HomeMy WebLinkAboutFire Main - Fire Bypass Backflow Cert.pdfReturn Report lnformation
By Mail: Mick Holte, Cross Connection Control Program
Utility Systems, 1055 South Grady Wa¡ 5th Floor
Renton, WA 98057
, ByFax 425-430-724L
By Email: mholte@rentonwa.sov
Any questions, contact Mick at 425-430-7207 or by email
ent öäe
Public \.Volks
ACCOUNT It
Backflow Prevention Assembly Test Report
P,srnax¡
NAME OF PREMISE
SERVICE ADDRESS
CONTACT PERSON
LOCATION OF ASSEMELY
DOWNSTREAM PROCESS
CITY alD
/Residentialtr%s(
FAX( )
{*r"on PVBA fl orHER-DCVA./
NEW rNsrALL Mexrsrrrue E ncpncEnnENï E oLD sER. s PROPER INSTALLATION? YES M/NO-tr
MAKE OF ASSEMBLY DEL NO.
INIT]AL
TEST
PASSED y'
FAILED T]
AIR GAP INSPECIIONT Required minimum air gap separation provided? Yes E No tr Detector Meter Reading oM),4
REMARKS:9ry36þ t{ffi-d æfr4 I n*l NE PRESSURE bS '',
SPACE? \IO
DCVA / RPBA
CHECK VALVE NO.l
lrnrro EI
D
pcvA / RPBA
CHECK VATVE NO.2
ucer¡o fl
L
RPBA
OPENED AT- PSID
#l CHECK_PSID
AIR GAP OK?
-
PVBA/SVBA
AIR INLFT
0PENED AT_PSrD
DID NOT OPEN tr
NËW
PARTS
AND
REPAIRS
CI,EAN REPI.ACÉ PART
tr
E
tr
E]
tr
n
tr
E
CTEAN REPI.ACE PAßT
n
EI
EI
tr
trtr
tr
tr
CLEAN RÊPLACÊ PARI
tr
trn
E
u
E]
Eu
CHECK VALVE
HELD AT
-PSID
LEAKED EI
CLEANED
REPAIRED
TEST AFTER
REPAIRS
PASSED tr
FAILED tr
LEAKED tr
-.-P5ID
LEAKED tr
PSID
OPENED AT-PSID
fll CHECK _PSID
AIR INLET- PSID
CHK VALVE . PSID
TESTERS SIGNATU
TESTERS NAME PRINTED:
REPAIRED BY:
CERT. NO.
TESTERS PHONE # (4â ZSvSh r+
t
/rNAL TEST CERÏ. NO.
cALTBRAToN oarc 02 I&-.:ß-GAUGE * l7¡u435 vioo SERVICE RESTORED? "'
y'*O N
I cenify that this report is accurate, ond t have used WAC 246-290-490 opproved test methods and test equipment.
Return Report lnformation
By Mail: Mick Holte, Cross Connection Control Program
Utility Systems, 1055 South Grady Way, 5'h Floor
Renton, WA 98057
ByFax 425430-7?41
By Email: mholte@rentonwa.sov
Any questions, contact Mick at 425-430-7207 or by email
ent öäÐ
Public \\¡olks
Backflow Prevention Assembly Test Report
ACCOUNT it
NAME OF PREMISE fblR/esidential trmslo4 E E-lf 'Pçø€Pg-tÏãJ 2lPSERVICE ADDRESS
CONTACT PERSON
LOCATION OF ASSEMBLY
DOWNSTREAM PROCESS ÉeE Sffi{l.t
NEW rNsrALL ú*,rr,*n E RrpucErv¡ENT El oLDsER. #
REMARKS: PåSS*Ð
N!pHoNE& 61L'noSS ,ort )
ocvn ,bl nran n PVBA D orHER- :--:-
PROPER INSTALLATIONI VCS frO tr
+E PREssuRE ØS ,r'
CONFINED sPACE? [[C
MAKE OF ASSEMBLY EL NO.
INITIAT
TEST
P^SSED ú
FAITED tr
AIR GAP INSPECIION: Required minimum air gap separation provided? Yes E No E Detector Meter Reading M)"öl
DCVA / RPBA
CHECK VATVE NO.l
uRr¡o El
3,0 ,r,,
DCVA / RPBA
CHECK VALVE NO.2
uer¡o E
3,L ,,,,
RPBA
OPENED AT- PSID
#1 CHECK _PslD
AIR GAP OK?
-
PVBA/SVBA
AIR INLFT
oPENED AT_PSrD
oio r,¡or opr¡u tr
NEW
PARTS
AND
REPAIRS
CI.EAN REPIACE PA¡T
tr
tr
EI
tr
trn
E
EI
CTEAN REPIAC€ PASI
EI
E
EI
tr
tr
tr
tr
tr
CteAN R€PLACE PART
tru
n
tr
tr
tr
E¡
EI
CHËCK VALVE
HELD AT
-PSID
LEAKED E
CLEANED
REPAIRED
u
tr
TEST AFTER
REPAIRS
PASSED tr
FAILED E
LEAKED tr
PSID
LEAKED tr
__PStD
OPENED AT-PSID
#1 CHECK _PSID
AIR INLET
-
PSID
CHK VALVE PSID
TESTERS SIGNATURE
TESTERS NAME PRINTED:
REPAIRED BYI
CERT. NO.
rEsrERs PHoNE "&S I 7<S -9Lrt
iiINAL TEST
SERVICE RESTORED? "' {*O ACALI
Ntn CERT. NO.
opproved test methads and test equipment'
itw
ù.tuúFdotu¡@ùtuúDù2úã
BACKFLOW ASSEMBLY TESTER
VALIDATIONCARD
FOR CERTIFICATE OF COMPETENCY
CERTIFICATE NUMBER VALID FOR YEAR
BE IT KNOWN TEAT TIE WASIIINGTON STATE DEPÀRTIIilENT OF TIEALTII IIAS RDCOGNIZEI':
81253 2019
Marilyn E. Edlund
AS A CERTIFIED BÁCKFLOW ASSEMBLY TESIER
,_)
Gal i brati on Certifi cate
Gustomer:Edlund Associates. lnc.
Unit Under Test (UUTI
Manufacturer: Mid-West
Serial Number: 12121935
Model 845-5
Gauge Range:0-15 PSID
Calibration lnformatlon
callbration lnstrument: DP¡ 610
serlat Number: 61059948
N.l.S.T. Traceable
Order Number 356281
Relative Humidity:
Temperature:
42o/o
78
Fail Pass
Pass Pass
Pass Pass
Pass Pass
Pass Pass
Permissible Deviation: 1+ or -) 0.2 PSID
Prqcedures utllized were in accordance with the USC FCCCHR Mangal of Cross-Connection Control 1Oth Ed
Appendix A and manufacturer's requirements. The remaining items in the test kít, if included (needle valves,
hoses, etc.) were evaluated and pressure tested.
Calibration Points
9 PSID
7 PSID
5 PSID
2 PSID
1 PSID
As found Status As Left Status
Date: 2/8/2019CertifiedGonéonat
7.O
1.0
o.
7580-A West Tennessee Strôet
Tallahassee, Florída 32304
850-575-961 I Far850-575-6508
wwwbackflowparts.com