HomeMy WebLinkAbout1692_001.pdfEarth Solutions NWLLC
ESNW Rep.
Project No.
Page
Report No-
-
TMJ
0895.06
1 of 1
133
15365 NE 901h Street, Suite 100
Redmond, WA 98052
Time On Site
Time Off Site
Date
Da of Week
y
Main (425) 449-4704 1 Fax (425) 449-4711
12:OOPM
12:30PM
2/17/20
Monday
www.esnw.com
Travel Time
Weather
DAILY FIELD REPORT
1.5 Hr. RT
42 F, Sun
Project Name
Job Location
Client/Owner
Weatherly Inn
4500 Talbot Rd. S., Renton
RJ Development,
LLC
Contractor #1
Contact
Field Supervisor 1
Reviewed
Rino Construction
Mike
M I
g
Contractor #2
Contact
Project Manager
Reviewed
AC
Are approved plans/permits on site? Project No. Permit No.
At the client's request, ESNW rep was onsite to test pH and turbidity of stormwater.
Test pH of Stormwater:
ESNW representative took pH and NTU tests of stormwater. In the filler baker tanks, ESNW representative
observed: 10.74 and 16.12 NTUs. ESNW representative observed contractor added dry ice to lower the pH level.
ESNW representative observed that pH level was contained onsite.
ESNW rep. will return to observe earthwork activities when requested by client.
Trevor Johnson
ESNW Field Technician
206-468-9751
y Earth Solutions NWLLC
15365 NE 9011 Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
TW www esnw com
CONSTRUCTION STORMWATER
GENERAL PERMIT - FIELD REPORT
ESNW Rep.
Page
Report No.
AK
0895.06
1 of 2
134a
Time On Site
Time Off Site
Date Day of Week
11:30 AM
11:45 AM
2/18/20 Tuesday
Reviewed
WAR-307963
Project Name
1
Weatherly Inn 4500 Talbot Rd. S., Renton
RJ Development, LLC J
Erosion Control BMPs
Overall
Needs
(13 Elements)
Condition
Repair?
Comments
(Good; Fair; Poor)
Les; No)
1. Preserve Vegetation; Mark Clearing Limits
• Buffer Zones around Sensitive Areas
G
N
Silt fence working as intended
• Silt Fence
2. Establish Construction Access
• Fabric; Quarry Spalls
G
N
Sweep roadway when soil is seen on surface.
• Wheel Wash
replenish quarry spalls as needed
• Sweeper Truck
3. Control Flow Rates
• Stormwater Vault or Facility
G
N
Add check dams and straw wattles as needed to
• Straw Wattles
slow stormwater onsite
• Check Dams
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers
• Vegetation
• Straw
G
N
Add straw as needed throughout the site, 2"
• Sediment Ponds, Traps & Filters
minimum
• Treatment
• Sediment Pond (Temp or Perm.)
• Water Truck
5. Stabilize Soils
• Nets & Blankets
• Mulch, Bark & Rock
• Hydroseeding; Grass
G
N
• Plastic Sheeting
• Straw Stockpiles
• Stockpiles
• PAM
6. Protect Slopes
G
N
• Benching; Track -Walking
• Pipe Slope Drains
• Plastic Sheeting; Anchors
7. Protect Drain Inlets
• Catch Basin Inserts
G
N
CB inserts working as intended
• Gutter; Road
N/A
8. Stabilize Channels and Outlets
N/A
N/A
• Channel Lining
• Check Dam
• Outlet Protection
• Nets and Blankets
9. Control Pollutants
N/A
N/A
N/A
• Chemical Storage Area Covered
• Concrete Handling
10. Control Dewatering
N/A
N/A
N/A
11. Maintain BMPs
G
N
See recommended notes
12. Maintain SWPPP & Site Logbook
G
N
Available upon request
13. Protect Low -Impact Development (LID BMPs)
• Bioretention Rain Garden Facilities
• Permeable Pavement
N/A
N/A
N/A
Earth
sollut-011"
%W 11 r
Earth Solutions NWLLc
15365 NE 9011 Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw.com
ESNW Rep.
Page
Report No.
AK
0895.06
2 of 2
134a
Time On Site
Time Off Site
Date
Day of Week
11:30 AM
11:45 AM
2118/20
Tuesday
Reviewed
WAR-307963
CONSTRUCTION STORMWATER
GENERAL PERMIT - FIELD REPORT
Project Name
Weatherly Inn
4500 Talbot Rd. S., Renton
RJ Development, LLC
Monitoring, Records & Recommendations
Will existing BMPs need to be modified or removed, or will other BMPs need to be installed?
❑ Yes 0 No
List the completed, not -yet -completed, or ongoing action items in the table below:
Actions Items
Completed?
Date
LYes; No; Ongoing)
(If Completed)
Sweep site entrance when soil is seen on roadway
Ongoing
Add 2" straw throughout the site over exposed soils as needed
Ongoing
Replenish quarry spalls at the main entrance to the site as needed
Ongoing
Replace plastic sheeting on exposed slopes as needed
Ongoing
Current Weather: 40sO F. Clear
Precipitation since last inspection (approximate): 0_19 inches
Precipitation in the last 24 hours (approximate): 0.00 inches
Was water quality sampling part of this inspection? ❑ Yes Q No
If "Yes":
• Record results in the table below.
• Characterize the stormwater discharge, e.g., the presence of suspended sediment, "cloudiness", discoloration, or oil sheen, if
present: .. N/A
• Hanna Turbidity Meter #
TurbiditypH
Monitoring Location
Notes
Is the site in compliance with the SWPPP and the permit requirements? 0 Yes ❑ No
If "No":
• Indicate the tasks necessary to bring the site into compliance in the table above
• Has the non-compliance been reported to the Department of Ecology? ❑ Yes ❑ No
• Should the SWPPP be modified? ❑ Yes ❑ No
"This is true, to best knowledge "
`r
report accurate, and complete the of my and belief
Inspector Name: Andrew Kimn CESCL Number: CESCL-EF8183912
Inspection Date: 2/18/20