HomeMy WebLinkAboutERC_Notice_Determination_200303DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
PLEASE FOLLOW THE DOCUMENT CENTER LINK TO SEE ASSOCIATED PROJECT DOCUMENTS.
IF YOU NEED ADDITIONAL ASSISTANCE YOU MAY CONTACT THE CITY OF RENTON,
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT AT (425) 430-7200, EXT. 2.
DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION.
OF ENVIRONMENTAL DETERMINATION
ISSUANCE OF A DETERMINATION OF NON-SIGNIFICANCE (DNS)
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
DNS: THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED
ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE ENVIRONMENT.
DATE OF NOTICE OF ENVIRONMENTAL
DETERMINATION:
March 3, 2020
PROJECT NAME/NUMBER: PR20-000030 7-Eleven UST Replacement/
LUA20-000014
PROJECT LOCATION: 11505 SE 168th St (APN 2892600051
APPLICANT/PROJECT CONTACT PERSON: Pat Hopper, Barghausen Engineers/18215 72nd Ave South, Kent, WA
98032/phopper@barghausen.com
LOCATION WHERE APPLICATION MAY BE
REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also http://bit.ly/2Gsln8O
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the removal of
three (3) 12,000-gallon underground storage tanks (USTs) currently on site and the installation of two (2) replacement
USTs, one (1) 15,000-gallon UST for the storage of regular unleaded fuel and one (1) 15,000-gallon split/dual UST for the
storage of diesel fuel (8,000 gallons) and premium unleaded (7,000 gallons). Proposed improvements associated with
the project proposal include: the removal of the concrete slabs covering the existing tanks and the drive slab beneath
the fuel canopy; excavation and removal of the existing USTs; removal of the existing dispensers, including the existing
fuel pump islands; removal of the existing fuel distribution system; sawcutting and trenching to accommodate the
installation of new piping and conduits; installation of the new USTs, turbines, and vent box/risers; installation of new
dispensers; installation of new sensors, electrical panel, breakers, wiring and intercom system; installation of a new
air/water unit; and replacement of removed concrete slabs and patch asphalt to match existing pavement. The project
site totals 29,611 square feet and is located within the CA zone and Urban Design District D. No changes in site access
are proposed. No critical areas are mapped on the project site.
THERE IS NO AGENCY APPEAL.