Loading...
HomeMy WebLinkAbout1125_001.pdfEarth Solutions NWLLC I 15365 NE 901" Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 1 Fax (425) 449-4711 www esnw.com ESNW Rep. Project No- Page Report No. AJL 0895.06 1 of 2 102A Time On Site Time Off Site Date Day of Week 2:45 3:15 1/3/20 Friday NPDES Permit No. Reviewed WAR -307963 e\. CONSTRUCTION STORMWATER GENERAL PERMIT - FIELD REPORT Project Name Job Location Weatherly Inn 4500 Talbot Rd. S, Renton Erosion Control BMPs (13 Elements) Client/Owner RJ Development, LLC Overall Needs I Condition Repair? Comments Lood; Fair; Poor) Lyes; No) 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas G N Silt fence installed and working as intended. Should • Silt Fence be repaired as needed 2. Establish Construction Access • Fabric; Quarry Spalls Sweep frontage road as needed and daily when • Wheel Wash G N trucking is taking place. Repair site entrance as • Sweeper Truck needed. 3. Control Flow Rates • Stormwater Vault or Facility • Straw Wattles G N Add check dams and straw wattles as needed. • Check Dams 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation Straw G N • Sediment Ponds, Traps & Filters • Treatment • Sediment Pond (Temp or Perm.) • Water Truck S. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass G N • Plastic Sheeting • Straw Stockpiles • Stockpiles • PAM 6. Protect Slopes • Benching; Track -Walking G N • Pipe Slope Drains • Plastic Sheeting; Anchors 7. Protect Drain Inlets • Catch Basin Inserts G N CB inserts should be cleaned or replaced as • Gutter; Roadneeded 8. Stabilize Channels and Outlets • Channel Lining • Check Dam G N • Outlet Protection • Nets and Blankets 9. Control Pollutants • Chemical Storage Area Covered • Concrete Handling 10. Control Dewatering 11. Maintain BMPs G N 12. Maintain SWPPP & Site Logbook G N ESNW will provide upon request. 13. Protect Low -Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement Earth Solutions NWLLC 15365 NE 90" Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 1 Fax (425) 449-4711 is www esnw corn ESNW Rep. AJL Project No. 0895.06 Page 2 of 2 Report No. 102A Time On Site Time Off Site Date Day of Week 2:45 3:15 1/3/20 Friday NPDES Permit No. Reviewed WAR -307963 CONSTRUCTION STORMWATER GENERAL PERMIT - FIELD REPORT Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S, Renton RJ Development, LLC Monitoring, Records & Recommendations Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? 0 Yes ❑ No List the completed, not -yet -completed, or ongoing action items in the table below: Actions Items Sweep road, stabilize expose soils, repair site entrance as needed Cover exposed slopes and cuts with anchored plastic sheeting Current Weather: 50° F Raining Precipitation since last inspection (approximate): _0 35 inches Precipitation in the last 24 hours (approximate): _0.00 inches Was water quality sampling part of this inspection? ❑ Yes 0 No If "Yes": • Record results in the table below. Completed? Date (Yes; No; Ongoing) (If Completed) (ongoing) N • Characterize the stormwater discharge, a g., the presence of suspended sediment, 'cloudiness", discoloration, or oil sheen, if present: • Hanna Turbidity Meter # Monitoring Location Turbidity pH (NTIJ) Notes Is the site in compliance with the SWPPP and the permit requirements? 0 Yes ❑ No If "No": • Indicate the tasks necessary to bring the site into compliance in the table above. • Has the non-compliance been reported to the Department of Ecology? ❑ Yes ❑ No • Should the SWPPP be modified? ❑ Yes ❑ No 'This report is true, accurate, and complete .lo the best of my knowledge and belief " fnspector Name: Adrien Leland CESCL Number: CESCL-EF8182312