Loading...
HomeMy WebLinkAboutPre_ Pre -Aplication Apron E_ meeting summary_190404_v2 .pdf April 5, 2019 Boeing Apron D Expansion for Paint Hangar Building Meeting Minutes April 4, 2019, 2:00-3:00pm Renton City Hall, 6th Floor In attendance: The pre-application meeting covers the City of Renton’s review of the Boeing Apron D Expansion Pre-Application Scope Summary of March 19, 2019. The attached memo containing Fire and Emergency Service comments was read by Corey K, in Corey Thomas’ absence. Rohini read her review comments with regard to water, sanitary sewer, surface water, transportation and general civil, as documented in the attached March 28, 2019 memo. City of Renton would like to review the traffic study two weeks before the SEPA application. The City noted the closure of the north end of Burnett Road, as a consideration in the traffic study. The City indicated the traffic study may undergo a secondary review, by an outside Reviewer. Alex summarized his review comments in the attached April 4, 2019 memo. The review comments discussed in greater length are: the City’s expectation of a parking analysis; an emphasis on aesthetics and low visual impact at the perimeter wall and landscaping. Alex Morganroth / City of Renton Corey Kappelletti/City of Renton Rohini Nair / City of Renton Mark Clement / Boeing Mehdi Nakhjiri/ Boeing Andrew Fitzpatrick/Boeing Jadene Kearney/Boeing Kahsoon Wong / Boeing Brook Emry/Boeing Debbie Jung/KPFF Emily George/KPFF Travis Neu/DOWL Eric Cranston/Rolluda RECEIVED 02/06/2020 amorganroth PLANNING DIVISION April 5, 2019 The review time of SEPA application is estimated to be 14-16 weeks. A public hearing will be required. The City’s reply to Boeing’s request for waivers may be submitted with the SEPA application. The SEPA application needs to include studies on neighborhood impacts such as traffic/parking, lighting, noise, visual aesthetics. The proposed construction schedule is December 2019 through the fourth quarter of 2021.