Loading...
HomeMy WebLinkAbout20200221145906.pdfUrth lult>��n ►it. Earth Solutions NW, LLC LETTER OF TRANSMITTAL To: RJ Development 401 Central Street SE Olympia, WA 98501 Attn: Mr. Duane Meyer Email: duaneAaccrete.build No. of Comments: CC: 1. John Wilson ATTN: 2: Mark Richardson ATTN: 3: Jeff Brain ATTN: 4: Jennifer Vo ele ATTN: 5: Jonathan Chavez ATTN: 6: Joe W ATTN: Transmitted By: Earth Solutions NW, LLC PM: Scott Riegel, L.G., L.E.G. Date: February 21, 2020 ESNW No.: ES- 895.06 Project: Weatherly Inn ohnwa.rinocon.com mark _accrete. build ieff accrete. bu i I d jennifer@accrete. bu i I d ichavez rrentonwa.gov oew accrete. build 15365 NE 90th Street, Suite 100 Redmond, WA 98052 (425) 449-4704 FAX (425) 449-4711 .J?-'1'4� Earth Solutions NW«C ESNW Rep. Project No. Page Report No SZS/AK ES-0895.06 1 of 1 134 15365 NE 90"' Street, Suite 100 i Redmond, WA 98052 Time On Site Time Off Site Date Da of Week Y Main (425) 449-4704 1 Fax (425) 449-4711 12:00 pm 3:00 pm 2/19/20 Wednesday www.esnw com Travel Time Weather DAILY FIELD REPORT 1.25 Hour RT Clear, 50s F Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor#1 Contact Field Supervisor Reviewed Rino Construction Mike LAC 1�,aR"_Z114 Contractor#2 Contact Project Manager Reviewed RAC Are approved plans/permits on site? Project No. Permit No. Yes Supplementary Report At the client's request, ESNW rep. was onsite to observe condition of cut slopes and test pH of stormwater and footing excavation backfill. Cut Slope Observations: While onsite, ESNW rep. observed the south slopes of the cut slopes to be near vertical at a ratio of H0.75:V1. Although over - steepened, slopes are stable in current configuration and stable to work within. At the time of visit, no changes were observed in the conditions of the cut slopes. The contractor is responsible for providing all safety measures in accordance with state and federal regulation Test pH of Stormwater: While onsite, ESNW rep took pH tests to determine the pH of stormwater. In the filled baker tanks, ESNW rep. observed <25 NTU in a baker tank. ESNW rep. observed the contractor added dry ice to the baker tank to lower the pH level. ESNW rep. observed that pH level was contained onsite. Footing Excavation Backfill: While onsite, ESNW rep. observed contractor bucket mixing cement mix with saturated native fill material. Cement treated footing excavation backfill was placed in approx. 12-inch loose lifts and thoroughly compacted with a medium sized hoepack. ESNW rep. will return as requested by client. Stuart Sullivan Field Technician (206) 945-3348 AV Photo 1: Cement treated fill material backfill and compaction operations in progress.