HomeMy WebLinkAboutMFP20000042.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP20000042
IVR Number: 20000042
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :12/20/2019Application Date:3023059067Parcel Number:3400 EAST VALLEY RD
Permit Type:01/16/2020Issue Date:Franchise
Permit Work Class:01/15/2021Expiration Date:Minor Utility
Job Number:105093581Franchise Type:Electric
Description:Work in the ROW at V01 to upgrade existing padmount transformer from 45KVA to 500KVA. Restoration per City of
Renton standards.
Contacts
Name Address PhoneTypeBilling
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Applicant
Corrie Rydberg
Puget Sound Energy
C: (425) 892-0416Applicant
D & C INVESTMENTS 555 SW GRADY WY
RENTON , WA 98057
Owner
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street
տ Open Trench տ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
105093581
CORRIE RYDBERG
(253) 234-6410
CORRIE.RYDBERG@PSE.COM
3400 E VALLEY RD
WORK IN THE ROW AT V01 (316712-165792) TO UPGRADE EXISTING PADMOUNT
TRANSFORMER FROM 45KVA TO 500KVA. NO HS CUTS ANTICIPATED. PLEASE SEE ATTACHED
✔✔
Potelco, Inc. (253) 234-6410
POTELI#227PL BL005109
Corrie Rydberg Digitally signed by Corrie Rydberg Date: 2019.12.22 00:03:04 -08'00'12/22/19
RESTORATION PER CITY OF RENTON STANDARDS
MFP20000042
Scott Warlick 1/14/2020
Holly Powers 1/16/2020
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
•Comply with all traffic regulations of the City of Renton and the State of Washington.
•Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
•Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
•By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
105093581
Potelco, Inc
FABIAN GOMEZ (206) 573-0031
6905 S 228th St, Kent, WA 98032
FABIAN.GOMEZ@PSE.COM
3400 E VALLEY RD
TBD
TBD
CORRIE RYDBERG
12/22/19
Corrie Rydberg Digitally signed by Corrie Rydberg
Date: 2019.12.22 00:02:35 -08'00'
Monday - Friday
8:00AM - 3:00PM
MFP20000042
Scott Warlick
1/14/2020
SKETCH
I
-- NORTH --
I
NOTES:
•Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
•The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
•Approved Temporary Traffic Control Plan must be at the work site during work hours.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
•Total road closure lasting more than 24 hours is subject to the approval by the City Council.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
•The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
#3400
E VALLEY RDSW 34TH ST
RR13 11 12
13 11 12
13 11 12
11111211VO1CONETOPPER
W1-4LROAD
WORK
AHEAD W20-1100'100'100'RIGHT LANE
CLOSEDAHEAD W20-5RW4-2LARRW-BRD
ROADWORKAHEADW20-1
100'RIGHTKEEPR4-7BRIGHTKEEPR4-7BROADWORKAHEADW20-1100'N PSE PUGETSOUNDENERGY
-OB#105093581
3400 E Valley Rd Renton, WA
6th December, 2019
prachi.joshi@pse.com
425-424-7808
SHEET 1 of 1
Puget Sound Energy
Traffic Control Supervisor:
Stephen R Gadke
Card No. 010741
Exp.5/31/2021
stephen.gadke@pse.com
(425) 424-6431
TEMPORARY TRAFFIC CONTROL PLAN
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
UG/BOX/VAULTVault
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
MFP20000042
3400
3351
ROW
80'
SW 34TH ST E VALLEY RDROW80'316703-164756
2500 kVA
(ABC)
316711-165777
25 kVA 120/240V (B)
316712-165792
45 kVA 120/208V
500kVA 277/480V
316705-164756
CUSTOMER OWNED, INSTALLED,
& MAINTAINED 4-RUNS 500 kCMIL SVC
316714-165765 316714-165781
VIC
15
AØ32334
BØ32335
CØ32336
J
J
J
J
JOB SITEE VALLEY RD316711-165777
ROW
82'
34'
7'S/WEOPEOP17'
J
24'316712-165792
500kVA 277/480V
UNDERGROUND CIRCUIT MAP
SCALE: 6" = 1 MILE
Owner / Developer Contact Info
officeATTN:
D&C INVESTMENTS
555 SW GRADY WAY
RENTON, WA 98057
ADAM PERSON 253-924-9073 105093581GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:FABIAN GOMEZ
206-573-0031
FABIAN.GOMEZ.COM
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
F. GOMEZ 206-573-0031 11/20/19
F. GOMEZ 206-573-0031 11/20/19
S. FOX (714) 893-2405 11/20/19
REQUIRED RENTON
WALKER'S RENTON MAZDA
3Ø 500KVA PM TRF UPGRADE & CT SVC
3400 E VALLEY RD, RENTON, WA 98057
N/A N/A
N/A 105093581
AS NOTED 1 OF 2
KING N/A N/A CSPSKEIN
SE 30-23N-05 N/A N/A
2305E120 2305E124 2305E120 VIC-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
105093581508159682
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
VIC-15
05/2019
121.00 118.00 116.00
6.75 6.75 6.75
127.75 124.75 122.75
00 1"2"
00 50'100'
SITE PLAN
SCALE: 1" = 50'
OVERHEAD CIRCUIT MAP 2305E124
SCALE: 6" = 1 MILE
JOB SITE
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 11' X 11' WORK PIT 1/3 CUBIC YARDS OF 6” CRUSHED ROCK AT V01
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED
5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
N
Vicinity Map
N/A
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
CIRCUIT FEET ADDED: 0'
SQ. FOOTAGE: 33,225 SQ FT
PANEL SIZE: 600A
HEAT TYPE: ELECTRIC
EST. DEMAND: 123.71kW
LRC: 257A
% V. DROP: 1.0%
% FLICKER: 2.1%
E80' ROW
CL
W
NOT TO SCALE
CROSS SECTION - E VALLEY RD
LOOKING NORTH
PARTIAL PLAN DETAIL
SCALE: 1" = 20'
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
V01
316712-165792
500kVA
6259250
JOB SITE
SITE SPECIFIC NOTES
AT V01: 316712-165792
-REMOVE EXISTING 45KVA 120/208V PM TRANSFORMER
-REMOVE EXISTING 4'8" X 4'8" X 3'6" VAULT & LID
-INSTALL (1) 7' X 7' VAULT W/8' SQUARE COVER & 60" X 24"ACCESS STD. 6045.5000 (PM3P15M)
-INSTALL (1) 500KVA 277/480V PADMOUNT TRF (MID: 6259250)
-INSTALL (4) 4-POS #2 TO 500 KCMIL CONNECTOR LUGS (MID 7651002)
-INSTALL (12) MOUNTING BOLT KITS (MID 7651008)
-CONNECT (4) RUNS OF CUSTOMER OWNED, INSTALLED & MAINTAINED 500 KCMIL
M01: NEW METER BASE
-INSTALL 600A METER
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point on private property.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
101125210
584045026
587030797
3000429705
508579061
508579067
Service
Meter
108117701Removal
TRF Upgrade
TRF Removal
MFP20000042
11' X 11' WORK PITCUSTOMER SUPPLIED
W/ 6" BEDDING OF 5/8"316712-165792
500kVA 277/480V MINUS CRUSHED ROCK
AØ32334
BØ32335
CØ32336
105093581UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
F. GOMEZ 206-573-0031 11/20/19
F. GOMEZ 206-573-0031 11/20/19
S. FOX (714) 893-2405 11/20/19
REQUIRED RENTON
WALKER'S RENTON MAZDA
3Ø 500KVA PM TRF UPGRADE & CT SVC
3400 E VALLEY RD, RENTON, WA 98057
N/A N/A
N/A 105093581
AS NOTED 2 OF 2
KING N/A N/A CSPSKEIN
SE 30-23N-05 N/A N/A
2305E120 2305E124 2305E120 VIC-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS.
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
10'
10'
APPROVED
TRANSFORMER
AREA
10'
TRANSFORMER CLEARANCES FROM COMBUSTIBLE SURFACESCOMBUSTIBLE BUILDING WALLS AND ROOFCOOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
1.5' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
Not to scale
1.5' MIN
3'
MIN
3' MIN
3' MIN
10' MIN
3'
MIN
2"
Excavation - 20 cubic yards
8'-0"
or 10'-0"
7'-0"
8'-0"8"
4'-2"
SIDE VIEW
4'-6"Crushed
6"
Rock
11'
11'
TOP VIEW
3'-6"
7'-0"
6045.5000Not to scale
VAULT & EXCAVATION DETAIL @ V01
PSE
ENTRY
CUSTOMER
ENTRY
CABLE & CONDUIT DETAIL
SCALE: NONE
MFP20000042