HomeMy WebLinkAboutNOA_Re-Notice_Project_Acceptance_200128DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION: January 29, 2020
PROJECT NAME/NUMBER: PR20-000030 7-Eleven UST Replacement/ LUA20-
000014
PROJECT LOCATION: 11505 SE 168th St (APN 2892600051
APPLICANT/PROJECT CONTACT PERSON: Pat Hopper, Barghausen Engineers/18215 72nd Ave South, Kent, WA
98032/phopper@barghausen.com
LOCATION WHERE APPLICATION MAY BE
REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also http://bit.ly/2Gsln8O
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the removal of
three (3) 12,000-gallon underground storage tanks (USTs) currently on site and the installation of two (2) replacement
USTs, one (1) 15,000-gallon UST for the storage of regular unleaded fuel and one (1) 15,000-gallon split/dual UST for the
storage of diesel fuel (8,000 gallons) and premium unleaded (7,000 gallons). Proposed improvements associated with
the project proposal include: the removal of the concrete slabs covering the existing tanks and the drive slab beneath
the fuel canopy; excavation and removal of the existing USTs; removal of the existing dispensers, including the existing
fuel pump islands; removal of the existing fuel distribution system; sawcutting and trenching to accommodate the
installation of new piping and conduits; installation of the new USTs, turbines, and vent box/risers; installation of new
dispensers; installation of new sensors, electrical panel, breakers, wiring and intercom system; installation of a new
air/water unit; and replacement of removed concrete slabs and patch asphalt to match existing pavement. The project
site totals 29,611 square feet and is located within the CA zone and Urban Design District D. No changes in site access
are proposed. No critical areas are mapped on the project site.
DATE OF APPLICATION: January 21, 2020
NOTICE OF COMPLETE APPLICATION: January 29, 2020
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that
significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the
RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued.
Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no
comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only
opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance
of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review,
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Fire Permit
REQUESTED STUDIES: Drainage Report, Geotechnical Report
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Commercial Mixed Use (CMU) on the City of
Renton Comprehensive Land Use Map and Commercial Arterial (CA) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
RE-NOTICE
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR20-000030 7-Eleven UST Replacement/ LUA20-000014
NAME:
MAILING ADDRESS: City/State/Zip:
EMAIL: ______ TELEPHONE NO.: ___
I prefer to receive project information and documents in hard copy via US mail
Development Regulations Used
For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, RMC 4-2-120 and
other applicable codes and regulations as appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing to Jill Ding, Senior Planner; CED – Planning Division,
1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 12, 2020. If you have questions about this proposal,
or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone
who submits written comments will automatically become a party of record and will be notified of any decision on this
project. A copy of the subsequent threshold determination is available upon request.
CONTACT PERSON: Jill Ding, Senior Planner; Tel: (425) 430-6598; Email: jding@rentonwa.gov