HomeMy WebLinkAbout1692_001.pdfEarth Solutions NWLLC ESNW Rep. Project No. Page Report No- - TMJ 0895.06 1 of 1 133 15365 NE 901h Street, Suite 100 Redmond, WA 98052 Time On Site Time Off Site Date Da of Week y Main (425) 449-4704 1 Fax (425) 449-4711 12:OOPM 12:30PM 2/17/20 Monday www.esnw.com Travel Time Weather DAILY FIELD REPORT 1.5 Hr. RT 42 F, Sun Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC Contractor #1 Contact Field Supervisor 1 Reviewed Rino Construction Mike M I g Contractor #2 Contact Project Manager Reviewed AC Are approved plans/permits on site? Project No. Permit No. At the client's request, ESNW rep was onsite to test pH and turbidity of stormwater. Test pH of Stormwater: ESNW representative took pH and NTU tests of stormwater. In the filler baker tanks, ESNW representative observed: 10.74 and 16.12 NTUs. ESNW representative observed contractor added dry ice to lower the pH level. ESNW representative observed that pH level was contained onsite. ESNW rep. will return to observe earthwork activities when requested by client. Trevor Johnson ESNW Field Technician 206-468-9751 y Earth Solutions NWLLC 15365 NE 9011 Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 1 Fax (425) 449-4711 TW www esnw com CONSTRUCTION STORMWATER GENERAL PERMIT - FIELD REPORT ESNW Rep. Page Report No. AK 0895.06 1 of 2 134a Time On Site Time Off Site Date Day of Week 11:30 AM 11:45 AM 2/18/20 Tuesday Reviewed WAR-307963 Project Name 1 Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC J Erosion Control BMPs Overall Needs (13 Elements) Condition Repair? Comments (Good; Fair; Poor) Les; No) 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas G N Silt fence working as intended • Silt Fence 2. Establish Construction Access • Fabric; Quarry Spalls G N Sweep roadway when soil is seen on surface. • Wheel Wash replenish quarry spalls as needed • Sweeper Truck 3. Control Flow Rates • Stormwater Vault or Facility G N Add check dams and straw wattles as needed to • Straw Wattles slow stormwater onsite • Check Dams 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation • Straw G N Add straw as needed throughout the site, 2" • Sediment Ponds, Traps & Filters minimum • Treatment • Sediment Pond (Temp or Perm.) • Water Truck 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass G N • Plastic Sheeting • Straw Stockpiles • Stockpiles • PAM 6. Protect Slopes G N • Benching; Track -Walking • Pipe Slope Drains • Plastic Sheeting; Anchors 7. Protect Drain Inlets • Catch Basin Inserts G N CB inserts working as intended • Gutter; Road N/A 8. Stabilize Channels and Outlets N/A N/A • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets 9. Control Pollutants N/A N/A N/A • Chemical Storage Area Covered • Concrete Handling 10. Control Dewatering N/A N/A N/A 11. Maintain BMPs G N See recommended notes 12. Maintain SWPPP & Site Logbook G N Available upon request 13. Protect Low -Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement N/A N/A N/A Earth sollut-011" %W 11 r Earth Solutions NWLLc 15365 NE 9011 Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 1 Fax (425) 449-4711 www esnw.com ESNW Rep. Page Report No. AK 0895.06 2 of 2 134a Time On Site Time Off Site Date Day of Week 11:30 AM 11:45 AM 2118/20 Tuesday Reviewed WAR-307963 CONSTRUCTION STORMWATER GENERAL PERMIT - FIELD REPORT Project Name Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC Monitoring, Records & Recommendations Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? ❑ Yes 0 No List the completed, not -yet -completed, or ongoing action items in the table below: Actions Items Completed? Date LYes; No; Ongoing) (If Completed) Sweep site entrance when soil is seen on roadway Ongoing Add 2" straw throughout the site over exposed soils as needed Ongoing Replenish quarry spalls at the main entrance to the site as needed Ongoing Replace plastic sheeting on exposed slopes as needed Ongoing Current Weather: 40sO F. Clear Precipitation since last inspection (approximate): 0_19 inches Precipitation in the last 24 hours (approximate): 0.00 inches Was water quality sampling part of this inspection? ❑ Yes Q No If "Yes": • Record results in the table below. • Characterize the stormwater discharge, e.g., the presence of suspended sediment, "cloudiness", discoloration, or oil sheen, if present: .. N/A • Hanna Turbidity Meter # TurbiditypH Monitoring Location Notes Is the site in compliance with the SWPPP and the permit requirements? 0 Yes ❑ No If "No": • Indicate the tasks necessary to bring the site into compliance in the table above • Has the non-compliance been reported to the Department of Ecology? ❑ Yes ❑ No • Should the SWPPP be modified? ❑ Yes ❑ No "This is true, to best knowledge " `r report accurate, and complete the of my and belief Inspector Name: Andrew Kimn CESCL Number: CESCL-EF8183912 Inspection Date: 2/18/20