HomeMy WebLinkAboutPUCR_WA6148 Sunset Relo_1-3-2020UCR: WA6148 Sunset Relo 1 Utility Coordination Report Sunset Relo Site# WA6148 PRELIMINARY Company: J5 Infrastructure Partners Consultant: Devin Taylor Phone Number: 503-803-2850 Email: dtaylor@j5ip.com Power: PSE Transport: TBD Prelim: 1/3/2020 Final: Revision: V1 Rev Date: UCR: WA6148 Sunset Relo 2 Site Contacts Site Address: 3410 NE 12th St. Renton WA 98056 Lat/Long: 47.503639, -122.173819 Property Owner: City of Renton Property Contact: Abdoul Gafour Phone: 425-430-7210 E-mail Address: agafour@rentonwa.gov Site Acq Vendor: J5 Infrastructure Partners Site Acq Contact: Germaine Bazan E-mail Address: gbazan@j5ip.com ☐Received Design Walk Package ☐Received PCD” s Revision Date: ☐Received 1A Survey Date: UCR: WA6148 Sunset Relo 3 Power Company Contact Information Provider: PSE App Sent: Engineering Contact: TBD WO# Phone Number(s): 188-225-5773 Fees: WEB Address: https://www.pse.com/start-stop-move/start-service Design Confirmation with Field Engineer: ☐Yes, Date: ☒No (explain): TBD Power Run Information Point of Origination: ☐Existing Pole ☐Pad-Mounted Transformer ☐Electrical Room ☐Sub-meter from Existing Power ☐Vault/Hand-hole ☒other- Abandoned Meter Base Identification number on Point of Origination: Existing PSE Utility pole # 318643166904 Capacity at demarcation: 200A Service, 120/240V, 1 Phase, 3-Wire Distance to site (via existing or proposed easement): 65’ Describe route to vendor equipment (be specific, including if and where a new transformer will be placed, where new VENDOR meter will go, etc.): Primary power will be brought to the site from existing abandon meter base. AT&T GC will need to install (1) 3” Schedule 40 PVC conduit with pulltape, from the existing meter base to the new H-Frame in AT&T lease area. AT&T GC will need to install new H-Frame at proposed AT&T new site location for power and fiber handoff equipment. AT&T GC will need to size and install new A/C service panel on H-Frame. AT&T GC will need to size and install power wire from meter base to A/C service panel. UCR: WA6148 Sunset Relo 4 Notes: • AT&T GC to request locates prior to any excavation. • AT&A GC to maintain proper clearances from all existing pipin g, drainage and conduits on property. • Where power and telco are placed in a combined trench, a minimum 12” separation must be maintained at all times. • All sweeps to have a minimum 36” radius unless otherwise noted. • AT&T GC to provide a minimum 3’-6” clearance in front of the meter base. • PSE will require 24-hour access to their facilities. • AT&T GC to have all required inspections complete prior to PSE installing their wiring and energizing the service. UCR: WA6148 Sunset Relo 5 _________________________________________________________________________________________ Power Easement (or equivalent) Information Utility Co. Easement(s) Required (Utility Co. Document)? ☐Yes ☒No Third-Party Easements(s) Needed? ☐Yes ☐No ☒Possible/Needs Verification Who will Write Who Executes & Notarizes Who Records ☐Power Co. ☐SA Vendor ☐Other: See Below ☐Power Co. ☐SA Vendor ☐Other: See Below ☐Power Co. ☐SA Vendor ☐Other: See Below Where the Utility places and maintains power and/or Telco assets on private property from the Right of Way to the site, the S ite Acq agent is responsible for securing land rights for the path, environment (Aerial or Underground), and 24/7 access where the plant will reside and as required by the utility. Also applicable to 3 rd party private property where required. Where the Utility does not require an exclusive easement, the SA vendor shall determine the final means of securing the appropriate land rights and approving with the utility and landlord/owner. Also applicable to 3 rd party private property where required. UCR: WA6148 Sunset Relo 6 Transport Provider Contact Information Available Transport: Providers in the vicinity of site location 1. Provider Name: CenturyLink fiber vault just outside fenced compound. Path to follow proposed power route ☐Yes ☐No ☒Partially 2. Provider Name: ZAYO fiber vault just outside fenced compound. Path to follow proposed power route ☐Yes ☐No ☒Partially Is there an approved Transport Provider? ☐Yes ☒No Approved Provider: Engineering Contact: Phone Number: E-mail Address: Met Engineer on-site? ☐Yes Date: ☒No (explain): Transport not selected at this time Transport Provider Run Information Will Ethernet over microwave be required? ☒No ☐Yes ☐Possible/Needs Verification Point of Origination: ☐Pole ☐Pedestal ☐Terminal ☒Vault/Handhole ☐Other (Describe) Number or address of point of origination: Existing fiber vault just outside fenced compound. Distance from meet me point to site (via existing or proposed easement): 70’ Describe Route (be specific, including whether a new pedestal or terminal will be placed, where it would be placed, etc.): AT&T GC will need to provide and install a new 3048 handhole (or approved) by the existing fiber vault. AT&T GC to install (1) 4” SCH 40 PVC conduit and (3) 1-1/4” innerducts, from the new 3048 handhole just outside the fenced compound to the new AT&T lease area. AT&T GC will need to place the conduit in a 36” below grade trench. AT&T GC will need to provide and install detectable warning tape in the trench above the fiber conduits. UCR: WA6148 Sunset Relo 7 Transport Easement (or equivalent) Information Utility Co. Easement(s) Required (Utility Co. Document)? ☐Yes ☒No ☐Possible Third-Party Easement(s) Needed? ☐Yes ☐No ☒Possible/Needs Verification Who will Write Who Executes & Notarizes Who Records ☐Telco Co. ☐SA Vendor ☐Other: See Below ☐Telco Co. ☐SA Vendor ☐Other: See Below ☐Telco Co. ☐SA Vendor ☐Other: See Below Easement Requirements or Suggestions: Once a fiber provider is selected, Site Acq will need to verify with the provider whether the existing access/utility easement already in place by virtue of lease or non -exclusive easement will suffice in lieu of a separate utility easement. Where the Utility places and maintains power and/or telco assets on private property from the Right of Way to the site, the Site Acq agent is responsible for securing land rights for the path, environment (Aerial or Underground), and 24/7 access where the plant will reside and as required by the utility. Also applicable to 3rd party private property where required. Where the Utility does not require an exclusive easement, the SA vendor shall determine the final means of securing the appropriate land rights and approving with the utility and landlord/owner. Also applicable to 3rd party private property where required. UCR: WA6148 Sunset Relo 8 Attachments ☒ Vicinity Map ☒ Aerial Site Map ☐ Drawing or sketch showing the following: o Utility run(s) from demarcation(s) to site o Identify whether utilities will be overhead or underground ☒ Labeled pictures showing utility run(s) from demarcation(s) to site UCR: WA6148 Sunset Relo 9 Proposed New AT&T Cell Site Existing abandon meter base Existing Fiber vault UCR: WA6148 Sunset Relo 10 Existing abandon meter base AT&T GC to install 3” Schedule 40 PVC conduit from the existing meter base to the new AT&T lease area UCR: WA6148 Sunset Relo 11 AT&T GC to install 4” SCH 40 PVC Conduit w/ pull strings and (3) 1-1/4” innerducts for fiber. AT&T GC to Install new Fiber vault Existing abandon meter base AT&T GC to install 3” Schedule 40 PVC conduit from the existing meter base to the new AT&T lease area UCR: WA6148 Sunset Relo 12 AT&T GC to install 4” SCH 40 PVC Conduit w/ pull strings and (3) 1-1/4” innerducts for fiber. Proposed New AT&T Cell Site AT&T GC to install 3” Schedule 40 PVC conduit from the existing meter base to the new AT&T lease area UCR: WA6148 Sunset Relo 13 UCR: WA6148 Sunset Relo 14 UCR: WA6148 Sunset Relo 15 UCR: WA6148 Sunset Relo 16 UCR: WA6148 Sunset Relo 17