Loading...
HomeMy WebLinkAboutNOA_Project_Acceptance_Mailer__200204DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400065, LUA20-000024 ALEXANDER ROBERTA L PO BOX 59194 RENTON WA 98508 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400155, LUA20-000024 ALLEN WAYNE C 11915 SE 161ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200035, LUA20-000024 ALSHEIKH FARIS Y 11643 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600355, LUA20-000024 ANDERSON JEFF+TAMI 15763 119TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600280, LUA20-000024 ANDERSON R J 15766 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600305, LUA20-000024 ASHELY KEVIN+WALSH TERESA 15786 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600550, LUA20-000024 BAILEY LEO P 15758 117TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600290, LUA20-000024 BARRAUGH SANDRA M 15774 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200090, LUA20-000024 BAUTISTA ROBERTO & GARVEY A 11668 SOUTHEAST 164TH STREET RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400205, LUA20-000024 BELCOURT RODNEY J 16171 120TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200045, LUA20-000024 BENEDETTI JENIFER 11659 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600465, LUA20-000024 BERNAL-PAEZ ERNESTO 15787 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423700600, LUA20-000024 BERTHLAUME CONSTANCE 11603 SE 164TH RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600475, LUA20-000024 BIDMAN JAMES S JR 15779 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000070, LUA20-000024 BITH KONG HENG+SEREYNA U 11420 SE 162ND ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600300, LUA20-000024 BLUE GEORGE E 15782 118TH PL SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000221, LUA20-000024 BOWERS FLOYD & DANEEN 16229 116TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000242, LUA20-000024 BOWERS FLOYD L 16229 116TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400195, LUA20-000024 BRECHT JANET G 16159 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000222, LUA20-000024 BROWN JENNIFER L 11444 SE 164TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400315, LUA20-000024 BROWN MICHAEL T 12006 SE 161ST ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400075, LUA20-000024 BUCKMEIER LLOYD M+MARLENE J 16547 121ST AV SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400040, LUA20-000024 BURROWS DAVID+SUSAN 16107 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600430, LUA20-000024 BUSHONG MARILYN R 183 VASHON PL NE RENTON WA 98059 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200190, LUA20-000024 CAIRNCROSS CHARLES E 11680 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400275, LUA20-000024 CAMPBELL THOMAS E 16152 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423800030, LUA20-000024 CARBAJAL JESUS 11833 SE 164TH PL RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 6673070150, LUA20-000024 CARLILE JARRY R+NANCY L 2409 SE 21ST ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000281, LUA20-000024 CARLSON MARILEE 16220 114TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600255, LUA20-000024 CARROLL R 15774 119TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600485, LUA20-000024 CARROW CRYSTAL 15771 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000075, LUA20-000024 CASCADE CONGREGATION/JEH WT C/O BRIAN MYERS 18127 141ST AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 2023059068, LUA20-000024 CASCADE VISTA FREE METH CH 2201 EDMUNDS AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423700690, LUA20-000024 CAVANAUGH STEVE+KATHIE 2807 MILL AVE S RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600470, LUA20-000024 CHAN RONNIE K 15783 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400105, LUA20-000024 CHARLOT KIRK W 16164 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600180, LUA20-000024 CHESTER DAVID CULLERS 11877 SE 160TH STREET RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000277, LUA20-000024 CINQUE TERRE DEVELOPMENT LL 3800 NE 4TH ST RENTON WA 98056 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400255, LUA20-000024 COJOCAUR ANA+VLADIMIR 16300 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600215, LUA20-000024 CONNER ROBERT S+AUDREY R 11960 SE 160TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400090, LUA20-000024 COOK AUDREY S+GARY D 15346 SE 182ND ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 6673070100, LUA20-000024 COOK RENEE ANN 2307 SE 21ST ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200185, LUA20-000024 CORDERO MARIA A 11674 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400230, LUA20-000024 CRAIG KRISTIN+BRANDON 16329 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000083, LUA20-000024 CUMMINGS PHILLIP D+LEE G 11525 SE 160TH PL RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400165, LUA20-000024 CURULLA LISA A 16119 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600160, LUA20-000024 CWIAK KATHLEEN L 11853 SE 160TH RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000243, LUA20-000024 DANG BICH-THUY T 25515 122ND PL SE KENT WA 98030 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200200, LUA20-000024 DECAMP DANIEL J A & PATRICI 1515 DOCK ST #307 TACOMA WA 98402 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000226, LUA20-000024 DEJESUS ARNELFO+SOLEDAD 11442 SE 164TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000068, LUA20-000024 DELL RYAN PO BOX 1500 MAPLE VALLEY WA 98038 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400010, LUA20-000024 DENT JOHN M+RHONDA E 16147 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400305, LUA20-000024 DOLLAHITE KEITH I DOLLAHITE CARA L 16110 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 6673070130, LUA20-000024 DU NGOC K 2401 SE 21ST ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600185, LUA20-000024 ELIZABETH TRUJILLO 11951 SE 160TH STREET RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600415, LUA20-000024 EWING RENTALS PO BOX 5221 HELENA MT 59604 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000064, LUA20-000024 FARM & HOMES ANDRADE LLC 24414 109TH PLS E RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600330, LUA20-000024 FAUL SANDY PO BOX 58832 RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400190, LUA20-000024 FERREL LARRY 5151 MAE VALLEY RD NE MOSES LAKE WA 98837 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600125, LUA20-000024 FLEMING JAMIE 16020 116TH AE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400245, LUA20-000024 FLORES SIFREDO B 16312 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200155, LUA20-000024 FRANCO RAYMOND M 11632 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000082, LUA20-000024 FUSKERUD DAVID 11515 SE 160TH PL RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000220, LUA20-000024 GALEANO HECTOR+DOLORES+AIDA 11454 SE 164TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000223, LUA20-000024 GARCIA AMOR M+ROSEMARIE F+A 11460 SE 164TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600350, LUA20-000024 GARCIA JESUS JR+MARIA 15767 119TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200025, LUA20-000024 GARDNER JAN+REBECCA 9619 56TH AVE S SEATTLE WA 98118 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000362, LUA20-000024 GERTH A S 11443 SE 164TH RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000365, LUA20-000024 GERTH RHONDA L 11443 SE 164TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600460, LUA20-000024 GIAFFOGLIONE TIANA CUEVAS CLAUDIA 15791 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423700640, LUA20-000024 GO ALBERT M 11635 SE 164TH RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200010, LUA20-000024 GOMEZ BERNARDO V+HENNIE G 11611 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200165, LUA20-000024 GOMEZ ROBERTA+CYNTHIA 16407 116TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000360, LUA20-000024 GOMEZ ROBERTO V+CYNTHIA V 16407 116TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000063, LUA20-000024 GONZALES CARLOS D+CATHLEEN 16020 1/2 114TH ST SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000073, LUA20-000024 GONZALEZ MARIA D 11432 SE 162ND ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000219, LUA20-000024 GRAYER DONNELL 11456 SE 164TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600320, LUA20-000024 GREEN CHELSEA E.+ATHARI ADA 11860 SE 160TH STREET RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200015, LUA20-000024 GREENE MICHAEL 11617 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200020, LUA20-000024 GUAN QING HUA 16138 SE 42ND ST BELLEVUE WA 98006 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600140, LUA20-000024 GUTIERREZ JOSE M JR+REGINA 11711 SE 160TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600295, LUA20-000024 HADDOCK SHIRLEY GAY 15778 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000200, LUA20-000024 HAMILTON ERIC+STONE SHERRI 11438 SE 164TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400170, LUA20-000024 HAMRICK JANELL M 16125 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400160, LUA20-000024 HANEBERG HANS O+SHANNON K 11923 SE 161ST ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200120, LUA20-000024 HANS SUKHVINDER K+KAMALDEEP 11626 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200065, LUA20-000024 HANSEN BETTY LOU 16303 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400095, LUA20-000024 HARPER NATHEN C+REBECCA A 16300 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400225, LUA20-000024 HASANBEGOVIC DAMIR 16321 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000245, LUA20-000024 HASELBLAD LORI J 11445 SE 162ND ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000202, LUA20-000024 HERNANDEZ ROSA 11434 SE 164TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600145, LUA20-000024 HILDEBRANDT BENJAMIN E+CHER 11715 SE 160TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200175, LUA20-000024 HO KAM SAU 360 HOLYOKE ST SAN FRANCISCO CA 94134 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200040, LUA20-000024 HORNBAKER RUSSELL WILLIAM 11651 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200005, LUA20-000024 HU SHU SU 2402 71ST AVE SE MERCER ISLAND WA 98040 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000192, LUA20-000024 HUGHES CRAIG LYNN+KELLY HWA 3716 LAKE WASHINGTON BLVD SE #A BELLEVUE WA 98006 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400310, LUA20-000024 HUGHES MIYA 16102 120TH AV SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400295, LUA20-000024 HULL ANDREW W+RACHEL E 16124 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200150, LUA20-000024 JASON PETERSON 11626 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600165, LUA20-000024 JENNINGS ANDREW & RACHAEL 11859 SE 160TH STREET RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200095, LUA20-000024 JIRSA DAVID L 11660 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400270, LUA20-000024 JOHNSON CARL M 16158 120TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000341, LUA20-000024 JOHNSON JOHNIE B+DEBI K 11433 SE 164TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400280, LUA20-000024 JONES RICHARD C 16144 120TH AV SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400150, LUA20-000024 KESTER K K 11909 SE 161ST ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000072, LUA20-000024 KHAIRA JAINDER&KAUR RANJIT PO BOX 88942 SEATTLE WA 98138 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400135, LUA20-000024 KRULL J BARBARA 16124 119TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423700660, LUA20-000024 KUMAR AMIT+RICHA DHUPAR 11645 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000201, LUA20-000024 LACKIE DANIEL M 11420 SE 164TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600120, LUA20-000024 LATOZKE GERALD P+DEBORAH C 16012 116TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423700700, LUA20-000024 LEBLANC CHERYL JEX 11811 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400260, LUA20-000024 LEE JONCIEN MARY & REAMS RO 16170 120 AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600175, LUA20-000024 LEFFARD CLAIRE E 11871 SE 160TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 6673070140, LUA20-000024 LEMLEM G BERHANE 2405 SE 21ST STREET RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400100, LUA20-000024 LEWIS EDWARD J 16170 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 2023059156, LUA20-000024 LIVING HOPE CHRISTIAN 16015 116TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200030, LUA20-000024 LOCHIO SAEPHANH 11637 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600170, LUA20-000024 LOPEZ DANIEL+KATHY R 11865 SE 160TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423800040, LUA20-000024 MAAS ALLISON+SCHUMACHER KRI 11903 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400145, LUA20-000024 MACKLIN KENNETH L+CYNTHIA L 16108 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400005, LUA20-000024 MAEDA JAIME J DONIS 1624 INDEX CT SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600325, LUA20-000024 MANALO DENNISH P 11868 SE 160TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200055, LUA20-000024 MANULAT PAUL V+RALNA L 11673 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 6673070120, LUA20-000024 MAQUIRAYA CRISOGONO D 2315 SE 21ST ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1431400270, LUA20-000024 MARIANO VALERIE P 12003 SE 160TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600345, LUA20-000024 MARLOW ROBERT RYAN 15771 119TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000282, LUA20-000024 MCCURDY KYLE R+BURGANDI A 16226 114TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200085, LUA20-000024 MEDCALF VALORIE L 11674 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200145, LUA20-000024 MELLON J L 11618 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400220, LUA20-000024 MEN VANTHA+BURY 16313 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600200, LUA20-000024 MICHAEL FOX 11969 SE 160H ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200105, LUA20-000024 MIDDLETON JAPHETH 11644 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1431400070, LUA20-000024 MILLETT JENE DENISE 15744 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600070, LUA20-000024 MISNER R J 15767 117TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000071, LUA20-000024 MOKREN FREDERIC+NGAI-TING C 17251 NE 18TH PL BELLEVUE WA 98008 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600245, LUA20-000024 MONTANO SANTIAGO PENALOZA 15766 119TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600050, LUA20-000024 MOORE BYRON L 15774 116TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600425, LUA20-000024 MORRIS JOSHUA+JUSTINE RYLAH 15868 118TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000081, LUA20-000024 MUZHICHKOV DMITRIY+DINA STO 11505 SE 160TH PL RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200075, LUA20-000024 NACCARATO MICHAEL+EVGENIYA PO BOX 59974 RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423700680, LUA20-000024 NASSET JESSICA LYNN 11655 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200050, LUA20-000024 NECOCHEA RICARDO S+MEREDITH 11667 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400200, LUA20-000024 NELSON DAVID 16165 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400115, LUA20-000024 NEMETH BARRY J+CHRISTINE F 16150 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600340, LUA20-000024 NESS JOSEPH WAYNE+TAUNI O 15775 119TH PL SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 6673070170, LUA20-000024 NGUYEN ADAM DUY 2018 EDMONDS DR SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000363, LUA20-000024 NGUYEN HUE THI 16413 116TH AV SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000062, LUA20-000024 NGUYEN NHI 18312 112TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400290, LUA20-000024 NICHOLLS COLE+DEVON R 16130 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400130, LUA20-000024 NOONAN MAUREEN KELLEY 16130 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600126, LUA20-000024 NORTHWEST PIPELINE PO BOX 2400 MD 46-4 TULSA OK 74102 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200130, LUA20-000024 NUNEZ RICHARD 11600 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200100, LUA20-000024 NUPEN JASON M 11652 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600285, LUA20-000024 ODELL PATSY J 15775 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600480, LUA20-000024 O'DELL ROBERT F & PATSY J 15775 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200160, LUA20-000024 OKEEFE MICHAEL S 11638 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423800020, LUA20-000024 OPSTAD JOHN W 11825 SE 164TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000263, LUA20-000024 OSMAN SAHRA 11431 SE 162ND ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600250, LUA20-000024 OWENS MARCUS M 15770 119TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600155, LUA20-000024 PEELER JOHN E 11725 SE 160TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200135, LUA20-000024 PERRIELLA JACQUELINE+ROBERT 11602 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400060, LUA20-000024 PHILLIPS PATRICIA L 11912 SE 161ST ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200140, LUA20-000024 PHILLIPS WARREN PAUL+KATHLE 11610 SE 163RD RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400020, LUA20-000024 PICH ROTHA & TOUCH YINVANNO 16135 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 6673070110, LUA20-000024 PIEDAD PEDRO B+FLORIDA D 16928 164TH WAY SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600135, LUA20-000024 PINKAEW VICHIEN 1783 BROADWAY RD NORTH POLE AK 99705 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000191, LUA20-000024 PIPKIN DAVID J & JANELL 16230 114TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423700670, LUA20-000024 PITTS MERLIN K 11647 SE 164TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200180, LUA20-000024 PONCE JOSE A+ORTUNO MARIA C 11668 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200110, LUA20-000024 POPOV IVAN 11638 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400035, LUA20-000024 PORTER JEFFREY L 16115 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600045, LUA20-000024 POUNDS STEFFANIE+ LEECHAO CHRIS 15766 116TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400210, LUA20-000024 PRELLWITZ DAVID A 16301 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200115, LUA20-000024 PURSELL CONNIE S 11632 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600435, LUA20-000024 RALPH MICHAEL D & THERESA W PO BOX 58637 RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400045, LUA20-000024 RASMUSSEN JESSICA+TROY 16101 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400025, LUA20-000024 REED RUBEN R 16129 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400285, LUA20-000024 RELPH GAVIN JAMES 16136 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 2823059034, LUA20-000024 RENTON SCHOOL DIST 403 300 SE 7TH ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423800010, LUA20-000024 REYES CIRLAYIN 16207 141ST AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400125, LUA20-000024 RIGTRUP KEITH R 16136 119TH SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600205, LUA20-000024 RNR PROPERTY INVESTMENTS 12819 SE 38TH ST, #416 BELLEVUE WA 98006 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200070, LUA20-000024 ROBERT CHANELL M+CHADWICK K 16311 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400085, LUA20-000024 ROBERTS GLEN C 16312 119TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600225, LUA20-000024 ROEN OFILIA+DANIEL 15775 120TH AV SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423700630, LUA20-000024 ROGERS SHIRLEY PO BOX 28946 SEATTLE WA 98118 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600555, LUA20-000024 ROSAS ROGELIO MORALES+ANTON 15865 118TH AV SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400015, LUA20-000024 ROSS JONATHAN K 16141 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600230, LUA20-000024 SABR NASEER A+SUNDUS K ABAM 15771 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600150, LUA20-000024 SAETEURN DONOVAN 11719 SE160TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600450, LUA20-000024 SAGASTUME MARIA DEL ROSARIO 15799 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600060, LUA20-000024 SAND HARRIET 15783 117TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000264, LUA20-000024 SAPPHIRE HOMES INC 16805 SE 43RD CT BELLEVUE WA 98006 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200195, LUA20-000024 SARAH FOWLER & KHILE KORY 16223 119TH AVENUE SOUTHEAST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600335, LUA20-000024 SCHAFF WILLIAM F+MARGARET 15779 119TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600440, LUA20-000024 SCHULTZ GARY ALAN+SHARON DI 11700 SE 160TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 2923059197, LUA20-000024 SEATTLE CITY OF SPU-WTR 700 5TH AVE STE 4900-RPS PO BOX 34018 SEATTLE WA 98124 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400120, LUA20-000024 SERRANO JESUS R JR 16142 119TH AV SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000261, LUA20-000024 SHAFFER GENE B & LAURIE A 11435 SE 162ND ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600220, LUA20-000024 SHIEH HUGH+ KATHY 21433 SE 33RD PL SAMMAMISH WA 98075 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000244, LUA20-000024 SIEV POHENG V & SAOVRY M 320 LYNNWOOD AVE SE RENTON WA 98056 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000240, LUA20-000024 SIEV POHENG V+SAOVRY M 320 LYNNWOOD AVE SE RENTON WA 98056 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000224, LUA20-000024 SIGNATURE GENERAL CONSTRUCT 14208 4TH AVE S BURIEN WA 98168 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423700610, LUA20-000024 SINGH GURMUKH KAUR RAJWINDER 16410 108TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400215, LUA20-000024 SMITH KARL D PO BOX 39 FREELAND WA 98249 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600115, LUA20-000024 SMITH MARVIN DREWCEL+JESSIC 16004 116TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400300, LUA20-000024 SNYDER JENNIFER LYNN 16118 120TH AV SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400185, LUA20-000024 SOOMANN SHELLEY L 16145 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000065, LUA20-000024 SPAIRRING PETER L+ELENA 16022 114TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 6673070160, LUA20-000024 ST MARIE JON S+ANN L 2020 EDMONDS DR SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000069, LUA20-000024 STIREN MICHELLE L+JOHNSON A 16010 114TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200080, LUA20-000024 STROM ERIK J+JANIKULA CALLI 11680 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600420, LUA20-000024 SUMAOANG TRACY A 15864 118TH AV SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400140, LUA20-000024 SYMONDS LEANNE 16116 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600310, LUA20-000024 TEEL MELODY D 15790 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600190, LUA20-000024 THOMPSON MARK R 11957 SE 160TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600055, LUA20-000024 TRAN MAKADONA+TRAN MAN VAN 15782 116TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400175, LUA20-000024 TRAN SANG M+VONG SAT A 16131 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000193, LUA20-000024 TRIPI JOSEPH A 16318 114TH AVE SE RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600210, LUA20-000024 TUCKER THOMAS A+CHARLENE K 15780 119TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400180, LUA20-000024 TYSON ROBERT HOWARD DIERS 16137 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400265, LUA20-000024 VALENZUELA TIFFANY CHRISTIN 343 CAMBRIDGE DR SAN JACINTO CA 92583 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600040, LUA20-000024 VAN NAM THI 15758 116TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600455, LUA20-000024 VAN VALKENBURG BEVERLY J VAN VALKENBURG PHILIP R 15795 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400050, LUA20-000024 VASQUEZ JORGE R+ANNE E 11900 SE 161ST ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423800050, LUA20-000024 VENERA LINDA PO BOX 59414 RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000241, LUA20-000024 VU LINH D+BICH-THUY T DANG 11457 SE 162ND ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600065, LUA20-000024 WADE LORA D 15775 117TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600410, LUA20-000024 WALKER KRISTINE 15856 118TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400030, LUA20-000024 WALSH KEVIN F PO BOX 2754 RENTON WA 98056 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600235, LUA20-000024 WALTON WILLIAM C+GLORIA D 15765 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423700620, LUA20-000024 WASHINGTON AARON E+JEANETTE 11621 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423700650, LUA20-000024 WATTS SUSAN P 11639 SE 164TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400250, LUA20-000024 WEBSTER WM P 16306 120TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600195, LUA20-000024 WICKS DONALD Q 11963 SE 160TH RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200125, LUA20-000024 WICKSTROM ROGER G PO BOX 59444 RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400070, LUA20-000024 WIESE H OZZIE 7418 121ST AVE SE NEWCASTLE WA 98056 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 6673070180, LUA20-000024 WIESER ROGER P+CARLA J 2402 SE 21ST RENTON WA 98055 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600075, LUA20-000024 WILKEN LORRAINE 15759 117TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600130, LUA20-000024 WILLIAMSON DOMINIC PO BOX 115 TOKELAND WA 98590 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600445, LUA20-000024 WILSON DALE R JR+SHERRY J 11710 SE 160TH ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1432600315, LUA20-000024 WOODS APRIL 15794 118TH PL SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400110, LUA20-000024 WOODS ISAAC 16158 119TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 88000080, LUA20-000024 WORD OF LIFE 16045 116TH AVE SE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200170, LUA20-000024 ZASIMOVICH KATHLEEN MARY 11652 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423200060, LUA20-000024 ZHEN YANQIU+GUO MIAN LING 11679 SE 163RD ST RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024 DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: February 4, 2020 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center/ LUA20-000024, SHPL-A PROJECT LOCATION: 16022 116th Ave SE (APN 2823059034) APPLICANT/PROJECT CONTACT PERSON: Steven Berg, North Peak Associates LLC/17270 Woodinville Redmond Rd NE, Ste 705, Woodinville, WA 98072/stevenb@northpeakassociates.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/36WzttS PERMITS/REVIEW REQUESTED: Short Plat Review PROJECT DESCRIPTION: The applicant is requesting preliminary short plat approval for the subdivision of an existing 14.88-acre site into two (2) lots to construct a community center (Family First Community Center) at 16022 116th Ave SE (APN 2823059034) on the south portion of Renton School District’s (RSD) property. Following five and one-half feet (5 ½’) of right-of-way dedication along 116th Ave SE, the property would be divided as follows: Lot 1 – 128,508 square feet (2.95 acres) and Lot 2 – 515,182 square feet (11.83 acres) with a net density of 0.14 du/ac. The community center would be constructed on Lot 1 and the existing elementary school would remain on Lot 2. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School, supplemental portable classrooms, and related play areas, parking, and mechanical equipment. The proposed 21,100 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker rooms, gym, and fitness programs. The existing parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for two- way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide fully sight- obscuring landscape visual barrier would be provided along the south property line within the construction limits. No 1423400055, LUA20-000024 ZOLNAI MICHAEL 11906 SE 161ST AVE RENTON WA 98058 NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR18-000336 Family First Community Center/LUA20-00024 NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ___________________________________________________ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail critical areas were identified on the site. The applicant is proposing to remove eight (8) significant trees on the existing parcel. Construction of the Family First Community Center is expected to begin in May 2020 and end in July 2021. On December 6, 2019, the project received conditional use permit, site plan, height variance, street waiver, and driveway design modification to construct a community center under LUA19-000212. The applicant submitted a Geotechnical Engineering Report, a Technical Information Report and a Tree Inventory & Retention Plan with the application. DATE OF APPLICATION: January 29, 2020 NOTICE OF COMPLETE APPLICATION: February 4, 2020 Comments on the above application must be submitted in writing to Clark H. Close, Senior Planner; CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on February 18, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PERSON: Clark H. Close, Senior Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov LUA20-000024