PR#3) ($618)
Subsurface Concrete $8,830
Sprinkler density and dry system $29,503
Sack& patch spandrels $10,908
PR#7 change details OVHD's $23,511
PR#6 add louvers $1,713
Potelco transformer $13,316
Transformer hookup $33,613
Week time delay $6,033
Purlin Repair $342
Gable ends re-inforcement $17,824
Deduct frittered glazing ($2,211)
PR#5 add height to door $4,307
PR#4 revision to DN room $5,971
Future conduits for tenants $1,583
Sub strata finishing $8,000
TOTAL $190,108
July 14,2003 Renton City Council Minutes Page 244
Citizen Comment: Johnson- Arland "Buzz"Johnson,334 Wells Ave. S.,#221,Renton, 98055, speaking on
McGowan's Restaurant, behalf of the residents of the Spencer Court Apartments,reported that the
Hanging Flower Baskets problems the residents were having with the neighboring McGowan's
Restaurant have subsided. Additionally,Mr.Johnson complimented the City
on the beautiful hanging flower baskets.
Citizen Comment: Devine- Matt Devine,527 S. 28th P1.,Renton,98055,described his 4th of July
Fireworks Ban experience, which included watching fire trucks respond to fireworks related
fires in his neighborhood and surrounding areas, and worrying about the safety
of his house while he attended a planned fireworks event. Mr. Devine
encouraged the City of Renton to institute a total fireworks ban,noting that
people do not understand the difference between legal and illegal fireworks.
Reporting that the Public Safety Committee met on the subject of fireworks
today,Councilman Clawson stressed that this is a complicated issue and the
Committee will continue to review the subject. He noted that the Committee is
looking forward to receiving reports from the Police and Fire Departments
around September.
CONSENT AGENDA Items on the consent agenda are adopted by one motion which follows the
listing.
Council Meeting Minutes of Approval of Council meeting minutes of July 7,2003. Council concur.
July 7,2003
City Clerk: 2003 Renton City Clerk reported the official population for the City of Renton as of April 1,
Population 2003,to be 54,900 as calculated by the State of Washington Office of Financial
Management. Information.
CAG: 03-103,SW 7th St City Clerk reported bid opening on 7/8/2003 for CAG-03-103, SW 7th St.
Drainage Improvement Phase Drainage Improvement Project Phase I; seven bids; engineer's estimate
1,DDJ Construction Co $305,058.88; and submitted staff recommendation to award the contract to low
bidder,D.D.J. Construction Co., Inc.,in the amount of$305,293.34. Council
concur.
MOVED BY KEOLKER-WHEELER, SECONDED BY CORMAN,
COUNCIL APPROVE THE CONSENT AGENDA AS PRESENTED.
CARRIED.
Added Correspondence was read from Judith Fillips, 3405 SE 7th St.,Renton,98058,
CORRESPONDENCE expressing concern regarding the use of chemicals along the Cedar River Trail,
Citizen Comment: Fillips- noting that Tier 1 chemicals can have significant long-term effects on humans.
Cedar River Trail,Use of She encouraged the City to discontinue the use of chemicals not only along the
Chemicals Cedar River Trail but also on other City-owned property. MOVED BY
CLAWSON, SECONDED BY BRIERE,COUNCIL REFER THIS
CORRESPONDENCE TO THE UTILITIES COMMITTEE. CARRIED.
OLD BUSINESS Finance Committee Chair Parker presented a clean-up report for the following
Finance Committee three items listed on the Committee's referral list and recommended that the
Finance: Finance Committee referrals be closed:
Agenda Item Clean-up Report • Referral 1317—Automated Payment Procedure for Utility Bills. Since this
matter was referred on 11/06/2000,there is now an online form(available
4,0\rittim � 6on the City's website)for citizens to fill out,mail in; and have their
payments automatically deducted from their bank accounts each month.
-- July 14,2003 Renton City Council Minutes Page 245
•
• Referral 1507—Gambling Issues. Council met on this issue several times
and,at this time,desires to make no changes to the City's current
ordinances.
• Referral 1671—Pavilion Building and Aquatic Center Capital Projects
Coordinator Temporary Hire. The Committee met to discuss this on
8/05/2002. Both projects are currently underway without the need of a
temporary position.
MOVED BY PARKER, SECONDED BY CORMAN,COUNCIL CONCUR IN
THE COMMITTEE REPORT. CARRIED.
i
Finance: Vouchers Finance Committee Chair Parker presented a report recommending approval of
Claim Vouchers 216818 -217404 and two wire transfers totaling
$1,774,490.49; and approval of Payroll Vouchers 44959-45293, one wire
transfer and 577 direct deposits totaling$1,845,559.39. MOVED BY
PARKER, SECONDED BY CORMAN,COUNCIL CONCUR IN THE
COMMITTEE REPORT. CARRIED.
ADJOURNMENT MOVED BY CLAWSON,SECONDED BY CORMAN,COUNCIL
ADJOURN. CARRIED. Time: 8:00 p.m.
13611444:4,t' si. 1441474-
BOA L WALTON,City Clerk ..
Recorder: Michele Neumann
July 14, 2003
I
APPROVED BY 1
CITY COUNCIL
FINANCE COMMITTEE Date 7-144°74°3 1
COMMITTEE REPORT
July 14, 2003
Clean-Up Report
The Finance Committee recommends that the following Committee Referrals be closed:
#1317 — Automated Payment Procedure for Utility Bills. Since this matter was referred on
11/06/2000,there is now a form online for citizensto fill out,mail in,and have their payments
automatically deducted from their bank'accounts-each month.
#1507 — Gambling Issues. . Council ha .met on>this issues several times and, at this time,
t'. i T
desires to make no changes to the City's current ordinances:'
#1671 — Pavilion Building & Aquatic;Center,"Capital Projects Coordinator Temporary Hire.
Committee met to discuss.on.8/5/0Z;.Bothprojects°are currently underway without the need
of a temporary position: :;
.c"♦
King e
dy Corm , i e ha� •
Don Persson,Member
cc: Dennis Culp
Victoria Runkle
- April 7,2003 Renton City Council Minutes Page 128
Solid Waste: Hazardous Waste Council President Keolker-Wheeler advised that the King County Health
Department plans to conduct a workshop on 4/18/2003 regarding the West Nile
virus issue,and requested a briefing by City staff to the Committee of the
Whole after attending the workshop.
RECESS TO COMMITTEE MOVED BY PARKER, SECONDED BY NELSON,COUNCIL RECESS TO
OF THE WHOLE COMMITTEE OF THE WHOLE. CARRIED. Time: 8:15 p.m.
The meeting was reconvened at 8:53 p.m.;roll was called; all Councilmembers
present.
OLD BUSINESS Council President Keolker-Wheeler presented a report from the Committee of
(Continued) the Whole concurring with the Administration's recommendation to complete
Committee of the Whole the renovation of the Pavilion according to the final design which includes an
Community Services: underi floor plenum,glass curtain walls on the East and West ends of the
Pavilion Building Renovation, building,and air-conditioning. The Committee recommended that the City
Edifice Const. Co., CAG-03- Council authorize the Administration to expend the previously appropriated
005 $2,3010,000. The Administration will return on April 21,2003,for Council
authorization to includethe air-conditioning option once the funds are
identified to cover the remaining project cost($292,112.81).
The Committee of the Whole further recommended awarding the construction
contract to Edifice Construction Company in the amount of 2,242,077.91. (The
total project amount of$2,592,112.81 includes the bid and other soft costs).
The Administration will find savings from capital funds or one-time moneys
and from areas that will not impact delivery of essential City services.
MOVED BY KEOLKER-WHEELER, SECONDED BY NELSON,COUNCIL
CONCUR IN THE COMMITTEE REPORT. CARRIED
ADJOURNMENT MOVED BY NELSON,SECONDED BY CORMAN,COUNCIL ADJOURN.
CARRIED. Time: 8:55 p.m.
8011444:4, Idal4fri--)
BONNIE L WALTON,City Clerk.
Recorder: Suzann Lombard f
April 7,2003
•
April 7,2003 Renton City Council Minutes Page 125
SE,Renton,98158;Vicki Dodge, 18622 SE Lake Youngs Rd,Renton,98058,
Chris Fleck, 6123 S. 242nd Pl.,#12-205,Kent, 98032;Darren&Davida St.
Yves, 16624 133rd Pl. SE,Renton,98058;Jennifer Haines,Boulevard Lanes,
SE 192nd St. & 140th Ave. SE,Renton;Dollie Meyers, 18919 140th Ave. SE,
Renton, 98058; Sunny Kathlean,Fairwood area,Renton;Vicki Murphy,no
address given;Elynn Clayton,21429 113th Pl. SE,Kent;Dr.Timothy White,
12940 SE 185th St.,Renton, 98058; and Shari Blevins,Seattle resident.
Councilman Clawson explained that several citizens approached him about an
off-lease dog park within the City at a recent Highlands Community
Association meeting where the"KDOGS"from Kent were present. He stated
that the citizens brought the issue to Council at his suggestion.
MOVED BY CLAWSON, SECONDED BY PERSSON,COUNCIL REFER
THESE ITEMS OF CORRESPONDENCE TO COMMITTEE OF THE
WHOLE[ CARRIED.
OLD BUSINESS Council President Keolker-Wheeler presented a report regarding the tracking of
Committee of the Whole restrictive covenants required through the permit process. Until a few years
Development Services: ago,covenants restricting the development of property were difficult to track.
Tracking Restrictive Staff generally did not know if any restrictive covenants affected a property
Covenants unless a'title report was provided. Title reports are expensive for applicants
and are only required for certain types of land use applications.
At the end of 1999, staff completed a project cataloging and mapping all of the
restrictive covenants required by the City. Staff can now research the
covenants by consulting a map to identify affected properties. A corresponding
database provides the recording number of the restrictive covenant,a legal
description of the subject property,and a summary of the requirement of the
covenants.
In addition,the Permits Plus permit tracking system is utilized to document
conditions of permit approval,including covenants. These conditions can be
researched by project name,address or parcel identification number. Another
tool developed by staff to track project conditions is a matrix summarizing the
required conditions. Copies of this matrix are distributed to the contractors and
inspectors at pre-construction meetings.
The Committee recommended no further action be taken at this time.
MOVED BY KEOLKER-WHEELER, SECONDED BY BRIERE,COUNCIL
CONCUR IN THE COMMITTRF REPORT. CARRIED.
Transportation:DWI Council President Keolker-Wheeler stated that in the process of reviewing
Memorial Signs agenda items 6.1.it was noted that there currently is no policy in place
regarding DWI(driving while intoxicated)memorial sign placement,and
recommended that Council consider development of such a policy.
MOVED BY KEOLKER-WHEELER, SECONDED BY PERSSON,
COUNCIL REFER THE MATTER OF DWI MEMORIAL SIGN POLICY
DEVELOPMENT TO THE TRANSPORTATION(AVIATION)
COMMITTEE. CARRIED
Community Services: Council President Keolker-Wheeler advised that the Committee of the Whole
Pavilion Building Renovation, meeting would continue at the conclusion of the Council meeting for further
Edifice Const. Co.,CAG-03- discussion concerning funding for the Pavilion Building. At the conclusion of
005 the Committee of the Whole meeting,Council would reconvene.
APPROVED BY
CITY COUNCIL
Date V-7 ad03
COMMITTEE OF THE WHOLE
COMMITTEE REPORT
April 7,2003
Pavilion Renovation
(March 24,2003)
The Committee of the Whole concurs with the Administration's recommendation to complete
the renovation of the Pavilion according to the fmal design which includes an under floor
plenum; glass curtain walls on the East and West ends of the building, and air-conditioning.
The Committee recommends that the City Council authorize the Administration to expend the
previously appropriated $2,300,000. The Administration will return on April 21, 2003 for
Council authorization to include the air-conditioning option once the funds are identified to
cover the remaining project cost($292,112.81).
The Committee of the Whole i further recommends awarding the construction contract to
Edifice Construction Company in the amount of$2,592,112.81. The Administration will find
savings from capital funds or one-time moneys and from areas that will not impact delivery of
essential City services.
00404 — PITko
Kathy K olker-Wheeler, Council President
cc: Jay Covington
Jim Shepherd
Dennis Culp
COW Pavilion committee report REV 1.doc\ ! rev 01/02 bh
AGENDA
Committee of the Whole
April 7,2003
SUBJECT: Pavilion Renovation Project—Funding Discussion
HISTORY
FINAL DESIGN
BIDDING STRATEGY
RECOMMENDED PROJECT
COST INCREASES EXPERIENCED
RECOMMENDED COURSE OF ACTION
r
PAVILION HISTORY
• Council authorized the Administration, via an approved Committee of
the Whole report on June 3, 2002, to proceed with design of the
pavilion renovation.
• On July 22, 2002 the Council authorized the Mayor to contract with
Mithun Architects for design services.
• On two occasions (October 14 and October 21, 2002) the Committee
of the Whole was briefed on the status of the design progress.
> The first meeting was an"information only"presentation of the
design status after 40% design completion. Council feedback
included suggestions for sinks, awnings, baby changing stations,
and improvements to the Burnett Avenue end of the building.
> The second meeting on October 21, 2002 authorized final design
with an under floor plenum and a bid document structured with
adds and deducts to test the construction market place. This
meeting authorized the Administration to spend up to $2,000,000
on the project.
> The Administration cost estimate with under floor plenum and air-
conditioning was $2,157,086.
➢ The bid package was structured to see if the construction market
place would produce the $157,086 in savings needed to get from
the estimated to the authorized expenditure.
• Bids were opened on February 28, 2003 with all bids rejected due to a
mathematical mistake of the Mechanical sub-contractor, which
affected 5 of the 7 bids received.
• Re-bids were opened on March 12, 2003 with 10 bids received. The
apparent low bidder for the preferred project(under-floor plenum and
air-conditioning) was Edifice Construction at$2,184,890.47. When
design and engineering costs are included,the project cost becomes
$2,532,065.99.
• As you may know there were two protests. Both were determined to
have no merit by the City Attorney.
• The cost increase ($374,980) from the project estimate on October 21,
2002 (60% design complete) of$2,157,086 can be attributed to:
> Cost of materials was higher than expected due to the increased
cost of energy and stable (not decreased) pricing for special
manufactured items (windows, roofing, flooring, mechanical
systems, etc).
> The bidding climate was intense (10 bidders) but not as aggressive
as anticipated.
• There is somewhat ofj a sense of urgency in deciding this matter.
Even though the project manual requires the General Contractor to
hold his bid price for 60 days, subs often only hold their prices for
thirty days from bid opening. Therefore April 12, 2003 could produce
pressure for price increases.
• After Mithun presents the final design that was bid, we are prepared to
discuss the project options and costs.
•
COMMITTEE OF THE WHOLE
COMMITTEE REPORT
April 7,2003
Pavilion Renovation
(March 24,2003)
The Committee of the Whole concurs with the Administration's recommendation to complete
the renovation of the Pavilion according to the final design which includes an under floor
plenum and air-conditioning. The Committee recommends that the City Council authorize the
Administration to expend the previously appropriated $2,300,000. The Administration will
reurn on April 21, 2003 for Council authorization to include the air-conditioning option once
the funds are identified to cover the remaining project cost($232,065).
Kathy Keolker-Wheeler, Council President
cc: Jay Covington
Jim Shepherd
Dennis Culp
COW Pavilion committee report REV1.doc\ rev 01/02 bh
,._ NntiniAttet 626 V-Ite ko-14-41''maeRld
•
•
• , i i 1-,..,----v ,,\ ,1 i /1)(
..,
\ \li
i
I. 1 I I \ '
/ . ., ,,
.. \\ A r, \ 11
i - ,(..,.....
i • /I/v\
\ \/\\,/ i
•
• . ., .
• , •
•
‘\
/ i" ;2. ;
'` k X ' 1,11 li 1 1 .
\
, -
ill 2
•
• -
,... - _•
....,-----
II ,•,,,, 1
. ..
. .
. ,•- .
•• •
• . .
„-_:_-7- ;
• .
•.
1,1 '
• ...; • •
/ t I
•
•
1 i
)
•,. . .
V\ /4
•
, • .: , •
. .
. _ _.
• •1 .
• . ./
7
• .
•-- ;-1-...'---,-1
.;,--,,,,---,----•,/.' -}7L-re,-- .,A
k....._,
,-11,...., •,...,„ -;;?--z•-•-,-,...„---..........
let,,,
r .
-__ -_ • •:.-4?-; ---,-..--• --.„.:„ ..., =,-----....2_. . .
- •• • . r ,
• , ---...„.„--... • -.;r4311111: --, i - ....„. ',-;zi-..: . . •"----,___ ''---...,_IR.4--------.-:,-..-•E;:--:-.-_•-•:::: ' •••-'
..,..._ •_.. . -
- -----,._ :-.•...--',. ,.:- . . k,-,,...„ : ..1.;;;, . ,7,.;,,,;..,.• ...,.. ___,..,,. ___ s .... .. •....„ ,, . . •
. . -, •' 1 .
----'-'7-------,;---____ . ' -:. ,•.• '''-‘,----. ---------1_,___________------=,--,-- ___:-'- - ------ .
I i*
•
...- . • . _ ...
,
. -..
-._. -,-,.,.:..,„,--,-7-,._...„._--- -- --• ....., .
. .
.1 2.101 4. .'!F.•-r , .....,N ..___..._____„.._.:....„•_. .. ._...„.,•.„ ,. . . . , ._ ...
....,..:A.4 •4,6 t_.\'•• •t4-
\ ‘)( I
.. .....•;,-••••••• •0•11,',T•1% ;.•p'14:‘• 4; ' ,„,,.,-,,,4,., '''. ,11113..--"7-- -------.wz--:-:-----2:-.'''':....' -7:'••----11111%,:7.7.-- --------:1•7=---- -- 7---:-. :-.- -- ------- -.. • :
• t . 4.4 .
• . .e7.i',0*.:Yir*V114:‘:,'•. . :.•"'
L _ --- ••••.,
. . . '
.:..,,:..:..If.,ir ._,...--,. 7.1...--7.:. --z,_ :,jr"-7::_-__.1-7:7"--Ic;1._• -;;,.•._1'.-.-....-•.r.::-/1;7!-;--•;;;-';;:i eliggrt.----- -- -------------'-------- ----'''''--------------. _-:':---:1-P-----------------:--- --t---------------t:- ----"-. ----'--
.4- 4. •0,1 .i .,-,411 4.!itO. - • .,...',1 •i:r?..1'.4•
--.el.••.,' .!•1 4. ‘Li ..4"..,,er ir- ,,,i,v,,e. , . • •..,,o.0A.41 i t. —
- • -
.,.•-• - --.,.._:-, i' i
r.•?,, -',.-44f 4--/N...!,i'-..! I'441'.. ..e,;•6..4‘t,,102- •-Abi •4 ii.v..' ds.vit'
\ \I \*
4.....t.3-$r.,,,,,v ,...:.,..:.74. 3 i,t. .0.,......;,•4,,,,,,,),,i,A,.:rz,. -....,:,•,! ,•;,.,th...•.--....-- - •,v_i, •:,-•-:-•= :•;-• • L:.....---•:-----_- . 5;---=',-- -:,3;.:1-2.4-.•,__,== LI-tr_- ;1 r '6:11'.•,-_-_,,,..91 -..----------,------.7-.------,-----..--.., __;:-----____'•,__ )
.•
. ,
• •/.1•••'.,,4-...",;-,,,•„‘''1•..."c,,,•• •'•.`:_k t.V,-.."---..' ., ••••1••••..,,-11111 '- ,\-i.Aint.W-_-,--.0-:-% •,-4.;-, -1...., ,,,',,i-4.-,4,w V-. 1,-.L:-__ - .p6 1.2.......„-. ......-g-tr..-7-_-_-:-:z.1 -'-=-.....-.1,..-',.--:-=':=.=."---5-4 nr.--,--- -------,,......._ ------. ....-:-.--z-.-_i.,.---,„:
N.. -4e r•,:,••••,:f,..'ilt.A• 4>7:‘,..,-,..,'-• -,--, Ti--4-.0,A..e,!:',.-., ..
\ \/\
r•'=;,•:, !:'''.IP i`...C•sip,. -.-.. ..-",.--1..ul'-:.-••,.. ...'..:fi:.At.;01."0,1.4 -•vi," V,,z4,_45.„. ., , . , ___...._, .. . ._.-_______ ,E,L---z__„,.._ i-••- _,....1:.--.,' 1---7: I•‘="--',":•" -;,......-,,-. _-,-; ...,--7. -,.:•_...,..,-,•4.,....- ig- ;....,ia-:-..,,D--,_ ..,-..-.- ..,_•--•..--z----------7.,..,--,--_ -
r . .,,,,_.:, ..,0.,...f ,.0. .i„,.....:1...,„,... ,1,_.;,ii,i.„..„,,,,:,.,.4.t.if 4,i' : t:P.,,6r-i, ----A%,;";--;":---.1.' "--------s',.'- -------- ;k--- I P-q-z-17:7: -;7----'77------''''--'-'1'-', ;:';',.qi-.-±-1 Ir-L- - -'-.1:' '-ri: r:••-•:-- -:--=‘Ii.--,-11 ...2 -.T'hi 1-'''''.'`;";:::-.----'-':'-
•
I .' '.4*..',11'...-- '.--;''' 4t'll i'?-4%:7.1.C1 '';',..5:i'e,ogitrf21.1..1§ A.f1 \c-; '.,,A,.-•‘-:---,----r._ -r—c il ap.a.t•-7.*::[,_:i P,..?=.- : .---- ---li.'--...,._=,, ,,.._. .11-.ill Y * -• - :
- '-'•--•-= -.,-- -- - -_,- •2711-T.--.,,- 1*----'..:•-----.---1---4-:- - c.-1 ,4 ',, I 1., :1 „
r.•,, ..--.7.j..,,,,...--.:-.,16,,,,..,:i.,-.-L-t--.;_r,ii...:7:-::,-;:::-.`...,:.A.3.,),Z."-'''il !...-7j.'115:.."' .:%...... -
.:-:''''''''''iv:170:? 411-,7t4.11',‘';_tP‘ .;,') '-t;i1 -. 7.F=:=1;---'— '1'4;",..;t ; • -'Vl ';'.1,, 1:,;.,....: :i,;-,..;.. .
4,,!r 4•A`TAV....;.'=', .:k PIL,‘,‘ .,-.1.f.--kl‘r.',ktOgit to.;:,-4•,1721 .7, ..,,:5-...„ss : • • 4 ..
' ':A:"'t?v, 1 ‘ita4,•:-.'1'•- iii F''.. .47'F 0. YA .4.'4Y. p.' zii'''L-1.('- I TaT,40„ i _.1,==:11/....,• -'.i. .,..j...:,.--...l.li„11111:-..----:---• .',',1r,it!r T.:-.1-1111!it rir'.'•111(111.-11,•itili;11-!•1, it•I' „.,,,,,._,._ .
- tA4`i. .1,/ -1...,:it\\ i*--yr. /i,-,,,,\AMIIIII9,s-t• -•7. ,....;j. h,...„..,,..1 , ,__. _.7., ..1.-. ____ -----..- - -,- - -----. 1. , $ • riw,„,,,w4e. ........- ..,...-,„
.... . - . • it:. „ll 7;11 11 11 •'s- -1 1-1 ':7.11' . II= 44,03F-, , , VSkt,"•';1-•:;..-,4.-4.5
TA-'''.. ''....-1Y. 1 ' -4/1 ‘IV' fe...*-11r. __ ,.. *, • ,.f., -, - -, - 1 - - . i
1 'ail i..., - --,-..,,,,Forx.. 1 •
Alt!. 1_1,- ,t ,,441.-.4-11 ,-„,Ed .A--- ,..f.,,,e...*A4-.
•
• y,,.:--:, -_,-4/ '-',f4-.,,,A,--gf.x::::',-.:•,-.[,,,i ri
-
i ';',,,41.;,,,:;MI,,‘ l''' 4 1 .'''''''• . i -.2 Et3.-'i -Ill IRA- 1 1 it ... 1 1.11. Elf !
-i -
_. .
..-.:. :,,. ._,...
„,,,,, -..,..• -,..,___.„.„„•;.,... _I., .„-‘,,,....., i. _fr„....:„.. -...,......._,_, . _ _.....,. ....--_:,„-LL. ill ''''-h..--144 .) -• '17.1`..'' - -:: -..-- -: 47---- "7.. -. • l' "' :- :"4. t.. ,
v '•'' p- 1•ie. 1-...!:7111.dr4r,--f.-: _.-,=.-.L-f7.4.. i.- --L:•7;".- m.,.=sil. witiri.: -•, . r.
1111 I.,..,- ,-,• ..,,., 1,__,...--__, ._._ -,....z*:‘,..--- ,_.,,;;;-•••--. ..,r,--..... --.1-'-. . . -.
i7-,:-4--.,.,..1.----,...-, .:...-k,... r., !, ,47-?.%VI.4 .11- .-444.4- 1,4. 4 te- .•14,k. .41- - ..- — -— I-.,
'di,''. '•-.., ..A.1 illita% 1,,":. 4. 11S•' lull, d ;---;:7,,,;;•-•' -,••-•-• -1 ‘1--',. ., ------4! ..''-- ,,,--
-...„,...„ , •„ _ .,_
•--.3-1,-,.:`*1.Of 1-0'..,,"-;,4; . ,T.,14 !It::: , '....:-:.•11,IP. - 74k: *:----.. 411741";;,,,..'- 1111\44 4•. ;If; ,I. ' \- .,,;,..1 I 1.-"'Aeik:. i i', .4- 17.......__ ‘ ,.. _ • ,•,_....,...„....._.. • . , ..,!. .•...,:_,.._ ,... .. .._._.. z ..2,,,Ii, I,..,.._.,.s______ ,,.,. ..7..„.t,.‘,.,5„...„....„_.7.?„,..7i:i_.
go-w.,--- ----,-::_:7,A-,,r.., 1-,L.1.•.-il..., :57-1---i-.)ifili% .:;;1.--- r, ii.ML-• 4:;-:',14,11t,.3.1. ___ _--A,...! -•'',.),-'el-'11 Iiii-',.:1p;`-- 9 ''''''C:::.7"-: ' ; ----''''''4 r- "4..".'"' : ..w. l.m.,1 -. --- t.-4. ...„.:.,...._II
, __ -
_ _
,',4',:*.4A-,!. • ". .c..4..i.4, L.„4.-,,,,,3 ...IV% 'd MI_ ..,,,..i di - ‘ al F.-, •I' a..il ., ' ••-•. .-- -,. . 7...- ---, ,. i--. ,. . I_____.- . - • ..... ----- •—• ii--'•=••,• - •.-••-•,..r.•-•=-. 4..,---- '. ' '''''' •,..1••.--f&t..1" "' .•*•" ' • - '
....••••• .-,-;.-____--,...,,v, ...!:_r .,-,7-,-.3-n'p.,.,;1,1 ti,:,,--.--• 1 ,N7-5•1111.7-- 1:--7r- ‘,....___- _,---,_,!..,.,:::•,a ..,7-,,,_., - - ----7 Rim ,_., ,.-.-„,,,„_-_ -,,--_-___.--,..,-..--..,. - _,,,..---,--.r...-4-,..e- •....- .....,N.-...-.,.....,----,- ,:-,;..!.- ----..------
.
at.v:iF--1-- t .'"'sz.;:-- -,111111.[W • -,•;:.-.1c------,-;-,-,-.., . ,..._. , . .,,,,11._, ...v.__ __ ,, ,..\
, --.--,,„, .-.- --.*..- .-- ,-. • ', esita,,,*_›..n--,..".• '--- ---- t-„---,- - -..,---- 1 .._,_:_.- i ..,*_;„- _ -4-..._- ..-% • tref,&,, • - -.......--- .-- A. .-14'-'""J. -- '-- -
-*i. . 't
' ' -' -4'.-! --. ---_---,..-.%--'------.4,......-. -".._ ^.A.'.'"'_
• • •• ' • -
... ._ _ = -,.--,..•. -•-,-•,.„•,.., :%.,...,a,.I ..i.,.!-......:_‘_„_...:: .... :,...,ta, „._,„,,. ....,,_:,=._. , it..,.,,:ii...„__,.,..,......._... ,___,....,,L,,,,,__,...,,,.. „.„.........,;,_,_,,, _______„_„,,,,,,__ _,... ___,.„_..,.., , „____ ........„.„ ._,.... ..,_ _ .
...i,e,
....
• tdi --.a.....17,...,.....!•• - I-4- —•---- -. ••••••--;•,..--,_-_-..- -'-• r'-' •••.._-7=- .r..., :---:•--_=-:-,•---',:•' 7 --'&--1.12-• i'•.. „.'s.7.-:- ---''.-_-•-•._..-.1- :;;:il-1::.':-,•÷A•3'W••''-r--'•: • ' --.;-:,- ---Z•••ky--,-4... ;.-'t, :- .4•,'"'-'-'...1,UVe."'-''''''• •
.,..••=,• '-----••••-.-•,•-•••4 0;•:..;-.1 il''''-'-.7::4--"'V';'•7.--'=•-•-.--5?;•-.:.- --• -•••.:%' •..'1.-75-•--t;', .11 :'''•-•17-75:•..--..L.7 -••• •,.,-....-..:.!:;17,_•44-1._-11,„_,.:;.v,• ••••6_,C2e--,:e _ ar:,,,,-,--,...,_.____.' •••-•"• .4.-__. -. •.IC'----‘-`.•pf,'••••2.VX.Ci-•,,,•*--1,,,- .1,',, , • •.• •• •
. '•1•:":..,-774- 4 . : k-77,--.._.,..- ---k.t.:1-,- ,......---i-- a.,....,,,_--_ -_-•-_-_,...---,--_,„,----_-„, --_--..--.,--
„--,z,-_-_,_.:-.- -_,..-„i.,-,.. .------..... .,---:- ,,•,i ,...,-----: -,,,, ,..1"*--',.1.---r,„*.--*4". .-_,--i. -.15.-.F4'.. .;:s,..-,..re.*4-.1•-•,.,'414. • :•- '-..•4.0.—-----.---..'---.-•''''' '..1.-4.-i.-- 3,1^.1%,.'''' ..f ......
M.,....------...., ._.„......7.z.........
...-,`---'---..•'-"•- -.---.-,.7-.1.7 - -7•-i----,I -0 ft''''-;,-.--:.,4,•...,..-----...-- -'..--,,,,;_r1,17:_-:••-,•,..._ ....,a„,,-...,-4,-- ...-1:r.es .,..., :-..',-._-.'- i*,•-•- k'.:,,v., '....,,'-.- , „ -.. ' ,--.-.: 1•*...••,-,!•,%•'
%
''.. --..;,----"-7:'''''"----- ,---,7,._,_.,...,,,,,
- --V.?,,a•a•.4:,,L..W.k.,._- -..-1 • ...,, _- 1••• ----1..---,---c-,-1
'- 4..•4.••_"•••••••••,-1;--._,-.7•"'...7-c..7•:-,1,7"--••.J;7, • -c...-''''••-•''.. ‘••-•%...2•Zi•-.-' •-••-:—.--•7•-,-.:•••,--C.-:-..-":,-7;:"-ik•S••• •1"1'1Fe ' ---"-••-r-E-.._ ..:-.1 4 04- .cv.:1;.--,44i.-1,,si-,'•--d-,:-* - "k.....=,S 4-Yrjr,--,_;-4!'. .,' .';.....- •-i- :''' 7..."'""...tir.,:' t..'-''' ,
.-----'7---"-:''';-•--•,'''' ''''' .''."-441,-'4TV A-*--4.'`...4.^ : '-'-`,440-k.-4-••••4.f4,,......."Vzter s.„-..Agirlifrwt .•,---,x,i,A,..•,._=:-• .•?,7,7:',, ,•,•:,1-r,,,,-"f•%' •jk.' -'
-r'''''''x'''., :,-.a%'-' •-•'‘,,r,•,,,-- -.."-..:NA . :,...-_.....-,..f..,..--r-,_--.....-7,...-7..--.;.
•- 1:04N%,• '-, - - -."e'V.').'7,-.7,..)'-.."'"'Z'....., • ...." .31%),V,M4.:----..e:.--"414%-,.1.-""4".‘",,,-"1--'- -.,'-^Z.t..- "..743 -tiC -..4 -,,
. .-^' •---..---”-'--.-.... - -*'''' ' ,--. ' ' "t"..'" Attil.r...t.4.`'.1'4."*.W.^-'7;..r.''1;',14,.---'''-'3,-..--1---.4 .'..-W-P,ITS. ,..Ati-A4-...-'. -, ...... T-. ...--.."-. ,-,,atirl,17*.'-•
- ..../t...,..-5...,,_
........._.„... ..................
. ..V..• tit,-,..„.,- .a..•.... • -,-----, ------,„--v.„,-.- - ..,....;., -,,,,,,;„:„. --1/4„6„.„..„:-_,...„,,,,,...... _ „....,...,.,„...., :._.,.. . .,.. L. ..• ..,.... .,..,.. . .
-.4:-- --wgz• - .L, .- .. , - 7---L----- •-.-L.- . •,. - • ..-.....44.:.--, ti,.. - ,4,--,,,-1.- . •-...,,,,,--„.„4„.... „_i-..----,-,._.._;.:--:,,,,......z....-.;.........•.:-..--.- ,,. .- —
"' - -4 --- 1,7 ,- - ----- -- • k.,.-.•• - ,,,,.. - i,.-_,-. ,;::-.,,,,.-, -. 1.-.. - ..-4.,-,-__ ---.„...,„.--..z, .-... .,__,-.-w.,. _ . -. j. -
,,,,,-, • .:,„,...k.,...•.: .-.2,-,,,_1•..,:_,..F...„:.....--,r_,,„ ..,;. - •Nt,..,..„.••, _,-;-., 41:-..--3.',.i..,. : ,',i„.• ,..1k,;.. --...,-:...,„-,,,•.4_,',,_ ,,,..,,, -:,-_,,.... .,••:-.,-.2.-,,;_,-.4.4-,-,.„--- . ,•-•-
•
•-w*,..-„,..._:, -,-- f' ,•-•. ,.,. , r4,,I,,,,•%.•••,•-y-t4 '''.'s;t•„4.„N',.,e...-• ,-..:, - -,,..-n..' %,Awe_' -:"..tr:;,,-„4... `.4,18t.04-_, -1-''': '..'''' ''• '," '''N!.'... --;:,-,-
' • ' ''•. :AV %,72-,r-Lcr ..-7e,EN . 144-i'''rtUe•z‹,- '.--. •----4-''''-‘t j ---t ---- - -,,, -r%--.ks''' '
,, .;•'-,-;.'77-, ' "•-•
,.
1--,-,N1 i,.:- ,‘.\ s _tk, ..,-.2..7 -f.„7.-)A•r)v..- .-7-7...4- •--:• -:'_:',...., '-.;'-- - -',,, ''- .•- .
•
" 4"k4,\,'.:c"..' At.k:-Lt ‘. .iiclg%_‘•'A--s,---t:'''- '• '.."-. 7-il.,• . '' ..:- -
•
z..0,:try.4-,;._.--":%.1-: .i. •s';'''-`-' '''',':A,--- 's? - - , . .
•
_ . .
•
. - - --A- ;•.- - '----: -1 v.; %'' \
•
,..
.. J, . •
.._.•• , . .._
.-1.-.".
:.4.
•
•
,-. .
,..-
- •
.--:
. .
. •
•,.
•
•
•
..
•
MEI
MITHUN .
RENTON PAVILION ,
•
. APRIL 7, 2003
. Arch. itects+Designers+Planners
. .
.,...
•
• .
Z 1
. al
1 1 I = E
I I I I I
• 1 , 2: F°1
PM 1I I I I
o
i —14
:::10:kot:i6i,,,•4111 ,: .41_ , FR - . .s,..i.erv ,')
1Y11Y1
i OA kioicitifsitkigillii - 111;1=MA.,,,i'' IfittillfrO2 _ - — simi
/1 kr--„•;sol, ‘,• simb-40w.tost:. ,,, outkito • . .. . .tIlf
f d 4!5... •)..,.. . .*. '..,, ,'" kt_.,.. Ian& il•Ps,4.*... z_
e -
fk
$ IiiiAlilill'H #
$111#11 ".e2i- '4."t '' *'4':11 k,'ill:ttfBf 6''.'4'il.rl --E - —
1 '".'10',,.."$Ail ‘. • . , ..
•‘'''T1' 't 1 d .. I .'....L i 1',
.ni
75371:11171WEittifttitiTsramixa,-,:int*• li•
fl' V •' 'f75' ^ , MR'i'6,•A'al;, 'IT P',
V 441.'4: 1 7 A"17; ', ligi 1 A Xil A 0
. .•'r .. ' - +, ' , . ,r, , '' . . .. .
-,1 It i'''''li_160i''''14111 We 04'.'-'.,,';;o':,2 i k''!.:Y a' 4 '' 1 ;•, .;,''1'..11
Intivstmsc;,lit4,4,4mv.: .-.40 'I. kr.
iiretlie("ailk',, 4triii,V 041611tiVig 1.','2
kit g
C-) ind,
J:I -.--_ 4 I 2...21.:,,, v al....- i..., •, 4 .:.. L ,..,:.2.11.1Lg: 11--,.....LI41c7,— - -
- - SI d.,111REPLImAltd,'..ii ‘,..,m• ,E4.
?„0 S' .''Ll '4*
:iii" ilv.;! .,$ '-LL'' ''. ',-.
. :*' ; c, ”1,'',L.7.1 40 4 '-::.7' r • III_ir- -44r-41';.
: . ', ;71i, ' ' —c '—c 4, `e•—• .Th. r ,
'' ' 11' ., 1,,I '." S , ''IT , '0/ MIt, V
. 0 .7
Ifi 44 ' ' " ' 'M
ii'''4 ' "111'
4,
iiii
, ,.,:,,,, ,,.„,,. , ,,,.. .,,t..:„ ,....,,:_,, l' ell::1121,
, 0 • jj 7',. t itall '01''1771'X'r*414 0, 'ril=MEV', ': ...14 0
1.#1;,:',13 t137-1P iii.4 .. . .. ..: t ', . tri4imiz orgi..Imi:,,It gAlii ----- - —
Id ifil I*ii.ifW k..'..0.,. *RAtApift,...'-', -ANA,
iie0Mkiilfityrii 44 •hOWV#41i;.' '..' ..2 :14[fiLE4060,
gitj** . '14 ttiri*Of.4010`' r,J."
r
t,t0,10.4 . plw IA Z12044 Kco:. I*4!r', ',.• kA At.,riA ;1.147F.Vill',i
Elthr,ilitill ..1:...r!IMM*1 ".41Wililt ,0,01... ftd,6140.111,,AOMInUit
01 ,0'..i loil*....' itIrt,, Arkw woo wet*eilitiitL,otoway
, 7, ',' ' ' 5 '','. ,,45, . 4
-- '
1114 tier 17art,,- :11 IFI-,11‘Cur.1 , •,' •-,' .:k
..- ----. ------- .1' '.',4 •r71.ApIll,4 .'' ', 1 #' • ' ' ',11 , ''67
0 - -
1 '1'; ''' ... iiT1 ,1! '.. '•. 4 . ' • 1 ,Ts' .-- fi . ... ",, ,l•
''''' ; 2 l'' ''''' '''''''*He''/' . !'""mbe,,I IN h*6g,'." - ' IfiljiMargIV!
. , j,', ti,i,'g ii'r.. ,,,'-..,_:4^ .'li W, .; ,;:, „It Of Mkt riff
i rot.71',Ito l'il'a f i '16';1',' RI'l':WO Iti'',' ''';''%f4, ,'Ill'i Li '7' .7 4 Pt"'44* •.,:,::711'
. : tiag,WiiiilL0a,,-14,9 'ittOgAllit 1. ''. . ' .1..-'
' •' L.:: IVAZIOrale Ii*fAfft4iiiikettibi01***101r -i.",,A11141.*Milittko.40 1
1 1110 .
r" 1 114:0111 Mtlikr**Otftliii1N4,,1
, 141' t*,
., ':. . .p,r1i. ., 14.0. .! ittixnemmi0.0....,r-r .. I , , I' .op itt.wl
1 itufkit.co,ira ti .,t• •..1A*14 1v, r-
I I ''' WI*.''''i* 1;1 ...r. 'I' f-rL.... • 'r. ,.. 4. ./,r,4.. I A.4, i'7 6'''.7' ''Ii
O - _ r—--7.t.,— ,..1 ,flicri,, 104..12 T.,_t.fla:C:::r..L.VCJRIFZZIME:LriLLI_ ii
`-=''.7,,,4,..,•1•,•1•11g- .e.'771 1,-pgi Itt0 "TiZt3.CfMnfiETT11:".1'-..ILLIT A.- 7:Tri
- -Atf., - '
Eufwitigrin',9to i.;.1 ),..urvulFriMMzizii=a
It.:1,,'4:til.lainAtlifitr"IMELT:11§Mtitinft:Irit ittritildiftsn
i'.i'\ ;,le 7tILZIFiViNziagmraPII.NZINI:77,1=Ell' 1
IMEXIIRELVIj'A' 1 I1 1 I 5 Ell.I.FT.I FOTIPIITER2
-. 0 ', Innit'l:/".:,1 ,#IIIFTIA4.71.tin:MOHR TE:tru at MEI
L'...4gr!..,.11:.' I, NI,'. YiElkiATheirdEL_ r.irmricliTZIMMI1
n'arita712111FINTLTI r..7. 77117.:1171FinEle:JIMr'i is‘i
C) oi P4';',; .',,L.I''.11i:475.1:111 !LJ#1# 4pMMil, I?'L11, VAt:. •;...
I.7rc;1Z.L;!,,Z*. _,..4.14-4rtittm)1.: •- wle--,i' - —
1 , ,*1."#.. M,""':F4 '.• .,4', ktia i t .,1.4 -14 - A -,11:10‘,. , si
', 41 '''' ''''''''''' • *ilk rA a 4. 11Q14.3•..e. -2*be:**d I
.11.. .,.;.., o km4.4 1 .W140114.1 .,..., ilk,.- _ oi • r'4, .I.,, r,
" . • ', 7;'..• __.-....:. W..'„....(.1..r,. r. - „I_LI'11.-M ' ' .L.h:--z r2.;t:I'd
mtral, ,,, .,, latiA.401,...,.1,2,,.:.. ,,.,411,71-
'ktl .' m 40;,‘i 0,-,!
1
O . i ,k,'5'''m.' ,,,.,1., ,,.'i I 17;‘,11;3-14 :12,,.''''',,:::•, ,'.„,.[-,..-i 4,--;',11::,,l,r7,1,,,:.11,-J,!:,11..,41,;;,:iri-..h,,,i,,.;,11,,,,,it, ,,'I --
I. ='—'94 141-r',,,,"-4--------r--1-11TA' ,',1-"0. 4"4 :ri ! _
I ' . '-' - it',''' '', '' -Sio.A0,11.0,!t ",,'''' - .-; '. . -' ,q,,'I J0:1
!'VI $''i 41,WO' 01111$1kic irN'''ht ! 1 ' ' '''''''' ''40411
1, .VA '''''Ilk 60041 il VillaiMPit '.4 it," '. :IN 61044 te0011i1401BAINif
,:1 " .r..I1:iii ....fsil '4._.igPlr..
;...'!"•••,':',.r..'-..,..,g1r--.-...--,4..•.::41`R,,,`.., 101K*40 1**A; ,11-I, Kt,.- IN.4 tiO•t*r •.:11.:
..r.... ,-,,.....4-irvii.;10;-.A.i:. ..41****11_141Apiamilfii0otif* 'W. *WOW 41".40011e
„..,....• ..-r.
••...•;.?Or1Zglizi.r..A,•;4. it faitil.**ilitikfil*Ntialtii**** '.' moolitidamia NI ViciAttai i
., ?:; :i
.".;::::..,,.;:,;;!.e!:,i;',;ri'
• •-•::'•:-f•Ze .1,,V.*: gi'l*..,'-21 RI ii11511161101if-Sis URA ai 1111..':g..1111141 MN li Id.%".fa it•., LW
fitopw.mq,NiggiVANwit4lopf 0 119d,iwg :1/4:pulkl, ,:tatfairi,P q10,1P1"44 Fa kil.ngtit?#110.1 .
.. ....,... '' ,,1" . ,Itg 1..11 6,7,1,' t*'" VL4a1/' ."••••-.. - -
N42 11441121 IN rliN i' bi MAW a Mil a. Viii el 4 11,„E., 14,,lq Vii...011,.01!ii0: 11A 1!
.".;,"#'111iii 11 N.IY.f a F. )4-'','.r., e
.'..-'.:;..i--,-,'"..2;..f..'0".!.1••.z,h.;,.. N'5','Ft'It 1•$1 r r.OM*, ".:, ' T 4 71 re 4., ill 14,1
Y. ,4444'i Al •., r, ,, . ,,, 0. ..,c,,,,,,., „. , r.,1,..„..,,,,.: - 11. ,,,...RE a.1h
,,,, ,., it, ,. -„iL. L ..,> Not ,
c.... 3.tor4;:t4 ' II 10 ! whollott, ra , .Iticii 'H.110 101,10 A01,,,_ ,..0.49,:l
- ..i.i0,-.?2,*4r,
-: ,.•,-q',--:-.-git'4-44., .i.,,,, tgl:oll'4111.1filikl ..'.•• ,: 11t,
:,•-•..:Joi.--A,wAto
,.,.4gi,..;:•::_¢.--,,,,,.-,14/ triciiiiiii.sh,44,...imiglii., lYivt Is -ism Niili i gal p ftfkt,
t,t,7,-r,-,,,:•-eL,i't.,.:-P.t: ,. T.,
- -
: •i2:0,...,,,,,•goi.,y,-, ift8AIRI!.4Ackmorx.,-- 4 :,I, I.Vrr,. ,OlkigiliO#V.C.
IL.:r,'.mr..0.1.93 kg 444*45411' ''''''," . -1”. 'i',''''-' '4:"I"" "'.'°I.Ng itlr'''?ili —I- - —
- 1lilliiii1111101k11%...LIE.Mi Sin:** ro. F01001t4I.Arat§0'5, .1t,O.
-• '-.5.-- .1.4;.,:-.4",:i N2III
• ,•,.-1"'!' ',...e.,-1-1,,V. IX I ft4Aiari 1110105111%.0ditE04,1* 04,kiiiNti,. 01.3$36%1
.., ID
V
ILI
.:-':.A , .... _i Al riOrtilt4t.'ik,.*41„., .S.,7,4A.,. .,,,i 1'M,,,,,
- F,Itt.:,vi,,r. .4 -4ipit.;,,..,,,,cp:..m,ittp .;:a: _ 1
—, -
.#:.5,6L. I.
-..,,,..1%ipl.,,,,,,-- ‘, .,,,, tit ,• Iv 1
rfn•,..Iiii16,:,? . 4.:..,-....-,-„.., . qi,"'' ,t,4 'p...,:, , z
...1 „„„—
.4.q.,,,,,,!,, ,,.,L109,FiAit — la. !J''.':1q1dlig`I'', • ,'' 0 "44-11.1".4----.-.-- 4 . 40, ..' 1 b ' ,, t::,,,
Cl) 0 o ....-iil..t1:- .120,144,41 ,Amiliiloodigly qtribUt
•,:•,?...A).:I;&.›..1,:w.,4 co u) • ,.--,.:. '".?r".. ':-4*
I -,-"-., s ,.,,4 V 41414 qi,1,1., + .4aitt iy. •0 ..Ci.di .-.4'
II
;2:31.P41#4.,A'LL' 4 ' .57,
..%=6-4*. iz,i B .1.,,,:-.1:.-1':.: N::.".: 1:.• ,r,::.'...1,i_7'.t.1 ,,sai,,,,N=1,'
e---;t.L.I.':1cag14i44rM9 E"l-11-1,T1
:1111111.1111.1.11 •..1 0 CeZ
csi
- • LI4Cii0tWign e \l, _;,...#4,1111,MIELVINalE
LL N:
•,..:,,,v.-..„-upui,a.i4 -2:41,,:f I . .. ., -,..k.av,,.L.--,----,"14-kommonws.:4ERN
Cl) :, ,*:-- F.,-; .. -----:.,f--- i,.. I ...---i lo. ...J
.;,.. ,:tgalif.P't!I -
0 L'f'f,' -1A.`, N..E..-- • ir+.41.4.3o,01+44,16.%` N.': • NNW -
_. _ ._ _ _ 0
g'AACOVEWO? '' , .47.--.go, . 1I I CC a.
'4 4 0::'t.•' •
1 i i
(I) C) (I) 1
' • . •
. . • . .
,.... . _. ,... ... .. .. , .,•' .-
,
•
- ----_-,;,.-:-.0r=5-4f=t-n.-_-,-;,'--.---7,'.-,----2..;•:>;.:-.3,:!,- .4..-.,', '•-,'-111.,--.-... .... --, : ,
,,--_,..---4t,-v--k--,,,--4.--,ft.'.'''''','.':.-2 ,-,-,..:;,,-:2:-..-,..?,?..;,--2;,---;,-__-,.•,',-,,,_,-,-,-„,?..,t,,,,:',,,,.. .-
. ,,.: .„„,-4ki," : .•?:'---'- - -z-..:-.
BASE ,1EC-F-''' ''''''- ' AIR CONDITIONING
OJEST- gr 2*kc"..11-11"111 RE- s -i.,--,•:-_,;-,"::.:*=-"-'zIr.;:',`,.:•:•.3,i':'-:-,::e. .--:-.-
C)
4-;.- ,.. -, ,,...-offtVpisfORql -f..,=--,,....-.-,<F4.„4-,-i,:t.3,-.:,;,:=24''',a.-ili-..i-,,..„:4:.:*,,naf :.':q43.; ',;'
1-st-puiz,_Lialy.Y. Z....4;51 .-<‘-' `,.,-,7,<'4,'•5.V.g,l''5.,'UtA.L2',4:-aj'''4.-;.--...42 .f.i:•.':'-1N.?5,5 ;:i-tri-
NIA•rtv. ,----''' ' --, Ng TE .,.:.-- -..-,i,,,F.N,:-.A.,„,;:,-,.4,,,,,,,,,,,,_,,,--A-;i.,, ,i,-.,u.y.20,4-14.,•,:,254,-Ai.,2::::
CT)
,A--,,:.,.--:Fro•I- mi.t.c.,A4-'' -Ii<' 5*-- .-7=-. -..'4A--',Z0.0W•tt:FAAY.01fft'5:::,147,:i.fiAt •I''''-'57'-
.
l.'4 -emi-.4' em.=-.----,, . ,.. „..1`734,:k.f_4."--',5-',‘'7,...(st.,*-1-4-„-_--Vivg--,-4-,-;•,- -_,-, -,-,-°--
®
'''t!- ;:-' 7,,-S--,-%r.:74f,5,0„-- ,%*,Z
.. .,
0
15'-4-
0
2V-0-
0
20%-40-
20
C) 0 0 0
T
20*-0" 209:-: 20*-0" 20--0.
- I I _
_
2T-0.
1'
20*-0'
'--' -
-- --—'
2,3*-1)* /-
1 4*-4-
I
,.,=•_c. -'----1 I ,
/
-
,--,_
----, -.1-11„„.0-..
_
-1;11FJ-75'rY,V.!-`4-`.,,k_'.•-•--=
,:-
- —
I
.... -.-._- T --
t
i
-
.. ..=,,'---- ,-----, - 1..--..)--;%Th v --- -
.,
_-
-111
I i -'-'"- IR"
r_..
-
--
AZ.-3:7,..-V4-7-1;1.0.4.s.' ,-.0, I -
i. --
. .
-- --, -.7
_------
4-•;." -7-','' ___ ql,1.3-.._ 471. I' - -
-
.--,5..7-7'''7' ,J—7 .•-157.-C-"-='-',:.-5 --' '.'.5'-' W'C---:----,--42.6. 7- 24: - -
----J1k,
..-"-.::-:;":7 ------- tW:-.. .0:1.-.--'-'.46"-,17 it', _—-- ---- -4Il'i t7-_ir"'3.1.-' K,'-C;,'"--1-".., _:-=',46 r 41, - '.__.0-2,:__„.,,- ,:---_„%,A,--4-- „-V:,
• ' ''''',,-;- , ‘-',,-%-.. --1-,',' 77..: - -,-,-t,-...--,'--- --'411--:-rl,i'_ '`-'`._4---'ir-:-fglil---'- .,:1 )-- .3..--''',11k-- :_'';- -;' '4.T-T,_,- -44-----r._
' .
IF---- T
_ ___ ....----- „.. _ ,„ _..„- _...„ .„.„,..„ _ , „ -51.,-, !:-•(*ke:i_ -,---`.....-2: ..--1 F.77,4, -r4-4,,'r-';' ,-7.-=----=-7;',--'----' '-• '-.-_-
-,-..,- -1,,,,,,F7' --T1,,,,-a,,,,,,,r,-r7 ---:=`,-. r-,,,1=04--w„----1:...v--".„=.7: .,,t .,_ ,.....,0 • •.1 •,,,,_ •, ,m,„ 0.3,,f1.-1.,..."•• .r-.---'.,-,:-4-----'• --'-*IL, -et.57...5,'---5,:. ,-,Z.=- 5'
-=—: -•'".• '0 '-`754 =.-54 --.-, •-'455..?.3Q-Lr'S7','X', '`:*P 'I .,7-Be ''.-_775;:27:. ,7 ,t,Ff.t.'.,.."73:24,11_=----- ,,.....,...(1.-31,- 671'. 55.= .---- -.r;RIE.5 -457,15.7:'L'f-- --Ifig3-.1:,;-L"7-I_
11'
55----- - -_ 3...•,-.3-.4 ,t,..,••:..5-,. '-. h.. ••.:_- - 15.-'5'f,;:"'r7. -7.7,V., 9,7: .1.'.-.5-.5j4k..:',-,--7-5•,..a.,,,-, 1 P.I.,.77., - c.'."4:75L 7-...i.r,-'="='.- r-,_-,..-4-f_,.... .-... .....a---A =4.-:-_ -..,:_,T.-4-,--57-7;i_.---=,,-...fr-
-...)
4,..-. ,==g-- ---..,f•-',.....--r* - t•,,:e:',.,,.., -......-... ies-,4- -,--,, . _r- „77,-,.:,----., ,,---...-c.,--v- --%••=z -c-- k..--: -.1:7, ,-..,- ,,,,_-- f---r- ------,f,4 =-------s.,-,:41'-f,t, r.-
-;11,a-----.=,.,: ::-r------,-;;',-- .,v- i- ,,--c,,-,, i.,f -,r,,,,,-_:. •;-1.--e- -.:--tp.,.,--..-.g.,,I....-2----;_-_,-f- -_--;,-ti..-- -,E ,---„,,-4--t_.-,p,4.:,..-it.,--- ------;1- -..--,-
-
,-.-,,w *,!--..-4.-'4,-7,.-,p -',„:---cl..,1-5,---,-.„;:r.:,---,,4$_ r..fr.1.` _ ,,,-----.....-t-':.1.---- -x,,,_______-... -..*•44_-__-,?.. ,V_,-:--7_, v=„sv-_---:-- ---,.., .-;-:-.;,..:... .;:i...i.„-1-,,lt.-:._.--,,,,f...„t--: -,..-.,.:•.- ,:f.t_st4,4.-:._-_,
-
I
4,-.rs__* -._.,-,.-14.----;•,:,. -`-r:V4,-.._:,.--•. -.-_.it-;,W -,',..,c',:i..- .4_,,. ri.„'64.:P.-:_.,:-.:41,t.: 1;•67---= , -,,,p--,-4--4i., --, .'::::----6%"'",66"7•.",.?. .1, ,41.11r,-7-1-'*•:--_4.-4 ar---.-4,-7.t-
-
..... _...."._,-7 35,,,,_ _,,_..r__-:.• r„,.. zz.,,,,,r,",-4,i•-.44-,-_,.,,I.,_ -„_,,41,,,,.1,-,-5,,v.7-..--,_'ic_,It--- ,5-,=1'.?: _1,:if-.,--';'„_:-.-_-...z..,,,_-_,7- „-c.„- --:„4,--z. -_ ,,z.--r. ,rti..,__",_•7-1-,w3:,....5 --,-_-=-,.4,,,,,I.;,--,..=:-_41 __i,.-„,,,,,,.._
® N -
'' '- -- -'-'''' 5=,,_;:,..1.3 . -Orel=-.. --"•77---t1L,-", -11.1.5'-,=-.,,,L.;==.--4r'. .9.-", ,t.-'77%.5'..i..! [7.3. .Z,-=A;•,'-•,- 41. ".-_.:.,--`,.= -',0-, . <;,',„,.", 1. -..i.---J.,ft,-- -',;
-.7.-t.-Z, 74.:7=:---- -:',1,-.;•-i7: i.. .--tf.7.--Z51--7-•-•..._.'-'==-7.1:::.=-.1 "-r-77-A'.11•1==•XT---1..-'7-7" - :',7!' -:""'&7.=' ;'5•.'"-,51.1-7.•. -'--.A4,-7.4,5:k"---=''',:f.-: --=-,'T.1-,--*3.3,-,....,_-4. -..L--- 5-1.. ..-4•=3""40,,,,5.. -..•.-,.- E.' f=,...e,...=•- ",3,4,-,'7,td-.4,--4'-.1:1-715:„.,, IV._`,-
- ...3,-',.•-•= 7.',,,,, ,•... -..4-,-?‘ le _15-=..7.1 ,-,----A.ik-5...,'-;==-"a- Ife,;. .3•-_,.---7-5,, ,"---,1,- -e--.: -,,-,.,- „.,. ..5t- ..4...,iiki,',. •.,- •_%,..,,
5 =.=,W3X:e.1.,__..7.1.W:=___.,,,t.,:•.,,,,: 7-"--....,..._-_::. -<-- ,g`r'_--yr---.4,7-t. ..,,,r,-,... 2,,,- .=_- .-..."NM= • -,-.4,7 ...,--7,-= 2,-,,1--'7-...0.7.;1.-, , 7'` .55---=-5,,S..5 t..7 1--_0.i.:.---`,...1. .;,-'.--a.- " --."-..,,z
. .
-;,14--.7• __--. .-,....-'-. ___-,r'-----,:-,:--.;-,z;-,,--_,a___7-__L-::_---4-k=_...„--- -_„....__--‘'17•6:-toz•„,-.A. _ ,,..Aor.-tr--, _n•-:- ---1-;..1.- .___---t;,.axi;; - _,, 0;f.-., r..-------zAr..- -...ii4 - .-- ...ia-4 .,.q.it.a.."_ -.•:-.4"g.:177,----x-:r7=1.7.,,i:i4--.
,
„.-c,„;-,, ,;$--.10itz.•,--%„70. -7.3,1%.‘-is..,, ,- _-A- ",_-,i7r-,---.,.:1=211-0,A.J=t -- • -z-_-- ,-0”--.14rfc: - --e?tV'";:-L.,-,..,.. Elg-,-:::,„W. -.,".c7 =5 0',.5:2`,„%;-$1%.,5t,*;',7
-
I
'--1:-,-.-f4-1--_,I--- -T---:-7 !--;:-,r,z- -x__--7.'-.X5k1,---..:NO--"-- -_. ., ,,,-f._-_---z*...-___,--_-_,-. k-'4,-'4- ,. -,f- --7,-,t A• ,,`,-, --,' :-t-i^:---4,4i--:-,-Ak.,:L-F.. T..;--. 4--,,..„-'-4,....-,Z7F:-_-rls-' 4.--i- :=„1-kr,..,4•4'•_,?----,..,1.=.,.11.,„_i :
-----
-.'-7-Ii---r-:--4- --4.. ‘-,- -2-4,}:-*-------,---,0V7-, ,es-,4.,*.-,'-';',,---448-7-----';'r-sik-,----- - R-!-- -- --.-t.g, -----4''-''' 1'3 -•;ii-?-- ::4.- '1,---,- '.-1.;::',-,-. F.A.,-,,,i,--1 z.t:.: -7t.''' '1..-1•,.' -'-.7-!,,,5--4' ..r.-,-'..---;.--f-,.,---7.-- ,j'aV -
' -.:-.-,-;:rkt---a-V-1-_5,- -'----i---- ,-„,,T,-7-4----,-.. -----7-:- .4, .4'.-41'-7-i ii-T---4 -_,p- ,; ,-. .- ,,t,„,-..„);;„-----,__=.1,-,. -- ...-:..--,, 0._,,,,....-- ..,=.t-_'- 7-.--. 0.,-;,
:,..
0 x
z__„:„ve,,,,,,,-1., ,,: -1:..71'. i--„.-;. '• " .,,,,--r-,,,,..r., ,z1.:, -1.-1.,Iti.p.1:4-•.-.:.-",,r_Pt-•' 1 F.,,-'-,-----is.'..,..---4-- -T.f..,----- -gv, _I-- t_---,-,_..-.. ,,..-.,'--.,- --,--,-- 7i,"....
-,-,c,F.,, ,,... ..-I.,64 _--,,,,,..., --,:-4. ', .-,.,-_ -,..i...,- ,.f.4 ,.s:-‘7.,,,,,-,"i ----1.,:_..---.. - '--'.,1,,--..--01,--*.-,-',"... -"';'`':4:7-•-'_ i.Y. = ,A,- -47. -`,..„.,-7111.-- :7...,--"'-,-, "--51 7‘5.•<*--- -"1;7,5.'---,•,'''...LI.'' = '''
----P•P''7--;- T".-''-7---.. ,-.77-. '''.--'7'.-/-r-71 ----77-a•-• ' - 1,--'' 7 ..- .A.14 I'-'4'--•1"' 7'=-----17:-.-'"''7A.-- " `... -5 ._-.'-"Z-.7 .-..r.,,," vT:t'•-•..- ,- •,-...,::, --i,:- ,-',6.---`--------_`''; -, .'",..-,.., --- ' ,..;, -,:-..--...,:_•4....--'5.1,..•,-,,....-/
„.or.„_,„-,_,„,-,,, --,,,..„, „7„.,--:_,-,e,,..4-,,,- N,,.,:--_-,-_-r-:4--.,,,.-...4.,:„,-*--,t,..---..-?.._=:•.0.,,---""5---51s,k0"',,•- ',5 -,r• g,`.7, _.....-_,-"...,,,,--54..---=,-7-7.,55% - ...f. • .^7..7i,"' L'-.:-- `,. - 1,',,-1--e.'k,f-- --,4.--.
1'.4:-;7,,.4,. ..- :f .SS ;:"M:. -. ..5.,,i-'' ,,,...,':'.,--.'et.-'.;.':.',1,-.12,- -a-_,---. -.. ---,-,,r-,,,....,..-----..--,-,...-------,--, -, ---.-
. - --- -c---f-i-,-4,,,,,,e7.-_!-, .--v?_- _,-,,,-„-4,-_--, .-!,-„T„„,-,s1-..-11...7-4,.. ,...„---,-- -- y:s2t-Lk" :::,5 ',.',,F,,,C.;.1,- . -er ,.,= .,.'
___--
, -..4,g-f,-,4-4--- -:.:---..- 411,44,-;":77.-- -7.---: f-_,-;--1,-,-..ti..,_,..•_-...,11-..,...-7 ,,,,,,,_ ,y,„:„,.17:'...z,-,:,.„.iiIi-,,..,;_„,.,,, ,•• .:,,,,,,. 4%4:-1 ._.r. :',.-,'-,,,,":-•_ '---': ..;":-.,..- 7, -,:c•-:,"
— _
--,,—,---"I':: .., v.-.. ...1, „-.. ,.„
.-4-'-'.`"---4----4, ----_- .....:.--- - : - -,..;..:'•-:,.. 7.--:' .--,4- ‘4=, ,'t•-'4'>. -''''-' -•.---S.S.,
,:.;;M:.:: :f.,i"-..., ty.-_-_: -, ,.: 4%: : .:::-" ::- 6...,-.•--':^7.--i- `6.;,::- -'-: Le...e.: 6-i:,,,taB-4, It:"
-,---,$'flL---,-,f,--:-"- 4:-..,----- rs -3.r. ,,-•7-, ',...' ..- t---- - '4.,..,5,,--,-1.- . •- -4: J =.• ,--"...-,,,,Z,,,1.n.,,5-,- ... .
I -
'im a
, '';'-..7 74,0',,,,1,a7",r9.7-::--=-- a- L 44-_,--''•P - ---"---74.•K,---',=--,,- --'-'"--, -4," ,==_.i:,-; - -1',.„--Aer '.:2-1-,,"-",--, 1-1 1-- In- "--:7.i• i...1--`1--4-. 't•-'',. '::" --.","'Tr--T, .-------1... --. -4,-,r,'--v-'".5 .--7'''..''.7.15,-,=.2•`-..--"1"' 7 -7,',.'.7.
1,... "
.''-=--1`1.-.--=:47 -Atz-•:--.•'•175k4-- 5S,:r* :•7- --‘•-sA7-1-'•'*.'-'--,,,I --J;17.-.. -r-i:-... ,t-.-=, ,,,;.-_:'7%. 13.7 '•.-7.33,1,1‹.1-5--.. , '-,75 :11 t-.' ,'"' '
-:_ria,%-ti-- ------A-1 -.1._. ---''. -.:(.1"--7•12.'::-'- !; .,•,. -,,-:,--..;,% '1-14•'5f-='9_ '.'11-- ' .;= .: -'tr•-':--4;7..-V=.'-'-j--•,- -.:'--',--."'"'tm-'-- .':-- ''J..", =--- --. 7-,f,,'-;.-,. ,f:---,i--c-'---. `'-".-- --'----.---4-:-11 --,'''r'=';..f4. .-':4--.'''."-'."-4.--1 lil.;'-''''.
-P- -; _ ,.,., ..:....,...,,.. • . ,_,,•,:z.-4 --,-...,--r.-- ___';:.:A0',..!'••":!rt.‘:.-':__.,;.-7.,
. .
__ __-- ....1,:„,„ ..% „.q....,...t. Fts -,:_,L, .,,_ 3-.-,?!.--55';,..„..1-5.-7, -_._-......1:"-- 3%..-"."",-..t."..A4=.N7-7,--.=*I.:5".• -,' -",`,A-4,47-"'"ft.3.7,..-.,",=:;.,<..--.,-.: 4,1?..";,:f.,:-.1.3.;5."-,,,,5_,-,-,..,_'•Ze-'•,-7"'.11.4"&"
____- -
..• '• :".--r..- .1-7'-1, 77.;"...,*.c•'.7. -,._-..- ,,=;2"...... ...ttl, -;,,,,,3,- =•_iir'-'.,,5-'3- - irt--...--i.,,,--.:z --_,,,,--,,.-1 -4,.,-,,- -= .•.-q..-
.... —
-- -'-. - ',,,N-- -- ,___, --.,..-,-,.- ,...-• .,„ ..,3 , .. 3--N.,' -54• ..-,. b-,.'.. .., A:- -• -- ."..- - i-..4--..-..,.... ,'---L...., --,..14-",-- •4. -47:---,, -"‘ --7" 3,',I..1,", -f',1.
...
- -I
-'*--.7%'S:$:A: a-,-:,X'''''"-'4466 .--:664-:r' -: -:, :e-'..,..a:nt-a- ...."'..,—r1.-, ,,,,,.'5,'- --F--.Ip'f•-7,..i:` •- A ...,.. ,--k`,1-.--'-'.,,rr ,, .,•.,_ ,--_.:.-,T, -,,,,-V-r,l't"-`,..1.--'„%-..,..,'"., ,-,: ' -1.-,,..-.-..,-,-dr-L,----- •-'",- ,.., ,
4,:t.„, -- -----,,,,„_.,'_e-_-,--,a-,41- -4, --F_If- ,,:rii__:---_--:-_,.7;„-_,,-4,-,,,,,f_:,:gt;,-, p„,-', _:,._,,•-, --,--= ',cf1.- _,Li•t:',4.1.,:, ,',÷::,-,- '-1-`: ___ . ......1-2. 11...-I_Iv-----'''---
i
. .•'.;,'.-.z•-,4"1.I. ..-;-. it-:--4 t, -,-,;-,-- ,...;'=-,,,,,,...,,i-r, __ .,-
1?
:,4:.i.:i'.4k'''''.5*11.'l''''''Y4-74,.'r''.7-'`.;-t•tri-f 1 -='-:4,--14'1"''.-1--,-'.--'--.. --. ;':-''.1'--'------'-'="'------
_
-._
LW..___-,__ . --',,',.T.3',-4.r__-'..-9., -,..,-:,'i,•-•--',. -• =•-•;-_--:_Ms t-t.--,,A_V,.-.,-.`== t.V---n-1....'.1:-.---4-,-n-f. .A. - --
-
. ,--` .,s,.,,,..,..-7-7;.:-.w,•-:.---t usl-,,---,.-,•-=• :...=..--.,c.---•t;-•,,t.-....,--,-,'.47.--41 %,-,--‘.'%-'.-',.4-- i...,- _-,--;•-42=-; --- -'-.-------
--.,----gt%:-.it!..,:,,5,-----,.,.-I-a--,_;_-:.--=' ,.--,;-,15-4,--:i.„--.31 :1.,=,, -'-_-- ,,,-,7:-.L',.77,,""' t.''`'''- • --—
_\-- -
1
-Z5•7' -'''''-'-'..--,$-."- .f'-'"...5'. - . -,',W,3:‘, - 7.=--A4'--:-1:1.5-45' r-,n.',.... .-0' r '
'k..- -..:'1 %'?;.1 1'' .... ...7..'0-.'j. , -
.,-,..-N__,----..,...__,-„, :...,,:s„--„,-„„T„ft, .-, ..r. -.,,,,,„ _ -- p.,
„. _
-g.t. .+.-.,,....,,,...,--4--:,-,Z- ,--.4,..,_,. .--=-----
1
oz.
-en
-, •' ,
,,,,...
_
L i
_
_
0 N --N I
EIMI
1 '
N
1
mITHUN
planners
ED igners+
itects+Des
_
°
FLOORPAV
MEZZANINE
RENTON I PLANLl ON
APRIL 7, 2003
•
-,...
z
c
4 oo
i ,,.. 4 C C
IZ
K I E
431
- F.
I
,,,,,::..:14:1?
> r FTM„,,g,,,,,,..1 gi is 1 Y 4 yr.:r.,r,. I n , a
,,„,4,, ��..�..7,1,--`..... Et,[C.1[1.[.
.......
,c ,,,
s'tf, ,,PAX t14 fiiiikrtii-,,:,- 4
...,
q'�xi�t;r ,lrxf,fi'J +�4i ZS�� 'C ,..•... �.I
4i31,
'rj„5 ��r(i 'd 'r' �.�`rrt "!r`af Sr}v i ®�6�E.i'.7 rlp i 7st�?' It Nt t ::.,i ••••••""';',7,!!".4
® w 1,mow a e } r+.iL 1�fi�tr34c �in ce:e- . „•.•
z.lF r �yd' 1} IKE i •
•,',..2..:•-•-:::21,,f4t � Y 'L�fi "'61d0.G4r 1 I i :_I,
k / �y
d Fs x�� it
w f r
p.
r >,h.-.•,•4o.,, ,d7 x:444,t1
�'r'. !11,
� tl:,. III V r I I.
s'....:',,4}'!':',';'!,'..
a Mt I:r,J.�.ly”1 ,�u� �h},z i+ tP'n I ._ I®fid:;,^i
a a � } �”
1�.r"::t.. 't'f`;,ho•if� -M yGj•£W'i'n wD.rM E Ir i„
i:�y ;?`",:;itnw'`w'e::•r,� at1 r f-„ - ___ .--':
Jttj:'^F=,q„ '�rl d. � FF",�'J3L�, -- �I k '4 y,�r
j } t`'i •Ff�f n yr�Tr3 �� c,..-....=:„.....1
'�vt n yo�b moi;
f :i4.� k�1 '41,14,g,
y, �� .,14.;„,,„f'')04;9:1Y j, WF8 •.. I®!ma' ..,1I
`r'37Yt ;f: ' t F, rl�r�.�%c K v r•
:;:.,,,,,v.,;, r`s'X..�.•5."•(x1¢. +' :av-1!yTq� tyy.`y:i�°'. •
tt{[, 's%Y�`"•y
:`•F r';:3g",;.0",'1.,840,,F:44
ti I".�y: 5 '.•'a%.f} .1 FT!Yil✓ri� �l:`;r 111
.'il.:v.1} .I'
� i,,F Y
'4 :r h.;.,•,!':!,,•,..Aiu ` $nliu' S1`nFr,K?'vztd' �. .--.
A[- , C-,' W : w K
sr�3 'rr i,Tip. s' v `,, �I u`
}� Kf SCJ � i ! 7,...,:.:.,....,.,,,L,,,,,::.p.,....7_:,.
E�l'r-t E`++tid X tk�3'^'7" . 7rr �. 1
1
4 ttir5f 7 t N '�S�"T x. 'zYF`.%.{ n:' 1�� ert I' 1 -rryv s 9 Nu.*�flt,, II. r I �;l: 'E' '� e i,tp,.::,:.1,4.4.Ac ,> h z tib chi V r-. •-
{F s. di. 71¢ Z tct aafzs' _ i
'i_ y}; ':?i4�:;:Fn::`!'�+.i'f„V i 1 lr: ' �5 -' - - - <-
y T F*34:4
2''�, ��Ir f44.4s.F �74 Y � s.n` 9 t �- ''.l i I
dl it'1 - tsy
,ffkg
'j, t '47v,-,. tF, Jx t.�'t- .x;t? t .. �'L:� Imo-„•''-
v;�,'�.;:°,x14'4!'+,-Y�47 i4+:''tr•..:nei"i•:?bii�.':'u'.:1""•..'cr, I div y l
muff-
t a i t €� A ,
artdr^,71,i': Z 'y �1.k r i 1 �� c:",
i1,,,,',",-"c,.;,.4{;�tg�''y%y ,pJ,ts'4 t1'a. `y { t`
•
iiu;� • z,ay`.w�a+P�T;1,u ,.fin `iS yt . ..-__ - I ax,�- .—
r,,';� i l�;y�.i:i� 4'".°'r'r."7ti:•r'd i'r*%Sizr':u`u"ar.` . ;r'.*+
iM 7`v1 xiti ;fie st-l' ...'' . II
yi • y i'
V
is �'�zfi ty'yB- ri ,.i.1:_.'' '; �'(i ,: y„„
.1 ,
1f f 4 i $k F' wry.:. I 7 1 rP{L,,''
��Ci;^�CFe1; {';;?.�7.>4. (f.
NE, ?T. lir.,,, [...
1
,.
Sty ,4 R., 4 µa ii, 4y% i - I t • '-
4� ��5JY�'Jt i{!�:'it'.�`t'�J�'•.ZR,•CY. u"I}J.i�v'1 1,,,....-..'
Km
{ri� �r Y PT�'�� Slf wr cr a'S . iff I 7,�' kt F 'RI,yIh,11 �`Ly 4il ` , • i tel
wt
Ja tAfy 4� '�I M .. - fj�,tY�h t5 ae ', .�k •1
� � Hy;7v F'�si evFs'3rnF>e�' ��f'�`�IL "t�r.'� �t.5LImo..
* ,s'•7 r 7}x.54-01,g!,1',•,,,,,441!L�ro .. pp8I
45
" f C'�{d''t,?"`*l5� R ;1t:N�r'�i^`i3 '�'}+P,a7r�h'�Si - , ._
..:"01.1.'''I;'1 t 4 }{.d�;'(5'f)) <;h�.F4 7N cai,�r 2 �m,'�'��' I to'fir M t
> ! ,4:11'41 :1,1 i ;',:11�.� f ,."r.+• i I I I { 4.;
r �C �'j J 4i i fgqot S } 7
J i�,tL ,}E( p4 1•.'S,F4 Fh Y 15 I®L��se':"tl i�
n q:i.}; •.r � �{o",+ NEU_ p/
LLJ
;;r,ii i!�: �r}? 3'i{{' .;;1(dbC i C}y:r,ryd'.l.zy�,7u!S"1 0
MET ,. I I '',,,,i.' _I _
LU
' its "�°,"� 9■®■■�®iq¢�%I� �' ��'
.d. >rr!i'�rdti ;r■■®�Ii15C1 a }� ,i' , -I l
, .
U.1
�j I A
r,•:rlf;�`s'A> si■®■q■�®�7I�..il I imegoal ma ir' W --,,.,,,n• I •'-Ar..v, ,r I
*-;,...0.0,-j;
`XE A Y•,�" ASS;k�r■■■YN�G:il� ...i• I ,•,''.d,��.'1'
co
�5hh�f ,7J• ® ( �TR;SII
`L C'�xa 04'�l,all Y9■■®fit®�®�41n S`1 �i+�•�.. �®�.lTL{.'�-{I
AAs ;�C�at,�}r. 1Ltr G■■■��®®�l>"f RI = �r,..ir_ I ' np
.1.7,•=71M.1,,.
dt.�''i,`y,.t;yae ""f,£Z,It��7■■■&�7®��!711 dt"'1'j�`t +1 - '! I� '-,r„ O
St ?':"-' �? uI a'.3iw■®■i�®1:����5 ..1.„,„.,1.4
,j;d y �r"""ei i d ,r •;,ti° E
in
,4,A,;,.,-,;••?.'
,;4.f R t V`dJ r .TIY Sfi l�d a{'!�t,9,i�k'tX'"ry 4 sa"4�tl 'w,72- - CO`.?S f s'L I 'y q p� r SiS is �' r �� CO
kri` y t� r��i l w{�' � t. ■///`OIC' I ,. i1
et! {rr�h' • 'fie'F, i i �// � 1
' ga i { ' Z
len
"w• .t, A 4yCO
(� �f0011 - i2
" '=t" � ; 11 EP
% e""' waft �,,h �, 0 `a M
C',,;1(Fiul'Fi`�'�rr''+"+Ph(;'x `.:,{ '.:'CiA 'i,`,z• 'f FSR /
I
...
+t 4�;, L ii R-1:
y "i ..' y x y� „,,,',1.1i,_•qk; C/AJ
CIL 2?
!'«'`.t,'V'yt'j, 'y {k 9'i {55s '.L I—I T I O T • W N
'''''''44"j
i'' ta' �; k t..,r r o CC a =
III
•v ; W11
!II
4 pc
y ,r .:u L} o a
t#
y y`# '` �c;,y�fi}s i,..,r�^s:16YSb''i. A l e 4 (/) Q
��Jr� r,1G.1�y�yp'
'}\.1.':� Ain 'd.'(,✓e+'..�.-.,vi.c�..4„a..-..+,
..r f ai,,.,:-, .� GL
1
�1 , J�r rr
Q ,, P ` t /
1
1 t
9 4111lia. ' Ilk'', Z 1
. -
a a\kc,a ...,k\ ), co
I 0 i
4 ,c..4 :11... ''' a. . ,..,,mooll.
t.
, = .1s
- - - -7.-..,,r:,
. . -
IIMMI +
K=A-.7-lir rr';r--7r.'77.7',-F ;,
MIN
,,,-, 1.,1'' 44 Y ,, ,,,,6
"O'frgO, i,1 t:',,,11 d
1 1
. 04T1f,w
, "" ..
,
444 go I ..,,,,,,i
A41N,w.,4.*•r, ',.ti,ote.d.ri,t.:tily.
.,,,,,,„m,04,, .,,,t-;I„ ‘,,i..p',,,„,,,..4-a,-5,..• .-.. .
''' r"A 1,Ei4e-r .: ,t,ftV.DittIllfikiZIWYRil
•
1p i'i'' 1 ,--•1,,,i
. .,fi
t..,1,..r-N.4.,5 '- •,-,-a a '''' '
lth, t ";•• •• ,••,•:,;,-.t4 I gi ,tiiir
•
'7
e :HUERIFIN'
0,,',J., ..: -.....f..,vil g D.a I T„,1'
gl T 4 4`'....441 .,,I. ,
A ' ' 44 •
: hrizEitint
--.4,-?•,,ssil,V.-
whu.a-4,4k.....•iv 1,• , ;•.,,,,sl up, ,if,'"
0,,WV f'' 4,' • ••-''''"'"''' ''''''.." •• .• 1 AI MEI IICL.
.,.q..
ici,'";%Vel'')...„9,0 v--,gokayZ,Ki=i.:41 I iliiii1111:'' I 'ET
isomman ,,-:'..:.1.,
i%:.il .n , .,..k,
, i iii I --1.1 J1 -,:
KF,X;r4. r:010,4,;11ININIMMEICI T,e,:v ,';
., _
'''':'k'C'M°J•z-kk',',?'''''emu mon
dies:,
0,04,4 irlo Y6',,killnieNtaDEI ',;*:Fi, .,,,
:0104•falmiii .p..,;i:4,,i. . „..-,-.., . 1112IF.1!. !,
0 .,0'.04123, •-, -"., g a g"r%, %$.1,
i:',''', . wa. I -7.
.7- iiiiiiiill
'Ari?:':ii',.to goggimme A.i
'04Viti,;t:.,';',A. 111MMEIG ,*•'..,.4
1
,1,
III id
tOYee iggigir,MEirl 1 ,1
54 4
raemcmo
''0:.,Y....,': ii ,t,„4:;:!'.. -. v a F.a .•!\.$4,-1'
-.r.,-. .
"-''.2it.e'fIq• inn.',. AstuaLgaztalsoaltolt-:7i
.i,, 1
•.',t,34:,.40 Imo ,,,,,,;,...ze,N,al, .:40,c,-
j
. 1 . . ,
Li..A.a„'-,. rp,74,4.!•A %. '-.:„,,,,_,. ,.i.
M .1-
,,,,,....ieR,',4444/..1 •, .:i,tc ia ET. O A'
I . . .
'•,''':4411 lig v. ••:,..•:.1, „ ., ','y so, ',..• :! ••$ ,
544W 0,t . = ma ii ,,.7,..y i.
I
, ., . •
:.',,.
',.....,'
ic0.‘all'r -,Okiti ...'
1 t
4i:agiFig., ,1' .• .
, 1 •: •,
I
Ii-L 'III :,'.''i N 2.,Z. 7‘; ..a,'. s'
-t,
;',:s.:1"'40•4 0444'4 • ,,al 8,N,2 ,:. ,5-!... .
y1,51 - ,
.....„,....„
i
1
... .
1
pt.,.-,•:::,,,kto-.;'T.,"0 . ...',..1 li ail N N ,r,1$
.
i AI°IP • ''''''' .4. ''x' 1
' ' r., ..,Nixttepta seam,.
,„;!,,,,x,,,,,,g-,4t, wi . .•4.4 A I .k;
.,.,,,,t4F--q?,'-•',, ,Itiir,'‘ . •.•.:f,tia N N. --,;.--.4 4 .,„..
547
..:,i i 4'
10§6/11 4i5-'• ...-0-
,, . i
” -
,.., : ,
001,1 .I.M.,;' : ...;,,m 0 i,,, :,..,..,;i.!.
1..
t411„IP"..- - ..A. I IN
Mit'4i,- X1 ,',...i.f5,x.
1
..,1„...„
., .
i:' I ' ";' ,,' . ; .:,•
554. i:
,i !
,,L
gl A A a ' •qh , .....,- E r• -
kv4,-,94,„.•.or' ' , :--t,s,B W.kil, il,:4'' z', -,, a , , , ..
KirultiW+114•'.,,1 - - 7,6w ,'"04;
r"Fak':' ig :,..,t?
.$•5,kira.,1 Ri,i:v • : g to a
. ,„.
. -
4
.§7„, • , 1 ,
4(.. ,
.V.t..r#i :;,,'a Of @Zit' ;/,;Pr..!,
'.A..§ 4
.:. , k.-4'.
. i
.I.
rx.,,..74 ..,•fi,-•,. - I, , . ..?,k ,: . -
96-1,4
..
f. 1 .L..,,,,, ,
•
cow , -..; • yi•l,
,:•,,.4 ,==
1144 .„.,,,Iig47x,.....41
• '..: . — r
.,
j'4W WOO 40
'.4:13k1 I A1111111ENDE1 b,,,,,,,.!
.. ...
F?:
1
."..1.,
':: ,j ,•:.
14, W NUN ELIO ,4t;'f V,-, 111111NECO k.
i'44 •We- sin oDE3 457.1 .„ ..
:.,,....- i .I
• ,.„
:-.,t'-;,;•4T Ifi-,,..,• 11110E3AS ',;,7.,,.,:zt'iil -, k-
. . , „,.'
z.',,K40414!k...3.,,,'''i,militiaman) 1.
.1
A4.,,v.,., ,
VV th+,t.::''.1 immentgo -,, ,., ,
•
. , 7- 3
„.„...,-..4.- ,.. „mi.r.vemati...4
•it,,' • 1,,.,-„
Vc%,t,,''" ' '7444rif '
, '',i• J
V4-`V ,4"a'4 I g 441'X.'Ci 4 ol „.t,-, ,LL I 1 IF ,.. Li.
! ;''"i': 110 ' ' ''':'' - •
;,.,.„, ! ' I.,
?;N,,f*,.. L4,4L___,I.,1 a§ .
4.1
l'f;''.''.g;)"Vifitt' ,_.._. ,,HUblf .:,.'a,"-,, - ; i
. ,
--1
",•,":--.5%.Ve. ,'i4V,'#i. t..oi NV 2 ,...'" I
lt,i,
0 -° '.: 't;
4
TP ,
1
,.Ir.,., • .,,i,m I 5 ,-, 1I
44 41 tr'i ' . i4
'- -:,.,,.'r.' •-4 en A'.• ;
elhA •:0' .,% ,v,m ri k'tii .1*1
.,,l, • 1;, I.!,‘ , 0
,':::,i i
.
, :
A 6'a , •+
Z i 7,-117
,,,
FetliCti Itt .:„ItirafaMMiCartMai
'''..'r ' : 17,
car r:,40,F,415111E1iiiri N°,7. 0 ..:q
, i — i
,. .
, ,. ,,Ilail•
4,t1 0111111151111135 fi1
.4
a..1
9%?•'P:A e p '11111110210 go,„
tf.:14Aile,4'44 NEMBENI tf 44 17' :';'1
4 , x
ti :
...."-qt. , 0 .. ,, , •Jr-,
-4,40.-, p.,,,6-..-v lancillEiB0 40
,,,Q
,,'''.111,11510193 :'4t 1
al77.,.A..°4fta1?4.4,1g,*4'A,'. , ,
1iNEEMoPnEn
EI 1
1'.0'I'4l''0'hk
4(,t,
.,,..
UJ
.
,,,„;1,— i
4!11111612111EM .7,644, 1.1.I _'.,;,v, . '•r;EID El In tEl
In
''I i:.4.- WimmatimanA
. ,,- .:::::: ;
. iiisilii.
O 0 31!•!‘" ' • '''''oile 9 ' ,ks'
i1414te4-1,,i ."4.'i r,, ..!:ii,,- ' -,v 2Ira
. 1,i*Ii• ,.
M ':r;1111
0
, ,101 1
•
,, 4 ,:,,, . .,,,,. , =41 ..,...,
gr
Rg•t• ., ••••, , • . o ,,,,,
LL
kord, ti,10:44.,•,,,,, - :, .,-'a a cd it i's.,,,,..; . 0 . . • ,,
I, ,ogrii:.fi:i, '-•:,
' CI CO
,.
Z
.tj . 1 11,11il
,h, Z . . ,
LIJ -...4 C11
,,..
0 t4,1' 44' .. , IL:' .,- ,,, .
fo;
Cl') a i-
r1111
Nifr:1,4 eigittlplal,ar -No.Nlyz,,,- ,-;,, 0
Z
,.,, ;1 gliii f;
.4!''
.-15.1Ele.Wili
. 0 < on)
> Oft
,,• . ,,vaaa .,.4 4 i' 7 T3 0- b,
• -- : iiiiipii" " ,, " ;
• -1 N
lr. ... 1 1''.',i :;
II ,, - , olivi
, . 4.64,.4v, ,,,,;,,r,.;..t•J.'i,,14.0.1',: Ci) ;- ...,74 '''' ; ;,..i...;. . -] . '
-,-rn•' el.11. ".,.,-',,' ii4.....V-...414 ' .. .
11
A I... m•I
. , oe cTe.
4 .,:;:,:/
"4 74 4! till L. -
•
0 LI,
i4Q,,y; ...!..,,,,,,,,,,,i,.,:!;•,,:,,,,,:y.L.,,,;,,,,,,,,y v..
ad Z <
.
®
0
,„.,,,,......
•
.. .•. .. .
• .• . ...? ...,.. , ......,., •,...:...., ft r e „ .
.
._
.;. ' ' • ' 1r(':. •'!:!Zi. (. '- %. •
, .
Z
. 1 = 1
= Fo1
1- 2
MEM i
,f ,. •, a,•'a��,.... ::,;;::J':'..''
ab �+.�s � ..4 midyy Z Q
c��� � L., , ••
;1 �I��
, .i. .
. ....,, , ., ,
, L 4: •
40111E1 ,;,'„ ..41 : i:,... :.,,ii,,,..i! ,.•r:,7;
,At? T g , uc ®vara ,Ii
} a,.
/14
"a a � ` • • `• �,
,t1 t -11 g I 7 ?„.
ft r ''•kis ,. .q' , ' � I.I �tIf i� :.r tr .
0
(' iY '� y1y .,P1,44.** •‘,I,0.•
'•1 ii11111H'
't y'�,Y u,'.. !4., O rt
r.il
a a.`4 $ s yrs`^c'Sµ1 ,$`"�+i+k k0 i VI! I li ! I �"�' 9k �'
`3 ,i f��i77c I II. x {
'irib Z „tl(F i' tiA t• 1'(,�.1PF - - - 1�� 1.1 I y �'^" - •L7fiq �� `'
:;i r Y lyk s+if .3 }ex,,? 17o I—_ rlr.I r r
al
w:rFv..*,4k'.^.>`>G 7t f'� F`rw r•s 7 111614111
•iL Is
:771!. pp';y II
5r,'!•,;,.:' S-, y �— , IS• I I/\\! 1t!
„%,:,0;,),10,i4 Lvi, ,,,,':0,g I i ,`),,,i '\Ill 44 i „.,4,,,:„.„
00. 0 ) G n) hyo " ®� srl rj/Wr t ;J
',k 1�k i .r� r=y�'y 111 I:, ,{ • 'P'' CI
: .*
:.,P4,4.
`i IP 1 gat# CD
CO p
/\ m \ cc 0
W � ak
aiiitil 0. 0P
,...0 t :+11 44.` :
il •
•
,/
lw ' 't o� A rkro' I l !k
,�,P'i•: - rC W .... yy
yk," 41C9 rr , iN
'''.."'r -:0) ,`,1 .0glit )? '1 'Al 1 +4"-,:".i' I
i Vire. 3.f i ,rr�Y...g il!v m>.cn www,u I MI p702V-l N• 7
� `�� .ti b rw< c5{' �� ''.'' wn Y. Z
i i. �¢r'9 it Y ?7, n, I ''v;6 . y
•
4Vn °.,,A y 1t,S,r,. dna'r. , ,Kicttr, Yr a V, ..�; . !, Afaii
k�� h ` 3 : sz } ^x� ;a r ti Q 11 �a7i' W6s;•tiy�M::�7a�,�yy�;p '�t1^� „s,,; n:fi„Ys '..+e•,°{"• . 4,. W lir
:•. r11 �',: LU
S
zr. d�,7e ,�,sr#I Y ,Ti 5. u4- �h 1�
`i; `I r u ff 4 , 'Wait`,f tr: .. ��� Y¢��. ,' �' Z
s s'r�r r 'uadt,• =I r 0+ „'m is' S'.° '
1 e,... -pa V 1., W Ci) / Q.
BR
:,,Mq
Ad Lss. 9 f Ci Sit Y`�7¢ W 1E11
' I �.,e.-��'i
IJJ•
,y\�0 414:�}}�f, LLI
�,iT - .-pdd �EyS�+y 11 '.,, ,°,''','• *11(1 1 Q ...�
"iXl`i,a7�.C%f.�• .1+LI':F& •VRs, ,n T F..Ip W
vt,
la,;:s: P a' :.-iii v"o� ilF.!`.' r •
I�\TAIi::
_2.
'� 1' 1"'•
'' •
• � f r. ' az is it�, O W
'1it',lpr y0 7
a ,,sp y �3 'NOM
N
! .1 z N
i 7.Y: iE 0 gi ^5 . `7—�' �ll 11:11.11
,i'i,.uiP:s /\ w.n'�-•o:� MQl lel�:�r:ll u)cr II r4
/J/
W - N Li
0 0 " g
•
I Ia,,...,,VI
, !
0J
� ;��,r� �
ono I rr'rr• .—'moi
id -,-->...,-"::,-''—r •�� =��SII
•
UNIT HEATER ! -<' - y` � /
SPRINKLER LINE i - �. -- , r,
g
--` - `-. _-F- V • a - -'4.-,'''
/
1111111 '
., . —T:. UNIT HEATER
: ,_ - —
INTAKE AIR 1
os/V�� MECH. Il
01%0140%110* .?Z:i ROOM 111 FRESH AIR THROUGH
OPERABLE WINDOWS
¢ I OPEN HALL
I
i P - 'ISED FLOOR II
� RESTROOM FOR FUTURE lil
AIR CONDITIONING
1 11
G' -:MO i i\ ..-=-= _...-- ----.
I.
i ---_----'-16-1111111111-11111—11111111 111111111111 111111111 1.1 all 1
. 14-11.11111 IIIAAIIII--1111 .11111 0—-
I `z'- ;,>`;:s
:..:v13j: -:';'N+`.. ,`:;:y'-�tZ'S sk' a:.fi:-a,, f` '<i31:•.'i.:' '•XSf'J s`'Y.E�'':x�=?�"^r`:a.4�-�'�3��-� r�a` - :ti?:` S:,"-"�``S-Y'z+.xz x, .�i9n."^�;.k ` 'v'�r,r=eiri
1' �.:R --t` : ¢ "- , ^ ,.f ., '- ziP- zfmR IS DrONDITIOkNING
QRryF<�. URE�'�AIR�,�,.��... G`.
=EN111,_ ,ham., wr,, o, -r- ..R ; ::;,—e,r1>
-,g --A-7 .._,W `r ,::,1 1 - a' wed,,,..a t • 'r. �,k.- ''�
IMO
MITHUN
Architects+Designers+Planners
L. \
BUILDING SECTION
APRIL 7, 2003
s
1
I
, •- ..,;',q.'Aif-ttitlEP AIN E
Z =
t I .,..:,,,,.• .:, i, - - , • -..,,,, Drovi „ •
'-' -4 Vil",';,.uMr-s'j V ':7,'';" . ; ."'", 1 '.. . .4. , . ,' •.,','1;V',1s. .N4.1t.er
• '"„r..1 •
. - , ,,,
• !,:s6: ,4,•,.0,.., `,' ',/,A -1.3,,..„;:c ,t,.::„.641,stiv--., iimprommo"' -- .,' ;:.n-11.7,Ver-,,,4109 c
‘
.r4w•v-i•••11, ..ii, =-4,?,f, mwrivionoll
• .:,'.•:7-1.,;.14,"..,4w., 7,:;4".v I = i
0:',V',",,„,,,,,7".1120,1,0, WOO
4
x bps
'''' 4'4,4,,..,'•-&-••• •••',
),',.,,•:-Wi;i ,44 ,,' i.,••-,, .,. "4•' v moommillsor ''' ,,'it r.iff•. pftillA
,w:*,•,, ,)0,:i-7.41,1 , _ Nisminigimmogiri . •,:• :4rt:,',-:,•:10..;-,0,14,
: :.'•tiii•64::i 'Ck), 4:":1 =17.4,.=:.i 4t.w41.
......
'''',f 45'.4je'k' '
1-- g+
....?.... 44.14,v,,I,,„
i ,%.,i.l.4„;,..„1,,,,,,I,
.,q.,..,,4:4„v,,,,r,.6;,.,T,. . :.,\ '.:,.:::...::,..•'.. . „If',11W,,H1/47, , ,frit-•,,
,-, .1=70'• ••=. {Nil ,
.< i''..:1,* •,.-....'•:3.%
...„ .,,,,,,,,...,_.,
'',,, ',-,.4;.,,c4,2,,,,,:,,, I
, to
',....,
.. •
\- _.........-00.
:•:•sv ArilP:4 :•,. ..4, \',\ \ Ig.,f,,IA11. ,:.1:7,::., \ V,.' lo"' NNW alliiiii !: ;,•;i4, .e,,T4. ....rA,
•
— ' 1:.:'..,,'''''•1:7'1E:4::vi.'4:::::::i 44
t.T1..t0f.kv at;M'41K% 1 -•
::... , ..-=, -•,,,A •,, , ,,, , ,, ,
;_•.•..k.:•„)..., ., 5,..0,--,,,,,.,..,,, ,, wc..0;,--; ,, ,. .„,,. ;.; : - or/ A ,,.„, ,...„,.,,,,„,,,,,,,4,..,.
11 •.:k.-4.;-
' .1- .•„-',. .- . • 1,,,,,. . 1 I 1 ,....„.„,,,,l,
. .:, ..:".!',,,,..,.<
Ai:V.1,,,,I,::1 Nri'k:' Ak ..rl,...„.„.......,AD xingssi
:;,,,Tokr,,o,,61211,,,ttze
.1kNikfF.'- . •, \ \--iii-;- 4.' I. i I
1111,
, 4..
p wir!), -",,.151.,]iiii.„--' , ig;,;,:,4:•,1., , ____ -
1
pg
-..i ,.= , i,:irk•t-,,,a“.i... a
-_---- ----irciii-,-;affir, :_,,,t,,, .,.i.,03,4,,41,1 t,::.,,,kf.. •,-
,,
.(,1N,. t,,,.. • 1.,A;"1,14,40. .,* , v
110 itilikk'4,3,,,,:,,,4: . -.4%\:,,.;,i;i: \'‘ _ . . ‘',.,,,%:-1,:,4,1,-,,i,•ri.41 4- N,,, ,11: .0.....,..,-,----c-Viiiie_.. ....1.1.01----7- ,,,,,,,*-4. i.
I off
Iv' cOlkilli•71-77---- .. 't.•V - - I
,
,
•
i •
i'..,,,A, • \''...,-,‘;.:>- V 1. i.,',,,,iiiiirliP V.•14: ' ,
,
•::',•••'',v'.,-'.
'5' ' 1,....."."-.4'...-7i,f7k 1.3 . :,:'. i„k:•:“
, . .,,-,.-....,,-,.._, •, . le....3.
1
ii&.,' ,I ' •
., • r,/..‹.C,;•'r''..- ----1;,,,-----"...7:,:In a =, -•
:.:.,.._-_,,,A........... ir . ,,,,4.,.4 ,....„ •,,,.;,....,--
Aft,'-'4,!NI.,-4-,. ..in,•,:,:•.: --v„. \.,,1
, 0
Iik Iligli'li.--- --:'; p_Ilt,\kkl 0
1/41,
ftik''O'';''4'.4`..•',It '
MILVC:•''•:.:11 7k.11
410111111V c1;1,0"'") VV.;Oti•••"7."`:•!i 4,6111., piiP
e- • ''''‘ \.• ' \tI4L:'? V/V ,?17;ii: ''411'ill 111.1.1.1, 'I 1,4 "...F,' .'41t.
d 0
• i .
• -,,,=,=,,,,,,,, 44,1
• ',...",=:,?•01•••:,,C, =‘,,,
. .,,,' •.
Irlikli ‘j‘:11.0.-ififir- -4114WajelV N% \:'i'. .,==: '`IP*1:7r"T 1,..' .41:4/^11!,ii: ly I!.. ti-r I :,•,ee •. ....mt..!,p6.4.„,
441 1%, ,,,,7111 \-.'- ii,..,•,i,p;, 1,1u,.:.;.1;,,,,' 1.1:1., ,,,,,till..v,, 0, ill 1..,_,I,it, ,10, •c i.il. . I I,: 1,..,.,
'1:11t-1*--1 -1".•-'4'''''-'''l ''' 1-4.- z.,:r t, ,,A•it.,,,_,,, ., ii , • . -f,,,'.06,;','401.,...,,z,rl
,S ''11,Y.0.0......."."-...4. •=d1.--".•-_,T1 ....1 .,‘
4 p
gimpill, 11,;1 0
li`, W
IN• 4pr
t
t
--...,••,i-SV.,. .L'‘'''• ••. '•
-W11..444.•il',,"'4'044
.-:•`.'fi4v-.•••4-,,,„, ;cit., , ,
...,•,•,!.••4.,•, pr•, ,....:..,.•
- iyi:144. .,,,,,e,ILIKAVI ,...,_.'_ .+ l'''11..... , -,zilkild.';',:g•-;.41;',Ik.q...1111 lifiN I
1
OiliflAigh,"\,„„ ,,.......,,,,,,,_,,,. .-2:- -,-,T0.4,.. .), 11 ,.•-•• i'.......,,,:..1•••••-1-,-.,`..q.1 f•4, .I. 1.,•• ,•..
file..-......-w-24-----w.4wpit,---,91...„ ,t4.•(,,,,,••!•,,,-4, :,...„,4,414 0,7•.,,.w I,••;.•,..,.41 .ENI, i,•• ,
..,, ..•%••,4,1,,mo,ro
i ,•• i ,,,.,
.iiritt...1TiFf,..-7-":•Nir: ....0.0.11,1 1. 1.:?:k.,.\•..,.,d„lieo,*•.6;,,,,-.1.,-, a r,I ilyni, k, :::.,: 1 Oh111
• •::40.1,4,,,,y,'.,41,
„,..ikvik .1•Irv-IV:4A lip "filite,,, .Igi %4-?...-As,.._ gilieil.,,..N:Iii,:i..c.:4.i:'!i,111 i!iit,d i Hi ii 1.4:.,..-::1 A tiVA ' ''•,'..,,,a,TON Akal.W.0
' 'Iiiigt.'iiiiil..%---.40S.,..-4* -A. t,VII. k 4.Z:%.%.-Itilialti.;;:iii.0:•;!1'0.Li;''k.:i•i 't.'4!!!!' 0 „ .'I IfiftiA•S!"0.,„. .-,, ,:agp,,,',.4,,r,',.. „ ,, ..4
Aret):Zs:'*.1-r-Apl` ' • im , go, .40;,',4- 411klipip,-;.71r r:,--z;-',i 1',',,1„-„,1,11,1 1 i R.11.13 1 -r•i:'-,,i .41910:::-.,
4140".
...,.
gm-- — - .44k °.i.`1 i'l'i. •'7'.• , ."rre,,..011;21 1 O''''l' ' MlAr,A1,".:". gri
oi...,. 1 '0='!'..?,7•.'0.'.'' 1." •'1'. .411,.;.;tt".t';:i:/..*V=."-Lbe' 'AtiEn. '''''''i
„. Illii!"11111111111.11111, 4/ .'0Volilir- ' ''''''''. ]Llill'i.:4!A ,4.C.t;'' I ,45W,* f
• -_-:`-':-----.---,----.7.;,-----....i '.^,/7" ,,P ..•,.,,01:..'Ai f.= l'Ji iff1'1 ' I ' A li r, 1 z mc ;,.' ' •A
AI,..!%Pt:r, $4.454
th-Ad,
-'--.'-'- ------- -# -Irdpi=-...0-- !Ala , -.;,-roilnliti•,..! rt,"•*.it.',..ViZ7;:,;IV ....,,,:,,m; - - ,.. e'-',troT.tr%,;(
: x:iL,;',1„,lit,
r•.,7,1M,74-47:•t;
----- ."'" '.'7'----4-- -''' ,40.....-•'*00----- 1",.;...,,* -"'1';',,,..4,3;,•••iiimmiliW ,,,...k 4,4,;,.A':',1;i,?",:'' .
.:0 ','40401...., !---.%"----.0, .,.. •,•.',. 'aie.. .
a'ctleir- -Alli .'it,irdorsimmr• ...
.....- .,.,:.4:j.,b-‘4F, . ...;A,
' \ \ i'qt. -...w..,..-<,•:,,,„7.r.'"' ,,,,41.7011111111,-,,Alki010 " , ,,,,,,e*.i.irillIP ,14 11;110,203.M11111111111111i.:,:;,'......"•::f i MX .
11")44;041 V4ir .,•;7ili'l;37-.774q111E. '.tt. ,'.-i',,':,,,f- IM.
'''.:•,%'''.:1116fk"'W''''''' •""f"41-1111#01-4/110.1 ,'.,740.iy,,,,,,,. ;., ... .m,m....r.....
`. ",,',21450.,Nt
• ."'''•-
=.,.:„=.:,:•1-d,i;;,,,,,.. ,:, , , = =
, •••=,?4,- .11V tt,,•=rt•Tte.',='=-= 'Af„,,x,,,',1,';
'''''Mrt=,'''k4,0,0==•"•,11" ,,:„
%.,,•lt..----...:U.I.,;;'==, • ,'00' AidoOdilig. =,d,,,?=.,W .,1,) I V(1',•I aiS X1',,t2:'''''PLV I Y'-'7?: •i''' ' -'' ' ''t'-'.'"V'ffiA•Nr,,,,,,,-4,I,
...:,. ....,,..itia,N.04,..*Ati
t,e'.4ip.r ,,, ,n11: :.., :0, 6,14'..:.. .4 ,4
ri:,\r'..,„i".11, 4.4pzitilroir*,„01 '#., ,i'i: 1,!3' i, .... . •%.iii 4" '''';:.'''''''''' '4 ')
., , ,,,,,,)-4,-• .. _....4., 11 -;..,,;." ,.),.0,11, .; , Aik,.t4 :,:,7 4,h.,4,,,. iu 1;..:•4,-4,...;„,‘,..4, #44 '1,V;;• '. .::i': ''.:-
7
• . ,,,,i,,..„1„.11,!...it„:tot,,,k,,,,!.0
. -!-
'"I'-
• '.-Y4 ,ati t,,i,.,114.'.0....,ii.,.,,
-1 ''' . , ,Pt. ilk "`n"-'.'"74: 44.11' t• 6M IC• .•.q.,% A, ia........„.________:....-•j::';,:Y;skt•A.; 41M,604
1
li
-14?,:+,:) e! fi -,,, . )t,,, k,i ,-,- ,..,?.7y,,, ti,,,‘, ••
‘.' "--------.........-.--- -. -. 7-5-7-=-10.--rin ' r..;,::•Wip im izi.,i, 6.4 1,:,:•i!y;11,6,,,AiltilL
/
..AMA..ditv.„ -___-_;..-....7.4.- wir.opti fp, '-',!-=11,,,t)--N t t oqi:",h.-A,10-:,•„''','1; ',,•'•.•,'••111 MIK% \ - .•.--,..4',4,'-••'Wg..0'V
tkiiiiito ,. 0-,,7,"". - el:VA‘\ ..,..4.,i, -;.41 il•r, .1 '-'' .14;,!t:',4-1.4•-• '';" 1/4-4,•'11',4 IN* ----: ,--:-.._ ;.',',',,.*,?,,:'••••.:triLl
eel'
/
/
/
•"'LlA '/ * / '':-.=-1-'*41C o'...11111 f'.-.'', 44.4 il.s.! itz:.: .....:...16:e,..;(zi.N.,,:. ..4' .: ..______,,,,4,4k. \i„.1\1,-,- .7,.,•,:,,,:7,,,,,,,,,‘7,;.:17,:x:::,
____..„._-_—-___•., it i
igAIL / .4!.:' .77.11110111=11.,-.411W...A414,, ...111.11L, I (-----='!"-"j'..•'''• .,:'1,,, ,N,'"."7,1311,V;it.
` '‘'-'161111k,-". -,:i .•• ,...,: •,..'..7 'ff t Ix -441it'Va.V.7.' /WA finammaimmenemilimmuniniro _,,c,,,,-.„,,A. 1,d.v444.
t'‘, / .,-,-,4' ,,,/,.'.;,-;',/ „.•',;," , 1.0010010.:417,„ loss am immonimmins foondiiii
'Nlii1Y114,...' 4-,:vail .-4,1,%-''It' /,' : 014-s '454'54,07117 iMunimmonianueetigi Za"."-imaidil likke 6\ • ..ni,.,.j.: :11;,,,,,,1'4.40
\
1 °°-a-1"1---.- -.• --•----. . .
----.- •:•2..a_•',7111,04,
• V 1r47-411-,t481iWi /.;;•";16.Zli,41\N '.';',.'41):4: 7',ci.i.............SERTVOIRIMBlill.11781111
i .,...,.__
r i
734%,,,,,,4,A%,.•' ,„" . ,)•• III A 1, i.,,,, ,,,,,,,, , __________....... I.- imi ••4.1.1111Liii-. '1..-.;.:- - ..",,:`,r.';(.1•;::.:40,,V4.4,,:„1. '9,,;.:,,,,
'.%. I. f , , %*---'--8f Y •.',''.:44,, ",-;,0114,0,Wiik ,
1.:t,••4,'":10 ,. I 0,17
' %NV ir!'tt4,,h.H f ..' i t .1 ;.,.`ii:,,",1',.' U tit.4::A•b.,'Ih.,',V,R,i' ,i1.: - / )f„,,/ _„4....1,':-:rf''''.44 0444
. ...• '' ,,,''.•"/ -., 4.'4,
,..„ ,,,.• ,e-r, .,-'4. Az,,
\, is
-,„,41, ,,,!: .,,,,,./ yiiii-20„.,:, 4 *....:, ,. ., 1X,..rA,);:,:,.,',',`...Nli.;in•X?.•''...
I....,.•-,. -••.i. OS -.14,4-1'. '•••.;'''.•• 944
,,,t; , , [0.„, .... •.'••1.,.. ,,....,, •••,--,•••'---, Oil ••,,, " ‘4,-.• ,, ',,,,o,m,',
it
:p,,p, moi ammommimininumummil 110 ,..•:,- .,,,t' 4 't
11!•1 r':;.tirOrtie•01
\12tis •''.,.•_ . '/7,,ffiNijklA i
1
irt:'.--717.77- 11
T42•VVIVT/Afir;pf0, A.„._,,,,A,
t-z,, ,,'0,:ti,,,,, • 1 , . .Nt-Rit7,,,,,mi.•,,.„-b•••
, vi}.; ‘, ,•:;.,' A, -- .. ,w,, erA
ttglrik
xi• /- , 4 "(4' '
‘•„ , 4iii
\ •- .\ 44,/ . .0friliti Aitorar.------..- -
.10 .,"-.4-.V1,j-i.i:441'•<10‘fpfliii,n.q.';*0.7"•;Ait[ot il - ;tzw:0, Ir•v•
-1111‘tv..4)7,tio..*Itisimumennuti A,•,-n-VAtsitrkAler‘lk ig ‘ , ., ,‘,,,et 0.•,,,,,,,4..,.-,,,J,:.,.,,,,,,A, q't,•,,
''i.r..,!•v.\„400r,.., ars, , - *.-77-..,., -i•••-,. •..,,••••-z.1,•-, ,• .-..
•11,‘--444-.\,.,‘,1),,,,,,iwitr.v .:4. .,, 1404,,,,4„...ifiatdoodijims.... iiwm12m......mi....,...,,,,emm,,....._- 1,„.0410. ....: ,.1 •-,,•,,,..T.„,„..1,7„;;-,';,,,,:,..,.0.,:•,:•.••• ,
. •,....„,,,,,,z„,,...,,,,,,,,,,tts„,,r, • .47,1„---...„,•?3,t„,,,„ „:4,-,,,,, , .—___________,--• : - , ,' .
li " . .. .
-i#tV.I2Z-,<Atir.'7 ,, ,,.fit\ ''' .,•'')'''':e:74, Iii'.:i';'.i 144P,C;r1k,*,siT., ' . ,'LE ..
' .
....,,,
\1.11 .4,,, ..,-,..,1•.:•vv. '.7),k4 „,.,.;„,,
\
. ••.,,,, ,
.40.- .",-"A',.•-.0§,wiJ..,:•••,,,,..,-.•:t. ..- .,,.... .. I):,,.L. : ...„ ,,,..._.....,,._:...._, ,,,.,:.,....„,,,,„ .,.
p '0A4 s-••••.N10,A70,,,iisilaim•••'••-"-' - ' ,., .. . "..:
\
47.*--,. . ‘Nlilri;*#,M.* It AL_______1.11.6.:Vam"-L-tili4 .`imminciii,,....
Ali
. ,. .
, .•
.... . ,......4Aih..._ ,...,,......i., „..„..,.4. ":„..... p.7. ,.,... vipp.--,............. .......-...
''•'''/ ;',..' -
-11.‘7.--1-1-11-k.' -"42-,*".1.t-ii..'':'‘..L. 41421.- ""'/-1.'lit,, ..-',‘,.'.1itiN ' .''',.*.,. .111110 lat'l':':. • --',.:;•••,,,:::4;-,,,,,„
IIIII,- ‘ *.‘.. .- .-- -,• -:„,,,a -,-011iiu-i4,4, ,,r, ,-. * t.4._r:,.,,I____' 0.,•.t.', .,, oriii,.-Ir,.77..*, `.'',.,,-L'•,.',:'',,,..' - • - ,...,:. ..... . z
04 .0,,,:.,;:,,,,ir,--v.:Ny,,,oi .,,,w.. .....,...•:...--„,,,,„,, ,,.. ,. .,,,wilmub,susii_ , ..,, .,,, 0 favk
• Virt,,....-.... •swri,.•4,,i,
. . . . ...
" '1'..&---- ",,,' '''‘'..1.'-,. *iv .-.••.•-....,:fa-,• • - •
---.7.111,
n''..4•1,N.iiiiTA
...-4,
....,....4!;,..4.....
.410ftit w•••04\ • .•".•.Ni-
,-,ti,,‘,..:- . .,vo•vtii",',.'s. .. .• , ..,_.•,,, ,,,t4,-0,,$ .. . , .
. ..
— 1—
<
/
-P3 t.s. ' •-•, • ,- • • ., ,)., - ,,..,,,- ,,,L,f,A, ,_\ ..,,
• ,,,, • . . .
v4.1•....i4 114711,AO „,,It,,,v-',--49.00.N,-, i.,1,:`•.e:•'2.--:;-r.--- .•:., ;'1:-,`•" , .•-47•3'Att, II'‘4'"9 • .v..,4--,,t: .•'. .
.%"4116'... -,.,.--.---- .,....1.,::,'?„."1titir4,-09r101.,,,,mr,,Mb;,"':;.'•;;.r.:,.':,st...`'''.:‘•,,f,(,...421\:1 ;%.•'''..°". .,'IV.......'.';''',:'?,344''''''.,',''''V'''I'''‘'',Pii\i\' . ''' . .-,,:„,,: ..:::.,::..;,,,,: ',:i.,1-:1„, re
i 1:,, lik
4
S,
'. .'':.:°•.:"A,R ,--.,.,,
. .5.,,A.4,1-,ft _....q ,,,.‘••,..,,,t.,. •••,-,..
•46,. .•-• ,-. 4' •dilt ,-,t. --NieffA atijibl,•!-:‘' ',„ 4/,,y•,..irit----.4%._ ,-.1.Trt#01,' . '
,,,•,'- 140),„d te.4, • . ;, . ,
%I \NI, 1111W., .;7•`.. 4.4e woo,'•••'f',74.+. 101-..‘cl,'4'er.K.';*.At'WA',,,i,• . .../fahm.4 ,.. .,Aitn.,i,,),,t,iyiv, .
\
fAti.,..0:,. Ar ir,--. .. .....,;,...:... \. •4....:,.,:,;+.: •:,..../:, .;:-:-...,4 .q....gallio,43,N,;„...,,, ,..,. ,..-: .•,;„,-„,,:,,,,,,,,-, u 1- (4
Z LLI
i lirm‘17-+Nk , ,..'.4,py! r ,, .....vm,,, •4.. -44.•,,,...., -., .,... ,
, i,,, . ‘..,.,•,--; ....- ,k-,4k'av,rov*4.'4 ,' a'.. ''-:'•:,, :7-'• 1141W V
• • - .--,..,. v. '..,:t1,41,, v,‘ :1.7‘2':n".'A-0'•''', ''''
•.• `:1,41j; , ,,.., , •-:•,:.t-, •r,".
..,....: •
j.1 'L."..,,,,, '';',N.,;At. vv., I. . •+, • ... 41, MA,,,,..,. ,...., , LLaild in
-,,
•.:',a,,,..:,,,2:..„..-.L„, f.. <a
,',....‘'4,4 :45711i4-- -z-.W •
,
.. .
. : . . .
• .
- ••,, ,,-3
. . .
. . .. ..,_,.. . .
, - ........, ....• .,„• ,_., . ,.., , ...
•. • . . . ,. . .... _. .
. . .
•
. , .
.. ,
. .. ,
. -
J
•
•
•
. . .
FUTURE AIR CONDITIONING . =,
.- ,. .
DUCTS IN TRUSS SPACE _
.. ' ...-
, , •••:, ,
• _
_ ..
•
:• , _ , [Maw _ , ,
- --.1201:-- 'IIIIIIIIIIII— A—v'O--•' ----::- -:-'''''''''t7' 4, V 1..':.- - ---'"---''''''' '-gr.-.4---.:-Z-7-'1•2-t----'-.-7--- '-'-i--------1-_ ir--- ' ------- -- .
. iii01111\WPn--------- --"'-. A"' -4,‘ ••••' '_.' '-4 * ,- -"" f- - --'-•••_szt,-,—
.
' UNIT HEATER -_ \ .„ A..„„..„-r,-tz- -— . Nt.,':'':. 1 1 !,', , ••'._., . --4-...- -. -----
. \ --- „1„,..,:-•,- x. , ,§, / ,-, ,„,,r 4 \ / •-'7' 11 ''ci- . ''.•••----,--:.------L
.- -I •
• , 'i,-,- ,...._. f• ft,, _.,. .; , ‘ J :- ....1 A..., i ii-iy.,-,1_-_----- /iiiii-- -., .
• SPRINKLER LINE till.---- - I ? . •
,,.., -- ',. - ,' — •:---' ' k 'Vi -—--:-,,,,,,--...--- .*iiir.
0 .
• .---# ':-. .. . .,, ....0 le -4--‘-'_-_-1,-----4-,...
, .. : . 4111,,---":1" • 1.: , . ...:, ..„, ,,,
. I & ,, •••:;,: . tr 4; ..,_
A, • ••.?.: ...-.9
- .I.W,'L'Ily•‘
/5 w \ 4,..•".
: \C i; -,--/;•`":.,- 1
1 1 _-..:„...'"....,- - a-. . ,.,.,,,,• . 4'4' ,. .:..„,, .. ..... _ ..-
,. -
i ri-7,:.7*--- ' —- -,---,z-,--,--,..- .,.,-.T.-— .•••:-.. _ ..t 77--4--- ; .V....r.;...-1 ;i'.'''-17- .-.7.--.'.:7":1 ..'--.,`",'''".' 3-,.,•,.1 I ''''',--7......),,,,
... • -,:-',-'--- .,
. . .
.': INTAKE AIR 7.',F-7,-,• p. •
,...,,, .„.„.•
• R- -- f
MECHUNIT HEATER
i . .
0111401111101114011)„ ,--' : - i ig4111141.11. 1 . ---4 •
---''-,
Fd ..
,.....„ •, ...,,,,,,,,,„„,„. ROOM- ‘
. /
11.- —
eil
, .
— FRESH AIR THROUGH
.'
-, ..
11 : 77=,
OPEN HALL OPERABLE WINDOWS
. . _
„,.. . ..
....
'
A
• 'I • RESTROOM •
I
. • a — —SLAB.ON GRADE.
, ..
: .
IE
A —.. • :,
. .__cor.,.•„,•:,,,„•,,,,k,,.,,z„.„:„.„,,......,„.„,•..:,,,,,...44;,,•i.:::„:„,,•,.„.„,„.„,!.,,„..-::,„,,-,.:,,,,,,-...,-:,
,,...•
„.4.,... 4.... N..--AV '. :. u.,„g —lteAN=--.-.4-i-,.,44-i.c.,.
f'''-';•'-.4',?',.`, 10..-t,.,=0.it,".iA',6,-4.i..,94;f4?".44,
DELETEiTRAvEplF FLOOR
--,...;k•...,,..e-,•,---4,,--.3.0,-,.... ...i.‘ziaK., - t ig-t-Ift,..i4g•
. iT-h--,--:1,,,,:------.,,,..;;•tyi,...-a,....,..-)-4,..,, ,4,..,•:,.4, ,--)=-1,,,..tr-'4.'".•,-'T-'f".--VIN: .,, •-•-- -,;•.4',*„,.:1-,,.*:.4,-.5?-• ,4
HEAT . .r : ,.,,fli..'''.7-'7::..1-';-5,..*:, -2..,,-..;:.*::... .,,,,.g.P.....".i,..,:...,:."',, ,„,,,,,.4z eit.. •2.,,,,,,,,,...,..:.,-:
-itinuirA,2,b_k..- ..: AY''A.Nt-,;13TIVI:.-:-.4,-,--•.-Vg-',V1''''-w.5.''";44iNri-f7,g-nli.-,-4
•....:...',• rf.„4..l--.4k r --1.-,U';'f•T1- ,-1 :.,., eOri,-:g` 4- ,: i , , -.•- sM
-
g-e,_,,.....0,n... --,,,,i...:, .,,,,,, 2--gkif.,A 7:1,,a,..SA,-,--. 6 .5i.,,5*..,,.g.,, ,.....-I, ' •.,....-c.,.7..4.-,s,,,-.7,- ,:>-:,4,-,..,-....,,...,,,,,,A
MI
. .
,-. • .
- .
RENTON PAVILION. - MITHUN
BUILDING SECTION
APRIL 7 Atchlieitits+Desigriers4Plaiinerg
,.:
2003:
....
... ..-
..•
--- ,
, .
.. .
At'
*1 RP
.,-.
,-. •:, ,
tr417F,7,
. ,
-- 14 • 1-, . .•
-——
r _ _r__ -.-.---iii. ." •• •'. ... -.11.."- • _.,..-- + ',.. -ZI
.. . _-_,.:...naral-MI1-1 1 111111mr•Ar.r...,.., '''''''''''......'NNN":„... i .......:.;;Lxvoin111 ---/A Allill .....---
-214:(1-r.-••,. •
..0-
.111. - ---- 111111
1 1 1111■11..--
'
•1 1- 1. l'FAIMIIMIKI:INEMIMII WI MEM Pl_%-did- !ib--
II i wo.wa.......... .;.... .m...7.Ea a...a....w........ .....Emi.....a.......:d.resmossm.mr sass...1 1
lir t....,""41‘ -.,•411-111 .-\. VAIN!.NW— WI[NW VAIMI, NMI LIMN lft.:=—=—= =—
immirmiummumml MN I IMI I.I il M MM:Z.= M...li Mil.I ME M.MMENI=C.=MiMii..iMMEN ii
=NMI: -
-.....
I .
•f.
'•:. f60a2 )g=--,-...-...,...=,--,-•—,--r,--'lIi.1A,..-.-:: fr.,i- ir4,,%k---.i,:::.,"f.:•„i,4t.-'f-5.:: -- 1
II
II„,,.1'”ri , ..„._:„-.Atr-,,,,r I.'''„':..f....r4.._.A_v,i ,,1,1,,,'..:•'L-•'-„•. i1„,qr.1E.ac=caztcar:a:,,y,:,,:m„nm'.,.- --..a„„'
+.
. Et MI •.:5 _""trIT-3-9•S. t._ ..,t,._ "'Zt'?.. --7-'`1”A — ....,-,.0 tal W.1 .^,. - ,7, -.--••••/-.1• 1-=....05-.-..: - .,---.' .
. • LA ='-'=- =1.E....,2_1,1 r,:__:,_:___1,_____________ 'I :47 '-'”'I 17_,=.1 , : 1771 LI
. i "--— --— •
. .
:: ......
PROPOSED WEST ELEVATION PROPOSED EAST ELEVATION •
, • 4
11311/8.= 1-0" lir=1,4y
.•
,.--
. - -- ....
, • _._ ..,-- ,
------- .......„.
_,...
...---
4,. • ,., ,
.,..1 • ---_. ,
_ 7 _. :,......\-. ,„--
.....
. .
• -------__
• ,.
.....
f -• • .
. •
•
. .. ......_ ...._ ............ . . .
. l _
••
IIIM,:,-;;.,•:__,..• - ..,,.1„,-..,,,L..-r...-s"7:
i ,•• ' M-- , , : ,,,„: micemals.,. .!
• H .-_-... ._,•.: ,• _;:„.„=„,„ n „.... ., ,t4 . •
• ev::,...,.,„„,,,..,,,,
El IF...e.r.,....• ;" 1. F.1,1',,..'r.r r'e:.0. 1 v.--- - 1 r1.-i- M,---,,;,-----P1-7.-„,1 ...'..- ---
. 3
1 -:-,-E ;;,-+.4, !.4.71.1..ii-2:-. ,L'-__.,.-..1.-, ,___4_...--- , r , . __,,, ______-.-e: =:-,.__ ._.._, , ..,....- ,,,,-.1...7., q-,,,, ..„7.: ,,,.., 1 ?,„ :., 0::::-.-•,-.i ri t.,-.,„ -- -,..•.4 l-',,'„:-. 1.-.1,.',z-,,A•• •=4...;,-:---
, -,-
.. 1 ', '-•'1•• ?...;4 7 ' ''''-: - --.. :7- :-, -7_.? .: ,_._____ _ - — - --,;._ -----7----1,2'.....,-•_-....- .7"..-.,— -
. . • . .
ALTERNATE NUMBER TWO WEST ELEVATION0ALTERNATE NO. 2 EAST ELEVATION
.,• •
411111/8.. i4r
1/8' = 1 1_0„- -
,.
6•-•%. .
.,a,„. •
•=1..
-,•!,--
OM
,..,;..'. RENTON PAVILION
s„..._. MITHUN
EAST AND WEST ELEVATIONS ,,,....,..„.„,...,„:0„.., -...... .....,"4.1(....1w26.,t4gq .,v-t-, Architects+Designers+Pianners
,.,. AlE -NIATE---"NOM,13 .,211(VL- -t....4,.
.F. . APRIL 7, 2003
•
•
0,--7 .---
W.V MET.-. .g*WALL'GABLEV ENDS
, . , .-,,,
• ,_:-:-...,-.."-r .f..-ykA!.7s,s4,--,40~-#.:k 2
.. ,
. ,
::.
.,..
c:: _ , = .. _, •
t _
....,:: _
RETURN AIR --..:':,. _,. __
•;::.!-...:..
c•,-:,- ----------101111111101 INN I liii.1111111111111* ---.------
_rAa._-- li 0 . ...----------,., ------ i„: ,e, •.,.. —.-.-&-i.o.. .,-.1-_,_-:::__17.7-,-:
. - -
.. , .....,
...--- _ -1 ,-,---,..,:lav - 4,6 ..-...% v. .";.:• ,,, r '', -,1-1.4:7-.-7---,-",11. iffi . --• ---,
----- -tr --e' --i.•,.:.--''`'' -',/ ..,,,,, A \‘''''' .
...
SPRINKLER LINE
...- -
\li- ilk
v 11 .
;,"2-•-.--'"--- alirl
---:_•-2.,'•'.7.1,,...,/
,.....-
'14..,.. .. .
_,-----•..,..-----..-. --- --et ,-T-. ...., .
--'. Ilks, ,.--.-.-:7.-:-.,,,,,, `^--...:,,•,n j=i;,,,-., -,...!J 4 esi ,, ,
tr. '
-- ....f,-----:-..---- F,;• .-..:„.. _:, 'my;V 'IF 4r, -1 ''.i`.x... I ' s'2' 1
• . _ _.__,-
,.;..,. ...,.. ....„...,.----.-- -- - , ...... -7-7.4' .-- --
'''' ''''-,7 . 7 •1:-,4-,1%‘,.' ' '7 5.,--.'-'- '-';-4'-"-FA4-7.`"t741-4.7*-,---''= ."'"--"e"7='`.74-7-7,74 c. k. _-, - - ---;-."...4 ----: 77.- _
--77,-.z:-'""---:- - -npe07-77' .AT --z,...',.'"•,',.„,,
_ —
ir`gl-- . '5"1 . a—
,:,,_
INTAKE AIR :,
A
j" "--,:-.., ...-e-1-,..•-, -..7...--2;', - . -"V.b. ;
.• :- .,
' d MIL
•••Pil•MM. OPEN HALL
kaki--1"4114414JFRESH AIR THROUGH
8 - .
,..._
it INWO5Innti ...IPM! I OPERABLE WINDOWS
is-
RESTROOM 1 I
I i
•
I i RAISED FLOOR
1 DISTRIBUTION OF
HEATING AND COOLING
1...-
---1
.4
...
I, .-_ ..." ....." , _le
s„:1,--- e ,..,--
i.
:::1) VIIIIIP' 1 i'-' 71r-- 14 1-'-i"'` I 1 To I
L _
'11,,,,'"''-11:Mr-nrax''-'d.t-,'.-V-r---V4r:'-'-1---,Y•70;eff,W,W-T4,437-2,..e:ihl?=,-74.-z n-410,--,2,;:5.:ti
. ..: • ',"-`f,li,!,-,,, ,,,,,iLiei4ihit-47,-,,,,,,- ,...;: - '--,--vik ...,,.:,Cld'4*.si :-:1.,,if.'& ..:..,,..,;,..W,,,...qqe.?..4 '
,--RAIS 'euil:FLOOlt
,,,,,,,,,..„,,w„
Tfi;F:t04. : ...1:.4110GANWOOPLANGISMOAL,;,174V-0-,,AzPit*;:frn
, :ii.„,...0.„:„1,. ..,,;3.,:-4-.,,,,,..4,,v,-sly4,i„4,4, -,,:;,,e,-.:&*.IV:',-44•7.-i-E-Vrt-.1W,.''=----AI.444AtAX.f;R-Tpq,;4-21:',,,,, -
i.,'Irg'..-,4',":41.. ,,,lf,--,-.Lit.-0;• ,,,t,.<-$‘391W:7,:i'="f'10'''. 1,''r''..'tt', A",t:',141424i,,,V..; ".g,,,r)%1
;-7. IWV,:"--,,51,,,,Aq' -'-'Y.,•-,.., -... ":"V... -.4 i','At,A'.'.1:...,..K .',.- .,'4...1.1",; r of,t,,,,,, ""......,,..Mit;e-X
U.v,..k.:4" tg.k....21.-,,,,,,,4_ -..,---- "--4.,...,i, ..f,...-p*,e,:v'.3;,,,,c,.;•- •,,c.,,,,, ,;fr „...:..,.....- ...:4,,,s,,,...- , ...,...y..6• _,r,„,
.,_
miTHuN
REtacapiwillos
BUILDING SECTION Arthitedis4,Desigrier5+Platiners
APRIL 7, 2003
Z i
c
ii
I
.
i-E 4
„..I. „II
NMI 1
...
I3E X
.
0 in 'lip r. ,
:. ..,,,,,;•-•„-,,,,,,,e•-••4,14,,------ . .
---10,7V , e,..
441 ••
..,
I t . '
9) 1
,
:,-. ...- -,--------- • ,,.-.,,,,..4,
rr,, ,'. 1 f,1 _ ,,--1'. -,,,, •;.,7 `.,t.,,
-57-4.c.14.-
,. - • ,„, .,.,
t
FATial0. •,-,'.,i00
.:,., ,
,r
,...,,„ ,1 •Al .
'''';' '''ge.-2',, . . — ' ,.'.•,Vi.,r•141113%
V•.'"i',..WO !...t,;'!ja., ' ./.,1; 'p
40I, • • i 'a,,,.• Ajr,i7=-*". 4C.I.
:,a,A,StrIT. ,414 1
1.a.,•• A"t•^4,P A
kr,A•dts4;i1"1-4,-, • ;- ,.•• • i
• „
r.4011.4:;,6•1'-.4:;-- ,:"'''''••••--':s?' ii• '' ? rt,;•.V
0, .„,.,4?„, . ,,, .,,,,.... .. ., ,
, ,, , ..,44 rrl rvi,- ,' . , rY,
1. 4'1:44,i
- . - ---,-: ,-•'- ; ,, ,
pii.•:„,,i;',4f.v.t,'..Q'!' i ;,..."%. ',,,.-..''
• * ' ''
--.,,....e,g,.‘....1.,,...0.
,, ,. ,,,g V.teNy,_ .1;k:'4, if(A.', 'i ,,,„1 .•1‘... .-'•
,...•
Ze4,‘'147.4•44VV411)W•." 4•?O'i, i ...fAit'•111 ''i..1 l'Ill A'if•''-i.-• 1•477"LRI'''' :''f-'"'S'•
eA.1 .•
tek'''S''!:PA340§6'.4 1'a.„ r p.,..4 4,11iNti•TiJ31`.'ic''
4. • ,,•f.'1 . .
, ;,';'7,':144.F'";44;*••74;'`''',A,44"'t,.w.,:r7.'c' ••••,4,"•(54,4,,.!....t.--,"';'• t kt..•. '''' :".. .fc.*L.Xce.i.''.4"..:...-iil-,, '.oq
-li. ,,;,,,,, ,,„ , .4a••••••-..,it 141,00...e ,,,,tri•• ,•,,...•. ,•.!i,,x,,,,,,14:,„4„.404,,,,e:„..,T
I ,a,v„,,k,..,
111P:ir---7.'- - .--,."...?....;,..s.
'
,71.h.',1."-- ••" :We; ,.. 344'.1,:4,W.:4$3itO ', ,%. i,,.,,., 1,44g.dea, i:. 44,1.,,s,
Y`,At,''
tl
e
,'+.1...
4.0,'. ''V '':it'
•.. ...:,..,.......*4-:„- •:. .4;,, ...._..,_;....„
, •,..y.,,,,...,3'A:,.,,'i,i4•.• • ".. --4,-,---"---2:::;:::-- , -._-..,,„,-,,•• ' ,„,",.;,„,,_"t*.•'41-„ •%?;,r,;$•,el,,lv 't,,0,-. "4 •;,..1 ,....4•;,c,,c;•,-lid. 3 6 11-,
.,:•"...-„.1..r.,.-', `,... •:', „10J,Z.. , . - '-' •-.;''.•,.44,41,0,'IN ' •I'A ',11:-'40,44%.,',,e,;1• •,,l' iii4 "1.0AL.,&0.•,-. — • iii..4.?
i.‘i:LJ.,.„,,T.,,--t.'.•;,,,.04,,,,....-,../:,;;.., i--,:q,'.-...,.:„•.,...,..:..:-. !.:.,',..,:.-:::Wi.,:-7.!-...-1 iD,P7114,4:,X. *7'1;:OPO,F,411::f;;', .. -.7-T-7— !':grt,;',.
:''t''''7!';'-'':s''.::*C-i.""-',.1 4'.',' ;:'I: l'•',':;','•-•...:. g :1.,:' .:,-or,C1fir44‘,:.
,,E.,„:,.,4,„ev.914,1,1*•...1. ,...=',,---,*-............1`Pr '1,
ri• ,, .3 1,A*,...., -4, ,, , ..,L,"t,',,, ---,• . „,..
„,ip,,,,': :',,..,.:,,,;`,, 6,,•:..,•,A..••••'1'''"•;:.'-•':• • '";•••:':,•,•:-_,.h.."•, ,,.•„,',_;NA .r.i...,q45',,iipzp.g.„.a•r.,.12 ...r.A.b,. .5i"..•RataVA,V.arra..,‘A
9,-'''. ' ' ' .'''. ' .*It.':.[E, , ::21,AV 7411.7.14:,,O. ....,i 4,4 .'.4719*''.4. .'SP'rj
--1,‘,-.: !,.•..,.72.,,s:.. -.....:!;:, .....
...,ogemr.P.or-T-
.
•Alit-4:1-•...' •
•
•
'''0'i• "'/;!
.. i...'•'• 47104- opiirmt.' --L.."'"',,I.14.4.,•,,4,„q.,, •
- ' .;«,4k?"*"..`,,,',744.- • .4.-An..„.. - .
,,, ,„,,,.., -.3,,,,,,,41,. .24-41.........,4•••%,,,,” •••,1,4-' ,41..irt.'''''.' • *'•l'941,4.4‘..,
''tz41....--• ....•' .; ., .',. : ,' -' .,"•-,- ,,!<;".4-.:1:7.:. ,. .,..;!1.-''' • • •"..41.':.1:,,,ti,•ir,.,,,,...... .
..,,,, .,,,,,,„„p,,..... •,. ,•l•„•.,•,;,,,k,,•„,„,.::„.-,„ 1'.'A Ink 4t-."*"V..."0.A.;-. .. -'4-.0..e"'' • ,,,,V,.6i,e,, •
11;4411, '- :4 -'. ,,X, i.,.!. . ' tc,.‘T -.. • .. t-,,474'.?c,,,I.....,
?..ii„,-,,... • .,,,,,07.1`,g,,,,..',,',,, :464`. " 341, ‘e,t,','5,'" ,,,,.. 5,i•.„,,.,,,,, ,•,,,,
i;4';'. ;.,,.,,'.', ;vgr04it3:o-A.,-:0 .':4k4%0:,,,'4,,,,7,.10ti't-s,',„, 4,.,q,.,/l,.,,,.",;-"-,-,,''„,'4,-'1/4.9A':''e„'Il,,",.,,,-"I1t1,•i,t4,4i..x,-rtp"„.0-„•
i,... :,,...0,.:1..,4,.1,-a7(144.4,”„,,,...,,,,,...•......
,.,
4r $ :, , µ1004” ,•,x .., ,..
:: '7'n.:....'..A. 11.arvafo : 4.v.e421:40?ii+,/,1414:11ks -1,. .':':' ,I.i,010, 177"-7. --""' „ .:f.:,44;•••-•.-,..,4.4. ,i'llic.P.:'-
,,,,,4,..ri.::'"-..'44,441'" ' •'44:ig-irc,i,4•''i'ttv4 Ait PO i3:114, 4 •'.,-` , ..........--.-....:,-.. ...,4,3,., '1•''':.:,,la,'Y.:Pt ' '
.•-,t...,,,i,1/"44,4t.,4',:r0..'"•.', ,`4114.1.14,',.4':-1-A,•. " """--4
',,,,,41"„roF.P....ct4,,,o,•)•, •
---4'•-•-: 14D,, e-:. .!,-•,*',,Ar•-••cp•rv",:,,,,,1"44.0,1,,'*,,,1 , ,,r
.....3. , ,:'44 .1„,
i',, ..'.•,"' ,.. ..ev-.•,,:g4k,,,,•,71r.,,I, M,AL.iwv c•
,.i.„74, ,I,a1,t',..•k•,,,,,,„15,A,,,t.,,,,,A•Pe.:,...,.14,,''' ..r,K,..,.,,,,41.,,.,,,Ilk. ,r,V4r
.;;1r"...,,,,,,,1,144,44,, . . ,, , x„,..1.4 ,,,,,...,, . , -.„..„,,,,4;,..;"'rirlpv.,,%.,t,fk-t,..:„,
4,1/4„....„.,ip ,,,A,- ,,,,,441,,,,,...44,,,,,41,,,,,,c,4„0,:z4..„04.,,,,, 7::v r:•,,,,,:,,,,11. 4,11*.At,«..'''or'44'i?";..•',"4.,',•••4 J„.•'`:4.
01,V13.*::4404.430WrAlAr.31,4%514C'N.4+344.4,1,11,713(433r1‘ ,!.."., .,./.Ap.0,,„t10,0&i, .;,0,01.4
,i ta‘,•/' P.' A',AI,-''1C1-•.t•A•4•J•r•A••••V•A'''''',*46.› -0 ,.0V•••Vti••:".1*,*'e.',.*,,,,,,...,,,,,,,,. ,, ,,,,,,,..1,4,,t...,,, .4 41i'''."a''' •`.''''i,'
A4.4044114•Iiipttirt..31°1•1$.114,1e,":14,i,..*Ast••044:Q,„''falit•VAA.,,KA!4:,Ili.,iialli.tvirgi50.tir,.*::•:••• •,,,,A5i,,,siqii4L.i•• •i.,jj',:r.',':3%A;.::
4,tikAVA-4.01,a1I'Vr.01''''',..:'RAW& .Pk:,e--.•IN,Vil,"t,*.p,. ."1.,,...'-•<z.,:•011P.o'ai'r,q,0 -c,11.%,,„&40,70,40.)•,, , ,,,:.";ji,,,k, .0,,',,,,,i,.,,-,;.„•.,
iv" vlikt•.441,fik.,417.1,0,ttitticik,ifs,'",k,-.1e..,f';.,;40.,r, 45,,r."0„•,,,,. ., 4104,,..q
ai.V1Pdt r:144•1i40$464ViS.X4, :;..17 ..•:/d• i4akit4a 74“.. .$,.. ,,1=,',-• "tt" • .•,rAi)1R,1"••••,$g" . ,,' "•,'''''"44 01'''''''':
fiONWc.,11„:54,00:l',:lk,‘,1,414mt,h0-..rre0B,..,...--9..-ii.,-,;,..!.., -,•plotli,A,.-bi,rirm,'',:,,,,,, ,,,A.',4_,<•,:,..,x,,,N
zoll,,-A ..,....0N „,.• , .1,6. vo:..q...FA:.;;4„,..0••:+tr.- 4
V.knall-'4.1'..LWrtf•ikui-.• '''' r4s7.'"..4,4d,'''' ''' ,A VIVI 4 61,1,1,„e„jj,,,p,a,.: '',.,41-1,1?A,
,a4--"*Ign.•,iNtk.4.•,V,;feyy.t.w;.;;At.,.. - iv --,,,,, ,,waratit',,,,,,.; li, c•,irr v., ,,,0•„,%,trAgliz,k....„,•,, 4,,,,,..„,
gyisi,,,,,F4...?,',,,T4.c,..,,,,,,111,•::: ,,.
''.•&••' jii:'-• Lt.*ft6sitit•A,•.3••• n!''*'-60',0
14,it';',.•1: ,%.',-;,.W.N.'•••1,4Ckf"4-4t•tilVigitAiggAki10... •,,,,,t,k,*:000,40.,,,,,4.e,,,,, ..
Dvi,,.:4,0.4„,,,41:,:,-6;.,•,:“•:.'•,,h..114,2,4,.,..v.".....0.4.,p3i,lygt,r4v404,,; $0,,,0041 vi ••- 0;,...,..,,, 0,11,,noi,,,:do,„..4.„0
0149i.2; r'kE. A:.,,,.'",•"4,46:V,Vccge. 44.40 T' ;",,A11•14•Vt-, 410t"'"A in.,it•NtiaAr,i1VV•k49r ,•• k,,' ..",.
M,,, 4M,1. ViVi.).:, 1;,1.1„. ,-,,.100'..,,r,P4',,,,• tit:';,:t4w11,
st410,0 .' 2'.411,-Abeht-Nr.,..7- 0-011?,0,,,,,4-01,P.,,c. l'. ..'•1.'114't•-?'.4WI'','i'll„',imi';'4
oeN 1
Nw. -A'0`,,Y.P,. .. •-,-:.54N44,04-P4ir,g:4,..,'4, ,i,;Jr...-‘."` . ,.... - .s-c4YA;0,,,,,....04;i,Ngp.,,,eW;
ti1;011-,.J4fgas0,4v,w,,m14:1,01w.wt17,,,. 2,..i.1„;:q4'-4,-- ' ,yiezz : A.,,4*.•100,,,,K0.- .0,,.. 0,1•;0,,vt 010
vit,,s4xilftwo.t.- 41:1,4,,c,1,..nox3.4,4.,,.4:.-1,--,.,'',ti.-,„.,;.,-- I . AM:1*.L.,r0P1,01
kr,10•ViT,i:.1•2A. :!'i,,...t 4,V,.,:l...;‘,•:,•:..''•-;;;;',";;,0104‘,•0;;e ,;,';•,.;.:..',•;;,•3"!:.:.:0"4'?1' " 4. 4-,i,, ,•'',.:.1%1PiANI*4,1s,-•441:4,43.
i
.-v..;t1 • •'* *t t 10.4..h.tiz-• • '---4g'..1!,b.,:„Pit,'4.,Vi•
0r4Acitliitifigmw ,;,8,.xi,i(gri5..„.,....„. 4.,! .64 01,,,v,tff,u4 \f,r7.0,Nog
,t 00,...;A.. .:„;;.....41,1
0.41,k.:P.A.41,:WL:-1,Igt:t4V'e.--..:ZI'l-,:4- +‘
,k,'31104,4440Wr','.''fb*
, ,,;,..:•,
, ,..'ig.l.Ate$4,4,Aqt.t,.,;-:k.i.i.w
. . .q-0.-ft:4...,..A. Il ..5 ‘.'',•,,, -,.tt4,-;;.'4' •'''',C.,2if,,v,u'': 144' '''' AftthigiA•11:0441g"7;'1'-'A
ig-,:V.,.;,-.=:;'.,•;:,'1.':04:yi', . .7.it,,M1,14;:',',!.:-,: f'i. 4,,,4w40 •44-4rby'' 't" •yr, . • .3re.,04ty.fm5q.R..0, 0.,:..,,,,A,„fi
A, +4.04161,044,v(,40,,•.14,-.
ik,Ac,:ve.641A,,Oey. .,•z:•••r,,,?,•":„4-•,,4.:,6,,i.44ig.'•..., 2,1.1 14 'A'Ar... 1.•-.1q,•,P-,,, - •4,,..„4,,,, 1•11,..!,,,,•,o$.,,,,,,..0,,4„L1,11.4•,:„F't.'•ii•
'illifral;''',%•a• •I'il ti''''', t%.4 k'''',VP''.'''', ' ' p"" '' 14),y. ," ' -140,T:,,VirTkofC,464'.:4/4
.44:'.•
1 4
'?4PligIbV4%41.44.;T'' '''. 41t:r4;:-L :Iii,t4 '°"4"k""'''''I'' 'A''''''' ' ',10,711ht1V301004Y4,....:
r g ..,..,404, •
4:,-. . , ,ivios,vi1„tivci4;.;
.p,,.. .,...„,.........4„.p .„. .„.....,,,,,,„,,.. ,,,,,
,. .3,..- $,...„„..„...1 I., - , .i.t..,„,.,, , , ,K,„„04$041,,,,.„.,,
4,:i0p4:4-0 ::,4. 4 %.„...,f",. 47.1,-",—..14,14 ::‘4,44414.07:4,14;,,c4,0,4, II
0,
i,,,t1.1.01,41.kg."V.',...t!.. ." ,:-It:j..-1,"., ••f:-. t..i„,.. .;..., i.g„,A,..,,,Y:, .
,i.,,,Y.,, ,,,•,16,1 W?
I arr"00,1,VV,,,,,.--,,.-:,',.ta,,,,pv.,..,4A' •..),, l',,, 0;4 t V'g ,' ' Et1.44441014P ,,,.. 11,4,
,,4"6470,:•'V.:',.,:ei? iNilt(4.t.1*;',i),y(pit .';,,. tr •,.'"..',. `.0.! :1,,,,,,...,.*,. to
vq,s.-,,. .„1,,k,..„.
•-•,,,-.-.••••,;,..,..A.ccktV!..i.,,,r,,,,i„,... ,,1
“.......ms,,,v •• .„, J.('‘ ,5,-., rt.,..., rtp,504.,
11A15:11.1VIVA,;"-):: :1:j9/ lk;li.:ii:'41;1' " ""'1., ' 4' ,'•"..4141,11: ',.3,0Roli;s4
v--- .,-4,0"'"'"? '.. ., t`..1 3,14ri"; ,•.0.,), 101,4,4ki,,,„• :%
—•'-' i',....4,4
•:...0 #tillatie,i.kt .,:•;,:,it- 'es.•,'.....kt 0-. '0 ,
• ,), y__ , .... 0•1=74.="ig ''1•41-10,1;it•„IliFIC,if0441-V.•.
IV' 444 ,4l - •1) ,..s.,,,,A .s. a • •
' •-itt.4 „zt:- 4:4.1' •T.,64,.,,J,.r,4.1., 0. :k 4,`,C''
a g'
* . ''' ' ' , ktA:40.1413;1?P i?AlPAS,,1
4;4• 5.1.,:-•O.' ;ek?':. ..^ • 1Argf'). ''' 'Pi ' - "-'"' '''''•Ized*:00•0',".;'.(',•0,,,-,,,,,W4e,';
1:401e,•, 14t...4.e,r,•.4V, .te.,'' ' • s,-, ...,
0.3.!:,1, 4..,?ii..kfft,$14,
61001X'',4''';'- ''Z PIWT•'LI ', . l,?,
,1 , , ''..,'. ; 4'....4.4..4,444ern.-44
.,,;01.t..64.,got.ii...; '" !.LA,46,.,,,.. , -1 ,,
Z
Oitt4i114,T0' • '-'' •44„,• •- .4'— ', ,
4.1,,, „ . d 41,0. . ,41,,i, ,,14,40,.,-. 1,:r4,0,1Atir,p,
iii, , *-1,'. of 1.,,li
::, , . ..,.., , , ,„
t• -,••.,,,,pv• •,,, ,-x „taa..
0
.•..4.,t,' •44',.4.;'Ki : 'l K•4%,.,•,-;•it,,,1.1 , . 1, ,,,,t1r,„,:,,,,,t,;:iy, i,,d114-,..,,,r.t.••1,n. %,,f4
,cric.•,,tokcik.4.-,.0 Ak:40,4 • " lit'P'• .,„. .r e,4:f,y...,.+,123,0.V.tr; roniTP.: f. ,
1,. '1:,s1,--i- -, .00.1,44.,,.„„In„,,,,,..,,,
.1)„.1*.f,t40.1,,,ct . ' 'w,4) ' -, -., ''A .::• .,.. ,,..,,t4`.'igh;lit,1,,/,''.:-At, :'‘F) ,-
.....
mlioteth.:fplv,..1
, .4, „ , *Cie..'1':f.Ph.f.S., -843"
'MK• •";•A',A4i,:: •A ,. 0-.4- - . ,• .,, .itp, , .:info-.3.,, Act!:',1,-i'41'4,4
_as>
,•.).,,A.. y1.1.P.I •
,l''",,•"4- .tp,-A* ' , --7,-.1,
k„,,,,,,,o,,,,, A!,., ,,. .
•.4k4'.1.Y•••••••DON.1 VA ..,,i0 'VW. • 1:ii.•tki 4.1t ,,,.:::1,,i$0.,,b,P,•,‘; i.,
y,
• . 1,,.ce. .,...,4.i.•„,!...30,,,
UM
,Iiiiiet.AK''',1 4
440.40:4;.lidlt44in
1,4! ),,,,,,,,,i
, .
etite.„4",,,,...,
cv),„0.
Z 0
,-,r-..r•-i,.4,,,...',:'!,,,,,,„,,,,,, '.."4.4.e0Aviii., ;r , 3.1r„,-,7,4
-0, ,,J,....V.,P,'
r,....,„i",,up,,,,,,,
et
10.1'*0•41,11,144,ft J Plev,, ,
44.404. ."-.. • . .,. .. .,.t.,v , ,,4Y, 7„. r., ,,,,n40,
...if C%1
,., . -•.- .,,l',, a. •,.,
•...c."4.,,,"'":.,,&,,,,,,o,,f,•41.Ky 4,,
r.,:‘,•"•••'- , C, • - ,••(,,-•,...:.: ,(t0.,...,',,, ,..c.i..,1!
'''' :: i:,.P44. ,„VC. ,1,tA1,4-1.,,A,14#
'i.
.,"giti.,,-,- '
Alit A,
a%I T.ik,,t•', "...‘,'...1.1,,k.;.„,:,,•
,,A;),A...'•:','• „.• ..44,404,:,WP,,i4
Z• •,,,t4 ••••tt,;.,••••i • ,.
LLJ ce
.
.,„--4, p,
0.
. .
-,c„: -,.,..,,.i.,,,,,k4,. : ., ,
CL a
— CO2k-
-Too .- .• . '
‘A,. 0,.0.-
. ,.. , ...:,!..kp
•
.
,..., ..
, -,...v,...
.,.. ,,!
„
. ,
, •
„....,,,F.,.
•
•
... . • .; t'.;4,20 03) kl.'4 i''.4 -...-„, .,...,. ,... ..,
.
. .
.. .
.
.
. .
. .. .
.
.
. . .
.. ,•,, .„..... .,,,,.. ...,.. .... ...
... .. . .
. . ....... _
,
Renton Pavilion - Project Cost Information
Approved Project Cost
o
_..,._
$(12'nc.Millionludings loft costs)
Approved.._
Construction Cost $18 Million
----Ao---v„.
PV%,
{
.-,,f,t.t:-..,•.0,*-_,..-1"21-4- , ''-',O'f---e,A " -srl++, •f,..,...e", ,,,- '-.s td: -a.,e,,,b.:'.,--0,7,.." a
..,'wt:`$e,,, •---'.-,.--,,,,..v gi.-"_,,..,--,wl.f.- ,...",t,'4,,,,,.4::€ 44_,--;',4 -. ---. -.,,,,,,n4q.
0,7-- .., --*...-1=, -*---VtIrr - - .-r2'' !zit,- ',,-%'.5';r44-%r•-„
t----4*.-w-;•-kkl-P"? -t`„,,,,,,:t,:•.-q ., ,.,,p4N,
*. ,„ :e- 4„.4 ,--_ --4v.‘:e-1-,-!t-z.z7.5.-j4 -W
h side
- se e '''',....,".
een on south HRaeaistecodnBFlyalossoeyr sfPotreromfjuetcutre Air Conditioning
., •„zp, - -0, . ,,,.44-......,„
1-•E•4-kL11.1W:0-7=t-4 4- r'-- - --.- •'''P'-', .3. ---v"--e-v .41-=---r---/'-'"
_.n....4s,,,, ,- Cos
e..„4...iip,,..„.1,,,,„,c"..,„..k.i..t.
,..4,-,... .-_,r..--4,,,„,-..,3,-.4•...c:::--e.,,,,fr--.-....--,?,..--7-,-,....:-.--,--*.L-f„ .,..,
.,••R'%.,,::.,t"---..34.---- 2, - s -i ell 0 e if' vr, •-! .4
'-4-r...-" z.c: .- --... .`-rr,
• 80 sal- ax ---4±-,- ,,-. :41.4., AGiluazminingumin GableEnds
.
.•0 ..._ :;-
, •rvz..1,1?-,,,Ei.,l'i.f:.4... . -,..` -,41-r-r-4:51.,..'-.‘,,,,:..i- r --.-,..1-e?..,..0-..,,i,--rirf 1-„,!..F .r.t.
-';:i.41r."•^•-.';Th`z-4.4,- ' -,-. .e:r..:ta •-,.,T. -------s "4'--At-v&-:.?-.,1,.-Y.:11-*A1W-,* $1 938,341 0
Base Bid
. ,,,......,
.,z-z ,x,-.-.. • --"n'-
Xtr'''''''''--- ,r. ..,..,e,,-,..-:-.14".1.7--,a-,-7,
0 ..-.W.E^'-'-'2.vt.-5 ". •'',1--'7,...C . ''''..,, ''- -
,=1?--.„4,..2.,'4-,.---'-;.---:','-'.,:-.-1-.v,-',-'„-2---:,:7,,.-..:_„:r.„-.'.,,,.,:17-t,.fr.,.4',t-"7,.",.::--:.`-.,%--."C,.,--.,a':t„g.`,---,;..4,-7:4-,t-;-;:i"v_1l1-:::f,,-.'..”,.,",A7,-v.-t,4,..:...`,ti.,--.*..r_..t4,.,f.--.:'.:tc,:-,.-d,-:.."..--:--;.:.-.)v,A--„--;',.7...--3VV-4--.--„-,.,;.,-24--;..1.„,---,z%,Z-5_V-r.,4-,.,-.,,.---:-...;-;.,.,v..1,aI.,.-,..i,-,-,...t-V-_--i.-4...,%.--f.4-T-,:-i.-•--.,--_-",':,,.,.--:-..,1.P-....2-,„,,7.„-.S4u.7.-.-7.-u„94.4.„1,-.-w,.,-„,,.3,.-,,._,_v`z-:.;„'---.-a,-s_---..,..-_'-,,;.-1--f,.„-i,=-.4,.-.-.-7.,-.-4-1--,.-.-1=-a-,-,.,-4,.A-.-44.,.V."25--S.,.a..-.1.4-,.'--e't-i--t---.~,,4--,.-*.-.-„.-,‹'.--,`-.0--'..,.-.--........'-4.4-..,--,,.5-.2,t-'-t'..'*'w---'--,.
4?,,:,-,w,,,;eWt, t,V,-!,-,,r,;:.:.i,7t.--,P-1,-i-o• ':,4,),.4:I-c.„g4':.,"t'-,f..?s..,-!...1b‘..s..1"-,.,;.'.,4-vV4,-1.4.--,V,,,.-,i,,-,k34c;..-:-4:4.-t1.*-,-,,s-;--,-,..:--,,,.f.V'•-.t4„;-41_-,..:.,•4`:.,,=.,--'.-.-,,,.L,7,4S,-.,-1",f-,'--,...„.-'..
7,-,*.',,,F2,..'2,t,4Ci'---':--.-L,T.i,_Pt''4-?--at_-t,.-.,.--'t.,.eftV--'-,s.'---..-f-,:-,7,:4w--.'-4f,,-,.a.,-.'-i:-,x--...4,.?.-Zs..-4.--.---'.-4:-,4.-.t,-'..n1-...-...zL.7.',.:-„,c#-,,_.--:,i-,..,'.,k---,,-..'-',,,,_,r4`,..-',,-;-'-.r-.A,,'-,-:*.--.,,--%'.,.-'-,.:'..'.I,€-,-,-..-..4)r,,-".-A'k-,t'ir-„Vz-,--1s21t.s-'•-f.,1V,r.,..,,kA..*...”,.-f-r,„w-.-,!--a-,,,._T-4,.-:-.,c--w,..;:,p,--,.-,"-;.1a,-'2tfT-'..-=,';-,-',,,'.'s,.,'._,s.Z,--..-,.-4,-
"---.*:.V..-',47•:,---.f.,-,-*...,:-a-ar..:,-'.-e.._.,:i..:,'-'---"..-'-4.Lc.-P,,-r.r'4.-,.e A.-.fi';-.A'4_-Z'I-','-''zT:,.v
,i..
't.
-
-
Contruction
Contingency
$112,676.52 2
Design Fees
$145,000.00
v ' - zPermits $21,500.00
-- . - -' Art $21,500.00
sTesting $21,500.00
Additional Services $25000.00
I
5/752
_ =
A.,--.,-,........f._--
- --12,11,..„-• .,, — .. p,o, ---„------ ,.-,.:,
...
----•. :,.......-, go -
.-
•,-,-
.',i2-•
nom,=p:.Y F .n.'.so-,',-e•c'�' .a. _-.,r:,t>F- .z:'^,�� '"`iz;?F;�.:c-�-. ,;,i', _"iii'<r5°..
�,c
_ -. ..-..- ..-.,,. .. .......� :. .. .,. .. �.. ._ ... .,.. ... .. ,.,, .,xw r. m .'nv. i a - 'c.
..- _ 1"6-
.,. .... - , '.. a .Y i S'Y'
.,y� :5. ��+v.
14
�.-. ....,.,.-.Ko-v,•...t+ ....,.:. .. = rb r:•.e.Fr-... ......_ :..:.- r. ... n., e.. ..s ..'. ..-5t..b..., i 4_
om'.., - .�.:'Y~i^ >Gf'�'+•''
_ ,etc
.t
' - r-n<
104,10:
�'F.
_��.'.:.. gyp, } :`r:.r
ZZ
74411,
v.�.� . = o e�. too . .74
Alternate #1 - Delete raised floor and replace with -$131,600.00
concrete slab on grade. Heat only system-57 Average Project Alternate Costs = = a
includin 8.8% sales tax Alternate #2,- delete glazing at gable ends -$56,600.00
Alternate #3 - Add full Air Conditioning System +$320,000.00
Alternate #4 - Delete Sunscreen -$44,000.00
•
a .
Renton Pavilion - Project Cost Information
-t '- v 5 _*
tt= f Prer"rred P jec . :� ...q Base Bid $1,938,341.00
4 ;�';i%iS::S`•..`:c-:xy'. _ t �:�`rv1�',.`_si_.. -:$_` � ..'s..;Ynvky'^'1,?•�-y:.�'_,v"r`��F.'�rij;
yti}:�c"�=_�p�'�F, <:,.-.��-,.f�E 'k:� n�� �.�Y'fiz.G.s`;3-�..=
. o w'��,... ",G,tc«ir', '-a - ,�' - r - ;;`.h:-:k;a`iy:.,1?' c`"'as :^.�,;",tea:
- > F�=���� _: `y�OCf���UC,.��O_ .:�� S� y��.�,�.:r���,��:�.::� Alternate #2 delete glazing at gable ends $57,187.44
e c am .
#- including 8 8; sales, ax) Xw _ Alternate #3__ add full air conditioning system $303,735.91, • „F_
ti _ - -
$2,184,889.47
3 ' {u � ``r' M} . : "` ~ '� Construction Contingency112 676.52
d y '*> '4: '' z Design Fees $145,000.00
:% _ --1-'4r„-74,E, i -, _ ,w Permits $21,500.00
qC viy��� t'vb}. �4
�{a - -,. Lam..- , — ��V `..�,� -,r�t
z g� > Or� - � ��f Art $21,500.00
t� � W � -;� Testing $21,500.00
$25,000.00 Additional Services;�
1
$2,532,065.99 ate iTalPeplz og s_
•
•
F•"'
• •
'•••
•
- • . •-
7.1
74-•reiV• . . :X., •'4'. • •c•- • • `•
• .1114."' ‘." ”•Y-.11" "fr.; 17.-a•Wr-7 .•,•.a • • •
• -43-a 3,34 '.•7; Z..•• •
.
- . •
- •- - g:41-.•71. 11-1-.,-N
- _ -- •
' 3.• 4:4: çi . r -,• ,z; *
. • • —
• M 'of==4;
4 7 • : ,
— •••• - •
_014 p r • .
„ • -
, .
••-• , y, '
•
••
•
„ JiIJI , - - •
• -
- _- -
_
.1
•
•
•
•
. ;
. •.
•
•
MIN
RENTON PAVILION MITHUN
APRIL 7, 2003 Architects+Designers+PIanners
•
March 24,2003 Renton City Council Minutes Page 113
MOVED BY KEOLKER-WHEELER,SECONDED BY NELSON, COUNCIL
APPROVE ITEM 7.a. AS PRESENTED. CARRIED.
Separate Consideration City Clerk reported bid opening on 3/12/2003 for CAG-03-005,Pavilion
Item 7.b. Building Renovation;ten bids;engineer's estimate$1,800,000;and submitted
CAG: 03-005,Pavilion staff recommendation to award the contract to low bidder,Edifice Construction
BuBujJ jng.E novation,Edifice Company, Inc.,in the amount of$2,184,890.47. Refer to
Const Co Committee of the Whole for discussion of funding and bid protests.
MOVED BY PARKER, SECONDED BY KEOLKER-WHEELER, COUNCIL
REFER ITEM 7.b.TO COMMITTEE OF THE WHOLE. CARRIED.
CORRESPONDENCE A letter was read from Robert F. Carter,4515 NE 26th Ct.,Renton, 98059,
Citizen Comment: Carter— requesting connection to the sanitary sewer on NE 23rd St. in the Summerwind
''' Sewer Service Connection development for his property located outside the City limits,north of
Request for Property Outside Summerwind in Newcastle Terrace,Lot#5. MOVED BY BRIERE,
City Limits SECONDED BY CLAWSON, COUNCIL REFER THIS
CORRESPONDENCE TO THE UTILITIES COMMITTEE. CARRIED.
Added Council President Keolker-Wheeler reported receipt of a letter from Vision
Citizen Comment: Camerer— House Executive Director Susan M. Camerer,PO Box 2951,Renton, 98056,
Building Permit Fee Waiver requesting the waiver of building permit and development fees for the Vision
for Vision House Children's House Children's Village,and in exchange,Vision House will offer
Village scholarships to low income Renton families in need of childcare assistance.
MOVED BY KEOLKER-WHEELER,SECONDED BY NELSON,COUNCIL
REFER THIS CORRESPONDENCE TO COMMUNITY SERVICES
COMMITTEE AND COMMITTEE OF THE WHOLE. CARRIED.
OLD BUSINESS Utilities Committee Vice Chair Briere presented a report regarding the
Utilities Committee agreement to update the City's digital orthophotography. The Committee
Technical Services: Digital recommended concurrence in the staff recommendation that Council authorize
Orthophotography Update, the Mayor and City Clerk to execute a sole source consulting agreement with
Walker&Associates Walker&Associates,Inc. for aerial photogrammetric services in the amount of
$49,858.75. MOVED BY BRIERE,SECONDED BY CLAWSON,COUNCIL
CONCUR IN THE COMMITTEE REPORT. CARRIED.
Finance Committee Finance Committee Chair Parker presented a report recommending approval of
Finance: Vouchers Claim Vouchers 213231 -213713 and two wire transfers totaling
$2,985,625.36; and approval of Payroll Vouchers 43257 -43497,one wire
transfer and 565 direct deposits totaling$1,740,520.66. MOVED BY
PARKER, SECONDED BY CLAWSON, COUNCIL CONCUR IN THE
COMMITTEE REPORT. CARRIED. •
Transportation(Aviation) Transportation(Aviation)Committee Chair Persson presented a report
Committee regarding the design contract for the Strander Blvd.extension. The Strander
Transportation: Strander Blvd Blvd. extension project,from West Valley Hwy(SR-181)to East Valley Rd.,is
Extension Design,Perteet an important east-west trans-south valley connection project targeted at
Engineering improving access and mobility for the traveling public, freight,and businesses.
When constructed,it will provide access to the development at the Boeing
Longacres site,Tukwila Transit Center,and provide a'grade separated crossing
at the Union Pacific Railroad and Burlington Northern Santa Fe railroad tracks.
The contract is for 30%design, covering the Corridor Environmental Impact
Statement(EIS),base-mapping,road section,and project phasing.
Supplements to this original agreement will be added to cover the final design
of each project phase,of which there are expected to be at least three. The
March 24,2003 Renton City Council Minutes _ Page 114
contract is in the amount of$2,213,349, to be completed over 26 months from
the time of contract execution. The Transportation Systems Division has
budgeted $600,000 in 2003;and will request budget approval for$1,400,000 in
2004,and $500,000 in 2005,totaling$2,500,000 for design(including contract
and City staff time)of this project in the years 2003, 2004, and 2005.
The Committee recommended that Council authorize the Mayor and City'Clerk
to execute the consultant agreement with Perteet Engineering, Inc.in
amount of$2,213,349 for the Strander Blvd.Extension—West Valley Hwy:
(SR-181)to East Valley Rd.Project.*
Councilman Persson reported that the Committee was concerned whether they
were committing future City Councils to this project with a chance that there
would not be traffic mitigation funds available to finance it. He stated that
there is every indication that the funding will be available, and the Committee
was assured that the agreement contains an escape clause in case it is not.
•
*MOVED BY PERSSON,SECONDED BY CLAWSON, COUNCIL
CONCUR IN THE COMMITTEE REPORT. CARRIED.
Transportation: NE 3rd/4th St Transportation(Aviation)Committee Chair Persson presented a report
Corridor Signal regarding the 2003 signal synchronization grant. The City of Renton applied
Synchronization,King County for and was awarded$80,000 for signal synchronization on the NE 3rd and NE
Grant 4th St. corridor. The City will be reimbursed$10,400 for work by City forces
to implement changes on 13 City of Renton traffic signals. The City will
remand$69,600 of the grant to King County for work performed by King
County's contractor and/or King County's work force. The grant also includes
three traffic signals in King County to be managed by King County. The
improvements are expected to reduce congestion along this corridor.
The Committee recommended that Council authorize the Mayor and City Clerk
to enter into the agreement with King County to accept grant funding for and to
collaborate on the 2003 Signal Synchronization Project on the NE 3rd and 4th
St. corridor. The Committee further recommended that the resolution regarding
this matter be presented for reading and adoption. MOVED BY PERSSON,
SECONDED BY CLAWSON,COUNCIL CONCUR IN THE COMMITTEE
REPORT. CARRIED. (See page 115 for resolution.)
Transportation: NE Sunset Transportation(Aviation)Committee Chair Persson presented a report
Blvd&Duvall Ave NE regarding the NE Sunset Blvd. and Duvall Ave.NE intersection improvements.
Intersection Improvements, The City of Renton applied for and was awarded a Hazard Elimination Safety
WSDOT Grant (HES)Program grant in the amount of$396,000 for intersection improvements
at NE Sunset Blvd. and Duvall Ave. NE. This project includes a new
eastbound left-turn lane, a drop lane extension, and a signal modification.
These improvements are expected to reduce congestion and the number of
accidents by providing additional left-turn capacity and extending the drop
lane.
The Committee recommended that Council authorize the Mayor and City Clerk
to enter into the agreement with the Washington State Department of
Transportation(WSDOT)to accept the HES Program grant funding for the
design of NE Sunset Blvd.and Duvall Ave. NE intersection improvements, and
that Council approve the resolution and all consecutive phases and subsequent
elements up to and including construction of the roadway. MOVED BY
PERSSON,SECONDED BY CLAWSON, COUNCIL CONCUR IN THE
COMMITTEE REPORT. CARRIED. (See page 115 for resolution.)
jyr J
CITY OF RENTON COUNCIL AGE16A BILL .-4 CeW
AI#: 7 6,
SUBMITTING DATA: FOR AGENDA OF: 03/24/2003
Dept/Div/Board.. City Clerk
Staff Contact... Bonnie Walton AGENDA STATUS:
Consent X
SUBJECT: Public Hearing..
Bid opening on 3/12/2003 for CAG-03-005, Correspondence..
Pavilion Building Renovation Project Ordinance
Resolution
Old Business....
EXHIBITS: New Business....
Staff Recommendation Study Session...
(includes Bid Tabulation Sheet—ten bids) Other
RECOMMENDED ACTION: APPROVALS:
yretifite,(,!�„A' Legal Dept X
Refer to nanee-eoimnittec, Finance Dept....
Other
FISCAL IMPACT:
Expenditure Required for entire project... $2,532,065.99 Transfer/Amendment..
Amount Budgeted for entire project $2,300,000.00 Revenue Generated...
Amount Authorized for entire project.... $2,000,000.00
SUMMARY OF ACTION:
Project Estimate for Construction: $1,800,000 (including all deductions and no additions)
RECOMMENDED ACTION:
In accordance with Council procedure,bids submitted at the subject bid opening metthe following
criterion: there was more than one bid. The bid submitted by Edifice Construction Company,Inc. in the
amount of$2,184,890.47 (including alternatives 2 and 3), however, exceeds the project budget when
added with the design and engineering costs; and there were bidding irregularities. Therefore, staff
recommends referral of the bid to the Finance Committee for discussion of funding and bid protests.
CITY OF RENTON
MEMORANDUM
DATE: March 24, 2003
TO: Kathy Keolker-Wheeler, Council President
Renton City Councilmembers
VIA: Jesse Tanner,Mayor
�l� Bonnie Walton, City Clerk
FROM: Jim Shepherd, Community Services Administra`tp
• i
STAFF CONTACT: Dennis Culp,Facilities Director x6606
SUBJECT: Pavilion Renovation Project CAG.03-005
ISSUE:
Should the City Council award the bid for the Pavilion renovation project to Edifice
Construction company, Inc. for the bid price of$2,184,890.47, which includes
alternatives two (2) and three (3)?
BACKGROUND:
Bids were opened on March 12, 2003, with a total of ten (10) bids received. The bids
have all been reviewed for correctness with the tabulation of bids attached at TAB A.
Bid alternates were evaluated, and the Administration determined that the
recommended project should include the base bid and alternative 2 (substitution of solid
curtain walls on the east and west ends of the building above the store fronts) plus
alternative 3 (air-conditioning).
The project consists of remodeling the exterior of the building, a new metal roof, patio
area on the West end of the building, a raised floor system, and an option to add air-
conditioning if Council approves the Administration's proposal.
The apparent low bidder is Edifice Construction Company with a construction contract
amount of$1,881,153.56 (base bid plus savings of alternate 2). Including
design/engineering costs and a 5% construction contingency the project budget
becomes $2,213,142.24.
With the air-conditioning option accepted, Edifice is still the apparent low bidder and the
construction contract amount is $2,184,890.47. Again, including design/engineering
costs and a 5% construction contingency, the project budget becomes $2,532,065.99.
See TAB B for budget details.
Using the base bid and the recommended alternates, the apparent low bid plus soft
costs (design and engineering) exceed the project budget. To date we have spent
$92,624.43 and the total project appropriation is $2,300,000 of which the Council
authorized the Administration to spend $2,000,000. The fund source is the 316 Fund.
The Administration proposes to pay for the recommended project by asking the Council
to authorize the expenditure of all previously appropriated funds ($2,300,000), and the
Administration would commit to funding the remainder($232,065) from within the
existing 2003 budget.
There are bidding irregularities. The air-conditioning sub-contractor, used by the low
and second low bidders, withdrew his quote because of a mathematical mistake. When
Edifice Construction (low bidder) was asked if they would still honor their original bid,
they said yes. Copy of Edifice's commitment to honor their bid is attached at TAB C, as
is a copy of the mechanical sub-contractor's withdrawal letter.
There has also been two bid protests. The third low bidder, MJ Shockley Construction, is
claiming that the low and second low bidders used numbers for the air-conditioning sub-
contractor that were wrong. Copies of the Shockley correspondences are attached at
TAB D.
At TAB E is a bid protest from a mechanical contractor who is claiming that one controls
supplier had approval to bid but in fact did not. The specification was clear that the
controls contractor had to be BACnet, level 3 certified. This requirement allowed the
City the greatest flexibility in connecting and controlling different equipment, since this
produces a non-proprietary control system. According to the City attorney a sub-
contractor cannot protest a bid, so this "protest" has no standing.
At TAB F is a copy of a memorandum from the City Attorney, which indicates that both
bid protests have no merit and the City can proceed with a contract award to the
apparent low bidder.
RECOMMENDATION:
Award contract for the Pavilion Renovation Project to Edifice Construction Company,
Inc. for their bid price of$2,184,890.47. This bid price includes their base bid and
alternatives 2 and 3. Council authorize the use of$2,300,000 previously appropriated
for this project. The remaining funds needed ($232,065)will come from savings within
the existing 2003 budget.
Attachments: TAB A Bid Tabulation
TAB B Budget Details
TAB C Letter from Edifice Construction and a letter from the Mechanical
Sub-contractor withdrawing his quote to Edifice
TAB D Protest letters from MJ Shockley Construction
TAB E Protest letter from Ramsett Mechanical
CoTAB F Letter from the City Attorney
CC:Jay Covington
TAB A
CITY OF RENTON
BID TABULATION SHEET
PROJECT: Pavilion Building Renovation; CAG-03-005
DATE: March 12,2003 Page 1 of 2
FORMS
Contractor's Sub- BID
BIDDER Bid Triple Qualification Contractors Addenda Includes 8.8%Sales Tax
Bond Form Statement List (8)
Summit Central Construction.,Inc. X X X X X Base Bid: $2,139,737.00
44110- 196th Ave. SE Alt.#1: ($78,009.60)
Enumclaw,WA 98022 Alt.#2: ($56,140.80)
Wayne Gilthverdt Alt.#3: $455,872.00
Alt. #1:
Alt.#5: ($54,182.40)
Alt.#6: $35,904.00
Steele-Corp. X X X X X Base Bid: $2,069,526.00
17024 68th Ave.W. Alt.#1: ($97,045.00)
Edmonds,WA 98026 Alt.#2: ($49,374.00)
Shawna Steele Alt.#3: $298,138.00
Alt.#1:
Alt.#5: ($61,193.00)
Alt.#6: $40,853.00
Const.Enterprises&Contractors X X X X X Base Bid: $2,050,355.00
3221 Center St. Alt.#1: ($30,035.00)
Tacoma,WA 98409 Alt.#2: ($40,563.00)
Greg.D.Warter Alt.#3: $308,548.00
Alt.#1:
Alt.#5: ($56,507.00)
Alt.#6: $61,018.00
Hartford Contracting,Inc. X X X Base Bid: $2,119,424.00
5525 Lakeview Dr.,#200 Alt.#1: ($119,788.80)
Kirkland,WA 98033 Alt.#2: ($48,416.00)
David Calixto Alt.#3: $311,712.00
Alt.#1:
Alt.#5: ($80,729.60)
Alt.#6: $43,084.80
PCT Construction,Inc. X X X X Base Bid: $2,076,992.00
7400 3rd Ave. S. Alt.#1: ($129,815.48)
Seattle,WA 98108 Alt.#2: ($50,121.98)
Teresa Rencourt Alt.#3: $313,959.35
Alt.#1:
Alt.#5: ($60,666.88)
Alt.#6: $42,116.37
LEGEND: •
Forms:Triple Form:Non-Collusion Affidavit,Anti-Trust Claims,Minimum Wage
PROJECT: Pavilion Building Renovation;CAG-03-005
DATE: March 12,2003 Page 2 of 2
FORMS
Contractor's Sub- BID
BIDDER Bid Triple Qualification Contractors Addenda Includes 8.8%Sales Tax
Bond Form Statement List (8)
E. Kent Halvorson,Inc. X X X X Base Bid: $1,951,442.00
9840 Willows Rd.NE,Ste 200 Alt.#1: ($136,248.00)
Redmond,WA 98052 Alt.#2: ($48,375.00)
William Miller Alt.#3: $317,894.00
Alt. #1:
Alt.#5: ($55,374.00)
Alt.#6: $41,465.00
Edifice Const. Co.,Inc. X X X X Base Bid: $1,938,341.00
1417 31st Ave. S. Alt.#1: ($114,169.54)
Seattle,WA 98144-3909 Alt.#2: ($57,187.44)
William F.Alexander Alt.#3: $303,736.91
Alt.#1:
Alt.#5: ($53,471.22)
Alt.#6: $41,672.33
M.J. Shockley Construction X X X X Base Bid: $1,973,903.00
11107 101st Pl.NE Alt.#1: ($144,405.00)
Kirkland,WA 98033 Alt.#2: ($64,165.00)
Michael J. Shockley Alt.#3: $335,886.00
Alt.#1:
Alt.#5: ($21,128.00)
Alt.#6: $44,987.00
Schuchart Corporation X X X X Base Bid: $2,074,687.00
419 3rd Ave.W. Alt.#1: ($94,384.00)
Seattle,WA 98119 Alt.#2: ($55,267.00)
George Schuchart Alt.#3: $301,180.00
Alt.#1:
Alt.#5: ($72,162.00)
Alt.#6: $40,838.00
M.J.Takisaki,Inc. X X X X Base Bid: $2,012,198.00
1314 S.Weller St. Alt.#1: ($125,930.00)
Seattle,WA 98144-2051 Alt.#2: ($59,163.00)
Mark J.Takisaki Alt.#3: $339,561.00
Alt. #1:
Alt.#5: ($71,370.00)
Alt.#6: $34,588.00
ENGINEER'S ESTIMATE TOTAL: $1,800,000.00
(including all deductions and
no additions)
LEGEND:
Forms:Triple Form:Non-Collusion Affidavit,Anti-Trust Claims,Minimum Wage
TAB B
Pavilion Bid Evaluation
12-Mar-03
Deduct Access Deduct Curtain Add Air Deduct south sun Add resilient All deducts
Company Base bid Flooring wall at ends Conditioning screen awning floor Tile no add,,
Edifice $1,938,341.00 ($114,169.54) ($57,187.44) $303,736.91 ($53,471.22) $41,672.33 1,808,656
E. Kent Halvorson $1,951,442.00 ($136,248.00) ($48,375.00) $317,894.00 ($55,374.00) $41,465.00 1,808,284
Schuchart Corp $2,074,687.00 ($94,384.00) ($55,267.00) $301,180.00 ($72,162.00) $40,838.00 1,965,874
MJ Shockley $1,973,903.00 ($144,405.00) ($64,165.00) $335,886.00 ($21,128.00) $44,987.00 1,810,320
Summit $2,139,737.00 ($78,009.60) ($56,140.80) $455,872.00 ($54,182.40) $35,904.00 2,041,491
PCT $2,076,992.00 ($129,815.48) ($50,121.98) $313,959.35 ($60,666.88) $42,116.37 1,939,171
MJ Takisaki $2,012,198.00 ($125,930.00) ($59,163.00) $339,561.00 ($71,370.00) $34,588.00 1,861,693
Steele Corp $2,069,526.00 ($97,045.00) ($49,374.00) $298,138.00 ($61,193.00) $40,853.00 1,963,960
CE&C $2,050,355.00 ($30,035.00) ($40,563.00) $308,548.00 ($56,507.00) $61,018.00 2,040,775
Hartford Contr. $2,119,424.00 ($119,788.80) ($48,416.00) $311,712.00 ($80,729.60) $43,084.80 1,994,304
Project with Airconditioning
Deduct curtain Construction Contingency
Base Bid walls at Add AC Contract Amount 5'/o Soft Costs Project Total Rank
building ends
Edifice $1,938,341.00 ($57,187.44) $303,736.91 $109,244.52 $237,931.00 $2,532,065.99 1
E. Kent Halvorson $1,951,442.00 ($48,375.00) $317,894.00 $111,048.05 $237,931.00 $2,569,940.05 2
Schuchart Corp $2,074,687.00 ($55,267.00) $301,180.00 $116,030.00 $237,931.00 $2,674,561.00 5
MJ Shockley $1,973,903.00 ($64,165.00) $335,886.00 $112,281.20 $237,931.00 $2,595,836.20 3
Summit $2,139,737.00 ($56,140.80) $455,872.00 $126,973.41 $237,931.00 $2,904,372.61 10
PCT $2,076,992.00 ($50,121.98) $313,959.35 $117,041.47 $237,931.00 $2,695,801.84 7
MJ Takisaki $2,012,198.00 ($59,163.00) $339,561.00 $114,629.80 $237,931.00 $2,645,156.80 4
Steele Corp $2,069,526.00 ($49,374.00) $298,138.00 $115,914.50 $237,931.00 $2,672,135.50 8
CE&C $2,050,355.00 ($40,563.00) $308,548.00 $115,917.00 $237,931.00 $2,672,188.00 6
Hartford Contr. $2,119,424.00 ($48,416.00) $311,712.00 $119,136.00 $237,931.00 $2,739,787.00 9
Project without Air Conditioning
Edifice $1,938,341.00 ($57,187.44) $94,057.68 $237,93100 $2,213,142.24 1
E. Kent Halvorson $1,951,442.00 ($48,375.00) $95,153.35 $237,931.00 $2,236,151.35 2
Schuchart Corp $2,074,687.00 ($55,267.00) $100,971.00 $237,931.00 $2,358,322.00 6
MJ Shockley $1,973,903.00 ($64,165.00) $95,486.90 $237,931.00 $2,243,155.90. 3
Summit $2,139,737.00 ($56,140.80) $104,179.81 $237,931.00 $2,425,707.01 10
PCT $2,076,992.00 ($50,121.98) $101,343.50 $237,931.00 $2,366,144.52 8
MJ Takisaki $2,012,198.00 ($59,163.00) $97,651.75 $237,931.00 $2,288,617.75 4
Steele Corp $2,069,526.00 ($49,374.00) $101,007.60 $237,931.00 $2,359,090.60 7 -
. CE&C $2,050,355.00 ($40,563.00) $100,489.60 $237,931.00 $2,348,212.60 5
Hartford Contr. $2,119,424.00 ($48,416.00) $103,550.40 $237,931.00 $2,412,489.40 9
TAB C
Mar 17 03 02: 00p EDIFICE CONSTRUCTION (208) 322-9594 p. 2
educe
CONSTRUCTION
COMPANY INC.
Monday, March 17, 2003
Mr. Dennis Culp
Facilities Director
City of Renton
1055 South Grady Way
Renton WA 98055
RE: Renton Pavilion, March 12 Bid
Dear Mr. Culp:
Pursuant to your request, please let this letter act as notification that Edifice
Construction will honor its Base Bid and Alternate Bids for the above referenced
project.
Once we have received written notice from you that we have been awarded the
work, we will forward our certificate of insurance and payment and performance
bond.
We look forward to working with you and the City of Renton to make this project
a success.
Regards,
William Alexander
President
Cc: Roger Williams, Mithun
et5a.uit t'f'. .Irr •;��ti,t'rca.:As:'.'•JY.Ren,,,:Pa:•ilientC::r.eae::r>enue;0,lhtEftINekihrAiiora ku Hu;,o; :f.:;.=til:�c::
1417-31st Avenue South Seattle, Washington 98144-3909 Telephone 206.328.2700 Fax 206.322.8594
Sent By: AM; ell01 '4U'+0mar-vo-uu
To: SHOCKLEY At: 4258286391
•
•
•
IC) •
4/6
alicV 111211 F
ANDERSON-MAGRUDER COMPANY,INC.
MECHANICAL CONTRACTORS
PFIOTECTION
smtworammi
Vie\ March 13,2003
4A9
FAX ND CERTIFIED MAIL
.•,
.•
Edifice Construction
1417 4-31'Avenue S.
Seattle,WA 98144
RE: Renton Pavilion
Ladies&Gentlemen:
Due to complicated bid package on Renton Pavilion Wednesday,March 12th,we had an
error in our bid and at this time we are pulling our bid.
I apologize for any inconvenience this may have caused you.
Sincerely,
ANDERSON-MAGURDER COMPANY,INC.
4avi)411,104,4414/
dg..714 agrucler
President
DLM:fs
CC: Ronald E.Anderson
•
•
.•••
•
•
.•
(206)784-4600 P.O.Box 30759 Seattle,Washington 98103-0759 FAX(206)784-0489
. . . .
TAB D
F1314\-7-Tjr-i
•
M. J. SHOCKLEY CONSTRUCTION
11107101`.PI.N.E.,Kirkland,Washington 425-8284359 fax 425-828-6391
A JOINT VENTUR E OF LANIKAI INC. + BURRIDGE INC.
City Of Renton
1055 So. Grady Way
Renton,Washington, 98055
ATT: Dennis Culp
RE: Renton Pavillion
Date: 14 March 2003
Dear Sir,
We have just received notice that Anderson Magruder Inc has claimed an error in their Mechanical Construction
quotation for the above referenced project and is withdrawing their bid.
We did not utilize their quotation when assembling our quotation to you, however we under stand that both E..
Kent Halvorson Inc and Ediface Construction Inc listed Anderson Magruder as the Mechanical subcontractor's
quote they had utilized in assembling their bid.Anderson Magruder's base bid quote was$286,000i-/-and the
Alternate 3 quote was$407,0004-/-. It is obvious from the face of both Edifiace's and Halvorson's quote that
Anderson Magruders bid amount was not used to price Alt 3 as AM's quote is higher than either Edifiace's or
Halvorsons.As such both realized AM's quote was in error and elected to utilize the more correct amounts as
furnished by other subcontractor's who accurately quoted Alt 3. It can only be assumed that they intended to
negotiate with AM after the fact rather than disqualify AM's bid or resolve the discrepancy via the telephone prior
to the:bid: "
They are now facedWith asking to be relieved of their quotation, negotiating with the 2nd place Mechanical
subcontractor to perform the work for AM's price and asking you to allow them to replace AM as the named
Mechanical subcontractor, or absorbing the error and employing AM to perform the work.
Given that they have not used AM's quote for Alt 3 and not named the Mechanical subcontractor they intended to
use for that portion of the work, both Ediface and Halvorson have not fulfilled the intent of the listing requirement.
While that may not be reason to deem their bid as non responsive, it should be considered when resolving this
issue if a judgment be required.
We are the legitimate 3`1 place bidder with no errors. Had we used AM's erroneous error our quotation to you
would have been the lowest submitted. In can only be assumed that had Ediface and Halvorson not used AM's
erroneous bid, their final quotation would have higher than ours. Suffice it to say that our position should be
considered when and if you are asked to render a judgment as to modify either or both Edifiace's of Halvorson's
bid.We are asking that the above be considered.
Incidentally, we had the only non erroneous bid the first time this project was advertised and could have
performed the project for slightly more than the low quotations now under consideration. In both bids,we
disqualified the erroneous Mechanical bidders PRIOR to submitting our bid to you rather than pulling the burden
of this decision on you after the fact
Thank you for your consideration in the issue. : •
Very Truly Yours,
M.J. Shockley Construction
Pik
2003
Michael J. Sh. - - FAX MAIL MAR. :.
President , nx-NTON •
COMM'J I,' SERVICES
M. J. S H O C K L E Y CONSTRUCTION
11107101`.PI.N.E.,IGrldand,Washington 425-8284359 fax 425-828-6391
A JOINT VENTUR E OF LANIKAI INC. + BURRIDGE INC.
City Of Renton
1055 So. Grady Way n37
Renton, Washington98055 J l 0-/7-0.3
ATT: Dennis Culp
RE: Renton Pavillion . ';
Date: 17 March 2003
Dear Sir,
This notice of our protest the award of the contract for the above referenced project to either E.
Kent Halvorson, Inc. or Ediface Construction, Inc. as they did not comply with the requirements
of the instructions to bidders to list the Mechanical and Electrical subcontractor's included in
their proposal.
Both E.. Kent Halvorson Inc and Ediface Construction Inc. listed Anderson Magruder, Inc. as
the Mechanical subcontractor's quote they had utilized in assembling their bid. Anderson
Magruder's base bid quote was $286,000+/- and the Alternate 3 quote was $407,000+/-. It is
obvious from the face of both Edifiace's and Halvorson's quote that Anderson Magruders bid
amount was not used to price Alt 3 as AM's quote is higher than either Edifiace's or
Halvorsons. As such both elected to utilize the lower amounts as furnished by other
subcontractor's who quoted Alt 3. By not listing the subcontractor who's quote they used to
assemble their bid for Alt#3, they are non-responsive and should be disqualified and the
award be made to M. J. Shockley as the low, responsive and responsible bidder.
Thank you for your consideration in the issue.
Very Truly Yours,
M.J. a kley Construction
11144116
Mich- = J. Shockle,
President
FAX MAIL
TAB E
MAR-16-2003 17:09 FROM:RAMSETT MECHANICAL 425-251-3595 TO:4254306603 P.001/001
•
Rt-:.:.SETT MECHANICAL CO., INL.
18821 E. Valley Hwy.
Kent, WA 98032-1219
March 18, 2003
City of Renton
1055 S. Grady Way
Stn Floor
Renton, WA 98055
•
•
RE: Renton Pavilion Office Building (Rebid)
Dear Sirs:
It has come to our attention that several if not all of the other mechanical
bidders used a proposal from Control Contractors inc. for the controls
portion of the project. Ramsett Mechanical did not use a proposal from
Control Contractors even though we were verbally assured by a
representative of CCI that they had received approval. In fairness to all
bidders,we believe that the project should be rebid to insure that all bits
represent accepted control contractors.
Sincerely,
Mike Goodman, President
RAMSETT MECHANICAL COMPANY, INC. •
•
Cc:Keen Engineering 206.770-5941 •
•
•
•
•
•
TEL: (425) 251-9404 FAX: (425) 251-3595
TAB F
41 CITE . )F RENTON•
. Office of the City Attorney
r
Jesse Tanner,Mayor Lawrence J.Warren
i
MEMORANDUM
To: Dennis Culp, Facilities Director
From: Lawrence J. Warren, City Attorney
Date: March 19, 2003
Subject: Bid Protests of MJ Shockley Construction and Ramsett Mechanical Co.,
Inc. regarding Pavilion Building Bid
We:have received two bid protests, both of which I believe should be rejected and the contract .
awarded to the lowest responsible bidder. The first bid by MT Shockley Construction relates to the
use by the two lowest bidders oftbid numbers''by a potential subcontractor that subsequently
withdreuv its bid. Those two lowest bidders also listed the withdrawing subcontractor as a
subcontractor that they would be using on the job, as required by state law
We can't know, from the bids, how the-bidder'derived iits numbers. If it sticks with its bid,
according to the only case in point, it caw;change its:subcontractors from those listed in its bid
documents. The third bidder doesn't have a private right of action and would have to come up
with another ground to seek court help m stopping awardof the bid.:.: Absent other grounds or
policy decision to reject all bids, I think the.City should reject this protest.
The second protest is listed by Ramsett,Mechanical'..Co, Inc. Apparently, the protester is 'a
mechanical subcontractor on the job and relates to certain assurances given to the protester by a
material supplier. Since the City was not involved in;those assurances, I do not see how it can be
at fault. Additionally, I.do not know how a subcontractor can protest the prime bid. Since we
don't have a protest filed by one of the two lowest bidders about this supposed problem,.I can see
no basis upon which to reject the two low bidders.
It would be'my recommendation that the City proceed, in its normal course of business, to award
the contract to the lowest responsible bidder, thereby,.rej ting these two protests.
Lawrence J. • arren
LJW:tmj . .
cc: Jay Covington .
Jim Shepherd
Post Office Box 626-Renton,Washington 98057-(425)255-8678/FAX(425)255-5474 R E N T O N
AHEAD OF THE CURVE
This paper contains 50%recycled material,30%post consumer
sanuary 6,2003 Renton City Council Minutes Page 11
• Renton Area Youth Services-$9,000.
• Communities in Schools of Renton-$14,200.
TOTAL: $30,700
MOVED BY NELSON,SECONDED BY PARKER,COUNCIL CONCUR IN
THE COMMITTEE REPORT. CARRIED.
ORDINANCES AND The following resolutions were presented for reading and adoption:
RESOLUTIONS
Resolution#3610 A resolution was read approving the Cobblestone Final Plat consisting of
Plat: Cobblestone,Union Ave approximately 4.7 acres located in the vicinity of NE 4th St. and Union Ave.
NE,FP-02-073 NE(FP-02-073). MOVED BY KEOLKER-WHEELER,SECONDED BY
BRIERE,COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED.
Resolution#3611 A resolution was read approving The Vineyards Final Plat consisting of
Plat:The Vineyards,Union approximately 7.32 acres located in the vicinity of Union Ave.NE and NE 6th
Ave NE,FP-02-123 St.(FP-02-123). MOVED BY KEOLKER-WHEELER,SECONDED BY
BRIERE,COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED.
Resolution#3612 A resolution was read approving the Matricula Consular identification as legal
AILS:Matricula Consular as identification for Mexican citizens living in the United States. MOVED BY
Legal Identification for NELSON,SECONDED BY CORMAN,COUNCIL ADOPT THE
Mexican Citizens Living in US RESOLUTION AS READ. CARRIED.
The following ordinances were presented for first reading and referred to the
Council meeting of 1/13/2003 for second and final reading:
Planning:Development An ordinance was read amending Chapter 4-2,Land Use Districts,Chapter 4-4,
Regulations(Title IV),Non- Property Development Standards,Chapter 4-6,Street&Utility Standards,
Substantive Amendments Chapter 4-7,Subdivision Regulations,Chapter 4-8,Permits—General and
Appeals,Chapter 4-9,Permits—Specific,and Chapter 4-11,Definitions,of
Title IV(Development Regulations)of City Code to edit text references and
implement administrative determinations. MOVED BY KEOLKER-
WHEELER,SECONDED BY CORMAN,COUNCIL REFER THE
ORDINANCE FOR SECOND AND FINAL READING ON 1/13/2003.
CARRIED.
Utility:Utility Fee Code An ordinance was read amending Section 4-1-180 of Chapter 1,Administration
Amendments and Enforcement,and Section 4-3-050.P of Chapter 3,Environmental
Regulations and Special Districts,of Title N(Development Regulations)of
City Code by reorganizing the sections to make them consistent with the Title
IV format and to be more user-friendly. MOVED BY BRIERE,SECONDED
BY CORMAN,COUNCIL REFER THE ORDINANCE FOR SECOND AND
FINAL READING ON 1/13/2003. CARRIED.
NEW BUSINESS MOVED BY KEOLKER-WHEELER,SECONDED BY NELSON,COUNCIL
Council: Meeting CANCEL ITS REGULARLY SCHEDULED COMMITTEE OF THE WHOLE
Cancellations(1/20/2003, AND COUNCIL MEETINGS SCHEDULED FOR JANUARY 20,2003,IN
• COW and Regular Meeting) OBSERVANCE OF MARTIN LUTHER KING,JR.DAY. CARRIED.
Citizen Comment: Aihadeff— Council President Keolker-Wheeler reported receipt of a letter from Jack D.
Pavilion Building Lease Alhadeff,JDA Group LLC,95 S.Tobin St.,Suite 201,Renton,98055,
regarding securing a lease for the Pavilion Building. MOVED BY KEOLKER-
WHEELER,SECONDED BY PERSSON,COUNCIL REFER THIS
CORRESPONDENCE TO THE COMMITTEE OF THE WHOLE. CARRIED.
JDAGroupLLC
95 S Tobin St•Suite 201 • Renton•WA 98055 • Ph 425-891-1002• Fax 425-687 1405•alhadeffiack@hotmail.com
CITY OF RENTON
2002DECECEIVED
December 17, EC 1 9 2002
GIC 1 9 2002
Ms. Kathy Keolker-Wheeler CITY
RECEIVED
LERK'S OFFICE
And The Renton City Council
1055 South Grady Way CITY OF RENTON R a
Renton, WA 98055
DEC 3 1 2002
Dear Ms. Keolker-Wheeler:
RECEIVED
CITY CLERK'S OFFICE
It has come to my attention that the city of Renton has made a commitment to remodel the
Pavilion Building in downtown Renton. I would very much like to talk with the city about
securing a long term master lease. If the city would like to place a long-term lease on this
property please contact me at 425-891-1002.
Thank you, for your attention to this matter I look forward to your response.
Sincerely;
DA Group LLC
Jack D. Alhadeff
Managing Partner
/
•
V co. Obi
,, Community Services Department • Facilities Division
4. 4.
DATE: November 25,2002 RECEIVED
E
TO: Toni Nelson, Council President NOV- 2 5 2002
Renton City Councilme ► I •
VIA: Jesse Tanner, Mayor
RENTONCITYCOUNCIL
FROM: James Shepherd, Comm ►;ty Services Administrate •r"
CITY OF RENTON
STAFF: Dennis Culp,Facilities Director, x6606
SUBJECT: Update on Pavilion Costs NOV 2 5 2002
RECEIVED
CITY CLERK'S OFFICE
PURPOSE:
This memorandum responds to Councilmember Kathy Keolker-Wheeler's request for an update on the
funds spent to date on the Pavilion.
BACKGROUND:
• In addition to the funds identified in the memorandum to Council, dated September 17,2001
(copy attached),the Administration has spent funds for the following Pavilion work:
> Three studies were undertaken in an effort to determine a commercial use for the
facility. The Retail Group use study at$36,794.00;the Columbia Hospitality Study at
33,861.00; and the Terranomics Building use study at$3,500.00.
> To finish the earthquake-related work,we spent an additional $4,068.90 from the 502
Fund.
> To prepare the building for the Farmer's Market, staff spent$6,746.86 from the 316
Fund. This work made the doors operable, spot-painted the exterior,repaired some
windows, and made access ramps.
> In April,2002 the Administration spent$22,905.41 from the non-departmental account
of the General fund on a feasibility study that supported the decision to renovate the
Pavilion.
> To date,we have paid$39,648.63 for design and engineering services related to the
Pavilion Renovation Project. The 316 Fund account for the Pavilion is used for this
purpose per authorization by Council action on October 21,2002. These are the only
expenditures to date from the $2.3 million originally appropriated for the Pavilion
project.
• The current total expended on the Pavilion from all fund sources is $328,414.80.
• We have not included in this update any funds spent on activities that occurred at or near the
Pavilion. This report is limited to studies, engineering, design, and construction related to
physical building changes.
CITY OF RENTON
MEMORANDUM
DATE: September 17,2001
TO: Dan Clawson,Council President
City Council Members
VIA: Mayor Jesse Tanner
FROM: Jim Shepherd,Community Services Administrator
STAFF CONTACT: Dennis Culp,x6606
SUBJECT: Pavilion Building Costs to Date,LOG II 0105
The purpose of this memorandum is to inform the City Council of the funds spent to date on the Pavilion
building. This total does not include the original purchase price of the property since the Pavilion site
itself was part of a larger property purchase.
DESCRIPTION COST
EARTHQUAKE RELATED WORK
Initial engineering assessment of structural stability 789
Initial earthquake repairs to remove wing walls and some parapet 19,371
Engineering to redesign gutter system 1,641
Bid price to complete parapet repairs •
20,563
SUB TOTAL $42,364*
• Note the Earthquake repairs costs are less than estimated in memo to Council,dated July 2,
2001 (copy attached).The engineering to re-design the gutter system cost less than expected and the
competitively bid repair work was less than estimated($20,563 versus$37,507).
PRE 1999 CONSTRUCTION WORK
•
Asbestos Abatement 3,500
Vehicle lift and contaminated soil removal 64,256
Repair/replace concrete floor 7,185
Sewer and water extensions 7,737
Interior building cleanup 6,293
Structural improvements 4,339
Electric service for police security 3,474
Roof repair 21,720
Exterior painting 8,880
SUB TOTAL $127,384**
** A large portion of this work was identified by Level II environmental assessment that the City
performed before the property was purchased. The city negotiated a lower purchase price for the
property to offset some of these costs.
CONSULTING SERVICES _
Engineering consultants for code compliance report 4,424
CJA cost estimate report-1998 4,993
CJA cost estimate update-2001 1,725
SUB TOTAL $11,142
TOTAL CONSTRUCTION AND ENGINEERING FUNDS
SPENT TO DATE ON THE PAVILION BUILDING $180,890
As the Council knows,there is also a proposal from CENTEX to develop the site. The Administration
has been talking with CENTEX since early August about the possibilities of developing the site into a
new,mixed-use facility. Any actual development work on site,however,would not start for at least six
months,if at all,because of CENTEX's due diligence requirements. Since the building is currently
unsafe,the Administration felt it was necessary to complete the repairs in order to remove the fencing and
the building's"Red Tag".
CITY OF RENTON
MEMORANDUM
DATE: July 2, 2001 1`
TO: Dan Clawson, Council President
.City Council Members
VIA: Mayor Jesse TanneEj
FROM: Jim Shepherd, Comm ity Services Admiriistratgr ',
STAFF CONTACT: Dennis Culp,x6606
SUBJECT: Pavilion Earthquake Repair Costs,LOG# 6-C
The purpose of this memorandum is to inform the City Council the current status of earthquake
repair costs to the Pavilion building.
BACKGROUND:
• Council memorandum,dated June 18, 2001, Subject:Pavilion Earthquake Repairs, informed
the council of actions underway to repair the Pavilion. Repair costs were not included in this
earlier memo since we were still deciding to replace or repair the gutter system.We have
decided it is more cost effective to repair the gutter system.
• Cost of repairs.
➢ Remove wing walls,planters, &3 rows of parapet bricks $17,188
➢ Remove remaining 5 rows of parapet bricks $9,737*
➢ Engineeringto re-design gutter system $2,500
➢ Repair gutter system(cheaper than replacing system) $27,770*
Total Repairs $57,195
* We have delayed the start of these two repair projects pending a decision of whether the
Pavilion building will be renovated or torn down to accommodate development at that site.
• Source of funds
> The 502 insurance fund is being used to pay for earthquake repair work while we await re-
imbursement from FEMA and others. Any re-imbursements received are placed in the 502
Fund.
➢ FEMA is expected to pay 75%of the cost of repairs. They will also consider allowing us to
apply the cost of repairs to building demolition,provided the state accepts demolition as an
alternative solution to building repair.
➢ In past disasters where FEMA funds were involved, the state also contributed 12.5% of the
cost of repair. For the Nisqually Earthquake the state has not yet made any determination
concerning state funding.
➢ WCIA insurance pool has limited funds to allocate to the pavilion project, and we are
submitting the project for funding consideration.
> If any residual funds are required, the 502 Fund absorbs the loss.
• The $2.3 Million currently authorized for a Pavilion project will not be used to fund
earthquake repairs.
October 21,2002 Renton City Council Minutes Page 407
Development Services: Parikh Development Services Division recommended Council acceptance of the
Short Plat,ROW Dedication, dedication of additional right-of-way at the corner of NE 7th St. and Index Pl.
NE 7th St&Index PINE NE to fulfill a requirement of the Parikh Short Plat(SHP-00-106). Council
concur.
CAG: 02-077, 2002 Street Transportation Systems Division submitted CAG-02-077, 2002 Street Overlay;
Overlay, Icon Materials,Inc and requested approval of the project, authorization for final pay estimate in the
amount of$56,035.94, commencement of 60-day lien period, and release of
retained amount of$40,411.96 to Icon Materials,Inc., contractor, if all required
releases are obtained. Council concur.
MOVED BY NELSON, SECONDED BY KEOLKER-WHEELER, COUNCIL
APPROVE THE CONSENT AGENDA AS PRESENTED. CARRIED.
OLD BUSINESS Council President Toni Nelson presented a report recommending that the City
Committee of the Whole Council authorize the Administration to proceed with the final design for the
Community Services: Pavilion Pavilion Building renovation using the Administration's recommended design
Building Final Design alternative. The preferred design includes an underfloor plenum and air
conditioning. During the bid process, the Administration will structure the bid
document to include additives and deductions to provide scope choices if
required. This authorization includes an increase in the project budget to
$2,000,000, which is less than the previously appropriated funds reserved for
the Pavilion Building renovation.
MOVED BY NELSON, SECONDED BY PARKER, COUNCIL CONCUR IN
THE RECOMMENDATION OF THE COMMITTEE REPORT. CARRIED.
Councilman Clawson explained that the funds committed for the Pavilion
Building at this time is not new spending, but that Council previously allocated
the amount of$2,300,000 for the project.
Community Services Community Services Committee Chair Corman presented a report regarding the
Committee status of the Skate Park Capital Improvement Project and park improvements
Community Services: Skate associated with the Water Utility Improvement Project. Skate Park
Park improvements include enlarging the landing area,completing two bowls,
adding curbing and installing a perimeter walk. Park-associated Water Utility
improvements include removing the existing concrete walk located on the north
side of the library bridge over to the Skate Park and replacing the walk with
7/8"exposed aggregate concrete pavement,replacing the existing basketball
court and tennis backboard,installing new court lighting and reconfiguring the
existing parking area. In addition, staff briefed the Committee on the video
surveillance camera installation.
The Community Services Committee decided no further action is required at
this time.
MOVED BY CORMAN, SECONDED BY CLAWSON, COUNCIL CONCUR
IN THE COMMITTEE REPORT. CARRIED.
School District: Performing Community Services Committee Chair Corman presented a report regarding the
Arts Center Agreement proposed Renton Community IKEA Performing Arts Center(PAC)Interlocal
Agreement. The Community Services Committee reviewed the proposed
Renton Community IKEA PAC Interlocal Agreement between the City of
Renton and the Renton School District. The City has been an active participant
in the creation of the PAC as part of the Renton High School renovation. To
clarify roles and responsibilities governing the use of the PAC, the PAC
o,S
APPROVED BY
CITY COUNCIL
Data /0-gicAO0o2t
COMMITTEE OF THE WHOLE
COMMITTEE REPORT
October 21,2002
Pavilion Building Renovation
(Referred March 4,2002)
The Committee. of the Whole recommends that the City Council authorize the Administration to
proceed with the final design for the Pavilion Building renovation using the administration's
recommended design alternative. The preferred design includes an underfloor plenum and air
conditioning. During the bid process the Administration will structure the bid document to include
additives and deductions to provide scope choees'.if r`egiiired.,This authorization includes an increase
in the project budget to $2,000,000,which s less=than the originally appropriated funds reserved for
the Pavilion Building renovation.:
Toni Nelson, Council President
3 I'
r
cc: Dennis Culp
Jim Shepherd
ULC thi t.a. /e/z44/Le,
Pavilion.rpt\ Rev 01/01 bh
RENTON CITY COUNCIL
Committee of the Whole
October 14,2002
AGENDA FOR PAVILION DESIGN DISCUSSION
Introductions and Council Direction
Designs Considered
Recommended Design Concept
Cost of Recommended Design
Cost of Other Designs
Attachment: Committee of the Whole report, dated June 3, 2002, Subject: Pavilion
Building Renovation
Z A
•
low /3JLoo�
COMMITTEE OF THE WHOLE
COMMITTEE REPORT
June 3,2002
•
• Pavilion Building Renovation
(Referred April 22,2002)
At its workshop held May 17, 2002,the Committee of the Whole reviewed potential uses for the Pavilion
Building. Also reviewed were cost estimates associated with several scenarios that included renovation .
of the existing building and construction of a new building at the same location. After discussing various
alternatives the Committee of the Whole recommends that the existing Pavilion Building be retained and
that improvements be made to the facade of the building and to the interior.
These renovations should be consistent with using the building as an exhibition hall,where such activities
as a farmers' market, craft or antique shows, and other public events could take place. Funding-for the
design and renovation of the Pavilion Building`fbr`tthi_s'piirpose is estimated to not exceed $1.5 million,
• and would. come from the $2:3 million:"`eurr" nt1y appropriated and allocated within. the Capital
• Improvement Fund for Pavilion Building Imp ovements. ,�.....'.
The Committee requests thattkfollov'iing information be 1irovided-to cthe Council for review prior to
completion of the design phase of?,thiszproject:
" , .:. 'Y.�n'>.•.:_:.. .::.a. t' v Hyl:
• Detailed cost estimates for renovation to;:meet-b lditt code, including seismic reinforcement, life
safety systems, replaceitent fvin io s^ t o ill"finishes, aril tl1e construction of restrooms:
Construction of a latched is not td_be cor side pd;"^ N ' ei
• Two or three conceptual dwings-offacade improvements;rand.,;;`:_
• Separate cost estimates for upgrades tganechaanicalsystems(HV V)and energy code requirements. •
•
The Committee recommends that the Laity,Coitncil';authoiize. kie Administration to proceed with design
of the Pavilion Building in confortrianceih the above criteria.
•
Toni Nelson,Council Pre 'dent
•
cc: Jesse-Tanner.
Dere 7-► �` 0 •
Sue Carlson � '" `1
,a;- 2002
Jim Shepherd _ .. ,11t`
Dennis Culp C • - ' J lJ 1
Gregg Zimmerman IOPI V
Neil Watts 'Jr REQ 'CES
�•' •
COMMUNITY SE
July 22,2002 Renton City Council Minutes Page 300
MOVED BY PERSSON, SECONDED BY CORMAN,COUNCIL REFER
CONSENT AGENDA ITEM 6.i. TO THE PUBLIC SAFETY COMMITTEE.*
Councilman Clawson asked the City Attorney to review the ordinance language
pertaining to the use of the phrases "dangerous dog" and "vicious dog."
*MOTION CARRIED.
OLD BUSINESS Utilities Committee Chair Briere presented a report recommending concurrence
Utilities Committee in the staff recommendation to approve the interlocal agreement with the City
Utility: Emergency Sale of of Seattle for the emergency sale of water. The Committee recommended that
Water to Seattle Contract the Mayor and City Clerk be authorized to execute the interlocal agreement.
The Committee further recommended that the resolution regarding this matter
be presented for reading and adoption. MOVED BY BRIERE, SECONDED
BY CLAWSON, COUNCIL CONCUR IN THE COMMITTEE REPORT.
CARRIED. (See page 301 for resolution.)
Finance Committee Finance Committee Chair Parker presented a report concurring with the staff
Community Services: Pavilion recommendation to authorize the Mayor and City Clerk to sign a consultant
Building Renovation,Mithun contract with Mithun Architects to provide design,bidding, and construction
Architects administration services for the renovation of the Pavilion Building. The
contract amount is $127,500, which is consistent with the Washington State
Guidelines for determining architect and engineer fees for public works
building contracts.*
Councilman Parker stated that eleven proposals were submitted for this project,
and after a review of the proposals by staff,Mithun Architects was determined
to far exceed the City's expectations regarding the options available for the
renovation of the Pavilion Building.
*MOVED BY PARKER, SECONDED BY CORMAN, COUNCIL CONCUR
IN THE COMMITTEE REPORT.*
Councilman Clawson indicated that he did not sign the Committee report,
saying that some improvements have already been made to the Pavilion
Building and he is concerned about going forward with this project due to the
City's financial situation. He pointed out that if the City cannot afford to hire
an additional patrol officer,then he does not want to see money spent on non-
essential items. Before decisions can be made on projects such as these,Mr.
Clawson stated that Council must first discuss and determine the City's
spending priorities. He emphasized that despite the issue regarding the use of
one-time revenues versus ongoing revenues, it is all taxpayer money, and it
should be used to pay for public safety first.
Councilman Parker stated that his philosophy is different from Mr. Clawson's,
and pointed out that$2.3 million was set aside four years ago for this project.
The project was reviewed very carefully over that period of time in efforts to
create a facility that further enhances the downtown area. He noted that the
City has proceeded in a cautious manner and the scale of the project has been
reduced considerably. In regards to the police staffing issue,Mr. Parker
indicated that the Police Chief presented Council with staffing priorities which
he supported. He stated that during the upcoming budget hearings, issues such
as police staffing will be discussed and a list of spending priorities will be
developed. Mr. Parker maintained his opinion that one-time monies should not
be used for ongoing expenditures.
*MOTION CARRIED.
•July 22,2002 Renton City Council Minutes Page 301
Mayor Pro Tem Nelson relayed that many citizens are excited about the
Pavilion Building, and stated that once renovated, the Pavilion Building will
create revenue for the City.
ORDINANCES AND The following resolution was presented for reading and adoption:
RESOLUTIONS
Resolution#3582 A resolution was read authorizing the Mayor and City Clerk to enter into an
Utility: Emergency Sale of interlocal cooperative agreement with the City of Seattle for the purchase of
Water to Seattle Contract non-peak water by the City of Seattle. MOVED BY BRIERE, SECONDED
BY CORMAN,COUNCIL ADOPT THE RESOLUTION AS READ.
•
CARRIED.
The following ordinance was presented for first reading and referred to the
Council meeting of 08/05/2002 for second and final reading:
Utility: Sewer Service An ordinance was read amending Section 4-6-040.C, of Chapter 6, Street and
Connections Outside City Utility Standards, of Title IV(Development Regulations) of City Code by
Limits, City Code Amend revising policies by which the City allows connection to its sanitary sewer
system by property owners outside of the current City limits. MOVED BY
BRIERE, SECONDED BY CORMAN, COUNCIL REFER THE ORDINANCE
FOR SECOND AND FINAL READING ON 08/05/2002. CARRIED.
NEW BUSINESS Councilman Parker reported that he met with Kathleen Southwick,Executive
Human Services: Crisis Clinic Director of the Crisis Clinic,regarding the 211 dialing code available to local
as 211 Call Center communities to use to provide easier access to comprehensive information and
referral service for health and human service resources. MOVED BY
PARKER, SECONDED BY CORMAN, COUNCIL REFER THE ISSUE OF
SUPPORT FOR THE PROPOSED 211 CRISIS CLINIC CALL CENTER TO
THE COMMUNITY SERVICES COMMITTEE. CARRIED.
ADJOURNMENT MOVED BY PARKER, SECONDED BY PERSSON, COUNCIL ADJOURN.
CARRIED. Time: 8:31 p.m.
BONNIE I. WALTON, City Clerk
Recorder: Michele Neumann •
July 22,2002
APPROVED BY
CITY COUNCIL
Date 7-6101-PDDa
FINANCE COMMITTEE
COMMITTEE REPORT
July 22,2002
Pavilion Renovation—Contract with Mithun Architects
(Referred July 15, 2002)
The Finance Committee concurs with the staff recommendation to authorize the Mayor and City
Clerk to sign a consultant contract with Mithun Architects to provide design, bidding, and
construction administration services for the renovation of the Pavilion Building. The contract amount
is $127,500.00, which is consistent with the Washington State Guidelines for determining
Architect/Engineer fees for public al
works building projects.
.,
, .
,,,
Kin er, C
/ ,
j
Don Persson,Vice Chair .
Dan Clawson,Member
cc: Dennis Culp
Jim Shepherd .
Pavilion-MithunArch.rpt\ Rev 01/01 bh
July 22,2002 Renton City Council Minutes Page 299
Utility: SW 7th St Drainage Utility Systems Division recommended approval of a contract with Gray&
Improvement Project, Gray& Osborne in the amount of$207,743 to provide the engineering design for the
Osborne SW 7th St.Drainage Improvement Project to improve storm systems capacity
and reduce the potential for local flooding problems. Council concur.
MOVED BY CLAWSON, SECONDED BY CORMAN, COUNCIL
APPROVE THE CONSENT AGENDA AS AMENDED TO REMOVE ITEMS
6.c., 6.d. AND 6.i.FOR SEPARATE CONSIDERATION. CARRIED.
Separate Consideration City Clerk reported bid opening on 7/17/2002 for CAG-02-104,Police
Item 6.c. Evidence CBC Building Foundation and Site Work; four bids; engineer's
CAG: 02-104,Police Evidence estimate$250,000; and submitted staff recommendation to award the contract
CBC Building Foundation& to the second low bidder,Hisey Construction, in the amount of$208,896 due to
Site Work,Hisey Construction an irregularity with the low bid.
Assistant City Attorney Zanetta Fontes explained that a required document was
missing from the packet submitted by the low bidder. She stated that there is
no requirement in the law that bids be accepted if they are irregular in any way;
however, the City can choose to waive minor irregularities. In this case, the
missing required document concerning Equal Employment Opportunities
Commission compliance was determined be a substantial irregularity, and Ms.
Fontes recommended that Council award the contract to the second low bidder.
Chief Administrative Officer Jay Covington noted that according to City policy,
an irregular bid such as this would normally be referred to Council committee
for review;however,due to the time sensitive nature of this project, Council
concurrence is recommended.
MOVED BY CORMAN, SECONDED BY PERSSON, COUNCIL APPROVE
CONSENT AGENDA ITEM 6.c. AS PRESENTED. CARRIED.
Separate Consideration Community Services Department requested authorization to appropriate
Item 6.d. $147,231 from Fund 316 Unallocated Fund Balance to hire a Capital Projects
Community Services: Pavilion Coordinator, for a term not to exceed 24 months, to manage the design and
Building&Aquatics Center, construction of the Pavilion Building renovation and the Aquatics Center.
Capital Projects Coordinator Expenditure in 2002 is$22,955.
•
Temporary Hire Responding to Councilwoman Briere's inquiry regarding the project managers
currently employed by the Community Services Department and the projects
they are working on such as the Downtown Parking Garage, Community
Services Administrator Jim Shepherd explained that an additional project
manager is needed to manage the Pavilion Building and Aquatics Center
projects because all project managers are currently working on other projects.
He noted that the Downtown Parking Garage will not be completed until
February or March of 2003. Mr. Shepherd stated that he will forward a list of
current projects assigned to the project managers and the project timelines to
Council.
MOVED BY PERSSON, SECONDED BY CLAWSON, COUNCIL REFER
CONSENT AGENDA ITEM 6.d.TO THE FINANCE COMMITTEE.
CARRIED.
Separate Consideration Legal Division recommended adoption of an ordinance changing the definition
Item 61 of dangerous dog and increasing the amount of insurance necessary for an
Legal: Dangerous Dog owner to obtain a certificate of registration for a dangerous dog in order to
Ordinance comply with a new State law on animal control.
CITY OF RENTON COUNCIL AGENDA MILL
AI it: d.
Submitting Data: For Agenda of:
Dept/Div/Board.. Community Services July 22, 2002
Staff Contact Dennis Culp, Facilities Director Agenda Status
Consent XX
Subject: Limited Term Employee/Pavilion & Pool Public Hearing..
Projects
Exhibits: New Business
Old Business
Issue Paper Study Sessions
Information
Recommended Action: Approvals:
Refer to Finance Committee Legal Dept
Finance Dept XX
Other
•
Fiscal Impact 2002: $22,955 ($17,955 salary&Benefits/$5,000 supplies)
Expenditure Required., Transfer/Amendment
Amount Budgeted 0 Revenue Generated
Total Project Budget City Share Total Project..
SUMMARY OF ACTION:
A project manager is needed to manage the design and construction of the Pavilion remodel and
the Aquatics Center. Duties also include the management of other small CIP projects as
workload permits. Due to the nature of the project, the Administration recommends that a
limited term position of Capitol Projects Coordinator, Grade 25, be created, with a term not to
exceed 24 months. Expenditure in 2002 would be for 3 months salary at $17,955 and $5,000 in
supplies.
In 2003 the total expenditure would be $71,820.
STAFF RECOMMENDATION:
Authorize administration to hire one limited term project management employee to manage
design and construction of the Pavilion remodel and the Aquatics center. Appropriate $147,231
from the Fund 316 Unallocated Fund Balance to cover the cost of this position for the duration
of the projects.
C:\My Documents\council\AGENDA BILL-LTPM.doc/
orr• Or
MEMORANDUM
CITY OF RENTON
COMMUNITY SERVICES
0 Committed to Enriching Lives 0
TO: Toni Nelson, Council President
Renton City Councilmembers
VIA: Jesse Tanner, Mayor
FROM: James Shepherd, Community Services Administra
STAFF: Dennis Culp x6606
SUBJECT: Limited Term Project Management Employee
DATE: July 22, 2002
ISSUE
A Project Manager will be needed to manage design and construction of the Pavilion
renovation and the Aquatics center. A position was not budgeted for this work in the
2002 budget because timing of the project was unknown at the time of budget
deliberations.
RECOMMENDATION
• Authorize the Administration to hire a limited term Project Manager to manage the
design and construction of the Pavilion Renovation and the Aquatics Center.
• Appropriate $147,231 from Fund 316 Unallocated Fund Balance for this position.
BACKGROUND SUMMARY
• The City is ready to begin the design/construction process needed to renovate
the Pavilion building and to build the authorized Aquatics Center. The position
would last for the duration of these projects, which are scheduled for completion
in December 2003, with commissioning completed by June 2004.
• The 2002 cost for this Project Management position would be approximately
$23,000 (salary & benefits of$18,000 and $5,000 for supplies). Total
authorization of$147,231 would be sufficient for 24 months salary and necessary
supplies. The funds for this position would come from Fund 316 Unallocated
Fund Balance.
CONCLUSION
Additional project management staff is needed to complete the two projects in the
desired time frame.
'v-n ( lel
CITY OR RENTON RECEIVED
MEMORANDUM
JUL 1 7 2002
RENTONC%TYCOUNCIL
DATE: July 22, 2002
TO: Toni Nelson, Council President
Renton City Councilmembers
FROM: Jim Shepherd, Community Services Administrator
CC: Jesse Tanner,Mayor
Jay Covington, Chief Administrative Officer
STAFF CONTACT: Dennis Culp,x6600
SUBJECT: Answers to Councimember Kathy Keolker-Wheeler's Questions
PURPOSE:
Councilmember Keolker-Wheeler asked two questions concerning the Consultant selection for
the Pavilion Renovation. (1) Who were the eleven candidate firms who expressed interest in the,
project? (2) How did they rate?
BACKGROUND:
• The eleven firms that responded to the Pavilion Request for Qualifications are listed
across the top of the evaluation matrix found at Enclosure 1.
• After the advertisement was published in the Daily Journal of Commerce,the staff
received over 40 requests for additional information concerning the project. The
additional information provided to interested firms can be found at Enclosure 2.
• By the submittal deadline of June 24, 2002, staff received eleven responses to the
Request for Qualifications (RFQ).
• The RFQ process requires that firms be judged on the merits of their qualifications and
ranked accordingly. Once the final ranking is determined, negotiations begin with the top
ranked firm. Only if negotiations with the top ranked are unsuccessful, can fees be
discussed with the next ranked firm.
• The process for the consultant selection included two phases. The selection criteria
outlined on the evaluation matrix were used to evaluate the firms.
➢ Phase one was the screening of all submittals to determine those best qualified to be
"short-listed" and invited to an interview. The selection team used a"go-no go"
decision rule and found four firms that stood out from the rest in terms of meeting all
the evaluation criteria.
➢ Phase two included separate one-hour interviews with each of the four firms. In
addition to evaluating them on the above selection criteria, the selection team sent an
email to all four firms with additional questions to address. The questions were as
follows:
1. Please affirm your ability to deliver on the project schedule. It is important to us
to have the project competed in May 2003 in order four our summer events to
occur.
2. Please discuss, and perhaps show pictures of,your experience with interactive
design in an urban environment. We are particularly concerned about having the
remodeled Pavilion fit well, and contribute to,the look and feel of the down town
core.
3. Please discuss and illustrate creative ways you have dealt with energy code
compliance. As with any older building, meeting current energy code
requirements can be expensive. Since we have a very limited project budget ($1.5
Million for both soft costs and construction) inexpensive ways to meet code
would be helpful.
4. Please discuss your experience with the transformation of industrial space into
retail space. This is of interest to us because the long-term plan for the Pavilion is
retail space with an interim use along the lines of exhibition and meeting space.
• At the conclusion of all interviews the selection team ranked the finalists with Mithun
Architects unanimously ranked first, Collin Woerman and Kimball Fritzemeier tied for
second, and Van Horne and Van Horne was unanimously ranked third.
• Mithun Architects was ranked first for the following reasons:
➢ They had the most recent experience with seismic upgrades of old buildings, having
done work at Pioneer Square.
➢ They just finished the conversion of an old warehouse in downtown Seattle into an
open office environment. This project, like the Pavilion,had an aggressive schedule
and a constrained budget.
➢ They presented some very creative ways to ventilate and cool the Pavilion Building.
➢ They were the only firm to suggest changing the color and texture of the roof(in
addition to changing its silhouette) so that the Pavilion relates better to the residential
buildings on the East and West.
➢ They had one of the strongest project teams,having named one of the firm's
Principals as our project manager. Additionally,the project architect proposed was
the one who worked on the renovation of the Smith Tower in Seattle and led the team
that did the conversion of the warehouse to office space.
➢ Their project experience included conversion of several old building to retail space
for REI.
• On Friday July 12, 2002,Mithun Architects was invited back to interview with Jay
Covington, Sue Carlson, Jim Shepherd, and Mayor Tanner.
• Upon completion of the interview, staff was authorized to begin fee discussions with
Mithun with the objective being a complete scope of work and fee in time for the finance
committee meeting on July 22, 2002.
• The aggressive project schedule, announced to all interested parties in the RFQ detail
document, is necessary if we are to finish the project by the summer event season in
2003.
Architect Selection EVALUATION MATRIX Pavilion Remodel T 3
Evaluation Baylis Merritt+ Collins Van Home Mithun Michael CJA Daly& Heery Sierra Martin Kimball
Criteria Architects Pardini Woerman Architects Architects Runyon Architects Associates Architects Architects Fritzemeier
Ability to:
Complete by May
2003
Provide cost
estimating
Name project
team
Experience with
changing
industrial space to
retail
City Governments
Design of
exhibition halls
Design of meeting
spaces
Interactive urban
design with
neighborhood
X\ &I 0% kg
A aD + REQUEST FOR QUALIFICATIONS
.11
YPZIN,rvo FOR ARCHITECTURAL AND ENGINEERING
SERVICES FOR PAVILION BUILDTNG
Submittal Deadline: 5:00 PM, Monday,June 24,2002
INTRODUCTION
The City of Renton is requesting statements of qualifications from interested consultants capable of
providing professional architectural and engineering services to redevelop an old industrial building into a
special event center. The scope of work includes all necessary architectural and engineering services for
the design and construction to renovate and remodel the Pavilioon,including design development,
construction documents, building permit and bidding, and contract administration.
PROJECT INFORMATION
Project Overview
As part of the City of Renton's downtown revitalization efforts,the City plans to convert the Pavilion
Building,located at 233 Burnett Avenue South,Renton, WA into an exhibition hall and special event
center.
The renovation work, including seismic and energy upgrades as well as façade improvements and
restrooms, must be completed by May 2003. See the following project schedule.
Project Site
The project location is City-owned property at 233 Burnett Avenue S. The dimensions of the property are
220 feet(east to west)by 110 feet(north to south). The building occupies 14,770 square feet and the total
lot size is 17,000 square feet.
The new Regional Transit Center,operated by King County,is located to the north of the Pavilion
Building and the City's downtown Piazza Park is adjacent to the building on the South. A new 570 stall
parking structure, located to the North of the Transit Center in the same block,will be finished by early
2003.
Design Context and Constraints
The City of Renton is actively working to revitalize downtown Renton to create a pedestrian oriented area
with regional transportation connections that contains a lively mix of residential,office,retail, and
entertainment opportunities within walking distance of each other. As outlined below,the planned
remodel of the Pavilion is in the heart of the downtown revitalization area,adjacent to the new Regional
Transit Center and near three new mixed-use developments with a total of 258 residential units and
14,000 square feet of retail space,a new Piazza urban park,a planned new 550-seat performing arts
center,and a planned 14,770 square foot City-owned renovated retail space.
The City will finish a multi-story parking structure with approximately 570 car stalls to provide more
long-term parking for employees and short-term parking for customers to support and enhance the
downtown revitalization efforts. The parking structure was designed and built to be compatible with the
1
urban design of the new developments in the surrounding neighborhood, as well as to provide appropriate
connections with the adjacent Regional Transit Center.
There are a number of constraints which need to be factored into the design of the Pavilion,including:
• Work must be completed by May 2003 in time for the summer event season.
• Detailed cost estimates for renovation to meet building code including seismic reinforcement, life
safety systems,replacement of windows,interior wall finishes,and the construction of restrooms.
• Two or three conceptual drawings of façade improvements will be required for City Council approval
• Separate cost estimates for upgrades to mechanical systems(HVAC)and for energy code
requirements are also required.
• The design must accommodate the city's long term goal of using the Pavilion building to establish
retail opportunities to create a sense of place that is interactive with,and connects to,the Piazza and
the neighboring facilities.
BACKGROUND
The City of Renton is an urban community located on the eastside at the south-end of Lake Washington
with over 50,000 residents and over 46,000 jobs. The City has initiated economic development strategies
and fostered public-private partnerships to create a dynamic downtown revitalization program. The
City's goal for downtown Renton is to create a pedestrian oriented area with regional transportation
connections which contain a lively mix of residential, office,retail, and entertainment opportunities
within walking distance of each other.
In 1994,the City of Renton began an investment strategy for downtown to include upgrading the utility
infrastructure system,relocating two downtown car dealerships to a new"Automall"along Grady Way,
and purchasing property for a downtown Piazza, establishing a new Regional Transit Center, and
providing additional public parking.As part of the redevelopment strategy,property not needed for public
purposes was surplused to developers for mixed-use housing and retail buildings in the downtown.
Highlights of the downtown revitalization include:
• The Renaissance(located to the southwest of the planned new parking structure), an urban-style
mixed-use development featuring 110 residential units and 6,000 square feet of retail space,was
completed in December 1999;
• Burnett Station(located one and a half blocks south of the planned new parking structure), a 58-
unit urban-style residential mixed-use development with 4,000 square feet of retail space, is under
construction and expected to be completed by the fall of 2001;
• Metropolitan Place(located to the east of the planned new parking structure), a transit-oriented
development featuring 90 residential units,4,000 square feet of retail space, and 150 park-and-
ride spaces, is under construction and expected to be completed in the spring of 2002;
• The Piazza(located to the south of the Pavilion),a beautiful new urban park which provides a
space for community-wide special events and activities,was completed in the summer of 2000;
• A new Regional Transit Center(located adjacent to the planned new parking structure)was
completed in the fall of 2001 as a partnership between the City of Renton and King County Metro
Transit;
• A new 550-seat Renton Community IKEA Performing Arts Center will open in the fall of 2002 as
the final phase of a$30 million renovation at Renton High School(located to the northwest of the
planned new parking structure).
2
SCOPE OF WORK
The selected consultant and their project design team shall provide all necessary architectural and
engineering services for renovation of the Pavilion building, including but not limited to:
• Architectural Services
• Structural Engineering
■ Mechanical Engineering
• Electrical Engineering
■ Civil Engineering
• Landscape Design
■ Irrigation System Design
The architectural and engineering services shall include design development, construction documents,
building permit and bidding, and contract administration as further outlined below.
Phase I—Design Development. Complete preliminary design and prepare design development
drawings, including:
• Develop three schematic design alternatives for exterior façade treatment;
• Complete preliminary architectural and engineering design including building elevations,floor
plan/layouts, ingress/egress, and structural systems;
• Identify and inform the City of all applicable codes,requirements,permits,and approvals
necessary from federal, state and local governments, agencies,and parties;
• Develop detailed cost estimates for renovation to meet building code, including seismic
reinforcement, life safety systems, replacement of windows interior wall finishes,and the
construction of rest rooms;
• Prepare separate cost estimates for upgrades to mechanical systems(HVAC)and energy code
requirements;
■ Prepare design development drawings and refine the project schedule and estimate of probable
construction cost for approval of City;
Phase II—Construction Documents. Complete design and prepare construction documents and
specifications,including:
• Complete architectural and engineering design and prepare project plan specifications;
• Incorporate all architectural,structural,mechanical, and electrical engineering design and site
issues into construction documents for City review and building permit submittal;
• Refine the design development estimate of probable construction cost; and
• Incorporate City and Building Department review comments and City construction contract and
bid requirements into the final construction document/bid package.
3
•
Phase III—Building Permit and Bidding. Secure building permit and prepare documents for bidding,
including:
• Submit construction documents to the City Building Department and make necessary document
revisions to secure a building permit;
• Prepare construction and contract documents for competitive bidding; and
• Assist the City with construction bid solicitation and evaluation.
Phase IV—Contract Administration. Review construction and submittals and prepare change orders,
including:
• Assist the City in preparing a construction contract for approval by the City and Contractor;
• Provide construction field observations and written reports to the City at appropriate intervals
throughout construction;
• Review all contractor submittals,testing, and inspection reports to assure conformance to contract
specifications; and
• Prepare change orders as necessary for City approval.
The project design team shall take necessary steps to provide a unified design approach with the new
urban-style mixed-use developments and the Regional Transit Center, as well as to provide appropriate
connections with the adjacent transit center.
PROJECT SCHEDULE
The following schedule is established for the project:
Consultant Selection July 11,2002
Council Approval July 22,2002
Permit Ready Design Complete November 1,2002
Permitting Complete November 22, 2002
Construction Contract Award January 31,2003
Construction Complete May 31,2003
Design work shall commence as soon as the consultant is selected and a contract is executed.
SUBMITTAL REQUIREMENTS
Each submittal must include the following information.
1. A brief letter of introduction.
2. A statement of qualifications describing the responding architectural and engineering firm's
abilities to successfully complete this project, including computer design capabilities,
specification format,scheduling,cost analysis,production capabilities,and project management.
3. An organizational chart and summary resumes of key personnel assigned to the project, including
designations of the project manager and all other proposed sub-consultants with their roles.
4
4. Examples of three projects,completed or in progress,during the past three years demonstrating
the responding architectural and engineering firm's qualifications or expertise in the following
areas:
A) Redevelopment of industrial structures into retail space
B) Projects with local municipal governments;and
C) Design of exhibition halls and meeting spaces
5. A list of recent clients and a description of the responding architectural and engineering firm's
record of meeting project budgets and timelines.
6. Current names and telephone numbers of references for projects cited in numbers 4 and 5 above.
Limit the Request for Qualifications responses to a total of 20 pages. Submit six(6)copies to the
address noted below by 5:00pm on Monday,June 24,2002. The outside of the envelope must be
boldly marked"RFQ for A/E Services for Pavilion Building".
Please mail or deliver submittals and address questions to:
City of Renton
ATTN:Dennis Culp,Facilities Director 425-430-6606
Community Services Department 425-430-6603 (fax)
Renton City Hall—5th Floor dculp@ci.renton.wa.us
1055 South Grady Way
Renton,WA 98055
The City reserves the right to reject any and/or all submittals and to waive informalities or irregularities, if
it is deemed advantageous to the City. The City assumes no obligations of any kind for expenses incurred
by any respondent to this solicitation.No minimum amount of work is guaranteed.
EVALUATION OF SUBMITTALS
The submittals will be evaluated to select a limited number of firms to be invited to make interview
presentations. The final selection will be made based upon the results of the interviews and reference
checks.
5
June 3,2002 Renton City Council Minutes _ Page 202
Finance: Utility Tax, Cable Legal Division recommended approval of an ordinance clarifying that cable
Modem Services Clarification, modem services are included within the City's utility tax structure. Refer to
City Code Amend Finance Committee.
Transportation: Duvall Ave Transportation Systems Division recommended approval of an interlocal
NE Improvements (SR-900 to agreement accepting$684,000 from the Transportation Improvement Board for
City Limits),TIB Grant the design of road improvements on Duvall Ave. NE and SR-900(NE Sunset
Blvd.),from SR-900 to the northern City limits. The City will receive
$3,095,640 in total for the project. Refer to Transportation Committee.
CAG: 98-146, Oakesdale Ave Transportation Systems Division recommended approval of Supplement No. 1
SW Extension Wetland to CAG-98-146, contract with Osborne Pacific Group, Inc. for Oakesdale Ave.
Mitigation, Osborne Pacific SW Extension Wetland Mitigation Area Performance Monitoring Activities,for
Group additional monitoring and maintenance of the wetland, in the amount of
$234,316.04. Approval was also sought for additional funding in the amount of
$476,593 for the 2002 Transportation Improvement Project(TIP)#40
Environmental Monitoring Program. Refer to Transportation Committee.
MOVED BY NELSON, SECONDED BY CORMAN, COUNCIL APPROVE
THE CONSENT AGENDA AS PRESENTED. CARRIED.
CORRESPONDENCE Correspondence was read from Nancy O'Malley, 1569 Aberdeen Ct. SE,
Citizen Comment: Various— Renton, 98055;Susan Brumfield, 1517 Rolling Hills Ave. SE, Renton, 98055;
Police Department Staffing Earl &Nancy Greiner, 1709 Rolling Hills Ave. SE,Renton, 98055;Michelle
Lemke, 2020 Jones Cir. SE,Renton, 98055; Mark Faas, 2030 Aberdeen Ave.
SE,Renton, 98055; Kari Hollandsworth, 1822 Lincoln Cir. SE, Renton, 98055;
and Carolyn J. Igoe, 1605 Blaine Ct. SE,Renton, 98055; requesting additional
police coverage in South Renton. MOVED BY CLAWSON, SECONDED BY
PARKER, COUNCIL REFER THE LETTERS TO PUBLIC SAFETY
COMMITTEE. CARRIED.
Added Correspondence was read from Fr. Gary Zender,Pastor of St. Anthony Parish,
Citizen Comment: Zender— 314 S.4th St., Renton, 98055,regarding the Whitworth Ave. S. street vacation
Whitworth Ave S Vacation, St. request(VAC-00-003). Father Zender stated that the parish has submitted its
Anthony Church(VAC-00- Conditional Use Permit application and has addressed the concerns of the
003) neighboring residents, and he requested that Council place the street vacation
on the agenda for prompt consideration and approval. MOVED BY
CORMAN, SECONDED BY PERSSON, COUNCIL REFER THIS LETTER
AND PREVIOUS WHITWORTH STREET VACATION REFERRALS TO
PLANNING&DEVELOPMENT COMMITTEE. CARRIED.
OLD BUSINESS Council President Toni Nelson presented a report regarding the Pavilion
Committee of the Whole Building renovation. At its workshop held on May 17, 2002, the Committee of
Finance: Year-End Fund the Whole reviewed potential uses for the Pavilion Building. Also reviewed
Balance Use,Pavilion were cost estimates associated with several scenarios that included renovation
Building Renovation of the existing building and construction of a new building at the same location.
After discussing various alternatives, the Committee of the Whole
recommended that the existing Pavilion Building be retained and that
improvements be made to the façade of the building and to the interior.
These renovations should be consistent with using the building as an exhibition
hall where such activities as a farmers market, craft or antique shows, and other
public events could take place. Funding for the design and renovation of the
Pavilion Building for this purpose is estimated not to exceed $1.5 million, and
would come from the$2.3 million currently appropriated and allocated within
the Capital Improvement Fund for Pavilion Building improvements.
June 3,_2002 Renton City Council Minutes Page 203
The Committee requested that the following information be provided to
Council for review prior to completion of the design phase of this project:
• Detailed cost estimates for renovation to meet building code, including
seismic reinforcement, life safety systems,replacement of windows,
interior wall finishes, and the construction of restrooms. Construction of a
kitchen is not to be considered;
• Two or three conceptual drawings of façade improvements; and
• Separate cost estimates for upgrades to mechanical systems (HVAC)and
energy code requirements.
The Committee recommended that the City Council authorize the
Administration to proceed with the design and of the Pavilion
Building in conformance with the above criteria. MOVED BY NELSON,
SECONDED BY PARKER, COUNCIL CONCUR IN THE COMMITTEE
REPORT AS AMENDED TO REMOVE THE WORDS "AND
RENOVATION" FROM THE LAST SENTENCE OF THE REPORT.
CARRIED.
Finance: Year-End Fund Council President Toni Nelson presented a report regarding the construction of
Balance Use, Swimming Pool a Family Aquatic Center to replace the Henry Moses Pool. At its workshop
held on May 17, 2002,the Committee of the Whole reviewed several options
for constructing a new swimming/leisure pool to replace the Henry Moses Pool,
which was closed in 1997. The Committee reviewed the 1997
recommendations of the Citizens'Pool Task Force, and considered updated cost
estimates for both construction and operating costs of indoor and outdoor pools
at the Cedar River Park site.
The Committee of the Whole recommended that an outdoor Family Aquatic
Center similar to option 3A be designed and constructed at the Cedar River
Park site at a cost not to exceed$5 million, and that staff be authorized to begin
the design process now. The design should incorporate the possible future
enclosure of part of the Aquatics Center(the lap pool). The Committee further
recommended that$5 million be appropriated from unallocated year-end fund
balance for this purpose. MOVED BY NELSON, SECONDED BY
CORMAN,COUNCIL CONCUR IN THE COMMITTEE REPORT.
CARRIED.
Responding to Councilwoman Keolker-Wheeler's inquiries, Community
Services Administrator Jim Shepherd indicated that the budget appropriation of
the funds for the project could occur at the next Council meeting. Regarding
the soccer field that is located near the site where the pool is to be constructed,
Mr. Shepherd stated that maintaining the integrity of the soccer field will be
part of the Aquatic Center design process.
Citizen Comment: Renton Park At the request of Council President Nelson, a letter was read from 3rd grade
Elementary—Year-End Fund students (Mrs. Picken's class) at Renton Park Elementary School, 16828 128th
Balance Use, Swimming Pool Ave. SE,Renton, 98058, stating their support for the construction of a new
swimming pool in Renton.
Community Services Community Services Committee Chair Corman presented a report regarding the
Committee Renton Composite Squadron Civil Air Patrol (CAP)request for financial
Community Services: Renton support. After receiving a Color Guard demonstration by the squadron at the
Composite Squadron Civil Air May 13th City Council meeting, the Council referred the squadron's request for
Patrol Funding financial support to the Community Services Committee.
F..rw.F-.r-^ ---• ^r7
•
"
Date /3J ?o .
COMMITTEE OF THE WHOLE
COMMITTEE REPORT •
June 3,2002
Pavilion Building Renovation
(Referred April 22,2002)
At its workshop held May 17, 2002,the Committee of the Whole reviewed potential uses for the Pavilion
Building. Also reviewed were cost estimates associated with several scenarios that included renovation
of the existing building and construction of a new building at the same location; After discussing various
alternatives the Committee of the Whole recommends that the existing Pavilion Building be retained and
that improvements be made to the facade of the building and to the interior.
These renovations should be consistent with using the building as an exhibition hall where such activities
as a farmers' market, craft or antique shows, and other public events could take place. Funding-for the
design and renovation of the Pavilion Building;for'this purpose is estimated to not exceed $1.5 million,
•
and would come from the $2.3 million currently appropriated and allocated within the Capital
Improvement Fund for Pavilion Building Improvements. " ,
The Committee requests that the following information be provided to':the Council for review prior to
completion of the design phase'of this,pr"oject:
•
• Detailed cost estimates for renovation to meet building..code,`,including seismic reinforcement, life
safety systems, replacement of windows,"interior, wall'frnishes, and the construction of restrooms. •
Construction of a kitchen.is not to be considered;
• Two or three conceptual drawings of facade improvements;;and,
• Separate cost estimates for upgrades to mechanical systems (HVA() and energy code requirements.
The Committee recommends that the City Council:authorize the Administration to proceed with design
-afkel-rerrove-ierrof the Pavilion Building in conformance with the above criteria.
Toni Nelson, Council Pre 'dent
cc: dvsP T^aa s
Jay Cei: .
Derek Todd
Sue Carlson
Jim Shepherd
Dennis Culp
Gregg Zimmerman
Neil Watts
-May l0,2002 Renton City Council Minutes Page 186
Audience comment was invited. There being none,it was MOVED BY
CORMAN,SECONDED BY NELSON, COUNCIL CLOSE THE PUBLIC
HEARING. CARRIED. (See page 189 for Planning&Development
Committee report regarding this matter, and page 194 for resolution.)
APPEAL Planning and Development Committee Chair Keolker-Wheeler announced that
Planning &Development the Planning and Development Committee meeting regarding the Reservoir
Committee Short Plat appeal(SHP-01-169)was continued to May 30th at 3:00 p.m.in the
Appeal:Reservoir Short Plat, Council Chambers.
Deborah Gregor(SHP-01-169)
ADMINISTRATIVE Chief Administrative Officer Jay Covington reviewed a written administrative
REPORT report summarizing the City's recent progress towards goals and work
• programs adopted as part of its business plan for 2002 and beyond. Items noted
included:
* The first annual Mother's Day Memories event was held on May 11th at the
Community Center. Over 120 children and their moms enjoyed a brunch
served by-the Renton Culinary Arts Program of the Renton Technical
College,followed by a performance of Sleeping Beauty at Carco Theatre.
* On May 16th,26 student volunteers from Nelsen Middle School worked for
three hours on community service projects at both the Highlands Library
and the Renton Public Library.
* Many meetings are being setup to address the proposed Regional
Transportation Plan that could potentially go to the voters in November.
The 1-405 Executive Committee is scheduled to meet on Wednesday,May
22nd,to discuss phasing options for the I-405 Corridor Plan; South King
County Transportation Board(SCATBd)is scheduled to meet this week;
and the Eastside Transportation Partnership(ETP)is scheduled to meet on
Friday,May 24th,to determine recommendations for the plan. On
Thursday,May 30th,at 6:30 p.m.in the Kirkland Council Chambers,the
King County Transportation Committee will meet again,presenting an
opportunity for local elected officials to provide input into the plan.
Police: Alarm Assistance Councilman Clawson reported on an incident that occurred on Sunday,May
19th,when he received notice of an alarm that had gone off at his office. He
described the actions of the police officer who responded to the call and
investigated the incident, and he complimented the Renton Police Department
for its professionalism. Mayor Tanner agreed that Renton has one of the best
and well-trained Police Departments in the Puget Sound region.
AUDIENCE COMMENT John H. See,438 Burnett Ave. S.,Renton,98055, stated that he supports the
Citizen Comment: See—Year- construction of a covered swimming pool in Renton which will serve the
End-Fund Balance Use citizens much better than an uncovered pool due to the unpredictable climate.
(�, He also suggested that a portion of the year-end fund balance be reserved for
114j\f‘`�� �� economic downturns. Regarding the Pavilion Building,Mr. See questioned
whether the city wants a nm-down building in the middle of the downtown
beautification project and said that it would take more than a can of paint to fix
up the building. He suggested that the building be used as the City's Parks
Maintenance Garage.
Council President Nelson stated that the Council decided at its Council
_.._ __ _ workshop_on May 17th to bring forward.a recommendation on June 3rd to
construct a swimming pool with a separate lap pool. She pointed out that the
May 20,2002 Renton City Council Minutes Page 187
lap pool could eventually be covered. Ms.Nelson also stated that the Pavilion
Building will be fixed up so that it looks nice and will attract retailers and
developers.
Councilman Clawson expressed his concern regarding whether there has been
enough public input and education about the swimming pool. He stated that the
City needs to be careful as to how the money is spent.
Citizen Comment: O'Halloran Mike O'Halloran,4420 SE 4th St.,Renton,98059, agreed that the swimming
—Year-End Fund Balance Use pool is a good investment and he recommended naming it the Henry Moses
Pool. He suggested that the Pavilion Building be torn down and the space be
used to expand the downtown Piazza park. Mr. O'Halloran also suggested that
if there is any money leftover,that it be used to improve the City's
infrastructure,such as NE 3rd and 4th Streets.
Citizen Comment: Kwolek— David Kwolek, 1113 Shelton Ave. SE,Renton,98058,expressed his concern
Cedar River Spawning that using the U.S. Army Corps of Engineers as the general contractor for the
Channel Replacement Site Cedar River side channel replacement project is an expensive mistake based on
past experience with other Army Corps of Engineers Cedar River projects such
as the Section 205 dredging project.
Mayor Tanner commented that unfortunately the only way to get funding for
the project is if the Army Corps of Engineers is in charge. Councilman Corman
stated that the Utilities Committee has discussed this matter at length and he
said that the City will have daily meetings with the Army Corps of Engineers
during the construction of the channel. Also,the possibility of involving a
representative from the neighborhood was discussed,as well as having input
regarding the final clean up and buy-off of the project.
Citizen Comment: Fillips— Judy Fillips, 3405 SE 7th St.,Renton, 98058,reported that she has been a
Cedar River Spawning resident of Renton for 17 years and has been working with Cedar River issues
Channel Replacement Site for much of that time. She said that the City has been a poor conservator of the
Cedar River and there needs to be more oversight of what is being done.
Stating her opposition to the selection of the Rolling Hills Site "A" or "B" as
the Cedar River spawning channel replacement site,Ms.Fillips expressed her
concerns about the management of the Cedar River conservation zone and she
described illegal activities that have taken place within that area. She pointed
out that placing the channel at that site will: draw more people to the area,
undercut the slope over time,cause more trees to be removed,and increase the
need for more enforcement of the area.
Citizen Comment: Rosemary Quesenberry, 3609 SE 18th Ct.,Renton, 98058,read a letter
Quesenberry—Public addressed to Councilman Clawson from the Public Disclosure Commission
Disclosure Commission (PDC)in which Mr. Clawson's allegations that Ms. Quesenberry sponsored
Dismissal of Complaint by false political advertising during her campaign for Renton City Councilmember
Clawson were dismissed. Detailed in the letter were Mr. Clawson's allegations and the
PDC staffs review of them. The allegations related to: Ms. Quesenberry's
statements in her political advertising regarding property taxes and Mr.
Clawson's'statement in the Voter Pamphlet regarding property taxes, and the
use of a portion of a letter sent to her by Councilman Corman in her political
advertising. Ms. Quesenberry stated that she hopes this dismissal letter finally
puts the matter to rest.
Councilman Clawson responded by saying that people in the public eye are
often criticized,and Ms. Quesenberry had criticized he and the Council by
erroneously saying they raised property taxes. He acknowledged the dismissal
raw lto-Y1 01-611 1/A,Aq Wold&6-1
511-712-o 0 2-
�Y
�, O
•
0 41
M
1'1".
Nric
0
•
1 .
Pavilion Building
f.=
LI
i
» LA _
ee;r. — •yt .t""
In1
iG°1I4InII1iI � a `C; .,,.
Pavilion Building
" - r" i
•
—
■ 14,770-square foot structure
■ Open wood bowstring truss roof, 14-16 foot
exterior walls, large scale windows and no
interior partitions .
Pavilion Building
Then & Now
m4 • T E Burnett
;G:' Avenue S •
,� :-� facing east 3.. :.
__.._ .....,._........,.••. .F.'�.....a+-w4'tea c.. 1 c rt
•
A '.-
Burnett
®."7".;
r, _F l Avenue S ' t i^ ;
" ,, � facing west
r'. .. �,
i-
Downtown Redevelopment .
.,. ,, -.::-.„..,r .,--, . ,,. ,.. . f. f 1 Aff t.ir ," . • .. . . •
=IVP4 ..'''- --f---• -L.__ ''.• ...4"-:,,'7„.•.',;,
'', • - .. • r,. 4 - ttl ' .0'
:Zs' SL-1444_,_,•-..t.„..„ 1 f' ,A,
„";... ",,,,,ct -; 1....v.:,..4,101 E.,... ,„„3 ,,,1 ,,,,,, _11%) • " ,,,-. 441-g-21,-TAZ:brt:1
•-..• -,-...., , ,, P
1
I 1 . ,1 I t: ..:rte-4.1 ' ''', ''' ,:l FoIlrf h r- I- lo •y,.-Th,
'' r':c..,'t•lo--.:^olil•VP.7--:2-o,At2-0
• 1* --..- -_----_-,
*,•-• 1.
...../.....-.**:-7", t't---—1,"--- •-"=" _
Renaissance Apartments and adjacent gateway park
New Transit Center and Renaissance Apartments
' ,.:..,v,.**1P....e .P.: - .•*;,„7.----....--;*1 ,
f -• to'D't IL,
%41- ' ,'"q.,'4.:',"v'''. r'l *iZ1,-,•11 Ray,
Akrt.' - . Rilgf. .*t. .#9-1. ,,.•,..- . Lir ; rcb
Q If _-
I
,t,r..,,,..., 1,,,,,,A ,-, • ...,„.;,/ , ,- -5,11 ... ,, ,
.,- ,
LA' ' - ' '
.... L..
it.1.,.4 V.:.k V ..1.--i :
•-.-kc " I
r ,..., -...t'.; I • s'-' cos-r17"0"
,,, ,I1, ,
ansicimpl)pr,r4,o1'0*. 1........yo..ory.- ..%'-..-.--."4""l'' • ' -'7';) 'L
•-*eft v*t.'.**,-,..),,,--. ....-. I,—
ilirs,,Trft.' .',,. . -,*1 1,.. '
44
czat-4-7---`-h
Piazza Meti*O4LpOlitfiPlaCe1ZMetrOP;k n'Ride
mi
Upcoming Projects
(Under Construction)
.. .,,,- .,..,
f-
1400
. .?".liA14".0 „.111%,",.,--8,."". -,,It•
7. tp.*,,,i .•,f;. ....- irl'1,thisi•*4.o., . -7.-;,,, , --
P.:'. ..,. --1 y I..,._;01:4,'41 i 4.r.:•%'•_,'Or.•,•,*•• --••vor
L 1-X:fillei IN-1g-''J I 7o
h i[,** - .r•,--iii-l'ili`iL-,%•..,":1.' i.:**•'4;l' 11 ''''
o•oy''i y,c,.1..1,- -ill•o„..11.,, .414. ''.•• •11.,,IC yz.t.,.
. tor,•••ot i y, ..,tti.1 of.1.4. 1(, •• , . ''''-•,-,.. .**P1'.. 4 fr
,e.r....,'''•11L'. ch-SiTylt".,ti•'olio!t• ' / ',.......:. :„...,.. ./.92..1i4d,F.,yela744 ".V4"-4111.
11_,,,.,- ....,L -IntriS Nil tr-ItiO •--1---..l•if i,pir k_ ...oftri'V-.4 iZ---,..7, 411.5•4*.er:sz.4.1,,y+,..1-„:
e, f'1 i-';'• •i IF''''-'eV 1/14>P-J-..,.',,-.•1'4' .ar,-. --',='''- ,.•..,44:.4,zus *It,RentonS:cMunicipal Parking
Garage 4, '1:,.•b44.r..if.-l*,,ti1#2z:i.Iz.t.ce.'*.'ni:r-';.
''''.1:-. , 'fb,--F•117,..4 ..-1,4sik.'.vi•V,' • •• i‘,...
, -* "-'51'11 ,i,*-il:•,,-,... * y',
11 ' .2M; - >//
a'45'•N- . i'' k.jr i'...
4 '*)•-• ' J'"'' ' ... .
IKEA Performing Arts Center
t
.F � h
A.. i'mt ;s:e.-cl* * ' / ' •"^-' , '' *',. .41.'4',.k..,,eft,,4.. ..1...
,:o. ,s,\.,, ,,, - ,11,147.. - , ,,....710.1.0... ,,..,...,...,'''''''AQ ,.,'t ,,,,
Ce:
tt` 'k,.-,,,' ,.,1'r' .:4r.r ,✓''"+W' �'�p s y +"'�,�..,,,"
i \ iii . }f '° A `� , , L '''',4.V-'-`-‘,.� 01't. ,,,,A4--(.„'N.--' P^ +# '.
As
� \ ' L, e" ' ' y�1- r 'r'* r +r' l
ki
l' I �: \�'t t Ry, ti..5 \ �4 '* .
*
, ,,-,,,,-.4.'-\ ,:.-**viti •r . .. 1...".
\ /$"
" ` w
rtt�r,A�s .p t• •r � F •4, r.
"'a�- t-.:. •\ \ k,•i.. "yr f
Pavilion Building
Project History — Renovation
From 1998 to 2001 , the City
investigated measures including:
■ Renovation to comply with,building
code, and/or
• Upgrades for a higher and better
use
DCI Engineers - 1998
(Structural Condition Survey of
Existing Building)
Identified three-phase renovation without
examining costs:
■ Phase 1 — Retrofit the east side of the
south elevation
■ Phase 2 — Re-roof the building
■ Phase 3 — Complete seismic retrofit
along with architectural remodeling
City of Renton Community
Services Dept. - 1999
(Code Compliance Report)
Identified scope and costs of a code-
compliant building under two scenarios:
■ Scenario 1- interior and exterior renovation to meet code
$935,505
■ Scenario 2 - improve aesthetic appearance, functional use
and marketability of the building
$456,000
■ Scenario 1 and 2
. Work completed at the same time $1,214,135
. Work completed separately $1,391,505
Calvin Jordon Assoc. - 1999
(Projected Rehabilitation Cost Estimates)
■ Completed cost evaluation to renovate as
community meeting and conference center:
. Scenario 1-bring building to code, plus minimal interior
improvements $1,132,887
. Scenario 2-interior improvements for meeting and conference
facility $957,031
. Cost of Scenario 1 &2 $2,089,918
. Scenario 2a- Improvements in Scenario 1 with exterior
upgrades from 2- $111,525
. Cost of Scenario 1 &2a $1,244,412
. Scenario 3-Construct new building $2,878,644
Pavilion Building
Project History - Uses
■Staff has investigated potential uses,
including retail, mixed-use residential,
exposition space and as a conference
center
Terranomics Retail
Services - 1998
(Initial Market Analysis)
■Identified three-phase development
strategy:
•Phase I and Phase II were identified as interim
uses
•Market would not support desired long-term
retail uses identified in Phase Ill
Terranomics Retail
Services - 1998
(Initial Market Analysis)
• Phase I (1-3 years) - Immediate use: antique stores, art
galleries, concerts, films and theatre productions
$326,638
• Phase II (3-5 years) - Intermediate uses/"town square"
theme: public market,flea market, arts and crafts market,
banquet room, art galleries, quick-service food and
"market"tenants $875,695
• Phase III (4-7 years)- Long-term retail uses: Lifestyle
tenants, including independent bookstores, small shops
and destination restaurants $1,718,092
Note:Renovation estimates include restrooms,some roof repair and life
safety systems,not structural code improvements
The Retail Group - 1999
(Use Analysis)
■ Provided directional and positioning strategy
for retail use:
• Unique wood bow trusses makes a single user optimal
. Reported that"retail will not work"until the surrounding retail
mix is improved, traffic generators increase and perceptions of
Downtown Renton change
■ Proposed two uses:
. Community meeting center or exhibit hall
. Art school
Columbia Hospitality - 2000
(Feasibility Study for Banquet/ Meeting/
Exhibition Space)
•Renton is properly positioned for a new
banquet and meeting center
'Projections based on positioning "as the
number one, moderately priced, meeting-
focused, multi-purpose venue in South
King County that can accommodate large
groups for business and association
meetings, banquets and special events"
Columbia Hospitality - 2000
(Feasibility Study for. Banquet/ Meeting/
Exhibition Space)
Project Total Cost $3,191,672
Renovation & build out $2,328,445
FF & E for full kitchen, plus audiovisuals $677,647
Pre-opening, marketing, management & $185,580
staff, plus grand opening
Projected operating loss in Year 1 ($150,026)
Projected operating loss in Year 5 @ 5% ($242,198)
growth
Projected operating loss in Year 5 @ ($128,689)
15% growth
City of Renton Recreation
Division - 2000
(Alternative Operating Budget)
■ Projected operating budget for City-managed
conference activities.
■ Excluded major interior, fixture and audio/visual
equipment upgrades and associated external
marketing effort of Columbia proposal.
Projected operating ($296,327)
loss in Year 1
Retail Marketing Efforts -
2000-2001
■ Staff turned its efforts to identifying retail
tenants
. Contacted 200+ companies, through:
. In-house contacts
. Direct marketing through commercial real estate
broker CB Richard Ellis
Pavilion Building Contact List
■ Grocery/Food • Albertson's
• A La Francais • Cash and Carry
• Briazz • Central Market
• Café Appassionato • Dean And Deluca
• Central Coop Madison Market • DeLaurenti Specialty Foods
• Cookies by Design/Cookie Bouquet • Lam/s
• Cookies in Bloom • Natures Pantry
• Dean&Deluca ■ New by former CEO QFC
• DeLaurenti Specialty Food Markets • Okanogan Farms
• Emerald City Smoothie • Olson's/Food Emporium
• Great Harvest Bread Company • PCC
• Jamba Juice • QFC
• Larsen Brothers Danish Bakery • Safeway
• Marlene's Market&Deli • Smart&Final
• Mrs.Fields • Tawa-99 Ranch Market
• Pasta&Co. ■ Thriftway
• PCC Natural Markets • Top Food/Haggen
• Remo Borracchini's Bakery • Trader Joe's
• Simply Desserts • Uwajimaya
• T.C.B.Y. • Whole Foods
• Trader Joe's • WinCo Foods
r
Pavilion Building Contact List
■ Health Clubs ■ Office • Arts &
• 24 Hour Fitness Supply Crafts
• 24 Hour Fitness • Foster Office
• All Star Fitness Equipment • Michael's
• Bally's • Keeney's Office • Craft Supply
• Columbia Athletic Clubs Plus • Ben Franklin
• Crunch ■ Kinko's • Aaron Brothers
• Gold's - • Keeney's • Artco
• Love's • Kinko's • Ben Franklin
• Office Depot • Craft Supply
• Mieko's • Office Max pp y
• Pro-robics Packaging • Frame Central
•• Pumakicks/Urban Specialties • JoAnn Fabrics&
Fitness • Staples Crafts
• Pure Fitness • Superior • Michael's
• Seattle Athletic Club Reprographics • Pacific Fabrics&
• Sound,Mind&Body • Trick n Murray Crafts
• The Vault • Seattle Art
Supply
Pavilion Building Contact List
■ Furniture/Music• • Bookstores
Sporting • Albert Lee Appliances
• Bassett • Book World
Goods • Continental Furniture • Barnes&Noble
• Crossroads Appliance •
• GI Joe's Book World
• Dania
• REI • Ethan Allen • Borders
• Bicycles West • Kuala • Crown Books
• Big 5 • Kennelly Keys • Elliot Bay
• Blazing Saddles • Kerr Interiors • Evangel Christian
• Bogart Golf • Krause's Books
• Champs • La-Z-Boy • Family Christian
Gart • Mills Music Books
• • Nielson Bros.Carpeting • Footles
• GI Joe's • Oak Barn
• Greenlake Cycle • Prosser Piano&Organ • Half Price Books
■ Play It Again Sports • Sean Design • The Book Market
■ Pro Golf • Storables • Third Place Books
• Puetz Golf • The Container Store
• Thomasville
• REI • Underhill's Fine Wood
• Sports Authority • United Furniture
• Sun&Ski Sports • Washburn Plano
t
Pavilion Building Contact List
■ Restaurant/Brew Pubs
• Old Spaghetti Factory International • Hale's
• McMenamin • Honey Baked Ham
• Original Pancake House • Hooters
• Dick's Drive Ins ■ Jillian's
• Coyote Creek Pizza
•
• Salumeria on Hudson Johnny Rockets
• 6 Degrees- • McMenamin
Degrees-
• Atlanta Bread Co. • Noodles
• Big Time Brewery&Alehouse • Outback Steak House
• Chuck E.Cheese • Pagliacci
• Claimjumper • Pike Place Brewery
• Cucina Cucina • Pyramid.
• Darden Restaurants • Ram
• Elliot Bay Brewery • Red Robin
• Elysian Brewery • Redhook
• Gordon Biersch ■ Thai Ginger
Pavilion Building Contact List
■ Music •Drugstores • Other
• Blockbuster •A&H Hallmark • Alhadeff Companies
•
• Blockbuster Music •Bartell Drug American Charm
•
• Camelot ■HI-School Pharmacy City People's Mercantile
• CD Warehouse -Long's • Connie's Hallmark Store
■ Cost Plus World Market
• Guitar Center -Rite Aid • Eddie Bauer
■ Hollywood ■Say-on Drugs • Garden Home
• Kennelly Keys ■Walgreens • Mark's Hallmark Supplies
• Mills Music • Marshall's
• Prosser Piano • Minkler's Green Earth
■ Sam Goody/Musicland • Molbak's
■ Tower Records ■ Pier 1 Imports
• TowerMusic • Pyramid Catering Company
■ Washburn Piano ■ Signature Affair
•
• Wherehouse T.J.Maxx
• Wizards of the Coast Game
Stores
Residential Development
Centex Homes - 2001
(Purchase Letter Offer for Pavilion Building)
• Proposed purchase and redevelopment with
50 loft condos, 70 parking stalls, 8,000 SF
ground level retail and a courtyard breezeway
connecting Piazza and Transit Center.
• Administration not willing to sell property, offered
long-term land lease
• Centex felt for-sale condos would not work with a
land lease.
CollinsWoerman/GLY - 2002
(Conceptual options and cost estimates)
Scenario 1 —Bring to code,build facility space and 1,000 SF office $1,927,348
mezzanine. Includes partitions,restrooms and plumbing for kitchen
area.
Scenario 2A-Bring up to code. First floor meeting rooms with $1,972,738
kitchen facilities. Allow second floor addition at a later date.
Scenario 2B—Demolition of existing building. New first floor meeting $3,343,913
rooms with kitchen facilities and breakout area. Second floor deck
gallery and studio/lofts/classrooms. Exposed steel roof structure.
Scenario 3-Demolition of existing building. First floor retail space $3,746,681
(core/shell finishes only included). Second floor meeting spaces.
Roof structure to be joist/girders and metal decking with built-up roof
system.
Downtown Renton Interests
May 6, 2002 Meeting
• Meeting held at request of Councilman Persson
• Attendees included:
. Don Daily, Daily Homes
. Gene Sens,-former owner Jubilante and Gene's
. Armondo Pavone, Armondo's and Melrose Grill
. Gary Faull, private attorney
. Suzanne Thompson, McClendon Hardware
Downtown Renton Interests
May 6, 2002 Meeting
• Key Comments:
• Existing interior with clear-span space is an asset not easily
replicated
. Improved facade would provide a focal point for the area
. The building should be made attractive even if not immediately
used
. If community becomes attached to a interim use, it may be
difficult to convert to retail in the future
. Do not invest$3-4 million to renovate without an identified user
Downtown Renton Interests
May 6, 2002 Meeting
■Attendee recommendation:
.Bring up to code
.Make significant facade improvements
.Construct bathrooms but no kitchen.
.Pursue Yakima Valley Growers Association
farmers' market concept
Recommendations
■Downtown interests — keep existing
building; interior/exterior upgrades to
allow interim use
$1 .2 to $1 .9M
▪Administration — new two story
building with ground floor retail, second
floor meeting space
$3.7M
Note: Cost estimates are based on rough
numbers and will require more thorough
analysis once direction is identified
�o , 4
•
May 6,2002 Renton City Council Minutes Page 163
MOVED BY NELSON,SECONDED BY CORMAN,COUNCIL APPROVE
THE CONSENT AGENDA AS AMENDED TO REMOVE ITEMS 8.b. AND
8.i. FOR SEPARATE CONSIDERATION. CARRIED.
Separate Consideration Council President Nelson requested that the Council meeting minutes of April
Item 8.b. 22, 2002,be corrected as indicated:
Council Meeting Minutes of Page 144, 3rd paragraph, insert Councilwoman Keolker-Wheeler's comments at
April 22 2002 the end of the paragraph as follows:
Councilwoman Keolker-Wheeler thanked Representative Jarrett, saying that he
is a breath of fresh air in the Legislature and has great creative ideas. She
stated that she hopes that he will continue to put forth his fresh ideas and
continue to work very hard for this region as he has already done during his
term.
MOVED BY NELSON, SECONDED BY CORMAN, COUNCIL APPROVE
ITEM 8.b. AS CORRECTED. CARRIED.
Item 8.i. Finance and Information Services Department requested approval of an
Budget: 2002 Amendment, ordinance adjusting the 2002 Budget by transferring fund balances in the
Veterans Memorial Park amount of$389,000 for construction of the Veterans Memorial Park. Refer to
Finance Committee. Council concur.
MOVED BY PARKER, SECONDED BY PERSSON, COUNCIL CHANGE
THE ACTION ON ITEM 8.i. TO COUNCIL CONCUR. CARRIED.
OLD BUSINESS Responding to Councilman Clawson's inquiry regarding the progress of the
Community Services: Pavilion repairs to the Pavilion Building, Chief Administrative Officer Jay Covington
Building explained that the City is waiting for a cost estimate to repair the doors and then
will proceed with those repairs,as well as with the other needed building
repairs.
Planning &Development 'Planning and Development Committee Vice Chair Briere presented a report
Committee regarding the proposed 2001 Title 4(Development Regulations)revisions to
Planning: Development zoning interpretations,use table, use notes and related City Code amendments.
Regulations(Title 4) The Committee reviewed the proposed 2001 Title 4 policy docket items on
Revisions April 4, and April 8,2002. Issues raised by the Committee were as follows:
A. Reference: RMC 4-2-120A—Consistency of residential zone lists. Issue:
Found a Code section where abutting and adjacent landscaping width is
treated differently by zone. Resolution: Corrected error and double-
checked other Code sections to ensure consistency in treating abutting and
adjacent to residential zones.
B. Reference: RMC 4-2-110F—Nonconforming issue paper. Issue:
Language currently only discusses meeting development standards and
critical area regulations. Resolution: Add catch-all language that says
must meet all applicable City Codes for development of lot.
C. Reference: Nonconforming issue paper. Issue: Wanted clarity for what
the 50%assessed value applies to(structure?) and at what point the
assessment is taken to judge conformance or nonconformance. Resolution:
Review of existing language finds that these issues are taken care of in
several places (RMC 4-9-120A,RMC 4-10-050A.3.b.,RMC 4-10-
050A.5.b.). No change is proposed since existing language covers
structures and uses, and is based upon most recent assessment on property
prior to damage.
E. e ,„,„Atue 0.644 uultat
?Uk 1- 4
Mn1 Li 1.y?..1
e,
?GlA/1(Co-rt/
I
G L Y CONSTRUCTION
I . ......„.....,,.
1 ilk
I
ailimmitim
I
.,.
I
awl /
aliktik.:"v
, .
I
I
1. -..-..,..
. :
1
y -
MN j1110
livais, _
1.
. lilt
•
II
I,
1
z,
i .
RENTON PAVILLION
Conceptual Estimates and Summary Letters
Table of Contents
Description Tab
Scenario 1 1
Scenario 2A 2
Scenario 2B 3
Scenario 3 . 4
C LLINS
rn
G ► L ►Y
Z CONSTRUCTION
G ► L ►Y
CONSTRUCTION
April 22, 2002
' RENTON PAVILLION —SCENARIO 1:
Retrofit existing building to bring up to code for Seismic, Energy and Life Safety. Build
new office/facility spaces and a 1000 SF mezzanine to be used for office space.
Includes Operable Partitions for Meeting Room spaces and Plumbing rough-in for
Kitchen area.
Estimate Summary:
t ' Construction Costs(Includes 15% Estimating Contingency) $1,589,565
Design Fees @ 12% $190,748
King County Sales Tax @ 8.8% $139,882
Permit/Plan Review @ .45% $,7,153
Total $1,927,348 •
Cost/SF: $122.2/SF
•
• Scope of Work Summary
Division 2:
- Selective Demolition
• - Utility Connections
- Fence/Gate at Dumpster area
- Sidewalk cut/patch as required
• Division 3:
- Slab leveled, stained, sealed; exposed slab in meeting areas.
Division 4:
- Masonry infill as needed for shear wall and door/window infill.
Division 5:
- Necessary structural upgrades for seismic retrofitting.
- Support steel for Folding Partitions
- 2004 SF of awnings/canopies
Division 6:
- New Sheathing on existing roof
- Allowances for Reception, Coat Closet and Plam vanities in Restroom
Division 7:
- New Membrane Roof.
- Required insulation.
Division 8:
- New Doors/Hardware per plan
- Window Infill
Division 9:
- Lath/Plaster over existing block
- GWB construction per plan
- Restroom Ceramic Tile
- ACT ceiling in non-meeting room areas (4850 SF)
- Resilient Floorings in Kitchen, Service Areas
- Carpet in limited area.
- Paint as required, including exposed roof structure
100-116th Avenue S.E. Bellevue,WA 98004-6453 P.O.Box 6728 Bellevue,WA 98008-0728 Tel:425.451.8877 Fax:425.453.5680 www.gly.com
Division 10:
- Required Partitions, Accessories, Extinguishers
- Folding Partitions @ Meeting Rooms
Division 15:
- Required HVAC, Plumbing, Fire Protection
Division 16:
- Required Lighting, Power Distribution and Fire Alarm system.
- Assumes the reuse of existing pendant fixtures
Subtotal Items:
- Estimating Contingency @ 15%
- King County Sales Tax @ 8.8%
- Design Costs @ 12%
- Permit/Plan Review @ .45%
; I
Pavillion-Scenario 1
Retrofit Structure
Meeting Space
Project name tkpavillion-scenario1
Renton
Wa
Labor rate table 1/02-6/02 Adj
Job size 15770 SF
Bid date 4/19/2002 12:00 PM
Report format Sorted by'Phase'
'Detail'summary
Combine items
r"
&,?
GLY Construction, Inc. Standard Estimate Report ,,, L Pa
tkpavillion-scenariol 4/22/2002 9:21.
Labor I { Material I Subcontract Total
•
Item Description Takeoff Qty Amount Amount Amount Name Amount
2050.000 DEMOLITION
105 Asbestos Abatement 14,770.00 SF - - 11,078 11,078
210 Demo Dump Fees 6.00 'EA - 3,900 - 3,900
512 Demo Conc.Sills 302.00 IF - - 19,177 19,177
522 Demo Roofing 14,770.00 SF 0 0 23,632 23,632
524 Demo Windows/Storefront 2,735.00 SF 6,024 410 - 6.434
524 Demo OH Doors 728.00 SF 1,604 109 - 1.713
t110 Demo Doors 2.00 EA 28 4 - 32
t115 Demo Door Frames 2.00 EA 56 6 - 62
t190 Demo Dump Fees(per load) 6.00 EA - 3,900 - 3,900
1205 Misc.Demo Tools 14,770.00 SF - 2,954 - 2.954
DEMOLITION 7,711 11,283 53,887 72,881
14,770.00 BSF
15,076.771 Labor hours
2450.000 SANITARY SEWER
400 Extend Sewer to Street 30.00 LF - . - 1,650 1,650
SANITARY SEWER 1,650 1,650
30.00 LF
2550.000 SITE CONCR(SIDEWLKS,ETC)
100 Patch Sidewalk 36.00 SF - - 432 432 ,
SITE CONCR(SIDEWLKS,ETC) 432 432
2600.000 WATER SYSTEMS
105 Make connection for Fire/Water 1.00 LS - - 1,500 1,500
147 Fire Dept.Connection(61 1.00 EA - - 4,500 4,500
WATER SYSTEMS 6,000 6,000
2700.000 SITE IMPROVEMENT
100 Fence @ Service Entry 20.00 LF - - 240 240
115 Gate @ Trash Area 1.00 EA - - 750 750
SITE IMPROVEMENT 990 990
3200.000 SLAB-ON-GRADE
360 Sealer/Stain @ Exposed Areas 11,000.00 SF 5,524 4,950 - 10,474
435 Patch SOG @ Sewer Connection 50.00 SF 453 300 - 753
SLAB-ON-GRADE 5,977 5,250 11,227
236.67 Labor hours
3650.000 SLAB LEVELING
105 Level Slab on Grade 14,770.00 SF 5,151 - 13,293 • 18,444
SLAB LEVELING 5,151 13,293 18,444
14,770.00 SF
184.63 Labor hours
4200.000 UNIT MASONRY
200 CMU for infill 80.00 SF - - 1,020 1,020
200 C.M.0 Shear Wall 970.00 SF - - 12.368 12,368
UNIT MASONRY 13,388 13,388
1,050.00 SF
5120.000 STRUCTURAL STEEL
100 Structl Steel Material Quote- 2,500.00 LB - 2,250 - 2,250
Mezzanine
125 Structl Steel Erection-Mezzanine 1,000.00 .SF - - 6,000 6,000
STRUCTURAL STEEL 2,250 6,000 8,250
1.25 TN
5300.000 METAL DECKING
105 Metal Floor Deck,Material Quote 1,000.00 SF - 1,836 - 1,836
METAL DECKING - 1,836 1,836
1,000.00 SF
5500.000 MISC.METAL
100 Cont.Channel over Windows 6,744.00 LBS - 10,790 7,418 18,209
100 Connection @ Truss to Column 24.00 EACH - 7,800 11,520 19,320
100 TS Columns®20 ft.centers 12,034.00 LBS - 10,831 10,831 21,661
300 Standard Pan-Fill Stairs 1.00 FLT 31 11,500 4,400 15,931
410 Operable Partition Support 296.00 LF 2,065 5,624 - 7,689
M'.i
GLY Cdnstuuction, Inc. .- ,, Standard Estimate Report Pay
tkpavillion-scenarlol 4/22/2002 9:21.
f
Labor F Material I Subcontract Total
• Item Description . Takeoff Qty Amount Amount Amount Name Amount
MISC.METAL 2,096 46,545 34,169 82,810
75.111 Labor hours
5700.000 ORNAMENTAL METALS
rz"'?. 400 Canopy w/Metal Roof,Painted 2,004.00 SF - - 92,184 92,184
ORNAMENTAL METALS 92,184 92,184
6100.000 ROUGH CARPENTRY
275 Sheathing 5/8'(Roof/Deck)CDX 16,456.00 SF 8,348 7,422 - 15,769
ROUGH CARPENTRY 8,348 7,422 15,769
299.20 Labor hours
c • 6400.000 ARCH'L WOODWORK •
1 100 Coat Closet 1.00 ALLW. - 1,500 175 1,675
4 100 Reception Desk 1.00 ALLW - 6,000 175 6,175
300 Lavatories 12.00 LF - 1,380 128 1,508
ARCH'L WOODWORK 8,880 478 9,358
•
7200.000 INSULATION .
115 R-11 Batt Insulation With Foil 6,533.00 SF - - 3,071 3,071
INSULATION 3,071 3,071
•
7500.000 MEMBRANE ROOFING
200 Built-Up Roof w/Rigid Insulation 14,770.00 SF - - 81,235 81235
MEMBRANE ROOFING 81,235 81,235
14,770.00 SF
' 7600.000 FLASHING&SHEET METAL
100 Coping 562.00 LF - - 4,496 4,496
FLASHING&SHEET METAL 4,496 4,496
• 562.00 LF
8100.000 METAL DOORS/FRAMES
• 100 Hollow Metal Doors 3'x 7' 20.00 EA 558 3,600 - 4,158
105 Hollow Metal Door Frames 3'x7' 20.00 EA 558 2,900 - 3,458
•
• METAL DOORS/FRAMES 1,116 6,500 7,616
40.00 Labor hours
•
8400.000 ENTRY/STOREFT/CURTAINWALL
•
. 100 Window System North Elevation 1,390.00 SF - - 44,480 44,480
100 Window System South Elevation 1,602.00 SF - 0 51,264 51,264
100 Radiused Clerestory above 1,184.00 SF - - 21,312 21,312 '
Partitions •
100 Window System West Elevation 507.00 SF - - 16,224 16,224
100 Window System East Elevation 299.00 SF - - 9,568 9,568
135 Entry Storefront Doors 11.00 EA - - 22,000 22,000
ENTRY/STOREFT/CURTAINWALL 164,848 164,848
4,982.00 SF
8700.000 HARDWARE
200 Exterior Entry Door Hdwr 2.00 EA 100 711 - 811
(Man-Door)
• 205 Interior Entry Door Hdwr 9.00 EA 322 2,766 - 3,088
(Man-Door)
HARDWARE 422 3,477 3,899
15.12 Labor hours
;i.
`' 9200.000 LATH AND PLASTER
100 Metal Lath&Plaster 9,407.00 SF - - 61,146 61,146
LATH AND PLASTER 61,146 61,146
9,407.00 SF
9250.000 GYPSUM WALLBOARD
235 New Parapet Construction 1,680.00 SF - - 10,080 10,080
245 GWB walls to Clg(8'-6) 4,760.00 SF - - 18,945 18,945
245 Non-Rated Partition w/1-Layer 2,080.00 SF - - 8,278 8,278
5/8'GWB Ea.Side(to ceiling)
260 Restroom Light Cove Soffit 42.00 LF - - 896 896
600 Framed GWB Ceiling(complete) 520.00 SF - - 2,163 2,163
a320 2-12'MS x 25 Ga.Furring 6,316.00 SF - - 9,853 9,853
4:, (perim.walls)
a425 5/8'GWB @ Furred Perim.Walls 6,316.00 SF - - 6,379 6,379
GLY Construction,Inc. Standard Estimate Report ,,, t Pa
tkpavillion-scenariol ! 4/22/2002 9:21.
Labor Material Subcontract Total
Item Description Takeoff Oty Amount Amount Amount Name Amount
9250.000 GYPSUM WALLBOARD
a530 Tape&Finish,Furred Perim.Walls 6,316.00 SF - - 6,821 6,821
a800 Dumpster Fees(per SF of wall) 6,316.00 SF - - 632 632
GYPSUM WALLBOARD 64,047 64,047
14,770.00 BSF
9300.000 TILE
100 Ceramic Tile;Floor/Wainscot 936.00 SF - - 8,424 8,424
TILE 8,424 8,424
936.00 SF
9500.000 ACOUSTICAL TREATMENT
100 Acoustical Ceiling Quote 4,850.00 SF - - 7,033 7,033
ACOUSTICAL TREATMENT 7,033 7,033
4,850.00 SF
9650.000 RESILIENT FLOOR
100 Resilient FlporingQuote 1,250.00 SF - - 8,125 8,125
105 Floor Preparation 1,250.00 SF 272 188 - 459
205 4'Rubber Base-Perimeter Wall 562.00 LF - - 674 674
205 4'Rubber Base 410.00 LF - - 492 492
RESILIENT FLOOR 272 188 9,291 9,751
139.00 SY
10.00 Labor hours
•
9680.000 CARPET
100 Carpet Sub Quote 156.00 SY - - 3,744 3,744
100 Lobby,Corridor,Meeting Rm 0.00 SY - - 0
Carpet
CARPET 3,744 3,744
156.00 SY
9900.000 PAINTING
100 Painting Sub Quote 7,344.00 SF - - 2,938 2,938
100 Clean/PaintStructure/Celing 14,770.00 SF - - 11,078 11,078
105 Perimeter Wall 6,533.00 SF - - 2,613 2,613
PAINTING 16,628 16,628
10150.000 COMPARTMENTS/CUBICLES
200 Metal Toilet Partitions 7.00 EA - - 2,940 2,940
COMPARTMENTS/CUBICLES Z940 2,940
10520.000 FE CABT'S AND ACCESSORIES
• 100 54 ABC Fire Extinguisher 8.00 EA 56 368 - 424
200 Fire Extinguisher Cabinet 8.00 EA 112 648 - 760
300 'Knox'Box 1.00 EA 50 340 - 390
FE CAB'S AND ACCESSORIES 217 1,356 1,573
7.79 Labor hours
10600.000 PARTITIONS
205 Accordion Folding Partitions 4,588.00 SF - - 119,288 119,288
PARTITIONS 119,288 119,288
4,588.00 SF.
10800.000 TOILET/BATH ACCESSORIES i
100 Toilet Accessories(Standard) 14.00 EA 1,698 4,480 - 6,178
TOILET/BATHACCESSORIES 1,698 4,480 6,178
60.87 Labor hours
15100.000 HVAC
306 HVAC Systems 15,770.00 SF - - 102,505 102,505
HVAC 102,505 102,505
15,770.00 BSF
15450.000 PLUMBING FIXTURES
100 Restr000m Fixtures and Kitchen 15,770.00 SF - - 39,425 39,425
Rough-In
PLUMBING FIXTURES 39,425 39,425
15,770.00 SF
15500.000 FIRE PROTECTION
• GLY Ddnstruction,Inc. _ Standard Estimate Report Pa!
tkpavillion-scenario! 4/22/2002 9:21
Labor r Material Subcontract Total
Item Description Takeoff my Amount Amount Amount Name Amount •
15500.000 FIRE PROTECTION
100 Building Sprinklers 15,770.00 SF - - 20,501 20501
FIRE PROTECTION 20,501 20,501
15,770.00 BSF •
• 16100.000 ELECTRICAL POWER
kL ? 302 Connect Power,Power Distribution 15,770.00 SF - - 31,540 31,540
ELECTRICAL POWER 31,540 31,540
15,770.00 BSF
.• 16500.000 LIGHTING
135 Light Fixture Allowance 15,770.00 SF - - 39,425 39,425
LIGHTING 39,425 39,425
15,770.00 BSF
•
• 16700.000 COMMUNICATION/ALARM
100 Fire Alar System 15,770.00 SF - 15,770 . 15,770
COMMUNICATION/ALARM 15,770 15,770
15,770.00 BSF
•
18001.000 GENERAL CONDITIONS
100 General Conditions 16.00 WKS 60,800 20,800 17,600 99,200
GENERAL CONDITIONS 60,800 20,800 17,600 99,200
16.00 WKS
GLY Construction, Inc. Standard Estimate Report - P:
tkpavillion-scenario 1 4/22/2002 9:21
Estimate Totals
Labor 93,807 16,006.145 hrs
Material 120,267
Subcontract 1,035,426
1.249,500 1,249,500
Labor Taxes 43,151 46.000 % C
State B&O Tax 13,491 B
Renton City B&O Tax 2,313 B
Safety 1,407 1.500 % C
Warranty Expense 3,275 0.250 % T
General Lia.Insurance 9,637 0.500 % T
Fee-Percentage 79,366 6.000 % T
152,640 1,402,140 .
Estimating Contingency(%) 187,425 15.000 % C
187,425 1,589,565
King County Sales Tax 139,882 8.800 % T
Design Consultants Fees 190,748 12.000 % T
Permit/Plan Review 7,153 0.450 % T
Total 1,927,348 122.216/SF
,
I
G ► L ►Y
CONSTRUCTION
April 22, 2002
RENTON PAVILLION —SCENARIO 2A:
Retrofit existing building to bring up to code for Seismic, Energy and Life Safety. Jack
roof structure up. Insert Clerestory windows below parapet at North, South Elevations
and at ends. 1st Floor to be Meeting Rooms, w/ Kitchen facilities. Pour 2nd Floor PT
deck to be used for Artist Lofts. Add mezzanine level apartments above lofts.
Scope of Work Summary
Estimate Summary:
Construction Costs(Includes 15% Estimating Contingency) $3,395,208
Design Fees @ 12% $407,425
King County Sales Tax @ 8.8% $298,778
Permit/Plan Review @ .45% $15,278
Total $4,116,689
Cost/SF: $113.5/SF
Division 2:
- Selective Demolition
- Utility Connections
- Fence/Gate at Dumpster area
- Sidewalk cut/patch as required
Division 3:
- Slab leveled, stained, sealed; exposed slab in meeting areas.
- 2nd Floor PT structure supported by concrete columns
- New Flat roof structure at East,West ends of Building.
Division 4:
- Masonry infill as needed for shear wall and door/window infill.
- Pavers at balconies from Artist lofts.
Division 5:
- Necessary structural upgrades for seismic retrofitting and supporting raised
roof structure.
- Structural steel, decking for balconies.
- Required Fire stairs and shared circular stairs to Mezzanine.
- Balcony Railing
- 400 SF of awning/canopy.
Division 6:
- New Sheathing on existing roof
- Allowances for Reception, Coat Closet and Plam vanities in Restroom
- Mezzanine Level casework for Toilet Rm., Kithcenette
Division 7:
- New Membrane Roof.
- Required insulation.
- Dome Skylight and and 432 SF of typical skylights
Division 8:
- New Doors/Hardware per plan
- Window Infill
- Glazed sectional overhead doors on South Elevation
fa
100-116th Avenue S.E. Bellevue.WA 98004-6453 P.O.Box 6728 Bellevue,WA 98008-0728 Tel:425.451.8877 Fax:425.453.5680 www.gly.com
fL
Division 9:
- Lath/Plaster over existing block
- GWB construction per plan
- Restroom Ceramic Tile
. - ACT ceiling on Level 1 only
- Resilient Floorings in Kitchen, Service Areas
- Mezzanine floor is stained/sealed decking material
- Loft Level floor is cork flooring
- Carpet in limited area
- Paint as required, including exposed roof structure
Division 10:
- Required Partitions, Accessories, Extinguishers
- Folding Partitions @ Meeting Rooms
Division 14:
- Hydraulic Elevator (2 stops)
Division 15:
- Required HVAC, Plumbing, Fire Protection
Division 16:
- Required Lighting, Power Distribution and Fire Alarm system.
Subtotal Items:
- Estimating Contingency @ 15%
- King County Sales Tax @ 8.8%
- Design Costs @ 12%
- Permit/Plan Review @ .45%
I
Renton Pavillion-Scenario 2A
Retrain existing,Add PT deck for Floor 2,Add Mezzanine Level
1st Floor Mtng Rooms,2nd Floor Artist Lofts,3rd Floor Mezzanine Apts
Project name tkpavillion-scenario2a
Renton
Wa
Labor rate table 1/02-6/02 Adj
Job size 36285 SF
Bid date 4/19/2002 12:00 PM
Report format Sorted by'Phase'
• 'Detail'summary
; Combine items
GLY Construction, Inc. Standard Estimate Report x & ,. P�
tkpavillion-scenario2a 4/22/2002 9:21
Labor I Material Subcontract I Total
•
Item Description Takeoff Oty Amount Amount Amount Name Amount
•
2050.000 DEMOLITION
105 Asbestos Abatement 14,770.00 SF - - 7,385 7,385
210 Demo Dump Fees 6.00 EA - 3,900 - 3,900
310 Shore/Jack Each Truss 14,700.00 SF 82,026 73,500155,526
504 Demo Slab For Spread Ftngs 192.00 SF 804 413 - 1,216
512 Demo Conc.Sills 302.00 LF - - 19,177 19,177
514 Demo CMU under Windows-1.5ft 560.00 SF - - 10,640 10,640
down
522 Demo Roofing 14,770.00 SF 0 0 23,632 23,632
524 Demo Windows/Storefront 2,735.00 SF 6,024 410 - 6,434 ,
524 Demo OH Doors 728.00 SF 1,604 109 - 1,713 ••
1110 Demo Doors 2.00 EA 28 4 - 32
t115 Demo Door Frames 2.00 EA 56 6 - 62
t190 Demo Dump Fees(per load) 6.00 EA - 3,900 - 3,900
1205 Misc.Demo Tools 14,770.00 SF - 2,954 - 2,954
DEMOLITION 90,541 85,196 60,834 236,571
14,770.00 BSF
18,048.771 Labor hours •
2450.000 SANITARY SEWER
400 Extend Sewer to Street 30.00 LF - - 1,800 1,800
SANITARY SEWER 1,800 1,800
30.00 LF
2550.000 SITE CONCR(SIDEWLKS,ETC)
100 Patch Sidewalk 36.00 SF - - 432 432
SITE CONCR(SIDEWLKS,ETC) 432 432
2600.000 WATER SYSTEMS
105 Make connection for Fire/Water 1.00 LS - - 1,500 1,500
147 Fire Dept.Connection(6') 1.00 EA - - 4,500 4,500
WATER SYSTEMS 6,000 6,000
2700.000 SITE IMPROVEMENT
100 Fence @ Service Entry 20.00 LF - 240 240
115 Gate @ Trash Area 1.00 EA - 750 750
SITE IMPROVEMENT 990 990
3010.000 CONCRETE REINFORCE
115 Mesh 6x6,W2.9 x W2.9 2,100.00 SF - 447 134 581
135 Supply PT Cable @ PT Slabs 13,230.00 LB - 8,203 - 8,203
210 Place PT Cable 13,230.00 LB - 7,673 7,673
0101 Rebar,Footings 2.00 TON - 960 640 1,600
C125 Rebar,Columns 20.201 TON - 9,696 6,464 16,161
C130 Rebar,PT Slabs 16.00 TON - 7,680 5,600 13,280
CONCRETE REINFORCE 26,986 20,512 47,498
38.00 TN
3107.000 SPREAD FOOTINGS
100 Layout Spread Footings 48.00 EA 670 - - 670
105 Excavate Footings 10.904 CY 55 - 120 175
120 Remove/Haul Off Footing Spoils 12.33 TCY - - 99 99
140 Form 2x4 @ Top Neat Cut Footing 384.00 LF 429 272 - 701
145 Rebar Templates/Supports 384.00 LF 564 154 - 717
211 Pump Spread Ftgs(36M to 45M) 10.904 CY - 30 114 144
215 Finish Top Footing 192.00 SF 31 - - 31
225 Strip Footing Forms 384.00 SF 268 - - 268
990 Tools/Equipment for Spread 96.00 MH - 96 - 96
Footings
SPREAD FOOTINGS 2,016 552 333 2,900
11.00 CY
73.66 Labor hours
3200.000 SLAB-ON-GRADE
360 Sealer/Stain @ Exposed Areas 11,000.00 SF 5,524 4,950 - 10,474
435 Patch SOG @ Sewer Connection 50.00 SF 453 300 - 753
SLAB-ON-GRADE 5,977 5,250 11,227
236.67 Labor hours
3500.000 COLUMNS
100 Column Layout 48.00 EA 1,339 - - 1,339
110 Prefab/Rent Rectangular Column 1,32224 SF 2,459 5,765 - 8,224
115 Set Square/Rectangular Column 3,966.72 SF 6,917 - - 6,917
GLY.Corrstrl,tction, Inc. Standard Estimate Report Page
• tkpavillion-scenario2a 4/22/2002 9:21 A
Labor 1 Material I I Subcontract I Total
Item Description Takeoff Qty Amount Amount Amount Name Amount
3500.000 COLUMNS
135 Strip Columns 3,966.72 SF 2,490 - - 2,490
140 Resurface Column Forms 396.672 SF 692 397 - 1,088
175 Place RectlSq Col,5000# 73.46 CY 1,265 5,659 - 6,924
195 Pump Columns(36M-45M) 73.46 CY - 202 1,543 1,745
200 Cure Columns 48.00 EA 167 48 - 215
205 Patch Square Columns 3,966.72 SF 2,693 476 - 3,169
t`. 225 Column Rigging Hardware 48.00 HR 1,339 - 1,339
990 Tools/Equipment for Columns 48.00 MH - 48 - 48
COLUMNS 19,363 12,595 1,543 33,500
74.00 CY
711.581 Labor hours
3600.000 STRUCTURAL SLABS
100 Structl Slab,Forming Subcontract 14,700.00 SF - - 132,300 132,300
• 105 Structi Slab Layout 14,700.00 SF 583 91 - 674
185 Form Structl Slab Blockouts 168.00 LF 586 119 - 705
190 Strip Structl Slab Blockouts 168.00 LF 141 - 141
225 Chamfer Mark Tendon Locations 1,888.00 EA 1,756 283 - 2,039
230 Wrap Tendon Ends,Structl Slab 3,429.00 LF 3,827 857 - 4,684
235 Attach Tendon Ends,Structi Slab 620.00 EA 2,471 87 - 2,558
245 Patch Tendon Ends,Structl Slab 620.00 EA 624 74 - 698
275 Structl Slab Cleanup 14,700.00 SF 422 - - 422
280 Structl Slab Pour Watch 14,700.00 SF 436 - - 436
315 Place Structl Slab,4000# 351.88 CY 1,953 24,939 - 26,892
• 367 PumpSlructlConcrete 351.88 CY - 968 1,232 2,199
Slabs/Beams(36-45M)
395 Stnictl Slab Trowel Finish 14,041.00 SF - - 5,055 5,055
418 Finish Structural Slabs Closure 210.00 SF 285 - - 285
Pours
425 Cure Structi Slabs 14,700.00 SF 123 441 - 564
990 Tools/Equipment for Structural 1.00 MH - 1 - 1
Slabs
• STRUCTURAL SLABS 13,206 27,861 138,586 179,654
• 14,700.00 SF
483.804 Labor hours
3650.000 SLAB LEVELING
105 Level Slab on Grade 14,770.00 SF 5,151 - 13,293 18,444
SLAB LEVELING 5,151 13,293 18,444
14,700.00 SF
184.63 Labor hours
3700.000 TOPPING SLABS
100 Layout Topping Slabs 0.84 HR 23 - - 23
n 110 Edge Form Topping Slab 340.00 LF 791 185 - 976
115 Topping Slab,Strip Edge Form 340.00 LF 185 - - 185
150 Topping Slab Embeds,Mfg. 12.00 EA 112 - - 112
185 Topping Slab Screeds 2,100.00 SF 86 21 - 107
190 Topping Slab Pour Watch 0.84 HR 21 - - 21
210 Place Topping Slab,4000# 22.701 CY 196 1,686 - 1,881
227 Pump Topping Slab(36M-45M) 22.701 CY - 56 175 231
• 240 Trowel Finish Topping Slab 2,100.00 SF - - 798 798
255 Cure Topping Slab 2,100.00 SF 48 36 - 84
990 Tools/Equipment for Topping Slabs 1.00 MH - 1 - 1
TOPPING SLABS 1,461 1,985 973 4,419
54.173 Labor hours
3915.000 SPREAD FOOTINGS
131 Footing Concrete-4000# 10.904 CY - 785 - 785
SPREAD FOOTINGS 785 785
4200.000 UNIT MASONRY
200 CMU window Headers 0.00 SF - • - 0
200 CMU for window infill,OH Doors 1,019.00 SF - - 12,992 12,992
200 C.M.0 Shear Wall 970.00 SF - - 12,368 12,368
242 Form/Strip Masonry Punched 0.00 EA 0 0 -
Window Bucks
500 Balcony Pavers 490.00 SF - - 7,840 7,840
UNIT MASONRY 33,200 33,200
5120.000 STRUCTURAL STEEL
•
100 Structl Steel Material Quote 12,000.00 LB - 8,640 - 8,640
125 Structl Steel Erection-Flat Roof 2,100.00 SF - - 7,350 7,350
Areas
GLY Construction, Inc. Standard Estimate Report ,_ !-, , Pa
tkpavillion-scenario2a 4/22/2002 9:21
•
Labor Material I Subcontract I Total
Item Description Takeoff Oty Amount Amount Amount Name Amount
STRUCTURAL STEEL 8,640 7,350 15,990
5300.000 METAL DECKING
100 Metal Roof Deck,Material 2,100.00 SF - 2,709 - 2,709
Quote-Flat Roof Area
METAL DECKING 2,709 2,709
5400.000 METAL STUDS
100 New Parapet Framing 1,680.00 SF - - 3,780 3,780
METAL STUDS 3,780 3,780
•
5500.000 MISC.METAL
100 ConL Channel over Windows 6,744.00 LBS - 10,790 7,418 18,209
100 Connection @ Truss to Column 24.00 EACH - 7,800 11,520 19,320
100 TS Columns for Truss Support 5,200.00 LBS - 4,680 4,680 9,360 '
110 'Purchase/install Shear Stud Rails 576.00 EA 1,786 12,672 14,458
300 Public Stair 2.00 FLT 62 6,600 3,600 10,262
300 Stair up to Lofts 2.00 FLT 62 6,600 3,600 10,262
305 Mezzanine Circular Stair 8.00 EA 223 19,200 6,400 25,823 •
410 Operable Partition Support 265.00 LF 1,848 5,035 - 6,883
MISC.METAL 3,981 73,377, 37,218 114,577
142.693 Labor hours
5700.000 ORNAMENTAL METALS
200 Balcony Railing . 84.00 LF - - 7,140 7,140
400 Canopy/Awning®Entry only 400.00 SF ' - - 18,400 18,400
ORNAMENTAL METALS 25,540 25,540
6100.000 ROUGH CARPENTRY
100 Blocking/Backing,Treated 1,200.00 BF 2,054 567 - 2,621
152 Gypsum Sheathing 1,680.00 SF - - 1,764 1,764
275 Sheathing 5/8'(Roof/Deck)CDX 16,456.00 SF 8,348 7,422 - 15,769
ROUGH CARPENTRY 10,402 7,989 1,764 20,154
372.82 Labor hours
6130.000 HEAVY TIMBER CONSTRUCTION
200 Mezzanine Structure-Posts,TJI's, 6,885.00 SF - - 48,195 48,195
Decking
200 Wood Trellis 490.00 SF - - 5,880 5,880
HEAVY TIMBER CONSTRUCTION 54,075 54,075
6200.000 FINISH CARPENTRY
200 Mezzanine Level Base 920.00 LF 1,901 2,208 - 4,109
210 Lobby Area Wood Base 160.00 LF 331 480 - 811 ' .
FINISH CARPENTRY 2,232 2,688 4,920
80.00 Labor hours
6400.000 ARCH'L WOODWORK
100 Coat Closet 1.00 ALLW - 1,500 175 1,675
100 Reception Desk 1.00 ALLW - 6,000 175 6,175
200 Servery Lowers 18.00 LF - 3,060 270 3,330
200 Mezzanine Kitchen/Toilet Cabinets 160.00 LF - 27,200 2,400 29,600
300 Lavatories 12.00 LF - 1,380 128 1,508
300 HospitalityCounters138.00 LF - 12,420 1,470 13,890
300 Phone Counter 9.00 LF - 810 96 906
400 Shelving in Mezzanine Units 192.00 LF 670 3,840 - 4,510
ARCH'L WOODWORK 670 56,210 4,713 61,593
24.00 Labor hours
7100.000 WATERPROOFING
145 Balcony Waterproofing • 490.00 SF - - 270 270
WATERPROOFING 270 270
7200.000 INSULATION
115 R-11 Batt Insulation With Foil 6,533.00 SF - - 3,071 3,071
INSULATION 3,071 3,071
7500.000 MEMBRANE ROOFING
200 Built-Up Roof w/Rigid Insulation 14,770.00 SF - - 81,235 81,235
MEMBRANE ROOFING 81,235 81,235
7600.000 FLASHING&SHEET METAL
GLY Co11struction, Inc. Standard Estimate Report Pag
- .: tkpavillion-scenario2a 4/22/2002 9:21.
Labor Material 1 Subcontract I Total
Item Description Takeoff Oty Amount Amount Amount Name Amount
7600.000 FLASHING&SHEET METAL
100 Coping 562.00 LF - - 6,744 6,744
• 135 Gutter along Roof-2 sides 360.00 LF - - 4590 4590
FLASHING&SHEET METAL S 11,334 11,334
' 7800.000 ROOF ACCESSORIES
100 Circular Skylight 256.00 SF - - 19,200 19,200
100 Aluminum Skylights 432.00 SF - - 26,136 26,136
ROOF ACCESSORIES 45,336 45,336
•
8100.000 METAL DOORS/FRAMES
100 Hollow Metal Doors 3'x 7' 20.00 EA 558 3,600 - 4,158
105 Hollow Metal Door Frames 3'x7' 20.00 EA 558 2,900 - 3,458
METAL DOORS/FRAMES 1,116 6,500 7,616
40.00 Labor hours
8200.000 WOOD&PLASTIC DOORS '
105 3'x 7'Wood Door Leafs to Lofts 32.00 EA 1,440 8,800 - 10,240
115 Double Door Frame to Lofts 16.00 EA 893 2,880 - 3,773
120 Wd.Door to Mezzanine units 16.00 EA 2,480 7,200 - 9580
WOOD&PLASTIC DOORS 4,813 18,880 23,693
172.501 Labor hours
• 8300.000 SPECIAL DOORS
145 Sectio'nalOverhead 784.00 SF - - 21,952 21,952
Door-Glazed(South Elev.)
SPECIAL DOORS 21,952 21,952
8400.000 ENTRY/STOREFT/CURTAINWALL
100 Windows @ South Elevation 784.00 SF - - 25,088 25,088
100 Window System 0 East Elevation 507.00 SF - 0 16,224 16,224
100 Clerestory Below Roof 1,440.00 SF - - 46,080 46,080
` 100 Clerestory 0 Ends of Building 1,120.00 SF - - 35,840 35,840
100 Window System 0 North 1,648.00 SF - - 52,736 52,736
Elevation
•
• 100 Window System 0 West Elevation 300.00 SF - - 9,600 9,600
135 Entry Storefront Doors 11.00 EA - - 22,000 22,000
ENTRY/STOREFT/CURTAINWALL 207,568 207,568
8700.000 HARDWARE
200 Exterior Entry Door Hdwr 2.00 EA 100 711 - 811
(Man-Door)
205 Interior Entry Door Hdwr 9.00 EA 322 2,766 - 3,088
(Man-Door)
210 Hardware for Loft Doors 16.00 EA 312 3,390 - 3,703
HARDWARE 734 6,868 7,602
26.32 Labor hours
•
9200.000 LATH AND PLASTER
100 Metal Lath&Plaster 5,510.00 SF - - 35,815 35,815
LATH AND PLASTER 35,815 35,815
9250.000 GYPSUM WALLBOARD
100 Frame/Sheathing New Parapet 2,240.00 SF - - 15,680 15,680
245 GWB walls to Clg(8'-6") 4,760.00 SF - - 18,945 18,945
245 GWB walls 0 Loft Level 6,615.00 SF - - 26,328 26,328
- 250 GWB walls @ Mezzanine Units 8,320.00 SF - - 33,114 33,114
254 Wrap Interior Columns 2,800.00 SF - - 10,024 10,024
260 Restroom Light Cove Soffu 42.00 LF - - 896 896
266 Wrap Trusses for Separation 770.00 LF - - 29,322 29,322
600 Framed GWB Ceiling(complete) 520.00 SF - - 2,163 2,163
a320 2-1/2"MS x 25 Ga.Furring 6,316.00 SF - - 9,853 9,853
(perim.walls)
a425 5/8"GWB®Furred Perim.Walls 6,316.00 SF - - 6,379 6,379
a530 Tape&Finish,Furred Perim.Walls 6,316.00 SF - - 6,821 6.821
a800 Dumpster Fees(per SF of wall) 6,316.00 SF - - 632 632
1180 5/8'GWB Ceiling under 6,885.00 SF 4,269 1,721 - 5,990
Mezzanine
- t195 Tape&Finish GWB under 6,885.00 SF 4,802 689 - 5,491
Mezzanine
GYPSUM WALLBOARD 9,071 2,410 160,156 171,637
325.13 Labor hours
9300,000 TILE
GLY Construction, Inc. Standard Estimate Report - t_ Pat
tkpavillion-scenario2a4/22/2002 9:21,
Labor Material Subcontract I Total
Item Description Takeoff Oty Amount Amount Amount Name Amount
9300.000 TILE
100 Ceramic Tile;Floor/Wainscot 936.00 SF - - 8,424 8,424
TILE 8,424 8,424
9500.000 ACOUSTICAL TREATMENT
100 ACT on Level 1 Only 14,700.00 SF - - 19,110 19,110
ACOUSTICAL TREATMENT 19,110 19,110
9550.000 WOOD FLOORING .
105 Stained/Sealed Mezzanine 6,885.00 SF - 8,606 8,606
Decking
WOOD FLOORING 8,606 8,606
9650.000 RESILIENT FLOOR
100 Resilient Flooring Quote 1,250.00 SF - 8,125 8,125
105 Floor Preparation 1,250.00 SF 453 188 - 640
105 Floor Prep @ Cork Flooring 14,400.00 SF 3,129 2,160 - 5,289
130 Cork Flooring at Loft Level 14,400.00 SF - 64,800 64,800
205 4'Rubber Base-Perimeter Wall 562.00 LF - 674 674
205 4'Rubber Base 410.00 LF - - 492 492
RESILIENT FLOOR 3,582 2,348 74,091 80,020
131.87 Labor hours
9680.000 CARPET
100 Carpet Sub Quote 156.00 SY - 3,744 3,744
100 Lobby,Corridor,Meeting Rm 0.00 SY - - 0
Carpet
CARPET 3,744 3,744
9900.000 PAINTING
100 Painting Sub Quote 38,380.00 SF - - 15,352 15,352
100 Clean/PaintStructure/Ceiling 14,770.00 SF - - 11,078 11,078
105 Perimeter Wall 6,533.00 SF - - 2,613 2,613
PAINTING 29,043 29,043
10150.000 COMPARTMENTS/CUBICLES
200 Metal Toilet Partitions 7.00 EA - 2,940 2,940
COMPARTMENTS/CUBICLES 2,940 2,940
•
•
10520.000 FE CABT'S AND ACCESSORIES
.100 5#ABC Fire Extinguisher 8.00 EA 56 368 - 424
200 Fire Extinguisher Cabinet 8.00 EA 112 648 - 760
300 'Knox'Box 1.00 EA 50 340 - 390
FE CABT'S AND ACCESSORIES 217 1,356 1,573
7.79 Labor hours
10600.000 PARTITIONS
205 Accordian Folding Partitions 2,253.00 SF - - 58,578 58,578
PARTITIONS 58,578 58,578
10800.000 TOILET/BATH ACCESSORIES
100 Toilet Accessories(Standard) 14.00 EA 1,698 1,960 - 3,658
TOILET/BATH ACCESSORIES 1,698 1,960 3,658
60.87 Labor hours
14200.000 ELEVATORS
300 Hydraulic Elevator-2 Stops 2.00 STOP - - 30,000 30,000
ELEVATORS 30,000 30,000
15100.000 HVAC
306 HVAC Systems-For Lower Level 29,400.00 SF - - 191,100 191,100
342 Loft/Mezzanine HVAC 6,885.00 SF - - 27,540 27,540
HVAC 218,640 218,640
15400.000 PLUMBING
340 Mezzanine Kitchen/Toilet Plumbing 6,885.00 SF - 27,540 27,540
PLUMBING 27,540 27,540
15450.000 PLUMBING FIXTURES
100 Restr000m Fixtures and Kitchen 29,400.00 SF - - 102,900 ,102,900
Rough-In
GLY Construction, Inc. Standard Estimate Report - Pay
tkpavillion-scenario2a • 4/22/2002 9:21.
Labor 1 Material Subcontract Total
Item Description Takeoff Qty Amount Amount Amount Name Amount
PLUMBING FIXTURES 102,900 102,900
15500.000 FIRE PROTECTION
100 Building Sprinklers-Firs 1,2 29,400.00 SF - - 38,220 38,220
a" 100 Mezzanine Sprinklers 6,885.00 SF - - 8,951 8,951
FIRE PROTECTION 47,171 47,171
16100.000 ELECTRICAL POWER
5-1 302 Electrical Main-Floor,Loft 29,400.00 SF - - 182,280 182,280
302 Electrical-Mezzanine 6,885.00 SF - - 42,687 42,687
ELECTRICAL POWER 224,967 224,967
16700.000 COMMUNICATION/ALARM
100 Fire Alarm System-Firs 1,2 29,400.00 SF - - 29,400 29,400
100 Fire Alarm System-Mezzanine 6,885.00 SF - - 6,885 6,885
COMMUNICATION/ALARM 36,285 36,285
18001.000 GENERAL CONDITIONS
100 GeneralConditions27.00 WKS 148,500 37,800 29,700 216,000
GENERAL CONDITIONS 148,500 37,800 29,700 216,000
22.00 WKS
.
•
•
•
•
ryf':
GLY Construction, Inc. Standard Estimate Report .1, Pa
tkpavillion-scenarlo2a 4/22/2002 9:21
Estimate Totals
Labor 324,730 21,177.261 hrs
Material 390,943
Subcontract 1,901,411
2.617,084 2,617,084
Labor Taxes 149,376 46.000 % C
State B&O Tax 28,817 B
Renton City B&O Tax 4,940 B
Safety 4,871 1.500 % C
Warranty Expense 7,013 0.250 % T
General Lia.Insurance 20,583 0.500 % T
Fee-Percentage 169,961 6.000 % T
385,561 3,002,645
Estimating Contingency(%) 392,563 15.000 % C
392,563 3,395,208
King County Sales Tax 298,778 8.800 % T
Design Consultants Fees 407,425 12.000 % T
Permit/Plan Review 15,278 0.450 % T
Total 4,116,689 113.454/SF
G ► L►Y
CONSTRUCTION
• April 22, 2002
RENTON PAVILLION —SCENARIO 2B:
Complete Demolition of existing slab and structure. 1st Floor to be Meeting Rooms, w/
Kitchen facilities and Breakout Area. Pour 2nd Floor PT deck to be used for Gallery and
Studio/lofts/classrooms. Exposed steel roof structure.
Estimate Summary:
Construction Costs(Includes 15% Estimating Contingency) $2,757,867
4,7
Design Fees @ 12% $330,944
King County Sales Tax @ 8.8% $242,692
Permit/Plan Review @ .45% $12,410
Total $3,343,913
Cost/SF: $116/SF
Scope of Work Summary
Division 2:
- Complete Demolition
- Utility Connections
- Fence/Gate at Dumpster area
- Sidewalk cut/patch as required
Division 3:
- New slab on grade and 2nd Floor PT structure
Division 4:
- Split Face, colored CMU as noted on elevations
- Pavers at deck above breakout area
Division 5:
- Steel for roof structure.
- Required Fire stairs.
- Balcony Railing.
- 630 SF of awning/canopy.
Division 6:
- Allowances for Reception, Coat Closet and Plam vanities in Restroom and
casework at 2"d Floor Food/Beverage area
Division 7:
- Architectural Composite Roof
- Required insulation
- Dryvit system as noted on Elevations
- Corrugated Metal Panels at Radiused Breakout wall
- Kal-Wall system as noted on south Elevation
Division 8:
- New Doors/Hardware per plan
- Window systems as noted on Elevation
Division 9:
- GWB construction per plan
- Restroom Ceramic Tile
- ACT ceiling on Level 1 only
- Resilient Floorings in Kitchen, Service Areas
- Carpet throughout balance of space.
- Paint as required
100-116th Avenue S.E. Bellevue,WA 98004-6453 P.O.Box 6728 Bellevue,WA 98008-0728 Tel:425.451.8877 Fax:425.453.5680 www.gly.com
i
Division 10:
- Required Partitions, Accessories, Extinguishers
- Folding Partitions @ Meeting Rooms
Division 14:
- Hydraulic Elevator (2 stops)
Division 15:
- Required HVAC, Plumbing, Fire Protection
Division 16:
- Required Lighting, Power Distribution and Fire Alarm system.
Subtotal Items:
- Estimating Contingency @ 15%
- King County Sales Tax @ 8.8%
- Design Costs @ 12%
- Permit/Plan Review @ .45%
•
Renton Pavillion-Scenario 2B
i Floor PT structure,Exposed Steel Roof Structure
1st Floor-Meeting Rooms, Kitchen;2nd Floor-Gallery,Artists Lofts
Project name tkpavillion-scenario 2B
Renton
King
Wa
Labor rate table 1/02-6/02 Adj
Job size 28808
Duration 5 mo
Bid date 4/19/2002 12:00 PM
Report format Sorted by'Phase'
'Detail'summary
Combine items
.
•
i.•
tiz-,
GLY Construction, Inc. Standard Estimate Report ., &. P:
tkpavilllon-scenario 2B 4/22/2002 9:2c
Labor Material I Subcontract I Total
•
Item Description Takeoff Qty Amount Amount Amount Name • Amount
2050.000 DEMOLITION
105 Asbestos Abatement 14,770.00 SF - - 7,385 7,385
110 General Building Demolition 14,770.00 SF - - 59,080 59,080
DEMOLITION 66,465 66,465
2400.000 STORM SEWER
1200 Connect Rain Leaders to Storm 4.00 EA - - 3,200 3,200
System
STORM SEWER 3,200 3,200
2450.000 SANITARY SEWER
105 Extend/Connect Sewer to Street 30.00 LF - - 1,800 1,800
SANITARY SEWER 1,800 1,800
2500.000 ASPHALT PAVING/MARKING
255 Patct/Repair Paving @ Street 40.00 SY - - 1,200 1,200
•
400 Patch/Repair Striping 60.00 LF - - 300 300
ASPHALT PAVING/MARKING 1,500 1,500
2550.000 SITE CONCR(SIDEWLKS,ETC)
100 Patch/RepairSidewalks 400.00 SF - - 1,600 1,600
915 Poured in Place Curb/Gutter 60.00 LF - 1,200 1,200
Section
-
SITE CONCR(SIDEWLKS,ETC) 2,800 2,800
2600.000 WATER SYSTEMS
105 Make connection for Fire/Water 1.00 LS - - 1,500 1,500
147 Fire Dept.Connection(67 1.00 EA - - 4,500 4,500
WATER SYSTEMS 6,000 6,000
2700.000 SITE IMPROVEMENT
100 Fencing @ Dumpster 35.00 LF - - 630 630
115 Gate©Dumpster 1.00 EA - - 750 750
SITE IMPROVEMENT 1,380 1,380
3010.000 CONCRETE REINFORCE
110 Mesh 6 x6,W1.4 x W 1.4 19,940.80 SF - 1,787 1,273 3,060
135 Supply PT Cable©PT Slabs 9,612.00 LB - 5,959 - 5,959
210 Place PT Cable 9,612.00 LB - 5575 5575
C101 Rebar,Footings 2.003 TON - 961 641 1,602
C105 Rebar,SOG 2.80 TON - 1,343 895 2,238
C125 Rebar,Columns 12.63 TON - 6,060 4,040 10,101
C130 Rebar,PT Slabs 13.00 TON - 6,240 4,550 10,790
C135 Rebar,Masonry(Material Only) 12.00 TN - 5,760 - 5,760
CONCRETE REINFORCE 28,111 16,975 45,086
3106.000 BEAMS/RUNNING FOOTINGS
100 Layout Beams/Running Ftgs 600.00 LF 670 180 - 850
105 Excavate Running Footings 79.49 CY 399 - 874 1,274
130 Remove/Haul Off Running Footing 25.62 TCY - - 205 205
Spoils
131 Stockpile Footing Spoils 77.721 TCY - - 233 233
135 Prefab.Footings 266.67 SF 155 - 155
140 Form Running Ftg/Grade Beam 800.00 SF 1,594 1,439 - 3,033
155 Rebar Templates/Supports 600.00 LF 881 240 - 1,121
160 Rebar Protection 600.00 EA 335 324 - 659
n 210 Place 4000ft Ftg Conc 19.704 CY 82 1,436 - 1519
221 Pump Grade Beam Conc.(36M- 9.852 CY - 27 172 200
45M)
235 Finish Top Footing 798.00 SF 129 - - 129
245 Strip Footing Forms 800.00 SF 558 - - 558
250 Backfill Footings-Import 113.593 TON 594 - 2,045 2,639
990 Tools/Equipment for 1.00 MH - 1 - 1
Beams/Running Footings
BEAMS/RUNNING FOOTINGS 5,398 3,647 3,530 12,574
200.484 Labor hours
3107.000 SPREAD FOOTINGS 586
100 Layout Spread Footings 42.00 EA 586 -
105 Excavate Footings 54.77 CY 275 - 602 878
120 Remove/Haul Off Footing Spoils 10.532 TCY - - 84 84
121 Stockpile Footing Spoils 60.67 TCY - - 182 182
125 Prefab Forms Spread Ftg 116.67 SF ' 81 - 81
d-'
GLV Construction, Inc. Standard Estimate Report Pag
tkpavillion-scenario 2B4/22/2002 9:22
Labor Material I Subcontract Total
•
Item Description Takeoff Oty Amount Amount Amount Name Amount
3107.000 SPREAD FOOTINGS
135 Form Spread Ftgs 350.00 SF 610 245 - 855
i ; 145 Rebar Templates/Supports 140.00 IF 206 56 - 262
155 Column Templates 35.00 EA 1,953 385 - 2,338
195 Place 4000#Spread Ftg 8.102 CY 34 591 - 624
• 211 Pump Spread Ftgs(36M to 45M) 4.051 CY - 11 43 54
.
215 Finish Top Footing 218.75 SF 35 - - 35
e" 225 Strip Footing Forms 350.00 SF 244 - - 244
230 Backfill Footings-Import 88.67 TON 464 - 1,596 2,060
F.-. 990 Tools/Equipment for Spread 35.00 MH - 35 - 35
Footings
j . SPREAD FOOTINGS 4,488 1,323 2,507 8,318
165.07 Labor hours
•
3200.000 SLAB-ON-GRADE
100 SOG Layout 18,128.00 SF 328 181 - 509
•
110 Machine Fine Grade 18,128.00 SF 228 - 952 1,179
115 SOG Capillary Fill 358:084 TONS 2,158 - 5,192 7,350
125 Exc.for Thickened Slab 0.62 CY 8 • - 6 14
•
135 Form Edge SOG 800.00 LF 2,046 1,188 - 3,234
140 SOG Form Thickened Edge 200.00 SF 526 414 - 941
155 SOG Form Square Col.Blockouts 320.00 LF 1,116 384 - 1,500
165 SOG Screeds 18,128.00 SF 1,010 598 - 1,609
195 SOG Visqueen Vapor Barrier 20,847.20 SF 458 876 - 1,334
225 Place 3000#SOG 223.802 CY 875 16,222 - 17,097
230 SOG Place Thickened Edge, 0.62 CY 5 45 - 50
3000#
235 SOG Place Blockout,3000# 1.98 CY 50 131 - 181
271 SOG Pump Concrete(36M-45M) 179.54 CY - 494 2,900 3,394
315 SOG Trowel Finish 18,128.00 SF - - 6,526 6,526
• 340 SawcutSOG 1,500.00 INFT 369 420 - 789
375 Strip SOG Edge Form 800.00 LF 402 - - 402
380 SOG Strip Thickened Edge 200.00 SF 126 - - 126
390 SOG Strip Blockouts 320.00 LF 574 320 - 894
400 SOG Finish Blockouts 160.00 SF 241 - - 241
435 Patch SOG 18,128.00 SF 1,563 725 - 2,288
990 Tools/Equipment for 1.00 MH - 1 - 1
Slab-on-Grade
SLAB-ON-GRADE 12,083 22,000 15,576 49,659
455.77 Labor hours
3500.000 COLUMNS
100 Column Layout 30.00 EA 837 - - 837
110 Prefab/Rent Rectangular Column 619.80 SF 1,153 2,702 - 3,855
115 Set Square/Rectangular Column 2,479.20 SF 4,323 - - 4,323
135 Strip Columns 2,479.20 SF 1,556 - - 1,556
140 Resurface Column Forms 247.92 SF 432 248 - 680
' 150 Column Embeds 60.00 EA 1,046 - - 1,046
• 175 Place Rect/Sq Col,5000# 45.911 CY 791 3,537 - 4,328
195 Pump Columns(36M-45M) 45.911 CY - 126 964 1,090
•
200 Cure Columns 30.00 EA 105 30 - . 135
205 Patch Square Columns 2,47920 SF 1,683 298 - 1.981
225 Column Rigging Hardware 30.00 HR 837 - 837
990 Tools/Equipment for Columns 30.00 MH - 30 - 30
COLUMNS 12,764 6,971 964 20,699
468.47 Labor hours
- 3600.000 STRUCTURAL SLABS
100 Structl Slab,Forming Subcontract 10,680.00 SF - - 96,120 96,120
105 Struct'I Slab Layout 10,680.00 SF 424 66 - 490
110 SVuct'I Slab Safety Rails 600.00 LF 837 600 - 1,437
170 Reshore Beam or Slab 200.00 EA 797 2,400 - 3,197
'i-L'.- 175 Edge Form Structl Slab 600.00 SF 2,790 491 - 3,281
180 Strip Structl Slab Edge 600.00 LF 502 - - 502
185 Form Structl Slab Blockouts 240.00 LF 837 170 - 1,007
190 Strip Structl Slab Blockouts 240.00 LF 201 - - 201
:' 220 Install Structt Slab Embeds 80.00 EA 558 - - 558
kr.:-; 225 Chamfer Mark Tendon Locations 200.00 EA 186 30 - 216
275 Structl Slab Cleanup 10,680.00 SF 306 - - 306
280 Structl Slab Pour Watch 10,680.00 SF 317 - - 317
315 Place Structl Slab,4000# 260.741 CY 1,447 18,480 - 19,927
367 Pump Structl Concrete 260.741 CY - 717 913 1,630
Slabs/Beams(36-45M)
395 Structl Slab Trowel Finish 10,560.00 SF - - 3,802 3,802
425 Cure Stmctl Slabs 10,680.00 SF 89 320 - 410
990 Tools/Equipment for Structural 1.00 MH - 1 - 1
Slabs
GLY Construction, Inc. Standard Estimate Report a, L. . Pa
tkpavillion-scenario 2B 4/22/2002 9:21.
Labor Material I Subcontract I Total
Item Description Takeoff Qty Amount Amount Amount Name Amount
STRUCTURAL SLABS 9,292 23,275 100,834 133,401
342.502 Labor hours
4200.000 UNIT MASONRY
200 Split Face,Colored CMU-East 800.00 SF - - 11,200 11,200
200 Split Face,Colored CMU-North 1,806.00 SF - - 25,284 25,284
200 Split Face,Colored CMU-South 1,660.00 SF - 23,240 23,240
200 Split-Faced,Colored Block West 800.00 SF - - 10,200 10,200
Elevation
•
200 Reduce Block for lowering 4ft -484.00 SF - - (6,171) (6,171)
500 Pavers @ 2nd Floor Breakout 2,720.00 SF - - 43,520 43,520
UNIT MASONRY 107,273 107,273
5120.000 STRUCTURAL STEEL
100 Stnictl Steel Material Quote 56,000.00 LB - 40,320 - 40,320
C205 Erect Structl Steel,Office, 14,700.00 SF 820 - 36,750 37,570
Cols/Beams/Joist/Deck
STRUCTURAL STEEL 820 40,320 36,750 77,890
. 29.40 Labor hours
5200.000 METAL JOISTS
100 Steel Joist Material 12.00 TN - 12,300 - 12,300
METAL JOISTS 12,300 12,300
5300.000 , METAL DECKING
100 Metal Roof Deck,Material Quote 14,700.00 SF - 18,963 - 18,963
METAL DECKING 18,963 18,963
5500.000 MISC.METAL
100 Exposed Posts-South Elevation 2,400.00 LBS - 2,160 3,120 5,280
105 Purchase Fabricated Embeds 150.00 EA - 1.950 - 1,950
300 Standard Pan-Fill Stairs 2.00 FLT 62 6,600 3,600 10,262
305 Prefab Metal Warehouse Stair 2.00 EA 56 2,380 - 2,436
410 Operable Partition Support 162.00 LF 904 2,649 - 3,553
510 Curtain Wall Embeds/Support 40.00 EA - 660 - 660
Steel(Buy)
MISC.METAL 1,022 16,399 6,720 24,140
36.622 Labor hours
5700.000 ORNAMENTAL METALS
200 Balcony Rails 210.00 LF - - 17,850 17,850
200 Interior Balcony Railing 123.00 LF - - 12,915 12,915
400 Awnings 630.00 SF - - 17,010 17,010
ORNAMENTAL METALS 47,775 47,775
6100.000 ROUGH CARPENTRY
100 Blocking/Backing,Treated 600.00 BF 1,027 284 - 1,310
152 Gyp.Sheathing for Metal Roof 14,700.00 SF - - 15,435 15,435
ROUGH CARPENTRY 1,027 284 15,435 16,745
36.81 Labor hours
6200.000 FINISH CARPENTRY
210 Wood Base @ Lobby Area 190.00 LF 393 570 - 963
FINISH CARPENTRY 393 570 963
14.074 Labor hours
6400.000 ARCH'L WOODWORK
100 Reception Desk 1.00 ALLW - 6,000 6,000
200 Lowers©Food/Beverage 18.00 LF - 3,060 270 3,330
300 Restroom Vanities 36.00 LF - 3,240 383 3,623
400 Coat Closet 12.00 LF 20 720 - 740
ARCH'L WOODWORK 20 7,020 6,653 13,693
0.71 Labor hours
7100.000 WATERPROOFING
145 WaterProofing on 2nd Floor 2,720.00 SF - - 1,496 1,496
Breakout
WATERPROOFING 1,496 1,496
7200.000 INSULATION
115 R-11 Insulation(same as CMU 5,066.00 SF - - 2,381 2,381
area)
• GLS'Construction, Inc. Standard Estimate Report Pay
tkpavillion-scenario 2B 4/22/2002 9:22,
- Labor I Material I I Subcontract I Total
Item Description Takeoff Oty Amount Amount Amount Name Amount
• 7200.000 INSULATION
125 R-30 roof Insulation 14,700.00 SF - - 11,319 11,319
155 Dryvit/Framing in lieu of 1,032.00 SF - - 20,640 20,640
Kal-Wall-South Elevation
155 Dryvit/Framing @ West Elevation 934.00 SF - - 18,680 18,680
155 Dryvit/Framing®East Elevation 934.00 SF - - 18,680 18,680
I.• 155 Dryvit/Framing @ North Elevation 1,947.00 SF - - 38,940 38,940 .
155 Dryvit/Framing @ South Elevation 728.00 SF - - 14,560 14,560
155 Reduce Dryvit/Framing by 4ft on -468.00 SF - - (9,360) (9,360)
South
7. INSULATION 115,840 115,840
7250.000 FIREPROOFING
200 Fireproof Roof Structure/Decking 0.00 SF - - 0
•
7400.000 PREFORMED METAL ROOFING
105 Standing Seam,Metal Roofing- 0.00 SF - - 0
Main •
105 Standing Seam Roof @ Lobby 0.00 SF - - 0
110 Canopy/Awning Roofing 630.00 SF - - 10,710 10,710
PREFORMED METAL ROOFING 10,710 10,710
7460.000 METAL SIDING
110 Kal-Wal System @ 2nd Floor 1,032.00 SF - - 35,088 35,088
110 Corrugated Panels @ Breakout 1,440.00 SF - - 41,112 41,112
Area
METAL SIDING 76,200 76,200
7500.000 MEMBRANE ROOFING
605 Architectural,Comp.Roof 17,808.00 SF - - 67,670 67,670
MEMBRANE ROOFING 67,670 67,670
7600.000 FLASHING&SHEET METAL
100 Coping along Roof 683.00 LF - - 8,196 8,196
100 Flashing @ canopies, 320.00 LF - - 3,840 3,840
downspouts,etc. •
FLASHING&SHEET METAL 12,036 12,036
7900.000 SEALANTS
120 Exterior Caulking 1,400.00 LF - 3,500 3,500
SEALANTS 3,500 3,500
8100.000 METAL DOORS/FRAMES
100 Hollow Metal Doors 3'x 7' 23.00 EA 642 4,140 - 4,782
105 Hollow Metal Door Frames 3'x7' 25.00 EA 698 3,625 - 4,323
METAL DOORS/FRAMES 1,339 7,765 9,104
48.00 Labor hours
8200.000 WOOD&PLASTIC DOORS
105 3'x7'Wood Door 12.00 EA 540 3,300 - 3,840
WOOD&PLASTIC DOORS 540 3,300 3,840
19.354 Labor hours
'11• ,. 8400.000 ENTRY/STOREFT/CURTAINWALL
100 Storefront System @ 1st Floor 1,728.00 SF - - 65,664 65,664
Breakout
100 Window System on North 1,843.00 SF - - 62,662 62,662
7'; Elevation
135 Storefront Doors-Including 22.00 EA 44,000 44,000
Balconies
ENTRY/STOREFT/CURTAINWALL 172,326 172,326
' 8800.000 GLAZING
700 1/4'Plate Glass Mirrors 96.00 SF - - 1,008 1,008
GLAZING 1,008 1,008
9250.000 GYPSUM WALLBOARD
100 Misc.GWB/Framing 28,208.00 SF - - 28,208 28,208
241 Furred Perim.Wall w/5/8'GWB 5,066.00 SF - - 21,277 21'277
246 GWB/Framing @ Breakout Wall 4,320.00 SF - - 20,736 20,736
246 GWB walls,Level 1 4,139.00 SF - - 13,700 13,700
246 GWB wall,Level 2
5,196.00 SF - - 17,199 17'199
GLY Construction, Inc. Standard Estimate Report 1 P. .
tkpavillion-scenario 2B r 4/22/2002 9:2.
Labor L Material 1 Subcontract I Total
Item Description Takeoff Qty Amount Amount Amount Name Amount
9250.000 GYPSUM WALLBOARD
254 Wrap Interior Columns,2'x 2'x 2,400.00 SF - - 8,592 8,592
10'high
260 Restroom Light Cove Soffd 60.00 LF - 1,280 1,280
600 Framed GWB Ceiling(complete) 512.00 SF - - 2,130 2,130
GYPSUM WALLBOARD 113,122 113,122
28,208.00 BSF
9300.000 TILE
100 RestroomTle/Wainscot 1,904.00 SF - - 17,136 17,136
TILE 17,136 17,136
9
9500.000 ACOUSTICAL TREATMENT
115 2'x 4'Tegular Ceiling&Grid-1st 10,680.00 SF - - 13,884 13,884
Floor Areas
115 2'x 4'Tegular Ceiling&Grid- - -
ACOUSTICAL TREATMENT 13,884 13,884
9650.000 RESILIENT FLOOR
110 VCT®Storage 52.00 SY - - 936 936
115 Sheet Vinyl 0 Kitchen 134.00 SY - - 4,154 4,154
205 4'Rubber Base 1,200.00 LF - - 1,440 1,440
RESILIENT FLOOR 6,530 6,530
9680.000 ; CARPET
100 Carpet Throughout 2,948.00 SY - - 76,648 76,648
CARPET 76,648 76,648
9900.000 PAINTING
105 Interior Paint 21,633.00 SF - 11,898 11,898
325 Paint Steel,Railings 793.00 LF - - 1,427 1,427
PAINTING 13,326 13,326
10150.000 COMPARTMENTS/CUBICLES
100 Toilet Partitions 12.00 EA - - 2,880 2,880
COMPARTMENTS/CUBICLES 2,880 2,880
10520.000 FE CABT'S AND ACCESSORIES
100 51t ABC Fire Extinguisher 8.00 EA 56 368 - 424
200 Fire Extinguisher Cabinet 8.00 EA 112 648 - 760
300 'Knox'Box 2.00 EA 100 680 - 780
FE CABT'S AND ACCESSORIES 267 1,696 1,963
9.571 Labor hours
10600.000 PARTITIONS
200 Manual Operable Partitions 1,400.00 SF - - 39,200 39,200
PARTITIONS 39,200 39,200
10800.000 TOILET/BATH ACCESSORIES
100 Toilet Accessories(Standard) 4.00 EA 485 2,000 - 2,485
TOILET/BATH ACCESSORIES 485 2,000 2,485
17.391 Labor hours
12500.000 WINDOW TREATMENT
100 'Levelof Blinds 1,474.00 SF - - 3,317 3,317
WINDOW TREATMENT 3,317 3,317
14200.000 ELEVATORS
300 Hydraulic Elevator 2.00 STOP - - 30,000 30,000
ELEVATORS 30,000 30,000
15100.000 HVAC
200 HVAC 28,808.00 SF - - 187,252 187,252
HVAC 187,252 187,252
15400.000 PLUMBING
200 Plumbing,Rough-in Kitchen,Food 28,808.00 SF - - 72,020 . 72,020
Beverage
GLY Coi str.iction,Inc. Standard Estimate Report Pas
tkpavillion-scenario 2B - 4/22/2002 9:22
L Labor I Material I I Subcontract I Total
Item Description Takeoff Qty Amount Amount Amount Name Amount
PLUMBING 72,020 72,020
15500.000 FIRE PROTECTION
100 Fire Protection System 28,808.00 SF - - 37,450 37,450
FIRE PROTECTION 37,450 37,450
16100.000 ELECTRICAL POWER
205 Electrical 28,080.00 SF - - 174,096 174,096
ELECTRICAL POWER 174,096 174,096
' 16700.000 COMMUNICATION/ALARM
100 Fire Alarm System 28,808.00 SF - - 28,808 28,808
COMMUNICATION/ALARM 28,808 28,808
' 18001.000 GENERAL CONDITIONS
100 General Conditions 24.00 WKS 129,600 38,400 26,400 194,400
GENERAL CONDITIONS 129,600 38,400 26,400 194,400
24.00 WKS
.IS.
S.'
..,'i
GLY Construction, Inc. Standard Estimate Report- , w Pag
tkpavillion-scenario 2B 4/22/2002 9:22.
•
Estimate Totals
Labor 179,538 1,844216 hrs
Material 234,343
Subcontract 1,746,992
.2,160,873 2,160,873
Labor Taxes 82,587 46.000 % C
State B&0 Tax 23,407 B
Renton City B&O Tax 4,013 B
•
Safety 2,693 1.500 % C
Warranty Expense 5,684 0.250 % T
General Lia.Insurance 16,720 0.500 % T
Fee-Percentage 137,759 6.000 % T
272,863 2,433.736
Estimating Contingency(%) 324,131 15.000 % C
324,131 2,757,867
King County Sales Tax 242,692 8.800 % T
Design Consultants Fees 330.944 12.000 % T
Permit/Plan Review 12,410 0:450 % T
Total 3,343,913 116.076
I JL y
G ► L►Y
CONSTRUCTION
April 22, 2002
RENTON PAVILLION—SCENARIO 3:
Complete Demolition of existing slab and structure. 1st Floor to be Parking w/ Retail
space. Pour 2nd Floor PT deck to be used for Library. Roof structure to flat PT deck w/
built-up roof system. Structure enabled to have Apartment Living built on roof deck.
Scope of Work Summary
P
Estimate Summary:
Construction Costs(Includes 15% Estimating Contingency) $2,956,826
Design Fees @ 12% $354,819
King County Sales Tax @ 8.8% $260,201
Permit/Plan Review @ .45% $13,306
Total $3,585,152
Cost/SF: $131.7/SF
Division 2:
- Complete Demolition
- Utility Connections
•
- Fence/Gate at Dumpster area
- Fencing at covered parking area
- Sidewalk cut/patch as required
Division 3:
•
- New slab on grade and PT structure for 2nd Floor and Roof deck.
- Concrete shear walls assumed at stair areas.
- Painted Precast tilt-up panel at North, South Elevations.
Division 5:
- Required Fire stairs; NW stair allows for roof access.
- Metal Grills along Garage area.
- 399 SF of awning/canopy.
Division 6:
• - Allowances for built-in casework at Library space and Level 1
- Wood Base assumed in Library area
Division 7:
- Built-up roof w/insulation.
- Required insulation
- Dryvit system as noted on Elevations
Division 8:
- New Doors/Hardware per plan
- Window systems as noted on Elevation
- Curtain wall system at NW stair and North, East, South Elevations
Division 9:
- GWB construction per plan
- Restroom Ceramic Tile.
'{ - Ceramic Tile at 1st Floor Lobby areas.0
- ACT ceiling on Level 1 and Level 2
- Carpet throughout Library area.
- Paint as required
100-116th Avenue S.E. Bellevue,WA 98004-6453 P.O.Box 6728 Bellevue.WA 98008-0728 Tel:425.451.8877 Fax:425.453.5680 www.gly.com
Division 10:
- Required Partitions, Accessories, Extinguishers
- Folding Partitions @ Meeting Rooms
Division 14:
- Hydraulic Elevator (2 stops); Only 1 Elevator installed at initial build
Division 15:
- Required HVAC, Plumbing, Fire Protection
Division 16:
- Required Lighting, Power Distribution and Fire Alarm system.
Subtotal Items:
- Estimating Contingency @ 15%
- King County Sales Tax @ 8.8%
- Design Costs @ 12%
- Permit/Plan Review @ .45%
Renton Pavillion-Scenario 3
(2)F.—.s of PT Structure;Enabled for future Apa ?nts above
Retail, Parking on 1st Fir;Library on 2nd Floor
Project name tkpavillion-scenario3
Renton
King
Wa
Labor rate table 1/02-6/02 Adj
ti Job size 27230
Bid date 4/19/2002 12:00 PM
Report format Sorted by'Phase'
'Detail'summary '
s ik
Combine items
GLY Construction, Inc. Standard Estimate Report u ., Pa;
tkpavillion-scenarlo3 4/22/2002 9:22,
-
Labor I Material I I Subcontract I Total
Item Description Takeoff Oty Amount Amount Amount Name Amount
1020.000 HOISTING
8400 Personnel/Materials Hoist 4.472 MO - 11,210 - 11,210
HOISTING 11,210 11,210
2050.000 DEMOLITION
105 Asbestos Removal Sub Quote 14,700.00 SF - - 7,350 7,350
110 General Building Demolition 14,700.00 SF - - 58,800 58,800
DEMOLITION 66,150 66,150
2400.000 STORM SEWER
1200 Conned Rain Leaders to Storm 4.00 EA - - 3,200 3,200
STORM SEWER 3,200 3,200
2450.000 SANITARY SEWER
105 Extend/Connect Sewer to Street 30.00 LF - - 1,800 1,800
SANITARY SEWER 1,800 1,800
•
2500.000 ASPHALT PAVING/MARKING
255 Patch/Repair Paving @ Street 40.00 SY - - • 1,200 1,200
400 Patch/Repair Striping 60.00 LF - - 300 300
ASPHALT PAVING/MARKING 1,500 1,500
2550.000 , SITE CONCR(SIDEWLKS,ETC)
100 Patch/Repair Sidewalks 400.00 SF - - 1,600 1,600
915 Poured in Place Curb/Gutter 60.00 LF - - 1,200 1,200
Section
SITE CONCR(SIDEWLKS,ETC) 2,800 2,800
2600.000 WATER SYSTEMS
105 Make connection for Fire/Water 1.00 LS - 1.500 1,500
147 Fire Dept Connection(6')
1.00 EA 4,500 4,500
WATER SYSTEMS 6,000 6,000
2700.000 SITE IMPROVEMENT
100 Fencing @ Dumpster 35.00 LF - - 630 630
110 Chain Link @ Garage 70.00 LF - 1,400 1,400
115 Gate©Dumpster 1.00 EA - - 750 750
SITE IMPROVEMENT 2,780 2,780
3010.000 CONCRETE REINFORCE
115 Mesh 6x6,W2.9 x W2.9 15,477.00- SF - 3,294 988 4,282
135 Supply PT Cable®PT Slabs 21,784.00 LB - 13,506 - 13,506
210 Place PT Cable 21,784.00 LB - 12,635 12,635
C101 Rebar,Footings 3.414 TON - 1,639 1,092 2,731
C105 Rebar,SOG 2.714 TON - 1,303 868 2.171
C115 Rebar,C.I.P.Walls 9.444 TON - 4,533 3,022 7,555
C120 Rebar,Precast Panels 10.00 TON - 4,800 3,200 8,000
C125 Rebar,Columns 30.301 TON - 14,544 9,696 24,241
C130 Rebar,PT Slabs 29.00 TON 13,920 10,150 24,070
CONCRETE REINFORCE 57,539 41,652 99,191
3106.000 BEAMS/RUNNING FOOTINGS
100 Layout Beams/Running Ftgs 1,108.00 LF 1,237 332 - 1,569
105 Excavate Running Footings 73.022 CY 367 - 803 1,170
130 Remove/Haul Off Running Footing 4624 TCY - - 370 370
Spoils
131 Stockpile Footing Spoils 48.693 TCY - - 146 146
140 Form Running Ftg/Grade Beam 1,477.334 SF 2,944 2,657 - 5,601
155 Rebar Templates/Supports 1,108.00 LF 1,627 443 - 2,070
160 Rebar Protection 1,108.00 EA 618 598 - 1,217
205 Place 3000#Fig Conc 35.57 CY 148 2,554 - 2,703
221 Pump Grade Beam Conc.(36M- 17.782 CY - 49 311 360
45M)
235 Finish Top Footing 1,440.40 SF 233 - - 233
245 Strip Footing Forms 1,477.334 SF 1,030 - - 1,030
250 Backfill Footings-Import 71.17 TON 372 - 1,2811,653
990 Tools/Equipment for 2.00 MH - 2 - 2
Beams/Running Footings
BEAMS/RUNNING FOOTINGS 8,577 6,636 2,911 18,125
315.99 Labor hours
3107.000 SPREAD FOOTINGS
GLY COhst.ruction, Inc. Standard Estimate Report Pa.
-` tkpavillion-scenario3 4/22/2002 9:22
Labor I Material I Subcontract Total
Item Description Takeoff City Amount Amount Amount Name Amount
3107.000 SPREAD FOOTINGS
100 Layout Spread Footings 36.00 EA 502 - - 502
' 105 Excavate Footings 65.333 CY 328 - 719 1,047
120 Remove/Haul Off Footing Spoils 15.60 TCY - - 125 125
121 Stockpile Footing Spoils 69.333 TCY - - 208 208
125 Prefab Forms Spread Ftg 144.00 SF 100 - - 100
135 Form Spread Ftgs 432.00 SF 753 302 - 1,056
145 Rebar Templates/Supports 216.00 LF 317 86 - 404
155 Column Templates 36.00 EA 2,009 396 - 2,405
195 Place 4000#Spread Ftg 12.00 CY 50 875 - 925
211 Pump Spread Ftgs(36M to 45M) 6.00 CY - 17 63 80
215 Finish Top Footing 324.00 SF 52 - 52
225 Strip Footing Forms 432.00 SF 301 - - 301
231 Backfill Footings-Native 69.333 TCY 363 - 832 1,195
p_ 990 Tools/Equipment for Spread 36.00 MH - 36 - 36
• Footings
SPREAD FOOTINGS 4,777 1,712 1,946 8,435
175.563 Labor hours
3200.000 SLAB-ON-GRADE
100 SOG Layout 14,070.00 SF 254 141 - 395
110 Machine Fine Grade 14,070.00 SF 177 - 739 915
115 SOG Capillary Fill 277.93 TONS 1,675 - 4,030 5,705
125 Exc.for Thickened Slab 22.222 CY 294 - 222 516
135 Form Edge SOG 600.00 LF 1,535 891 - 2,426
165 SOG Screeds 14,070.00 SF 784 464 - 1,248
180 Embeds SOG 60.00 EA 335 300 - 635
195 SOG Visqueen Vapor Barrier 16,180.50 SF 356 680 - 1,035
225 Place 3000#SOG 217.13 CY 849 15,739 - 16,588
230 SOG Place Thickened Edge, 22.222 CY 190 1,626 - 1,816
3000#
271 SOG Pump Concrete(36M-45M) 239.352 CY - 658 3,866 4,525
315 SOG Trowel Finish 14,070.00 SF - - 5,065 5,065
340 Sawcut SOG, 1,500.00 INFT 369 420 - 789
375 Strip SOG Edge Form 600.00 LF 301 - - 301
435 Patch SOG 14,070.00 SF 1,213 563 - 1,776
990 Tools/Equipment for 1.00 MH - 1 - 1
Slab-on-Grade
SLAB-ON-GRADE 8,331 21,482 13,922 43,736
• 316.57 Labor hours
3300.000 PIP WALLS
100 Layout Wails 3,400.00 SF 949 272 - 1,221
' 155 Prefab PIP Gang Forms 1,360.00 SF 2,372 6,671 - 9,042
160 Set PIP Gang Fauns 6,800.00 SF 8,624 2,380 - 11,004
165 Strip PIP Gang Forms 6,800.00 SF 3,449 - - 3.449
170 Modify Gang Forms 800.00 SF 558 400 - 958
`• 200 Catwalks&Guardrails @ Walls 340.00 LF 379 935 - 1,314
over 6'
205 Rebar Dowel Supports 340.00 EA 316 184 - 500
210 Rebar Protection @ Top of Walls 340.00 LF 190 184 - 373
230 PIP Form Blockouts 96.00 SF 536 126 - 661
• 285 PIP Embeds 80.00 EA 893 360 - 1,253
290 PIP Dowel Bar Inserts 100.00 EA 558 600 - 1,158
Ni..
295 PIP Bend Out Dowels 240.00 EA 340 180 - 520
325 Place Conc Walls,4000# 83.951 CY 908 6,007 - 6,915
336 Pump Concrete Walls(36M-45M) 82.37 CY - 227 2,162 2,389
1. 380 Delete Conc Blockouts,3000# -4.74 CY (67) (315) - (382)
385 Delete Conc Blockouts,4000# -7.11 CY (100) (480) - (580)
420 Plug/Patch 1 Side Wall 3,400.00 SF 1,847 680 2.527
425 Sack Walls 1 Side 3,400.00 SF 3,298 1,020 - 4,318
4.. 450 Wall Rigging 24.00 HR 670 - 670
990 Tools/Equipment for PIP Walls 2.00 MH - 2 2
kk:: PIP WALLS 25,719 19,431 2,162 47,311
, 929.79 •Labor hours
3400.000 PRECAST PANELS
135 Panel Engineering 8.00 EA 400 224 320 944
140 Precast Panel Layout 8.00 EA 1,116 38 - 1,154
150 Prefab Precast Edge Form 672.00 LF 375 916 - 1,291
155 Install Precast Edge Form 672.00 LF 1,250 101 - 1,351
160 Strip Precast Edge Form 672.00 LF 372 - - 372
240 Form Precast Reveals/Keyway 1,600.00 LF 2,232 959 - 3,191
245 Strip Precast Reveals/Keyway 1,600.00 LF 387 - - 387
345 Install Precast Erection Dowels 16.00 EA 50 14 - 65
360 Apply Bond Breaker(2 Coats) 3,456.00 SF 108 159 - - 267
• 365 Install Fabricated Precast Embeds 160.00 EA 1,786 24 - 1,810
435 Pour Precast Panels,4000# 80.00 CY 304 5,724 - 6,028
550 Finish Precast Panels,Trowel 3,456.00 SF - - 1,382 1,382
GLY Construction, Inc. Standard Estimate Report ,•• 4,
P.
tkpavillion-scenario3 4/22/2002 9:2.
Labor Material Subcontract Total
Item Description . Takeoff Oty Amount Amount Amount Name Amount
3400.000 PRECAST PANELS
590 Cure/Protect Precast Panels 3,456.00 SF 65 104 - 168
595 Plug/Patch Panels 3,456.00 SF 1,564 415 - 1,979
610 Sack Precast 3,456.00. SF 4,693 691 - 5,384
625 Layout Precast Erection Shims 8.00 EA 235 52 - 287
645 Precast Lifting/Brace Inserts 152.00 EA 998 646 - 1,644
655 Erect Precast Panels 8.00 EA 1,116 - 1,657 2,773 , '
665 Align Precast Panels 8.00 EA 279 - - 279
670 InstalVRemove Panel Brace 32.00 EA 425 960 - 1,385
690 Precast Panel Welding 1,200.00 IN - - 1,080 1,080
710 Extend North Precast Up to 27ft 207.00 SF 1,346 725 - 2,070
990 Tools/Equipment for Precast 8.00 MH - 8 - 8
Panels
PRECAST PANELS 19,101 11,759 4,439 35,299
3,456.00 SF
856.28 Labor hours
3500.000 COLUMNS
100 Column Layout 72.00 EA 2,009 ' - - 2,009
110 Prefab/Rent Rectangular Column 991.68 SF 1,845 4,324 - 6,168
115 Set Square/Rectangular Column 5,950.08 SF 10,375 - - 10,375
135 Strip Columns 5,950.08 SF 3,735 - - 3,735
140 Resurface Column Forms 595.01 SF 1,038 595 - 1,633
150 Column Embeds 288.00 EA 5,022 - - 5,022
175 Place Rect/Sq Col,5000# 110.19 CY 1,898 8,489 - 10,387
195 Pump Columns(36M-45M) 110.19 CY - 303 2,314 2,617
200 Cure Columns 72.00 EA 251 72 - 323 •
205 Patch Square Columns 5,950.08 SF 4,040 714 - 4,754
225 Column Rigging Hardware 36.00 HR 1,004 - 1,004
990 Toots/Equipment for Columns 72.00 MH - 72 - 72
COLUMNS 31,217 14,569 2,314 48,099
1,14526 Labor hours
3600.000 STRUCTURAL SLABS
100 Structl Slab,Forming Subcontract 27,230.00 SF - - 231,455 231,455
105 Structl Slab Layout 27,230.00 SF 1,080 169 - 1,249
110 Structl Slab Safety Rails 1,200.00 LF 1,674 1,200 - 2,874
175 Edge Form Structl Slab 1,200.00 SF 5,580 981 - 6,561
180 Strip Structl Slab Edge 1,200.00 LF 1,004 - • - 1,004
185 Form Structl Slab Blockouts 840.00 LF 2,930 595 - 3,525
190 Strip Structl Slab Blockouts 840.00 LF 703 - - 703
225 Chamfer Mark Tendon Locations 208.00 EA 193 31 - 225
230 Wrap Tendon Ends,Structl Slab 480.00 LF 536 120 - 656
235 Attach Tendon Ends,Structl Slab 1,488.00 EA 5,931 208 - 6,139
245 Patch Tendon Ends,Structl Slab 1,224.00 EA ' 1,231 147 - 1,378
275 Structl Slab Cleanup 27,230.00 SF 781 - - 781
280 Structl Slab Pour Watch 27,230.00 SF 808 - - 808
315 Place Structl Slab,4000# 649.88 CY 3,607 46,060 - 49,667
367 Pump Structl Concrete 649.88 CY - 1,787 2,275 4,062 •
Slabs/Beams(36-45M)
395 Structl Slab Trowel Finish 25,920.00 SF - - 9,331 9,331
418 Finish Structural Slabs Closure 400.00 SF 543 - - 543
Pours •
425 Cure Structl Slabs 27,230.00 SF 228 817 - 1,045
990 Tools/Equipment for Structural 2.00 MH - 2 - 2
Slabs •
STRUCTURAL SLABS 26,830 52,117 243,061 322,008
986.83 Labor hours
3700.000 TOPPING SLABS
270 Stain/Seal Slab®Retail 2,380.00 SF 598 2,856 - 3,454
TOPPING SLABS 598 2,856 3,454
23.80 Labor hours
4200.000 UNIT MASONRY
500 Balcony Pavers 0.00 SF - - 0
5500.000 MISC.METAL
105 Purchase Fabricated Embeds 160.00 EA - 2,080 - 2,080
110 Purchase/Install Shear Stud Rails 864.00 EA 2,678 19,008 - 21,686
300 Artist Loft Stairs 0.00 FLT 0 0 0
300 NW Stair 4.00 FLT 124 18,000 7,200 25,324
300 Library Fire Stair 2.00 FLT 62 6,600 3,600 10,262
300 Apartment Fire Stair • 0.00 FLT 0 0 0
335 Metal Grill©Garage 400.00 SF 201 2,000 - 2,201
7 GLS'Construction, Inc. Standard Estimate Report Pa!
' tkpavillion-scenario3 4/22/2002 9:22
Labor Material -I I- Subcontract I Total I
item Description Takeoff Oty Amount Amount Amount Name Amount
MISC.METAL 3,065 47,688 10,800 61,553
110.67 Labor hours
5700.000 ORNAMENTAL METALS
400 Awning/Canopy 399.00 SF - - 17,955 17,955
i
ORNAMENTAL METALS 17,955 17,955
•
o.,=
6100.000 ROUGH CARPENTRY
i;; 100 Blocking/Backing,Treated 1,800.00 BF 3,081 851 - 3,931
240 Treated Ledger 144.00 BF 201 68 - 269
250 Wood Framed Construction-Top 0.00 SF 0 0 -
Level
ROUGH CARPENTRY 3,282 919 4,200
�F
F.f 117.63 Labor hours
6200.000 FINISH CARPENTRY
200 Wood Base 0.00 LF 0 0 -
• 210 Library Wood Base 1,100.00 LF 2,273 7,194 - 9,467
FINISH CARPENTRY 2,273 7,194 9,467
81.481 Labor hours
6400.000 ARCH'L WOODWORK
100 Unit Cabinets 0.00 IF - 0 0
% 100 Library Built-in Casework 45.00 LF - 8,775 8,775
100 Levert Built-in Casework 95.00 LF - 16,625 16,625
ARCH'L WOODWORK 25,400 25,400
7100.000 WATERPROOFING
115 Waterproofing®Balconies 0.00 SF - - 0
7200.000 INSULATION
120 Perimeter Wall Insulation 5,600.00 SF - - 3,864 3,864
125 Garage Lid Insulation 7,700.00 SF - - 5,929 5,929
155 Dryvit/Framiing @ South Elevation 400.00 SF - - 8,400 8,400
155 Dryvit/Framing on West Elevation 1,040.00 SF - - 21,840 21,840
• 155 DryvitFraming @ South 720.00 SF - - 15,120 15,120
Bump-Ups
155 Dryvit along Parapet-North/South 575.00 SF - - 7,475 7,475
155 Extend Dryvit/Framing @ West 0.00 SF - - 0
Elevation
155 Extend Dryvit/Framing at 0.00 SF - - 0
• Perimeter(8k)
INSULATION 62,628 62,628
7500.000 MEMBRANE ROOFING
200 Built-Up Roof w/Rigid Insulation 13,650.00 SF - - 75,075 75,075
MEMBRANE ROOFING 75,075 75,075
7600.000 FLASHING&SHEET METAL
100 Flashing/Sheet Metal 1,200.00 LF - - 16,800 16,800
FLASHING&SHEET METAL 16,800 16,800
7900.000 SEALANTS
El 120 1/2'Color Silicone Caulking 1,600.00 LF - - 4,000 4,000
SEALANTS 4,000 4,000
8100.000 METAL DOORS/FRAMES
L
100 Hollow Metal Doors 3'x 7'-L1,L2 8.00 EA 223 1,440 - 1,663
105 Hollow Metal Door Frames 3'x7'- 0.00 EA 0 0 -
Apartment
105 Hollow Metal Door Frames 8.00 EA 223 1,160 - 1,383
3'x7'-L1,L2
.,, METAL DOORS/FRAMES 446 2,600 3,046
16.00 Labor hours
8200.000 WOOD&PLASTIC DOORS
105 3'x 7'Wood Door-Apartments 0.00 EA 0 0 -
105 3'x 7'Wood Door-L1,L2 5.00 EA 225 1,375 - 1,600
110 3'x 7'Wood Door 0.00 EA 0 0 -
Frame-Apartment
110 3'x T Wood Door Frame 5.00 EA 225 750 - 975
`i
GLY Construction,Inc. Standard Estimate Report -' "` * Pa
tkpavillion-scenario3 4/22/2002 9:22.
Labor Material I Subcontract I Total
Item Description Takeoff Qty Amount Amount Amount Name Amount
•
WOOD&PLASTIC DOORS 450 Z125 2,575
16.13 Labor hours
8400.000 ENTRY/STOREFT/CURTAINWALL
100 Window System on Apartment 0.00 SF - 0
Level
100 Windows-L2,North 200.00 SF - - 6,600 6,600
100 Clerestory Windowns 0 South 360.00 SF - - 11,880 11,880
Elev.
100 Window Opening on West Elev. 72.00 SF - - 2,376 2,376
135 Storefront,Entry Doors 11.00 EA - 22,000 22,000
175 Curtain Wall @ WE/S Elevations 6,240.00 SF - - 280,800 280,800
175 Curtain Wall @ Stair 496.00 SF - - 22,320 22,320
175 Curtain Wall 0 Stair-Extend up to 0.00 SF - - 0
38ft
175 Reduce WENS curtainwall by 3ft -780.00 SF - - (35,100) (35,100)
ENTRY/STOREFT/CURTAINWALL 310,876 310,876
8700.000 HARDWARE
205 Hardware-Apartment Doors 0.00 EA 0 0 -
205 Interior Entry Door Hdwr 13.00 EA 465 3,995 - 4,460
(Man-Door)-L1,L2
HARDWARE 465 3,995 4,460
16.682 Labor hours
9250.000 t GYPSUM WALLBOARD
100 1st Floor GWB 6,420.00 SF - - 39,804 39,804
100 2nd Floor GWB 7,200.00 SF - - 44,640 44,640
254 Wrap Interior Columns,2'x 2'x 3,840.00 SF - 13,747 13,747
10'high
260 Restroom Light Cove Soffit 16.00 LF - - 960 960
600 Framed GWB Ceiling-Restroom 800.00 SF - - 5,600 5,600
a360 Parapet Framing 1,500.00 SF - - 9,750 9,750
t170 5/8'GWB to Ceiling 0.00 SF 0 0
t180 5/8'GWB Ceiling 0.00 SF 0 0 -
t185 Tape&Finish,Walls to Ceiling 0.00 SF 0 0 -
t195 Tape&Finish,Ceilings 0.00 SF 0 0 -
GYPSUM WALLBOARD •
114,501 114,501
9300.000 TILE
100 CeramicTile-Apartments 0.00 SF - - 0
100 Lobby Ceramic Tile 1,994.00 SF - - 23,928 23,928
100 Restroom Tile Floor,Wainscot 800.00 SF - - 7,200 7,200
TILE 31,128 31,128
9500.000 ACOUSTICAL TREATMENT
100 ACT 1st Floor 8,050.00 SF - - 10,465 10,465
100 ACT 2nd Floor 13,600.00 SF - - 17,680 17,680
ACOUSTICAL TREATMENT 28,145 28,145
9680.000 CARPET
100 Carpet 0 Apartment Level 0.00 SY - - 0
100 Library Carpet 1,511.00 SY - - 43,819 43,819
100 Level 1 Carpet 244.00 SY - - 6,588 6,588
CARPET 50,407 50,407
9900.000 PAINTING
100 Garage Painting/Striping 7,000.00 SF - - 1,400 1,400
105 Painting-Apartment Level 0.00 SF - - 0
105 Paint GWB on L1,L2 18,260.00 SF - - 8,217 8,217
305 Paint 0 Precast 3,456.00 SF - - 2,074 2,074
PAINTING 11,691 11,691
10150.000 COMPARTMENTS/CUBICLES
300 Plastic Laminate Toilet Partitions 6.00 EA - - 3,000 3,000
COMPARTMENTS/CUBICLES 3,000 3,000
10520.000 FE CABT'S AND ACCESSORIES
100 5#ABC Fire Extinguisher 16.00 EA 112 736 - 848
200 Fire Extinguisher Cabinet 14.00 EA 195 1,134 - 1,329
300 'Knox'Box 1.00 EA 50 340 - 390
.
GLY�Constru
Construction, Inc. Standard Estimate Report Pay,
tkpavillion-scenario3 4/22/2002 9:22
Labor Material I Subcontract I Total
Item Description Takeoff Oty Amount Amount Amount Name Amount
FE CABT'S AND ACCESSORIES 357 2,210 2,567
12.79 Labor hours
10800.000 TOILET/BATH ACCESSORIES
2 200 Toilet Paper Holders 6.00 EA 56 128 - 183
205 Seat Cover Dispensers 4.00 EA 37 134 - 171
1 210 Napkin Disposals 3.00 EA 28 95 - 123
215 Sanitary Napkin Vendors 3.00 EA 67 780 - 847
220 Soap Dispensers 4.00 EA 28 186 - 214
225 Combo Paper ToweVWaste 2.00 EA 56 636 - 692
Disposal
230 Paper Towel Dispenser 2.00 EA 22 109 - 131
235 Waste Receptacle 2.00 EA 56 160 - 216
245 'L-Shaped'Grab Bars(36'x 48') 2.00 EA 32 199 - 231
TOILET/BATH ACCESSORIES 382 2,426 2,807
13.68 Labor hours
14200.000 ELEVATORS
300 Library Elevator 2.00 STOP - - 30,000 30,000
300 Apartment Elevator 0.00 STOP - - 0
• 300 'Freight Elevator' 0.00 STOP - - 0
ELEVATORS 30,000 30,000
15100.000 HVAC
342 .HVAP 27,230.00 SF - - 176,995 176,995
HVAC 176,995 176,995
15400.000 PLUMBING ,
340 Plumbing 27,230.00 SF - - 95,305 95,305
PLUMBING 95,305 95,305
• 15500.000 FIRE PROTECTION •
100 Fire Protection 27,230.00 SF - - 35,399 35,399
FIRE PROTECTION 35,399 35,399
16100.000 ELECTRICAL POWER
100 Electrical 27,230.00 SF - - 168,826 168,826
'ELECTRICAL POWER 168,826 168,826
16700.000 COMMUNICATION/ALARM
100 Fire Alarm System 27,230.00 SF - - 27,230 27,230
COMMUNICATION/ALARM 27,230 27,230
•
18001.000 GENERAL CONDITIONS
100 General Conditions 30.00 WKS 123,000 36,000 33,000 192,000
GENERAL CONDITIONS 123,000 36,000 33,000 192,000
•
•
•
,,i
GLY Construction,Inc. Standard Estimate Report x A. ` < Pa
tkpavillion-scenario3 4/22/2002 9:21,
Estimate Totals
Labor 258,869 5,135.128 hrs
Material 304,466
Subcontract 1,725,799
2,289,134 2,289,134
Labor Taxes 119,080 46.000% C
State B&0 Tax 25,096 B
Renton City B&0 Tax 4,302 B
Safety 3,883 1.500 % C
Warranty Expense 6,104 0.250% T
General Lia.Insurance 17,926 0.500% T
Fee-Percentage 147,931 6.000 % T
324,322 2,613,456
Estimating Contingency(%) 343,370 15.000% C
343,370 2,956,826
King County Sales Tax 260,201 8.800% T
Design Consultants Fees 354,819 12.000 % T
Permit/Plan Review 13,306 0.450% T
Total 3,585,152 131.662
,
• .
•
. . .
• .
a• . .
• . (...)
3. c" . •
... . .
....2 6,
—.....__ -
-... .."'
• .
. -
. .
.. i
fg'
1 1
7.,..„.11.• I4I I.,' 1 .-- - y.frai." '..§..: r. •Ei .p. -7 I
Pr* ..,.-,'''..:1, t .
i pl,e , ,
t ,..1 ', `•-
4E01 .'t '‘i
• 9 ' '
.1 •:4°,,,A.V:,I ' 'l . LVT ,`,., • LIZ ',.; ...' 'if . '..
r .
'INtirclf: iii:,,•::.",,r'll W...
I
i*A .,
.....I''' .I.-,...;1'' • ;- ' .iIi?!' 1
" '-..
' V IRV Alt ; 1.,A0A
' 1" \
:.-
,IIIIIIIAYd NIMBI
.
. . .
in i iT
,' .s•P i 1-
• t ,,; ,V
L.... ,, ,r,.....I.7_,N__-____I
lit
Z_ .„
—
- Oli LiT7- I)
,, •
• r---,,,,,. !
(.1
i '"---7-'-'''
,, ,'''`f h,..,, 16 ,,t,t...c..,21* sj..,..;:wo,
V l?fr#,I k;:,.4.
--_) ---.`" "ZVI Jo) : ' -, 41.,,',.i..- ,ft-.7..r. -,-.4'11.1,,
.,,, .'...,-0.,...-1. ;!g----'1,,,.`;',.3-;;Lsio. _
• ks
It'civyjy.,;xt-.-t • - •• I. .. .•I
''',i ;:72 •-•- . v ' '..* .'
I '? '. Z.. \
Trl
IIr ci ,:,,
7.-;.. I.'` , IA )...,..,_.1-..). co •i '•C'e;
' • el,f,,q. !ill,. 1 , ' ; :
• . 4;• I :to • r 41 l • '
-'.... ..J 0, , A. C:26E 4 It't''''''::::414: .., •
.. i.,
I •,`, ,4' , ‘,
.. . f
1 EV1 1 : I V)A N 1- '('' '• '''''i '...r"" 'i I o.. , ,; I
,. +...
; .
,I 1..,42-.4?::',',.. •';'' •,....:/1.;•.,,.1'1, F ' 1
. . . 173.2 b , h 1.1g ,'1'+.F..11%-'''',1'.'''''' 1:i'.10';''''''• ;-'
I vc:ratlAt•
'''.7-1•.• ' •'4',0?if. -4 It'P'''. " ' ":' 1' '/I.';' '' e.,Pii A. •
—.'-- . , .. _0... ..r.' • I .
•
... ..,.... . .:. . _ I
.. . Nammaiga •• ,.,..ir • 1 I, ,.:-;,:ii.':14 -.
.1; 1 -"• • ii,,,'.;,f i ,:,1,.. : r, , ' .; .1. ,-;.
Or' . r.Il....._4.„4-4.
-MI' 11
.
— r -r
. , — ---N• •Pl-I4
,`I
....::,. ./"...
- ----. .''' / I; "I-, ori"4 I , T:'',kt,rre.hp171.1-11fr - 1
,...i. i.• t,. .-P.: ..\ .1:.--!. ,.r—r.z.-' -''elt ,• ‘.#444:11A • 1 • • . td 1'
. , :,..• I.- i • ; ;';;— ;;
1 4'•1''
,i. 1 ,q i
) , 14 11114. rifgli
.,..,... ,. .;IA,
Otill - ,.w .. •• r. '-•,,,-,P47.:,.. .7,,.K.m..,?-14.. , 1,1,
.,.1.: $.1:44.,•i.,,,, ,f.'
.: • ' Y''' .1.dff r' i0.,. . ),. 1.,:i.:2z.,-,1 :. .e.
•
...1 • l .-'• :' ';• I ''
I '-`'I •I ' '4"'ck,„,\>,j4"-)c,I-4. 't ItiT*ITh I.I:.I.',..II‘ .I 'I' .
.-• 1 4. I , .4%.....1 . -I Of ii-II•fe I;I-'-',..f..:- , ...; i '4'
rl
.•"1. ',IL 4 11, 1 1411ilf 1 ' , !.''' 7 . 'filr '..
..'.•i '1 Ill.011 • 1 4. I 1 I.4,:71:P.1 1 I-7 '*'' \SiCk4....''-\''.'•".-O'Ll -7%'`-'1-1:':.---..:7"----:;111..r.%..
:r;I 1 14 I I e i' , \ \7',;eg'-''',•';L Vi 1, "::+4''•;,Q.5 j ['J.' -
.' -I • 4•;IV •
,'
.. ',1 "` ' 't.t,1 01$.4(Aft,`i ; I:,' • 1 VA i I I II . ?ve.. n t.i i... ,- .,,,. .., •,,,i ,,
.41.1.-V.9i• -:l 'i,),W ' LI.— 4,,,,tp,'y' AA..4 ',i;::51. ! 141 i 1-y A. --, ,549fr'f. ':L.;;,_,•'-'•,i'. ; ..4:.x2. .,.,1,-•. ,,,,
:1>i...1-,-.'".:-4-•=-=•--* ,!Psi `,.',.-; ' Thvgti 11,,,I,
.- 1...k., ,1,41,4i: ..J,f ,i. .: , a, ' 4 ..,..,. ,,,,,o.., a..,„
'2..._..._? .i.iii, 1,:-..,,A - 1----- .4 '..: W...(81/.1111,
.. .77.7.47..'"?. '
i .
•
.
,. . . • .
....1 r„ fi,kl, ,e ..5,..\
' . •
•
• .
' .
•
. . .
. . •
•
•
. a
:I
• ..
•
: •
q. .
•
• .
• •
•
-',7t
Ip
ueuA 1 1 1 1 I i 1 1 I i_i t
sasnlris a I 8
-- ;I.--- ,I_,— ----- _...T,' I lgl' `1.2'. L T
+t," 7 eA WA , gi1 8
, V.U'•tf Ai
ilk .,h -1
igiii I 11;•{ -e 4 ,
itl ' ' l'
lig C1 FT-
-- IIIOOdN`iJ go i ;i9 Oh'
Iiia t 1 ar;
lip; f r� 14l1 1 :�. 1 1 11 1 I 1 I
11r..n e," Y .5�u m'�i'I�`-��u� � 11�!e._d±�°I_�,I!�a�rllit�.. ..._L .� 1.. I --.7-1'1=,.--.� I i
Kiligin
itill II_ 1 _:.... • +�EM1I111 ...-_ ..
tl�,. Pi': 1 1I�y y� cif ter: —�1 I(:
al �Bel'iauy::A�ciryMi�3-'S,t�� p' , `- _ 1�
LE Mtntf11lf I !
1 5 P,oh u-x ..„1,,_ }�,•LL r'W'., r I :. a. I "—E�'.11' ' . s a^�
,111.0 M i G:`f Pg7�Gx; � t, A Sv, 1 1' 1 •' 1 IL _ .1__f.l 1.._
ii hit +;- c. r ,r a 3 tr l •_I , , ���
a
earA d7 pn •r .rr 61 pF tllq 1x , I
21 _
�� t� jl• I �.r,I�F.t,
v1�� fi " 3fl , , i+ El
I F_ g
�l^"' Fu tps+ �tFF`� 1 _I' 1• ^ L�11 .III' 7+ 5
'f43n '11 _-fri1 1, '1
11,. •i s . s OF
ilw Ei`I ti 11li.;, -tf If 1l' j o .ala
„;d 1 iiI• It 1 RI;;4. . -41 — -- -- - , g
:+sir-:9 3t(,@I"x;,' S"d v.A.'"iir "`i'h _ +-i tl1"3- _-- I --,........./ _- __-......-_.._-._--..—
�'�x +�r.z�i?="v'ii3rr_:is311,e.=€ii9".E`7'•- '.F;-•;;�. �. 1:-..._--
5
17ID1f PCNWS "1': e ` r
•
•
. .
L..... _ -
, - •
___—..--,--- -.., , .- • - -
•.,. ---. ,... . •i...-,....., -,' / - ,.,,a'''''',.- "' •
'.... ' ' -14 7 • -.,...2,t, ..,.41
..:,,.". -- •., .%7"....:.,--4-.7-44.ZW-- ---,.,,',.".;'. .,- •••:-• LT;, .•;,,,...-K4,0-•-• I
' - • . ''••••..,-.N.1.'4
.''• ir'W ' as'''`.-
, • la -pig, •,--n. --,
KO•••-
‘-; ..--,71. :••-• ••••••...-`' .:.-riki'-', '''',.:;,',./ '44 ---a'v ••''' '''.. -\%...}4e ••• • •• - . •'...-:•••'.'",;.-.V,s..t-iiV-P-5i4v''fr ,, ,, iie-•-: E.
e,,,,,,e's\: ...1„?..i„c 1„ • :•„,--••••"' 251,:1•44.1.4.viii. W.,41.,,,A. 1......, -...., ,„te,...., :,:..
• .„ „.......-?4,11 ,4.4.re- r_t...-•tAii,,,. ,.... ,.„...„ ,,,_.\\-t
..... , .-)' `,....„.,.. ...-, .
"'-,...- '"." -'N.*' ..•, •• 51....':.;:f.r.M..r.r,4.,..1 .....r,..4-..- .) -,,--. Vk
'*r.\\''•^4 •-s.-'h..;,.. ..04.Alic0,....-'". ,-,.--.',17.ttl' --;',..0r: - .7St.ii;•
..,,,,N.F.' •:;:.? ..4."..... ,...
t.,.'!.';.,'-‘, -...;1.:r.,c \i.. , a;VP-4'4,q'41.fry..15.1'.. ...11..;:••:!. .:!.- ...,%.' if
\ ---.A..;,,,,A,..';.,:gi.5 --5;;Vgir,A.,,,..., ' '..-^,,,,,r;;;;,..1.<4.,,,-,..-;----.-”,, ,-• .....-..s.,* 2 ./ffito. :,;.. •,:..,?-4,•- ,".
\ it•-'..=<,,..•••-s7.,."'",:l.- -.• „S,'5,--t,r-r0r.\ - .w.:.A,..."."'-.1--;'"-- --- -''-, / _el,,. .p---,'" ,,,,
•
\ `"t:"..:1',;••17„s,N ''''.:k*L\It.NiVal.ro.S7V% ..- , - ,,.,..,-N- L. /.17.-.?_.z). , . ,y., ,,,..
" s, i.s, -07 -.,.; -.‘ ."•.=`4,•:"-Nts.,..,.:,,-.
' ... \Al,,'-,,7,,.7....,.5.•.:-..'"4.•-•,,;e,,,,A,.,:.7i( ,*.1. --**• ,"-.-n"":"•v:s-.:,-:
‘ "..,1.-.1-.-;.,.„-4-4'-A.'".'..."•.>2-N
::s•:.e:,;,-.„'-/:1.--..-=NT1--'.-./.,.-%..„,4-‘•,-.-.k.-:•
.-•',.,, :
/
.-cZt s.,•.. -,;\ •,,•`'S.:;” \„.
9 /
..., ,\:„...„„,, , .., . --,•,:s , -,,
,---- - ' ..'''• ' ,,,,,, -ristk, \- ,:•-
,,
— .
,.,,,,,.., z.it,,i,.:csir . ,, 1,,•• es —le. ' I,- 'ri
.fr:::, i..0 \ • r:V. ..ke.•:,••7'ilf , e, ), .“,
'''-'(` I/
' '--,..i
. -;•••
.i4,-f.,':',..z.-,'''1.!-i... .;',-'1 t-f.4',.• ••-- •,...,:,• ', .e' -,. f. ---. .,‘
- .
11 7:,...:z7.,..,,,......i!..... ... ,)..i rA-'1,-.. ._,..,A..4....
1/4-4...,..4
I A,;•,:r.,---..- traormicree.;;;r1_,...". A.,---C-'• •
, ..- .9°4'4=..:1:::;-.2-,41\.•:-::• ..-A,..v,..1. 9..,----,---,--..., ,,.;......yr.-'e....,:N...c.,..
•A.-A....;.-1A--,.-.14,6"....... ..-0•-z-." t
.4......".... '''. '2, ...,4_
.111
-,-,,,..,•:i.,.>--
.- ' ',-- ,-. ,,-,. -'V
1.../.,. .__-•-.
-.=-..' . .,.1.-- ,.i, ..1.„
-
1.4
.,-•
Ti . .
-..',...,.,
.1•'A .fflt ?",',..e,,,..•.4-a..
. . . . . .
•".i t.ti
Iji-V--- .
:.4.' .. .,%•• .e:....1:'''".^-,.-- I l',."-:1"t '''' .
4.. ' ....,,
41.,' .. *. • .;,..:,..1 , ,. ir,,,..*1 IL ' 't „.;,
•%,",..., f ., ....,3
''.?,'`,..X1...,•_- • ''. '''`-.:..'.
•
'' -',x-e,•,..,,,....-,, - 4,74i ; ,,,,--•,-k.,,,,,,,,,.. .`.:‘,.r.V.,3..,I,):...,,Z
-...!le.:414,,t [ ..',"--_- IV .,.::_:;. '''''',..-4,..:4111.11111111 .......1 .4- -.1' I ..,?..ZZ.,^4, •7.4,.., 1..o.• .
-----....,-;;---
,.„,,,,,,,..,,,Ipx ti•,tr-tir..••' ‘• ••=•""'" ..
- -•".•:•.°O&D.A3: ,.•
..,
•.,.. 4.. '
...%•41.t;t:, --.7.4,,,
• ...,.. ;:::!,-.. .:1 •-., 4'}i '+'•.1,:''''':-...41:.'":
... .245,:-.- :
,,4.--,. itglaWk-.41..- ------,. ..,..i...::,:•,i, . -..1
....-_-:,,..—.,. ..... ...et•
.,,,-;,,,-, ,:-..:•.-.- --••.--,: ,1 -:2- ..,,4, •
' , "E•-•• N110 ..,-"tif ...
i•,,s I-
A ..
:Pj-.-'.,..
i.....•..-... 1......., . q
- - ..
'." .,. --...,- ..—r---
--....,_-- 1,-,, . ------7.,--..---, ----7\-- -' - / ---, - e,-.:-r_74,..51;
., i•,, _..,-..:.„1,01. ••••.•". .-- ..., h -:----- b . -- r ........,44.p..-4-_-"!•-, "-- ...':44,-,"
' ..), „....., . ',--......
1
'---1'''-- -'-'11.-.....:• _.......S' .i.C.-A,-.1 . -....",..' ec=.....'-..!',.:Ta'.-.-
s ,
•
5
•
•
•
VD
. .
* .
•
lialAtrialball'
• •'• •• '•" "• I- • 1 I .i :
97 .:....', 1 . • „..._,v„..._•1,_._._,,..-,..._,_._
.F.J 1 . ,• " • •,! ) -...:=•,• .___
• • • 4-. ... .
If.•,.‘;,,k;‘,„-ct,,,.• " w • • 9:4i-.; • 1 • ; ,. 1 •,, r.•
t.,,,:.,;,,N,,i7::-.,...,4: ,--.••
,,,,,,,*,A
,,.LI.fcil• , .„ •••i,....2;-!.'F.:• 1 - I .13TAIS CH IMPS
I l',H4 '117 'Ti
'41'7 t7;; -diflui ._• p_ ... .
ts,.....
... ,,,.. i A• :— • 1
•
•,\ y ,,'1•,-, - f r-J:.--i'n,1;n,tq,r',cr,t, I..----
\•ir p. .-
•. •••:,, r 1
•,
4, ,..,„••••f .•?-.•21. •II ,e3,...6 ,.,.,,,I,.,,,..,,i ,, ..,„, .7-1 ; •,,, • ••
(,, . 11
,\ ;•,!:•.,A ..., ie. , 4, ,.., k,_:,, ..„.1_:i• ..,1 ..:.a . . .
41`' .. 11 • L.I.'-sA.-1,7 I, '4
tl'r ------------ ----- - .1 • (:*''' I: I er'
!4•;;I;:Yr- ••, 4IS
p1,0,...>„
IFI:!-;!ui ; _1 1 .___ ...__cy .,..,..._.____,
. .. .
.,... ,, .. .. . .
• , i A ''-'7.1 .i. ii00,- Oa'
I it
:._,F.ILL...._ il
i I tuk4'4?iAi',11,1.',i+-i,6•4'...4 j ! 1
. ig'-',.•,:..7-:-...;-•.'..- '.;,- . 3
i
_.i 1 I- t 1 1' : Li I . 1 •
1 v
vueRwii..1 . I • :_ i. , i 1 5
t iT-'' •-!1-1--; - . i,- 111.,,'1 l'. ,
II-• I.,: ,. , , , -,----:-,,--.--•_ -.-• -..t I I Roil
till w•
rt . ihrun.-
--errilimar,,_.;...,1-.7i ,g. 4! - 1 74'
. . .. i 1 , , , .1 0 • --'-'--0,1,- - • ' "i •
.. ..
,„, „,_ , ,.•
hil ' ,';,-, 1 . , - • ... “7- •); •
- - • '. -
f . i. . ; . i• i,,41 1-7.--; ' ' '
116111ti lalfall: ' 1 ' • - 'I ..,,, '• '
•• 1'MEC - p .
,,,,,:til . :. •1..._ -,--• -; rz,„..., - RI II r;
_ _I.I. -- - ii i•i;?.•11--.,), -,.E.i.: #-..-• i f I .p - 0 krf . .-ilig• :'!. . • till (,,, i...,:-•
, --1-„..i •-••.„. H .•,11z4.g_l_gt. ,', ...E..._ p.. . ..) .,
... .:1!'I,.
. .
;.' '5412r4'244111:1-,Mi$:' 1Y: . ietA I LI' 4r,..-ril -;m4w.•••••%t,:'1.-,i,"; ;Riiii-f-.ii!'th- ,:.) ';___";,;
igAiribt,.ii;1 .:;:;1..,,,,e,::::3 ,-Lgi,;;.--3-0- ,••, aq-
kg t-• '' solowini • ,1• .... ris aq.,•,• '• • 11,...I
-Efi'w 1 •;:i-Lii 1. - "-01000.,:K,-- ilf.ii.,-,-,., , - ', lf,..!.
• - ut,, f q: ,..,',4 ;J., .; .ig„:„.i.i: • ,;•1
i-I.,'• • ',• • ': . ;, g plum] 11 . Cil : .•‘% t'.: n
• pz - -v.,. -,.:-.,- .,9x.'4.4,,-...„4:.4,,,-.1k. 1
.4,....”.:1- I 0 _ -,....!.::;,:--?-,:tt..i-i...!..?,::, ft,7,04.% • ..., i':
..,,,i, i.,..,..:_ ,•: .....„ :,:16. 4,,„, ill ,,,,,r,I H.:•,;„ .. ..:q 1 ' ;!,.„.t5w,LAT t •-••.1... .g.:
i 1 L,,-.= 1 ft'mil-1 =:•4-ii 4,,. 1,
) '/;'4,';':'' i '.-i!'3i-ittp t i
Ir..V.:`1' • ! ,.Ui4ilik,—s3.-iii5•t•-• .-91.r,t .,..ri_:-.,,.: t,,.., . z .01,,tp;
,•,..,. .. , , ..0 I- f.!I' , t. • ? ',..: P.
1 ....*i4-,*'4.441- itTrri,, ,,,,,,,..F,In'17,..ili'Il;,.. ,
• -___.- .- tI'• /-
"---i•'2 Ifilff iU'Inalir WM'Plf''':Ja'retiiiiiiikiikilliArl 177- 11:11.Rs
'i 1 I
• -glafife 11, ' - 'i
ill'Il'''•;:‘ 1 .5:-..,;.;.: ,\ .; -4) I I 1. : :;i1L..11' -...• -•.?: i I ITAISIIIIIIIIM
.;•,;_,_„,4 ; .., -4.
2i,,..1,0,•'; ''' .•-i`\ I 17RVIA;)/0:0,11:1L,,,i,;•.-
•,•, .
I---' ' '
.. .t.i.....
. . se ERMAN
I 1• . ;1 ' '-cc:,'"qi,I.
• .
h
i qi•h[tds tS•e•16[ ,:e;-ih h i tt•-•is-,,h, • ' - _ __
___,L,
"'''. so,,x1. , II..•p
E 8 — _
,..... .1,-/911 _ 1 m
i q-Ig*-1§4 h LA45 I %[k 11111 r 1 iyi ,.,,,,..,,, ,,. , i
• , 1 }
i (1)- In-..ur^-co. ,..- •.....3, (0,:; *.:7.15'.',-Tk L„.--Itz,.;• I 0 .•
L. E ', ,s, 1%ill #.' ,,,,t4:. .
.),,,,-4,
' iNV p. •,,,ie,,,,,4,,,
v :43,-,.,t niedit. *Ti. c•.\ .
,,. .. i,,,, ,,,,,.•„, Ni,..,,,,i.......4 4 k '• t,et
/,..' styje oil Iff-•'''0,:`\:4'.447'.):,',41-\
? .2
4
L ,
t. MIll
f„.,..,4,,,toe,r.:%s..v4\I •P%1),/mi,,c/,,,:c4. MI
'''''Or-''' , ,i • • •* .''', :i =•\ '
f =
IL,•Zirg -1.t__ J___/•Li- 1 • .1._ J ,_p dl .1/- %i'-',.N "1"‘• ' '"4.7.-' ' -PM' igif 7
1 i 1 i• 1 1 l \I.A
2 i 414„..:1 .., ;;10',,. s -
'IA- % ,,,,,f'z ' 5k A-,Nv• . k#4',,,,,OHA i"
2
of OE 05 f 1 f tg x tv-=h.Vkl 1 1"41"4 f ,.'''''.-,..11,t,""t''';,:e .:,'",-;. ..--":•'4‘1:1,,,i o . 1,
— . ,,., 7$
, ,r , ,, ,
i.,, -•.- 4, •
: - -01---Z 1 E ,,,, 4..„,,A4 . , ,--,,,,,,,,..,,,,,,.'-1 1 ''/ - I 1
''' •',A, '":c.;;; IN -ri••••\,V,...‘,`gt4ifiC''1:7'
•t •'• '1-..•‘4, '.2,,,.`ss,5' 7.,47-1 ' A" 'I::1 /e.t._.3
,i '.'r' . '.'2.2' 't".- '11'Ail, ''(k •‘: 211,''' —r;tira I ,2- ,...-0-- 1,
.,..
4 . . 9 . . 2 . . . 9 . . . . . 9 . . 'Wcfl <!''-,>.-'
'--''J ''' „...;00, "7. ',- z) ....-...
6 t, ---•
- •is q=-41., -1-.4, ,j --___„.- ,4 . - .-,,0 4,-.•,s ,•"',. •4,4) i ',,,,,,L,Pie-„, .
i „,,,,,i,_ . „, , ,./1 , ,,,f .'.-Q,•,at`p•4 -6'''''CIA1,:ki ‘-'/;1,'`'":
iril , i ° 1 °I ° ; ° ° 1 °, 1- , ( . 'Y'',',.rtt4k,1•414.0t• :61,,,.1, ,..?„...... - • li• t''',,,.
A A I---
, .,
° , k 1 . ., .,.._.,,k .f•fi•1/4t
er 1.4. ,t,..., .,i it, •1 .-4fs,
i--' ,5;
;11114e ig
Li
1
_..... : : k22_,,
1 ' •.A., ... F....- ..„ . I c7motpvii:. a , m
x.ru•
a
I
ggg � eiv r.,-a,.C--aZS'4,-T tN�....i tl `i`} ;'I'D x�r 4
i ! I : "xz�xfre
. \ ii a�. i,°
' {µ
f l�T.,.tel f4? 1. � .h i7. 5���!�_. --I-- 1.
• it lig `
v '11 Ik I 4 J t j ji + ,V -7.‘,,.1 ',.•,:.
' .11,.,;,:,ery( 51 �� {r�y..he� �9-1iltll. ,' �c,.._7_'_'
•
if :
WHOM.FAME �' fi,u[7 (l, ,,. 4 s
j tr,rw,� :' �II j ,
•;x, I, 1: ,t+Jam: y' i
nv,.u3^m i 4 ,.--,•T=ay•r-
qg� • ;zklili. �xeTM
^ I
11.-___=:,=•,-,_-_-.-,:.-71',_
12�- ---- -- a,.� t ;;f t fid:a
pt Sy ^' � r ai.: ic f � r: . 1i1 • t1 -rf-eL_ , r.-a-:'. 41 +
- \yte Y.x.,..,tC,0.4„ A
•. , ,,, -:.:„..,..2.1 i 1 1 . vt,-,4,4.:',4 •<.,fi
1
00
„:2P i a 1 t I i i ink 10 kt- o II ._
t'll. 1
i..--•
„.:,,,,,, ,•,..--,...,..__.. ....-_
tt.
„.,...,__ .'..—^• ---- „, .., .; ., p ., ......, • i. ----'-'-'” 71....4.,..„
I .
, ._I.-. .....f.1- .J. .1 ,
• • T,Iii" ------= ,,,,,,-IndTpw,44444001311.4'Via ri i•rgiVg.d:'11,,,... .2 It .-,:t.
,w; ) 4r-fel.
I
M i.•1' I . ' '"'014 ' N" 11;14.. , - C ..4.13
6 n ,F--
( I • 1 ., 4 ,, ,,, , ., 1,. 0 s
3 '
____( 1
_
1 1 : I 1 ' ''?' •'fi;4;0 i „, le, i ildalliq, .
hi•-'---7.--, v..----.-' is,-- . '' . t*'‘ 1,,--,..-• I*..,_..." , _..,,i'n-vii.'46. .r,A ,,,t L_,ii0 ilitithLIL!
111""4. ,
• Al?
•- '.." In ----1 : 1 I •I':: '-"•.,.'ili I/ ? 4N, I I h',.!.
"=r1--P1---11---- 1 ' 'd n ---'_ r.-- F. . • .--
;_::s. ''..i :•I 4C11! 5 g ' IL-.L.1. I,al gr I,:' '''''
4 I• •--• .• P. 1.T "'''•'.
• • 6 - - - - - 6 . • fO5iii - - - 6 - - 6 (
IL „k4 I
i i=‘...-1--1 ' -0-0 .; •'- ' : 1-i, 0-,„;10.,.0;;-.q . v li,
•-.,", •(1 {_L ftglIPMFuem;4-0-allialliwi ii tie,
!, : I i , 1.,,J ,-1111111 .... 410. i i;ii- •
pi , 1 [1'3 _LI 7,11F;#41gunamo NA1 A
dkip'
g i ---,- i 1al r•,,,
1 • , .,... MIIINIMMOI Le.lea • ..f,, 1 InweLatrugagli
II'
',-'-°- i --,• limn I-- 1-,...;
ii:-,;7:"-'-'"'" -e-r-'fg 76,7.1 '-;i4-4-Aigq,1'. tim di:
•,....---,:,,'. ---,...„..61,--.., -'1"....."".'r,•.,4• .,%IV' ------
. -• '.. ... '''' III". ''' '.' .
0 ,-.., ,1 _„,..., iFio ,-. ,:.,,,,,
',..> ”il.--r
i 11 Ir4
i ...,=•,. q 140 EA gma" L_____11
I.- rfa "",-7.— , ',..,; •:.il-fic -1-1-6 #..„-•.•_. :',-,,...,.
: fi fi &me 1,t . "--:,.- g •' ,_,__..".,11,t- --!iliENV
-- --- --''---- -'IT!- .1 - -4'-?' -•--':' ------- '
L -6- ,., b., ••••,''
' ' ,I ' • • ,t, '.- ' ' 1 - 1
1/4.0
. .
.,-,--, ,.. -,...:-:----"..:Tir117-71,777.'-.:-------- 44•11
.,...„4_.,,„,--,,,, ,,,! •-...,A-,-....41.,,,:;,-..,‘! -.,.,..
•4— , ---... - rq.-:-1-03A '-.0....:
.4.-..1....x-,c - -, . -...„,_.,,, -„,„„,...,,.• ,
-O.-,-•-•/-.• ,e, N.. 4., b '`.7:1,
,;,..,. .•••A.:.: . i ' .,-a--:. -- -;--' .._-'-,--N„,---1-,-. ..-4.,..,.
?iir.:::,:,..,•:47 :_ -72,;;;.40.7%.„,„;--...,,-1/4:-4.., -,
,,... --w• ,-,*-.4.4'N.,', -,0, - ..--- . .;5. , •-•,?-.,,-r`A " -- .
•-,- -t- -,.\\q„,,,,,,.4..4.1, " ...c.,:" • ' ••'-'1'1'‘‘••:. '?rt,
,...!:,*: 4:fr\i .1 -4'S•
. 4ii••4-4A,-.-7 I''t ''' 41'..`' #11;-e.' .2)
ti,tte".1 , N.\,...‘ '".,I. '•.•..A. 1.1.',";
-t4:41, . p,'<.,i,.c*,....s,..,\ • t.....-
em• -i- t4-..;,-„,-\-k-P--, '\i
. .
. -,......
,1
__,_ _ ,...., - ___
p::-.1 ri-7,— ,-:re-- _ _11 i.
-.0.11,11..„ k FF-,-;,,,-,,,.....,.I.v--.,,..;-.N.....t.t J ?,-IN.-tr--'•-•ei,---,i-
-:1[:-! -P,-,-. r• '' .t. -',, •-`•,....r.-141"1-,•. :Tri.•,,,,--- 1 tr-st
r- '',.... .'',, ,----;"--P
....,:k: ---',.,-di r'i'''''-i 1'
—-•— -. -• ,, r,v _. , act_ _...-ii....-_II 1,.,'• ', :,•:.
-.4.--:-..,.I'`..-kt-,-.,-•.."7"
..--Z•••••:' 1.: ':-..,'Y.-7.—s,., "'4.,'%'.41;7-...,„`ST.a-rt.--P-71, -.•,"4L-t4`--...".4,_"7:-. .-Aw--.'' ,,.. '.:
-•‘-''' ' -"'•••'1'- \,..-.-'•.-,"7.:„.7. --,,"1,- ----- '"; " ''''--4,=';'---c.--:
_ ,z....1.....,.....-K.-2
-,..,,. ..--`..4--'''''1 L V--.':':_ -:.,,•-''.-f-,,,',I'zI't"it'll'- p...._ ._,- ------ - 1
' ...tr.- ,7 i,1- . X",i7;,:4-4_,is-j::--- ,..., '''•,, ,-,,,,,...$4,-„-..s,4,- t.„. '*--:_-•""--7.
. -4- rif 1 C i r,',-",-,--i•-""--.7--t.--or"j."-iX7-*`7"-,o.,,..- .,•,...V-t--- .,:t,i- •-••7..'" ''
•
—--- s
' /.. ... —• ==_••••••_:.-L-_—=_ ,• ••:.
—-- -- ,,
------- ---- —• '
0
... e",.; 11:1-'7 '•' rir. F. 1..
,-.,- ,-,...,g .
.3,
• .,-....f -1; r
n."- .,.'41."-...--...•. - [ til
i 46,11.,!,.47,-,17ip: -:_-,:.g.;.--...,-.: '-. ,f, •-,';'
l'.#111$ lifil•"';':::-.1—.•:—..' s;L.---.T747::—,115,w—':,.eY' ti. .t.
l• k•' ••‘•i...-• •— •.*—;;;.---;:i;',--A i'•;' f Im,..%,,,i0
ofilLI:104',_:...;..6?:-4-.'"7-;.'-.`r,": •
,_ _ . - [i II[,•• i ' -2,-,-
.-
4
•
--w;...›-t...
..,_7•,,, ,,.,2,.!..._...,I et..4.5._,„..: ... .foi.
, ',-.::;.--'.1 i VEX'f••••2'444.',-i,..iii 2-PI:'s ! 1.'...-.--f"
I . r%i Flag. 4FAX-PPL'..,, _ •-•-T-1,-;-..'.1--'
• . 10
, •
•
•
•
•
•
�Ar 7.h f7 I i 4N n� nna..,.e.,rcn'i • 7,06,C-4...4,,.$, 7; Ife_'1 in!. I r . I ,Tct•-....d„'' r.;� ,r.. 1 - ,
•
'
1 ('L
,� ° ._ '• I (' �I, ` I 14 .�c\I SII;
)E1� )~ ( ,
�4`` ;1 , •41 �-- Is ~: 5 __.. .�-.L_.,__ ! j.i,{r', it
I �. ._i , r, A "—Jr � •I fi f�: i. ,, -_Seri.`{ �!,li _r.,-,,�•• rT• ._.__..'. t
—'_5 .> I ( µ. I - i�-- �tai>; , . . ,� . ... .., 1,a_ •
_ r
41.
•
i.11� .'r' r� A @ ”" 11,L.,-.:Y,..1 tr 111 . '''.-0
i n i - sn
',I;
J Wear+ L SII; -^�,."'Pim':
1
'I I
"Miff .I I '
L:,y cruc.:ty e � • -+1 �k.� y ti�b:l � l.
�. r� o; '• 11Wy1'1') • Irk(1.1 It'
- 1 2 ,�i .cr F,,ifi
P a "r i a tR
'th-Tim,,, I 1- e.. - a� B.>P y p�df'x''n _`.° ' 1 !r' i °6dy
: I `J.! 'i tc^ .y %ate w.r" 4 ,.a Y4 .y'A 1 i.} '01)(I
41—t • ,1.1�1 1 I 1 1 i ;I y` _ ' "'AY.�y �� k� : �►.. C.• p!S};.
( "L,��9 •}- Itt2 4; n •ilti 11111 r 4 W 1 1 /( ) IGYo,.
1!1, ' .�S` ; '► n .l:: tlI-19',3.4.' I� �1^% �1 t, Viiitit
I• III ;
�qq r ca s2 r-
•
.• F' �{ �y n r:3� ,_i .�t-t"'ts•"''.. • ''!' L 1 r� 1 {a 1Xl f{• iaN •1.• --i4., . I'I __,:a.
G
` p "! g ( Vim•• :r .. ' ,..
s r • �t1 } J e r �''J a. i y 4•`,';41 �A•� E ''?ta i� \ ie c .�1. IV'+. en
- • $1 • ha
1 • --104.•••'5014' 4G f 9 i -,r �'� ,,!',s` aa-` ��� !!{' :1 J,..� } ) an
u ' r I l•:G.. 'i iEs R'1 •' '• .t Ir ' 1, w 1 "44,---'-�-'
A. 1 Iri-- V•:''2 µn, 1 11 k.
NI i• n1. 1 f yi• �IIftV:IF' 'fil 'R7^Jiu •N$'I,°I'k17`'C'1' ¢� r.(' it�'-!.ti,
• � . '•A . ;:,' ; ,• •- 2 I 1312112224120103
4! 1 1/..,11/14,1 I h M LIPIrlGor„$;
•
Ei
FIT 1 P-1 1. 1
I 1
-. .1.14.1 — A "7.: III:: I—
••i 1 6
i'.44, , '‘,,i, 1-,,';- .'• j '
, ,'2,14 it,Pt''y V24,4_,..- -'•
...,,
' .
'---
. " ;" '\tk:42.4. tAiltig",'Cit;14,--r71,;'"'N.,-•-fics,/ Pi'A.4,':%1'..4,'''',',...',
Aelfe01:10,TO'7„.•:"Vi'S4A _,e3 v,,,,',..,,:
l'- " g'g'1'. .-c-t'• -•7'2.`' ''''/V.IPC 44.-- .1,‘,,`.„ 4
V,,, u,5., ,,,,
g\r ... ‘ gI
,..„„ ,,g,' ..1.,,r.• ., g - kr,g:It2A4c-;"'''..zi,"-,,,rst§:.<",,ti• -'.-. -L'' .' 40 • • • • • . . . . . . . . . .
..'"r't„.:,1, 7 4-,14"',!‘"...$7,; 0' ,..r..„4 vi•-k,:g*- 3 I,,g 7.ri
•''''c'-'," ,„,g....,",.„, „
;•e•L.g-,,,, g‘..`g,.. i47(.4•*'...^. 14 '.,i.. ]
•-,-.14, - V4:I ,,,,,, ,,,,,,,, ,v,
i :irr
-"'""'
I •'/..,,r,i N. /...„=. „,- ,,N.„ilk/ • •••IR,OL'aq, L, ,
.42.."41.4,,* , ) '.41,;,,t4.4 ',g ' E g - --g
RIP \A 1 II 1
I -g
, 17.1, ='-‘c,4,5",- „,.• Prigav.g. '`'•••.''' g .:_._--= 1
i g----I 2 1
'K,” •• 64 f.X c..,---3. '''.1 ' '''' '''' 't I'd\ ,,,,.4-t , ,
I
1' iT T - '. .3 g &,.
1 4 TP ,,' ', -.1,<•:d,„,‘. • .,,st,
„-. - , ., , • , .,,,,IFA- -,,,, , .4 rd' 1 1 r ' M 0 1.$
. , ,„,1 roi—a_ t.-.. .„.,. .,..): ,. -,,,,,,,.,„, 1 I
•-,, •a, 1.,4 • : ,>,,,,-(/•„f-t4,•ss':*, ,,11,,,•.• Iq....?„...,; •1 -) •• 10111111. 11 11 I (-1 , il 1 ii ii , .5
1 - - ora MIN
la,
,•..-., ,,,7,,,.. : ,...‘,,.;:‘,„,t--,A.::,..):,,,:.,,,,,...i.-, ,
...,
..., „„„.
;.,.,7,,, ,4\+.,--1..e.,,, i:1...,s.:4, A.
- r.. ...'• -,. iil ‘''..i ::i .° :t°': .g:g •'
I , ii . .-..., 'A ' il, AL, „ . w.....Ng
1, ,----"S \‘';,-* 'c ,:,/, .;''"1-,. e r"
:,` v: A j, writer • ' VY4.6.,..,..,,N, c',Irp, ,, ..ez, ' i
7.,'
r i ,,r 1. :.• - ..f:fif 547".• •.gp 1," .b.It ,i t
q.", v• ' ' '. -, , 0,,,,,z•-....4.1,4-_,A00 ,,r, ,
- ill
,-
\'411""Vid , ...ey,4 v A 0 1 .. k ,.,1 .acj,r2 . .. . ,.,..1 , ..I ,, 0114Plinarlirlt: --1.
1„r",1-t• , \t`,,,,,,,'"i 4,;',i.,ZY Xi*.••;41 c
'gi,"$••',i ..e. •.•-.\-',' gaggi'f - g. . ..g,ii
, , g. 0:''..1"' g•-:;;;';#.0,11 r",,g4g.'geg: ''- g.''' ,.x.rgtiZbr.,.• . At., N rrt , II- I , Nfit,
- ,.10- :"-:`71-;-;.- - ,, -: -; '---,%-I:-
1..• -,''' .:P , :, , , 1144.
'..--_.•...,;),t,t,,, ,,+___it,-,ma i,N-P... *iv, ,. ' '::••• .4:1E7
4 `•:; ii
,-,
I,1 - 3-1P'-'-;.q ...
...A...4.,,,,.„,„;;;,,, ,P .:1.iggre•,trall T.-...-1. - ,,,-..,7,,!' MA
_.:71,T. ..,, •-:',.'-, • •-_,"
.
1•••••
N)
4
` , -•:::' r.. 71 ;I111 iIYTs.-4, K . g . ` v-, "R--.,1 `�
-' _ ' ' tip, z —, . , {1la--r!!-
----k....-41,.;',74,...,7%.s.,,,
7.
1 _ - .F 46 m a fl-',?A r_- :et - - ,
,rth L.
� 3
3 '.4:s.i,$ata t_ I ,1' .-4?'? I.' % _
` .,I I
N• '
��..�� ,.
•
•
•
•
•
s
13.
. . .. . . _ .v. • • t." (i), ,,,.,
• 6 -,. ., •• „. ••;....,... ,„,:- ,:,7,,,,.,t,,;.•,,,,iriev,,s,,;,,w„11,,. . , i„,,
..: ..,,•,c (...; 0 * e ?-:,- t- , i., 6 411) . . , 40 .•..„, 6 (ii, ,•,. 6.. VV.:,4,-'14..:"4. .4,;it. •,.',( .4,44,, P'' J'Allir:Mir, ..., :.
'''''' '• ''..7'4.'41:,4'Y'''. .,4 4'l'',.,4-.,..Yitg.t41::ttg,Iii;;;A:?.,*?`F;;;7,110,..4,'„:,1414:44i,,"'"..,. ...4'.;.'•'',3'''t 4•.•.
. '' '' 4:'44''..4.4°.i'';' '''''ii.'i;1•4•4.44-'''''.''''1;.(1.'':'..,4V.,',Z44,°•fiii4Y/kt':''..;#:4'1,1,-.-'4,4,;-4,r.;:',..,•./?',4',,,..,,
'Y',i''''''P'44'.'':`,..''',..4'''''.;:'''';.'140-',44"..4.44,.4,`,:f1;',A'.,:.'1,''..1';‘,.'..":Y.,4',"t;'..4.•':tt ..
' 't.'4.:4'','-':;:4'7"'...7.44;:i.,-..4;,,i,,,,‘4••":",4",•',/,..:"":,,144.4,1V,4•44,,,,,,,,A,..,,,....., ,.4:4..,,.Y.'......-,.4.:-.1,,,.• ...
''':';--4.', ''...,:::E'•:44'rgiii.;:',,p,ria'ts?r,444,`'.4;[,•,1,',A4,;14i5P•.,:..V.,,,,,,-,.....',,,,,•.'4,1;.1..,2,;',;;..t..„,,,.,-..
• 4 - -''' •4"'.4.4i'',4;t'?",'-'4".:,-4',..A444A",1?4,.t.f.-..4:ir"':14f;r4.i'ii".e"P g';',•''''',?q ,..";''''''?:.-4'...'..:....;-,‘'-).- •
''',....,1''44'.-'•''47;''.:4'g';W'f'?k4V/i'464''.'i''tift'4,T, Y',;:t.'''.,GY.04'Z'4':•;-.'",;.:.4,14i:•;.14:---,•;;•.',t.-'.-;%..•,1.',
."..4.,';''i3',4;4 x'r:,',..-J"..4'44',:i.':.4.5.:il•:';',,t4‘ .!.444'1V.•,4;t:',alk.2',,,:',';'.41.4,4,:44441'4,4•,14'4,,'„,r;'..;.4....',.:,.:*••.' ' .
„,,....-„.';'.','y.,i,i,:fif:.:1:4, ,,:.1.,VO'0-':!',„;:N:.rv.,p.i., T.,',1::-.,,,.'...)....,:.:,..,-,..,,• ...•'" ••
..... ...,, .. „.. . . .
.iA , . .. „ . ..
. .• .
.. . ..,. . . „ •
_ . .. ..,„ ..
. . . . . ... .. ,. _. ... .
".." ... ..„ " "• .
..... ..•... ,......•. .... •.. •.•,..,• .
. . _ _. .... „.. . .. .. .. . . .
• ......,•.• ,I. •. . ,.. . • . "
\....1,.....
r ... •• . •,..,...r.,. • . ... "....L.. ' .. ...L.... ., . . r..
'.... •.'.•: .;''...7{..,'••.:'L.,.... ...1;''.::: ,..:''•,'.'ll'..::..••.,.....,•L,..,....•..:...'..' .. .,,•... .: . •.. .
L..
. .°I'';'•''•'•..:::!''i'...!'"'''?:4:::•.,''':,•7`''."'''..i':;:'''•' ' ''•:•r;•.:.• ..,,"''•.' .'•(•.;'••. '.•.:•..•. • .•.
1C N,C . , • •., .LL,.... .... „.•• •
•.• , ' L 1.....,..• t e • +..,. . . .
%...4.%. . .,
• ' ,.
•'1' .-••4...ILL„L• ....L.,...•.-•^ •• • •
. • •
•
•• ;••'.''''.[... '..;'••••••'•'.•,L!,,."••:•;'' ;•.,..;•..."•,..;'','.••:''.:::'.,....•'.:....'",.:..
. • ....`".......;•....'.•.1,`••t Z.1;;...1-:•f C'n';'‘;: '''.''•l''.''•'"''''(•'•••'.•'•' • . '.•••• .
• .
•
. •
, •
•
• .
. • I
. .
' . ' •• .•.•":'.'.':''•'••'•.('''i''')if?:(..':•'...'•:•.\':i'''.!.'"•.L '.•',•'. '••:'•. ,..`•;•;,../L'''. .'•....:.•''-:...;'•,. •.;..'.:'•,..,:',•!.. 4''','
••... ''..•''.: :'''';i:•.; l'.''•:-'•:'i •.`j'''''1•..:4•V•;•(.1'--:'•L•• '...'•.•.•..•';'•:-L-'•'..'...';-•."`•'••:..;‘•...'.•'•..'••••;••••.. '•''L 1••• '.•L•'••'''','''•
• •
• • .• :.• :::'. •:--';•,.''ri••••,'''.'i i?g.';'??..,tri;';''L':‘17.4.•T'••7.7.'•,••''''I':t'''T•:-•••'••''''-":::::'•.'•••.''.33::'":.:•:•'.•':....!?LI'''•••R'{',3;f'•:••••7•7••....;
•
.•'•.•. '. ..:.: ••.''.....•;:'•••f;;(.P.,•Lf i•,LL.;•\',..4 4.'1';'.';'f'.‘: .••'L",".•,:'1•1.!,:..'.1;::•...•4,:,•.;...,'•'.'•''''••••:.".':•'•L•'••. ',.t.7...,••• :'••f?L.,:''it'..,'.,";••'r•••...,
. ,•''.- •.•,•'-',V••'t,...':,!'",-,)1.1,4q.,44::;411'.".'4' ,.Ye-1"',4.•••••';'''..:'6,1';....,....,,,,4..:4:',.....:;',...,4,...',..:4%, ,fy.Y.'10..,.,`,",,-.742;;;,!..4:,
'4: .44.'''.'4;'-4,•44'4::''-':44'5' ,",-'144.;;;.','*,,;',..4,':".,413tS:4;'•k!!:::`.',..t.,:':'.'..',,,,.',...4:,,..t,,.4,',.',,....,..4,,,,......t.„-..,:-..,.4;',:....!..._,,;t.,,,,-,...,..
4 . -. )7 f4q4..,T,i-.:tigiii',401/;' '''''4..'S;•....54;P.'''.^.'''4,4`'r':?!''.''''''!'".4,4'4, "'r.::••:4 ' ,.,14:':2.4..?:.:.‘\'..''•;'!: •'.:.....;;.::'i:
, ..: ' .4,t4j,'::.!:._Z'f4';',k,ty'4,''' ''''.44,t'::::::E.),":;,-,,:,•,...:';':-,:•Y'-',!•,••••,'..,'',',..'.',"'::'...-..,:'.••!,.:if.'.1-.•,.r.....i;-'•-,••••'.1.,-.:...-:'
-. ••••-• ;;;„ '.....-•'?-,,!:,..-/;,,it.4f.6'i.,:•;::?,':-...',,,,..:,:,':.•• ''*:-.;...,:::',:',. -•,::,:,..„-2t,. :•,-.;,....::,,...i.,...:•••;,:.„;:,,,..: :-, :•
. .. ...:-.:•'1,'4'47,:;.,`.11,: i':•:-','••••.•••••;:"...‹'•';: •••• :. • • •- .':',..' ' ''''' '- '.
•
•
,. : ,..,•.- •- . • -
, ••
.. . .
•
•• •
. .• .
•
- • •
. .
. . . . . , • .
•
• . . . ,,. . . .,.. . . . : . .. , - . •
• -. — ,.' .. - . • .
. " '' •
. I
. • . .
. . .
. . .
. . . •
, .
.. • '
. . '. .•. .. . . . .,
. . .,.... , •
•
• .. .„. „
.•.,
. .
•
•
• . , ...„ .
. . . ,.
. . . . . .
. . . , .
•
To:3 kt,..,...,, . • -- .
IF
„. ,,„. • ,.,,,,e.';,..,-,..-,. `-'‘'-44- ----- --G., -----.4a. •
. •
:,-,- '•..- '.8,I ' V
• , ,.
..., ... ,
•
rv,i\.\:•:,. . Ji........,•,. ....,:, •., 1. •-,),...'.. ,,,;..•
,,,!.' ..-.,••• "• . . ,,..
i , ...„,i,,,,i'... -,.....,.. •
,ry.rv...,- t: -,.. • N'''':A-,. , ..
,
PIU .,..::,v ,' :',,i. •- , "i''.4•••;'.,•••,;...r. : ,. • . .: ,
i'•!:.•'''',4A. -.,i.,-';',./r1 4.•'•,..', t • .4,,,,,...4:%::.S.,
• 'c: -- -0,•„7-'',1.1,,,r . • . ...
1
e,rt.,,;',-'14.,/:,'r ',, ,i' ',.•;,:,. 101,0tr. :!,,,':;.; ':,,0 : ' •'
....• •,.- f..,,,.:....,,.., ...r."4„.01. .
„ ,
V_ :
-,,,, a., • /WC
' *,,,i, ' ;• .',,' ., -.; . .., •••• . . ,„ .----• ...•.- •
.,,-,,,,,,,-,• 4.•„.. , -''' ,1-,.fr.,,,,,,r,,,,...itire.7.
...,
AL. .';':',• .';:;:s,r •.,,',,rior po,l''''VH. '44.•''•,4-•Aiiilgi;.:•ci'. .: ••••,•'1. 'Lt..' Ig•-',"11 • b::',...:44'' '''''''''•'-'•''''''''j.'20.,:;:f• .•'.P i'--...„.,,•it.•>:-.:..•••`:•:pg,''',''''':::;,,,-b,;.'e.,.,):°...,,..•:,,:ii:,,:,,,,:,.;•i-.‘2..11:‘,.t.,,,,,,- ,
-----•
.F..,. .I • Ifir.:....•.;_ , '.',.-. Fi ,•'';' -A, — -.:-../--.krr v . •,-.-1',..-... .c.:v..,-,••, 1 -31,•,.,zz.-„,',.....;_c-It',.,.,',...r.4.., . • ...i.'.•,- '--
Iv
^,..
1
.• .• '. •
. rr L . i, .:1,
.,.: ...011Vii i6,
,$,,,, 11 I) , ., •kr
•
, , ,_,..„, •
' ?, .1-.,, I. . • ,4 4 , , , ..„ i ,.. 4 ' 4-.•• ',. '• ,;'.•1 1 •;';•
,.... „
•,, . ..•.
•\ ..41,";' • '''i.; ,
, ••••'-'
,I.t'i i'lif •
lvI
• Y 4 , 44.....' ,
4',, ,. ,Y, • '.• ,,
..4:14 ,.Z.Y,115•1.1‘1?44,..3-*,...'• , : i? ' . ' %,.,1.,7..., :,
A 1 :,;"911,r,P:2.14,W:rt,j1P,,,,..f:,.-, ..,,,,,,,,,,„14,1 '''..."•-•• ' ,',' i .,... t,r. ..,....4 2,.... .
, 'fr •i,
: • '••;i',•',.,,-,,.,•'.;f,'t...t1;''";if•g',,a• -t'o'•2 . ;.l(. . ‘•• .. 4,,,'., •?' ..''.•.1-.k"...t --. • 4E,.).
-At•
'., "'•'.'',,••'fi.;'•„:::'-• • •-•••'••,•A.'?tk.,.
•.
,..,,-:z.:," .:'.•.,..,I,,,:',,i.;„,o,cf.,;••.-;,•--„.•..'...:;„i,:F..,..:..”0:•::.:,,.--,j,.,,,-.,•':,'f'A-"'I•.,.l•'.'.,':''..'.,.,;••-.Ii' -i-i,"i.'i''I''.f'.''"'''••'-.„•''•.''-.,,,,
44, Al - Jr:if •$•t.. , ''''?;(1/4' . ''''''.' .'‘N.;.:r.".$4,?....i ,. . • „,, ..,',.... ,,,,.,1
0,,,,,,,,r;..,,,,,..,. ,, .- - - - -- -, ,,, =,....y .;• • 1
It.:1:1,.;.: ':. '• • ,.o.
f
.. - • i ,•:', y .',!.-• ,
i ,.'"':;. q P. • "•''',1"it 1:if .... !1 v,1.0•Vk '
't • '.'"1• .;4''' ...0 '::1''' ,ig. ,..; ;'.r':-'''. .'''Isit,xef ,..'••..,
t- 't , ,) r,,, •—',ill ,1. ,,., ,li, $ , 1
r r . ".?...:'.',.?,r6.":1411-kilt",• :77';.:::."';-::( .....' r-.A•
i',A 0,I,'..--'1 i ' I.1‘.'14 ' ''''' ' '''' . ' ' -q ,.:PAO '.: ,!' (,V.Q.,i.,,,j.r .4., ' i'o• ':cf•".::.-1-..!-e•".> ••,/, i''''1.:': '
. lifik.?'-4•!:-•'.'';;:,-,,/ ..!,t,',1 of '1,',1.,'.' •' );.::-.. ....,,L. ,;?,,i' —. , i.flf.t1,„le.,p :T1,4, .'or ., :4}. ., , : itli ,:.. ':' ,...; ....t.-114,7,?,.;_,4
':''' , • 'f f
,,. '',.'r'"'',:':vr,.;fr'Yi.'' :: ',..':://.0: 41' ',,,,f'•.,' .--. -e: ..- •.....• ',4•.+1,`, -,....' A.R.8V,f,''itg,;';','S-litc.,,,4'.el.'y ::. 1, 4) 4'.., ,:',,;'',.), ,1:-•-•-'• ',if ,
. ..
• ','.; ix„ ,f..CUY.-,h.'L,:ls.'l;=..-,._...1... . , ',=.6t.:. _.' 4,441 IV: ''S' 4.-,,,„^'!','d'A,-.......):1 le.trif*:i,,i;74.....,orek,-,,,,.,s.,k,....,;,' , / e_., .:'.-. .,4 yyd ,,,,t...t , ,.. ,.. ._
. •
•
.. . .,. t., .• .• .......--.......,......- ......, .
4 .•
•
•
C L L I 11 S
ARCHITECTURE • PLANNING • INTERIOR DESIGN .
Ern . . .
. . . .
. '
I
> . \
Z •
'
•
•
•
•
, .
• • .
. .
• ,
ty
•
•
•
. .
• ,in• . .,,,, to .
4) (I) a 4) 0 4 0 0 (9 $ $ $ $ $ 41; $ ,., $ 0, $-- •$' $ & 4) 4) ,0, 4) 41 , ,.,(4,,,,, ,_.,.. ,,, ,„ r .i.,..0„ ,,
Iii) al-•-Ni-:•,,.-•••,41-41,,•-,Vet-+4.,q,i(1,1;4 r"A,r,, r ,41,-,,, „:„
Ir ;,•,1,1ir i ,-;,. •,.-,,i,7!.4.,,,lim:,
• (,), ,. / -.1 vi
• '1';•ff. T , . .
_______.,....„....
....----- .
---- -\ ..___,
.4tt. , -vr--,--.4._.:;.-,4.=,-.
--- ,:-1,16, -'.;.----i ; " '") ..--1-.::', .1).t.i''''''''''
• • . i--• , • : ,,,.:\.' If
-ill Iti.•4.4114 •--,..„;i;,'''‘'•;:ii,
it.',41 hpffiffEjE..::.. .Iva .,-.LI II..1-1 L.. g..,,,,,,„,..s,,,
_... _
, ..... , ..* , ,,,,,, ..„, ,,,,,,,z,,,
„.,.....„ ...., ,,_,.....,, it -- , ..,-
, ..,... oi . . --., spc.-• • 11:".(if-.. re. ---. -1 . ..:
_
.11111 ---- ',V..:...--•-•:'‘. ,. .,......t!.. 1 ,....,:r...,..f.J:3;,...-...,.1 Ili:,,4..4,..v..44... „Xv.:44•V. liZ;',
--"' " ' EU/ ell:•- '
NEM= — IIM '
JJj
EAST WEST .--"."i",---,-: • '--.,—..:--- ,,• . ...''',''':':'77' ''1.1I""'*'.'"'-''--''''.'..--'-7-'-'-V."r'1';'';.:2:::i',:,l:.:.;.I•K,.L.,..„...,,-.V,.
;:...
.-^m'e.„,,•o•,.. ,Wqr,(.1'V-'r....:-.:- -,...!'.'L'-',./.;•'-' ..i.--,..:;.
• ..'.;....- -1‘..,1:VPX4A•11,:;V-1,14.4":.;'*';''-•?Y':; ;',':..: -':`(:'..:-'1-::00'iMi'';
. ';;•-•:::J:14;De-,
,' ,:, , --Li',', .• • •:.t.f.i-'.
411-s'*t itit.11"1';:: :;-•''.;'• i-.‘,....:: . ....•':-,''':''..--;'',-‘.--::.•A'FA- -P.'
,' 1 1,41;,.N! '''.•• '2'':-."1::.:• ;',._.'4.2,;'loyg.1.f lot taklaiiif,-
•
.. . h,"'i.ttL,•.:,.7.L .. 1', ...',i,o1,...•LA ' , '' 4.L.1....1 . 6.4,;,-..4.,1, . AL2.1
,..•'i''''T', IL .•:*:'''. ."&17,Lt
/
• '' L',;*.L.'.:;,.,:.t,11..:'•. 1 1-
I ' ; rTs."1,- j - L. •••-•141 1'1" -\.1.1,1 fAi.-,.,,:.-..„,..:n
/ .'! ii ..l. . , 1 y:f•-- -, ....ti a orii;..0 •11.4-,,,,,,,,,•-•,••
•• •••••••"•,.....z.:. . ,,. ,0,.,..„.•1•...,„-:,..,,...y: 1
Ern--m
I ..''''.(;'''''71,4 ''',.;;,...t,.....,';.:f 1'4, L.1....;,..; .. i.,,,,,t1V..i,',..; , ":. ..,,,44,.. '''''"':,,,,':,...:'•':':‘::.•
- I I ..'''-ik,!...c.,444-71.04.5,.1...,. ,•,..,., , wit,••• ''' 'k"s-t • . ,.
• -- '''-- ' '-,b.A,;;LXiip,:,.,.,,,,,,..,.,..,,,.;.,„„,... .4,,,.. ,
1_ — --- --- ==
-1::t:It:•:::- 11111MN 7:---1:1--7:7-.7:::= _-__._-__=7_ -__=-:_ -.-_______
-. 1.. TI• •• 111111E1i •-•:r---r---:-
____
—
' • .
. .1 4.., ?,.,..,..._ ..,... ..
'5.'Ll'itt.Llr'i•., ". .-.6-''''''''''""'", ;-*-..,...54"_ 434 i--14-q 4.t• '.,..- -.. ..•
r- --•-•-i T
., ,g):,I.:,.:
• -
• •
. - r ' • 1 , • :%H.. .•.;'k--4-1"-,:'...
SOUTH /
„.,..,;:,,,„,,...;.:-,1•.::,:•:.5,:i;•
. •-•..-.- ,'•.T.i..:- .-ge'r' ('1';01.':i - •'I ....• •-•"" i" .,.',I. -''•'7?.?.q114%.;•.;•.k.!:ks.;',...M•e,
. • :.,.:-•'.'''. li,AI r st'•4:1 I iiii 4.,1''"4-':'$....'.."',1:11, 41 i111,,,s.-!$14• 3.11•;
'• ':,,.... !•,,La jli",•"fli "'`..tl:l' 141,4k .i:t'', .1'0.1;'.1 '.:. z,.1 t,:140:4?•,;:1)..::';4:1'
. • ' . . . .''Z'.7.4 v.71-31-ef',„.1,--,r.,,,€.,derm,,,r-0=1:-, i., iri,,,,,,,c.g,„:.:,‘,,,i.,1,7:.-.:,.
• ..}!,--.2,.',,,,c,.4,,,,,' - , , 4 6'.,1,1,L4,4'6,1L..,it'1444,,,;,,,,,•,'-',,,t____4:4,''.,t'f, 14...L:' ''..';''4'..,:;,,.•:.
•,:-..... .'d4:4;t'-:"'..-• ':' 441'''': '.kth.,I4'. . ''.4"' , '''''''' 'r7A'AFfrg h"V:'''''''''';'4"'4-..••
/ NN_ , .. '.'., ''''''''..":47.: •-,,, . '• '...• -4-"-", '... .'-4'';',.:,,, '`,.',i,001:49:3C.•!$'.gi:..;,1.:
_ .
...„ , • . '- '"•-•'!' 4,01.4.:,:p,•:;:1,•;:.
..,,•=00A,••••••.-..-,.
...... .f..', , . „. . - -. , - ,,,,,,-., ,q.cl,W:qi.t.'''4''4: ::'
.---.
.:',':••••.•':.g''i, Z4V.OrgIOZAXI?OlgaWgq•;•*k4i':a.04:;-'*;+•;.",. . :.,...
ii•---Aim muss:::: =774-3-7-:: ::::::::11 • .. .. ..)
i4, .F!'' ,',"1,:::..-.....:::'.... •
iii iffilliiii ------ 111E11E11i t ----1-1 illeilli-riesi; iiiiiiiiii 11.111...!llllllll
L.._._. _JI______J I I L_____J I I I I I I I I I I • ,. , ,. m............„
_ _ .._._..__..
,--. •-,;4; 1,191F4 11-1tr MIN
.
ITH • .•...,.:-:•:".;,:,. ..1;;W•c',i,-.,;',..J tl-ir:I:,-'. ,'1,It, ";•,•4,-,.0,i'-ils' -'''''''''''''''''''..- ':'..
- .,. ,..••,-,,,,••.0,:. :'-' ..
PROJECT LOCATION
—"V-F7r....: V.:.Vit L.:'..0110'7"4,-";;•:.;' -'i.';,..;;.'•*;: .;•-•
..,...i....•.;-1 ''....i-•;; •.,•;.-`„..--- - .----;,. ....,67:-..,T.K4'11;.ilF.:V.:'t :74'", L''''.'r'''',•;',g•i67..,:;;;',:• ,.' :-
1 • .•:.i.,,•,,..:':...,:-..A. ":-,-;.'......",v 7,47,01Ill-.""%iy."..,+". to%,,sZ-9,,,-• .7d-.'•;',-'.. 'i..,-...:.•,
'.t''''-__..-c-°!r-9- -•-..__:.-, 1_.U.1." IliI-- L' ::-1..;.;f;... ',':.1.0:02`; 'Si,. ,L4/,`riSa...,./`4/1 '.''.'''1; ''....1. ,D,,,, :44,14,1-1:,,•,4:pg,•::;,:.-.,-:' .
-------r\c--yci_ •;-,.. 1.- 11 I '"':-:.•-•,.:•:-F,.‘,,,,,,t.,- -:4,,.. N.,,,,?#.1*..-i•,-,•:.,,%,,`i"... .f.',...'.. ..,::,.:. ,,,,'.y!,':‘,.,.:1?.)4i,::::;:::;',„:,--,..j....'-, -
,
_..1 . 03 l'''....::'''....';'.?•.';''',''‘;;iitt.M.4i4:1".. 11..K.L.• . ...7...'"-C...- 11'-',:•'••=..."''''1.' ,!;);;.c.:',„"I'': .'': .
[ ...... , ...." •,,..,;,....9v.:14;;;;11,4:1;-,WeM,Z;.,L4V.,,"1);,4'15';-':':1. 113..:.:;•,7..... ...'7:"...-;:,,..,../.;•',.... •'',...-.• L''-,•
1UCX % AV P
•
••-L1' - . • .."
— . •' L':, ......'',,h.-AFV.4..4....VS.VC/A.,,. .;:•LF,.;;;.c.th4.v,:..1,•,•:.,,:..q,',%1ZO:',••'' ;',AV. . ...,......-."'LL. ' •'
1...; --\--\--- i 111111Mini AL,S k'
— --7E -r.17.11 - '1 ,,,,,osh.,:,...., ,,`• ..... ''.'4,,,,/k ,,,..:;.."';*,' :., ..
\'-''''''''N
L.._J.,A i '4".--10".../:A/1 AV Si ji_rin . -• ,,• .k1 '1,,,,t,-, . ,,, •-......0:4*.,.:--•,-,, ..,-.. :„,:;,-.... 4 ..,: ..--;,....-. ..
• --- : • 4-40;40,..,,,,,,zreo,„:„..,, .--. . .. -,......,‘_....4.,,,,,1 .--, ,,.....•.:•...,....
. 1
PHU'I,t 4 mil.A.• :..,.,. ...6,,-••••,'mo"4.-1',.i•';, 4 ,,,,:,,..:,..„:,„..„,•,:,...,,,:,i.,:;.,:
. ,•.,,....,I„,I. '910_,4•Pa- , - N,'-.,,i2 -nr, ,-;,,,,,sw ••..q/L.r. .1.,kt.,-4•.;:-:*-.. '.:•.; .-
[-__ II\.. \ io- • ••• Iro,„, r,„,•14,4 1)./ ";..,..0.F.1.VONttliiii l......)i+;.,V,In 13',.`V:V?,11:4,L4:1ALUS-;:tht.
\_ L ... irial-F27 ''.:1•CL:•''''''':.;:'''''.,•.-- ntIr-4...A.•0,4 x,,pz frittisr-,,,1111...,:f;ionsilm-,.„,•,?4,i.o.q.a•i,i..,,?4,r;
,,,,„fliji_LI1I1 tc, iji. - ..,--..........:-....
- ,,,.....,--• •..- . .. ido '.. 4,0,,,.4 4,,,,...„.1L:1.4 .:I 4" '''. Ir.,.•41,:,,i'M,-.., •,,,,........
,....._ .4 ...;*:.',v.:,.'.:',.',.."qt IMV,,,,...4,;;A,.:,:,.0.k.„,,,,,,,,...24L,IIIR.hri_mi . . ._.,-_ ,T ;',V .,,,,,,..•...',. ..,..I ,'.
. . . 11 if'',;--11...,. IL ,,... ,e .,-,-•,•;•:: , ;-: 4.7t-'',!''''''
- , , ,-:--.''"::.-,. .-4,--,411,.....,,, - 4•. '.-.:,-..r• - • --,-
. SECTION __,,_.....?,- ,,-
.
---..i 1. jr-AE. _1 -----N s •-• , -- •‘ •••6411(rn t-----74, .--- ---- 4.--. • .
7- ----.=-- - f----i :\,-,-4 ..•.' : . "1,9:,'''''.'.14,. '''''''.'''''; Ilt ot= L :,,• 4,:,.' :,,,.:-...z-,..t-3, • -, • •
' ''''4_11 - -.'•:. .......'•• ,A,,,,,-;:s,-,--,.,,,,;• .,,,,1 ,,t,-.,„tt.,,,-„; , ,,-,,,,,,,,,,,,„T„,,..;.-.. ...•. .,
-----,-,_,: \------il-_,-V , . . .::..i,:;.,..::,ri,1„,:N.-0,i,..0.4.7,;',p,v+,.;i1giv,s,•Y`,30,.)14,,it,„ ,,7"..,...., :,...:, -. :.
- - 1r 11 ' , ii / -L- 'It '',. : .-•:.-.'-.:..,.,..,-7.-,:---'.-."'9" 040*Iti'u,V,:.:4:44`zl',A,4...- .-.:- .
,,:, ....-::: - .;/-_,./z..-
.---___
31111 7. ‘,.,- \ .-...c...-- r i; ::: I .. Ram AV S \ 1 lg \ •' ---7 •
•
VICINU MAP • . .,, '.104,,A"S A, 1' , Ill! //,If . , ,, , i . •
1,11: •<..‘\.,,••• - --14DcS‘,.', 4:4 ATIFIIIMMTAIII
h • ' . ..,;=6;;•.\-.111filiiiiimiiiiin:Fralii;\-‘<.\
mi. i ...„. ..,_,...., nroloringrintimimin.u.pm....
A°: !-•/. - ..‘;‘:111'11111/11:1/1;:::;15: ::;;;Fri.
t 1 :' -.-'wig--.• --, --- gilimpinioliiiiiiihni; „ .cia.• ...
I •
. ;;.";c.-i„'44.... ... ,.Li..fni.; .•:.:"-'_\..!... 1,1.1 ,.2:T ii,, ••:(/,4,/,.; ;1;; •
., •,... ... ,;.,,,.. .,.•-\ IA l•f4.--1, /it';. IN• ,.- ••.,..-1 •
. ', 11 ,, ,\.'li, 1 , , , 1.?.. .k..
,-\.,..11,...,,,." -m-itirk:111:11iiiii tlifiliiiiiiiiiiiiw.-14,11741111101,444::;7611116,1111,:.,;'5;-:•;,.„,,....,.?;!:j.:-,1:-;:..,c,;_t : 4, ;...,..._...--:":-.---- 7.,:,• .,.„.....,,
Riiiiiiii'4" mathilIC " II 41111r,‘'.177 .441';••4?.c S-- -• i : !
LOGAN AVENUE -dal
,
- • •1.•_.- -.,...,..,. ...-.•.L---..4.--- I 1 .• 1-!
dlip•••••MMMMM • 11111110111111■ 11,r:r7:040.1..T: 4.
E44:;441111MIIIIIIIII 1111111111111111:MMIIIIM , '•If
H"9111111111111111".":::::
aiiii.• MMMMM mm2 linligmgm2
g .1. mmumm .1 ',Ar''' i:- ,,.. .•
„..i. ...11.0..: • ••••ium Fgrortfqrk‘---,,,,,,474,4::
1•1111a.‘--- 111111....K"."'`- V.." ' lige4Taii•j:inria ,.
11:E'lliMPAMIlliiiiliiibilligt%...................................................................................FEirliq..11.....1.11.1.1151....11262rniii.lirdliNTM. ...gm ---v-M:::. mimmi
iiii Ir"' -:, 'PPM•i•••••••1......ithrrr•g" u. t...:.ntiliemenni.•• Um imm PAII MOM 4,111i '1::0 I- ,- •
iqui,, .....Eirri• .., • ••.......i a . _.. 11,1........!"..I•f. ,..,...,..,".7.*.t.t---4.kwm411 -.1--WI-WM--1"1:11t,... lirt... •-• . • ,.
iriii ..ea fpil•cs:d: Ittrit2111111111 7:;:ii.i
Iiill __••A -a uni ,.. 'g, 4.-. p4,,,f,"A.v. !..;......P11.......... •
gill .....,.- . . •, . ,..- . .."•
;Ohl • • lit eaannpulgi 1,,,,,,s:,rt;;;,„L , 4,),.e,,,_1_,,,a mirommilicill .
IN, ,‘i.AA Illemilitilli iilail
;nun :.,--1-.• .lirillieF. -'4g-T '',''''.441,4,:o.,.,i 1111411111111 )12:"""
1-••::Iiinni c lea- •
iiiiillgillid ht,,a4t4t,bli i.'Lvite imml. •••••••Ammuiii.
:.,.,''..1,.:.„,..1.;...'., ..'„.,::;,:,iti„.'!:,.,.:....,..',i';':.,....,...:..;:.'i:1,1.,,,..:‘,.c.,-,..,.,•;'..,..
I iiiiiPlit J•
111M101)
4.-*".:trtilei 7%.5/.1;-1 EffitinElnillEtilliM —,. •ill
-iii-
• ,- „osiimi,L-04,1,00.,,,,,,-4,4,.-..4 IS iiiii. immiggEJ :
:::,,,. ..,,',,,7-,...',......,2\,..:.:,-,i•:•4-.A?",4:,-, ..-:>.
41116-pial';[VigV.W. ':;,1;:-:,.4•12r4m 'PCIIIIIIII 1 i.2--..,'.;•:,;;' •.."',;-.Y.....*::cIF;`;'fat;;A•lig
llillin111111.1.....rilo
• ..•,-,,... •;.,-„,........,.2..:?c.A.:;•,.-1,...r.4 A.,
tiliii V " ,,,.,••••..33. III i 1 t. nos
-1 ,, ,w,i---, ,$4.il• :;•,r'`.. i r ,i
•,"... .:,.:',.:.,...-.:r:,-•:,,,•:::.:•:,.--",fet i,,,,,,t,
AM •& '41 41.';?1E44#4 * 111111111. 14111111 allidillil
,...('' '. Mr /.12ii., gr',4, . , -,,' ',.I'VOMMIN 11:::::1:13i , 72.,,<•7,1 ' .'' . ,. ,... ,...,
Ali -0 - // '' •-•11..i -- 11-4114:414.1 =-1,kt Iim#.,•■ -•iiiimmitE111111•11111 iiiiii0 ''- -. 1). .
. • 1
, Pips Jiigh_/".-•'-`,Aut. ...%::A"4 I Wkitz.AwAtg•!4141111111111111e•-•.mousommmiq„„,„.6-....% ..
4:MEW-°L TR- t ;•,* "lik • *Ili",;,., .,,,W•I'%;';'.;1,‘,50•Maa•OU'IMIPIE1111! go. ,....,14-7 -.77-=...Lr.r....... .„0.v. •i• PP
.a=I e= , . -• , 110-PINT------r.- --.111 7''' git-:•- '-.'.-e 1 .,:.'" irg,- „c::4-.‘!".:',;ISL"-1: - ''..- - :4%22 - "141-0- Fr _ t'. ..1„,-. ... „.„..4.,„ •
I G. ,
,. 7:,44,4!...,,,-./:/j.1.431114-1trii:10,1' Imi is v. 0 lir 0
illiminiiiiiimumil 11. amilri..... , -,•40
i;-„,',1 _II:`M• .04`60'14•*;4440; *1111M1r616111 1 - nulh
\wraTak, -1-:. . , .,•••\s"\le., ,d..,4-votg-tiR:o*,,•,•,11.1111.1111.F.-1,1,114 11111,14,1)
oli ...,,, .......Ay ,4,0•60§Yo'lliial 111116111i
CC i
1= Iiiii I PIAllA PARK 'Or. 4:::f11'6MN.:<;°41•
ccg Eli
usigki..4 a i•. -smog!.............................................................................. ei
111111
L.N...v...;.iik, ...;.......,..:iz
= • I Eli?
1 1r•••••1
:::P11113"''iw,,--,V,k,g.„,;.•,,,14.,k, '',. '. 1 4-
4.'3 MP MO
, • •
•
r-r 7 it) nu.181.1eaus c.,-;.(,,,.......fortx...0.,,1 ov,.4, 11
HIT ••••• .-4- v,---,'„, f•"tri44V4 1111111111 Atillal ; pimirillo . . ,.„ .,
au Li•ir..• .446 ":"114:4444441 '*444,4%t4"-?41,41: 50.410(4 4 ri Emesq-annull iiiiiiiiii% .
qui 4.-r.--ii- ,..0..
mulitidiall •251ttp-M14,0,,,,A',,,,,,,'.1.191.-ilirdilikliviil , mthficith •
-illselli 11111111:. •u• . _tev.i. , :: 1111.M .••4;ctiA'0.4,ANIT:E:.41).4 fighgenge....T.•••••11:I.. ; .
.2g2; .imenugir
• •
...12 111111111 Par (kfc-N,ISA\-Aaimmi'i'ill"!"41;40441,4.0.11K111111 Iri,11111111 111111111111
•HIP ;'••••::::1:1'1 All..
nip 1,112 1 -k, VFIsf ‘141 )709-3111'" ik02.0'M*:'4400,411121j§lik,..., • 1:iiimmi
impiiiiiii •r ra--,c4.,. .4.20.,\,, ..„ly u....I,,..,.•!;,..!•„,,,,,,!,,,,,,,:,,,,,,,,,,,,,,,, -.0.ow.. _ WIMIIhr,
-1 ii
Min '-' - .4:41.......... rr,v,m...,,,....'4,,v12-4,'q:ae-•--""'t"w' 6 Ammo MEI 11E4 =Maim Ojmaimemmi . • .
ql --- Alai' •-trii::, .2.......ihni "Mall IN MINIIMIIIIIIN
. . . .
•1"11"11. ---"-171.7-111-... ": .... P.411"11111111r911 111111111.1,11#1111111-11111-11L-""ttn"1:41.111101/14/161.M.M1111111MIIIMP -.....-;!" • '
illi 111111111111111111111k11111% grg;Witihhtlli—loognili..mili-R'PIL'P''..m"'Iii— iiiniPLatil-J'21P:Milizgo7.'12111,-77.41---nfil---101::,,..!!. ,:.. . -vr ...,..
illiiii? - ••••iii,:=1,4w;„„„,,,Riwoilirgaiii—Edwor.11;....,,,,,,,,..„.....,„,..,„„ m„„.„„„,,„_,
.......:,..:„L--;•;:.,,,:?,,,........:- . .: .., : ., .
'.- iiIIIM1111111111111111111171M11111111111MIIIMIIIIIIIIM
. •••• .. . • • .. _ •
ipmurimmirearmkiparnmi •
Aillik, ink II 1 :,•,.:.,; :, ,,. ..i.,. ..,___
. ayi , . liPiiiij III II Ill El NM in _ NM
.. „ions. wow moo blo; 4•370;Erniii_
1111whir :It_or Er immiraimpa.jil mom lessmi 1., ,.,.., ....,,,.:,..... ,.......:„,,mc •....:.,.....
___...
„..._
: "' -,":"i'-'...6-1Filii*.t:
jjlill riii 'II u:! :----jiraiiinfirsarigli—PPIllisiMarlitiPFilVil-E4•"=-11::=pgmpi=hriRMEillingerri: iirliro:::=LurollMutherhh.
iiicii,11-1511,1 IA.- .1;i212,01:11 ElialiEliaahicirthattiii.114:E•l21'1.-IN.0•••"*"tallami. •
17., ." •-'IOW - ' Mr - -INV Wile - im MilikedbagirmAtak ,... .- .... NI_ .01!. •:._ • ..,,,, 16....m.0
1. .
,111,-Ai 11 li 11111111111111'..1
H - . , i . ,
..
. -.
3
i • .1- . .
i: i.1E- .. . . ,... ., . .
s, 1.113
-s
3 .
, SITE PLAN , ...
. ..,,,
. ... .
.,) .
..., -, . •
C LLI1NS .
. '.; . •
m
. .
xo
•
I
EXISTING CONDITIONS .
•
. .
HH 1 -, , to 7 xi iii) 1 ,„.044. .;',-',icy 7• •,ii-ii,' 1.,, -,„,
'...ty,••• . .4-."
. •-•--....„...,...,..,. .
• .•.•.,':::;:,1-,.!.:!'"C,iillWg.'`'‘41,4;F;TI-11''S4•111&41'1'•'' 1:7;!'' r:it';''4''!'":41..:i.J..t.4 . '" 'i:,tbij.,
...•'' • -•••••-.....„........,
• .,'•-..-•'-,e,10'''.!-4,••,..!!•••••4,1 i' .1.'"."'•4''' •••N't!' • Y.,••,,,,!!‘k t`f.' *: 4•Le ° d•
••'`, /•••*'''''''''' •••••N.,..s. .•, -...;!*:-•• •:1'...'V.144.14:detqg'' :•qtV''4•IC• ' 'FP; • ."at74'...‘'At 40
. .• 1••:.,1••••:,,I..)V,•!:51•1'. ...6.S!!'1,0,9:tq.,4'490;re/.1"'.,.:,.t• •,•144.44.M••7*9)4111:W.4`
---•-• . . ,, ,,,.:•;,',..4?...,•!....44..,41/,'..,44......W.,....,,IN t41.?0,7,4-NKfat•,t1,.;4;.74.-, 1..,,..'lig 4,1',...."!..Nr,..if: ,.4
• ' ••.'•'•.•*•*,•••'• ••‘14 r..,,i??'',.'"....",'•;-'',4Q tj,*'•4 V l‘t t ',' ../"AV.At..P.'''i=:.'0
ii- 1 li I ! : . ;: ! Ul r1; 171171 ._. . . .
A •.,•_ : . , --- .... .„. .i., .. ,.,„0, , .,
1 P—J . .11-7• .- ------.- IIT •., .)1 1,„,„„, -...,_ .41.ioilim,.. ,.., t
1 lin
_lti.
- -:-
• _______J ... .1,..._ . _ -,
._.• . .
.,.,,, , 4,1_, . --, -mak. .
-,,.. --, L.,,,• _ .-2,,,,,•..,1.• . ,
4/0Nri6.,.., )0,41 laie
''.- ,•-•.' ' 0
EAST ' NEST , .
. , . ,:„.
, . , '-',..--.... -Iffo.,willeF-•„1.0-,....•%6
,_.. ,,, -,,,s---vit„,,,,,,,,, k..17,i•,,,,,,,,-4',;:: n...-.W.,,,,,70'.:
•
' • ." :;•''• fii. ? • , 'i ''•• .•:- ...,....', _..4-,Z7 *•141:1'1.'"-!•trr24-7.7.1-,.-..-1::,,otrIttine_
.. :- All li i4e-1,0y, 1r.
•
• 11 • ,1",,r-'.•‘,01,•••1=10
,,4.41.1.•;..",":.,... ,4 t'
_
TIN\•,....:.,:::..i•:,. ."0,
, r 0 $.
_____. ..• :&•i4-?:,, 1 1 . ,14
•!•fik•,,,:gti;1 j 1, • -,„,,,,,,,,,#,,- wvw.v ‘.-; , •,,,..„.,,,.„,„ ,„, ,..., _
• • • • .... . .._„__ . _ ..._... .. . - ,.;.‘,,,',•„.,A, , t'' .1---4 ...:--•,,-- - ..-iioj\,4,1.r-'1_,_,'.•,9k%, '''-',,
_ _
i i •,;-'1-7- I --: i 1 1.... 1 jr:.- . IN. FT I 7 TT. IT' i7.1717.7" 177_ ...f. - .."7.i. _7. -71-:"`
L- • .4. ; 1 _ i; - 1.....• ...•........ ••, !•. ., -;-, ,,s1, i•I
-: . , —, _ „ . ,.,. ..,, • . • 7,,,,,,,,,..- __-e..
-'''''V'.•••-:••'•,.•••''•.•.••'.4"ii', IC 4. ',,O.::.•`•;".:‘..•'!,•,•••"'!',"..'•:•
.•' ri•I '.' •• •''• **rrr .11"•:g :3•;''...,,4,f. 1.'• '44,•..:.; k!,1,':••? :"i•.,;.:".•1,-•'..'.
. • • • , •_ ... . T.1 . -1=11..--: •----- - Hip _____:,__-L • -- - --+-71- ...,..,,,,,,di,1, , „ ,,,-• ,..... ,, ,T.,,,,,N,::,4p,1..,....---- -, r,-.44,,v4,f,,,,,,,s4,
,_ • . -,..,—. ,
. .
.i , .....1 : 'Ai 1-IF -•-•!-T-T , . „
...:4.4,,,,,w.. ..j,. ,. '---: k,,J'4,. •
. ....,....4- ..
SOUTH •
. •. .-..„,,.•-.-.•.p1:4.i`:-='4-;z,....-, 'I 4.z10E-,iv.•-''•1-v;iort' N.-,t1-„‘,-.,.'-.., 4..,i
.2,,.....:•,....,:',:?:-';: f,.;.;,4,•ft41'4‘,14. ' • ?i4.1/44' l,.;
.• ....f,...:. .!4•1.'„,",n,,, •k,'''..4'4 ."%diAt'l'' '.-7 ,-,`..*.:4•:”- 4,0144:-04q.:4"!..i*.%
•''.,'"-''';''.':.,;P:,..0''. .,\ LZ•'''4\ '';' ''''- •••••4,..." 41-!-Y.z.':"... .- Qi :,',0.,,.'Lif-1,..„::--,:;At,,V,-:'4
-•',::::-.-.1,:',i,:.'0.:,'FAk,"X. . .-4--",',Lik.,•,‘,..•--4z.,!.,,,',..,.- 4,_-,!,,•,,.p.',,,-::::1-ii,i_v:J.4.7av,
, .,•.--c:,-...,,.„-.,..N.,,,, ,•.,-.1--,,...„,2,..,-.. ,-•- ,,,,,,,,;:,....„,..:..,,,-,,.....-
./..______.____________________
.., - •, „ . r e 1...e.",,. :::-t r•-.4:4"(4,4,13,i,or,al" 23:1•114,:tV1,•",..-1-41,01.-;:
/./ .-i-•?,'-a-,AV-0:4' •Ir. ?.? Or.4.:„.;4•if tiivotowokb,,ilmr., ve,
Ai..', ..•,.;.. ..-4;;;.08401,S,Milfgeta0,0°.,W;
-.-- _ . _..._
•,,,--.' ••••-r ' ' • ,t• iti — ea-, • ,•'.•:%.-,'-
-— • ----.1.,i, • Vi.,,-.;vf.;.--_-,,‘,,,.-.....:4e.,
,;,,e.,-„,,14 . ..,1.. .-..f ‘,. -...,,,/..--,,,, ,, ,.. ..,e,,4.. •...:•.4-c--- ... ;------...t.,-,
- - - - - .
''•"'''''' .4 ;)1" =41-43,-..----- i 45.1117*41h...I••„0,':-.•-.1 a , c.,J,,
. li .. 7 1 7 F----;1—j-7-7 I-7----1- . ' ' ,j ..._;_=-.;... , ..,•'../: ''' \"1 i/I ilL,,_.'‘,....' .,,-;;;•-•----,__.- •-„:, -'I ••• ,..,...,,,.b, cpp....,..• ,,:.4.:
• ; ...,. .4.-_.; I ; ; .-.... .14._.i._____L____il I..___._,__, 1 I ___:__ 7" - 1-... -•-;••• ; • • • :. "•::1 -,- ":,.Yi:,.. ,-.• .•, :.,....:.7,j':".;V7,•',....mun:-.77,74-",'":-.,-,.;- -' i ''-'"'-'7.•:'• !..."".. <%'''':,
I " ' ' ,,,,,f1,,,,, ,0,^aq*, . —.--. .--•
'''.. ' 1....C'. -''; i4.' "-"V.1',;''' t.....y'1_,,'„;•%-i..-:74*.
L"'"" iiii ,
i Ti--. . ,• . 1= --,-., -— '.......1.../._::: - ; ,i,,....E.. • .. , il. _ , If-, ! . .. __. ;:;;;;.•,;-!,$,v. ,.. ,„, 1:,,,.3.-wt ,_,..- ,.,, „F.:Fe-4'.1---,.-.7-k-F-, c...;-.-,._"--_- -_-.71.,,,.:
L.1 IJI.,i
. ‘- •- ..,-----4-• 9.--,*- -., . ....r.'; -:.7-----------.~,- z„.,,,
'.,•:A-•,.,,,•,q-,..::, -,, , 4,,I :tiFF,,.....,----,.-,.:;---,1.,- -E. „:„,,...r....;_,..L. ..,-,,, _'--., -. .::4
,.,
.
NORTH . -•.: ?..,,,::::„..4;.,-.. ...t , . rl,vgi.----. -,..t.:;-..-rm,-.,..i.,,,, ,,, - ,..•,•-•,,,,,,, ,
. • •-.:. -...-2.,,,,,,v , i,.• .‘b-1 •+--L-F-z, -t,--41i--,77-.----•,`Y*,,1 --.,,:•6!!.
• -.."•:.-----,,,,--,-t,•••. . !',,, ..,,,liy . wa:',,i..:• .‘,. • ••t'•.h,t• -Room---- ,..
1.,v.e.:;.ra Terr,r44'i,i,:V.++.';',"----''''''"'-'0-.'0-#.,-.1).4'•iii"-..,,,....--4,i'ki.54"'''''''..' W.l'kv....qop4,-,,„. , • r - • ' -.---i..;......"......ria,;-..,d;ia.i.--,_zi. ..,.---',:1 *.
f r.,:-',4:4:-.-i,,-9',.0--",,,.! 44 '" - ' :-'.'''--4-elf-, V-1,42.-ki-14.'4', '-'0--'..,'--:`••14*-4,/,,''If-------4,-.A4.
.,'6.glil'illisAszi,,q,,,• ,1,Al',..' _ .log' '0:1',41,4w.,..' tli 40,40,1",A4,",11.',,g4,1?,•' ..,..,,.c-.r .,,,,,, ,.. , , ',4,.,:, , • .
tert.',7*Ai.r'•:,,,,,,. ..4,.,•.•-•-.:spri,-•-- ago -,-.40-„,.‘r:k4:=7.-01W-*-*. ' „.t _ ......
- ... .. -
1.1 1
",,,,Iri.2i,10 .'":!:,,..- .''. .,..,tt,voi . ..,., -.I.' i_'-'11-1'?,r...;#44,0.,*„.-4 44," ,,---'% ,;.,-Ig.'' - :. • •
,,,..-„,„,ve.:,,;k,,,,..;,-;.,..:-:•-rs • '..-i:v.,1-4,,,,,A,:',...',.)q.0;`• • 'VS•',..'11.1',.'; '44 mom".'' ,10..,•: .:. •-.4" i,•IIIIIII.t.,1 , •, 1---
1 ri '....7.1157C"..1,1 1 [ . _ _ . _ ...-- •
•• M''04:::- -
iir,4'4'..'V.,' ?.,o5 ...;,`••.'' , .0,,,„ ...;:-"•e;i:.`'''• . .a IliZIN:m 11.0.,,p., •
: .‘,Z1.,•.,...1 . rtt,-^*"." ...•" ',,,.`1.Vi4'i.;:.tq., -4. 1.m,1 ilk..s'.%..0 , -.: , .. .. . 1,,,4r;,,l,''.,t-''..F.:-(:,:., ,:,.;;.t2
fi,. :‘'-;'.:! 14.ki t,°:'; ,' '''' - - • Os ''4 t,. .,)''; %.'.0 'IN Op 4 aa,•
, -. I .• ••-;; - .„ ,.., 1 itoios A.,. ' 4 •..h.....-,.,...-
•
't-.1,‘-fil...Y,..,,,:'•..4'
1,t• -,;.',g1,,-''.',0,"" ..:.,
' , 5,,,,..".' :•.',-,vrr,'"0114. •'.,-.':.,-.'..•. ...,,-- •riff,-,,,,,,,,„t„,-., .,:vh-,,., ,„... ..
• - .
..,-, IP'.•''.4" •, 10111iii•
l'''" , ,','•!il..47,11•.1.3.1; '''',4ii,••+'•.11 •
,
"V;•••V‘4: ''''l'r ' .'• •• ..1••••••; •.•-.. :••••4••••.' '••Y}!•• ,..*. : e'lelk••••q41:• .••'..•'INI•*•••••'•'•V•4•4 . / •2•,47-•••••!VitV_.*'t. .41;VI . , , : !, ''''''''•t":.''•••..:.• * r'--"":7- -, .
' '\ ',‘P ilk'Fk.7?..,' •t, • 3 •a0;-•'• •A.1.•'!:?•••••Pr'IL;'.*. e7.;7';4,••,,,.! •-•'1'''015"/Ar ipP4,4 ,
ot,,,, ,,A4v,..4.6, .....I.-, ,,-,-,•:,--446!;,,N,--...•,, •
t,,•••,,,t fie'. ,0, .,7\,. ..;:, "f• ' s' '*4.-;'41,' ' .' ..ftri:ipS''''. ,0<,.; :,...
. . . .
;..t.; ;',.! ',..:;.&:„.,`?;„•44,:it. • ,,,,,,,,t • ..:•:!,!•, ., .. .''„.,,:,:%3. ...;1;',,AV.."*.'%&."' .- . •".A.' - ''''''';•, ..';4' / ' . , ...
i'llz;it., !,;•:t.--...,,,;.,164..,,,.,„.,..?),,',v...., ,.-t--.,.., , . ..„0-.0,jt,,ro.),,kRA,44-q. .g-.0.,,.i.,,„di -‘,,',4,,c t„-,0-, ,, -'r -i-sfq,.?;”-i F.-.) ,:r."*--.#'..,%...:c,, .--'4'.... .*.`',„.4-1..r- .:----'L:-------4:-.--
,, ,,../..t:,,,,s0;...,,,,,,,.„,si-..i• N.-4:,,,,, ., - ,..Fi,--,--ts,,,:,F,k40.4.fr.,..it4/4.49-p• ,,,,-i • .41.,41 A.,..,4A ,.,,r, - ,; .11',2,E.,:p.•,;..,1,/,,,i .,•••>.• . 1,-7,,,,, _.,_:., .,....,,N.,--• .,/, --1,?,...,..:?,,..
MI 44 `"`''' '''', ----; „.4‘,,•••--..,e.A,. -0-wA--,k, ,-..,qt.. A-.1 PP\ct;',....4Mt,',,t, 4.• - ,,
'':4„!!74:&\,t, t__\°. -'••..,,.,,,„''t.'lis,*' . ,,; ',ire 1.,14,4yrzekt.t.;11it-w* If lz:4"-r,,0 !,,N.s,74-ft 00,41"_ .. ,
,
\
. -1 "7,1,4;A:///l ",,,^•;-4 . ''',-.-'^',... --:'''.:\:/7-41& .
krS'E!,-S.k.9, _ .7.':,. 1.,4,1•1•,;•:*-•,•,•p•-/ , ..?.$,.,hia,..44...toml-,- i• •,,,,-„•;...,-.,..1;,- ,0,..,01.,,,,,..k.,,,,,,, ' , ''.f•,,, 7,,, .•,,. '•/4,',-el-4, - -1 4 r•••!••••.- ±",,,,..% .. A,,,zif;
it'atf, ,. "•1'*.V.,,40 teak 7•AN.1 e.tx,''';,,,rje.061,4'N'41"'\ 49 '..;?...'''„,tr',*4.I.,,,,, '11.1,/ .' , • ; '4 11,00.11,0 fp-'` ,I.a.?.-,••-7-----0.2- 1-21 •A''' n -1-1-7:1 -- -----
II,FWIVI "•••Itt,*$S0 .m.k.,,orf v.4,,,,,p,,,00,-=. ,i,:' ,A,I .'.q,',',i,Z,fy:4.-.7,. ''4,/
. ,a
..i.,A.A..,10,,,,,,,t,sx.!-.1.,-,..,-.-=„r.,I,...-••r,-....,t pt., \!..a....a..--..........:—...•
,,,,:::::,,,14,,,-1,44,.1,,At .,,,,,,ov,%>‘'Y.:14-iii.t.41.7,4,1,41.p.,;1,1-01": -.>-:-...„(.,He'-'..-•*-r 1,11,ifii..:',49f,,t01.41,'''' ' '. . ' -- 1 •,17. 77,-;A:1727.1„,.."ikttr.. ke,.‘5-s.k.. ......f.,i.kx.;*•.; ':.-.--,,,,,:g,c.------/•!7 4..;,-.447,-,
,,.rµ ',401, 1,,,,,,:„.0,,,, 1,., fl -4,•',.. 4-K,The^,,i& ,-,‘ nr!••.n•AW„,fiX-F4-N,•!4-;,.. • ••°, ••••‘.-r7.11','f•• 7.,ts-',..•.Y...1.4,1•_ZZI`;'!•1 N.-
4t:•'Mlitlitce L 4* %W.-1i 1.1**V • '•. .••!r'''i;44. .1),tt,i • • ' ' . r r . 'k Lf....-Ii•Y°':•!!•,:i! '•:•••
,t1., 41. ,,li, .•t''1., 4t:itKIA4! •. ... • ••." Alp,•,,[i• * S , •
•11...1..4...14:"., 'I,,.1,1 '
11.,-.N:44.„,,,r, -.....,& ' --..,, ' ''Z'.7.t''t.).': ,g.'.)."'• -.0' ."..'4' Wi.,iq Sd:"" — '• '. - ''
il„ .,,,,, ,•.,,, .1 ..),
' 1
::1.-;t-15,11W4-44, ---. I.,•..---' ,e,..."4',A,t4e'Alps, "PY ,it., ,..1,4).±,, 'v: -
\
, .'%•r11,14:.:•,.-.:•'' '9-1 - •
,,:.,,i,r!%;41',....,,,A2,,:e.rW, f,, %., .,..,,'•....,, ..„.}. 4i,,,,•:tt...44., `;lith , .' ,I t 1 ''' , . ' ' . , . f',' ' . ,:.-Z7;;:r. .!..5.:.11M11/..V:7:',
itr.V...,4,;0,4,'N•r4'y ,a,VAL N ',••,:°•"%'0,„,./- -4•00;•• 41!.•4."'• ••• •I•'•%.• * •• • ' 's ' ' • '' '••" '•'•'•r' • NJ
•'St Sir,'-,.- ..
it.9 ,l•\• ,,c, -; /1:::in: rierripTer -- s,
'''',.'..42 -4...,•:7;.',..-1:7-:..:.__,J7 7-l-,-,..: :
El \ --7-AQ.'3:-',' Z" /lIllilligt-41 -)..• AERIAL VIEW •
.,i",•,'". ' •
•-• 'le 4%0:N.V..' 1,.. , i '•''ii:‘ilt...-.4.1A•,•••S• - -•'.- •
" :II, kt,s . ., ••••••• • '412.. ••-• '... 'P5 --,' . , '
l',. 3."••••6ii
IN 4 2i-r..ii....,;,,--11.\- -,:::::us:siter,eis__Itoyminiiii.. It\ ' ' 4,11. S-1444-7. ••,.,.. -
/ I. _.i..!;75). ,, --,..1. 1 "\'11 wip nummumpimomp.
4 ,1 1.1.•-•• •i id , , \ , ......, . •
. .•
. 4 . , , _ .„.., •-•,.1, ..... ,,•. _.„i
•-0 11-.‘r --. tile., • .^1--1 t -1 • . . ..
' 'Ha- "-' • ' 1.1f--, ,- t-....
••. '1.• 'it•411r. ••\,•. - . . ...-. ..q- Tr --- i-,1 • , •
4 iii'll,nr-1-7-- .• --:-. iis1;:pplitilientimexmisteessems,\',„>---..::•••,' - 1, ,-,,, •
/I •I•z• '-,-14,0..!"rat I min!!!"""""lieimilellWies;! .4.1114,.:1-.--,-- - -saL___-__•I'''' '.-L . - -i."0- .J. 'C''',. ..'1'!!it I 1-, ,,'1,.4:. :,' • ..•.'. ,, ,
hir"Milliffilliinir"13. lu 1.91iir""•Ailii i... . .21111...lillirpii-;:i1FUES VA, illiT•rip:::".•1.1.EURT33.7rIgq - ..,. .:..X11',,, ', ,., -' ' , .-', . . . - •,-.-
... I, . • .4,.." .. . _I. IN I 1111 III II II I ...MR" .,,,.. --.••N .___,___,...„;:, :.::a
.il I Mq .:Iiiiii[;" I - fliir-1,471"71/'''' -11191.1' Our it 1. hip:Ini"Lijobi"ImPiw-NiriAt--qiii.hirailst, ., ,, •,,v_ii, ,i ..;',,,,,N,,,,;• .....:-.;--- ;•,:r:.---1---5 -,:,1
,,----- • .....
1,,,.,,„„tila,.........I.......F.-.. „.:,,,,,,,,,,,,.., . , ,, . 0.0 '1.4 .„
Mg Tt .1 . t. '• . . 41,.'N', '-•'.5 :1 '''''
1 / LOGAN AVENUE
........,I
. 111,M111111 NUM 11111 '-,.•• .' .— i,,.
11 il (..—__ . - -
ilia.1 aiiiiiinlililliiii EMIL ' - •--'
,ILL , ailmimimer • ILE •, ,
atinnr• II • ow ....._
firri - IJ , Rim ..
/aitirguT-'1----qicaliTiffilipruivionlikflitig...., -11 ,?.,, ...ORE EWE: ..istaiii= Iraft.11Prilirrac91111:sszaisavil pr... : ,,,,..,_,-
al I. Z.•41.11111i• U9 i •LII...E...... kjidillIrt..;_i!e :•,. ..,,,,x, a....•,, :if: ....IR _
......a litINV: :;;;;Imputattaull,d...4:;.•
.,.utura
,,ir.iu,,,......,,thryalimminERNAimmimigi imiworirm " • • .
1,1611 Ili.' • . r..'sr Err!!lit•:-•:::,,,,,?,,,,:;,.•:,.--,:;.,...figns,,,,,,,,,,im!,,,,,,,, is„.4.4., liriniplif low,,,,,,;„..! • II '•'• ,• . . - • • •
nth:1:ml•-,,,..,,i,..„tp,,.... „..•„,,,,,,, 4kk ui,1... EMU ' . .,. ... ,
1.1711; -.:.,i..i •
••:•••41'Lq4.43,.. ..,4.i.,,liv......, .,,•1.4,ii;
intrumilk ,
i mils .........,..331,1,..; ..,,1,.•,--•:,,,,••,z;:,, '4", ' :: •
''':•.!_•.:.••,:•.,"".'•.•'•f','.,:::.„ :•:•'ir'q3.'1,!•'!ri:;.:114,!iS:•,;
11111
I. :ill • . iliSiBiiir'f.-,eicrtifk,-g,:!I• --0'94. I-',,,III. Ii; r,„,,,,,,,„,„ .:..,. ..,...„,,,.„,:...,,..,,k,.•!:AW; 44'i4
1 ..L-41
I -, _I
11
,.,„,.-A-.. ..1" 1.-1:---' 1:::11M11:11114,00A:•.v gr,„"';.,4•0-..,%!.41 ::
i"::,141111 9 ..-.,;:,', ;;;LIY..,_-"'.-- „,ok 1.•I;
;Fa'„am, „,foril„0.4 L•4; :. mil aiwini
iv
III1Nal.Rol
_
331PrAlii!il .•,1q";;;;;I',4;.f.flpui..`,voa., ,.....„„, pr.!
:::.::... ,,,--y r,;,c...,.:.=',...,.:.. ,-...$7, ,:aq1:: Egimmal•-•••=” int
1111N16:,
4m:hill .
'
r...-....:,...,--.)..,!....,,,:5,_•s2-4,14- 1,-;-,--,icil--
.-,
'.2.A 1:1:•'''-....W.'!kit'Or4,TirtUrz'''
pY'!..2'•';`4.,4 "':'','•,LiZ',,';' ,.Y•?,,
.....,%,. ..,....,,;'..4-.
1.121&.- PIO"
HiPrial V log-4-i.:A:tii,-,•;g:t-'-i11.... ,t3;Igo. FLAMM.
IHME1ifilil - . ,.-w.',,,:?:;i5I'f.i.:,p';..4'.‘,..i?.•givtv.4.
pm •w.riVILE
q 4:.'f.ff,`,,,.if;z....i11-.4 s,,,.,,e lip.mom !ilk- spi 211!• ) . .-...-,,...-.::.;,...,,,,,,,,y,':,.c.,i1::A:.:•41.4qt,„ik itiio
11111 12,17-1- --#111 I '4-11111 4164•Yeiiiiiiiitdalv*Pcill .061.111111111 "1 ...,:...,.•••,...„••••:„•,,,,,...,,pmt,m,„,.-.„,4,0F,,,,,
Aid --,),%-..,,- - 7.-ir )•,-,,-ef,..,,,,, ...,:„.,.,.„...„,„41.,411,,,,..
••• YL ,,,, ..x,,)-- i•z-4,-, . 1 ..'-$ri."(SOHEMEIYMIS'V.. 11!1IP iMriNiPili411 1,1%.:714. q:N.\\7\..,
—
.;.: ..,:-......&\.\,:i . ...
, ri ' '1-..L A • --.••:,,-:":4 --...?.-._`,..,:s cv,,,?..,,,t,:,,,: ,:-::, ;,.,..4...0:.,isf,A 141 imm.,,Emilliri, imm!iiiiii •:., . • •
•
.i i ilk tiT;ILL ..:2-FL;Iii,i.f .-1- ''',`,E.f.j:14"1,: i\-_\.vi...7.7 77---7,77.7 .. — imehl:::Nim:.a. tz. :•:1,,,,,., N • .
I
IITIMPINNIMMUIWIPPIPA PM AIM
a.a.g.= .... ala======,I I I I, - . -- t•••:'.-i- '.- - . " I" .:• ,c. •i..'...,Iii1-1-1111' • 'Immo!! sitear-ui-?Plomi . . ".-- +. '''...
I .
r..L._.,. ,.i. i• L. • -:- ,j 4",,',,-,,, ;IllatigrarlY111111::::::111 Opal Toi ..;
1 1 .../...' _I -:' • • ?•„`,1s.<Y':, ,,7 - ..."..,,,:: 2,-;:i.:.. ..'..,:,..:;.1.,,1A,i,4,-,:.1111 VI
L-,----,-zi-„•,-/- 1.--1.,0 • • ..,- ' ,,,,,f,:f4:,:,.: ',?.'VA1'nt'i,,.,:m..:4.4:4;‘,;:e5 earrirom ILI 41111N1111: NIA I
1 Mr, :•.tii
•
-ammilM k
.• •
,-- lanai mEat•Itt.4.- ... ..- ;I a•-,•:•,,---,,:Z:.'..•.:•:.:SA-;',4.,;1:,W",:i:f.t 11 IS rs ni• x •.'1
r."3 '4:11i \ ....L.._ . oigh ,.. ,,,,.,....?0 ,..4,,,• .. ,,,,,,,,,,,,.‘",y,..,:innli ,:,,,,ho
,,,„ ,...,:: • .. ....
•:• • . • •. ..,.••
. „ PIAllA PARK i' -• _-: '-S. ‘.:',1141' g....."),',1. .-7i.'a.-,:.,t,',.4.,•.'.04 I I!ilimE iiiimull!, ,.-9
= Mill .•I 113--iti •,.0.3.--4,1E::PI; ,`, e;,.::-:,.....i.:,1;.4;::;‘,9*.f.:$Ac 1 li:la II 4111)".1i1-.. t-r.-.,' I
k: -,-,•::: .
= J.-1:::-1"- ' t•.1 '- -v-r•la',;,• •7':*',';‘,4:;:il,-p.......44•Atg..,1 ict,, III ,..i..,,,,,,,,,.........., .
i-ta-,i. 1.. , • •Rioqui„•,-.1.',,,,..;, :-...•:.,-..•:,.,,.•-•:m.N.f•--0,Li - 11111.11 •;"lik 1=-• 1 ____I
mit, mi op
. VI
1"1 .
. ...rt j,,,-. . • ),, :LI mei:nr ':r..---.--...-.:-.-c- -.....A-:.1,1-11 ii14..
milicillii ti,,,..,',;•.2.7...N•:.:::-',:Ki•IiiNg:P.A,';pl I.1! immor,h4, imi[
C.,3 Lilli
6',,,,,,,,-.,,w.:,,, ,-,...-,•...v.o.,„.4„,,,,,,,,.4 .. I 1. ce "
- = • • • , .
gill ..T. " in'• rmilpi 123'11t;','4/1.:V!.;!..M.44 Di iNnommte,9......,.
1.,-•1 • 11,[qpiiiiilli•igas:-!;:"i,1;,-,N.Iir•A- --iin •111
• .•
- liTHII "ill
11.14,i• tf,,,...L.( rib
111 imilid, .
11.10•1 , lit:till* lt;1141.931miet---- 1114.11
't i:1 '\.*r.,....-•;;:1.5.11-litil W('#4. ,:t•.,.:M-.4.1zid0Z,kl,11;mmoil MO ei . .
• -Vit. immomo. ---. %. (du, . .,,,- ,,,;?.•$,,,-•!',i,v-'---own-
.,,,j,-.,,,-.v.,!,.-....-..vv.44,-,,,,,A 1-.,/,1- + INN Wiaillit• ' • •• • •
tilr•ITI - ---124.7 -NV4:,- 414%,- 1:1:111::11:* l'. `.':-•,'*---.:"••::?l;' ..,,n':''Ia.:!::1'''!1 ri 4 NIMIMMilf.----- Iiiimi II 1MMINEM • • . \.,,,,---;,''''''
-,::).:, ' •
II Or I "----.•..-E- L"-!,-?,iii,i1.:,Yv ;°!...::...dpif-•••••• ••;[; :,- -2, ,,..: _,..rt ; kli11111111MPPV • MR
1 .
fit,;! III -- ---- 1:ff: '7.-2 -.-r'",a, ir".4-211"P 11:) 11' -:--J1,-;i1-LILIVIL; 11111Pleilli ill* MI& El.'J.. _ 7. --,-.. r Hiliiiii
iilliiiii .51.111 -,-;:--1,„ii.i.,E1 Ala.,,,lin p„ q.1.411 otariet min-rimpiiiip
iiii 1.
. ' .ii• ---......4..,........1-11...irwill,-......nilei.i.=,i,16.ii,i.m...:,--0_ _.'-'1,16.16,,L.1..,4i----.10.„.,...-----11-...i.4---.A.11 ,3P-4.,L,L4II---.114-...L'A,---.-th,LNI_-'1,01.-'1. . .
III • •
'\..
I •111 —---1----- IN : " ; .11111111. 4111b. L rill ,.. ... ,
..• ..
_=---_.•
111111•1111111
. , 1
( 1 --1--- •-• - ----41111,111111111411111101:11113 II 11111111111:=14.
11111117MpaCiVerliiihingal:111111Pil 111Pr ; .. .
.. . . •..... - -
MI 1111Or 11111V 1 r
Li .___..11 Ilk . „.
,. „. . . . ,
.. ,. .
1 i Ilr III
___ ____ ,
. •
_.--...„
__.... 1 JI, 1 Nu jimmamm
111,111111.......11.111111.1111.„.... ':••-• '. •...''''....'... - .'' ''-
.
;:77... ,1,11; _,-,1 1,4;III-4i i A-_ 3.,:,-4,:,--- ,4,04,7-rillItiq,.:111.-411100,4,FIrciiiitIrric.OVV,IVAIGE:74001,1•1110,P.:1111-519.1.1-11e2IF,VIIMPSitek.:,14 ,...
Ilitli-17 im1 . ...iikiii ,...-.-I mai -1 so_ii •ite.dira.--.1L..-ilmii...i .17.1.mhmmusi...s...- somi...1...liwidimurtgri-- • •
,
-dual
314•14111 1111111111 II II II Rd . . I •: I ,.. , ! .• . ....._ ,. - . _I._ -r. .7- ...... .1111M1...1.....-.4„,,.,......... ,.,..,.....„..-....-.-,-.., .._MI.,, MI - 110.1111011.,!..1„,,Ir.,.,,.„1,1!!!.,! IO,T,. T :'• .. • ' • .•
k 1.1( g .•
i '',In • • ''• • .
• • 1..
:--1 .. •
, ..
. .
, .
,
SITE PLAN . . 5
. •
C LLI NS ,
• •
rn
. • . • •
70 . • • . . . • . .
. •
... .
• •
• .
I . .
• . .. • . ..
- >Z
SCHEME' 1 • . . -
. s • .
• •
•
•
ai.6 f {�
r- ' 1-- a (� f"' f 1 ) CT, I— i 17'.' I 1_ f f I F I 'fit+ It lv', t» 1+?�;r;1f '`' ..f }} S,.., ,,:-. ', ,� ,:,r.
V • &,N.^wv.n'dr}'],..,.cu,.,,� " . ,: --. .. ��,�' t - S: ___- •
- IM", t�'ti $:ejr?ir,;.g � 4.'•if.':::.xi;'r;,%. (`::3 Ja,S;
-ti`��,n ^..L">,.r ri"^"r.' +fir;"-..2' P:' F N, r;. ;u
.,..: -/:Y ,�' M,aS: '"'i 4ti` �.�� 'ate' �3 - ". s•c.sti,>�,�7 x'u.�5:�r1'w '�=•"..:
'• ' �;` `'1'�`'"�t=' r-J',�}y ^�` -� E' :—rtay,:�.`�,.Yr.'••;'�_ �. us� �y{I-.x.^t�. `:s. ,:.s" s,,�,;`n•".".'�;'• �r' sy�'r:a�l•'��`��r.t''`"'�'��D.. f�`...5
Atiff " `! � �• ,� C:W .?�" � AI Yr. 4r..T.. ^'f, ,r) 5ti,:. Y.vr r
zsirrt ' in <.1`!r +5 i xr°';1:-r n's.>a'. /•r.,q 1..1 :,. cw ,�h.,, _ .X,. r...5'b` ::4 <4•,.';YR Ff:.,l,.�.l ��t..;•:
',tr ;• n,%:A' ^i1v rvSJ: ger.r'*:e%'. ^is :f>": '•.t' .N, a.{ :.1li xFn - '\__.� ,1J'e, A ...(•lte- .¢z ;w;;:.,..
,..•'ti..,r ,'� tl �,f..y{f,�^•"�:. .�i -.� a,.: n7.^'-�, ..1; w ,.0•ns_._ �h,�� _ r. Y�;I' ;:i{4a'::f'. .krci 't�`^,•I�, r::;.:
M"�4 f.�F:`S:: I.� �.i "U�... b :Ar.,f,,•:.%:t�iLu.gr.,, "'i$_ I..K „1 -.�^N- - +� i"ir��i•""`, d- �� •
.iL , v. }t ,ti# ,+,. i a+C ', :7::`' � "AfC.SilfilY; ,b'.I>�t". ''M1' t,'{ ) riu ai S4.', ;i,,t{',' '•f '.�:
7.• •.taz.•cr,.(c':'•�x>,r.,�jr •,'„,,,,..4.,V../;.... ^ , _ 2-' �'�,baa _,x.,, ��"� r" @pw��3F`�4.� �•G'.t.th�_•r;f.,✓„ s;.. 4 :,,;:,�.
.1?„+,^s r,� r l,'.:t h rc,-',. •p b1;. '• ;,,:"°Rti <, il. y .%T x wt i C:'1.$.Y.r'11 „>rS„i`;°;: . �t,„...
•
• icx"Vn,. • ' ,{( �' `, t t ,,,,y''1(,,., u4)r,'t �r 4, SM1,= s •.t :.Gid '''S:i'i+ } f'� •;-:::.:'. 7•::..,,=
..-t,,. k' - • .A, ppTb'a` '''''--• ••'z li'"-vi Y�” 'Sa tk.,'a 4;` q •". - telt
„ ,.5�,.t.a' ..t ftr'..„;,.:I,” ;lkyr j 4.`..
- ,..,�e� `5x . '. 4�F. t�r .,y,'. e�e .r,M' :1 r, r•,),,i..c.,'4-/, -;__, �, rq. x„ r' i -,Tis>``"�:e"l ;rh.. :`4C " 4, " ! 'r.� ,3�� R,'��, _.,1-. F�{!A ,I, J.. .d.•.'Sr;;;'','; ;.17,i: ,,..„ r, •.^r' e. ,'�..'ki''a. ,rn 4 0.•i` $.'t ,. a. t1 l\1 Y+C. _ - V; :.f , '.7,M ;,`- ,i..• :�.i �" '-�r.. n..,r 1 ['t�. tom__; •",hi ;<.I,:s?:;i/ r:'�; r{.I,., )^' • ' ;.' ,,._� > ,R.f=v1;r1'� Isar r--• a,. •,�.,:: .,.V•?T.. *•fl• '- .
-• 40.,. M• F 1i'h?+f'y, j 16rL c;6A1Y.0 4*e�.�JN,; ..' *.-. ,�' �?...-,L � ey rsc; a '�41t�.., .: 1 tY- t;i.!:''s. .f'
- - I: ,�;, i --"‘t,',..,7,''''
.. -.wtf`.. ,'u 'w ' ,w< -.,a Y.YYrt'S'...• '.•,,,
ya,=: ".s`, I ��� [,;.,:.Y- (.,k ; : L „ d/F- ! r,=u% •: '''.
•""---"• =40.--::....-21"0417... .,
ir`ig�•� _ • i,v; ..i a 4, `db ` 'tma._""i� - -�III ' ” .4. :Y;T<i.:'4;•;?-,•'=V' '
=40_ •e • :ry k Jy,,.�'i''Z„'a'1td •�r 4 t'r� ,° "'�.. 1" . :d.s,,. .,yjt'c'Y, •'r!'•::",.z
t
•a.".• a 1n Y i a a,� `'-� `--,,.4..,".. .-.E.:---0:1161.77
FI. 1 5 r�c.)e:.rnx,�,t_" sem- _- - ? -r
4.4• Y 1;" ,r .s.a x ! *rt bl �,,.! a u �f !ie i
�- ` .rT-�,�, ' R• :•0„.,-,,,,
Ya sslA it, '! `.�'{,(\+�� (' _ �y�.. Yal 'r
. '•,:...'..::.:::''.:':::::.:;,'--doMb-,'".:-..
�'J::r,.f''§.`•72,t,•54S�i= '•x� I r Y In �Nl! j. •• ,t T�::x ``+Ii'�:.
, <<:. >w �� C^t I ' •: 'bli, il i:-
s,s:,�Q,`f,zr4,05,,��}ii..:P�ttsA((�;�'#Y1',1 f t,�„� -ilit�:�,, : sJ•.,7• .. j ' 'A' 'tn:r"�•y:z;: (;;:, . ,.. .
y i4iii it y fir+ iP* - '. - .w ot,,r,•r;,•'..:'•;:i : r ,')1,.,
•
T• ,�,�y.4[r c1 r "��ta :�.,' t-'t^:'^„ .a rs f r�, n :. ., '-:'t.fr..
:'V,., ,';f!%-it§�R1..,^.I "m.ws py • t '*�'... >h� ttF a t''I '_ ■ .
:t'f?r, t R,I .• .,,Aivgyp I?" 1.\' —T.,.--,7.----P--f..::____.,.-- ,: r ; ,*, I/kp7,;.- :-0;4r *s 1 wi •. ENII�..i
. J _ L •II(({' •_C'_'n. ' li •.Wt k`,,,- ,a,,t t +r-i:a,w;;d,l.tif::
h q"�k +. m,,x'y} Cil ::\ '�, .': `L ..,...-1,-..7/4,=---1, re i,.� 7 7 i,.<) , K, f-r ,r i
"•4 �"'1k "rlk ' �IL_-. r -• �4 ‘-'1.,...,--,.t.•
y !Y t',-,-;lttt•y:,t.,,,,-..../
;t t
tkA_, fp„�r'`� � .. /^` \Y\ ^.:.,_ 9 L'yr 4{;N 7 is 5 �,ty.,-t?,',"M`4 r
1^l YID { C �`, %y{3 ,y,r £7:iditk' yY1 Art •
,'' .'•'i°,�3 •:'.... .�,. ,Nle \ .�•. • ?„}.,$L"','4'`�"'A.y,ir;'"'*',?_, ,:+ �'
.fir 'i_.;'i,:,." r ,
t3' f 4 '3t AR;,,,'.A,, "'). •"yV'ri'+,' tr!M1
• .t:41,,,'�' .riy .. ..k.-„,..,..., .nrr 3 r., •� >
'I I3 6•' ''.Y-t[,,,L.�4"„ 1J/ i, :.3Pi '� `'\\ t +41`3.x'-."" YPy' "!i'.;;;;;'`';``" :i-:,;r4y2"`
',F'., } , 1. �;,;yf;, 1'�" k Iy}, r F,.�t f'` '0. �•1:F , jIY k'f,,:,,'... t ;:? a ".
....._.... W': d ,ati r 'r"u ,-i.' zt N ”^` I 't`Y.' .� _ '1+",1f t y e :;y':' 'i`
$ ,,_`x-. Si i .'-7.-�a s,y a sI S.;b4;,r,-xr,P„: s '^:.t,`, ;..
c t' J/....1....,, _ 7 ,rts•. I at^d?ya,'r' d',-'11y:,,r,1,, Y :
•
'1 „A FITVW,1!
4 .---•'•-A —J'-”. _ Cnl. x` ! / I'Fri�, F,:i i.17T 9. I"i,'.., ra n r'�o I ir1 )'
_
. na
� ,fir ,moi ` .�% ,t �:s,.:.a---. � „ 'I ® ,,;.._ ,f" pg, _,.,,' .,',..72,.... '1: , ..
.a ' • , ! )..a.'
, r' •
�-1 i'.r ^p ' 'I 1, 17h1&I� ' ..:. iyl L•JCT. } jC, , w 3' -
`` ; '' ,t mrl� "f- II \ a,;. h, ,•r,:�d' ,c
r-.._-- --:.� .' w�:u *i 111, �.. \: � — . - .::�� .Av:-� ,{a � . -lw .'•....i.,,•..
._ .. , - `:I�:^/f4J ,",. .',A::, " ;?;c,.•`�1 'ai�CrJ:".ot�Yt 4,..;-'.j'..I, T r'a:�.';:.'e..,v`
:• 'i4:'lj1., 'xrtCf�;:;w', k, t1�k7: vtt7.. $, ir, i<" '
.---:.--:...,,,,,,,,,,,,,,v-
. '-,,;+1"tr,J>f d i sf �. vJt' ,w,r�,tvLtrJ�^,,.,�ti.r -yy,4..y yy
.+3" .,.pct 1, }h '4b.,•,
..,.,, ..:J A{°le`i�1Cl y�`l-, is,. r' .hs(sX'�w''�ti:i,,,
::.:,, .i .r:,1. 7a t. �p l,}4yre�, gg`-d'Fjs'''`rf i„`?%`Y`,:Ik''�':,?T*,..4gt
a'h".r:1s)^.A;r ,,a2Se ki�,v4µ,'„ i wh,, a'J,a• }1. J:744.V. ^VY t.rir^r..r,R.l,.,ir,r.'>r
,•'� ?i. 4 �.j+l,``•d^'t�F.n�'-""',�,,'ry� ':r E�'`: $�'k:.r;'�Y T'. :.,n:��'�i?,:�;z;Cvi,:��;,N�
. ¢' ?'; -..ip'r`al',t�7 ^Y.,4 DA•43.'`d,'•s q::, .i r:la'r rg.;r 1. ,}r ,,C
• ::�`(r?+s X"�{�, �(,�•`�k� ,�,I 'V,kth; y� ,y,.f(.,n,;,�,)i r7�,)l.�trj� s;;.
•i:l:.f3R�'(`�' N)Tgyr���+r.�, ��t�,".iY rlti'�^�'v,. i�W,::}i5!'t3} .'i4-t•1 •11:n.�,�::!
}�yy?8rr'; '9p... ,pf% !,i�$!i_x"xktu:>+"rv2(,t ';77Yr;,:y:tip!i,,tf2•.•,n,f:f7M,.Ji?','
'`6:.:=qti,-. i�`I'+3 s37.c a Y r�}'�:P,+` ,,. i ,r, s t �., r
t,.,'.!•'' 'tt :, i� ,IuF P.r1,,.k..di,.s. h 40 f i k T `1
:,;7{`;4:,,}r�''u? r�, "2• r� .� 'k, U1 Q'/S':l•�Fi."„d.,, #, L Mf f
.;
..,.
.
Ai) ; i , , , I , , . ( - ) 1
1
• ..,' ..:,.: t, L.',t., "'c_.1..1.
. .. ., .
. , r-7---7---, '-.--:,-,---t:**•- 7----'..2-""...'"*.14 1,..-..-- iql,,
,• , .
, ... ,-:' a r ''' ,,t•14•!.''''', •.• 1. 1 A•', '•.;• :.'4... ..'''.....,'''isl.!4• &'..'4V•f40,41" •,, •p•S'
. -...•-----.-..--••• • :..v .k, :,11..,.,,,,,..,-',0„,..,...a..,4!.,.,.2.1., - --.k..:••'‘,'",..V":.":::...9.:"P'''''h'r litotii, - rik-,
.. ,, .. -:. . , . - I. -olgriv•'-,, . ,,,,,,,,?,
. .
. .4. • i '
,,..,. i ....Ir"..3 L-IL .4.177,,!:. "...'11 Li: I:.it,:, .1-4#71 MS'
• ,..-,'..- i 4 „,."!.,1! ,1',,.4 1:4 3
• .
. ., .
-• ' ='' IV r
.
. ,.. 1.., 1,,,# . . i
. . . .... . i ." ,,sin' lig IN I[ .-:."..:.,..-..•;..-..f.;...':',:::....:.t.... .i:':'..!...-"•...'• !'--.:•.•!1111t$,',•-
• . .
/ Nur 1. %. ... . .-...„,,,,,..; •,,,,„„,„;-,„5„.„....,?„0„...,,,.i.v.„.„,,r.:.,j.,•._.-FtWA 31'.''.`''"'.\4‘..:',....,:°-...",':-'.'llaiiitfy,i.:,'
...<:,,,,01101P44,:.. ,;,,,,,,„!,01sii ^•'..',, - .,:_----.5..:.:_71c-::: .. . - : . ' '"' -T%'A li,,'A'Ls-.!,,,,,.,,,,:,4;.- ).0.....
,, ., ,f,-- ,,... --. •'
1 ,;:-'r-,...;-'-zzi.----'I ,.--.,..'-',- ' N.. .r. .--- - .• i
N9LIV.-:'•`7:1-• .1..1., . 4,...'4,-.,,i'."'...-.. .;:, .* .1 7 .C; .. ':' - i \' t I Y'iiS.:.,'':::V. . , . tikir,O, '..r..., • M.,-
.1c..-...---twri 1111 *i'.;.-:.4,i,,ileitil.::...:.',..:., k t i t .. • i . _ ..._.
44,k44‘titti,ir
. . ,.... .
'".".
• -
• 74 .41.. 411I'......_' , •••'''.,..*;1'?j .,.....i.„..... ;...11:fii.,,r.:,1
.1.. c:1•
,;• '. ...e.t'lit'ri.t-." -ig:'.1.F.' ..q :it'.:‘-..'..Y.-... `.2.i..,I ., 'r ::.,,,u4.-.-I .sit
"'' • ''-"41%'.."1P7,
11.1111
il./).-/ iLl'pi!-' ..q111 A 1 i 1 :.'.•'.-';1.:',i,a,,, , :.,:ti ii, „,..:
r 4
. .. . , ...
:, 7,,,L---,,e.--P-t.-,,,T,./;,11-1.---:lifi:.-,7 .:._,C.,,,i;.;....v. -:-,..,i 1-1r-. !..;!,t4.,•,-‘. ,,-1.111"., • -I 4, ;$4. . .•
A ,5.,....:,..!,-.'i-,;: 1 • i 1,7,,,,4c-r, t ',' '
'':.v.XitiNft..iiii-'111174H t 'i,••;',....:'F',.,t f . :''':4;",',': • '.
.. r
. , .
. . • .,.,
drill
, - t't- .fc. . ' :*....,,-• !Ea-, ,,,, :Ned, .-71... ,I,k.:.- , . 1
, ,,.•;7:: 6 1! ,A1111,
.''' 't L ,4IL ' • •,..‘`: f lie.", '1'). Mr"?? - ' -'"I'SR!' __ '••
. 4-. ilk- - • - „ hi-,',., t Ltki..,,,. -,', ,„,u •-'1';'
t.;',,:lic!•%li'.1'.1 14, gt I,Al .40 „...., ..,' ci: ,..1,,,,,v„,..,i,,,,,..fe,.,,,,,:,F,,,A,
. *k-.1:'-I, t'''. . ' , - '-'' .. '. !4'..., ,...A•tA,4)14.. Al , u,
ty _.---r-7-4-•-t-trac-,144.--2._-::-..
:;,. ---, ..,..s.-ttl, 11 V . , - -...4"---:*:,,fthaz ,,.,4,,,...1.; ,.. ,vri,*; 4,,..t.P..,19,,k '', 4.. --4-.1o...:14.40:.,?','F;-...-: ;.= . '. .• •
,'''".. .v• 1 - 1 Icr-i •..;roi: '4 lib ''• . 1,1 •.,,•, ,..,4',. '. .' • .,-
..,„.A..,;,.,,,,,-;„ • .„....,,,.....i,-,7al,„,..;fry..0 4..01,...,1..;v4s,r,,,c...,,,y;..,„.... .
• - . --,D,•-••,---4', . ON---,,,,.17..V. - .. •,,.r,444,;:...,,,‘Or.....1..,-,;;;7,,. ;..7,.1",",""...1.4,,?,;•:„. •..4C..1`7:4,4 ..,•••i 1,1,...T..-, - •
,Fk.„..;.1'14..,.F7J.. , .;?;*- A44"...,irilli)114_41;•:. ..,
s:.,ril e(4-'1.----•%7C-10.::.Ti .. ..... ....r„,..
".•
•;!',"''V.,4",''ii'1:•;.14",d''''ll:k,riPe'dP4:'.1)$.4:i.V.g,P,144.00,1....::-., ,.. .. .. .
• ..„,..,?:7')WAV.I''''''''. .,rAFigig(0,' ' Vdt'---=.31",f11:r.F.RISF.7%....•--.lerm•r.ii:-.74:-74-:mg Elli27.4 ii
1 ''' ' - '.' '-' •fr- ' ,....''. ,,'A‘,.';=•:=.'.*--,;.'..,.',.:,;.:'.--..- 'k.',.:,•.
........,,...::,,,4:Nws•Titv..4 .K,m.r,,1 ,•'..ilioxvit.o.fg,,,,k,,c),...‘,..A;;.?,,,,.ip.-....1.,,,.11. .`,',.:.;.:•..-:',....,::.L, :.
. ..,,,:::,,,,,,.....ig,.,,4.....40,,o,,,,,f, ,,,,,,,,,.„0,11,,,„,,,,,Aii•ifii,,,,;,4p9,,,,!,;R.F0,,,,,..i,i,,,4.,,.‘;p,,,,..,,,,,,,sy-;.,:i•--,,,.:-..,•.".
• . ...., ..,:,..,,,,,,g1,11.4;,,0, „1„0,a4,,,,,,,,vgqiv.,;,,p,,,N,...,,,...,.0,..,,,,miTe:,,,..,.:.::,-..,..,?.....,?,..:.,..:,
, •.. ,:,,:,,,,,..4;,0•.0...,,,,,t,,,,,,-,it.,4ft.,*,v.R,I..,0,4:.y.,•N...,ii:,:iT,2,,...„,,,,,,,i,--,.4„.1,0„,,,,,,,v!,,..,..,.., ....,z,,....,:.
. ,...,.,.-..,.*,:-.1A::,:-...*:64;44,1filiv*. ,,,$),...,1.4i,,,,y'etoily,..,..o.,,,..of,,.6g,.J.4,,,,v,..2.4,,i7:-.7:.,.:,•;:;::,:4:,..„,?.:.,_.::
.• ,,...,...?.....T,,A.,...y,,,,,..4-0...z....,,...,.....,,iri...,-,*-0..JA.,,,•,,,,,,,,„„.i„,,ttrAti ‘„,...,..„.„.„.„..,,,,,.,,,,.,..q.„..4,,,,,,,,,,-, 1.7'..,:..
'.,....'"-*'.i. -ifq.,, „•lar-2'4,i'''jlt-P.V4'6; '•:..15V`v•-•.'.41.-4".,,,,,,.1.:',--.A,-.,,--:.2;1:-1,-{',.,..??,,,......i.,.•_.•,
. * • . .'.......„*.:......,...-L.-k....- -.4.'.,..itala-r.a.i2-,.,-'.•.-Lk-,:.,-,kg,',,i,-,.1.6..5...-,.../..,;„,voi-k*,.;i2;,,,,
•
**titg.I.4"k--:"1.4•.':40.e.441.ff.,,k-11
• VIC414V.-C.14:.. 44-1,1f.°.?4
. 4P4.011..t4/ir*W.Vit'4,0*)
•
a 4 .,.2 *:. • ••a' A'.:,,1.L:-. •.:**-.....'*,,",:•,,'fi ;1{1'1''''''.''''.2111,2A
• .-.,,- -. , . . • ..-.1^3;!*'!..)'/;"''4.''"*.,k1'..•f?-*;:211:,,,••''.1*.4;',,-,-;r E.21.-'`;,',..',''''elf'--,"12t11-'0A3.12.41,d 4,
. • -
. .. . rag •,„,,.,,40..„:.o.'', ,,.'":., ..-',,i',..,w,-",..,'-,,, ,...-k,., .t,,,,i..,!.?.,,,vi.,,,,,,,,..„,„•„;,,,,„
. R, i',I.,.,,` ;''''.0,17-ii..., ,-.:.• . . L ''• ---:.--•,...,L, '-.mit:,voi..., ,4,-,,,,41,-,,I.,i11,,
Au: :'.,L„-)•Al.; . . . . • re;t,,,,,,c0.4.),i..v.,11Pitit'
• ,-.4..... ,,,,,.0 .1. 4 • ',.Ei;.''",/...rif..q...*::: ':',.i'f'r..a%
' •,,,„.-. -..-,:p.,..„„.... . ...... ..
:i ;',,'N' r§fitilk.r0A -,..,,v,..,„, --- .
.. ..4--A?".;ii`i..;,:p l'i-i p ' 'sl.
.., . :.
i * il•III.1',-,
,,,
1_ '
141I7'- •
111
-**•••4;,;,*'''''''''',..4.'U* .i.%'11-N.i*;>.--''P'"'.'`A-N&Z.';`'..*-*?i.1*,. .iF.V.b.-4"'
. •
''* "-Igt, •', • •'.,• Li •
......- :••.. .; • - 1 , 177- . ,,,,,.;..k i ,,e,,,.,,- -...,- .; ,,,,'..-• ' .•'',-..•, ,,,.:,,,?.z.,?'1,: z4.•*,4.4. ..v,,,,*., .,•444, ;.44., .'i,40,,Acop. .„. ,.. -;.,,,,,',1..itA
I L'174-',.'‘.'' we ,,,
•, ;1•'Y. ',..iI!,,te,.3',. -.-.,':;,..4=',-,-,',' 4,%,??'''''.,",1.1..,..;04. ,M.74:0'2,'''. .""‘9+;,- .r" ':-,' - ' -, • .
„:.4.,..,_, ,.; , iy:, - MI :0' • •.
•
k i'V A Z get
..' 111 Ft..1.•
. .
„It!,
• ,,,,..r,. ..-J .,,,,,, - !. r ---4-,r- -A r,,,,FAili •• -1,..., -,,,,,r-, i .1....1..; ---.- r•.,,:.,•,.:•.
-,0, , ,I ,,,,., --.. _:.; ‘,.. •, -,t ., 3 41-
' ..*t,.' I.o'. 1,1 I.*q 1 11/III' •,1'.. * , .,„"'.," .1,,, 4.1mkt,I . +I-4 ' r: .1' • - I -111'' ''0„-i „ ,, . •
-4 -,,- .1-,,,,,.i•., ry . ,:.••_, . . z
" ., -,, , ,,, „ i :/ . • %''' ,...r.- ....1--t"t .. " ,I.A ' . '. ., ' ''. • PI -... I.: 1-1- ."` 1 ii.'' 1..1 -1, -4,fi: .
•
, I t%IT!'',1,',..,.:i.%,. ...; .'',. ,:-. - ....• • • . --:,-. ,• , , „......., ;,....,, Ali/ . ±LRJ,{f„.4 - ,tra.,.. .1..
i ' • .
„ ..., .
• • lt,,,,,..r, 7.... % .... .... , . . . f.
. . 1 - : .e:'. .*. ,, - I.t ...1,.-', 1,.i .0, , q p.ti, 1,1 .
..-5' -. • . ...• y , ,• .•......"'.. '. ....,...,-.1.- •- ' . -- - ''''' I.-.5-.-:-.-'''.''''.:: 1,,
1:.:Am...lt,,,,,,As,,,:- .. ,.,s... •..• , , ,.....„ ... - .. ,. ,...,.. ,.- • , , ,.,., i
.14.q•tk, -,Ork,. ",J,;,0,,q1-..,*,"';$,..1g04.-o*if.,:':\41-\`41- *
''' '1"' '' -"'''''''';VI-'1;'9414,. 0.;• , ; "N
i , .- -;-:_ :- . ~ 2_
.1eiVetrciV'
; ..,,., ,•,:,. „....„.....;,,,,,,,,,,
. -,,i.`Ah AVA"'%;',i•..`4‘,V,'..- ' .- . • . • .,."-'47„•''747,4.-Att..=•.I Illi Ire.-.....01',./E -,4,,%-..,:..,4.:..:„.t.4.. ,.i.,a •
.•., , '...-, .-.....,.*"..&.; ..,...-.,';,,f1.,,b1-.:,., / I _, . .. ,.,.._.•,,,....„,,.....7?„„ ,-..4...,,,r-.:.•, .,,... . . . - - - ' -,,K,,b,4'-'. .ti 110444 slit,. .%.it.g)1? •-, , .,: ...,
..,_
rh-44-',::•: • .eitt2St`'4.1. ,,..1.N•ti:,c;-: ',' i• r 1 I s tL• ' •" - S.-• "---•,...`;.I.•-!: :,j:1:-.''';'.`-i../....V4ii"..4,-W:r.."- .'""' .'"'... --4-t1;42'..-'-;st,r-7--;= .t. .,I.
,z,' .i.. ,rg. trJr.r.•., 4- - k..,,,,,,..,. ,,,,,,,,,.:., , : ,-,..,- . ..., -
.,.•-_, .. .
, ---- .... •-._•.• .,-,, •
, ,,-;,,,,,..4.64,,,,,,_-•,--,,,,,,.-40,..4.=-.•;- •.07,,,off-,•;- /-, .. . -
•;:1F . 0-10.4-4.3A . 1.-1...: ,. •,. 4'\s„,„1, 4. - • --r...... ,-,,-`'-'4",-A.7,..., "" " ' '. -41-'1'4..f'• is,414,4',14•vej''..-,'a-24. ,-,',*,4 V-E.',24;',,4,...,„''11.,,,,,,,,.. ,,t,,,,,sk,0„.;,,,,,..,:/%',
1.3,3t .4.1i,•••.7".1 ,A.•Ai4p,'''6i'..4
14.',,,,:A.A.!"F.-; ,..;•,.,.R`,.1:+A irAl.,6,,,, ......, st Nit4,44. -1„--,...-.....„.......-.4,itaq:......,,,,- . . , ,„,,,,.".,`,..3i,..;'4.4,-„„4„oppiitg.411,1:,....,1. .„4,2,,;? • •,•,,,..:9„.‘„v„.„',','„`.;,,r,...'.:1,1,,74,t,.73/4„,„,.,',f'=,:,..!: ..i.'.,'44 4.4
,-414 tr,w,4,,,04! ..,-,,,Ii•,14:4,.-, .,r...,. --- \
ir•=,., J0,,i',4 t.....14P , ••%•'' '-''''''''' ''EZ.?'',"24....,..t.''''4 .7.74,-,,07... :_;„ .-„, _:.,,-,..:•,,V.I,A.4,7?'?,', i-,Ilvi'lz-44...,:'?CV.L-0.1",'.';'. 1.1.:.'.,,..• • .111,,,,,,,,,...4 .,,.,,..,.:
r,,, ,.1:'1.',..i,"411,'.4.4.":('N.4,4,....,•,,,v.,;7 fiji.T-0 itNIV N.F.;+:' ....„_.) \ \ .. '''.. '''.*Ot'.e.;ft'-'•'''''..":::PS'•-'"••••"<----.---- ..k. ,, , 7,'f,44,:f4g,'":-.-..;'r..,,‘-'_,-,,,••• ..'!'''' ,,,,_ 'A.:,,::-,•4•,..,..,3i'4.1.4.1tN%,'"..':4•'..'`""''
s
,:k..4,-.1...t..,,t-'1,4,,r.-•''Y , 4,i..,v.,. 't.',.*'- 'l':':!Z-' •A,..`•"''''
k2:.i.w,4'01" --,•tt?.03 \ 1`.tf+:.:,?!!,,*(4 ,-kg......::::-... ;;;;•:.•',;.fii,k-.AN'',•;-.47,41-!.).t?....P.:.-;,...'''''''OF7- ', . ...,..10 .‘.''''...,.,...A...-r--' '''''-‘''-;-‘1•L'''.... ..-z-".-''• :
'te•r.'... -•••• ..4.4.',. *1:• .."•"V l'f. ..,."..'‘.11-...1,1,.',Al ...,%:%,:.1 • . ...----......,v0z.:. .k,.t.1`. ,....,--.....,.':,..,,,,..:4.t.,..7,.....,..,, ,I. .:,.,,;•.,.-....;,; ,..,...- ..,.., ,,.!•?,,,,,,.......,,-1-,-;:i;;•,,,,k,„11../Ar•wi,;;:.,-,,•*,.t,.....,1,ii.
....,..4 ,t, ...1=,;,,. ::,••,...r.„,-%.. , ,-'- •;z4,4-,t•'.•-•,.,..:: erk,-c..... .,---- P -.:-,,,,,,,J*2.....- - .,..-:,,,-,.., • •'41.47'-'0.144 A...4 0/4'-i•Ar-dt‘-arA.-!`0.13.4.-r
.2'-''f''''liPilizU1-4`1.9-•••?,,?.!'i'"",-V4-4.',41- - . 7.11,711(. --•.•'''',,Zit.,401.•\.._ ,s, --• - .''' '....„'''':•:,-...e'f:-'..-..."% s';-'wr...,..i,r,,•:':.\--=',0,...,a•-;.zi•X•PW.'4,:t.„•••••-•13.ii-qt,-;:e•lez):z-.1p.,...,•c.., 1.:',,t,.
ir,00:A..14e,.''',..#$,4;;,..•.5.,,,,..4'..;,":**:'.1. ;.1''''''''''l . -7------ ;')."'...A.::: ''''' ,,,?''--*''.7:'-'...•.'''''..''.k.'..."' '';',:,...;%,,r.frb"5.4'.-.:...::- .'AV.,,,'.1:44'..4.;.;.:•,-;.....13k, •: . - .'.....:3;.s.al.,-4.,;.Pr•1,,.k.,X*44.1.)2,.'.1
..4*''''5'4 710.17'-''' : Li''''.'k*r*-LP$SII.0 '.',...': :: ''-*- 4.* • . K.:;;424:." 4%,'•*,;.-,.',...-- '''''''--...-' ir'''''' 1,-...7i°1-,...'.''''..1-k :V44,t'Ll ;-.t4.4.2'''''''--,4-W'-i:''''..1;..`1,'.1**.:;:-''' '**".',':;*";`;:iP!'-'1'-''' '' '.4-?.;:;,1!'
*rf'f*:*,,,I.T0,4etat,i,,,.5-P,v47.;*1-1.-49,14141-Nt 1$9.M7 Ir-F-',,;,77;i•
.'''."..'r.. .02'..tilki..,1.4,',+!4-.Fir,..,..:'Art rj.,..a.:0,01',vg:•.;,' •.'„,..„.„ .. . . . . ..
..---, -...-f.'01.3f.:. -attt,ci..,;1•:. '-;=,i.,.:...-.:•.....,,,v-. •,;,.:,.......,-,.,,•• -1,,..,..,,.... .... ..,.., ,
. • ' ' '' . '
•
. .
•- -,.... . , .
• . .. ...,.„....
. r• .;.4,•:-., --..,.i,:.PAPIORAMICIIIIEW.
..
•
• - - . ..
. • _ . 1.
.7. %r„..
--- ,,•.?1 fig: iiii1111,ition:::=::::1:.•> ....
• .• ,6..
241)*-trd-• ••,:, ''simutIliiiPalitelliflin lllll P..' ' ••••<:\
ill: - ' .--- /-4-1,14--• "." :;:mpluet;112:1:::::iiii, .
• r. ' ' :::::::::: l•• 1.:...:- '. . •
. . ..
..
•
. . .„
• - •• ,. ...:
. -
•
. : . . • i
- 11
1 •
ir. •• , -•. : Ice 22...... .."\ .
II 1- :IF Liiiiii22 -.................'...'............A 2"92: _..,s4;2:1? • ,- .r-i.• t _ . .-,..,--c5,....r:. .:ig• k
• I - milieliiiiiiiii•iii
•Peliiiilliliiiiiii•a - •• . ,
e: jilftlifiiigq " 4„ ;;;;;;;:;;•0:::::::::1111111111* .i,
......_____
• I; ::::: - .-•-....: -a•------ -uglit.will;um iriitenr.g:::....,..i1.11:111.1.::P1111111111,11110411111,10;i;11111111±1..Iiiir:14.2!-Ikifsm. r•Tic ' 1.-risT_41idaciurA••••Litil..aiis.Pir.
2212222:227221122 2 1tulls ... • •••_ •_••••zat ••• „•• • •••••....... .::::•••••__ • . • ••• •• --_ , ..
: --.
gmy
LOGAN AVENUE
ki,,,11.1zLE. , •
.. .
•
. . . .
• . .
. •..
:IN.
t - . -liiiiiiiiiliiiiiiiiiii
11 ..• •
•
'------ .11-'-'.:-.-----*=low, ,,,,-------
.1..iiti-•= .,„-lir 1;m:glimiHN ,T,"
.1,, it„.... muiiii111011111.1"341EL-11i ...,=:::=0111 111111.111,..,,L• rT111111111111.1.--1;:rwm.-.1.1.1...m:1;:h1;;14•,....•
-a,-•-•• •••1 .:11.111,1111.111131.Nri.mi,„.:„ti;;;;IF J 11111M:111M1111MNII•-•' -•-r• nuommo, ......---.......,i.,...A ,
•
.11.:•:enni•..41;!..""""''' " ..uum....1.: IN 001111.i..11111111111171131141. 111.1111r41 Alli . lii.. • f
..,,T„ii .....b.. ...H. ...!,-. • -----
v,.,_-,,........1-1 .74P.'4[11 'el• -. . , • .
\Mari `. rar liiiiiNi:Ei s jr ,
- '•L',1MMIIIIMIlmmomii Ala , . . .
. .
. . . .. . •
. . •
. , .
,1111i II1 no-
alarm+ ..•
1. 1: 17. mow
imi: mo i ion ' l'...11;4;:i'' ° il'AIIIIIIIIIiitlm"""1
.....A., 1 ,
i•••••4411k
, ,.•F .
. .
Ilh. 1-railliMemill11,1111 licilliii
i!.1111: Sir ENIA ii!:1,1:EF.L. - . 0 . s'llA111111111.11
ili1i4oii1iii:ii:iMaI.7Lre01 _iEfFIM-.X EN
rL‘
iiir1.1m,1ilmii=m ir lliip•caP.lO ii ••"•,',-,L,.',•..•.•,'•::•.;1',',.,.X,..:•,....,,i=:'.•:!::'.4-,t,r,i,f,::T„&.;.,.1•:-.,"'..,,,,.:-•.f!..0'.,:.-:?•-r.:4.-''',.?.,,K'.Vc4
0::•: -4,........, •
,1-1. ............. • mccaccic.! 1"I- i;,'..'''',....'i,,,:,,,,,,,,;:it....;,;:c.,, ,,,,,,g,.-'744.4y4-_, '
,g,lii .-Litt,,,-1 .„--- csilirg.T.1:1-.? EW BUILDING il,1• 01.111111t117,1L9111 M
,it.usiom 1....::•..1 i"MiTi
!.....-:1.0 • '''''-'-''''',';-,,i'l:V.:-V...c'fr:jf.•.,-,i I:11,1•Wt*44,4t-
Mil .
gi: I.'11 OM
,/' .4" olus7 *4tVtiiii,. SCHEME 24) .illi mm.1 m it, ou i
11111111111011 I :?"';',4.,,,t,-,,,,,A,..v.,,I•..,:,.1.-',a;')t.;:,.40,,P,"'.'
,1,,:,..:',..,:.'?:1.4",,,:•.;-..;;;',ie,,11.,,,.,,,,,,..,,-,
Iiii le's 4:1b.111 t•••44,0 1 A.1111...I•Ill 1::I m•ts\-1,
lin; IrJe s A-i ,f. ,..s, . .. &41% •N-9 giliirinillunatin 0 ',z ,,,,.,,,,,
T:.,.:. ::.4.0.... ..!, 0
;pq-Wit! AMA...i 1#'1'i #41;:.........011,.• . .1. . , i .-1,-. II...........iiiiiibu...,...ia-mad'ok . - •
f-ifithELVIr 111P_,...L.-••S .•A.4.04:41,14.-:\ •s, ..- --- - ..4.4=1EMN fau-r ,g••17. -•-•,=riz..•1, •• . ,,, ks_. • --
:•:-.T.a. liTri•Trea 1 :Ihrt:GlilAt i IP ....tif ,.., .1..Pi”-..........-.,..p...:::r........f.r.- Lal -: ,..
••IP '\. '---- -- - PM WM
cm= ama oacccrorocas• .71.%1EL.... - . . __... in.,,,,...„.., ",..uri
.41,:io.: I'M Egaliirliiiit) :••
•
jir.•-.1, rSlifilliask St latt/PTIAT lit,
1. •
111,1; •
. . ..
g "1:11111171117111111111:1111"11111 ''I dii k .. . .. . . . .
, .•
Fi3i. lip ..1 10 ,IMININIII! i .
..Lu It' ! ' -.--.'...." 7NI:::.. imiol••,////,
NimmuktItt, t .,:sv
c,31- pion loommos 0 .• • ,::1 ...'N . -. .
.. .... .„
PIAllA PARK a= ;• st • • • 1111:5P111.111111111........111141111111.1k
1 OW
) _ • •m• ... ,
•
,, ...
c., illii! iLii,WIMIIIINE'......411
42 47- A 1111' I-- M!
111111111111:'
L:.4. i%S \.ti.&• * c.-1 .
i illflil --egf„glif '''t ::::.- .. . . ..11iFilMIIIIIiii If ---
b-
• =, 11::::: 11.4411,r1R5'17". r• •
C/3 il 141/111.11linflulq P IIIMPI)
1.., is .746
:•::::,
aat-es:II
I:::•: -:ea .
!.:.g. •;:_,r1;iiii:•:::. . .tliiiMill..111,0 I BEI Iiiiiiiir .•.. .
. .„
1;114 ALT' *I-S5.-iiiiiU mm40E: 7,.: !
• • ,. ••
iii:*
1......limit. .o..•00,,,,FA ::::1110:::” - pt-•]mliffirirbirl- i,:,.- i .Lib • ".
Nio
•••••:,i eiiiiiiii.,.. I ph' ...Av ....,,, 1 ovii11111111111fili •
• .... ..
..,,,.. 0 •,,,,:,,....:::-......... . . . Ittimmet
_•,...„, 1:41m! w....„,„,.,:„,.,::: :11 i ..immeli.... ......mciipi ; : s .. .
--•::1,11 iiesiiiihr• "Jr.V.1.-....-i'n.cti....v4:::.% III
Ell. ''LiiMral: HI.: .. . - • . .
0 iik
,smi •kiivi- ......, ,..„.„
II MIMI. ••••
•
•
..flim::101.111101:41.::(101r1.1:mici.,,r1g.a.P-gigar......i.
7:Iii• 1'''"""""I"""'milliiErigvE°1111 1.1auFAitle,-Ri`1441"111UP44::':!::6;V:":...I.i::;:.;4•41---'21:31•17,••-• .::•"Vil.11111111111111111111116„„„':-•=I:m.._.uul...I'd:!-HilmtxY.:-:124.-.11,1112e..i11=•,...II
.1E1111f 4,1"9,131:1i=.1.11...'-`5"41-111-.1111-11c''...141.77.111416.1.=1;11;1W.111_=41.W.11.74Eilian=--N1=111F4-4 1.k.:1...,1;7.174.;;;... :.;;,;;..,....!;;,,W1..1011-- 3 . ', • . .q.' .. ...
mew I.LIME ill.. ; .,RO,PJ$111MIIIMEMII11111111111111.11111.1111. /..
'''"*.r W''''' '.i;-(::'''',!:124...:....'4'.:.L'h"i,::'.. i. ' •..,..'4.4.'.
rel.\....
„... ,,... ,. .. ..... .... . •.... .......
....=_--
......
Millilirdil IL rdillilliallinirjill lira°.Minal111111111111111111Priffill 1111111111111r 2',-;.,. .,:-.!.'I...1. . '''4 ''.- '
1
1 elinnsimmun tiorammimonsmarstuaseasiiii iiiiiiiiiiiiiikerdi limmiiiiiiiiiiiii.:,-..,•••,:...:•„•-•••••:.,..-:•„.•.,-,f,...,,:..-...,•.i.,..,..,.......,.,.,..i:
1
...
.-.... IC it: IIIIIIIII. MIIIIIIIIIIIIIIIIIIIIIII 1111110111111g1111111.111111.11111.P1.1111011111111- ... . .::':''. ' .•••• -••
ARM 37r ":;:tit:Ii=g1tWiltftik":*ttitififftiiiiir.#LiftEalier;i:.:fit=iigeltir. r4=iiV. Vii.-!1,%Me. - MiEr.. ...:,: ...
-.. ' 1111111' n'T'IMITI ."' "11171r1.3411`11171101rellflirliFirlig!'!367.74r1r1-461-;i11711.;1111101iiiir011111:11'3:1•01glIktilgiki•iliOalkill714,3311lilailEil.3:41SPliiiiiiiiL"•: .---•
. ' , ,LE 1"1.-- i a l'-: , - - A.,_,_.,:•"-impi"' .161•11:allmol.= 11g1.111=10•11=11=11411•••. r illmillaklipl"'..... II malaiummlahelaii temmia.i .....
I, I 3. 'r • • • 111111.1wil. MENIMIligl-Eliiiia.immommoi ..__mi.
-.::,..:71 . •
• r .-.•
-)ii li li NH Hill il," nii' ' : , . . • --•••-•„mooning= _.. . No • • =moms= immarommi • .
. . . ..... V!2!,
. ... .
'• .. - - --
likll :411.;. I
SITE PLAN. •
., .,
.. -i.
, -
-i.---...,
.• • . . . .
•
. .•
. . ' .
C ILILNS . . . •-.4'..• '
nil
xi •
. .
. .
• •
i . .
- > • . •
z SCHEME 2A • , .. .. • • " •
•
•
•
- --... -- — . .. , . .,....,.. _.....;..„,„,,lot---... - , „41,.,' •,,,..7-1,- -.-- f.,r ''..'4
"...ink Vii " ilo " ,Alititl Ai& 0 'hifoi, iii% .11Pii, Aft,,, A* Allk...L.A) tt'' - L',i ,i1),f ' • The
•
• ' 'I r ',4--'.`" ,,'r — /0---k."'":4.`zi ..I.: "";:. -:!';-:".=,,`'.;:',.!;;;;.'*":;=.`1,'''C..'''I-1" 2.•",'t'''''
• ....t -3--i % '• •111111111
.,,I ,474,•;;Z: ,; •• :•, : - -',.0.--s) \*,4,..te-,•'''ilmaille
.,;,..--,- ''''k
, ',,. ;: ., .1,.,,ii.%... .,- -•:11,r-,:,. .=,...7.: -
, • . ,:. , :.::
' 1
• ., f ,. . . . ,
• i
" • ,' I I) .1, PI, ' '
-1 ,, Ay •
•••• ,•.„, ,, ,, ., ,, :,. _., ,...: -.....,,..,•,•-••• ,. . ..,.....,&_„.,Tho -,,,
--_, • ‘,. ... ,..,,,,. • ..,-
_ ... / ; -.. ..4: _rita, 1.,J,: .....- • ••••• -...,.k,r-i .„ .,,,7.- _ ., .1 . ,--.•,k4/1 wilii,...,
t ' ,.-e,,..- , .-,1,„. .,r4...„_„J -: .:, -...-::- n ei --" - -*if \ 1 .( li
'st -',,'''.r '.'.'''.:1 ' ''.irK' ,' .1'..' 7r411:i ". • .'"7.:::::::r7:176'. 117./4f ..‘:'
• 4, ,„.4.,.:Pfo' ';1-4i.' P . ' ' " . ..,
, .. .. . .
. , . .,4 '. ',+''''''''`.'' , l'" " '*',', ..,4 .r4''7 --i....:
, . ,
..,.,,, .:.•,:g: , • ,,. 4.1).; ' ("4x i'.....1 -,41,1 •, ..,:-.L,
•
r ; ,
, 1,J. ''';`,,,-.?:'' 1 •L-0.0. 1,l''',1 4• `elk;-1,1 ,,;t.`:-."...'.4.",-.24&•1
i t''''''' l' "L'111/''''' * ii=•'''1144,1-eirI iry";"4' :;•71 .- . ,,,,•,''',"_44,:.",'"4. ' I '._ •;•'.'• -;"'cal-
...,„.,,--0 ,-y..0
kr..„,,,,L, .-:
il!''''''': ''''':'• '. .4 p.' ,1-,to,,i. , f i,r/c. 4 -i,..',/,.: .114.,, ,,', :..,,N6-4,.. ,
, ,.•,--q„.-„,,,,,,,,,. ...,,,', , - ,,,,, 1 •?... .- . • 1,...4. .•, . ,.. . - •-2C•
/. 1 1 , • I.•',..*,4, . • !,,,,,,,,,.,),,t, , .1 ., , , . ,.,,. „:„,,,---..---:-::.• • 011\1, i ' .1 .• .'''-•- -• ..
ii,VIri'll, ??1,i::".g"• : . -..-.......;;; O1:.'%\ 1 Oi_l. x.44.61‘1 ' ';: 11"• -• .
'' ' .'•hl.:.
3,.., ...„,„,, . 1,114,, ••,,,... ,4,-, .•-,4 '-t'L ....1 a'i..'s.'' i..,
4.' VertV"'-,---., - .. •' 1,11 11,41.,4'0.41:4.. 1 ',' ..111.1',.'4Ajl'*,. ,. '1:74.'''! -' '% • . ' .;'FM"' 1•. I\ ,liqt.Ori ''''114,` ti fl• Li. ; .),.
Oaf" :''0 I;10 llefroc ' - "1 iil I 10, 4 rt 1,1 ' ''''- -
• ge
%II ' ..-:' • ' ''.
.,1 .,
`,. •-. ' • I. ' f.
1...e.,',„,„ ,-.••••-•-7,, , . . , ) . ,,, i --,- ,..... , - • 1,,,-...., , - ,•,,--..,, -- •.42,v,- ,..•r,1,,. 1.1r- , ..IH-Ild 1 Uri,Y1114,i'or- _ "4 '',•-`"••,•"•';.
'f i -..,-M1.-',.,11 ',.:• • .',.' " '.. ..,.",,,,tb , 40)\ ..4,. .4.)arii". ' pc,.yrliq .;
gl p. ...•,•1 ,_ . ,,-••=,,, 1 ......,. • .
...ti,..-,,.. ..,
,,,,, -.....„,.. ,..,k.,,,L, .., ,,,,,,;,,,I.:,,,,,,,, ,,. , ,:,, -.
. ,,,, ,,,..„.„ ..., -,4,1„, 1 t 1,1 . pk..,..,•..,....„. ..-. .. i,:,...,.. :?...,got‘ oi.,!' , :... iit,, i ,,,„- ..0,. ii,,,P,,„„1„,,,,,,,,,,,,,T,T,.. 1.,.-....-. . .,...., ..•,-,
.r, -- --..,„ • , .1„..—___.
„...,,,,,....,......,,,, p,,,, .....,:, r.,,,„,.." . ,
. ,,, 1
...)' '''' ,' 0, .;,;,`V.‘ 1:1,4, t.
I , .1
, t • •.,' .1 -:;:f ', .L.,. ,,"..' ic I 1.".......;:-l'o..••••:- ...,..„.: i i c4 g - , 1.,
,,,,i, ; .iil .k., -,,t1 .,..„. .:.,,.. .)-;Fiiiil. I , ,,'. fiZ ' ' • •• .1mr:riii , 't I II
' --,,,,-,..., f.
. i ' ' r .-41 ••
,
Zr ''' ••',4, f-, ., i . ,., — -f! v.,,.....4.1 .! ., ...{ r ' ' r ''. .•
,
..,.,,,,, .-ti,,,,' ,,.,f•,-,,,,P;4•-440.- -0''...,..-;-•:".,,%,•t•-•,,`....;;,--1,•L,r-•-•,-
, •
,.. • 0,'' ''."0" '4",'p..:40,-;PAPp:413f4fitif "..:..'"'..'•kg?•.:".4';'.
.. .
' , •........,,,...m.a. .;4",.'" '1 .,IA 4•,.''• , . ,.t,..4,1.4.1.12,„?". .....,•,-',g4.4.:'•":"..F"';'1'...,. ';'...','-i."''''',".
• +.• ''................-:','.,,,,:::::,-,44.4.441Th...,.4,1,4.. •4 4:4:lic,,•.4.4,..."4 "".l•".411.-4•••AC.4"4440...it,44n.1."44,144'-•44:::-.0.T.',',4%,1.1-'-',:s'‘
• .
• • .-.....':•''''r.'..`.''t';:;;::''..e-''i.eaAt'it''''I°$x',4"t,: vetrnr•‘,-,4-;•:`,•=,•-',-,e'l,':,4•,5",civa.a,17,Q, :s.'•-.:.'",•,„•;?. .4i,..:-1;:
• •
_. .,,..____.•.„•„,....„,_ • • ••• v ",1*-:V. -t',
, .
•
. . .
„,,_ __•
. -
, , ,., ••• ,,..9.4•:' ,' . . . ,1•.••rtg,-414"4•,C1.!!i'!"
- - ,.......
,
•
• •
,
.4 ,..,ovil,...4..$4',-,1•4",. lg.- .,..... .'1'1",,,""?."..44.1-V‘
• • .
. wsimffe7,:04..;
• 4.,....1'. 1
.•:''' s, .4.41114.`
.1. ..
'-,,,,,,'',-.'414•1171, 1
111 i_
4:,•,,,,,_,A,r,11.:.- k. -Alt,
,.•••••,- -• iiir,•„,0°.• i ; g•••••-L.; 01: _..._ ____ _' :'''1,1J .- '''' 4,11,11 ii"
I
.11
1 ,•
• ..._"7"---r•----,
....,
• 11, • --- '
III .
. ..„ ..,
• '. ' 44.,thio„404
/ la -';,,...4.-''• . ,,if y t „,,...171..: ,$ , .A. .•4:!„-e.,,,.. ',,'st%L,,,:- ..!,3:';,,'17,:!'(..i.:77,'1
/Krit,, !' rt- 4," "t'....4„61.-.b..-.---.,-1,..,",..;. . ",_. -,',7" ''," -!'''' ,. , ,, - , .",..",,,.......:.........' -..-'•
,,,, ,VAxirt, , i,,,,i.',',..0 .,V.: Zr', ..,--'-.' ••'. * •.A-,s, ...." '.' . -
pktat 44,1•.., ,• , •- ' ,'- n 1 ea,..•.• ci,gs,;:vm• .ti,g,..4,, ,..,-.•kt..;••••." .•.:;:-• , • '
.' A _4! 4.,,,,t4„*.it.0.A•01 -••-•5 :p. 7;1 .4;11,,, To 14,1i, /,,,,. •-:1_,,tf-gri;,:.-:--:-. - .:
1 • i . .-. pflid.k-1.1 ,-- .4,--iirrrry.1 -ti,:ti..4-17.11.411 ,4,02ii6i,rt,t41-1-4,111,.. 1•:;--,";-• • • - •
„,i,";:- •••1.-,' , 1,..1.1 ft 1[1._01• :1 1,, A:14,,e ;;,,,IA ,,,,.. ,,,,Ak-,,,,y ,,,,, num illiphuiii . ,,r3,-X.-).1•714irg 1`ItIO,V:1 4.,..1•1,i Hunt ,,..•
,.,, 1..., • ',..4,...ilv tt,:a ,-..-3 .w.:';:..AiSq olkilliNii 11040,,iii 011000.11,.Y, e1/4 'tkitiNti:.itq,14.4.4,..0.,
, wpic,;-$,i %,1,4....,, ,;i00111 ir4,..4.44-.4„,Ki low_'tr." Nr...ttri4i' ,P.' ,' .44'.•A!,,,.tt..e...4.-4,.---..,?-,4,,,4471 .:••.,,-,f,F,-4.4; '.44.4,4, . ' •
,-Ff,t't i ;i Itt -,I.•ti 4-'•- ' , •;ti7,0L4p), fi,; -,-...,-,,..VV;-41 4,41.--•wq •,'All.lirtfiP-Ipt.,..1rAP.,. i,' , ifjtAti ': jr."'; Ir
ii,..1 II 01, -'+zt5 -' . ; "il:g74 •.:..,..'IL-,•." fn4 l'-'-" '',., ::.,;4.V,PA.,i*:`,.j k: ,;.:- w4 4 Ei 11%1 1'''Alt.:4;4•1.4 ' •l'I'•0.)-44,j '''•41.1;'').'":.;44, 14 • 4 lei 4 ,r',.,•4
' ' 4.",n,r4-.•;.. '''- ''''. " n''''-'"'.' • ''-; ''''''''. ! .. V .1''i-,.".0 '''' ..-',.,a•1',7'•• . ''...1.t.444P.41( ' 'i Mr'1.11...1.,..0 9\to'no 1 Ito,, 141„.1 pc,ii a
.. , . ., . , . , ,,,,,,,„,,,,,pi., • •„,..,........,,, ,. .,,. .,.., ------- "• '-;,. --,----•- ,•,, 1 .._ _ - .:- •,•••-_,,,%.1.,,,,,•,...pix. ..........=4„,,,Anft gr.!!/,''' ..tv:„.>,:•', iivir,,...
, .,,Lr .... ,,
.. • ,4,.,.1•i•ri,6;.---,,,,:-,,7 1-0,,1;,;zy,b, ,.',:.,0s,,:;,4 ;:,
--.7.51,11,11 !+‘"1,1;.`,...'r.tv'r •"'‘...*:'I,1
,,,.,....e,.,,,4.4,,..,.--....i,..*:•A,1!, 4-, 4 4,.: s " '44... ..,•••,2,.....4.427-•".,, . ,.
.4.-",,,`. "4'4'•,, .4•te4•4:4;4•1.'.. .4-ii ." ''''k. 'Nc.-......m.-.."......Its,,,,,,,..,, .
1, .iyi'ril 4,,?• ,.,*,•,--4.-,..v ......1 .....,, •,,,,,,,,,,.... ....„.--„, ,.., ,ki,13,14;,,,, ..._ „ . _ ,_. _,__:,Airav ,,,, ,1*..41-•-.Ti-a.,„,4 ill1111111.iir"":114k*,e,;".,--1"
2"....", .% • --\" ' .,. ;,,k,g,n,qa,t4s,iv:,,,,'...4tr..i,g(1.,....31."4 „-,T.'-'°"•'''' --:. ''''!"=.''.--;':lAr-l';ai.
,...,',4, 'e.,-.A417"A.,-. L".'"ir,x4,us:',-.-- .1,:r;',,,e,,. , .--,4.m- , ',."'4.,,r`s\•••••4-" ^, ..-4'-'9,ritil'''''fftik'
•'''.',...10•04,:,,;,,,,,,;!,-;•I•11-.4/,5.„..:4•,,',.'.4..,‘.,,,,,,i4-.y, if-:„..,,f
/
‘ ..;-"...-- .,:"..',-,-,''''...,.'"?..., .7,...-,......,,f,-;,....;'i..,,,-...--;,,,,,,,,,,..,,,,,,,,.... ,:.,,, iv 9', .,:.1..,,,I,:..,-:.• - q t ....C.7`.'"1..,,IllY4'''',,..,::•e.,i21,$?..v,
•••-• ., •,-,...•,-•:. . -...f!: •...7,,,,,,,,,..-,..•••••T:21,,, - -,:7,6:•„„i.,;;,., ..-, „!•,=2:.,,,,,,,,..- ;.•..%•-,,,,. •.- r.,-....,,,,,,,,-ifo,d,;.1,k,4„....„•„„• .„.„r.,.
',•kli.:.„„1.•. •4,„„,',Ir,,,,,,,,,„,,,‘, ,,..4A-4•••,:ihm17'i-'-'-' % •••• --,,,,,,...-,..:-.., • 4,r,,,,,.;,'"`q'..,,-: ...r.Ar....%,•:'1.1.... .34,',.;eMs,...-Hp 't" `‘e, % •-,,, '-,' r,,,''7. .'":', V NP4,f.-...".q..
7,04,,sv . N" -k''.\ _..-•••••,•.,,,...,..,--,•.,,,,,,,,- '.•-••• ,,,,,,cm.f..7.,,,.-.7......,,,,,,,..,,,,,,,-4,•,...,,,,:,,,„:„14,14,,,:j.',..1:ci • i',,,,! ..'...,."'L''', ' •fr,y'41s.,;,:;1'.2: 4.,
N .'1 ' '',-..''4-4''`'4.44',. $„„ ,,,.t.',":f'''''"'Ll.....-V.:..;,"..,.',..:'-',11.":"1".":"!•:1,;;;',7:Sni.,..-:rtt;,14.""t:14:..,1".1.`...-""
41'9,,, ,,. •. ;'"ri.1/144As...:;• ':•,-.4.- '.- "- „, "•,w.-e#::',,i,`,Afir,ttrwertA• ki,-•,..:•'•-;--,:.-. 11,-,•,,--:z....;„....,:-7,,--.4,s=i4,,,..,:,! .._,_,...•;:- .:- ,,,,::,4:'.i.,,,i,i'.•.,,,T--,-t-,
lei.i, "•,:••47.,V$4,0,t,"41.,:n 7',.,:".A,:vrozvdim,•,0 -0,',,.'y - . • -••••••:•,- :„ .. „•,,t„;••.,,,,A,r,,,-..,,,•,,,,,•„;‘,,,,,..,,,,4,v,- ••=spi....- ..' -,`,•-,.1,,e,0-474.7,4„,,;• ,„,-_.0i.? -.-- '.: L-',:',.-.1:,--.--'..",... ,,e!.
.•••,,,..,4141,--•.-..p,.4',10.r.„.734''''"..",,,,:,r'fp-0,-,,,,f- i.r,-,, ,;,.'f.• \ . • ,' - -:-:4,1;t"•,. _[ 741Y-1,4'4% 'Li.4V41;k4...at4r4,N,7, -0'..."4 ,'" ‘47,-'1.45.',1V4',..e'•V4:144:4• •..•:',:4;••-•'..,4'.4 Y:'
4/k,;..1::-',.-71.';74,1*•,..;p '.4 'Tr14,14r0;lie.i.'''.4. i"'.'•••''.VI. ‘,.:•-,,4,:.:,.. ••,.',42.,q..„.',,RL;c -1,:„r...-;4',..:v,':...;f,......1.,:,,,=,,.. •
,c.,,,,,si.v.,,,-,,,,,„0,,,r...-. . ,,,,,,,...O.Aripi •,,,,•‘•'i,, A.,.,,,..„. ,.:. ,, ,, ,,,,k,••••-•....-t•-„:,•:',....-.440-4.-.• ••;.0• -'N-••Ao,.-•• : • •- --"P'.
,
Vf5rt: i t• i0114.1 •...,-,‘---, ,. , ,. ,,"1,••'“,?.-.:, . . ,.4rt>,1;',.,; : I.L.').- AO' •,4.3.,S4if''''''4" •' , •.:'4';-'•vV;3`.:•A".-'-' . -•`!"-•rf,'!•,,' 0.....,-.,:-.,•
--,4,.,„:",!20%":"`", " 4." "..-"$44" 0''' ''''1.-''-•-•-...' .'kl•C.• tl.::'• '" •'-• NEgiE410.3N16141ii47:14:4•'.'".' L:44:"'-4-'. •,4,'r,lrfiL:li'A.,'"••.,,''...j*.;;;":4'.•":4".' ..:44'''.44:,;"4,'"Ac'e0'4-T, ^yr:,
•:...,4.1‘4C,'Xri...14:eir4;a4V^' '0-'"7'14'jgeF.'4.!"."".4' •,:4''1141:i.Z.,44• ,,'" ":"."' .!'"441.17, .- " , ca."4 '•';.,t"•:4'4,:.'C.4"`"-_'.•.' .`,.... • ''4.44•11i4,..•4!":4"Nt4'44,'414.a4 4•z " ", ,,. - " .*...:.Z., ..t.,-.;,,'.14.:2,,,,..
•
• ,
....'...'-',''•'''T-1': ','.'',.•%;:,i.'....-. :.:'''.-:...'.• . .',' v. ' • . .
PANORAMICllIEW.,,.. .- . .
•
•
. • .
L,\•,;\ ,___.,0...,/,,17•f Along ::111,11 ,...\,-,.
1 .
•• ii , :: ,.... . App..",.1". ..,) ,... .
• II -• . .
. ,
. . ..
. 1 , •
_. :::,....
.rafrie,,, ....:ifEE I
•,.. . „ -"II I , „ • \• . • .. . . .
/AM: 1.• ' I ',.. , I. . • ..
... .
•
HI:111M=- .,' •
'.10 •-. "' " ''''"41111•"•:.30111111!9!!"11:: i'1`• \ ::::._ . • ,
,,r-i.,.', 1 ._„..--0„..d • . r.„,...
• (i- • -c...elign-•,=,•,- _____.•e•:e•:r:...:mem- -mem. __ .„.__...,,__
\
."--------------,. . seVe." _,77.,.....r, ....g.• .2
PIiiiriiPlitlflusT"' eiliziawringiPul";1311.3iliesoeserpedirene:.-- clie:, eseememselloserm...7,;:i::.Lii-mug 'hp?. . ,,,..„.4,...!nal....,,,,TN21 iitife '''••----
`•-Art lemi,11 1.1,1„.•,...iiiiit,........,..p"- pi„idiphili,"":,-.11311_1,n;;Hi:::..,,......... „„,.141.,..,..1;,....„„mt,P.:0,........,_,.,:.!1.0,31m4.......Arims.1,.........,1, „„:011:11.4,...:„„„iii.„„..!...1144„• ,,,,7u,isa;
...,„ii ,,,,„„:0,11....,...1..m. nviiimo.„,-. -• i,",.., ,--,•••••••• . ,, , ,.., , •..
iii„7•12- LOGAN AVENUE
eunillemnumem smummosm ., . . • .• ..... .,,.,..- •, ''- , .....,.: : : .. ' : -.-
.', ''',. ( ..,......____.• ----.-_____
--.) FM '
11111111 MI11111111 '-• - -':• •-- . -.-, ..':...:;' • . '.' "L., -, -, ' ,.•- . •••.-.-- ' . ..
•
, . '''': •••11:1••••• 1,11,;::::L.... . ' ' . .. • ,..,...:. .,....,....,.-.. .- '±f'..':; ...;:',:.••.:,'• ,,..ir;:i.'.,'. :* .':„, -.
,4'Er•Iiiiiiiiiiiiii:In7q: -. 1 Iroe'"1441P": ...a a Piiiiill:;,;:: ::Pliiiiiiiiinglit‘rAylill MI ...7.7mil. -11 .4 . • ... Ilitt .:. • - ,,,,,,------
-v• 2.•••,•:•••:'•''',- re '41;ii,.rilinutyleiliglir ,,, :a-6mila g•••seumurtmzumels o'cr....- ....=7,40........ ••• ali4,...........m.11..•ii....1 R....m.no..... -
.7.0.11::VA • - : .
46111"" '.113.1"!;•*"is"!- i " • r." ,L,Alluuliiiiiiffillilliiii """011111111111111111111W.:::...
_
qiiial "11W
IMIN5.11110111 MIME, ,
::,!:-!',--.;V:-,.,::-•--..,.:•:,,.,••-!-:.-.;•,,‘,i.•-•:-.-...,... ..--..
umn! 7
! ' ".1 IMITIVI . A utral
"Uit.111111•911""...-i I."--410
•
:::: . Ug111.1111111ECIIIIII Iiillgal
rill:mm.1, gm
.. 11:4"I'' ;. --------i . HILt111111,111.11iE...'.1
.....Ilii: . . ,..,.....tisk
inielffewl • •-.111
P-1 •
P111 1111111111Ii1111110' . -..., ... •... •, ..•,•.,. ..
um- .6 Jill Midi' - 4 NI
1:::: i■.g.., _ ... . r Re ...-r, ,
,:::: _ • . ri.,,..1.-- i. "I
Oar •
_iii ,::::::i -.- ' ------1 •
IER1211 gill......en! Pii"- ilk i.- .....-.,.,o :.,"-. .''..:.":?-2...i-, . -, •
• IT!!! --5CMR*1-• _.,
. ,•.;:-;.,.>‘'- gm -,,
JEll Ili IMF 119.E.or
qiig MIN I
kill ff-j„ ,,:,,-.),I., \-. 11,-M 1 • .r. 141 .filrlill El: i g i qs,..,..".... .
1iiiii , • • .1:"' ''
'' ...
.1..,--. .
' illinmiLmmii , emu. . .i 'AI,':t7sttittp:::1••• ...ir'' 4 .1.iimpvem!I lia flortilin ill
..••,-..,, .-..,-,,.,,....,.....,1—,ano i„,,,...........-.. . •
ilio.-4-1 .2,-4.= . -, i_,,.. , ., ,,,., ... • .5:1!1.1.111141"..1- it:144.41 .""'""R-Bg=ill!A161117,..n.4
I W.:::..--., %mt. t 14,..; . 4., ---&—iIitf)t '19■••4141,11::::::11,&-main...wmpie
1..... •
i_., ,inii -1%-ara'''•**1'144.••7-4 . ' 1,--p- '.1 icEllinklitliEllhillEimmilillEIEFLI0
.--c. EN ' ----°' 7111%,•tir • "
tt,....„. • . •. . 4 ...........JJ`Tini 1_:i. ,.., Nosomm.i k .,. . .
. . .
.,„ .. . ., .. .
.,
c.) -pa \r- - 1,1 to • , iir4.,'-\- 1,1911.1.r191[111111M 111111110'1 4. 1 . ,. .
.• Ai:: PIAllA PARK . am •-• -5 -14E. ... 4110:e:::::i liiiMEL110
c., ,....s: .
--1---1;111palret:iiii' NEW BUILDING i 1 If juiiiiimb
'' I . ;11111111B1 1111011; ,.., ... ,• - .. - .
. .. .. ..,,i . .= • .
ilaM ICJ"
t jiliidi _ 5 3 Et MI.9. • • (PHASF-2B) ---I •attIP N11::::::11: - lee!:-"II
7" "- ' ' • „; ... „ .. .
Isileu '
. , _ .. - witrAgemr.• .
1 --1 uzi
. ',pill H :F..-sie tit,111111111Essiiiiimj %Port . .. ... . , .
•
• wili ..16 ,E, •" f 1111111e P -•A''
ieesee . 111671 w: .1:IL • • =-,,-1 •g tlil ------" simi1 . -. .
. .. ,
_ILIIIIIi . ...: ./1111,24 IIIIIII!. . TAMEN/MN • MU Billqi
Ili " it 23111.11r2". irlifill !". .• li )
......'•
iiii"I, I 1Ni". .511111.1 V .v.ez•ge. ...c.d.pi
11H:ha:LI:Rh.4 fie 0 Ititi---:::14.41 1 1 On RE;q11111r1 11111111111111'
I I lItyiNEffiko.........,_4 im.
.11!1 1 slitliwil irl-ett--.. .,:at,-.4.7.1.44.A. Alum:
.cormill11111.11111111.10G.P ,........M11
=11110.1iiindie -.._,,-,--"•-
.1:1 ill! :...7•311..1
ISIDuen -1NIAe 'ileclii:Iiiimib,:i If q ')"HIMI,";44211":rii-Ir"am- Eimmom•m...:,''''---"••••-ii--;r:..1.14miproil . .. .
11:111' 5.---1117''',-17iin"-- mu &-rt•va' drii-,-.: -...:i. -A. !,-,--iiiimilom minifileMEN1111,0!infinimm--a•-• so mip .PPI
ill1111111111111111111 iiiiitlir•
"Akin 1 u. r.l1"DIME11030!„,1-'217manriEremiewilreinInlemilme•Artrimirempliminmin •Ge.t,,— -- •Iiliiilimmr;:8141141701 eller4D ii=ii;:i0iLilekeEM15:: .1
'..... eietwe.2el.cietegi.prhe:.-..-etweektioep=1,e21,0e::.--:e:-...;.—.::—,i= illi lL:••. .Ightallf.1411.11II: II ea=m1.1...Ifideeln= v;
.. , - ... ....-....--. . __....r..'
•111H10.' •.• 1 -':111114°--•:•• Pe; ' _...!1 -- ,
• ii . - .1. ,,,-,t,...„....,,..,..„.„,,..,.....„.•.„..,, , ..,..:.
..mlip ... i mion!mgmgmi • inommingl o iiii • whiz ,-....,r''',,':':-''''''''• '.. : ..'' .- .
......._.
= I AiNerainresPihk. parriniiii "I imiligAraiim .,",•,...„:„.::::::::,,,„:,..„....,..„..,,..„...„_____.:„.„.:::...„.::::::
illINED 11=11
. 14thimuwommirmiliwasioprinifir
Mir VW "11111Pr - , - - ...., .....,. • •.., .
. -..,.. , lithilltd111161111161141T1111111 1011111h0111111 II , .. • . . ...
. -- -, .,•• . , .. ...
,-•• ..—•„,.......... ..., , ,• ,•
-•• --- - IIIIIIII, IIIII
1....,m,... ... ..,..: q,...iiiiiiii.:ice.isir - ' • -- •
.—vm..,,a,„ mr•-..,,11=—Ill,„- --,IRMitira,T,I,Vjgrr,i7,,,i, i, „ , ..1,77.7-ahipreitrzitiiiii,V-a.....-.. 0i....m=1:11.4p,i=0. tim.r .,...,.,,,,
•-/-7-'... u tin • lug 1 ICI. 1.0--; 1.1•0•r"11111hirliquitu. ti.,,,L121,..zai •64,47.13it..raminitilau..r,plii..121.diivi ii„Liounii„:Liviii. miL,,,, r,,m..„I 1„.4 ..,t..1111.Licii„.Glecjt,ink, „....4
Jau Li :LI Dirm- 1.,.. la awl/ •-• kelim mg 11"Ill • : Skill
"°••••7• -.......-• 1-2.01,7.••:,..1--• • , • •,,--7.• -- -
ryl, ....
• !lag1E11mi!11 11 11,,T- - ----......--- -- .........,, , . 0• •
,
A.,
.. .
. 1 • .. .
SITE PLAN •
•.
, • . ,
'A •
C LLINS .
I
•
m
•
70
. , , . • . . .
. >. •
z SCHEME 28 • .
• .
. .
•
•
•
di -„.,..0,..4., ,.. „• ..,, . . ,,,,e, „. ,L., .
• „„..‘
- ''.";-..::'!:11441-'1*.P.,44-00,V".•'4,4%'IR40.0.%45,174,0,','
-.;,,,:,•:...!4.4. ,,I*V"0414',14..V01,41..401V,405;,,,.?Ak.11/4',,,W.-;ki? 4
. ',..-,:-.,',43.i•iti;;•-%'434,V40.fg.kxagtig.,:gnipg'..i:024gr,,v.44, .;:.r.:
..:5-.•,,,,•,f.,,,,m1.,,,,A.,.:435,-.41-001.*,,,vi,,,Rogi,,,,R0,,,,t;•*-• .4-....:
.,-.:.„••:,:...,,.,q,p4,0t#0.074.0,s, A..t.4.,#•com,,z,,.. .,),.,...,-,.-„,......... :,,,,,
/n1 .
_ :.:-.:;„-,,,,,,,,,;:-..tt,,,t,,,,A,,KA•s'o,iomtotfgo.ottv'i,-oz ,,j,i:,
..,
...:..,,,•-:;C,',...,`.''''"';vi;;,y;',;',Y4P'i.',',3 rtd44,60.f,,,,KON.,'.v,,,,;4:,...4,-IP-v-4,...,',.. ic,-.
' JAN -.41111,111-1111.11 I
o i , :.;.:.,:--,7::,,t,.,re,nsi•pq,1,-ViN11,410.7144KW.-Aidi.d:`,F•:::''Sillielki.i;
•, •- •'4,:!•?-;-(4-,,,,,, ,,,e;4:,,WQrSVP:';'ii,14t''''51.`7'''''',:kel-i ''',;---''':''..-Z4liii'-'--
-',''.--"-.',.;-".,!..:::.;,-,,4iY11'911.,CN;-eA.,-K.,i,:.;i'''-„ ,,,f;.!•.4,,-.N.•:::-:...;.`:',i',,.....,-,:-,F.- ,...,...,
ii .1.
• - ••;-;.'",_.Y?,:.'.i2o;•,-:,?•-!•!..,o',.,;-,,•:.oi.. ..".,:i.„:.--5;:,:=,....2.• , - r '.- • •• --,.
1/
• ... , . ,.„ ,..,,• . , ,....,...,,., ..... . ....
..
‘ . T. qs;, . ..'.. rAI:2.;'
., , .. ... ., . . ......„
. .. . . •.• ..,..
• .• ,„ , . ,.,.- .., .
•
GALLERY SPACE 0 •,
• /:::1-‹.^› . •
•
4 y • ,
•
• •
• :::'•-:,41:::;n:!••74,•.1',1•,,f4,..41;,40,i,;•F f.,,A.,,,,,,,,,V;,,e,/,,,,::,,,.•...- ....... ...,,,. .„. .
, AERIAL VIEW
• .,.„ .:
. . •
0 ;
.,....,,•mm„,-„. 5,,,,,,,F „.„. ..-,z4,,,,,,„ ,0,0x,,:„01,,,,,,q7.4..s„...•••;,..: ., ,l .„. ,,e
• .,..,,.„•6„,.. , , ._.,„ ..,,,,, .,,,. . •,•.,icit,,,•-1,,,,iN,41,,,,,i:::,...„,,,,,,i0fetitlaingl.o.liii.;•40g037.14,,,„..:4„,,,,„,,..,,,,i,,,,,..,:,,,L,ittok1/4:„.„ir-,,,,,,--.46,..44„„„•..,*.lil,, ,,,, 4.2,:xert4..t.. ....„;77,447.
'..g..1...,,,„;,A.W. i..., ,. .,„,,,,,-46,,,,x.4-0,,P,- : ..,-, ''"AO"- .-.,..!:',.• •:•1'.1'''',0•4*;-: -4 Ill. ; ,Alca:!°:,,.,0 \41.411%.
1
Kt:ot,-1;„,••„:••:,:•;;;;•:,:o r'•"•.!;'_•%-,',„.,;;41);;24.0,0•, '.,..,--••'''''‘ .„.•,,,,,,,1:1,,,;' , ,1 ' •',°.,• `'-::,...%.t.fir4,4, , '••1 -:1 :•!&41`.. a....„4.,..„
1p,•••••,--:!:.••,"•';'.-r'•1"••'XI''•)....' -' .., ••,...r I,ri ,o”;•',41,•.;•-.„.4t,4•V,foW.•°,,•„1.,:!..-,,," '.;t, •,:.r•,,,:.,:, .430 .41.0‘1,.. . ,..„,„, ..
I . ,. , -„, ,,,,,,4„ok ..,.opm id• J, W•-11:4"Nr4r0..41'li`l.,''irt, 1.'•'•'+ ''''.1'4''••'1., • W,4fif ga'N V.! • 4114•11t-
e,",'.5.•,%i,W.,,f, ,,:',2...:!'.."'•••' . ...,'"•' . '"..4''1,-.,„.-.qv,i,,A,,,,,t,;.4,...4A-„:":„ .'t,•'',•e-,. ••,„.',.'•.-,.•,t;-•••••• qlitiligeNji_' ../k'-4,7-'
• ,
1.14iik, "..-
f 7, - I
— . —
Foo ur 1 .-,:: il Rf..,,,..„,., ,,,,••••- ., •. , .,,,pkikp..,•., - .--e-.„!,„:•;,syii.„,„4:,.., ,.7, 1 . f .:::r44.,„.*.-.4.:*-747.1114k..
,joitO.A04.4,,AI,‘,,,,.. . ...,.. 1.7,,,-,1,4,;...!,;;.c-:,;,,lb.,;6;"vi,if4e.ft,e;_,:4,,4, :••',i41,44,k•B7 4/
BEV.
.1 •"=•'=--7: Kot,t•••1,,,y o;'•"'••-• •;•••11.„ oll fftWor4.01,,,V440.14,Jiv,,,,••-41,.,4.4,..•' I #•,',,•'.i .,..,,,r ..,,..A. . , ,Ne.o.,,,--:-I• , •,4 74,-••
111111 -5. SE•
0.),*“.,=4,,',..r4V;44114,,06.^10 ,4.t.V.,,,,,,: ,,,t.:1 i ^ ,,..,,,,,kiel,.,0, „),,....:x 4fr, ,,.,,, ,, , . . , ,,,.. ;,. _ .,,,4,. )
44'4 '''''''''''''-)• '1, ' 'rrVIt Oiert '''''' . ''''''Y'. .''''.,`'/U'
,
'..r,;.re:<,';'',1012.11,k,,.,'-,,.,,,'LI.,*.''.:,:''ili,0404'45:",' '.'" - ',,« K '''..If•••<14,.7-,,,";••11firk,Fg-"' r;:,,C•I'''' ;(4'1"•''';1;Ors...Ati,c,„.%.':Wie•••,s1. '' •.1,-::Z'174);•••••1---
.1. •ko.';‘4\k•Ittr,.,veN,::•,';1,:z.•`?-1 11,, ,,,,r.-- .,-„•; .4.:,,,e,'.or; ;11,41.04.,1„,"..;t..e...`:;,,i.','I•,..:,•,N.,1,f.:'•,.:•/.•,,,J.,„-2,:.;,,,,Li;,.0„Ve,41•1*/-.'t•-•;•4•••4•!•• •,----s...---":::/i ;
I ,:,,,-,..-'
4..;-,4:,• 1. _ _. 0 1,' ,'IP '..f,. .,.-. go',.-,,,l.A:..v. •:- -It'r-:' "-.,,,,..-•'': ,,,,e'a el'•gi,*•ii•-,N.t-z...,--":.-:',•;44---472, - --,ke •
._ . -- 4 .. - . -.,,k, . ,,, ,i , ..,--, • ,. ., t. ,•,, ttif-'• - 4— .,. ,r>"*'' •-;-I:.1.4'
...
- -----
. OPEN TO ,;., p `,,:kge'Z.,Z=-.' '7,t'rr .'.7,0116''''': ,•;„ 4•04,1/4.1,4:1p-:',,,7 e...•jfitr:‹1•11•7•V:tor ..,,•14.%;,1&•;.*4,;"-• ,„,44,1,.„3.174:;•.•,....:
OUTDOOR .
BELOW I Ici liii ri,'.4.-C''1;1"•1‘!•,:f•. N'. I 1 -AI'- . !K..;:'''e';!/P,4'g,:- -" ,4x..... .c.4,r4„;:1:7...,0 ,;1/. 4r.01".!:t,c,-,'"4:144:`,•:-;=,
. • u ft.r . , ,,.,,e..,....!,,.,5,,§ :,k!" „,:,..--. .c...Er.A.",,-, r.,,,,"0.4.0....,5,44.0- ;`,...,..,'' 21.- .V.,> ..."---.:•,tr,?..M.A.vi,;::„,,7
1•CAFE AREA
1•. 'I, • „ ..,•,:,,i'''ti ‘ N.. '.. . ' ,,,,. ...,*,,,,,, ,,, ,,,k, „4: lk •4,,,,,A6s,,,...-41•14n.v.,4 .*".±., Al..„V.;',1-.• .., ttA.,,;,„,1
r\ 4 eW'''' ' . • ..,?,ioct..,,, . .• b,-•.• .,- -., q.,„.,-, •-• . ,,, t, .•.• .. -ce,„--44?-.-1.,,:-*.-t,-,:%..---.. . •:4-i.:.--, ------t,
0.,f • , ,, ,,:„4. k•Y(6,,,..., ,.'''',•*•• .1i, -,- , . ..` : %. „.•..14;i0, 5'--k*:AtIV-V:* A. 41/\]%'-;:iii,4"'":;:./. '1,•-t
„
0 4,1111 I'
14 •
.. .., . ''''''''''''' -:'.!'.7-1k\\' -I4'"'e C't'C ''';' ' '''''. V'' :.k- ''' '4‘' ''''•'.1-3:4t1**',:igi : 4P.ps , . •t,,k,,q,141...,i).,, , •
,,,-;.i.,•„,:,,.., -16.,-.0„ ,-:, ,,t,,,.. ,,,,, ,,•••••.1 -.14/. • , • ...---- ..-;::-..,-•-•,4-2A;,t6e,ot,'.•,•:•,--,,t,,..r.;„,,.,, ,,,,,,.: ,„,,,• t.-, -1._i,:sv4-,-,...,,,,p,
• •,-, , ,,,,:, ,,,,t* '-4\::-,'0 i C''.ni..: ea>,r- . 'lv--,4--,'),vpt%.4'--xiiemi., t,g;t.,;.,,*-t, - ,,fi,i- :11A<.ci. . ,f.P4,,,,,q;',','7,4, ii
,,s;,-,v, !.W. -,,, , '.,,.':.:-,',.,:,,., A- • ''.1.k....:,.,. '.. ,....,,,,,,3';'.lot:,1.- .441,414,,,,,,"--,N*,0',0-,,-.` , .. .qii ,q,4,11,'.4k-w,4,1kL.,,r41:*a:TA:,
. ,',.'. . t v: r v.,•i.';N•k. „. 4'•-,,,,,••:: :•:',.•.-:• ,..---:••N:-.1,-t,-44,41pV,:k4AK,F,t 's.i... - .4-i'f•tv...a,•'•'•• Itt-,,.'..-t.,,NW.104-VAP •r:' •' : ,-, 1.
0
CP .- '''::''''','''',;::' 1.:,=. '1."' N- - - ''.,"-f`,., 4,s''',i7'.., ‘11--=.- r,:•'',.-'0,10,440lek,,,, tv . '•:',. ,,,.(10....4'/‹.:10'110t.4.t,yr 4,4Q.,' . .• 1.
,., .,.,...... .„.,,',. .4-., ,,,.',„e,,,g-, ,,,i,A,,:10,0!.:. ..,..:-.:'..-.° '*ki,V64.11.441P4W. ' - Fs'' /•'4'.''''.'"'''' -` ' -.-• .'' ' ' ".' ' , , ..,
, •.. ..,,,,,,„ ., . ..,44:71,04.;‘,.' , ' .
..-- ..:.'.• Lz"r.-1.1`.:i.s.fr'.5,10*,.0..!...J......:.,.,:-...::.-.... .:0..,•;.'"1114 4-•c,r,' -N-\.,,, t•:1' .-,.,•io:..441‘;',.444;t•- ''',./0 ok I i-
,';';:•';-••:':j.4:- \-!'"4:'t.•,0,-AP:-•••••••.:‘,..,•'''.';Otit,;••" &k.iji, ;•,40:-' ,,i,) ,••)ift!,.,;,-. oi•-,04t.v.,....*••,-,
,;•,-,.,,•;•••..::_,,:;-..11:,,,,,,,,,..-,,,A:s. ,•,_....,. .,:,,,,,,,4.4..v.4s,4,,,,, ,,:• y--,\,..,,,qgk:Orrs,i0
. . , R,
e. ...„R.,•,,,,, t.,411^7,„,it4,;.-•
''','-'''..":..:..',„...4 , ""'N'4'' -...° •'.re.V.,P4t,t44W.,.,:'57,:.,"44,41 " '0}?.44..;,..t.,\•.0„,,,,,•ixisit.lbs,
•
• .,,'".:.:-.:::,..':..!:.,.',...t2,-;:',.11,.,' kkiti.:10,1,„„70„).,1,7to,,,,Itttt,,,,t,,,i1,.-4.it\:,,P.,,,I;
STUDIO/
•:•?'•••,::i •r',..,7.„••.-.'•::•?•,:e4.•.•fir, , • •,, •••7 - We'C`.4',...1,Av,,#,.'"'^ie,,..,4',?.,'''y
•,,,„,..../„i„...:`,„.,., " ' - •'''''' . •,, Irmti•-••-:. ),,,,„,,, .
,...,..,,,....„,....„,„...,,,,.„,,.. . ,,,,„, .c , N.„,,y;,..-gw,;sarsy.,11,,'," ft,.t.h '•t,i.Thit.,,,4,',.
CLASS RM. -'••„•2.,.Y1•' :"..:oo,•.`"•••"11,,,V;•,;\\. \• 1-40,g0til; .•o' •il. ,• K6/0-
..,.:1,,,,,,„:„.:,::,,,,„„,„,,,,,,,. ...;.1t.. 9/'11?.. ,„.' ' • . , A,
'• : 'II'V' \ \C;11;14'lli'l.''t4 V: 4,4 ,472:04-1...-1 , . - , • i.
..,-,,,,,.-. ,,,.,.., skl-w, \ . „def,,,,,,,,,...,,•it,,..,c,,43. ,i .--,•;;Yit,,:.:'-fr:{. Y'''' ' •'; : ' ''''.r: "'. ' ' ' ' ''' '
0
-;:::.;:'1:::::::',2:,''', %]%:AM1 ...: 4.,,,'Itif"!•`, 0-•io‘kNiplke.,^ , . , .4 to ,— - - • 0. e.
'
. STUDIO/
,•
..,
LOFT/
'•r••'•'••,•c,_;-?:1;•••-•f,r,rifr••!".M.:61:i2A. 0;•, ,,,.14,1P40' er•.xq;c•4%, ,I:1.7‘ ••,:, !,*-'"/,9.!',,F.1 TA,..,•., z.,f ". , , '',, '2 - A:
CLASS RM.
1 . ,
1 \ck><>
, .
-------C.
.
.
• •
. . , ..
1
. . .
•
,-,--t
f,s> .
' STUDIO/
---- ------ •
. . . . ... •F • • • • - . ri• 1 • .
LOFT/ .
_, 1
t o .
CLASS RM. CVV-,=1.•
. ! .„.I . . r. • • . ; ! . --'-. . •:__•••••:, . , ." . , :‘ , •--•- ,'• I, •• ' .
.,. .., I , i. . , •,,-,_,L.-:_,• ,.--- • , , :
, 1 ---..--..-- I .;:- . •-77 7 .1; •g, -7-,.. . .. ,' !
,.. ,
PH• 1 MECH. - I •
,. ,.•41,0 I: . .
---11J- 11111 11111111; . .______t_., —
--------1--- II MEETING di , _ i_....:1
.._ ,
- ; n ROOM 6'. I
• SECOND FLOM PLAN , • ; . 11 1 •
;
I STORAGE I r
. •40-
I -h-Ti _
-
re
l• 1,
• .
. I ' ' 0
. , .
•I: I •,..
•
•
, .. ,r
, ,
LL
•
..... I 1_1.(i",••‘„,"> re
•
. tl
MEETING KITCHEN . IC!'k i . , •
:
fl <i,-,;> . . ------WIN-7--------- I - , :
i--';
.i 1 c.,-,-.0
I • •
•
.1.1
H. •,
1•1 (A)1 › I.
L •
• 1 I A.,71>
t • !., ,
1.--11 v O W
. •t " • .
n 1 4.eN>f,s • ..J r UM i • •••
...
1 i. 7 E r •
• •
i 1 ur--
L.LI lil
40•
7:4" I •
1 1 44 ) E_% cll. • r
• 1.1,. ....,, .,, ; ) • ,..0 - -
u,.__ex •
a 4..71;ri-r.€51
/
111 / , ,-,a /c, , . • . 1 . .
•
„ ,,Araro.,,, .L..
..MPRIPMPRIMMIPIRMOR... 4•Pl. IPA
immommaa Epd nommol• -•`-'10•01-- . --?• 'V- ...= ..... •-•,70-.4,1 , ' -IT-
..... .. ==... ....
. ,.
V •
'1•11
- I
• kF;=,
. n I ,,,..<>
ilE i• rvi---1., i . -- •
I I 1, _1 .i...
L,-•-I-I os A riidri , 1, cr.,1.r41:_1_::::.-:
I I (eY
. 1 . .
I I <,..,,<> ,
• ,
•
• •
-•-:
. .
• ' r, tpse
<
r----1 -,1 : *0 •
i 1, <,„1-4,,;>
1 t [ I I MEETING ”• • •
ROOM ' ...ir— ' •
1 l• i (1'4*'') I I .
•
. LII
I (,;,-4',;› ,
•
• MEETING I •
. •11 1 i I ,
,. •
' --rFV' <^)- ' ROOM 1 OVHD. I 0
•
, •
I t c,-,.(f> I DOORS I , - ,
. '
I ABOVE I • • r.: :'
•
'% 1 I I
.
94--- 1 'I • '''
. .
•-•• . ..' I 1.' LuiS ' • I I
' l kr I I MEETING
• : .:• - k,a- I I ROOM r
I-
V• -••••••-•-• ••--‘', I I .
• 4m....1.1 • •_j i . .
1
I I • • •
-- ,
.• •
'
1 • 1____f 1 I :
, . - r._1 • a . . • .I
__•. 1 :i
L
1
. .
•
I I
. .
. . .
]. .
C LL1N,S
0. 1
- • -, . .
- : 1E1 • -101 'st : '''''s:',41 M. H • • 16 , •
,. .
rri
, 1
• ...._ ._.... • 1 ,
7:) • - • _.
, • •
X .. • ,
.
FIRST FLOOR PLAN
.
SCHEME 28
,.
, •
..,, . .,. ,
6
0 ,, .0 ., 041) 004001) 661 •
.4 6 6 oD 6 -, ro e,. ,r.„ ,,, .:•.
. , . .....,,,,,,,,,.....,...0••;„,,,,„0.ti?:•,,,,. ...1„,m4, ..,...,,,,,,1„....,,,,,.,,„:4
. 2„,:•,:.,...7,..:,,,..,,, en:7::.;...,.:;,74w.•%.0,64,, ,,,,. :„....i.,....-. .
....
••'D:is5, ,. ';.'
l'•':1:7S, . kri,;,,,. 4 . .'! '•4.•4:',--" - '`- •••* ' • OAT.V-•--..'• '.•,',
,,,,04144'°°*''4 .,,, •• 'r- - ---,.. ..,--rio '•.111,
..,,,,...4
. ii, „ 'ktA,',•-• . ,, . , 1,f;y",..,• -,,-,-
..•
,---„:•••,,,
•
:. ..
..,..,..,..,,,,,,.,,,,,„ ,..-_.•;.•3•.14. ...7; . , : • . .0.,.,••"' 1 ,i i L.:'',,, -4,,..,,
1111111111
• .111 i . • hl._--- -qt.I. I ,,,.,.:,•„ ; •
'IV ''''''' ,.: - ' '•- '-' :,;;I.,'';'• ,;4_-!---- ,, •,,!'-„1 t, ,f,i•it . .. i4
I
....-
•, ' •
•'
.1'4, - *90 . .,:•:, I•4:i)77 . • •`:
, a --. s r, • , • -.4 al, ,. 1 - I.*, ' '..,..;i,' •' '''',4, 1
'''' '''-c-.7,-t".Y',.4t:•'' ','''\ .2.,
'':!.,"/,':... „.......:.( , 31" t 'IP' '': •i,, ; 11." '":- ' ,',,
i i
......: .......,......
, ,,,p,.. • .....,,i $4..,,;','„-.' l'Il'Itr.,11;"•,-,,,7 *74.. ,..,; . 11" I''' •=4;_. ••:, '' 'Z'',
,-, ,,,
' M'• , 117' ,1P)•' .',..,...V.I-3' .,..,\I 171N• ;1,e . . `."4••••
.
• .4,-47.,,'.;,.,,,.',:,, pil, •,,r,,,i1.1,,",„r'''I.,,...,•••7"....1 iii,,,,g,7',11,,,-,,.I\•'11 . -••'`' '
, _.
. .,
,.01,„-
... I 1...' I• 1 1
".; ,--t i: ,•!•411,i I Mr:. iI,-. Ill''A 1•P..i..4 4c ',,e . ..!,,,,,,,.,4,... ,1; '
,;k. V. II tit-.ivi,,q p::-A, g.' ;,.514.+.:,.._,..• - , i,,j,,,, T.,i, 4:,,, ,b‘,4kiy.v...., .1, ...,-... - , ,,.-. ,•,,_,,,..4 •i 4 1 ....,,,,s,., •., y ,.
;,....-4,• •IA 4 .Jr.,. IA Lil ,11 v$ta?..,, . .44Rigi"--- ' . . ...'. ' .-''., 4''. s!,•-•!:!:e••• ••••••rAq li4:',..f l'3--:-.--- !:•',."•f.'"t•-•-pli'.,•••• i 0',`,,,„-...F.''.' , ,
,r-- , 'm 1 • itii, l' ,. 14-r-,_ ',,t. ,Is;-.0,,,-, - - __. r A: '••\`: N..it•::77". ''‘r-9f•' 1.1•F• : I,1 1 • MO; ''' .1.,•'. l' 7
,;'.‘'I •r'•'''•• t. ,I"4,.,..-,..•.: ,c,1.'4 ',"4,,-,•"i-.fI"li.;'•4 ., '''' ,,.,„.4.1.P.4,C....1. • !' '42 .5'U, ,. •4,i.',..' .•`'l : - ,; . f -, • ' - .
Wf e'''il.,;•:•'''? '`,, •:,--kiko..........,1!,,,,qv' *,,,,.c.,:4,..,....,,,x..„-:,(0.4.,:,,f,..!:,:...:,.;,. I., , ( '-Q;..-• - .:..-.10,4,e:',I t.t. ,'I 3., I ,.....,,:i ,I '.1 . ;i41.41g;: ' 43 - /----r ". -•, '•:F.- ' " - '" -"' . ".. ` •
h
j
. _ _. , .. •
'',4,t&?,;>A,',ie,• ;;,•••Fttfig.11W4%-.iig4Tigt,lr'4,*WsY, t4t..'Lii R.. IV.!... ??`:t.lit:',..?11' 4.! .,1 M.._ k.."iirla., - 1,•-: :FL ii i..i'-tik.;1- .
, ......,..44,............,-,,...,,,,,,,,,..7.,..,..-..:: ',:-.,,i,•I, :
mil i ...i,V:•n . II ,,..„....„.,....„,,,..::•..„,..,,,.„,,,:.:... .,,.:...,. ,... •.
.,:,,,,:„.„..,..,,--:;i:„,•.•/;,.-''''.•":,•"',,•,'' - ''' .'-' ' '
. -7,''."-."'',I.., •,•''-••:'r'''•;,',-.1.,'-,,••,•..,,'; '..•. ' .... . .
. •
. .. . .
' • .
• . •
••••. •
. .
, . .
• :,,;.;•,HfI:44,.- - --7-- - '-'4i;',.''',.•-•. .
•
F,,,,r:',•:: -I•- ' • .;..i:41.I•.•4,..:''.41,,,, -'. g•,, ,•,.••,,.. - • .
. ., .,:x;'•V `,.`,44T '' •!?7,.`!•.,,,,,,,.1.,',,': ,
,'•',.,1,i,:,..,,,:...,,,,iC'.,:,!.',: , , , •- , .
114.1. 1.-,... ,. .•
- - NIL"I' 1,.'••
. •••'',4.01.idit4"Z.;', . ' 0,,,,',',;4,444. , ,
•
''''1:,1•,•::'F-: ' i', 1i.s . .
Pi.S44170;q' .. .
.,,,g;t:,•,I.!'1;i• Ur. ' ,
...-------
.. •! 1 ., ,
.,.
1.1,3 W i! II, :.: ...• .
••
--------- .1Li . - „ i . ..
7 . • ' 1 '' ' '"••••''10440110.740gg,!,,4_1"'
1 1 ,,.........,,.,....„,_, _,. .. . ".•,- :.".*:' • 11 LI.•' LI'
in ii: 11 .i6:Ili., '''':' ., -,• •I''' I —...,,,,,-;,..,..-.A-r v•1440,14*, I*,.„..,,,,,,,, 4..' ,,,,_,
. „I.
.i.;4. 'k
, .„.• •.„, . ,..‘ 1,1,2_, tt, ,4',1 ,.”, , . 1 gr.._A 1.• 1,11::'":::::::;:,,..;::,it,:,:ii:,-:, 1 ...;:,,,.4.71,1„1:i..:TE;,,,1,,,.:14:4%,'„..c..1,,.,11,::;:.::,,7:,,,::74,41;:.,,,..,:„..,-,,,,,,.:141-,,,,,.E.,i.
i eV.,1;.. '':-P1 r"".._,.• •.$.1.: roF1„;r...,...:,, i.,...„i Tv 4..'..,'
,F,,,,tif.A4. 1 rr • • N * -, • ,' 4 14
.14„,..;..v.,..it. 1,4,„ ,4„, ...•. ,....,..„ , .
„ , ii. .. „,„1„.....0,:i f.:::•rwir-- .•..,.ir,.f.„,..,,,./..,,I.4-4w.,,•!..,,,,I., •• r.
, ... . . ..,.._ — , :.,, ...,..- - .:',141,i4 1'11'47. '---Y-, PV4,ift-'4.4 ,a.Fifkri'•
,
T 1,`V .0"*T.,.• '''4.."'''Lt,', 't•.k'1,1.'. '
vg`.,,'k.`Ar•'k'''7. '• .-1..7' ,„;,-' '' : '•-.',- , ,I . ),...... . ''''',I7A,,i,:,`:•,IIV.:15Z'7•,4•,., `'..,-,.4',4•:Ii:"I.r.. -..•"..', : .; ,
. ... ., :')Hg 0,....Anl...,,P.qv,.,,,,..),;,,,,..,.:,*•,...i.
-.,,,,,,o.,,,...,,,..,. „,- 4,, , *' '''"'"".."14 gni,,,:"'"ti'.e::'W•4111,,ic,'V,111‘,"1,..'N''f;..4 Z;'^:'
„me 1 ,1 ., -,,,......,
' '''" •-- ..1q111':irk 0...tt 044t .,i...im t.o t«,.,„ ,,,'e.,, ,-,, , ., ,
i'•,%%.:1:'' ,,,,twe'''. ,,,,.-,. ,.-,,,'.. ..,,..;:'"'•'' ..:n.-j.: - '''14'i4t-':••:7:1741'... ,, . ":,. ':- - ._T - ''' . -..;••••.-,'--1'',E:;;,!:;•,,•••••:;i. EiltillTh'1:11,i•‘1"riT,"!:.F
,1?••••• •' .-,r•-::' ....,4%;";i1gr,:•;- -4;t: ' I , •
1 - •',--•,•,•••• ••• •1.4••••...••••01N, , ,.•.,„,,;.••„• 1•
f .......•:;•-• :..,*.4e•;",A4''','•,:-4111,.. 1, \ .• i .t.,,k .,,•:,•e''-lv.0.4,7.Z.tr',, „EIVRI/, ... Ili .•,.Z.,,-••I'L'Il'''.`.r•,',„ •;',...,'!':...,.....'.."
,
!-,,,44.:;;; 44,,T•'' ''''''''•c•I.'''‘TT!'77,;,;,-•.•,•:!g:, .•• I %. \ '''.-;-. .'''....
• . .
• `;.. ..,.pin. '' .,',':',,,,"•-•-'':- •.--',• '.. ..-
1.'''',,','''''.!'•'.7,7.'.-4401,1X 1..,,..,r1 ,2,•.,.„..!,:-.. ..\
- .t:.,,,sr. .,. 1- •-,..-V.f„e• ' ' ,y:.0: *,"..',';',.4,;''I: •.$0,`,:: ,; ...-. -,4':;• ''';.,:,:,-..,..:-.4,R.04-ii
_ .„..:",,,,"'4_,14: 5Vi"-r-r• "' •,-,i-,,,y'
••?,7',1,r!lq''••' 'I'`•fi'•Y:,.1(„PO:`••`1.•.,•,'1,'0•1,,.1,,',;" .r''•••,.„ '''., •••,,,t,,,,;4',44,,,•;;L, ',...;,....:1,
:r- :4-11M1 15.1A;42714 q:g 4.,V;..,, \
•
,,,,*V-'.f.414,t4.1.7--,'''.-••••-,57-,7x1V,1*,,,li • \ \
“1,2 1.4.".Z4jae ig,,..^ '711.1X:Z.,,,',,,g'sY.^,,,IiI'''',.;:.'1',6-'--7:1I-,:4,,,,,..,,,,..e;!
Mttz-',0,1.1,t,,7riN'''''Zli7i,:.•'4774,4,,,X„:• • ' . \ \ \.,‘,.. .''''"4,,,,.._,,,,,••:44" ..4,. , . . • '. ' ''''''L'f'•of,'P'",,-14*.,"":41;;;. .•''''.1-'''•:'.'i•-'',.''7,'„'',:,,,,•
.."' '''''II`•••''''''"• II4-4.I'','killifk,•*TAII,•:',• • ... s
, ...... ..... ' V,6",•,','','a ,-,14^ '1-,ktv...,',:.-;....,-4-..-1.:.•
`‘,. ..N., .‘••• ....3,,.1,,- , ---..7.,...,..„,,,,,,,,..:•-:. . ,. -,....._... •• ....-. '. ,. ....`•,-,,,,,;.!.:,..: i,t,P),„ ,ti; '. ..;::,..-,,....i:'--.,,,,
•". ,--.-?7,,p,,41...,-,Iith-.4.,,,,,..,.",
grEe:','-.. ".2,• .,, -,-,4,,,,,mq 44W''''!`',:: . .. '
,-- talicii%:4'''.:•g ' ' •
. ----. -— -----.---.--.— -- .2,-.-
, . , ' '..'"- 'C9..4:•.?,t"4}.4.‘,;.1'.'?,;',•
-;tp,--,, .:•,./A7I _.•.
lta•••••,4;•,&.•',?1•Ntr,r0;••-.,y,,,...?„ — - ......,
..,..1,,,.. ...,,,,,..2,.....,.........
--, 1 .. , „..........„
. . _
'''.---
''',A4.,•;. . ,,‘.::__itt.,•..'4%.... P.1,c4."J'II•,:# ,,,,,,:.,,, .,•L,+ - •... .... .
PANORAMIC:1E1V •
• •
•
•
.
1 .
1.1111 7 Wk ,C411:,?// 1:::::;•,•,•-\
•
'Ilit- sc,,:;.,,x•I. ... .-Ag•-•;z." / egr-rulipmilier---- ),,
LIU:- •" .k>A ••..,:im....3,611:2
, 1
111. •, s.,- .... 7j,...-1,....:::::::07.;g:111 . .. ..\ -;<..\
11, .-- .-11 um ---401P11.111111HIMI!!!!!!!!!!%Milta _... .. i
.i." - iiiii.umr _ .
ii14- --ii,.--....,,,*Hir,:murneranehe':-.121114\)•-:cii.‘• .
r . • - ,- •..1-1' --,p-6...,
...371111211:1? '
mennis
rr,rrrrrr-.....In"......lir—---irririrrillr-..-,. .-2.-4,rmaili....iiiii4:::...-osmer,sinital: v..,„
us" lointi.4111116iirgrimEmeip:: ii,_. emdrunri ,.:000plomullarni.,I.: k_i ,h.... I .01 ,-,„,..r..Niu_ii,..,A.krz-••;:m••••riiiimishume...
aiiiiihti 111 sl! e:/ 1-gut...._ ,,,Ausul--•• , Em:11111 illi _.:ginL,--tc...•..,.•.,. --•,.... .,r , inme _
4' .61:glen! .. ...: .....---4•11.1.01111117•11'
•-..- LOGAN AVENUE
/1. moo.....inumanuto siNE
E • •
'7-1,-L'• riiimommillmummothmmitmum
111 jffillillililmrlir°112
si....!.w
.1:1:.:1111111111111=11iiiip
• . ........m. mu... ON .
••• •
... ...''.
• ..L.rL." 19114:111P".1....,-,--atm"- ,••',
'Attd.. "2 2h2Liallniiiil""2"`"'!pi....Eili.„ '•‘"'..G , ''•. .1:31.1:!!!!!MtAIIIIMeallhillIHIIitials W.C..0. .;:fil. =Elm
•iromi- 4:1;;;01: is:=-: I•'""""filimml ! iprakqiummoniiiipm, lost1 _EN ..IP 1
t
- • "
is
••• ral i , .......2.,
1 Ill
r
_ 1 ,,,,,,tim, i.iIi•1.•.A ' "I.. 01 nr
laiii.....MI VE:t, .,`'.r.:',:,,••• ...1 1.= Alliellill AIIIIII 1
1
• il 4' 11504 .•"•s••••I IIMOVF,11111111111! • I f4----.40 i
•I. .....„
itiri m-mi _ .-.1.. mum pm et e 5'4?,•.4%.,*„, - .;i_inimaiRowl.3=.1133i1111
IIiiiii a 4r
imisiol! • ,
inn! .,0 . _I_II r4;"i.''ApiCifilawrim woo:
,Alvin!! c .7_71 j MOHR 10-7,,`i.:1',Atlir,.A,#•••-s At..,,,,,,,fig.alummegir.1III!I no
ifieeEirili
dim!•-,-1-.,,, !figilliiiiiii ririzikwilw:.,15 Prilimilip.,111111::1 ' IMIPAP
1 . '
. . IIIMI WI.
IA. . .HEATIE:17)::-..1.11,:,.,/ 42.".ilinillINEW1110..ra:...im 1.:1•••'IA
. .
IR .7--.• . .,,oira:11/fr ,..i ' 4,11411•Priiimmirml IIIIIII. ill!............... ,
11.11: - luaL.Je _---
MB
RE
Jiro _,-.1 ji • + 1 ,••;',...,•-4c- \-.41, , ,,, Triliondtriffillim
•.6c). -. -19 I--,•4,41*,:,,; .0.,,L.dt.1 is:
..,,
..1 Iii
.4111116
-... . _ .
lion ., , ,r4., sir • ,,>::. itvgd,,,,, .,,,.,, ,„,,,,„•. alidlimmil.r.waseinni
- / e • - ,Y` NI gm",11 :4• rio, ;.--J •II Immo m 41111111511.115 •I ‘", `''Isk
Iir38,:a
% -E%:: :: •, - ••;•••••ar ..5,„:.•,,e-.!Two 1 a 4111. "_.. i'
trimmer,i, . ill:,;•40• 1...Itii l'-''','!"- ,.:,.4::1:%''',1'`'..-1•:.?-r;•••1:•'..A.7';4i4t,:116.17114.4allike I ;lit 1.0.---M011111._ •. .11111111•11=1:;11L'"21 k
117,3,jet, , _..7f. Crill11 I ,
. :..„
1.14.RIT.EV -______._-,--I•--7,4..-..-:=74-,-2-7---. .-- -fil ' ' ..,.,,- ;;.w ..- • -i;;-- --- ---,-,--•..."'CM •-•••smm, g.L.1:: "Eri , ., ,
ravv:„•: ,rollatm," ari lim„,,,
-•••.•
I
t NH 44 At. „49.174; -A.,%„ 71110.11.fiTicui girt - wig"
.. •
. ....tiN • ,, i.,..log '00 lir',1.r; , , hong li. . 0 .
LL, ail .C1---0-.- 7', :412:um• ;010••• . kr •I'k;1 ' 111111111116,11 II ra lionni:01 ,
LIJ .
CC
.'
UJ •
1111111r9101111t
, 1
CI r IP PIAllA PARK fel;_ . *or, .•••"7.4zNotii!!,•A p•41*.,114.i. .I ,,rig liburtrau 14-11 I..,.....llb
1
cc .a•ki I 10.4,1.11.r.ce-A A Fr;••IWZ1911'1
tilli: •,. .
en
=
1
i•*m
:mica`s*Newomitglaqw• sii ow Eng
c•a
I- HIPME,GF. .'I. "E" '43,Eit V: =yk'"'•"--11) MINI.IPII 1 I I
.= •'Ad
,=, NE 'XI Fit"r" '' mile,rattur;„„,,,, t107-.), 11,ftirt0144:11....Eiwi, illia ZINN li
,.., 14 i -iv. ilidlommi Nut:0;......‘..,Toritv--ailiim• mi,,..... mim ,--.....::,.., .
.- I,•-
Rim,,,,q0-‘,:,,, f'-,,,,,ii-five,'‘, Ir. ... _.•.--"."- . ,.... .i, •
• ih, . .... is
. -I, , .,--,.... ,,,pilisiiim „."5:.-:,,v1v• i...4,.,,,,,,,-,0".,,,,-5.0-. i mom. . ts
silo inlii• rak sivirta, iiiiiiiiiimm.:4,..,..tr: ..2.14,15-1.4,11.9 if) lair-••=a--= .IR 4ernaudiir •
•MP l'ilimili I 1 L. (kg/,,.....'"e7-4111filiKIIN.-4,44 k.„,11 li,„,ttilit,..7.14.;;,! -2
:.: . ..
„um,' 111.. EPA. 4,t, u vi:kfinmiam.,.:..,:i.i.,,,..6„ ..-...,..„,.7., .7,•,- .1.1 ..
• mu:• iikimmai --• - ,- . AA., ,,,41i) -15,....11,7t%,,4„,• ••ny..fwzitt lihrimurimemr2L-OIANINMIIIIiu!.Fm a --.1 ......_-------
rii etill iiiigniill • 7.- ,...-:::',.:-..ritt-se ..., ' ,.3 •4.to,k_ea,,,,Aal.-iipp".11 MINIMINII:ma mil =Engrains" ie.:
Lit lig IM,1113 v.:-',run:: im =m
lm• .:*"t*•• -41 0.4:1D
IEiiii.:-, I II III'II I'I•II II 1!11 ;•1104gm " k7 " t"i:‘,4.6".:C.A. 111.14•CNirflirMINmIMpIIimIMINmWirwariiiain—i—m-1A,,ir,•-,:ii-::i:i;i„9i]1,:l.mo..tepiginteu..r1ig.n_.Ia.•i----gER4pLi'u11Iln.rA,...iWm-.Ti..4ipr7mr0iuHm4.p4.muLr.lmi.ffa1i„ev t.---,.!
,.
_ _;„7,N
-713.W41;-4,4=ririinri; 114•0(AiiiiiiiF
‘7.• qii,,..xmanm--,,-,,m,„,414wwws R-mg,4=117,w4i,,—,,,,, ...,,,,.. ...mgE:al.
(
" li IIII IIIMMIMETplIIIIIIIM,111
co
0 e ,IX•p.2.____„
lainlialltraiallgta. 110.1111111M111 111 116,11111111111111111116111 0 --..,..
VICIENCIMINICKFtlammla . --t ...,-...._.-
' Iiiiiiiillifilligat I I x
- ,
..-..-_-
,..._-,
=..,
'Is-I 1M1' .. ""11111WW •'''.••• ••• •• t IM• ''f '".".•=1.1ri-E'leg . firilL :i.1:•.--,..14,:•w:,4:,:..T.,J,I.,.. co
t:-•:. IiiiirlillrEin fl?Winrillilltrrldiffiddlikralklaillirci.1.14EllhltiOrlit11-4400;t::PA21.161,2ing"—DiSi--111,4171461,1i1MifilrogingliEtrf,:imingrialiNgli,„„:,4 m ,„,_ ...... .
' "'• .'"11""" '"Iipla alcullill.111 alLellelagalaimmlis mil lop 1 Ni.Elio gt,nommici i. maimAshom--......74
IM In q
I•
o
.1 t 11111ili II 1111 1111 Il IFIIII i . I. • ....... _ ww .,_ . - .---,..7 :,. _ mom._N. _ . .......... e wi
. ..:•.,,•i
•.:ff.
.
.
.. . •Inii
•
• SITE PLA .
N
J .
.
. / s'i •
• C LL .4:
1NS „
.i. .
•
.
m
Po
I •
•
SCHEME 3
•
. . . , .,..
• - ''. -, i,,,, F.fa-ai.,- ;"••74-4r••••-•••
AR: -.44,.'-','''r-4'z''..A'-f----',A:,• '".'iiii.,4,-Wil.:m.0•07,,,„,77. ....,..,- ,
,, -;,,,.,,p.-,ktpi,m94f-fAmonfirocite7,r,r"-: ';; P,-1;F:7;,17,4111.0!,....--v.:0174‘,4411..v.i. -','
-ir -...-.. „:,,,-::?.,_,i,,,.... ...,y-,,, .:4!-.2-i;..,,,,,okAiti',,....-'z',-i„. ,,,',.,: : ,. .R,!,..?...:-..- ,--_,,--. , .-.1..,,,,..,„,,.vtio 4, --,i,
-f ...,.. .. ......,„,,.. .,..,.,,,.. ,.._ .-i2 , .40„t.,,„ . „. .. .,..-:..,.. ,:,. , -..,,, =
0,..,-,....-40...,#,....4.4 - , ..„-,_....4.:40g,:.,..-----04e-t„_,„ ---,..,,,-„,k,,ii,N.„..,,,,,,,,..,,,::,-,i,-4,,,p.i..L.v- .... ,,,
......,,,,- ,.,1,04140to •,,7,-i?,,',- ..,- - ''''• ::.1.:,,,,. -.Akywkr: -:.:,-;?,1=if 411,4 4,..w.,:-,,,,,,,,,,•''
.•, Rt.•t,•t4,...-•"";:' .;-,,,M,..:4,,,i'i,-.4-,p.. ,.1, ,........•
' -"• •''•••:t•':';:;.,;;-;-:'!' -p•',Vigil, tr1"3416,1° 4,
le.,,
,.::-..,-„,.?„,::$,!r-:T:,,,•'-'":.----‘-'''3'V.tro ; .,,4 - .p,...: , , :-,,,,..:,,?•,,,,fre-4,„ 46, 74/1 4,,, ,,,,e. _,-
,--------,....-= 1 ,,,:,,r‘,,,,,,,,,,,,w,,,, ..:,. - , , . 0.9 '' ' •--'-;4, 1 .:.•ii.,,,,,A.,,,,,,,, .Ni Lvi,40 1,4 it MN
i.; , ---;=.• ; '••.--.",;•'"'","1,!' he % 4,v. •.i .., ,,,
e440`cfp., , ,,,..,,,,..vr,.„,,,,,,,.,,, „..,.,-1,„z,,,-.c , , :,..' Ati----,),1*. , :•I
ii
,%:',y-'''s",..i, „ , kkA, „ .1 .-
;-geritAktilrl'• r'4%,"•:,.,t5-:%;,,„,. %41!0 '1:4 4•';•• ••0
111111111111/111 ' tili
• •Af.f-•” ' ' '1,11i,
, ,-•figig,.,..:',.'te ,, -,. -.1,,-.!..,4 ,,, ,1,,,,,,,,, , ? ,#Wri, ' ',.,I,
. • -- -• -'';l''::':V..illtik ''...ii
• • :41. 1 4"' : '..! , -:ye--!_':?.. 1,, . .,it,, -4.4,--c.
. 11111111111g Moil
Ai
._ .,,z,,' 1,",,I.l''''''''', ', .',1 .,:., ' ligovo. ,,,,i,,, , , ,i ,I.,,,, .:,,.1,4,.,,,,,,,!...,`,J,,,''',..,+,'''',.,,,,,. • i .Alt.,,,e,,,,•
' f',,.., ,..; .‘"'',"t • r ,t,•r•P . -P ."‘•:'.',-,'''',..44V.V•6.' ,'>,.•‘'..'•l';',, ,,,P),,ice•W•
. IN LI _
— . -rv,T-111, •.;;11:-.+:-.:.. - : .- •-. - .,•• ,,--1- •-•-: ..•.,,t• , -,- •...,,-- ,,...----,,,,,Av.,,,,,,*.,.-..!..,,,,,..,.,, ,,-...,, ,
-1 1 1 1-
,70,‘ ,\ '.---$4..:,' . , V,e;,,.,, :. ':'-:.i.,.--,-..-.' i.5, 1,.. ;.1. .i; ''",..,„..,..-m-., ,,,,,I.- .;:-.,40,t,40,;,: xix-„,:::::,&ls,:,,:,',.,,,,, • Isim
A 1 DINJKIT it
:'•.k:''''''' '''' ''' '''*''''Ite''''jk ''''';5'•'"--••.'"'4::':'•••1•• I.''. ''.1-': .11.: -' s'''',:'''''''' . .1.?Ikillgt i.:14'ArtiA4i FikA*'::'•
- a
EC. \ *'.1,:', .',,P11'4,,.,:, •', ';‘.1‘,,,l,".,,,:11- r ;.!''' I `....'?'-'n .,. .(-4;',.."c,#•.'`,4 10,4,sgs'- :Iric 'tt0:vP•V,il-tXzc,',•YZ::.i,,
•,,,,,,,/i. , ,,, 4. 4- ,., , ‘„, , !.., ••,,, .,:,,-. ,•.4 0,,,%,' ,,, A1 44°1'."...,1,:•-•'''' • If' 4,,,, ilia
.- 11_,E.-70.±. ii_rei - INIII:Tram-1.0..6"
i
illi 1 ,,-\ ,s 11.`!...,:4;••';', .. A , v , -.,, s, ... ,,. ,,`..v • . .., -413,-4.<0.,-firalii.`J.`` ; ' .v..?:P.,' ;-,-"..,-'3:7..1:---•'••'''q.• '
lak . '.1‘'''4-•'"'('''' 44144,°..,'...'••--gr. --. -, . ..,,-:...1.,..,-„, ,1*,-- ... .,,,,,,4-.,, ,,,f0...,,-,, , .,.„..,...-i„,-..,:-?:.-- 4,-.,.::!
',..-::-,.,,,.. -itA4p,.1,K...,::: .„.,...,iv . ,,,.....), ‘, ........;,,--4,.6,4,,40,1 , ..'-', $0,0;',..-'...,:,-,:41,41N--. 4, CO
1 LT. - illic - _ IT ,4„,.:.,.... .,.....0.4..,:.... -14 . r.;•,-r`-- ,;;;Ikif.t.trOfe'',;....-.•!".`,,„s -, -'`A',5'.1,4„.*,-... "k1004?f,i.••.'- • ,
•,,,.,,,_ 'ea'i./16,,,` -‘,*..-4,.:a.,'fre4‘..•4.4s, ••:'
.- t',,,Vali.11444 ..N•;f,qi*'441:.....•':'' ,. • t, ,.,0,1. ,a'.;rd,i,, ,;,.,*•- •,A,
•- 11 ME II KIT.II t.3 • '. '''.. 'f.' .., .% V., .:Ii*•,".,'41/4111,PfiWovr..-A,-,,. r.,_.---<•' .•'.' ' "r1v:r;''''r•••4'ii•• tf"" \ f`t")k•Y °44*-4.4,4•0 ".'t ''-•••'' ''''•'l'-'• '. '
- • -' .,. ;-:''‘, , • -''' •‘I':•,;'''''Alei"01g•)••• "e5' ' `; '.''''...N. t-' ' ' ...!;0• ••••;.•R '4•irI411•174 ' „"'"- '••• •'‘. •:•'•:'.
11111101 1111111 ri __ -. Mil"'g - • • • l'qt7"1-•\. '-. ••• '.''' .10,',' ,;:e.,.-.,v,.,T-V1i.,. .0,,,,,M,;-,,,.,,'
N .;•,:,;•;,,,,, ,*„., ., „:,;;, :,--;j4, 44,,,e,,,,,,i. 74,,•. , , . ,, , ..,41,
,1 _ ,.' , _____LIL.i_ I ••• '-'--,. •''Air','' ••kgt''',.,.N; . "tt•N,-.,„ ,,,t;','N''.•'.':,.'',, C''
,-.. :. onfi,..--..„,,,q,.::;,,,..,. .,„„: 4.,Prin'•,,,,.;:.,:', •4';,.. , , ,-,,•-, ••••;-:,
is -E, ',-- _ ill ,,,.. „...„ , . , .,„, '4,t,,*,0, ',1,, .;r,'',,%, ' '..-N, .,(1'.•,1L i,''', Oh ' ',".., ,i.44:''',,•,-,C,',.,"'',.n, , ,,,'i '' .'.. 1'''''''
. . ' • 1/; , „.c4:.N,,,_,I.,,,,,,,,,, ..i,,,,,....,:,,,:.. , .,., , ,-.,•'•,,A0go,'.;'',.','2-14.,,-;,f', ,,,O,,,,ly,,,:!•„.,?,A.,.,:i:,•,..A.2,7.,,,•,•_,.,.4,, -,,:,,,,;,,,,
skri-... rifti ,, too_ NI _ a i 6 0, , ,.;14 -,,NTI?..4*:•••• : ., ..Pk4,-;,,,,, .,•,,,...i:f.„,-,,,4 ",-;•,:..• ,..-,,,,,,..-4„. ...:-•, .,,, 73. - •,• .
" ,,,,„, • liwol . li
• JF, Cr •,
0 =
Eg ill_1
Jill .
. ,
..
•arrl'-111—IS wilt
,,,E.,ri 9.
CI 1• • ,'.,,,..k..A " Ii4•6‘,-,A,T. ., , • ,.. ,, :46-4„,..,,4;,,,.,,,4.;,, ,..,:, „,',. ..,„ ,, '4, . :..,, .
',..y' '',: ", 1.‘ts,'.4.0 :-t'',V.,...74,..,1.. e ...,4,,4.1 .4.! 1por-,. .o-..r.•":44,;'n,l'.",'10''",-.• t'','•4`,,r,,,,i':. •'.; , `,- 'WI
' ..'• ..' ., •-•-•A '4,',.,•• ;142,t'--t;.,t..','- •.;',11 ..0;. At. •,p':'..sa 1.',:::1*:,-.L.••:. .:-,.'.•.i'+''1'''':'•'..--, . •'",.•'.'."..''l'.... 'i• ':,,7-NI
., *- q.,. ',Ai/• ..• ' h.-'-'7''',,...•,..;-. '..•?, 41;0 ,,,j'''','''',,:;,:ge.A..,,:,',.,,,„e,....,;.';.;.v-,,,;•,: . ,,,,-;.; ,:,''.',,:•; ..,,.:,:,
. . •::,. i ,U11,.'-;,.,„,.,,. 4,„,,yi:1:,,,„:,,„114-,,h5::,, ,1,, ,•...,4,?x,,, ,,;,..,.4.%4.4,14,,,:ww*.'44;,1,,,,3/4:,:„;)c..,...7,,,,tri i,!--$11--.1--4-1--tPt-L,•-'41.-•-.3,-.:.41----------—
... :,,,::„..;4,.•.,y00,1:\,A-,k-,,%,7,,,!4.,,,,•..Y,:-,4,-;:,7;.7,-r,,:.;.:,...,,,54,..'-'n.---1;',..,,,-I,.41,11;,:4,,•04.',..• "•':..t:.:.,',,'.--" 1.,. ",'..r. ,., • •,','';' ;• '"•
• :.. ,,. `.•41Aif.'l;,. :••':4,'-••-d•'. !•''• - 'I- '-'''' '.*•:*'`:1414'fi'L.',.. •-,'•, .';;,•7'..,..,":,,,,.. .;•oza•t,-.4•7•4•• '',7*4.,1;ij'''-ia,
. .VIEW
.1 i.„.......,...-
i... •,'
111—
1-1 DINJKIT. '•••mill 1.1= 4- I oninimm
0E13 1411 w• 17-.4.4 ,
iiimonim
, .
• ' 1 • ' iummim
maw.
..... 1 .•
. •
I ill ,
I
L
,
ii . —4 ARTIST 4 o'0 a o0
(> . I
i
1
, .11
•
-..,
LOFT 0, • '1,
. . 'am* h , ••':i-„
V
-------r i 0 ;....,.
03 ED 0 .
— KIT it.•:1' 1111111 '
E:=
• , Cktli '
*, ..i.-., 1 •_ I ',Cj t•ii
C 0 ' •
• •• Kik 1 - - It fr.. '11 ARTIST
• * 1 1 sik 1.1.,PL ;;Ii; LOFT
DISIONI
."-- 1 maw -- •Liv IF •!....:i 0
KIT !
._. c'p
a . \a \ CON ''
. , .
DIN./ .1il
imr. :fr`I • ARTIST 1 I :XI •
III 1E:Ir.\ KIT. a.'' LOFT
1
st...__ IiIiii•-,11AL. , .. ;0: _
a 11 Li .
.,:• or,,,„m: 2 0 . ,
.4. - 1 0 i •.
It.:
I "=----1
III 411\ -._-..!SE' MEETING 1 s , /,
1 I :-. ! MO :... '---. I • F \L
..,,. , LIVING ii 10,ft.. ' ROOM • •Wl
I I . 1 - . .
.ri•----E--- • 00 t II I * ,•
;1•1...,Allfril ,,
0 --- ,
TRASH
.;.1 1. Haim [ ii -11-/ EPA , 0 I D I • - :• \
. 1 '`' * *.• -1 mil 3 1.0 I /"..
. a 1121E1 .
..I FAMILY
•1" 101 1'..?,
111 Milk ; •
‘•':I. -----. .1 ! 0 t--1.1 ''''• 1 •1,i'‘,, ADMIN.
I • 0 0 1 1
II 1
e!••'..r...., ':",.';',.;1. .1;••"/..-7-•:-.t.,...::;:"...''-,44>$'',l'14); •`4; 1_1
I _
:.V,.!::,';a.',1t...:.<...::::.Y......,.,...‘...4:,'!..:i*:..4,::1.,,,.•.:.,Tvi,..,..1 A,•.::,...,>,,,...1. I 1-w-, I n ,\ i
,
0 ..8 I a I • '
of
FUTURE UPPER PLAN • CHECK I I , -•
I !
•
• I OUT . . 1
0 . .
1 /
. '--- Alit •
.
.._-- ....____-
. 1 0 1 'I'
t
LIBRARY riLt°1.1-Q ;
- -
' •
tl
. 0 0 •
•-
;
. 101 12Q ;
. 0, - 1 I 0
, ... • PARKING
...___
1 I‘ V:: _.....
, . •
a .t. WOMEN I I 0 <3.0
I 0.1 OCI I 0 0
•
WO
1•\* 0 0101011M I , 1
• •
10 .61,..,....rto
, .!
MEN I I 0 00 '
<1.
4. •IC
I I 0 0 •
0 00.;,, ----''
'IICO ,,4 .-
a . "Q 91F°
- -\ f r i=3-. •,,=,,.. .. ••:. ,‘„,•.,!--',.-..,-1-.TFIr.:••••.A bc".•-•.••••••••7 1 ...
IMI 1=0 8
,..... ...
0 _
- -- .. -- ---,
.1
0
1
a
'f4Wit -, ' (3 (3(3 LIBRARY RETAIL '
••
. - -- Id a
0 : II
al LOBBY
C I
_.1- - - _ *po I
ar .._,
a J . . _
. '
•
0 co ,., ,., •, 0,e, -
:I . FRONT ' Au:fix •
, DESK . -•
I ST.
••' .
s. 1
' -
OFFICE MAIL OFFICE
•••••••.-- • ,i.
_____._ .
SECOND FLOOR PLAN• _ a FDREOsKNT,
1___
... I LOBBY
• • 1 1
.••
• I il 1
• -
- --- H •
4, t ,e-g•
H---
' UP
•
'--- ;'; r ,..„...!_..._, LOUNGE 11
. • 0-0 0-0 I.
.
_ _
' I 9Q *Q lErmai .
--
.... AP" A et,
RETAIL ..v(-)'.. v(-)
V 1 . °
) <4 4 ) <4. _..__
• .
V 0
•-• • 0 0
01:1-0(11-13 A 0.1-10 cr-13 cr-to 61- .0
-Ls,AruL-Q, icup) 0_0 O CLO 11_,PA
•
• 01 -----
C LLIINS
• i
11E1 : --
1
MI
- .. -
, - 1
73
=,.
,-
RIM FLOES PLAN
z SCHEME 3
. .
. .
cA-cj -o2 -037
CITY OF RENTON
%
® CITY OF RENTON APR 29 2002
ail
RECEIVED
CITY CLERK'S OFFICE
MEMORANDUM
DATE: April 29, 2002
TO: Bonnie Walton, City Clerk
Jim Shepherd, Community Services Administrator
FROM: �" ay Covington, Chief Administrative Officer
CC: Dennis Culp,Facilities Director
SUBJECT: Rejection of Bids to Demolish the Pavilion Building
Bonnie, as an outcome of the Annual Council Workshop in March, staff was directed by the City
Council to prepare, advertise, and receive bids to demolish the Pavilion Building. These steps
were taken and bids were received. Staff has been waiting for direction to award the bid and
proceed with demolition.
As you know, since then the City Council has asked the Administration to hold off on
demolition,while they continue to debate the ultimate fate of the existing building. It now
appears that the earliest date the Council might make a decision on whether the current Pavilion
Building should be demolished or remodeled will be May 20, 2002.
The Council previously approved use of the Piazza—immediately adjacent to the Pavilion
Building—for a Fanners market,which could begin as early as June this year. At its most recent
meeting, the Council further asked the Administration to develop plans that would allow the
limited use of the Pavilion Building for loading and unloading during the Fanners Market
operation. In addition, construction of the parking garage has necessitated the use of the parking
area immediately to the north of the Pavilion Building. With these two uses going on in and
adjacent to the building, it would not be prudent to proceed with immediate demolition—even if
we received direction to do so..
For all of these reasons, I am authorizing you to reject all bids received by the City for this
purpose, and to suspend any action with regard to demolition of the Pavilion Building until we
receive clear direction from the City Council. If the Council does ultimately direct us to
demolish the building,we will likely schedule the demolition after the Farmers Market season
ends, and when doing so would not negatively impact the construction of the parking garage.
M!chele
From: Joy Hogley
To: Neumann, Michele
Date: 4/16/02 4:31 PM
Subject: Pavilion Building Demo Project Cancellation
Michele,
You may have heard that the project to demolish the Pavilion Building has been called off. Dennis said I
should let you know, so that you can send out a letter (or whatever official thing you do) saying we're
rejecting all bids.
I'm also planning to give the low bidder a call and tell him sorry, there was nothing wrong with the bids, the
city has just decided to reconsider the decision to demolish the building.
Thanks!
March 4,2002 Renton City Council Minutes Page 77
Airport: Security Gate Transportation Division requested authorization to use$50,000 from the
Replacement,Fund Airport Security Improvement funds to replace the gates at the Renton Airport
Appropriation with electrically operated gates which will provide more security. Refer to
Transportation(Aviation)Committee.
Special Assessment District: Utilities Systems Division requested authorization to establish the East
East Kennydale Sanitary Kennydale Sanitary Sewer Infill Phase I Special Assessment District in the
Sewer Infill Phase I estimated amount of$857,129.56 to ensure that project costs are equitably
distributed to those who benefit. Refer to Utilities Committee.
Utility: NE 2nd St Storm Utility Systems Division requested approval to add the NE 2nd St. Storm
System Extension Project, Add System Extension project to the Surface Water Utility Division's 2002 Capital
to 2002 CIP Improvement Program(CIP)and to appropriate$200,000 for the project from
the unexpended 2001 CIP fund balance. Refer to Utilities Committee.
MOVED BY NELSON, SECONDED BY CORMAN, COUNCIL APPROVE
THE CONSENT AGENDA AS PRESENTED. CARRIED.
CORRESPONDENCE Correspondence was read from Maurice Crock, Sound Flight,Inc.,PO Box
Citizen Comment: Crock— 812,Renton,98057,urging the City to keep customs service for seaplanes at
Customs Service at Airport the Renton Airport. MOVED BY PERSSON, SECONDED BY CORMAN,
COUNCIL REFER THIS CORRESPONDENCE TO THE
TRANSPORTATION(AVIATION)COMMITTEE. CARRIED.
Citizen Comment: Carlson— Correspondence was read from Clyde E. Carlson,Northwest Seaplanes,Inc.,
Customs Service at Airport PO Box 1845,Renton,98057,requesting that the City provide the necessary
facilities to the United States Customs Service for customs service to be
restored at the Renton Airport. MOVED BY PERSSON, SECONDED BY
CORMAN, COUNCIL REFER THIS CORRESPONDENCE TO THE
TRANSPORTATION(AVIATION) COMMITTEE. CARRIED.
Citizen Comment: Kotker— Correspondence was read from Dave Kotker,4339 134th Pl. SE, Bellevue,
Airport Noise Abatement 98006, expressing disappointment that the Renton Airport voluntary noise
Procedure Changes abatement procedures would not be changed as recommended by the pilots ad
hoc advisory committee. MOVED BY PERSSON, SECONDED BY
CORMAN, COUNCIL REFER THIS CORRESPONDENCE TO THE
TRANSPORTATION(AVIATION)COMMITTEE. CARRIED.
Citizen Comment: Hart/Burton An electronic letter was read from Mary Hart and Tom Burton, 2508 NE 7th
—Off-Leash Dog Park, South St.,Renton, 98056, asking that the Council support an off-leash dog park being
King County(SeaTac) considered for South King County in the City of SeaTac.
MOVED BY CLAWSON,SECONDED BY PERSSON, COUNCIL REFER
THIS CORRESPONDENCE TO THE COMMUNITY SERVICES
COMMITTEE. CARRIED.
MOVED BY PARKER, SECONDED BY PERSSON, COUNCIL ALSO
REFER THIS CORRESPONDENCE TO THE PUBLIC SAFETY
COMMITTEE. CARRIED.
Community Services Administrator Jim Shepherd clarified that the proposed
park would be a King County regional park located in South King County, and
the County is seeking a financial commitment from surrounding cities for the
park.
March 4,2002 Renton City Council Minutes Page 78
OLD BUSINESS Finance Committee Chair Parker presented a report recommending concurrence •
Finance Committee in the staff recommendation to authorize the Mayor and City Clerk to sign a
Lease: Vykor, 200 Mill Bldg lease with Vykor, Inc. to rent the first and fifth floors at the 200 Mill Building.
(1st&5th Floors) The term of the lease is for three years, and the cost to remodel the space will
be recovered in the rent. MOVED BY PARKER, SECONDED BY
CLAWSON, COUNCIL CONCUR IN THE COMMITTEE REPORT.
CARRIED.
Community Services Community Services Committee Chair Corman presented a report supporting
Committee the staff recommendation to have a supplemental funding cycle for the 2002
Human Services: 2002 CDBG Community Development Block Grant(CDBG)capital funds in the amount of
Supplemental Funding Cycle $210,857. MOVED BY CORMAN, SECONDED BY CLAWSON, COUNCIL
CONCUR IN THE COMMITTEE REPORT. CARRIED.
Responding to Councilwoman Keolker-Wheeler's inquiry,Human Services
Manager Karen Bergsvik described the various methods she will use to notify
agencies of the supplemental funding cycle which includes mailing information
to past applicants,publishing notices in the newspaper, and posting the
information on the City's website.
ORDINANCES AND The following ordinances were presented for second and final reading and
RESOLUTIONS adoption:
Ordinance#4956 An ordinance was read amending Chapter 6-18,Penal Code, of Title VI
Police: Lewd Conduct (Police)of City Code by adding a new Section 6-18-18, regarding lewd acts.
Ordinance MOVED BY CLAWSON, SECONDED BY BRIERE, COUNCIL ADOPT
THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED.
Ordinance#4957 An ordinance was read amending Chapter 6-18,Penal Code, of Title VI
Police: Severability Ordinance (Police) of City Code by adding a new Section, 6-18-1.9,regarding severability.
MOVED BY CLAWSON, SECONDED BY BRIERE, COUNCIL ADOPT
THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED.
Ordinance#4958 An ordinance was read vacating the easterly 30 feet of the unopened, existing
Vacation: Lyons Ave NE Lyons Ave. NE right-of-way, south of NE 4th St. (Petitioner: Abney-Revard,
ROW, Abney-Revard(VAC- Inc.;VAC-01-006). MOVED BY KEOLKER-WHEELER, SECONDED BY
01-006) BRIERE, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL:
ALL AYES. CARRIED.
NEW BUSINESS MOVED BY PERSSON, SECONDED BY KEOLKER-WHEELER,
Community Services: Pavilion COUNCIL AUTHORI7F THE ADMINISTRATION TO PROCEED WITH
Building Demolition THE CALL FOR BIDS FOR THE DEMOLITION OF THE PAVILION
®—' BUILDING. CARRIED.
Jim Shepherd, Community Services Administrator, confirmed that the
advertisement for the call for bids will be published on March 5th.
ADJOURNMENT MOVED BY NELSON, SECONDED BY CORMAN, COUNCIL ADJOURN.
CARRIED. Time: 8:41 p.m.
. LUale-rt-J
BONNIE I. WALTON, City Clerk
Recorder: Michele Neumann
March 4,2002
CITY OF RENTON
MEMORANDUM
DATE: September 17,2001
TO: Dan Clawson, Council President
City Council Members
VIA: Mayor Jesse Tanner
FROM: .1-r Jim Shepherd,Community Services Administrator
STAFF CONTACT: Dennis Culp,x6606
SUBJECT: Pavilion Building Costs to Date,LOG #0105
The purpose of this memorandum is to inform the City Council of the funds spent to date on the Pavilion
building. This total does not include the original purchase price of the property since the Pavilion site
itself was part of a larger property purchase.
DESCRIPTION COST
EARTHQUAKE RELATED WORK
Initial engineering assessment of structural stability 789
Initial earthquake repairs to remove wing walls and some parapet 19,371
Engineering to redesign gutter system 1,641
Bid price to complete parapet repairs 20,563
SUB TOTAL $42,364*
• Note the Earthquake repairs costs are less than estimated in memo to Council,dated July 2,
2001(copy attached).The engineering to re-design the gutter system cost less than expected and the
competitively bid repair work was less than estimated($20,563 versus$37,507).
PRE 1999 CONSTRUCTION WORK
Asbestos Abatement 3,500
Vehicle lift and contaminated soil removal 64,256
Repair/replace concrete floor 7,185
Sewer and water extensions 7,737
Interior building cleanup 6,293
Structural improvements 4,339
Electric service for police security 3,474
. Roof repair 21,720
Exterior painting 8,880
SUB TOTAL $127,384**
**A large portion of this work was identified by Level II environmental assessment that the City
performed before the property was purchased. The city negotiated a lower purchase price for the
property to offset some of these costs.
CONSULTING SERVICES
Engineering consultants for code compliance report 4,424
CJA cost estimate report-1998 4,993
CJA cost estimate update- 2001 1,725
SUB TOTAL $11,142
TOTAL CONSTRUCTION AND ENGINEERING FUNDS
SPENT TO DATE ON THE PAVILION BUILDING $180,890
As the Council knows,there is also a proposal from CENTEX to develop the site. The Administration
has been talking with CENTEX since early August about the possibilities of developing the site into a
new,mixed-use facility. Any actual development work on site,however,would not start for at least six
months,if at all,because of CENTEX's due diligence requirements. Since the building is currently
unsafe,the Administration felt it was necessary to complete the repairs in order to remove the fencing and
the building's"Red Tag".
.4
CITY OF RENTON
MEMORANDUM
DATE: July 2, 2001
TO: Dan Clawson, Council President
City Council Members
VIA: Mayor Jesse Tanned R,
FROM: Jim Shepherd, Comm Ay Services Administrat r J'
STAFF CONTACT: Dennis Culp, x6606
•
SUBJECT: Pavilion Earthquake Repair Costs, LOG# 6-C
The purpose of this memorandum is to inform the City Council the current status of earthquake
repair costs to the Pavilion building.
BACKGROUND:
• Council memorandum,dated June 18,2001, Subject: Pavilion Earthquake Repairs, informed
the council of actions underway to repair the Pavilion. Repair costs were not included in this
earlier memo since we were still deciding to replace or repair the gutter system. We have
decided it is more cost effective to repair the gutter system.
• Cost of repairs.
➢ Remove wing walls,planters, &3 rows of parapet bricks $17,188
➢ Remove remaining 5 rows of parapet bricks $9,737*
➢ Engineeringto re-design gutter system $2,500
➢ Repair gutter systemi(cheaper than replacing system) $27,770*
Total Repairs $57,195
* We have delayed the start of these two repair projects pending a decision of whether the
Pavilion building will be renovated or torn down to accommodate development at that site.
• Source of funds
➢ The 502 insurance fund is being used to pay for earthquake repair work while we await re-
imbursement from FEMA and others. Any re-imbursements received are placed in the 502
Fund.
➢ FEMA is expected to pay 75%of the cost of repairs. They will also consider allowing us to
apply the cost of repairs to building demolition,provided the state accepts demolition as an
alternative solution to building repair.
➢ In past disasters where FEMA funds were involved,the state also contributed 12.5%of the
cost of repair. For the Nisqually Earthquake the state has not yet made any determination
concerning state funding.
➢ WCIA insurance pool has limited funds to allocate to the pavilion project, and we are
submitting the project for funding consideration.
➢ If any residual funds are required,the 502 Fund absorbs the loss.
• The$2.3 Million currently authorized for a Pavilion project will not be used to fund
earthquake repairs.
September 10,2001 Renton City Council Minutes Page 309
anxiety attacks due to the noise,and often has to sleep in her car or at a friend's
house to avoid the noise. Mayor Tanner commented that although the Police
Department has investigated this problem many times,he would send the
someone to look into the matter again.
Citizen Comment: Burk— Alan Burk, 14106 SE 124th St.,Renton, 98059, suggested that the City amend
Directional Parking Violations the directional parking law, saying that it is a law of convenience and violation
of this law does not create a hazardous situation in most residential areas.
CONSENT AGENDA Items on the consent agenda are adopted by one motion which follows the
listing. At Councilwoman Keolker-Wheeler's request, item 8.c. was removed
for separate consideration.
Council Minutes of August 27, Approval of Council minutes of August 27, 2001. Council concur.
2001
City Clerk: Paperless City Clerk requested approval of a consultant agreement with CRE8, Inc. to
Technology Planning commence planning for conversion to paperless technology in the Municipal
Consultant Contract, CRE8 Court,City Clerk Division,Police Department,Development Services Division
and Fire Department, in the amount of$65,000. Refer to Finance Committee.
Vacation: SE 2nd P1 between Technical Services Division submitted the appraisal performed for the SE 2nd
Lyons Ave SE&Nile Ave SE Pl. and Nile Ave. SE street vacation(VAC-01-001;Harbour Homes,Petitioner)
&Portion of Nile(VAC-01- and requested that Council accept the appraisal determination of$50,000 and
001) set compensation for the right-of-way at$50,000. Council concur.
MOVED BY CLAWSON, SECONDED BY NELSON, COUNCIL APPROVE
THE CONSENT AGENDA AS AMENDED TO REMOVE ITEM 8.c.FOR
SEPARATE CONSIDERATION. CARRIED.
Separate Consideration City Clerk reported bid opening on 9/5/2001 for CAG-01-142,Pavilion
Item 8.c. Building Parapet Repair; seven bids;engineer's estimate$30,000; and
CAG: 01-142,Pavilion submitted staff recommendation to award the contract to the low bidder, Celtic
Building Parapet Repair, Construction,Inc.,in the amount of$20,563.20.
Cel`tic—Construction Councilwoman Keolker-Wheeler objected to spending any more money on the
Pavilion Building. Stating that although she understands that the repairs are
safety related as a result of the earthquake, she emphasized that until a decision
is made regarding the fate of the building, she does not want to spend any more
money on it. She pointed out that the building is fenced off to prevent people
from walking next to it. Councilwoman Briere also agreed that no additional
money should be spent on the building.
Council President Clawson indicated that although he also does not want to
spend any more money,he felt that if other businesses must comply with safety
standards, so must the City. Mayor Tanner urged Council to approve the item,
emphasizing that this is a red-tagged building and not fully barricaded.
MOVED BY NELSON, SECONDED BY CORMAN, COUNCIL CONCUR
WITH ITEM 8.c. TO SPEND$20,563.20 TO REPAIR THE PAVILION
BUILDING.*
Councilwoman Keolker-Wheeler requested an estimate of the money already
spent to date on the building. Stating that he considers the building an asset,
Councilman Parker, although hesitant to spend money on it, agreed that the
building must be made safe.
*MOTION CARRIED.
September 10,2001 Renton City Council Minutes Page 308
For the record, Council President Clawson acknowledged that there are
visibility problems at the intersection of S. 7th St.and Renton Ave. S. and
recommended that City funds be expended to fix the problem.
*MOTION CARRIED TO UPHOLD THE HEARING EXAMINER'S
DECISION AND APPROVE THE HERITAGE RENTON HILL
PRELIMINARY PLAT. (Mayor Tanner voted "aye" to break the tie vote.)
MOVED BY PARKER, SECONDED BY CLAWSON, COUNCIL SUSPEND
THE RULES AND ADOPT THE RESOLUTION APPROVING THE
HERITAGE RENTON HILL PRELIMINARY PLAT.*
Resolution#3526 A resolution was read approving the Heritage Renton Hill preliminary plat
Appeal: Heritage Renton Hill, located southeast of the intersection of Beacon Way S. with SE 7th Ct.,Jones
Renton Hill Community Assoc Ave. S.,and S. 7th St on Renton Hill. File No. PP-00-053 and AAD-00-149.
(PP-00-053 &AAD-00-149) *MOTION CARRIED TO ADOPT THE RESOLUTION. (Mayor Tanner
voted "aye" to break the tie vote.)
ADMINISTRATIVE Chief Administrative Officer Jay Covington reviewed a written administrative
REPORT report summarizing the City's recent progress towards goals and work
programs adopted as part of its business plan for 2001 and beyond. Items noted
included:
* WSDOT awarded the construction contract for the I-405/SR-167 flyover
ramp project to Max J. Kuney from Spokane and construction began on
September 4th.
* A ribbon cutting ceremony to celebrate the completion of the downtown
transit center located north of S. 3rd St., between Burnett Ave. S. and
Logan Ave. S., will be held on Saturday, September 15th at 10:00 a.m.
* The Renton Senior Activity Center will be closed September 10th through
14th for annual maintenance and repairs.
AUDIENCE COMMENT David Chesnes, 1105 N. 29th St.,Renton,98056, reported that he received a
Citizen Comment: Chesnes— parking ticket in June for parking in the wrong direction on his street. A
Directional Parking Violations Renton resident for 23 years,Mr. Chesnes commented that never before has
this violation been enforced in his area. He said he knows that there is a reason
for the law and understands its application to arterials and busy streets,but not
to residential streets. Mr. Chesnes recommended that the law be amended. On
another subject,Mr. Chesnes expressed his concerns regarding the lack of
parking at Gene Coulon Park.
Citizen Comment: Buss— Christopher Buss, 362 Earlington Ave. SW,Renton, 98055,commented on
Directional Parking Violations directional parking violations, saying that the issue entails not only the
directional parking law but the traffic controller's enforcement of the law. Mr.
Buss stated that, compared to surrounding areas,Renton's issuance of parking
infraction citations is high. He questioned the City's inconsistent and
unfriendly enforcement of the violations and asked Council to amend the law.
Citizen Comment: Pillo— Ben Pillo, 860 Chelan Ave. NE,Renton, 98059, spoke in support of the
Johnson Annexation,Jericho Johnson Annexation and relayed problems he has had with King County
Ave NE, NE 6th&NE 9th Sts relating to storm water drainage issues.
Citizen Comment: Shelton— Ida Shelton, 2020 Grant Ave. S.,A-103,Renton, 98055, complained about
Neighbor Noise Disturbances vibrating noises emanating from a neighbor's apartment which has been
occurring since 1991. Ms. Shelton said she is unable to sleep and experiences
June 18,2001 Renton City Council Minutes Page 193
Responding to Mayor Tanner's inquiry regarding the appropriateness of asking
for staff study since this item is still under appeal, City Attorney Larry Warren
explained that the letter to the Transportation Division as drafted does not ask
for new information but asks for what codes are applicable and which ones
were analyzed on the staff report. He emphasized that the Committee is asking
for factual information only.
MOVED BY KEOLKER-WHEELER, SECONDED BY CORMAN,
COUNCIL CONCUR IN THE COMMITTEE REPORT.*
In response to Councilman Parker's inquiry regarding the length of time needed
for staff to respond to the letter,Planning/Building/Public Works Administrator
Gregg Zimmerman responded that it will take approximately one week.
*MOTION CARRIED.
Community Services:Pavilion Councilwoman Keolker-Wheeler asked for the cost of earthquake repairs to the
Building Earthquake Damage Pavilion building,and inquired about the status of the retail brokerage services
Repairs Cost Request contract for marketing the building. Mayor Tanner stated that he believed the
retail brokerage services contract had expired; and said that he would provide
her with information regarding the cost of repairs.
ORDINANCES AND The following resolution was presented for reading and adoption:
RESOLUTIONS
Resolution#3511 A resolution was read authorizing the Mayor and City Clerk to enter into an
Public Works: Eastside Memorandum of Agreement by and between the City of Renton and King
Interceptor Project,Memo of County for the Eastside Interceptor(ESI) Section 1 Capacity Restoration
Agreement with King County Agreement,in order to establish the criterion by which the County's
supplemental pipeline construction project will meet its overall objectives.
MOVED BY PERSSON,SECONDED BY PARKER,COUNCIL ADOPT
THE RESOLUTION AS READ. CARRIED.
Citizen Comment: Petersen— Councilman Persson reported receipt of a letter from Inez Petersen, 3306 Lake
N 33rd P1 Condominium, Washington Blvd.N. #2,Renton,98056, stating that the owner of a
Potential Parking Violations condominium located at 805/807 N. 33rd Pl.has enlarged the parking
arrangement on her property without City approval. Ms.Petersen requested
that the property owner be required to comply with pertinent parking,loading
and driveway regulations to legally establish new parking on her premises; and
if approval cannot be granted,require the property owner to discontinue use of
the non-compliant parking spaces. MOVED BY PERSSON, SECONDED BY
BRIERE,COUNCIL REFER THIS CORRESPONDENCE TO THE
TRANSPORTATION COMMITTEE. CARRIED.
Community Services: Public Councilman Persson commented on the poor sound quality of the public
Address Systems Improvement address systems used at the ribbon cutting ceremony at the new Senior Center
Request Rotary Sun Room and other venues at which City presentations are made. He
asked that staff investigate improving the portable public address systems.
AUDIENCE COMMENT Chris Clifford, 2721 Talbot Rd. S.,Renton,98055, expressed his displeasure
Citizen Comment: Clifford— with the City's handling of the closure of the Lande Feed Building and
Lande Feed Building Closure, questioned why the building was not closed until Friday,when the City
Declared Dangerous Building conducted its inspection on Wednesday. He stated that the inspection process
was unfair and asked that Craig Lande be allowed to operate his store out of the
front part of the building.
INO
CITY OF RENTON
MEMORANDUM
RECEIVED
DATE: June 14, 2001
7 JUN 1 8 LUU1
TO: Dan Clawson, Council Presiderit
City Council Members
VIA: Mayor Jesse Tanner , ' ffONCITYCOUNCIL
FROM: Jim Shepherd, Community ervices Administrator
STAFF CONTACT: Dennis Culp, x6606
SUBJECT: Pavilion Earthquake Repairs,LOG# 01033-C
The purpose of this memorandum is to inform the City Council the current status of earthquake
repairs to the Pavilion building.
BACKGROUND:
• The Nisqually Earthquake damaged the Pavilion building. Initial inspection by city
employees found damage to the parapet walls and to the two wing walls on the east end
of the building. Falling debris damaged both brick planter boxes also on the east end of
the building.
• DCI structural engineers were called out to examine the building. They confirmed the
damage and declared that structurally the building frame was intact and that the damage,
though of public safety concern,was not structural.
• The initial method of repair was to remove the parapet walls, the wing walls (and
associated canopy), and the planters. The building shell would then be finished to mask
the damaged areas.
• Upon further investigation,however, it was discovered that only a part of the parapet
could be removed if we kept the existing roof drainage system. The roof drainage system
used part of the parapet wall to channel run-off into the vertical drains at each end of the
building.
• Currently a contractor has been hired to undertake the work to include removing part of
the parapet wall while leaving the drainage system intact. The wing walls and planters
have been removed and work has started on the parapet walls.
• There are eight rows of un-reinforced masonry brick that constitute the parapet. To date
three rows have been removed. Once we started removing the concrete blocks,we
discovered that all eight rows were no longer bonded, so we re-visited the decision to
save the existing drainage system.
• The remaining rows of block will be removed from the parapet walls, once we determine
the preferred roof drainage system to employ. We are designing a substitute system to
accomplish the same end result of channeling the water from the roof into the vertical
drains.
• Until repairs can be completed, temporary fencing has been erected on the Piazza side of
the building as a public safety pre-caution.
r
• RE �z_>>�.i .s.�_
JUN 1 3 2001
COUNCIL REFERRAL TO ADMINISTRATION CITY OF RENTON
COMMUNITY SERVICES
TO: Jim Shepherd DATE:: 6/12/01
FROM: Marilyn Petersen LOG#: 01033-C
On 6/11/01, Council referred the following:
Council requested a status report on the repairs to the pavilion building.
Please respond as follows:
XX Prepare memo to Councilmembers via Mayor. (After Mayor's approval,Mayor's
secretary will copy for Council and Clerk and return copy to you.)
Prepare memo to Councilmembers via Mayor and include attached letter with memo.
(After Mayor's approval, Mayor's secretary will copy for Council and Clerk and return
copy to you.)
Prepare letter(s) to citizen/agency with department head's signature and submit to
Mayor for approval. (After Mayor approves the letter,the Mayor's secretary willcopy
for Council and Clerk and return to you for mailing.)
Schedule matter on Council committee agenda. Call Council secretary ASAP. (Copy of
response to City Clerk not required.)
Other:
PLEASE REFERENCE LOG NUMBER ON ALL LETTERS.
Please complete request by June 26,2001. Thank you.
June 11,2001 Renton City Council Minutes 410 Page 184
matter of how the mitigation money associated with the agreement will be used
to the Transportation Committee. MOVED BY BRIERE, SECONDED BY
KEOLKER-WHEELER,COUNCIL CONCUR IN THE COMMITTEE
REPORT. CARRIED. (See page 182 for Transportation Committee report
regarding usage of mitigation money.)
Planning&Development Planning&Development Committee Chair Keolker-Wheeler presented a report
Committee regarding the Aegis Development Agreement. In the 2000 Comprehensive Plan
Planning:Development amendment cycle,a Land Use Map amendment and rezone were approved for
Agreement Changes,Aegis one parcel, subject to the conditions of a Development Agreement between the
Capital International&T and City,the property owner,and a developer. The Development Agreement
E Investment specified allowed uses, self-storage and office,and special development
regulations applicable to development of the site. The Development Agreement
also included a conceptual site design. Consistency with this conceptual site
design is required for approval of site development proposals.
The formal application for development diverged in several ways from the
schematic designs included in the Development Agreement. After review of
those proposed changes,the Committee found consistency between the current
proposal and the Development Agreement approved by the Council. Therefore,
no Council action is necessary to amend the Development Agreement.
MOVED BY KEOLKER-WHEELER, SECONDED BY CLAWSON,
COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED.
Council: Pavilion Building& Councilwoman Keolker-Wheeler requested status reports on the following
Renton Western Wear Alley items:repairs to the pavilion building,and use of the alley by Dally Homes
Status Report Request adjacent to Renton Western Wear.
ORDINANCES AND The following resolutions were presented for reading and adoption:
RESOLUTIONS
Resolution#3508 A resolution was read authorizing temporary street closures at Houser Way S.
Public Works:Eastside and Morris Ave. S.,Houser Way S. and Burnett Ave. S.,and Morris Ave. S.at
Interceptor Project, Street S. 7th St.for the installation of 72-inch diameter pipe for the King County
Closures Eastside Interceptor Restoration project. MOVED BY PERSSON,
SECONDED BY NELSON,COUNCIL ADOPT THE RESOLUTION AS
READ. CARRIED.
Resolution#3509 A resolution was read authorizing the Mayor and City Clerk to enter into an
Transportation: SW 7th St& interlocal cooperative agreement with the Washington State Department of
Lind Ave SW Traffic Signal Transportation(WSDOT)for grant funding to install a traffic signal at SW 7th
Design&Construction, St.and Lind Ave. SW. MOVED BY PERSSON, SECONDED BY NELSON,
WSDOT Grant COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED.
Resolution#3510 A resolution was read authorizing the Mayor and City Clerk to enter into a local
Transportation: East Valley Rd agency agreement supplement with the Washington State Department of
Rehabilitation,WSDOT Grant Transportation(WSDOT)for additional grant funding for the East Valley Rd.
rehabilitation. MOVED BY PERSSON, SECONDED BY KEOLKER-
WHEELER,COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED.
The following ordinance was presented for second and final reading and
adoption:
January 8,2001 Renton City Council Minutes Page 4
Technical Services: Latecomer Technical Services Division submitted proposed amendments to City Code
Agreements, City Code changing the service fees and conditions required of private developers for
Changes latecomer agreements. Refer to Utilities Committee.
Technical Services: Surplus of Technical Services Division requested approval to declare surplus City-owned
City-owned Property, 333 property located at 333 Main Ave. S.,originally purchased for the Main Ave. S.
Main Ave S widening project. Portions of the property were used for the project and the
remainder is not needed by the City. Refer to Board of Public Works; set
public hearing for February 26, 2001,to take testimony on the proposal.
Lease: Boeing Employee Transportation Division recommended approval of Addendum 05-00 to LAG-
Flying Association Lease at 87-001, airport lease with Boeing Employee Flying Association,to establish a
Airport,LAG-87-001 new rental rate of$.3220 per square foot per year, an increase of$.042 from the
previous rate of$.28 per square foot per year. Council concur.
Transportation: Civil Engineer Transportation Systems Division requested authorization to fill vacant Civil
III Hire at Step D Engineer III Position at Step D. Council concur.
Plat: Windwood Division 3, Responding to Council President Clawson's inquiry regarding the use of rolled
NE 4th P1&Pasco Ave NE curbs in the Windwood Division 3 subdivision(consent item 9.c.),
(FP-00-086) Planning/Building/Public Works Administrator Gregg Zimmerman affirmed
that Renton requires the installation of vertical curbs. He explained that there
are several instances in the annexation areas where the original platting was
inherited from King County and he speculated that may have happened in this
case since King County allows the use of rolled curbs. Mr. Zimmerman said
that he will investigate the matter and report back to Council prior to recording
the final plat.
MOVED BY CLAWSON, SECONDED BY CORMAN, COUNCIL
APPROVE THE CONSENT AGENDA AS PRESENTED. CARRIED.
CORRESPONDENCE Correspondence was read from Mike Davis,Davis Consulting,Inc.,27013
Citizen Comment: Davis— Pacific Hwy. S.,PMB #353,Des Moines, 98198, withdrawing the Anderson
Anderson Annexation Annexation application due to lack of neighborhood support to complete the
(Withdraw Application) 60%petition for annexation.
OLD BUSINESS Council President Clawson presented a report regarding the contract for
Committee of the Whole professional real estate services for the Pavilion Building. The Committee
EDNSP: Pavilion Building recommended Council authorize the administration to sign the contract with
Retail Brokerage Services, CB CB Ellis Commercial Real Estate as brokers to provide exclusive representation
Richard Ellis for the leasing of the Pavilion Building for retail space until May 1, 2001. All
proposed leases will be brought back to the Council for approval. MOVED BY
CLAWSON, SECONDED BY BRIERE, COUNCIL CONCUR IN THE
COMMITTEE REPORT. CARRIED.
Planning&Development Planning&Development Committee Chair Keolker-Wheeler presented a report
Committee regarding the request to modify height restrictions for the Conrad Short Plat.
Plat: Conrad,Request to Upon consideration of input from staff and the potential developer of the
Modify Restrictive Covenants, property,the Planning and Development Committee has agreed to consider
SHP-99-093 modifying the Restrictive Covenant established as part of the approvals for the
Taco Time Comprehensive Plan Amendment/Rezone and the Conrad Short
Plat. The modification would be pursuant to Policy and Procedure No.400-13,
Removal and/or Modification of Restrictive Covenants.
The Covenant currently limits construction to "one story in height,with future
remodels governed by the R-10 zoning in effect at the time of remodel." In
January 8,2001 Renton City Council Minutes Page 3
Mr.Zimmerman pointed out that there is a provision in the City Code which
indicates that under certain circumstances,residents who refuse to hook up to
the sewer could be charged a monthly utility fee. He said that he would
welcome the opportunity to revisit the issue and suggested referral to
committee. MOVED BY CORMAN, SECONDED BY KEOLKER-
WHEELER,COUNCIL REFER THE MATTER REGARDING SEWER
CONNECTION UTILITY FEES TO THE UTILITIES COMMITTEE.
CARRIED.
MOVED BY CLAWSON, SECONDED BY PERSSON, COUNCIL CLOSE
THE PUBLIC MEETING. CARRIED.
MOVED BY KEOLKER-WHEELER, SECONDED BY NELSON, COUNCIL:
ACCEPT THE 10%NOTICE OF INTENT TO ANNEX; AUTHORIZE
CIRCULATION OF THE 60%PETITION; REQUIRE ADOPTION OF CITY
ZONING ON THE PROPERTY CONSISTENT WITH THE
COMPREHENSIVE PLAN; AND REQUIRE THAT THE PROPERTY
OWNERS ASSUME A PROPORTIONAL SHARE OF THE CITY'S
BONDED INDEBTEDNESS. CARRIED.
ADMINISTRATIVE Chief Administrative Officer Jay Covington reviewed a written administrative
REPORT report summarizing the City's recent progress towards goals and work
programs adopted as part of its business plan for 2001 and beyond. Items noted
included:
* The City of Renton's website,www.ci.renton.wa.us, averaged
• approximately 14,000 hits each week in 2000.
* Renton Firefighter's Local 864 cooked Thanksgiving dinner for 100 people
at the Griffin Home, donated$500 to a family burned out of their Renton
home, and supplied Thanksgiving and Christmas dinners for two needy
families in the Renton area.
CONSENT AGENDA Items on the consent agenda are adopted by one motion which follows the
listing.
Appeal: Monopole at N 30th City Clerk submitted appeals of the Hearing Examiner's decision regarding a
St,Kennydale Neighborhood request for conditional use permit to erect a monopole at 1321 N. 30th St.;
Association&AT&T Wireless appeals filed on 11/09/2000 by Kim Brown representing Kennydale
Neighborhood Association and on 11/13/2000 by AT&T Wireless,represented
by John C.McCullough, accompanied by the required fees. Refer to Planning
&Development Committee.
CAG: 00-064, Old City Hall Community Services Department submitted CAG-00-064, Old City Hall Flood
Flood Wall Project, Stouder Wall Project; and recommended approval of the project, authorization for final
General Construction pay estimate in the amount of$7,938.66, commencement of 60-day lien period,
and release of the retainage bond to Stouder General Construction LLC,
contractor, if all required releases are obtained. Council concur.
Plat: Windwood Division 3, Development Services Division recommended approval, with conditions, of the
NE 4th P1&Pasco Ave NE Windwood Division 3 final plat; 50 single family lots on 14.41 acres located in
(FP-00-086) the vicinity of NE 4th Pl. and Pasco Ave.NE(FP-00-086). Council concur.
(See page 4 for additional discussion on this item and page 6 for resolution.)
Executive: CitySource Printing Executive Department recommended approval of a contract in the amount of
&Distribution (Renton $73,440 with the Renton Reporter to print and distribute CitySource, the City's
Reporter) newsletter to its citizens, in 2001 and 2002. Refer to Community Services
Committee.
December 18,2000 Renton City Council Minutes Page 454
Ordinance#4885 An ordinance was read changing the zoning classification of 0.7 acres of
Rezone: Vectra Property, property located along Monster Rd. SW and Grady Way from P-1 (Public Use)
Monster Rd SW&Grady zone to IM(Industrial Medium) zone. (Vectra LLC Rezone; File No.R-00-
Way,P-1 to IM(R-00-099) 099) MOVED BY KEOLKER-WHEELER, SECONDED BY CLAWSON,
COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL
AYES. CARRIED.
Ordinance#4886 An ordinance was read amending Chapter 1,Fee Schedule, of Title V,Finance
Finance: Maplewood Golf and Business Regulations of City Code by increasing golf course greens fees.
Course Greens Fees Increase MOVED BY PARKER, SECONDED BY CORMAN, COUNCIL ADOPT
THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED.
Ordinance#4887 An ordinance was read authorizing an increase not to exceed six percent(6%)
Finance: 2001 Property Tax in the regular property tax collections for year 2001. MOVED BY PARKER,
(Not to Exceed 6%) SECONDED BY NELSON, COUNCIL ADOPT THE ORDINANCE AS
READ. ROLL CALL: ALL AYES. CARRIED.
Ordinance#4888 An ordinance was read authorizing a one hundred six percent(106%)property
Finance: 2001 Property Tax tax levy limit factor for 2001 to protect the City's future property tax levy
Levy Limit Factor(106%) capacity. MOVED BY PARKER, SECONDED BY NELSON, COUNCIL
ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES.
CARRIED.
Ordinance#4889 An ordinance was read establishing the property tax levy for the year 2001 for
Finance: 2001 Property Tax both general purposes and for voter approved bond issues. MOVED BY
Levy PARKER, SECONDED BY NELSON, COUNCIL ADOPT THE
ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED.
NEW BUSINESS City Attorney Larry Warren explained that Council had authorized that he seek
Legal: I-722 Injunction to intervene in the 1-722 lawsuit. He reported that the court expanded the
injunction to include the City of Renton along with five or six other cities who
also sought to intervene so the City is now part of the 1-722 litigation.
Responding to Councilman Parker's inquiry regarding the class action lawsuit,
Mr. Warren said that two classes had been established, one consisting of cities
and one of counties.
Airport: Business Plan Responding to Councilman Corman's inquiry regarding the City's plan to
develop an airport business plan, Councilman Persson said that the matter has
been scheduled to be discussed by the Transportation(Aviation) Committee.
Parks: Pavilion Building ' Councilman Persson requested an estimate of what it would cost to demolish
the Pavilion Building and an estimate of the value of the property. Mayor
Tanner said that those figures would be made available to Council in time for
the Committee of the Whole meeting on January 8.
Responding to Councilman Corman's inquiry regarding past Pavilion Building
cost studies, Mayor Tanner recalled that the cost of constructing a new building
was approximately$1 million more than refurbishing the existing building. He
commented that he would welcome suggestions from the Council as to what to
do with the property,but pointed out that he does not want to sell it.
Citizen Comment: Turner— At the request of Councilwoman Keolker-Wheeler, electronic mail was read
Lot Coverage Standards in the from Ted Turner and Cindy Frank, 7540 34th Ave. SW, Seattle, 98126,
R-5 &R-8 Zones thanking the Council for amending the City Code to allow for a larger footprint
threshold for homes being built in the R-8 zone. He stated that moving forward
with the amendment allowed Harbour Homes to resume the construction of
their house on Lot 12 in the Honey Creek Heights Development.
December 18,2000 Renton City Council Minutes Page 455
AUDIENCE COMMENT Carol Heltzel, 8245 SE 61st St.,Mercer Island, 98040, expressed her
Citizen Comment: Heltzel- disappointment in the Council's decision to grant Aeropacific Aviation an
Aeropacific Aviation Request airport operating permit and encouraged Council to develop an airport business
to Operate Aircraft Charter at plan.
Airport
ADJOURNMENT MOVED BY PARKER, SECONDED BY NELSON, COUNCIL ADJOURN.
CARRIED. Time: 8:40 p.m.
D214,/ 1-7.)
MARIL J. • ' TERSEN, CMC, City Clerk
Recorder: Michele Neumann
December 18,2000
•
December 18,2000 Renton City Council Minutes Page 450
Intent to Annex for the proposed Honey Creek East Annexation; approximately
28 acres located west of Union Ave.NE and south of Sierra Heights
Elementary School. Council concur.
EDNSP: Main Ave S Parking Economic Development,Neighborhoods and Strategic Planning Department
Lot Lease,Taylor's Auto Body requested approval to lease a portion of the City's public parking lot located on
Main Ave. S. in the amount of$360 per month to Taylor's Auto Body for
• employee parking on a month-to-month basis. Refer to Finance Committee.
EDNSP: Retail Brokerage Economic Development,Neighborhoods and Strategic Planning Department
Services for Pavilion Building, recommended approval of a contract with CB Richard Ellis for retail brokerage
CB Richard Ellis services to lease the Pavilion Building for retail use. Refer to Committee of the
Whole.
Airport: Renton Chamber of Executive Department recommended approval of changes to Addendum#2 to
Commerce Lease Extension LAG-61-633, an extension to the agreement with the Renton Chamber of
(LAG-61-633) Commerce to lease space at the airport, approved by Council on 11/13/2000.
Council concur. (See page 451 for correspondence regarding this matter.)
Fire: King County Emergency Fire Department recommended approval of a lease with King County
Medical Services Lease at Emergency Medical Services in the amount of$705.93 per month plus
Station#14 escalation clause, to continue to lease space at Fire Station#14 located at 1900
Lind Ave. SW to house a paramedic unit. Council concur. (See page 453 for
resolution.)
Plat: McTighe,NE 4th St(PP- Hearing Examiner recommended approval,with conditions,of the McTighe
00-114) Preliminary Plat; 25 single family lots on approximately 4.685 acres located on
NE 4th St.,between Hoquiam Ave.NE and Jericho Ave. NE(PP-00-114).
Council concur.
Transportation: I-405/NE 44th Transportation Systems Division recommended approval of Supplement No. 2
St Interchange Preliminary to CAG-00-103, agreement with Entranco, Inc., for the I-405/NE 44th St.
Design,Entranco Interchange Preliminary Design in the amount of$296,953 for revisions to the
existing scope of work to accommodate changes in the project configuration.
Refer to Transportation Committee.
Parks: Water Line City Attorney Larry Warren requested that the item regarding the construction
Construction through Gene agreement with SECO Development to conduct work in Gene Coulon Park
Coulon Park, SECO associated with the Southport Development which was pulled from the agenda
Development two weeks ago,be brought back to the Council for approval. Explaining that
the item was originally referred to Council because there was a permanent
easement through Gene Coulon Park,Mr. Warren said the agreement now has a
two month temporary construction easement.
MOVED BY CORMAN, SECONDED BY CLAWSON, COUNCIL ADD
ITEM REGARDING THE CONSTRUCTION AGREEMENT WITH SECO
DEVELOPMENT TO THE CONSENT AGENDA. CARRIED.
Added Item 8.k. Community Services Depaitnient recommended approval of a contract with
Parks: Water Line SECO Development to allow SECO to begin construction of a water line to
Construction through Gene serve the former Shuffleton site, a portion of which passes through Gene
Coulon Park, SECO Coulon Park. Council concur.
Development
MOVED BY CORMAN, SECONDED BY CLAWSON, COUNCIL
APPROVE THE CONSENT AGENDA AS AMENDED TO INCLUDE
ADDED ITEM 8.k. CARRIED.
December 18,2000 Renton City Council Minutes Page 451
CORRESPONDENCE Electronic mail was read from Sam Evans, 127 Logan Ave. S.,Renton, 98055, •
Citizen Comment: Evans— objecting to Lori Giometti's article in the North Renton Neighborhood
Aeropacific Aviation Request Association's newsletter regarding activities at the Renton Airport.
to Operate Aircraft Charter at
Airport
Citizen Comment:No Split Correspondence was read from the No Split East Turn Lakewood/Seward Park
East Turn Club—Aeropacific Community Club,4916 S. Angeline St, Seattle, 98118,requesting that the City
Aviation Request to Operate deny Aeropacific Aviation's request for airport operating permit at the Renton
Aircraft Charter at Airport Airport.
Citizen Comment: Laing— Electronic mail was read from Colleen B. Laing, 5207 S. Farrar St., Seattle,
Aeropacific Aviation Request 98118, expressing her concerns regarding the increase in airplane noise and
to Operate Aircraft Charter at stating her opposition to Aeropacific Aviation's request for airport operating
Airport permit at the Renton Airport.
• Citizen Comment: Talbot— Electronic mail was read from Chas.H.W. Talbot, 3930 S. Ferdinand, Seattle,
Aeropacific Aviation Request 98118, stating his opposition to Aeropacific Aviation's request for airport
to Operate Aircraft Charter at operating permit at the Renton Airport.
Airport
Citizen Comment: Olson— Electronic mail was read from Dr. James M. Olson,4733 Lake Washington
Aeropacific Aviation Request Blvd. S., Seattle, 98118,requesting that the City deny Aeropacific Aviation's
to Operate Aircraft Charter at request for airport operating permit at the Renton Airport.
Airport
Citizen Comment: Heltzel & Electronic mail was read from Tom Heltzel, 8245 SE 61st St.,Mercer Island,
Herres—Aeropacific Aviation 98040, and Lorelei Herres, 8460 W. Mercer Way,Mercer Island, 98040, stating
Request to Operate Aircraft their concerns regarding Aeropacific Aviation's request for airport operating
Charter at Airport permit and requesting that the Council give this matter a comprehensive review
before making an irrevocable decision.
Citizen Comment: Lee— Correspondence was read from Joann E. Lee, Renton Rotary Club President,
Renton River Days Rubber PO Box 509, Renton, 98057, requesting that the City waive the fees required to
Ducky Derby,Request for obtain a Shoreline Substantial Development Permit for the Rubber Ducky
Shoreline Development Permit Derby held on the Cedar River as part of Renton River Days. MOVED BY
Fee Waiver PARKER, SECONDED BY CLAWSON, COUNCIL REFER
CORRESPONDENCE TO THE FINANCE COMMITTEE. CARRIED.
Citizen Comment: Law— Correspondence was read from Denis Law, Chairman of the Board,Renton
Renton Chamber of Commerce Chamber of Commerce, 300 Rainier Ave.N.,Renton, 98055, approving the
Lease Extension(LAG-61- proposed changes to the Renton Chamber of Commerce airport lease
633) agreement. (See earlier action on page 450.)
OLD BUSINESS Transportation(Aviation) Committee Chair Persson presented a report
Transportation (Aviation) regarding Aeropacific Aviation, Inc.'s request for airport operating permit. The
• Committee Transportation(Aviation) Committee recommended that the Council approve
Airport: Aeropacific Aviation the sublease of Aeropacific Aviation, Inc. including voluntary restrictions on
Request to Operate Aircraft the operation suggested by Aeropacific Aviation. The Committee further
Charter at Airport recommended authorizing the Mayor and City Clerk to sign the lease
agreement with Aeropacific Aviation, Inc. MOVED BY PERSSON,
SECONDED BY CLAWSON, COUNCIL CONCUR IN THE COMMITTEE
REPORT.*
Mayor Tanner expressed his displeasure with the Council's decision to grant
• Aeropacific Aviation an airport operating permit and stated that he felt Council
had taken an irrevocable step.
*MOTION CARRIED.
r
1. I l i /' / .- // 9-o Ob'
, 0 7,,�
4V%7
..4'4'4:',.;,",Z.:::,...„ 5-'4• ' "ra
.4' '+� $fix+ . 5 �" ' zi "``'v-- bai ,.si:# a .. 1,%A
xt'
y �
3�':'",74,,,:f‘,..741,41.:0-1':-...t1,410yk ,�.', / kN' '�'`r � ..Y�1.'.µ
a � as ;1 ;''1..:.<";711116::':2;-::''''',.
t'� :''., �T',sr r ,S
k' ✓� HE7 y�•'Y� * �rvt
w
,,
'0 ,2-< moi".,' V.m,? �i
� -: Y4T
's5 P
N a 'Y' - " zr ll.. ��3' V4
.- '''..;;;-:-4‘;''.,..'".. .r..-44'.:?:- x X
.a S
, •'''', i,k, ( +f }.+ iiYd '";."!.1'...
S .
H
,,t', ° 6�
E ! _ ,, ,,,....""q."
:i..ii.144 tt„#4
t N t,? , ' r 1,,5 " '�rc' + .:,:: 3 4 e.
-41=i4 ,7‘,;4,iii:::-.2'... .";40-i:
'..:.',.,,,,:„.it�, y ?*,;4. r . "'r w
'' ' °- ,-
a
'=.AvILIoN
I.
,..
(.
® Columbia Hospitality feasibility report
® Administration' s recommendations
.r ,.,I,. E, .,rA:„^'.W .. v �.' E; ,., kr a ta�p ;�:k'^.e
p
9t
wiy. $
s . Vit;".
,•rte` t t ?w a..;�'y 4, " .`t'U "k:.�. i."1..I77..."..^.
`.'i4 ''tv `,i"v�:� '€F zyi�'s,�.Mi a{,.^.'Lp,.,t,{, :�k,,. Qt; <i. e. kl- .r
,
r
�l•,+
Y•
•
.4• I. y
N
•
°AS.
.!ta �> >
�
t
f
t • ae
`2
�ibi - <,u ,
�q
w r rt„r-.q+'"'•"''#,t1 `' .u! x �.t' S•'-t 4.„,...,...,
`..,..;:4,
•,ter'z,,,,::',,,;:tv '4":
DOWNTOWN
. REDEVELOPMENT
. .
bs z
•
',.
..u.,
ew...
•
,
-
2.
ie'x,{`y,: ' ?"ye�,,., ;;-^.?.' 3,c ^r>e,- � . >a» Rjca•.:<,- A„^ Zp ` ti�” cf, r?'+ -,i :.4 w1 . ix - "c, Ywv �
)RQ:, ' tA � �ty«xk : M.0+. 4_'•• %r ,� '.s". .Ms'::- W;�.� "5 7„ , �stq- . ,,,A'Mst 0 Y t:•;nEa„. : '.*:;f:'
)n : y ' e �µ.L Y t , f, ,r: stii !1a•t: Wi''t4' ,r `t i '' e> 6 . , ',',,Trryn; �� :',,,,, � • ' NII `..Ml ''''34 --
•
... ."... irk..r. ....r.... ,
'm'
: ,C1,71':!*;
aFr. i !,..,,i1:• ',4'.
t,r.f,..>. > t 7..;!•-/'
- + A. - 5 ia , +l, 7 ,' -0 ' qti '�. 1 .. ' ....
A.
zl
''• „ �
,{at • . � � ," ®® aC ' "ri ` wiX 4 t • — rk „+t,lg�Stl - -•-'' 4 -) — t .,..7. . ;,: ��'�ns I c°°'' ii "'k „ ":".14.r ( ,7 'i, , ! y[ ,'ib � . . x � wv4.14.'4 , . ' 1 , i t ....'t-t.- :
CURRENT ' EASIBILITY
STUDY
• Rehabilitation and use for banquet/meeting/
exhibition space
• Columbia Hospitality
Presentation of Findings
For
c
The Pavilion Buil ing
Denton, Washington
Presented by:
OLUMBIA HOSPITALIT
MEETING AND EVENT PLANNER
INTERVIEW RESULTS
s) Renton/South King County
.a..
..S
s
i... er
},..
Y
.�
..
PI l
r,�:;•.i„:fiS•,„b`. 4
Yr . tJ
Yy "`
�•
^ :
Wi'zr ya.-_ s;; t.•;-• a
"�":anners Seattle/Bellevue Planners
''''..r;;-;%-:.4.;, ":4`.4Y,
e . La i ':: .Y — �•F�: J`� ., ^ ?( : s�: w„�ra - :: *^n .?>; - :.. : i , . . iti ,00 O/ . +-^n ,. �. . v _ . , ..r .:. ,......: . • ',; 4;4": ''''''`.7,�k�` S'#:
}. x , ;,.', ,." ;c.'�'x'.`. � ..:M s ,7"n`,''90.000 ;: swwi vr u z,a n ., r:.'..%1:::;"':' '.f .. . Wit. ;:'"xv'i ^•F-Vi^ •.,,80.000 Y 5543, kn.. ^S�' "v : ::�;4;,, AF y• <• l3p f f .(70.00/ 7 : ; .:$ x.4,. " y�„ YYS- - iA: vµ , ;, t 4 tryv
%•
6
0.000 � t { ti •""•:.!':'';...,'"1;,..",•':•,!f.:;•.,•'"'",,•:•:,:".. }� .--.:-.:,,-;: •=-,z"?,., ..,, •T
Y
50.0
i
i
•.t
.
3
' n„
y J'.
�Ie
x haw•
xrd.-
i „Y ��..}k:
0
r
tai,•,:•Y.�,.y”
't�.:
r `7 - x
— ,$� r3
40.00
4"l :See« ..S�'`.',
y«
Fta4' a. a'
r.
,
f
.
tkT
5::
r x .
,
.'Y 7
4,
t:';',.:',,,'
r.:h ,XA.
d
- a<
a'F./CJS�;r;'
30.00% r. ,1V ,
�j Cr
•t 1 � t*
:'t ." ,::.fi 5, v-�.,,° i ,
^v
f'"
rr' y
r''
i+� ,t
t)':'14:4.--•-,'A,44.. {...::'.E e.F"wT -✓:Y :• 'fed.'.
20.00/p ` ;! t",'... ?!k:< ', *. -
•
.! yi
rl
�'S
+
t
?i" r..
•
,a.
•
r.
.,.: . ,3. :.., .. ....a .,-c«:...,_..;r,,;:;,.b G;a`"' Yti;'�a. .s•" i'',y.',.
., .r - ";�" Fur -
L. "G. !-'m Y^ . yet:)s
0 ',lpy.'.;. y.;yr
0.00 0 � '�,. ..,, ;;�;,.
�9re�. s
µ5l �'.fi. ".i =
�'..� � `;1,.'..
'i
"i' +I
,9
-1• t ,ai
0.00% sr , x. �.� ....sa : :
Below Average Excellent Accessibility Accessibility Accessibility Would Would Not
Average Location Location Excellent Average Below Consider consider
Location Average Renton for a Renton for a
Meeting meeting
REQUESTED FEATURES
WIrfHINMEETINGVENUES
• Meeting space for 200 or more people
• Break out rooms
• Free parking (minimum 150-200 parking
spaces)
• Modem audio-visual presentation
equipment
SIZE OF BUSINESS/
GOVERNMENT/ASSOCIATION MEETINGS
(Data provided by Planners in
•
South King County/Renton area)
D
w
:- i Y •-v�r ,V•t :a ; ` �. ; "ti'°,'
•
,.., e
: tt
'
'."
}
.
�
•
�#;
..
"-y�.;.,
,
ir=
r
ni
_
K",-.,,-11',-'1. r�
I25 YS �{ g ,i.,, fl- mr"G Ant
. twt lt�: B, Y .af f•".5 '"''...d TR 9 '-. �h<ot . `; :t. rts.
:7uv '� k < lxk `.Y ,:{.ati.;' � ��.y `';> .';w: n CS� 5t s4iter: �� _ , •a� t � ' ':R .jlrf .K,31 .$ ': -:'%.�_i'.,, i " ':: 44 .20/ '.. . t �$' - 'vii _,a.,-1 ; h « 1- - .4%.,..P*
he } .4^7`,. _ C .,dM1vi*,;:
$V.1),.:. . x- . » : 'g � + dt•ei, - -�!, i i � i:: ge414~ '" ..- ''lm ; , w " Y s� u,' CT�(.. .Jd' ai:: U .. . =YyiPw ' , .S e r sX fv -
•
, ,.. ',
�1544� .,... -...
's.. .
' . • :ikf,
. . .W— i
0
io t _ ✓ tzx ` rix - yx' • +d" , t_.,.'. .#.!, fi. _J`:s�. '
4�
f�G
rE4 ,£� _':%-. . . 1' .e'e w
� 4 :5:','idt. " :d. . „ < t ' x 1,..*:-., , »'. .;, ,kpx,,f' A }. a ,,t k: X '.iY c. C •4; , • r 'W } ' 'rr"�,,t,^.` . a.;- `: Y. z.:t:( . 4a.yf } h :� "W t '. hte S+y7`* ,,.Y ,? A tr ^'' .
;10/ (( e ,,° ,J . ,..':'
� n. . ,Yti , T x-
k° x" `, "-,fi ; ^ { fir7 i ttis: ii�r' 'a� ;e;�lf Y -n^- �1I� � Y. ~':P . $:
tn # » . z' n:t, , f„.47`'moi•"'`::
z.
; ai'
- .:L
i
.r
w7
1-
F" y
d
, 7 t
x ^t
f„
S5, r,f.
F
- k'
�t
t'L
C:n yy .4'��
';vim
.w,i*r .'a "ie'fi.i, �, w "a ' ,,,..„-•,,,,,11
.a -'» v n O I=♦401 :1 I 'r'c4a.i •moi .'
i
a(,,- ' `" 1. . _,.�.. ' ..£• ..e.S - tee"s' ....A., _...„__..,40,77,:.y �
0% .•...,-o....=....!.k,.......,:...... .�:.. ". ....:. �f,¢' .sa 'i...a,., a�.. .._._.,,,,,41-.W.,:it;:.t.:..a:. ,..::xr`�.:' ','"„' u.r..ai,'^µ.a. ..� k.`.�"^" .*.c^_°y r's.; ^!.'. ?..•_�.._. z,„,...,..,...,'.
No Off-Site 0-10 11-25 26-75 76-150 151-250 251+
SIZE OF SOCIAL EVENTS/BANQUETS
(Data provided by Planners in
South King County/Renton area)
401-500 people
15%
50 or less people
35%
x.'
251-400 people
30%
51-250 people
20%
PRE-OPENING EXPENSES
• GGLO Renovation Costs .$2,328 ,445
• Furniture, Fixture, and Equipment .$677,647
• Staffing and Marketing . .$ 185 ,580
• TOTAL $3,191 ,672
I E T G OWTH
vr. ^
Year 1 Year 5 Cumulative
Years 1 -5
Attendees 26, 175 37, 169 164, 142
Total Gross Revenue $872,449 $ 1 ,253,390 $5,255,830
Total Expenses $ 1 ,022,475 $ 1 ,495,588 $6,299, 103
Gross Operating ($ 150,026) ($242, 198) ($ 1 ,043,273)
Profit/(Loss)
IA
4 s .
Pi""I ;
Year 1 Year 5 Cumulative
Years 1 -5
Attendees 26, 175 39,283 171 ,386
Total Gross Revenue $ 872,449 $ 1 ,541 ,386 $6,250,825
Total Expenses $ 1 ,022,475 $ 1 ,670,075 $6,889,840
Gross Operating ($ 150,026) ($ 128 ,689) ($639,015)
Profit/(Loss)
CONCLUSIONS
• Need for large meeting space for over 200
people with break-out rooms
• Potential for Renton to emerge as a sub-
market to Bellevue and SeaTac
• Projected annual operating subsidy of
$ 117,000 to $258,000 required
SUMMA ' Y
• $3 , 191 ,672 to make the facility operational
• Average $208,655 annual operating subsidy
• Additional 50- 100 parking spaces
0 HE MANAGE . ENT
OP'I'IONS
City' s Community Services Department
• Hire additional City staff to manage, market,
maintain and clean facility
• Use outside caterers for all meals
• Expect 50% less occupancy than Columbia
Hospitality due to reduced marketing
• Year 1 operating subsidy of $296,327
salmS TT!HU!JdS 0
salms aoeidaumo,j, .
pnoo zams .
5uipuBZ indsx.mZ .
uuI uapHrJ uoTIiH 0
1-03PS uuI IiepiIoH .
uoi;upossd iU1ipOj uo;uag
SNOI,LdO
IMZ1WZEIDVMVN }IFIHIO
RECtMMENDATIONS
In light of the report and findings of Columbia
Hospitality, the Administration recommends :
• The City not pursue the renovation and use
of the Pavilion Building for banquet/
meeting/exhibition space
• Staff explore other options to renovate and
use the Pavilion Building to support the
City' s downtown redevelopment goals,
including potential retail uses
!
'tib^
,2 -.
, _, ,;, ...4,,,,:ii . loin ,'t-i.t....,14,:zikutt.,..v.. 3.7.-4..,,:i
10. r '1
{". "..rc,� xs.P..� '—_,!,-+.. ,•- ;�7 °'- `� ,`, e .-,i tri, � ,. .'„,0..i-,01,11 .111111111,-f. t '' ` j �:i� '�� ,��,k � �.uz
pi,
' � � _ - 9 L-n i �� �� '�t+l�ii�1 �s�t�I,�4 ,�.�. l:F'rc-tln�aa4 �"�.�a^�..�„�:. .t � _...-{ Via.. �j � _ y-.''',;.:-....:g.�
t
' a a ,,...•�''_',,r,,y N ' , 9(y, t,^ v.i.. Fi..''. .i _x ..s .r1, tie? 5 f34`,f� .1 i i ,t..
.ar t _ rN q•r^ x^�r • • .7, is '.t:.7'.1 �1.'►W .}r`
... � - � ` '' 7-4.;...H. 7� srsy d:.)1' t.Ir',:'ti . ~R- ,t, f1 r k ,„.......„.....,...y:„.„/„4.,,..;._
' ,? 4 .41/1,
...�Y Wd.
F ' a. # :�i'�- �-"r�'+�` 2° .: t ,‘„Hsi
`4. , ' t Vii` 74`E ,f1 �A'{` '.i; la,,,,,,A, e.
'� '' rS,�s �•. $ ,tt" �zY�'� � lap r �_tli.� ���,.:��*"� ;y� it �{ t'a,��. l ;,,���$3,. r)9'I�a" 4�rL,s' - `�.
_� mi-,` � x .� '� ' r.:i��Z � -"`ti� ,..`z�y1�Y�Nx '�;ak'� .:L� 1E:�•_
-'. .:`i' :,. ti. :7-'"`' -•� SI�'.x .�;.--":. Z.,..;'wac>.r;,..„ r: ?,,--i .,, y�4 �r,y ti r,.`•u;e� -, l� "�&�iwlae '` 1?f
N +fir ars • ,,@x�-�,,; .y_ ...w.S''_"...£ ...�..° . ..:.;.� .. ..�:r'.�. .:.,. i�� (14 .. �,�•` _ ..*r•,,
'j}� '''"...,-,1.".:" a ter, ., w, .,; +d
11
.. w^.^ !d ^; pyx,, �+'✓ �. v" ] i
Xuidmo3 a° Id P " T1 `613LTS uoj •
3litoud DTZ `S)p�d clog 6
AHIflOMI
RETAIL VISION
ilding "
< < t s a neat u
Ron Sher, Third Place Company
•
,��^ x,t�=�n•.,`iC'� 'cv }9 �.� F fit.
,, 4 kts < w ,i,1M^ -:, a '`*• a''t,�^ 'fie k�x+4"E`'"-s�..' "" 1 �w,ip; .. ....,,. _w .'t—•;; „.
t &�, d.k y`".� ".*" f t .. .. :r f fit$` s- ,,,b._ - _ :-„,/3a 4 W �„ '" "'
•
F ,,
3 r X .�u'*+ f ' ,tz"v r. , „A',:•,.',',,',7.,.,;'a As s +,++
i” 2 .-• ::•' ..%•
d 1 „t , .>4•,:,'yA,477✓r 'f f ',t; , „ 3Y` , h `ti k 'y{ zr ; .. ,
•
6i + r. . , 11 , �L M i
• fp� „ „ *„..„,,,,,,,,t,-,,,,,„,,,,,,,„,„„..,,,, ,,,,,,,,,,,,„
p
^atr t4 t S'Yy�r.04 #x ,A^'G i..;; i.'s l l¢4�1 gu;tr 4 t a `'&�-�3 f. 1 a;..:k �P g® X ”,„...1411),t�.
• t 4 ,_:-',..,..‹._:2 sk..,,•'” 'sr '''�../' • . ,„? y.... a:':.' f.+s� .S ,,, i i'',!..4.,,e..+�IV`,,4 s ig-, •4� Y _' �'P :: ,r
4[• -..,...,z,-,.....,-.-,yr"u"s:' ;#. ,:.2.,.7.-"•x...7 .",-xe„ "'r' ,.. '14 —,,... iXl fr..-`'« ,;tj...r Iii' ,' ... tit-i ,t { P,1.. .4 -
t M1 r >A+C #t4 'nth... _yet'
(�(,,k L 5 ` •}� y1.it '17:71?-7: 17
�-+4 P M/ ,` �", 'y..E r. f1'{ 7� 4� 1~ �".y [ �-i6. .j`'X 84�f .. q,L
4.
1 _.'^';'''_ } -1-' t I' r '' _. .4,—:":,,,,,,;.3'
«� ,•:`'''4.'''''''41'.5i:'-'1:-
z n l 7�.ir,.- } 3"�W"'§t4k, — A-t'; '4'2�' i *4 .ty ?a s 3i. z«„_ '^a` ,
.7 �v� cr.m' sx„ar *- "S-.' ":-.4.;,*--: -',' t •
- - 21; 'x+” Mr,.1; kr. K F c T}
c�•�.�""r 4 'r` ;.,5- tx �� � s' 4 t'.?.„:
�:. rt 4 • `� tz�`".. ��� s x ��i
. rk
..Y�...�.........��`�`r,+'' �V ' p . �5.�x 4,,.:,.....s..._Si•
^ .Sty`'h•,'tu°?:..+.,r'..,:-:..i=`;Pim yd ,' =,w+,'1'i; "zCA.e..:.r.�s.Y 77 ---„=„4:4
,,,,� ,,�
-,....„,..„7„...„....„6 , : ,,,.
, • :,,......„,,,,,,,,,,,,,:„..,,...„,,.,„ . • ...„.....„..... „__.. .
rm.
�.:,n;xT'e��-'S'e"„�'.'�}b,N iil":, .C'- 1-g L.:';x...�:r `. -f.1-c.c.-.-._._ .__..._......�....� .. .�.. .e...J ... ...r.".... - -
•
�.J -� ..,'mss•»- . R� x ..$ahT•'�3�FmH & �-i`-`
,
y �ytll « .l `4ry iv,,,, ..,1-.h.�� ,, , 4-rZ`�!t',ir4L�i',,.'
a.ar.`�z.0=°f�'X6;" .�, '',1":',,,,,,e ;',4:',.„:„?`..
;v'.„,<vCrs :`yr„w 'a "e �;#'k� ' �i„;,F4
A
'µ a . •V..t < fi
_p
✓"` . tom:" •a � 1 ,r''1 iA-,; -:e. +.'fit ;;a4„-"�. n 4.0,,,,. .3 e
.2- ?ys �.:,r•..• �y�`�U?� �� �.n%{7... FA' ..; 'r.z��-,'p�--- �:; s.V"R.'�P ~YY' .":.
's..� ,t 8.4�,.r:. �"."=z_ � _ t:.' ''4,="i:*-;-!,,'
:r' i'so--.v�.°n: ' `
•,,,' :.q„: :.e. .,4 ,'.? {'yia *,',?' zi,.sz''aC i'*'i ,`�" 'p i •-!,,rad -,.-10:4,11:1,,,,:
R
-,... ...,..q--7:171', a
AC
sa x 'ser,
r ,i 'r� x, ,, a F �` "r1 ',, a
3Zr ~r~Zs -^
,. f{..
2;7,. .€ �. -�. 1.`-,fir- �'..� L sg " `
gi,
r t
s
ui✓n'`a ,in a'M- r-'.k:e °°S� ° .a, a ae -`--rs � o ;,..,f- sas.
i t ;;--.;..,,,,014.1,...:,:,4
q v`b;;,, ;,.,...,,..--..,..... ...,;:.i
w x 3r 3 y r 7 �,,..,..,.., :::'
'�,,,, 6,r:
F..,.. 1 :?N'f x-..,... Eke' tu'4 ",w..
e+,#:"N•,, :e �3 ?, �,w'" r `r'": 3, ..- r t "wa r*P y°�
C•';.h ap 4 +'f �� �.. ria T , °'. .'.rA: �m..`y. ,
''''<,,S,:--5,.-4,r4-''''44,
`
`,,,•,,,,,,„,`"4',:i."? 4r a 'r' ° �z"v�d s. 7 �7•a x. � �,
'" ' , �' J:,,.,11,1,t,'e. 'z v'a yp r ";"'. "`�y fir'4.
3 y ,ler,-' '4 -`n:k 'a- "'''• S' ., s r 7, ^' ; OM1 .r S �'- ^
=4'",,aka't .t t�' L vt r�,k...s'S ,%��
'Y:r i v ... x, ,::{i)'^.4,„,:C'x`t4e,a ,'x44°k'� p ,)' s#,,.�, -+',+•�+'
+iyr+ yrr ,rxr t'., ( a5W " t%r,4,,', M fir,�a5e..:; ,�
I
•
41-
CITY OF RENTON
MEMORANDUM
DATE: May 1, 2000
TO: Randy Corman, Council President
Council Members
FROM: Sylvia Allen, Recreation Director
SUBJECT: Recreation Division's Revised Operating Budget—Pavilion
Conference/Meeting Facility
The original budget estimate that was submitted by the Recreation Division for the
Pavilion neglected to include the cost of janitorial support. The Facilities Division
provided a figure of$.70 per square foot,which was added to the original document.
This addition brought the total estimated cost to operate the facility to $-296,327.
In arriving at that figure,the following assumptions were used:
• Same parking requirements as identified by consultant(150—200 dedicated stalls)
• All meals would be contracted out to catering company—no resident chef or wait
staff
• Kitchen equipment and supplies will need to be replaced more often, due to increased
wear and loss from self-catering
• Occupancy would be about %of number expected by contractor(due to reduced level
of marketing). Occupancy figures were taken from consultants preliminary report
Version#3A(Meeting Room Rental Only)
• Annual rental income would be somewhere between Community Center($93,000)
and Senior Center($21,000). Income computed for this estimate was $71,428.
• Consultant specified that"if catering is contracted out, a$30,000 annual marketing
allowance would be required at minimum". Have reduced this amount by half, to
$15,000.
Pavilion Conference/Meeting Facility
January February March April May June July August September October November December Totals
Lal Fees 1,545 2,140 2,603 4,842 6,405 7,075 3,514 3,833 4,710 6,267 3,506 6,574 53,014
Zoom Revenue 455 568 682 1,478 1,705 1,705 796 795 1,364 1,932 1,137 456 13,073
:nue 124 124 186 248 434 576 470 578 186 495 156 1,764 5,341
ue 2,124 2,832 3,471 6,568 8,544 9,356 4,780 5,206 6,260 8,694 4,799 8,794 71,428
inator 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 48,000
tlist 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 42,000
1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 21,600
3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 45,000
:Replacement 250 250 250 250 250 250 250 250 250 250 250 • 250 3,000
;.70 per sq. ft.) 10,339 10,339 10,339 10,339 10,339 10,339 10,339 10,339 10,339 10,339 10,339 10,339 124,068
and Maintenance 1,966 2,063 2,125 2,261 2,568 2,608 2,323 2,417 2,293 2,389 2,093 3,453 28,559
2,600 2,600 2,602 1,834 1,952 2,137 2,141 2,239 1,679 2,000 3,044 5,566 30,394
3eneralExpense 784 795 806 855 887 891 826 833 850 889 827 891 10,134
1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 15,000
:pense 30,239 30,347 30,422 29,839 30,296 30,525 30,179 30,378 29,711 30,167 30,853 34,799 367,755
Ise) (296,327)
CITY OF RENTON
ECONOMIC DEVELOPMENT,
NEIGHBORHOODS,AND STRATEGIC PLANNING
MEMORANDUM
DATE: April 14, 2000
TO: Randy Corman, Council President
Council Members CITY OF RENTON
VIA: Jesse Tanner, Mayor APR 1 4 2000
FROM: Sue Carlson,EDNSP Administrator RECEIVED
CITY CLERK'S OFFICE
STAFF CONTACT: Mark Santos-Johnson,Economic Development Specialist
SUBJECT: Pavilion Building Update—Report and Findings of Columbia Hospitality
regarding Proposed Rehabilitation and Use of the Pavilion Building for
Banquet/Meeting/Exhibition Space
In January the City entered into a professional services agreement with Columbia Hospitality to
analyze, develop and present a plan for the potential rehabilitation and use of the Pavilion Building
for banquet/meeting/exhibition space. Enclosed for your information and review is a copy of their
final report and findings.
Unfortunately, Columbia Hospitality's findings regarding the economics of the proposed use of the
Pavilion Building were not as positive as we had hoped. Consequently, we are exploring other
alternative uses for the building, including retail. We hope to be able to provide you with more
information at the Committee of the Whole meeting that is scheduled in May.
SAC:msj Q:/EDNSP/MSJ/Pavilion Internal Memo#12 3-14-00
Oerg.
CITY OF RENTON
MEMORANDUM
CITY OF RENTON
APR 0 7 2000
DATE: April 6, 2000 RECEIVED
CITY CLERK'S OFFICE
TO: Randy Corman, Council President
Members of the Renton City Council
FROM: ) ay Covington, Chief Administrative Officer
•
Cc: Jesse Tanner,Mayor
Jim Shepherd, Community Services Administrator
Sue A. Carlson, Economic Development,Neighborhoods & Strategic
Planning Administrator
SUBJECT: Request for Information on Pavilion Building
Councilman Persson asked for the attached status report on the expenses to date related to
the Pavilion building. For your information, Council appropriated$200,000 toward
pavilion improvements in 1998. The 2000 Budget included$2.3 million to be used for
the redevelopment of the building into a conference center.
We have tentatively scheduled this item for discussion at the Committee of the Whole
meeting of May 15`. Prior to that time,we will have the final report from Columbia
Hospitality and other information relating to the feasibility of operating a conference
center ready for your review.
CITY OF RENTON
Community Services Department
MEMORANDUM
TO: Jay Covington, Chief Administ -lye Officer
FROM: Glenn Kost, CIP Managerlik.4
RE: Pavilion Building Costs to Date
DATE: March 29, 2000
DESCRIPTION COST
Asbestos abatement 3,500
Vehicle lift and contaminated soil removal 64,256
Repair/replace concrete floor 7,185
Sewer and water extensions 7,737
Interior building cleanup 6,293
Structural improvements 4,339
Electric service for police security 3,474
Roof repair 21,720
Exterior painting 8,880
CONSTRUCTION SUB-TOTAL $127,384
Engineering consultants for code compliance report* 4,424
Terranomics Building Use Study 3,500
The Retail Group Use Study 36,794
Cal Jordan Architectural & Cost Estimate Report 4,993
Columbia Hospitality Study 34,760**
CONSULTING SERVICES SUB-TOTAL $84,471
TOTAL OUT-OF-POCKET COSTS FOR PAVILION $211,855
* Code Compliance Report completed in-house.
** Contract Agreement
C:WIy Documents\Nell\PROJECTS-GLENN KOST\PAVILION\Pavilion Bldg Costs 3-29-00.DOC