Loading...
HomeMy WebLinkAboutMFP20000484.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20000484 IVR Number: 20000484 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :02/04/2020Application Date:1463400055Parcel Number:13805 156TH AVE SE Permit Type:02/26/2020Issue Date:Franchise Permit Work Class:02/25/2021Expiration Date:Minor Utility Job Number:186584324Franchise Type:Electric Description:EMERGENCY AFTER THE FACT REPLACE POLE HIT AND DAMAGED BY CAR . VAC USED. 1 POLE SET, 1 POLE REMOVED, TEMP TRANSFERS MADE. NOT HS CUTS. PLEASE SEE ATTACHED . RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (425) 892-0416ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contact DONNELLY KEITH E+SHIRLEY C 13805 156TH AVE SE RENTON , WA 98059 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES MFP20000484 RESTORATION PER CITY OF RENTON STANDARDS MFP20000484 MFP20000484