Loading...
HomeMy WebLinkAboutNOA_Re-Notice_Project_Acceptance_200128DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE (DNS) A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: January 29, 2020 PROJECT NAME/NUMBER: PR20-000030 7-Eleven UST Replacement/ LUA20- 000014 PROJECT LOCATION: 11505 SE 168th St (APN 2892600051 APPLICANT/PROJECT CONTACT PERSON: Pat Hopper, Barghausen Engineers/18215 72nd Ave South, Kent, WA 98032/phopper@barghausen.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2Gsln8O PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the removal of three (3) 12,000-gallon underground storage tanks (USTs) currently on site and the installation of two (2) replacement USTs, one (1) 15,000-gallon UST for the storage of regular unleaded fuel and one (1) 15,000-gallon split/dual UST for the storage of diesel fuel (8,000 gallons) and premium unleaded (7,000 gallons). Proposed improvements associated with the project proposal include: the removal of the concrete slabs covering the existing tanks and the drive slab beneath the fuel canopy; excavation and removal of the existing USTs; removal of the existing dispensers, including the existing fuel pump islands; removal of the existing fuel distribution system; sawcutting and trenching to accommodate the installation of new piping and conduits; installation of the new USTs, turbines, and vent box/risers; installation of new dispensers; installation of new sensors, electrical panel, breakers, wiring and intercom system; installation of a new air/water unit; and replacement of removed concrete slabs and patch asphalt to match existing pavement. The project site totals 29,611 square feet and is located within the CA zone and Urban Design District D. No changes in site access are proposed. No critical areas are mapped on the project site. DATE OF APPLICATION: January 21, 2020 NOTICE OF COMPLETE APPLICATION: January 29, 2020 OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS. PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Fire Permit REQUESTED STUDIES: Drainage Report, Geotechnical Report CONSISTENCY OVERVIEW: Zoning/Land Use: The subject site is designated Commercial Mixed Use (CMU) on the City of Renton Comprehensive Land Use Map and Commercial Arterial (CA) on the City’s Zoning Map. Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist RE-NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR20-000030 7-Eleven UST Replacement/ LUA20-000014 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ______ TELEPHONE NO.: ___  I prefer to receive project information and documents in hard copy via US mail Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-2-120 and other applicable codes and regulations as appropriate. Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting. Comments on the above application must be submitted in writing to Jill Ding, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 12, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request. CONTACT PERSON: Jill Ding, Senior Planner; Tel: (425) 430-6598; Email: jding@rentonwa.gov