HomeMy WebLinkAboutC_Public_Comment_76.bComments to The City of Renton on Puget Sound Energy’s Energize Eastside &
Renton EIS Consistency Analysis/Addendum :.
Version number: 1.0
From: Todd Andersen 4419 138th Ave Bellevue WA 98006
This doc needs a serious rewrite but no time to do so. It is however factually correct
in magnitude.
To: City of Renton, Jill Ding Senior Planner, jding@rentonwa.gov , City Clerk
jseth@rentonwa.gov
CC: WA State Attorney General's Office
Date: Jan 8, 2020
Subject: Renton’s EIS Consistency Analysis deficient & wrong in several key areas
per new infor introduced by PSE at the City of Bellevue Administrative Hearing
Mar/Apr 2019.
The new information PSE provided shows massive decrease in 2 aspects of Renton’s
review criteria “pipeline safety” and “economics” over existing power lines.
Energize Eastside has a ~104 to 107 fold increase in likelihood of monopoles falling
over due to earthquake liquefaction and rupturing the OPL pipeline over smaller
existing wooden H-Frame structures.
PSE introduced new information on monopole depths and distance from OPL at the
Bellevue Administrative hearings under oath. Monopole foundations depths up to
46 ft deep and as shallow as 13ft. But here’s the kicker, only 13 feet away from the
pipeline. And Energize Eastside has a ~104 to 107 increase in likelihood of OPL
pipeline rupture from an earthquake of one or both of the 16” and 20” pipelines
operating from 928psi to 1265psi than existing as built H- frames.
The real killer is the new monopoles are far more top heavy and will have minimum
+14X more leverage to the new foundations over the H-Frame foundations during
an earthquake liquefaction or landslide. They also increase SCC on OPL. Why? 7
fold reduction in poles at more than twice the height. Bigger single point monopole
foundations are far worse than smaller 2 point wooden H-frame foundations in their
failure mechanisms on OPL. The other new information introduced by PSE in
Renton’s EIS Consistency Analysis is “the replacement of approximately 144 existing
wood and steel poles (H-frame design) with approximately 41 steel monopoles” per
City of Renton EIS Consistency Analysis. Never stated in any EE EIS document.
Here is what the Tokyo Gas Company, a utility 10x the size of PSE with far greater
resources and knowledge said. To quote their 2011 presentation/paper of at the
International Gas Union Conference “Pipeline operators were shocked at the first
occurrence of AC corrosion in 1986 and subsequent AC corrosion failures of modern
pipelines in Europe and North America despite satisfying the protection potential
criterion.” “It has been definitely shown by the occurrence of AC corrosion on a
catholically protected pipeline that AC corrosion cannot be prevented by CP [catholic
protection, what “protects” OPL currently] in the presence of very high AC voltage of a
pipeline.”
PSE could use a DC line (Direct current) like Bonneville Power does to ship power
from WA dams to Los Angles. This has zero AC inducted corrosion risk while PSE’s
“solution” will remain unproven as detailed by the Toyko Gas Company published
papers, as physics are physics and no amount of fraud from PSE will change that.
Zero consideration of a DC line in the EIS.
What does PSE’s AC inducted voltage expert David Kemp say? Notice PSE does not
call him an AC inducted corrosion expert! His not even a AC inducted voltage expert
PSE used a non qualified “expert” for any electromagnetic analysis with his only
training being a BS in Mechanical Engineering. Even this so called PSE “expert” says
“this typical approach that we use for our customers was not the route that PSE
wished to pursue“1 Which is PSE’s phasing pipedream which will kill thousands.
Here is CoB’s expert”
Wolfgang Fieltsch used the exact same propaganda term of “holiday” and
even had to explain it to Gary McLean, the City of Bellevue’s highly coaching Admin
“judge”. (see XX above) Per Wolfgang Fieltsch’s own words “And some of the
coatings are so good that there's very few holidays, if any. Holidays are basically holes
in the coating” “these Olympic pipelines are older and therefore -- and have co-existed
in the corridor with the power lines for probably more than 50 years. And because
they [Olympic pipelines] are not well coated -- well, I shouldn't say
not well coated, but it's an older coating, which isn't up to the same
standards as the newer coating, the risk, the AC interference risk
would be lower. 2
Admin Judge Gary McLean’s admonishment to Bellevue City Staff. He actually
stopped the Hearing by saying “this is probably outside my authority, call this dicta”
to the Bellevue Staff that he hopes the City has a way to inform any future removal
of old OPL pipe with newer more corrosion resistant would be purely foolish. “I'll
give you here is where he [Wolfgang Fieltsch from Stantec, City of Bellevue’s Pipeline
“expert”] made the very clear point that newer pipelines pose greater risks. “
Unbelievable – Renton needs to save on court costs and embarrassment and do the
right thing
1 Pg 226 of 439 (printed page 218 ) of City of Bellevue EE EIS, HEARING EXAMINER REPORT TRANSCRIPTS - VOL. 1 OF 3 [30
Vol 1 Transcript.pdf] From AUDIO RECORDING OF PUBLIC HEARING (3/28/2019, 3/29/2019, 4/3/2019 & 4/8/2019
2 Pg 360 & 361 of 439 (printed page 353,354 ) of City of Bellevue EE EIS, HEARING EXAMINER REPORT TRANSCRIPTS - VOL.
1 OF 3 [30 Vol 1 Transcript.pdf
Sen. John McCain’s 2003 hearing on the Office of Pipeline Safety after a 8” pipeline
sprayed 10k gallons all over brand new homes in Tuscon AZ. “The questions that
have arisen from this incident suggest that delayed, lax, or worse, non-existent
oversight and enforcement by OPS …... I hope that at today’s hearings we will get
answers to these questions” They did get ansers and the fossil fuel crime syndicate
removed McCain as chair of Senate Energy Comm.
.
Xxx finish short adds
Furthermore PSE’s near zero ROI (less than 1%) on the company per year, since
2007, also means significant “Scenic Views and Aesthetics” decrease as PSE’s pole
height increase +2x allows for new business model of 5G antenna farm on every
pole. 5G has a +100X increase in number of antennas needed over 4G. If EE is
approved, new Federal laws on 5G/etc mean the City of Renton will have zero local
control what PSE does on aesthetics. Renton’s industrial look will significantly
expands into residential area as PSE’s Renton antenna farm services 5G to the west
side of Mercer Island far cheaper than PSE’s Mercer Island light poles.
Professional Expertise: Former advisor to the US Secretary of Defense and the
Chief of Naval Operations’ Strategic Studies Groups; Former Survivability &
Lethality Manager US Naval Weapons Center; the US Navy’s lead fuel fire expert
including suppression (think the +12 million gallons of gasoline & jet fuel that flow
through Renton/Bellevue on OPL every day). Masters in Electrical Engineering:
Electromagnetic propagation, Naval Postgraduate School. BS in Mechanical
Engineering. Functional expert in accelerated aging and aging of mechanical and
fuel systems (think corrosion & the ability to detail to frauds of the Federal Office of
Pipeline & GAO oversight). Shared an office with the DOD’s top two PhD Geologists
whose job included flying to any major earthquake in the world and detailing the
damage. One of 100s of relevant interactions: how US Special Forces reacted to
Singaporean Military detailing how they protect their critical pipeline
infrastructure.
Videos of City of Bellevue Admin hearing on Energize Eastside on Youtube:
City of Bellevue’s SEPA responsible official and EE EIS head and attorney, slapping a
camera out of a citizen’s hand at Energize Eastside public meetings. This one of
many such incidents at EE EIS, this one at the Renton Technical College.
www.youtube.com/watch?v=RfxzAsxF45o
22min https://youtu.be/LubO0oUT0QA
1hr3min= https://youtu.be/f7d7btufQ4w see the others by googling “youtube
orca80sr”
Executive Summary:
1) Renton’s EIS Consistency is incorrect as it is based on a fraudulent EE EIS
and an EE EIS missing key information, which PSE partially disclosed for the first
time during the EE Bellevue Admin hearing. PSE & City of Bellevue know they have
created a highly fraudulent EE EIS which is why both PSE’s attorney and the City of
Bellevue Assistant Attorney Matt McFarland warned the judge more than a dozen
times that he can’t rule against them for a fraudulent EIS. Matt McFarland’s exact
words “The Department [means the City of Bellevue’s legal office] has stated at
multiple times during this hearing that the adequacy of the EIS is not an issue that is
before the Hearing Examiner, because the City's Environmental Procedures Code does
not provide for an administrative appeal of this specific issue.”3 It forces citizens to be
organized & knowledgeable enough take their own city to court.
Bellevue Admin Hearing rules do not even allow cross examination. The
hearing examiners ears can be fill with fraud and misinformation for four days
without cross examination.
New information PSE presented at the City of Bellevue Administrative
Hearing and in Renton’s Consistency Analysis work, both not in any of the EE EIS
documents, give three independent reasons why Renton’s EIS Consistency Analysis
is wrong. Why Energize Eastside cannot be built without a massive increase in
pipeline rupture over existing lines and not meeting Renton’s Pipeline Safety,
Economic and Aesthetics criteria.
Earthquake/SCC
PSE’s new information introduced Mar 2019 stated the actual steel
monopoles foundations depths up to 3 times deeper over existing (13 to 46 feet
deep per new information from PSE’s construction mgr Lowell Rogers under oath at
Bellevue Admin Hearing see transcript4 ) Furthermore new info in Renton’s
Consistency Analyses of a 7 fold reduction in number of poles and placement
distance from OPL pipeline (also brand new information not in EE EIS) increases:
1. Earthquake risk in the 50ft to 100ft right-of-way by a massive amount
~104 to 107 increased risk in pipeline rupture over existing H-Frame structure.
2. From increased wind loads on taller and fewer monopoles and a +100x
increase (+10,000?) in stress corrosion on pipelines from 13ft away. Zero mention
of stress corrosion in ANY EE EIS document even though there have been three
pipeline failures in 2003 from stress corrosion cracking (SCC) two in WA State alone
(26” Williams Pipeline) These caused Senator John McCain to force the OPS to stop
covering it up.
PSE earthquake related info is another massive lie on top of PSE SCC lies.
Here is PSE’s Dan Koch, Director of Electric Operations for Puget Sound Energy “We
don't wait for earthquakes to occur before we decide that
building codes should require buildings to be able to withstand
an earthquake.5 True, so why don’t power lines have earthquake design codes
and earthquake construction codes for power lines collocated the bulk pipelines
3 Pg 257 and of 332 35 Vol. 2 Transcript.pdf of City of Bellevue EE EIS, HEARING EXAMINER REPORT TRANSCRIPTS - VOL. 2
OF 3
4 Pg 108 and of 332 (print page 537) 35 Vol. 2 Transcript.pdf
5 Pg 87 of 439 (printed page 81) of City of Bellevue EE EIS, HEARING EXAMINER REPORT TRANSCRIPTS - VOL. 1 OF 3 [30 Vol
1 Transcript.pdf] From AUDIO RECORDING OF PUBLIC HEARING (3/28/2019, 3/29/2019, 4/3/2019 & 4/8/2019
carrying gasoline/jet fuel? Odd that PSE’s construction manager Lowell Rogers says
that powerlines are not designed for earthquakes as they are “Acts of God”. Let us
see what City of Bellevue’s well-known-safe-construction-engineer says, none other
than City of Bellevue Assistant Attorney Matt McFarland has to say. Here are his
comments telling the public that ‘if you are to stupid too not know that you need to
address Bellevue’s world renown safe utility construction codes in your EE EIS
comments then you get what you deserve’. Lets quote Matt McFarland directly from
the EE Admin Hearing in March April 2019,
“On the other hand, Section 20.20.255F contains substantive
design standards. Subsection 255F has not really been at issue
during this hearing, and the Department's analysis regarding the
subsection is memorialized in the Staff Report and also the pre-
hearing brief. Given the lack of public comment regarding these
design standard regulations, I'm not going to belabor any of the
points already memorialized in the record regarding Subsection F
pg265/332 35 vol 2
Maybe citizen would of learned that they needed to review Bellevue’s
extensive safe contraction code for power lines directly over bulk gasoline pipelines
if the City of Bellevue’s SEPA responsible official and EE EIS head and attorney
herself, was not busy slapping cameras out of citizens hands at Energize Eastside
public meetings. This one of many such incidents at the Renton Technical College.
www.youtube.com/watch?v=RfxzAsxF45o I for one was not aware of Bellevue’s
impressive history of design code. After all the 2009 City Council overruled the City
Commercial building code inspector for failing the building that Expedia was
months away from moving into for what? Not having fire rated air circulation ducts.
Expedia was soon so impressed with Bellevue moved to Seattle. Commercial
building code inspector resigned.
But I am aware that the 2000 City of Bellevue Mayor Chuck Mosher was so
impressed with the City of Bellevue’s safe construction knowledge at that he formed
the “Citizens Advisory Committee on Pipeline Safety” with the Mayor of Bellingham
and got Governor Gary Locke to commission it. Well his heart was in the right place
even if this was a defacto toothless event. Amazing the ability of $$$ to nullify &
erase critical knowledge. Mayor Chuck Mosher was so impressed with the City of
Bellevue that he and his wife moved from Somerset (Bellevue) to East Yakima.
Meat of Earthquake
What does PSE construction manger Lowell Rogers say about Energize
Eastside’s earthquake design criteria at the Bellevue Admin Hearing? Zero design
criteria REQUIRED by law. Let us quote Mr Rogers PSE EE construction manager as
he is a bit more honest on the subject “Acts of God are things that we
really don't plan for in engineering design. We plan for things
that are reasonable and prudent and expected. Acts of God that
have been brought up such as an enormous seismic event, huge
landslides, those are going to affect a regional area, and I'll
talk about comparing the existing condition with the new-built
condition and how an act of God would apply to both of those.” 6
Mr Rogers is saying the Eastside is going to burn down during an Earthquake
even if EE was not built. Not true. While still deadly EE is orders of magnitude
more dangerous. Now back to Mr Rogers.
“So the seismic risk falls into two categories. One is dictated
by the International Building Code, and that prescribes ground
response factors, and that is incorporated in our design
parameters. The other, during an enormous seismic event is as
more in the nature of the act of God that I'm talking about
referenced earlier. Ref same but pg218/439.
The professional engineering fraud by PSE continues. Note1: PSE was caught
lying about earthquake design criteria in the drafts EE EIS and had to correct in the
final EIS. Here is the screen shot. PSE first said that the WUTC had earthquake
standards. I believe PSE lied there and is lying again with its fix of the first lie. PSE
6 Pg 215 of 439 (printed page 208 ) of City of Bellevue EE EIS, HEARING EXAMINER REPORT TRANSCRIPTS - VOL. 1 OF 3 [30
Vol 1 Transcript.pdf] From AUDIO RECORDING OF PUBLIC HEARING (3/28/2019, 3/29/2019, 4/3/2019 & 4/8/2019
is not to be trusted it is a convicted felon for falsifying pipeline safety records for 4
yrs in 2007. Fine a mere $1.2 million, the savings alone paid for the fine. Why does
Renton believe it has changed it behavior has any penalty for doing so? One does
not understand the level of propaganda/crime from coming from the for-profit
Electric Utilities until one reads these. Here is the punch line from Federal Judge
Richard Cudahy who saw first hand the criminal of electric utilites in his court room
for ~40 yrs. “The authors reluctantly conclude that history will likely repeat itself”
pg3 of 80 see item 4 below.
1 Electric Utilities: A crisis in Public Control by seven Syracuse University
professors documents the first 40 yrs. Published in 1928 and Roosevelt used to win
the Presidency. The for-profit monopoly US electric utilities had already a long
record of racketeering by 1928.
2. 1937 book Pyramids of Power The Story of Roosevelt, Insull and The Utility
Wars.
3. See a shocking level of corruption & propaganda below far below in
Corporate Public Relations A NEW HISTORICAL PERSPECTIVE 1987 by Marvin N .
Olasky The University of Texas at Austin. Any that book is still only a small part of
the story. See quote from far below.
4. 2005, Senior Circuit Judge, U.S. Court of Appeals for the Seventh Circuit;
Hon. Richard D. Cudahy and William D. Henderson Professor, Indiana University
School of Law; FROM INSULL TO ENRON: CORPORATE (RE)REGULATION AFTER THE
RISE AND FALL OF TWO ENERGY ICONS 80pgs
Not notation of who this mystery organization ACI is in the EE EIS.
Back to PSE’s crimes in progress
Note2:the court transcript sometimes miss identifies Rogers as Johnson. Also
is EIS is mis-transcribed as ASA??. ASA= (Alternative Siting Analysis)
Per PSE’s construction manager Lowell Rogers “To simply state, the
loads induced on a structure from anticipated earthquake ground
motions are not greater than other conditions such as wind and
ice loads, and therefore do not control the design.” Same ref pg
219 of439
It is good to know PSE and Mr Rogers know what the “anticipated
earthquake ground motions” are going to be. This very major fact that was
never documented in any of the EE EIS documents. Both 1) One is dictated by
the International Building Code, and that prescribes ground
response factors and 2) anticipated earthquake ground motions
What is PSE’s lead attorney, Erin Anderson, legal assessment of what is
required? Here are her exact words Per Erin Anderson, PSE’s lead outside Attorney,
Put simply, the code requires the applicant to submit the
ASA and show its work.pg307/332 35 vol 2 ASA= (Alternative Siting
Analysis) Why is it that PSE only has to show it homework in the Alternative Siting
Analysis? Who says meeting the IBC, ASCE and ACI are the correct or even valid
standard for a power line collocated with flammable pipelines? Who the hell is ACI?
PSE never states.
Let take a look at transmission lines without pipelines directly underneath
how have they preformed to IBC, ASCE , ACI=who?, NESC and IEEE earthquake
standards?
What kind of performance are do we get out high voltage power transmission
systems in earthquakes? Same as for ice loads design standard, very poor. Let us
ignore the 1000s of transmission towers that have failed from ice loads in the last 2
decades and just focus on earthquake. Even more unacceptable IF built on top of
pipelines that kill 1000s if ruptured. See this 2017 Applied Science paper that notes
just a few of the failures of electrical transmission systems in the USA, Japan and
China during earthquake as the result of no earthquake design codes for them.7 The
exact same thing was said of buildings before earthquake requirements were added.
1992 Landers earthquake, about 100 transmission lines, and several
transmission towers, failed in the city of Los Angeles
1994 Northridge earthquake, a number of transmission towers were
destroyed, and the power system was greatly damaged
1995 Kobe earthquake, more than 20 transmission towers were damaged
2008 Wenchuan earthquake, more than 20 towers collapsed and a 220 kV
transmission line in Mao County was destroyed
2010 Haiti earthquake caused damage to transmission towers.
2013 Lushan earthquake, more than 39 transmission lines were destroyed.
PSE never states what the anticipated earthquake ground motions are in any
of the EE EIS documents.
7 Vibration Control of a Power Transmission Tower, 5 May 2017, Journal of Applied Sciences
PSE states that safety measures would be incorporated into the project design to …..
prevent poles from falling and damaging the buried pipelines. PSE never “shows it
homework” on how PSE will prevent poles from falling and damaging the buried
pipelines.
The Coso landslide has proven these maps are out of date. This is why WA
State is doing new LIDAR mappings. PSE can stamp them Sources: King County, 2015;
Ecology, 2014 but the data is still known to be inaccurate.
How well will PSE’s EE preform in an earthquake? PSE’s new pole foundations 46 ft
deep as close 13 feet away from pipelines which are only 3-4 ft underground and
you are one earthquake away from a steel monopole falling over & a major disaster.
See elsewhere in this document what PSE’s taller and heavier poles will do when it
strikes the ground above the pipeline. PSE never shows its homework on why its
foundations will not rip open the pipeline when they fallover. And compare why
they are not orders of magnitude worse that the wooden H-Frames.
PSE’s use of peak ground acceleration alone is complete engineering
malpractice to determine the response difference between wooden H-frame
structure and much taller steel monopoles. Any competent ‘flutter’ engineer can tell
you that. It is just one factor and a tells you nothing about what matters most: the
dynamic response of much taller monopoles and shorter stiffer H-Frames. What is
that to PSE? They falsified pipeline safety records for 4 years and are a convicted
felon because of it just 10 years ago.
If a weak earthquake hits the resonance frequency of a structure it will do far
more damage than a more powerful earthquake that is not in the frequency
response range of a structure. Why did many more newer/stronger 10 to 20 story
buildings in Mexico city fall down in 1985 earthquake yet much taller and weaker
shorter ones did not? The frequency response of those buildings resonated with the
periodicity of the earthquake, 1-2 seconds. This was my first introduction to the
Navy’s two PhD geologist studying earthquakes I was interviewing for a position in
Aircraft survivability. They were rushing out of their office to buy plane tickets
when the quake was still happening ~1500 miles away, they could pinpoint it
enough from our base in the California desert. I personally have been through more
than 50 earthquakes in Ridgecrest CA. The most recent 7.1 magnitude in 2019 I was
not there for is what OPL and the electrical system should be designed for.
PSE never includes other far more structurally import factors particularly resonance
spectrum for the H-frames and compare that to resonance spectrum of the steel
monopoles. And for the wave types. Earthquakes have various wave types
including P wave and S waves and a good flutter engineer could show the delta
between the monopoles and H-Frame. The reason PSE didn’t do this work is the
answer will be very bad for the very top heavy steel poles. This “flutter “ analysis is
done on every new aircraft and it is criminal if not done on power lines collocated
with gasoline pipelines.
More lies/propaganda/misdirection by PSE in the final EE EIS? Below PSE
says very low chance of ignition, which is it? Why was this never corrected? What
other lies is PSE telling?
None of the above cities in that 2017 earthquake paper were dumb enough to let the
power lines be collocated over bulk gasoline pipelines. PSE will have you believe
colocation is common which is a bold face lie. What is true is colocation with natural
gas as nat gas pipeline rupture kill zone looks like San Bruno CA’s, under a 100
homes in a city. This because natural gas burns vertically, does not spread. But
100,000s of gallons of liquid, aka gasoline, spreads over miles killing 1000s even
with no fire via suffocation as no obvious warning of danger. PSE’s EE EIS did say
suffocation is the most likely cause with their estimate that a OPL break has a 97.5
% chance of not catching fire in the Eastside cities.8
Here is PSE’s propaganda that a EE caused OPL rupture will magically pool.
8 pg 228 of 274 Energize Eastside Project Phase 2 Draft Environmental Impact Statement Volume 2: Appendices May 8, 2017
Of course PSE committed fraud again and narrowed the review a snapshot of
pipeline breaks from a 4.5 yr period 2010-2015 (OPS has that 5 yr period with only
has 4.5yrs of data). Why just 2010-15? Because if one includes hundreds of decades
newer pipelines the results are better. If PSE was honest & accurate they would just
looked at pipelines break of the same age, coating types etc over time. But if PSE did
that we would see the “bathtub curve” and EE would get canceled for sure.
And, if the OPS didn’t note the fire in its records then it did not happen per
PSE. Regardless almost all of them with gasoline caught fire after humans showed
up. See the September 2016, the Colonial Pipeline break in the FDIC report on
pipeline terrorist mentioned elsewhere in the doc and google “Colonial Pipeline fire”
It caught fire ~3 days later after the repair crew showed up. Burned at least one
repair man alive. During the 20 months prior to the Sept 2016 rupture, the Colonial
Pipeline had 8 pipeline gasoline spills across its 5,500-mile fuel pipeline system.
Energize Eastside has a ~104 to 107 increase in likelihood of OPL pipeline
rupture from earthquake of one or both of the 16” and 20” pipelines operating
from928psi to 1265psi and in multiple places than existing as built. Why? Energize
Eastside has a ~104 to 107 increase in likelihood of monopoles falling over due to
earthquake liquefaction and pipeline rupture over smaller existing wooden H-
Frame structure. Surprisingly it does NOT matter which way the poles fall over
west or east given the NW subduction zone fault. Even PSE slip fault gives a east
west pole fall over direction. Also the resonate frequencies of PSE new monopoles
are far more tuned to earthquake frequencies & susceptible to failure than wooden
H-frame.
The real killer just is the Monopoles are far more top heavy and will have
+14X more leverage to the new foundations over the as built foundations during an
earthquake. Why? The new information from Renton’s Consistency analyses and
not in any EE EIS docs says 144 H-frames replaced with 41 monopoles. Given each
H-frame has two poles we have a 7 fold reduction in poles and at twice the height
even using PSE math gets 14X. It is far higher with increased wind loading but I am
dumbing it down for the City attorneys at Bellevue & Renton. In liquidfaction or
very wet soil it does not matter you 3x’ed the foundation. Large rocks do not float
better in water. And to finish the kindergarten level explanation for Matt
McFarland, when the monopoles fall over they either rip OPL out of the ground or
pinch it down from above. The resulting pressure spike from trying to slow down
miles of fuel will rupture the ¼ inch thick steel pipe 20” diameter pipe (0.312” for
the 16”).
The existing H-Frame wooden structures cannot crush the OPL like PSE new
monopoles. The two PhD US Navy earthquake geologies I shared an office with for
years were always impressed how much better wooden structures dampen energy
from earthquake verse metal which more often than not resonates until failure.
Here for poles near OPL the soil is the weakest link and H-frames win bigtime.
The new monopole loads are pure bending at the foundation from both wind
and earthquake swing and also have significantly different & greater risk profile of
stress corrosion cracking on OPL. Add another way the EE monopole cause
mechanical rupturing of OPL is during seismic liquefaction over existing H-frames
and Energize Eastside nearly guarantees the Eastside burning down during a major
earthquake unlike existing. Zero analysis in EE EIS nor in Renton’s Consistency
Analysis nor Stress Corrosion Cracking, nor any professional engineering stamp on
most of the EE EIS analysis nor any stating a level of safety. Wonder why there are
no the stamps of any professional engineer qualified to practice in WA on ALL of
PSE’s EE EIS? Only one select area.
Terrosism
3) In my professional judgment, as a former DOD survivability & lethality
manager/design engineer, an amateur non-state terrorist success risk goes from a
low ~X% to almost 100% success for a single 400,000 gallon release success with
EE on a single pipeline attack. Where X is a low number. Attacks of this nature are
not just expected to have a 2x increase going to a 2x new-built higher voltage. A
simple grounding of the pipeline to the new-built metal poles by non-state actor and
wait for lighting strike or other slower effects, integrates success over time. I am
purposely skipping explanations. All very easily to skip detection from OPL’s leak
detection system pictured below. Even comparing pictures from one two-week-
pass to the next, which this aircraft does to see if there is any dead vegetation from
one period to the next. I know because the plane flys over my house every time
always doing 2-3 circles around Tyee middle school as Somerset is a massive
liquefaction/landslide zone.
P1100417.jpg See Pipeline Patrol marked under plane. Tail number
N7140K.
Back to non PSE terrorism. Or worse, add shorting the 230kV line to the
metal pole previous connect to the pipe 13 ft away. This cannot be done with
existing wooden poles. Energize Eastside significantly increases risks by reduces
risk of detection given it allows a piece meal attack vestor. I am leaving out a bunch
of things but not the things anyone using google & maps can’t find. This is just one
of several new attack vectors that Energize Eastside allows.
The as-built 115 kV lines have a ~0.1X% for a four rupture site attack (~1.2
million gallon gasoline release: two 300k gallons on 16” line , two 400K gallon
releases on the 20” line). With 230kV Energize Eastside there a 99% success chance
on two of four attacks miles apart on the 16 and 20 inch lines. No analysis for
increase terrorist risk provided by PSE EE EIS nor Renton’s review. Significant
change in economic consequences. Any attack in Renton/Newcastle/Bellevue takes
down I-90 at Bellevue shoreline several after hrs rupture should fuel ignite. The 1-
90 highway only needs to be heated on the bottom surface to 120F for complete
collapse like I-85 in Atlanta 2016. 9 Same for Renton/I405/Cedar River. Also See
FDIC 2017 report on pipeline terrorist attack.
And what genius thought putting the OPL manual shut off values at the
intersection of Seattle City lights 230kV power lines and the PSE 115 kV lines in
1964? Lots of new non state actor possibilities here with Energize Eastside. Where
does the
9 See NTSB report on 2016 collapse of I-85 in Atlanta due plastics pipe fire, energy equivalent of 50 gallons of gasoline.
the 300,000 to 700,000 gallons of gasoline go from a rupture here? See map below.
This will shut down SecTac, Portland airport in 3 days and all auto gasoline
deliveries south of break including to Portland. If anyone thinks that level of release
is not going to put 10,000s of gallons on Boeing’s Renton factory shore you would be
mistaken, save very strong winds from the south; even if the fuel caught on fire at
the rupture site. The small portion that would make it way into the storm drains
would guarantee that. Why? The first dozen or so storm drains would clog over
with pebbles & debris after the first several 10,000 gallons or so. If I didn’t take
pictures of that event myself I would not of believed it. And that was from a 6 inch
water main break at 150psi in Somerset Sept 2017. I can say a lot more but I am
going to stop my comments here expect to say Energize Eastside makes our WA
state energy infrastructure orders of magnitude more vulnerable. How can that
pass economic muster in Renton’s EIS Consistency analysis?
The deadly recent history of 230 kV
upgrades in San Francisco = the cause of
San Bruno fire. And Stress Corrosion
Concentrated loading of new-built larger steel monopoles & foundations 2 to
3 times larger than existing vastly increases earthquake & Stress Corrosion
Cracking (details in section2) over smaller wooden H-frame. H-Frames also
have less resonance over wider range of earthquake frequencies than new-
built. With PSE’s design distance of 13 ft minimum from OPL, all proposed
steel monopoles are capable of ripping open OPL in liquefaction.
Per PSE’s Energize Eastside construction manager Lowell Rogers in Admin
Hearings “The final structural design of Energize Eastside will comply with NESC'S
standards adopted in Washington, which includes seismic standards”.10
NESC=National Electric Safety Code
10 Pg 219 of 439 (printed page 212 ) of City of Bellevue EE EIS, HEARING EXAMINER REPORT TRANSCRIPTS - VOL. 1 OF 3 [30
Vol 1 Transcript.pdf] From AUDIO RECORDING OF PUBLIC HEARING (3/28/2019, 3/29/2019, 4/3/2019 & 4/8/2019
While the above statement is true, it is pure fraud and professional
malpractice for use as a seismic standard for Energize Eastside. Nowhere in the
NESC code nor any other building codes are there any standards for constructing
high voltage power (115kV/1000 amps) anywhere near highly volatile pipelines
carrying +12 Million gallons/day. Let alone putting +100 ft steel poles with
foundations up 46ft deep just 13 ft from the pipelines. [This is newly introduced
information Renton’s reviewers would only know if they read the ~800pg transcript
of PSE’s “experts” testifying to Bellevue Hearing Examiner]
Put simply, the code requires the applicant to submit the
ASA and show its work.pg307/332 35 vol 2
I would submit Puget left no stone unturned pg312/332 34
vol2
ASA submittal shows how the project satisfies the design
criteria 304/332 35 vol2
Lack of public comment regarding these design standard
regulations……Section 20.20.255F contains substantive design
standards. Subsection 255F has not really been at issue during
this hearing, pg265/332 35 vol 2
Why are there no design standards for this case? First, no one is dumb
enough to do such a thing but PSE. PSE/(Eastside cities) are the only
company/entities dumb enough in the entire world to collocate bulk gasoline/jet
fuel pipeline directly under high power voltage lines. Second, powerline codes are
where building codes were for earthquake decades ago. Nonexistent except for the
assumption wind & ice loads cover small earthquakes.
Careful readers of the Admin Court transcript will know PSE’s EE
construction expert Lowell Rogers got the gullible and soon to make a complete fool
of himself Hearing Examiner Greg McLean exited with Rogers “Jefferson Martin
transmission line in San Francisco Peninsula” fraudulent example of safety. “This line
is very similar to Energize Eastside in that it traverses a suburban setting, includes
overhead transmission tubular steel poles constructed very close to a major gas
pipeline. This project was constructed without incident. Like what has and will be done
for Energize Eastside.” 11 Pray GOD that EE is not the case but before we discuss that
here is the uneducated coaching comment from Bellevue Hearing Examiner Gary
McLean. “THE EXAMINER: Just an interjection. That's a yardstick. That's the kind of
testimony evidence that I'm looking for. I'd like to hear stuff like that. So go ahead.”
Transcript mistaken IDs Mr Rogers as Mr Johnson. This is quite obvious has the
Examiner only says Mr Rogers. I was in attendance & also confirmed via video.
The PG&E Jefferson-Martin San Francisco 230 KV line AKA the
San Bruno 30” natural gas pipeline explosion
11 Pg 213 of 439 (printed page 206) of City of Bellevue EE EIS, HEARING EXAMINER REPORT TRANSCRIPTS - VOL. 1 OF 3
Ok so what is this “Jefferson and Martin transmission line …. placed into service
in 2006…..without incident”? per PSE construction mgr and expert Lowell Rogers
who worked on the project!!!!!!
Fact one. PG&E placed a 230 kV power line parallel to the brand new portion
of a natural gas 30” pipeline (11 yrs old, 1995) and just a few feet away for 1170
feet. This 1995 portion with undisclosed coating (even after the criminal & accident
investigations) but no doubt better that the coating on 1956 old portion of the same
pipe where the San Bruno rupture occurred just 1300 feet way. See color code map
below. It only took four years for Pg&E’s 2006 installed 230kV powerline to blowup
Pg&E’s 30” natural gas pipeline in 2010. And in the spot likely seeing the highest
above and below ground and electromagnetic energy, just 1170 ft away.
Given PG&E was convicted of 10 felony counts of falsifying information on
this and NTSB report is just as likely covering OPS efforts to look the other way we
have no official determination yet besides my professional expertise. The official
NTSB investigation is bad welds which is like say the Titanic sunk because of bad
riveting. Here the iceberg is the +100 years of corrupted government by the Electric
Utility industry. SEE background section below on this corruption. A book
published in 1928 called Electric Utilities: A crisis in Public Control by seven Syracuse
University professors documents the first 40 yrs. The for-profit monopoly US
electric utilities had already a long record of racketeering by 1928. Or the book
Pyramids of Power The Story of Roosevelt, Insull and The Utility Wars.
How bad is the Electric Utility propanda? See a shocking level of corruption &
propaganda below far below in Corporate Public Relations A NEW HISTORICAL
PERSPECTIVE 1987 by Marvin N . Olasky The University of Texas at Austin. Any that
book is only a small part of the story.
Back to the PSE & PG&E frauds. San Bruno is still the biggest utility disaster
in San Francisco peninsula’s history. The San Bruno natural gas pipeline
explosion/fire only killed 8; only injured 64 and only destroyed 55 homes because
this was natural gas and not gasoline.12 PSE Energize Eastside(EE) project will kill
1000s when the same electromagnetic coupling from EE on OPL causes OPL to
break with a guaranteed spill ~300,000 gallons of gasoline from the smaller 16” line
and ~400,000 gallons of gasoline for the 20 inch line. Why are the large spill sizes
guaranteed if ruptured besides already having one massive spill in 1999? Read the
2017 FDIC report on Pipeline Terrorism and pipeline break response sizes and
times to shut off up to 2017. Per FDIC report 78% of gasoline/jet fuel/natural gas
breaks are not even detected by any leak detection system but passersby’s.13 Often
days later in rural areas.
12 San Bruno CA rupture report www.ntsb.gov/investigations/AccidentReports/Reports/PAR1101.pdf
13 pg16 of 42 Terrorism and Oil & Gas Pipeline Infrastructure: Mar 2017 by FDIC & Univ of OK College of Law
https://digitalcommons.law.ou.edu/cgi/viewcontent.cgi?article=1078&context=onej find=google "liability for petroleum
pipelines"
The red arrow is where PG&E’s San Bruno natural gas pipeline explosion occurred.
Why am I talking about PG&E’s 2010 criminal disaster? Puget Sound Energy is
making the same willful criminal act/neglect with Energize Eastside. PSE is even
choosing NOT to go the route their own outside ”expert” David Kemp says “typical
…approach that we use for our customers was not the route that PSE wished to
pursue“ Instead of 8 dead EE will kill 1000 via suffocation and/or fire with
hundreds of thousands of gasoline coming out at up to 1200psi. OPL has zero real
time leak detection nor legal requirement for it let alone any manual shut off that is
not measured in hours like the 1999 Bellingham incident. See 2017 FDIC pipeline
Massive electrical coupling here
between red underground 230
kV and blue, green & yellow 30”
nat gas pipeline.
Max power direction of
unshielded monopole antenna
weak as it is former from 230 kV
cable directional bends .
Weakest spot in 30’ nat gas pipe from
AC inducted corrosion is 6 collocated
pipeline pup sections in the 1956 yr
old pipe. See fig. 16.
terrorism report and you understand the biggest pipeline terrorist is Office of
Pipeline Safety and the fossil fuel industry.
Shockingly the 30 inch natural gas pipeline was a few feet away from the
completely unshielded (faraday cage) from electromagnetic radiation from the 230
kV underground cable. While rupture was 1300 ft away it is likely where the
greater field strengths were there given all the other underground metal pipelines
water main, fire hydrants, smaller nat gas lines or sewer pipes acting as weak EMF
wave-guides even if plastic or concrete. See figure 16 above. Far more disturbing
the unintentional but at least three weakly functional monopole antennas formed by
the 230 kV lines with the two above ground mainbeam ‘antenna’ planes parallel to
the 30 inch natural gas pipeline. One vertical plane the other horizontal both
parallel to the 30 inch pipeline that blew up and numerous other metal pipes. As a
professional engineer who designed electrometric fields & directional control from
1 billionth of a watt (nanowatts) to +1 billion watts (gigawatt) it is shocking to see
two quasi monopole antennas 2400ft away and a third just 1170feet way from the
pipeline break.
The amazing criminal engineering malpractice of PG&E is they place an unshielded
underground 230 kV power line just a few feet away from their own 30 inch natural
gas pipeline for ~1200feet!!!!! This will induce a massive amount of electrical
coupling from the 230 kV line to the 30” steel pipeline, exactly the way farmer can
and do steal power from power lines crossing their fields albeit with copper wire
not pipe. This will cause AC induced corrosion on the pipeline. And given the
portion the pipelthat picking up the current/voltage is very well coated for galvanic
corrosion, stress corrosion cracking and etc14 the current travel down the 1956 year
old pipe with the worse inaction at 6 “pup” weld joints likely the highest holes in the
pipeline corrosion coating aka “holidays”.
The fossil fuels industry and the Federal Office of Pipeline Safety have been
committing massive fraud on pipeline safety for so long they have a special
propaganda term for a holes in the corrosion protection coating of pipeline. The
fossil fuels industry propaganda term is “holidays” so when uneducated pipeline
worker hear holidays not failure in corrosion protections they don’t get worked up.
Everybody wants a holiday!!! The more the better right?
The reason the coating is on the pipeline in the first place to prevent all other
types of corrosion like galvanic and stress corrosion to name just two. The industry
learned that lesson the first few years they put unprotected pipelines in the ground
back in the 1800s with methane gas from coal gasification plants. But City of
Bellevue’s pipeline expert Wolfgang Fieltsch is either ignorant of that facts or
committing fraud. A question I tried to put to him on video but the EE EIS SEPA
responsible official Carol Helland held him back from being at a public EE
presentation in Redmond. I guess someone will have to do that in court. Wolfgang
Fieltsch used the exact same propaganda term of “holiday” and even had to explain
it to Gary McLean, the City of Bellevue’s highly coaching Admin “judge”. (see XX
above) Per Wolfgang Fieltsch’s own words “And some of the coatings are so good
that there's very few holidays, if any. Holidays are basically holes in the coating”
“these Olympic pipelines are older and therefore -- and have co-existed in the corridor
with the power lines for probably more than 50 years. And because they
[Olympic pipelines] are not well coated -- well, I shouldn't say not
well coated, but it's an older coating, which isn't up to the same
standards as the newer coating, the risk, the AC interference risk
would be lower. 15
It would be comical if it was not so deadly to then hear the Energize Eastside
Bellevue Hearing Examiner Gary McLean’s admonishment to Bellevue City Staff. He
actually stopped the Hearing by saying “this is probably outside my authority, call this
dicta” to the Bellevue Staff that he hopes the City has a way to inform any future
removal of old OPL pipe with newer more corrosion resistant would be purely
foolish. “I'll give you here is where he [Wolfgang Fieltsch from Stantec, City of
Bellevue’s Pipeline “expert”] made the very clear point that newer pipelines pose
greater risks. “16 Gary wanted to make sure the City had a way to prevent OPL from
putting in new pipeline as they are more dangerous. Citizens are often beaten
senseless with a stupidity stick by our legal system, but rarely so thoroughly.
14 including stress corrosion cracking (SCC), corrosion fatigue, hydrogen-stress cracking, hydrogen-induced cracking (HIC),
hydrogen-induced loss of ductility, and sulfide-stress cracking (SSC). See pg 32of78 in OPSs SCC rpt 2008
15 Pg 360 & 361 of 439 (printed page 353,354 ) of City of Bellevue EE EIS, HEARING EXAMINER REPORT TRANSCRIPTS - VOL.
1 OF 3 [30 Vol 1 Transcript.pdf
16 Pg 367 & 368 of 439 (printed page #’s are 360 & 361) of City of Bellevue EE EIS, HEARING EXAMINER REPORT
TRANSCRIPTS - VOL. 1 OF 3 [30 Vol 1 Transcript.pdf] From AUDIO RECORDING OF PUBLIC HEARING (3/28/2019,
3/29/2019, 4/3/2019 & 4/8/2019)
Unbelievably criminal actions by Wolfgang and the City of Bellevue’s
Assistant City Attorney Matt McFarland, not to mention a conflict of interest law
violation from the 2016 Congressional law.17
Ok you caught me the above conflict of interest part is a lie, in practical
terms. After Sen. John McCain was removed as Senate Energy Committee chair by
the fossil fuel industry, the later made sure that 2016 law was neutered by adding
“to the greatest extent practicable” in 4 key places. So never mind that. Sen. John
McCain was chair of Senate Energy Committee until he investigated the industry
after the 2003 stress corrosion break two in WA State one in AZ. He barely escaped
from a massive fuel fire on the Forrestal Aircraft carrier and watched 131 follow
sailor burned alive. Even a book written about it. That fire launched decades of
R&D funding which I lead in the 1990s. Not bad John, breaking with the Keating 5
and doing the right thing. Sen Marie Cantwell on the other hand likely getting direct
checks from Charles Koch like WA Representative Rick Larson. Rick is noted for his
comments that ‘all is well’ after the 2004 Renton OPL break/fire in the press. Same
break that caused Seattle Mayor Greg Nickols to sue ….how odd.
During the Admin Hearing break I explained to my corrupt City Attorney
Matt McFarland what his expert just said in order to protect the OPL from AC
corrosion. Your expert says you have to make sure OPL stays unprotected from a
bucket of other corrosion mechanisms like galvanic and Stress corrosion. Matt’s
response, “ I am just an attorney I don’t understand these things” But the little scum
of the earth attorney did his best to cover things up including reminding Gary
McLean, the City of Bellevue’s highly coaching Admin “judge”, that the citizens of
Bellevue, Renton, Newcastle, Redmond are just going to have to take City of
Bellevue to court to not have a fraudulent PSE Energize Eastside EIS. Matt
McFarland’s exact words from the official hearing transcript “The Department [The
City of Bellevue’s legal Dept] has stated at multiple times during this hearing that the
adequacy of the EIS is not an issue that is before the Hearing Examiner, because the
City's Environmental Procedures Code does not provide for an administrative appeal of
this specific issue.”18
Unbelievably the NTSB report on PG&E’s San Bruno murders never mentioned what
coating was used, zero mention of AC inducted corrosion and zero mention of any
catholic protection on the pipeline. The report did say the CPUC would propose
future rules on “reporting cathodic protection deficiencies”. This is the current method
OPL uses to ‘protect’ the OPL from PSE’s 115kV lines. Maybe WUTC can do the same
for Renton after PSE/OPL burn it and, oh yes, the Renton Boeing facility to the ground.
Further shocking is the J-M line even had an ElectroMagneticField Plan forced on
them by CPUC before it was built but it was only for health of humans and only
meant PG&E would dig the underground trench deeper around schools & the like.
17 www.congress.gov/bill/114th-congress/senate-bill/2276/all-info
www.congress.gov/114/plaws/publ183/PLAW-114publ183.pdf
18 Pg 257 and of 332 35 Vol. 2 Transcript.pdf of City of Bellevue EE EIS, HEARING EXAMINER REPORT TRANSCRIPTS - VOL. 2
OF 3
Put in back?
The elevation raise from where the crude monopoles created by the 230 kV
Jefferson-Martin powerline transition from underground to above ground and
across HW it is possible the maximum field strength is at location of the San Bruno
pipeline explosion. The Glenview Drive Transition Tower and the above ground
tower are shown below in thick red lines with the underground portion of the 230
kV Jefferson-Martin line in thinner red line. Those with antenna design experience
or even RF signature reduction design experience will recognize this a one giant
random but highly magnitude increasing antenna. PG&E will have you believe that
the electromagnetic field strength drops off by 1/r2 for 3-phase power line with
balances currents AND that may be true for MOST of the time.19 Given there are
three massive and unintentional direction antennas from three transitional sections.
1) from underground to over head eastside of HW 35/Skyline Blvd. 2) from that
east tower to the across HW 35 and lastly 3) the right angle turn to turn and go
south. This and all the near-field interaction with the metal water tank and very
high EMF (electromagnetic field). The 30 inch natural gas pipe and ages of the
sections are color coded. The rupture occurred in the yellow section
Back to PSE’s 230 kV plans
The new-built EE will also be collocated all through Renton / Newcastle / Bellevue /
Redmond with a 20” and 16” gasoline/jet fuel pipeline same as existing-built and
just as unsafe right? Deadly wrong. EE is thousands to millions fold more
dangerous. EE even guarantees the Eastside burns down during a major earthquake
with just a few new steel monopoles falling over, unlike existing H-Frame unable to
rupture OLP if they could even fall over.
PSE is going to use steel monopoles with much deeper foundations over
replacing wooden H-frames 1/3rd the size in diameter as PSE need the height to
build the 5G antenna farm. Per code they only need to go up 3 feet when going from
115 kV to 230 kV. But without that 2x increase in height no antenna farm adding to
a good industrial look. Most of the monopoles foundations are far deeper than their
distance from the OPL. 13 to 46 feet deep per new information from PSE’s
construction mgr Lowell Rogers under oath at Bellevue Admin Hearing see
transcript20 And another staggering level of ignorance and new information from
PSE at the Admin hearing is putting the pole as close as 13ft from the pipeline. With
zero analysis of the long-term effect of on inducted stress corrosion from larger
new-built foundations on the OPL pipeline; the cause of two pipeline breaks in WA
State in 2003 alone. XXX See screen shots of key and more below.
THE EXAMINER: So 13 feet away from the pipeline, the design plan? 13 feet
away for construction that's activity that you might have to excavate?
19 www.cpuc.ca.gov/Environment/info/aspen/jefferson_martin/jeffmartin.htm see pg 4/21 of
https://www.cpuc.ca.gov/Environment/info/aspen/jefferson_martin/mm/final_plan.pdf
20 Pg 108 and of 332 (print page 537) 35 Vol. 2 Transcript.pdf
MR. ROGERS: That is what we've laid out as a criteria of a minimum
separation.21
Zero analysis of this increase risk in the EE EIS and these foundation depths
and placement distance from OPL are missing in the EE EIS documents. Back of the
envelope calculations gives the risk of pipeline rupture during a major earthquake
during liquefaction of ~100% fold for over existing H-Frame poles with low near
zero. And a 500-10,000 fold increase in rupture from increased stress corrosion
cracking (SCC)22 on the pipeline over existing H-frame wooden structure.
Monopoles with the new stated foundation depths increase stress corrosion on the
pipelines from long-term cyclic wind loading and/or slight soil movement from
foundation drilling/vacuuming so close. While still a vast under reporting &
falsification by Federal Office of Pipeline Safety, 32pg of the 2008 report says “Since
its discovery in 1965 as a possible cause of failures in pipelines, SCC has caused, on average, one
to two failures per year in the U. S.” 23 Yet in 2003 there were two SCC major pipeline
failures in WAS alone. [Note: careful reading of Tokyo Gas Company’s pipeline
reports like that on AC inducted corrosions shows how fraudulent OPS is even on
pipeline coating statements]. Yet zero mention of stress corrosion in any of EE EIS
not any in Renton’s Consistency analysis. Clear violation of Renton’s Pipeline safety
and Economics criteria.
See OPS final reports listing SCC on coal tar coated pipes, same a OPL, and
SCC due to ground movement how ever small.
21 Pg 107 and of 332 35 Vol. 2 Transcript.pdf of City of Bellevue EE EIS, HEARING EXAMINER REPORT TRANSCRIPTS - VOL. 2
OF 3 From AUDIO RECORDING OF PUBLIC HEARING (3/28/2019, 3/29/2019, 4/3/2019 & 4/8/2019)
22 see the 201pg SCC report when Senator John McCain was still head of the Senate Energy Committee.
https://primis.phmsa.dot.gov/gasimp/docs/SCC_Report-Final_Report_with_Database.pdf Not the watered down version put
out after McCain has his committee chair taken from him 78 pg version EE EIS quotes which is found at
www.phmsa.dot.gov/pipeline/gas-distribution-integrity-management/dimp-pipeline-corrosion-final-report-michael-baker-
jr-november-2008 Baker78pgfinalreport_pipelinecorrosion.pdf
23 pg 32of78 pg report above link to get Baker78pgfinalreport_pipelinecorrosion.pdf
https://primis-
stage.phmsa.dot.gov/comm/reports/enforce/documents/520031003H/52003100
3H_Amendment%20to%20CAO_12182003.pdf
All docs on WA State Williams Pipeline Company by OPS Enforcement actions back
to 2002 listed at
https://primis.phmsa.dot.gov/comm/reports/enforce/CaseDetail_cpf_520031003H
.html?nocache=858#_TP_1_tab_2
Magically Tuscon Az Accident which Sen John McCain held hearing on are only in AZ
state utility commission unavailable to the public
520031003H_post-
hearing%20decision%20on%20CAO%20amendment_04092004.pdf
See all at xxxx
Below doc found at at www.gpo.gov/fdsys/pkg/CHRG-
108shrg20974/content-detail.html CHRG-108shrg20974.pdf
Sen John McCain’s words below, then Chair of the Energy Committee
“The questions that have arisen from this incident suggest that delayed, lax,
or worse, non-existent oversight and enforcement by OPS and a company that reacts
to safety problems after they occur instead of taking actions to prevent them. I hope
that at today’s hearings we will get answers to these questions”
AC inducted corrosion from Energize Eastside and
the missing corrosion mechanisms PSE & Bellevue
chose to cover-up.
AC Summary
2). PSE used a non qualified “expert” for any electromagnetic analysis with
his only training being a BS in Mechanical Engineering. Even this so called PSE
“expert” says “this typical approach that we use for our customers was not the route
that PSE wished to pursue“24 PSE could use a DC line (Direct current) like Bonneville
Power does to ship power from WA dams to Los Angles. This has zero AC inducted
corrosion risk while PSE’s “solution” will remain unproven as detailed by the Toyko
Gas Company published papers, even in short term let alone long term +10 yrs.
2. There are at least three separate corrosion mechanisms for which PSE only
addresses AC inducted corrosion and does that incompetently/fraudulently. At
least two other corrosion types (galvanic and stress corrosion) cannot be safety
mitigated even with PSE’s highly deceitful & unproven method stated at the 2019
Bellevue EE Administrative hearing. To quote “adjusting the phasing, the tower
configurations, the loading, and even the route of the transmission line to perform
sensitivity studies to this effect”25. This never been shown to be safe over decades
NOR that it is even possible for OPL to do so and safely protect for other corrosion
mechanisms. Likely the reason why British Petroleum sold 100% of its stake in OPL
in 2017 after seeing PSE push the same in the EE EIS. BP only operates OPL with
zero liability and zero equity stake.
Even PSE own “expert” David Kemp states “So PSE engaged DNV GL back in
2015 to assess the likelihood of AC interference on the co-located pipeline segments as
a result of the circuit upgrades. I should mention that my typical interference studies,
my usual client is the pipeline operator” [And typical approach =] “so we assess the AC
potentials on the pipeline, and then design mitigation to be installed on the pipeline
afterwards” “this typical approach that we use for our customers was not the route
that PSE wished to pursue.”26
Why was that not the route that PSE wanted to purse? David Kemp is after
all PSE “expert” on the subject. Is it because PSE knows that Tokyo Gas Company, a
utility 10 times larger than PSE, published a paper in 2011 that says ““It has been
definitely shown by the occurrence of AC corrosion on a catholically protected pipeline
that AC corrosion cannot be prevented by CP [catholic protection, what “protects”
OPL currently] in the presence of very high AC voltage of a pipeline.”
PSE and the Olympic Pipeline are risking 1000s of Renton/Bellevue/etc lives
for decades and city governments are doing zero, save efforts by Settle City Mayor
Greg Nickels(2004); Bellevue Chuck Mosher& Bellingham Mayor(2000-03). When
OPL had a “pinhole” leak in Renton in May 2004 spilling 3300 -10,000 gallons. Why
did Seattle mayor Nickel immediately sue Shell/BP/OPL in 2004?27 Why did Shell
Oil sell 100% of its 37.5% stake in OPL to British Petroleum on Dec 2, 2005 just 1 yr
24 Pg 226 of 439 (printed page 218 ) of City of Bellevue EE EIS, HEARING EXAMINER REPORT TRANSCRIPTS - VOL. 1 OF 3 [30
Vol 1 Transcript.pdf] From AUDIO RECORDING OF PUBLIC HEARING (3/28/2019, 3/29/2019, 4/3/2019 & 4/8/2019
25 Pg 225 & 226 of 439 (printed page #’s are 218 & 219) of City of Bellevue EE EIS, HEARING EXAMINER REPORT
TRANSCRIPTS - VOL. 1 OF 3 [30 Vol 1 Transcript.pdf] From AUDIO RECORDING OF PUBLIC HEARING (3/28/2019,
3/29/2019, 4/3/2019 & 4/8/2019 Casey & Donley, Inc. 509.539.6153 rdonley@caseydonley.com
26 IBID
27 Pipeline fire disrupts supply of gas to region - Olympic pipeline remains shut after rupture, blaze in Renton
Newspaper May 24, 2004 | Seattle Times, & others. www.seattlepi.com/local/article/Wear-caused-gas-leak-in-Olympic-
pipeline-1145599.php 3000 gal per OPL self reporting . And, given spills were on OPL pumping grounds not reportable to the
OPS pipeline records, but a separate bucket, further hiding the true dangers. The two pipehole breaks sent 3 firefighters to the
hospital and evacuated 1 square mile including that the closest responding firehouse.
after the lawsuit was filed? Answer is Shell’s awesome operational research group
did not want to risk a +$10 Billion dollar accident in Renton/Bellevue/Eastside
bankrupting Shell. And while they knew the maximum federal fine was $3 million
for even criminal convictions resulting in death was puny for Shell; the state fines
could go to the billions, like PG&E’s 2010 San Bruno pipeline break. PG&E had a
$1.4 billion CA State fine and a the maximun $3 million Federal fine for 10 felony
convictions on 8 deaths and total destruction of 55 homes. Shell’s OR Group’s case
studies are taught at the Naval Postgraduate School and the Strategic Studies groups
of both the Sec Def & Chief of Naval Operations.
What did Shell’s O.R. group see that caused it to unload its entire stake to BP
at 3.7cents on the dollar? It took BP 12 yrs and Deepwater Horizon and PSE’s AC
induced corrosion frauds to wise up. On Sept 2017 BP sold 100% of BP’s stake in
OPL, contrary to the Final EE EIS which states BP has a partial stake. 28, 29 BP does
still operate it for the new owner Enbridge 66% and ArcLight Capital out of Boston
34%.
The list of why Shell (and 12 yrs later BP) sold ALL of their stake in OPL = Stress
Corrosions Cracking on decades old pipe is overtaking other failure reasons and
cannot be managed with replacing pipe.
1. In 2003 OPL filed for Chapter 11 bankruptcy protection due to the 1999
Bellingham 237,000 gallon rupture/fire/deaths.
2. Three large pipeline breaks all from SCC forced the Office of Pipeline
Safety to stop covering up SCC related because the industry has no way to detect it
at any level to insure no pipeline ruptures.
2A. Two massive pipeline ruptures in WA state a Williams Company 26 inch
natural gas line.30 May 1, 2OO3 rupture of the line ~300 feet from Lake Tapps
Elementary School, Pierce County ,WA. Shell learned that and saw what a disaster
WA State few pipeline regulations are. Even Texas Law requires that pipelines be
3000ft from school. The second explosion on the Williams Company natural gas
pipeline, Dec 13 2003, of was near Toledo WA and released for 3 hrs.
2B. A 8 inch gasoline blew up in Tuscon AZ on July 30, 2003 that sprayed
dozens of new homes not yet occupied with +10,000 gallons gasoline.31 The industry
in answer to Sen. John McCain’s question claimed for the 15,000 time that “The July
30 failure was caused by high pH Stress Corrosion Cracking (SCC), a phenomenon that
is new to the refined products pipe- line industry.” This a bold face lie that even the
2008OPS SCC report refutes with their fraudulent 1965 statement. The US Naval
Research Lab documented in a 1970 report on stress corrosion for DARPA that it
28 And contrary to PSE’s final EE EIS Vol 1 pg61/451
29 Shell Oil sold their 37.5% stake in the Olympic Pipeline Company Dec 2, 2005 to BP which 10 days later sold a controlling
interest to Canada’s Enbridge for $101.9 million for 65% of OPL. Sept 2017 BP sold all of its stake in OPL to ArcLight Capital
of Boston. www.bizjournals.com/seattle/stories/2005/12/12/daily4.html
30 https://primis.phmsa.dot.gov/comm/reports/enforce/documents/520031003H/520031003H_post-
hearing%20decision%20on%20CAO%20amendment_04092004.pdf
https://primis.phmsa.dot.gov/comm/reports/enforce/CaseDetail_cpf_520031003H.html?nocache=2164#_TP_1_tab_2
https://tdn.com/business/local/pipeline-bursts-near-auburn/article_9b509bd7-0c6e-53c7-9751-8eb8cc0222d6.html
31 pg 171/176 This doc found at www.gpo.gov/fdsys/pkg/CHRG-108shrg20974/content-detail.html CHRG-
108shrg20974.pdf
was known since the 1930s pg8of27.32 Admitting so forces the pipeline industry to
replace +$100 billion in older pipelines.
3 Shell saw final OPS report on the 2 WA pipeline breaks released the April 9
2004. The Federal Office of Pipeline Safety (OPS) knew since 1990 there was SCC on
the line since 1990 and did nothing until these two breaks forcing Williams to
replace all 300 miles. “There is a history of SCC with two failures in the past year, the
existence of several known parameters for SCC, an expert opinion that TFI will not
detect SCC in time to prevent failure, and no countervailing evidence. Factors that can
play a role in SCC include the operating pressures, imposed loads placed on pipeline
due to stress, the acidity of the soil, and coal tar coating. These are factors found on
this 26-inch line.33 “….failures on the line that have occurred since 1990, including
stress corrosion cracking and land movement , as risks” 34[causing SCC on the pipe &
rupture]
The NTSB report on the 2010 San Burno CA pipeline explosion notes that “about
61 percent of transmission pipelines are not piggable—meaning they cannot
accommodate current gas-driven in-line inspection devices.”35 PSE nor EE EIS nor
Renton’s review has any idea of what parts of OPL will see dangerous field strengths
from PSE’s wing it & unproven “mitigation” and equally deadly OPL may have zero
capability to inspect IF and inspection tools are developed in the future capable to
monitor SCC, AC induced corrosion as well as normal external/internal corrosion.
It did help that BP not have Shell’s operational research group, then only sold
67% stake to Enbridge in for 3.7% of OPLs replacement cost 10 day later. But
Deepwater Horizon got BP to where Shells has ZERO ownership in OPL Sept 2017
BP sold all of its stake in OPL to ArcLight Capital Why, both just bought OPL several
years earlier?
If PSE was honest and not a convicted criminal company as of 2007 for
falsifying pipeline safety for four years they would make Energize Eastside a DC
power line and remove 100% of the AC inducted corrosion on the OPL pipeline.
Bonneville Power uses a long distance DC powerline to ship power down to Los
Angles. But even if PSE did, EE still at least double the success of a $2000 terrorist
attack and makes what was not possible with using simple hardware purchases
from Home Depot/Walmart now possible.
If our local government and citizens were not corrupt the existing PSE power
line over OPL would be shutoff and all existing power transferred to the Settle City
Light. As of a few years ago the former CEO of SCL had leased those line to
Bonneville for free for at least 15 yrs. Yet another fraud. It would be poetic justice
to have the Eastside get EE and the resulting disaster if that disaster could happen
32 pg8/27 https://pdfs.semanticscholar.org/7ae3/8d35f7661a1950aa097138fbdc3be3421292.pdf
33 Pg3 of 7 https://primis-stage.phmsa.dot.gov/comm/reports/enforce/documents/520031003H/
520031003H_Amendment%20to%20CAO_12182003.pdf
34 pg 3 of 9 https://primis.phmsa.dot.gov/comm/reports/enforce/documents/520031003H/520031003H_post-
hearing%20decision%20on%20CAO%20amendment_04092004.pdf
35 pg 98of 153, www.ntsb.gov/investigations/AccidentReports/Reports/PAR1101.pdf also see
https://www.ntsb.gov/investigations/AccidentReports/Pages/PAR1101.aspx
quickly to those that deserve it. But I digress, back to the criminal behavior of our
corporate-socialist companies.
PSE, like PG&E, knows the maximum Federal fine from fraud by a utility
resulting in deaths regardless of the number is $3 million.
Before we get to the second reason that has no humor let us highlight the one
that does related to engineering/corrosion even though it is as deadly as the second
reason as Energize Eastside makes a $2000 unskilled terrorist attack possible.
Interesting that when the FDIC details pipeline terrorism in a Mar 2017 42pg paper
with the Univ of Oklahoma College of Law Oil and Gas36, they spend more time on
the lack of competent engineering. Among other things the critical inadequacies of
the USA’s pipeline basics of leak detection which, on average, takes days unless a
passerby calls it in and zero automatic shut off even today Jan 1, 2020. OPL uses
Piper cub aircraft looking for changes in live vs dead vegetation, every two weeks or
so. The FDIC spent little time on corrosion with just a hand full of comments mainly
around how smart pigs miss=Pg19/42. On 14/19=wsj. is Olympic Pipelines
majority owner since 2005 Enbridge’s 40-year-old, 30-inch pipeline ruptured near
Marshall, Michigan, discharging more than 20,000 barrels of crude37
First reason: For the very first time for Puget Sound Energy & City of Bellevue
barely glossed over two of the three forms of corrosion present on the Olympic
Pipelines and fraudulently claim all is well. & the 2016 Conflict of interest law To
quote City of Bellevue’s pipeline expert Wolfgang Fieltsch from Stantec. CoB had to
go all the way to Toronto Canada to find someone foolish enough to lie about xxx.
Even the two mitigate together, preventing two of them make the 3rd worse. That
3rd mode is AC induct corrosion and comes solely from being underneath PSE’s
powerlines.
Mode 1: normal chemical corrosion of putting a pipe in the ground,
Mode 2: Stress corrosion while known for thousand of years since man first
started working with metal it has been the Federal Office of Pipeline Safety’s
full time position to cover it up since the Office was created in 1970. They
changed due to their criminal jeopardy 2005 after three major stress
corrosion pipeline failures in 2003. Two here in WA State both on the 30”
Williams Co. natural gas pipeline 6 months apart and the 3rd spraying homes
in the Chairman of the Energy Committee Senator John McCain’s Tucson AZ.
PSE & City Of Bellevue have demonstrated criminal neglect with zero
mention of it any EE EIS document published.
36 Terrorism and Oil & Gas Pipeline Infrastructure: Mar 2017 by FDIC & Univ of OK College of Law
https://digitalcommons.law.ou.edu/cgi/viewcontent.cgi?article=1078&context=onej find=google "liability for petroleum
pipelines" ; Belle Hillenburg, Nation’s Pipeline Increasingly at Risk of Cyber, Physical Attacks, HOMELAND SECURITY
TODAY, (May 9, 2016, 6:00 AM), http://www.hstoday.us/single- article/nation-s-pipelines-increasingly-at-risk-of-
cyber-physical-attacks/e55550d405dcb 5ba3f1 e9ca1cabc7757.html.
37 Oil-Pipeline Cracks Evading Robotic Smart Pigs, Wall St. J. (Aug. 16, 2013),
http://www.wsj.com/articles/SB10001 424127887323455104579015140328479048. see also Daniel Gilbert, Big Spills
from Aging Oil Pipelines, Wall St. J. (Apr. 15, 2013),
https://www.wsj.com/articles/SB10001424127887323741004578418693982405224. see also ); Mike Lee, Decades of
Ruptures from Defect Shows Perils of Old Pipe, Bloomberg (Sept, 2, 2013)
Mode 3: AC inducted corrosion which PSE & City Of Bellevue have
demonstrated criminal neglect and outright engineering fraud on review &
analysis the known record which if allowed to stand will result in the deaths
of thousands. Here is what Toyko Gas Company, a utility 10x the size of PSE
with far greater resources and knowledge said. To quote their 2011
presentation/paper of at the International Gas Union Conference “Pipeline
operators were shocked at the first occurrence of AC corrosion in 1986 and
subsequent AC corrosion failures of modern pipelines in Europe and North
America despite satisfying the protection potential criterion.” “It has been
definitely shown by the occurrence of AC corrosion on a catholically protected
pipeline that AC corrosion cannot be prevented by CP [catholic protection,
what “protects” OPL currently] in the presence of very high AC voltage of a
pipeline.”
Please compare the resume & publication record of Fumio Kajiyama main
author to Tokyo Gas Company’s paper to that of Mr. David Kemp with his BS
in Mechanical Engineering. PSE’s Attorney “He is here this evening to speak to
the science of co-location.” I have the BSME and a Master in Electrical
Engineering (Electromagnetic propagation & antenna design) and years
multiple domain corrosion prevention. How Mr Kemp was allowed to speak
in a court of law as an expert on the topic of “ the science of co-location” of
high power lines and pipelines carrying highly volatile liquid is massive
failures on multiple fronts. Kemp’s pulp fiction papers including those in
NACE allow him to be the fall guy by PSE when OPL breaks and kills 1000
from suffocation the latter fire.
PSE and City of Bellevue’s has created a highly inadequate EE EIS and I believe a
criminally fraudulent EIS. Those with broad US Navy systems design experience will
immediate recognize the hundreds of false hoods in the PSE and City of Bellevue’s
EE EIS. The recognition of these hundreds of propaganda spins/lies come from
engineering design for long-term reliability (read up to decades), accelerated aging
engineering (aka “shake &bake”) and corrosion effects across multiple domains. The
US Navy designs systems such that it is known when they will likely fail and need to
be decommissioned even with decades of use. Even with that methodology there
are surprises. The for-profit pipeline and electric utility industry while less the 20%
of the number of entities do not use any such methodology as it cuts profit margins
and threaten their replacement with other technologies even as early as 1910.
Their criminal behavior in their first 40 yrs of existence is well documented in the
1928 book Electric Utilities: A crisis in Public Control resulting dozens of
Congressional hearings.38 Instead the Electric Utilities got the maximum Federal
fine for convicted criminal activity to be just $3 million regardless of number of
count or number of deaths. As PSE mentioned The Jefferson-Martin as a sample of a
success of 230 kV project “constructed very close to a major gas pipeline.” This
Jeffereson-Martin transmission line was placed into service in 2006” “ This project was
38 and turning hardcore conservative Republican Nebraska Senator George W. Norris to end up left of FRD on for-profit
electric utilities.
constructed with out incident” per Lowell Roger PSE’s Construction Mgr under
oath.39 Mr Rogers has an extremely warpped sense of without indicent as 900 ft
away when the 230 KV line transitioned form above ground to below the largest
pipeline explosion to occur in the history of the Bay Area occurred on Sept 9, 2010
vaporizing 38 homes, destroying 50 and killing 8 injuring 64.40 to Pacific Gas &
Electric was convicted of 10 felons (the FBI & Justice Dept tried to get
Instead of using failure of pipeline of the same age, construction techniques
corrosion prevention and design, PSE’s EE EIS selects a whole irreverent category of
all failures in a less than 5 year time period (due to corruption in OPS data) of any
pipeline of any age failing between ~2010-2015. This vastly underestimates a
failure rate attributed to OPL as 1) hundred of thousands of miles of much younger
pipelines are wrongly added making failure rate of an older pipe appear orders of
magnitude better that it is. 2) None of the pipes were under a ¼ mile let alone 24
miles of near field AC inducted corrosion or for that matter any known inducted AC
corrosion. Likely PSE will tell you that data is not kept. Certainly true at the Federal
Office of Pipeline safety but not true within the industry. The facts are it is just that
PSE did not want to pull it together.
3) And critically damaging to PSE’s/Bellevue’s/etc safety case is from a Tokyo Gas
Company paper at the 2011 International Gas Union Conference. “It has been
definitely shown by the occurrence of AC corrosion on a catholically protected pipeline
that AC corrosion cannot be prevented by CP [catholic protection, what “protects”
OPL currently] in the presence of very high AC voltage of a pipeline.”41 This
information was submitted to Renton & Bellevue EE EIS comment in 2016 and 2017.
Why has it not been disputed? An AC corrosion weaken OPL pipeline during a major
earthquake could kill 1000s and shut auto/truck and aircraft delivery to all points
south of Rendomd/Bellevue as they have guaranteed liquidation breaks from
Energize Eastside monopoles. These breaks include shutting off fuel to SeaTac and
Portland Airport.
4) Contrary to false/misleading testimony in Bellevue’s Admin Hearing PSE’s
colocation directly on top of OPL is in fact unique in the world let alone the
USA. The best ~100 fold less voltage from electric rail systems operating at 400-
2000 volts sharing a right of way with a natural gas pipeline.
39 pg 213 & 214/439 [30 Vol 1 Transcript.pdf] of City of Bellevue EE EIS, HEARING EXAMINER REPORT TRANSCRIPTS - VOL.
1 OF 3 From AUDIO RECORDING OF PUBLIC HEARING (3/28/2019, 3/29/2019, 4/3/2019 & 4/8/2019)
40 https://en.wikipedia.org/wiki/San_Bruno_pipeline_explosion The Koch-tapus propaganda machine has stricken the 10
felony convictions of PG&E including falsify information related to the incident. The Federal Judges orginal fine was $500
million but the Appeal court intervened informing the Judge they would take action against him just months from his
retirement if he went over the maximum allowed fine of $3 million regardless the number of deaths
41 TOKYO GAS CO., LTD Pg2/21 STRATEGY FOR ELIMINATING RISKS OF CORROSION AND OVERPROTECTION FOR BURIED
MODERN PIPELINES, Main author
Fumio Kajiyama, http://members.igu.org/old/IGU%20Events/igrc/igrc2011/igrc-2011-proceedings-and-
presentations/poster-papers-session-2/P2-43_Fumio%20Kajiyama.pdf IGU= International Gas Union “Pipeline operators
were shocked at the first occurrence of AC corrosion in 1986 and subsequent AC corrosion failures of modern pipelines in
Europe and North America despite satisfying the protection potential criterion. It was proven that AC corrosion was attributed
to induced AC voltage on a pipeline caused by (1) application of high resistivity coatings, and (2) the increased tendency to
locate pipelines paralleling HVAC electric power lines and/or AC powered rail transit systems. To prevent a recurrence of AC
corrosion, corrosion engineers have urged the necessity of a new cathodic protection (CP) criterion for AC corrosion
protection. However, there are no agreed-on criteria for AC corrosion protection.”
PSE & City of Bellevue’s EE EIS falsely (fraudulently?) analyses any pipeline failure
in the period from 2010-2015 when the correct analyzes should be all pipeline of
the same age bracket at failure. Most long-term failure mechanisms follow a
bathtub curve. PSE/CoB processes and actions have purposefully left out key
information and actively suppressed its discovery and spread misinformation at
public out reach including holding back public access to key so called independent
experts when they are questioned under video taping. Some of that suppression by
EE EIS staff & leadership was videoed & is on YouTube including the slapping of a
camera out of a citizen’s hand at a Renton EE EIS public meeting ref=xxx. Much
more would be posted if time allowed.
Some of the key new information left out of all of the EE EIS documents came
out in the City of Bellevue Mar/Apr 2019 Administrative Hearing on EE’s partial
permit application and just as import new information from City of Renton’s EIS
Consistency Analysis. From Renton we learn the new information of the ratio of old
wooden H-frame to new steel monopoles and from the Admin Hearing we learn
from Lowell Rogers, PSE’s construction manager, the pole foundation deeps 13 to
46ft. Every single one of these pole foundations is XXX1000X more deadly in
Bellevue/Newcastle/Redmond right of away of 50 ft. Even assuming Renton’s 100ft
right of way is accurate the same +1000X increase in danger is true depending on
how far apart the 16” and 20” gasoline/jet fuel pipelines are spaced. Likely they are
spaced farther apart but if not the 46 ft foundations guarantee a pipeline rupture
during a major earthquake with or w/o liquid faction. The new reveled (and
NEVER analyzed) information means that during a major earthquake the fewer and
stiffer steel pole are far more like to fall over and rip out of the ground rupturing the
50 yr old ¼ inch thick steel pipes. If just 4 pole failovers breaking the OPL the +24
mile Eastside during a major earthquake +1 million gallons of the 12.8 million
gallons that pass through Renton everyday. Even PSE say the max release of
372,162 gallon release of a single break.42 The 1999 Bellingham WA break spilled
237,000 gallons of gasoline from the 16” which has a flow rate of 228,000 gallons
per hour43. Nothing has changed on pipeline safety since the
Including City of Bellevue SEPA responsible official Carol Helland who as an
attorney and former Bellevue Developmental Service Director actively working to
prevent videoing of public meetings to document the false information City of
Bellevue and PSE were verbally telling the public. Carol even went as far as slapping
a camera out of my hand at Renton EE EIS public meeting. All of the information in
this executive summary was never disclosed in ANY of the EE EIS documents and
only reveled The switch from 144 small wooden H-frame (~288 poles 1ft in
diameter) with 41 monopole.
The facts
42 Pg 238/274 8841 barrels =372,162 which is magically the 16” 1990 pipe break scaled to a 20 inch pipe.
43 Pg 170/274 energize_eastside_phase_2_draft_eis_volume_2_appendices.pdf and 46,800 gallons/mile for the 16” pipe,
77,767 gal/mile for the 20”. Pole Installation at page 7 & 28/274 of same 2_draft_app pdf (Final EE EIS just refers to these
draft phase2s.
Lowell Roger testifies under oath that no design just act of God=FIND
Background
The facts that make the colocation of the Olympic Pipelines/PSE high voltage
powerlines the single most deadly pipeline accident or terrorist attack waiting to
happen. Why? Let us review the facts that the folks involved with approval EE are
unaware of or purposefully choosing to ignore.
1. Energize Eastside is a repeat of local history. PSE’s 2007 fraud conviction for
falsifying pipeline safety records is nothing new, nor is the deadly Energize
Eastside (EE) fraud (not yet noted so by the courts). A book published in 1928
called Electric Utilities: A crisis in Public Control by seven Syracuse University
professors documents the first 40 yrs. The for-profit monopoly US electric
utilities had already a long record of racketeering by 1928. FDR used the book to
win his first presidential election. The Seattle Library has the only the two
copies in entire Pac NW.44 The book details the criminal activity of the Electric
Utilities and their Trade(crime?) syndicate National Electric Lighting Assc.,
which decided to change its name in 1932 after dozens of Congressional
Hearings detailed their activities. The new name Edison Electric Institute(EEI), is
still alive and involved in EE if not directly spiritually. On Mar 9, 1931 PSE’s
puppet master, the NELA, got Seattle Mayor Frank E. Edwards to fire Seattle City
Lights Superintendent James D. "J.D." Ross. Edwards was in his 2nd term and had
been elected by the largest mayoralty majority ever recorded in Seattle. Even so
Mayor Edwards was promptly recalled by voters 4 months later. JD was
reinstated to SCL and employed by FDR on multiple dam projects & placed on
the Securities Exchange Commission. A careful review of the 100s of hours of
video of Energize Eastside EIS & “public out reach” will show the same
falsification tactics used by NELA/EEI if not out right participation.
2. A taste of the massive propaganda machine of the for-profit corporate-socialist
Electric Utility Companies like PSE, PG&E SoCalEd etc. Descriptions=Bernard J.
Mullaney was former head to the US War Department Office of Propaganda for
all of WW1; NELA = National Electric Lighting Association . Here is the taste
from Corporate Public Relations A NEW HISTORICAL PERSPECTIVE 1987 by
Marvin N . Olasky The University of Texas at Austin. In 1919 “Over $100,000
went to E. Hofer and Sons, a firm located in Salem, Oregon, away from major media
centers. Annual payments of $84,000 from Insull's NELA allowed Hofer to send out
almost 13,000 newspaper articles annually. The articles usually appeared as
unattributed, "original" editorials. Use of such services was only a first step,
though. Soon industry front groups began sending out enormous numbers of public
relations "news re- leases." For example, in 1920 and 1921 "five million pieces of
literature" were circulated in Illinois alone by the Illinois Committee on Public
44 Book is impossible to buy online. Call/txt me at to know how to get a pdf version or other key books
detailing the massive +130 year criminal fraud of the corporate socialist monopolies electric utilities.
Utility Information, headed by Insull's top public relations aide, Bernard J.
Mullaney. Mullaney deliberately sent newspapers huge amounts of accurate copy
to accustom editors to reliance on his work. Only after full trust was established
would he begin slipping in a few fast ones. Mullaney noted proudly that his work
became most valuable only when saturated editors began lowering their guard.
Public relations managers working in other states reported similar successes.45
3. The 24 mile colocation of PSE/OPL one of a kind in the entire world – no other
local/state or national government has allowed liquid gasoline lines to travel
directly underneath 115kV line for miles let 24 miles. PSE approved the Olympic
Pipeline Company to build directly under PSE existing 115 kilovolt power lines
in 1964, 6 years before Congress was forced to create the Federal Office of
Pipeline Safety (OPS). The Law was signed Aug 12, 1968 but OPS didn’t open its
doors until 197046. The 16” OPL line was already in operation in 1965 with the
20 inch operating in 1972. The 16 inch OPL was built with corrosion protection
obsolete even in 1960. That obsolete protection is coal tar slathered on to the
outside of the pipe to protect against only 1 of the 3 corrosion mechanisms the
Olympic pipeline are experiencing. Some might say well they have been in the
ground since 1965 and all is well and good, how could this be true? These
failures take several decades to occur and have happen quite regularly as even
the FDIC in 2017 is starting to document given it ability to destabilize the
banking industry. Even though the 42 pg paper is called Terrorism and Oil & Gas
Pipeline Infrastructure47. they spend more time on the massive ineffectiveness of
OPS preventing or even detecting pipeline breaks than. Here a just one quote
relevant to OPL “According to a Reuters review of PHMSA data, since 2010, there have
been at least 466 incidents in which a pipeline carrying crude oil or refined products has
leaked. Of those, only 105, or 22%, were identified by an advanced detection system.”
4. The new 2019 Pipeline safety laws still have zero requirement for any automatic
pipeline shut off system. OPL has zero real-time leak detection, same as during
the 1999 Bellingham spill of 237,. OPL only
5. with ZERO effective measurement to gage when to preemptively replace. See
OPS’s final report on the two 2003 Williams Pipeline explosions in WA, pg XXX.
6. Contrary to testimony in the Bellevue EE Administrative Hear by PSE’s
construction manager Lowell Rogers so called Professional Engineer from his
one man shop Oak Strategic, Inc. Deep pockets to sue there when the +$10
billion dollar disaster happens.
Approving Energize Eastside increasing that danger by at least +100 fold for
earthquake while increasing the odds of a $2000 terrorist attack on the 16” and 20”
Olympic Pipelines simultaneously highly X1000 fold. The Cost is simply the cost of
two 100 ft ½ inch steel cables tied to several 6ft steel tree stakes driven down to
each OPL pipelines. I am leaving out several other key steps to get the success rate
45 24.BernardJ.Mullaney,"EstablishingPublicRelations,"GasAgeRecord,October 28, 1922, p. 577; Gruening, p. 19. Also see Insull, Public Utilities in
Modem Life (Chicago: Privately printed, 1924).
46 www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/Natural%20Gas%20Pipeline%20Safety%20Act%20of%201968.pdf
47 Terrorism and Oil & Gas Pipeline Infrastructure: Mar 2017 by FDIC & Univ of OK College of Law
https://digitalcommons.law.ou.edu/cgi/viewcontent.cgi?article=1078&context=onej find=google "liability for petroleum
pipelines"
of up to ~100% rupture of both lines. The current 115 kV lines yield very low
maybe 0.1% chance of single pipeline rupture, both pipelines ~0.01%. Doubling the
voltage and the increase in amperage yields x1000 increase in terrorist attack. I put
a single line in about this in my 17 page 2014 paper on PSE’s fraudulent Energize
Eastside. But the willful criminal neglect and likely out right fraud of City of
Bellevue attorneys & senior staff force me to detail. The two lawyers are
1) Carol Helland EE EIS SEPA responsible official, and Development Servvices
Director who quit to work in City of Redmond when video of her surfaced attacking
a Bellevue resident videing City of Bellevue & contractors lying to citzens at a Rent
EE EIS public presentation. See on Youtube XXXXX.
2) Matt McFarland Assistant City of Bellevue Attorney.
This double attack occurring miles apart, if timed during the correct windflow
would take out both the Boeing Renton facility and surprising to even me the I-90
bridge even assuming PSE fake max spill number of 371xxx gallon for the 20inch
line. While PSE simply scales the xxx gallon of the 1999 Bellingham WA release for
the 16” pile to the 20” pipeline maximum gasoline of
One key and new piece of information brought to light from the City of Bellevue
Administrative Hearing Mar/April 2019 is the pole foundation depths, which was
never disclosed nor analyzed in Puget Sound Energy’s Environment Impact
Statement. Per pg
Here is What Renton is going to get if it approves
Energize Eastside: A giant 5G antenna farm.
It will look like above except on EVERY Energize Easide pole.
PSE’s near zero ROI (less than 1%) on the company in general, since 2007, also
means significant “Scenic Views and Aesthetics” decrease as PSE’s pole =2x height
increase allow for new business model of 5G antenna farm on every pole. 5G has a
+100X increase in number of antennas needed over 4G. If EE is approved, new
Federal laws on 5G/etc mean the City of Renton will have zero local control what
PSE does on aesthetic. Renton’s industrial look will significantly expands into
residential area as PSE’s Renton antenna farm services the west side of Mercer
Island far cheaper than PSE’s Mercer Island light poles.