Loading...
HomeMy WebLinkAboutMFP20000918.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20000918 IVR Number: 20000918 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :02/27/2020Application Date:3345100030Parcel Number:2100 NE 31ST ST Permit Type:03/02/2020Issue Date:Franchise Permit Work Class:03/02/2021Expiration Date:Minor Utility Job Number:593218024Franchise Type:Electric Description:Puget Sound Energy 593218024 EMERGENCY, AFTER THE FACT. AT 319261 166454 CREW EXCAVATED IN SOFT SURFACE TO STRAIGHTEN LEANING POLE RESTORATION PER CITY OF RENTON STANDARDS Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (425) 892-0416ApplicantX Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contact NICHOLSON ROBERT D+HUSTON K 2100 NE 31ST ST RENTON , WA 98056 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES