Loading...
HomeMy WebLinkAboutPN_Project_Narrative_SECO_200107_v1Southport Park Ave Extension TENW Transportation Engineering NorthWest TENW 1 May 23, 2019 Project Narrative DATE: May 23, 2019 TO: City of Renton FROM: Chris Bicket, P.E. TENW SUBJECT: Southport Park Avenue Extension The following is an overview of the decisions and agreements that have been made between all involved parties as a part of the Southport Park Ave Extension project. These items discussed below shall be taken into consideration by the City reviewers during the design review process. Project Overview The Park Ave Extension project consists of the design of a private interim roadway through the Southport Site, in the City of Renton, Washington. The purpose of the interim roadway is to provide connection between the existing Southport site, Park Ave N and N Southport Drive during the construction on this property. Upon completion of construction, a permanent Park Ave roadway will be in place. The City of Renton is concurrently designing the extension of the public section of Park Ave N. Decisions and Agreements o Per discussion with the City of Renton, it was decided that a crosswalk crossing the private portion of Park Ave would not be necessary. The city has agreed to include signage at the intersection of Park Ave N and N Southport Drive, indicating that pedestrians shall cross over to the west side of Park Ave N at this location. o Currently Seco Development is working to obtain the land necessary for the Southport development. Right-of-way and easement decisions between Seco, Puget Sound Energy (PSE), and the City of Renton are still being discussed at the time of this memorandum. For more information on the status of these agreements, please contact Rocale Timmons at 425-282-5456.