HomeMy WebLinkAboutMFP20000627.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP20000627
IVR Number: 20000627
Permit Informaon
Permit Name:Puget Sound Energy - ELECTRIC - 601 MONSTER RD SW
Address/Locaon :02/12/2020Application Date:2423049008Parcel Number:601 MONSTER RD SW
Permit Type:03/04/2020Issue Date:Franchise
Permit Work Class:03/04/2021Expiration Date:Minor Utility
Job Number:101120691Franchise Type:Electric
Description:Puget Sound Energy 101120691 AT GRID 317610 165178 CREW TO PARK IN ROW. AT J01(317588 165175)
CREW TO PARK IN ROW AND UPDATES ELBOWS IN EXISTING JBOX . AT J02(317581 165179) CREW TO UPDATE
ELBOWS. AT V02A(317581 165179) CREW TO REMOVE MINIPAD AND RELOCATE TRANSFORMER TO V 02B.AT
V02B(317580 165178) CREW TO INSTALL NEW VAULT AND TRANSFER SERVICES FROM V 02A. POTHOLE ALL
EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS .
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (425) 892-0416ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contact
Marita Bond
Puget Sound Energy - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 395-6346Specialized
Billing
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
PROLIGIS
601 MONSTER RD SW
TBD TBD TBD TBD
SEE ATTACHED
POTELCO, INC 425 892 0416
DAVE HONEYSETT DAVE.HONEYSETT@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP20000627
Scott Warlick C.E.D 2/28/2020
8:00AM - 3:00PMMonday - Friday
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG 02/12/2020
1212
MO
N
S
T
E
R
R
D
S
W
OA
K
E
S
D
A
L
E
A
V
E
S
W
MONSTER RD SW1311ONLYONLY111316var12ONLY1211121215
1
2
1
1
1313
POLICEUPO
THE CREW SHALL CEASE
WORK FOR A FLAGGER/SPOTTER
TO ESCORT PEDESTRIANS
AROUND THE WORK AREA W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'
350'
350'
W2
0
-
7
AROADWORKAHEADW2
0
-
1
BEPREPAREDTOSTOPW3-
4
350'
350'
350'
ROAD
WORK
AHEAD W20-1W20-7ARIGHT LANE
CLOSED
AHEAD W20-5R100'100'100'LEFT
KEEP
R4-8Bmaintain (2) 11' lanesSIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
UNIFORMEDPOLICE OFFICERPOLICE
STOP
UG BOX/VAULTVault
CHEVRONARROW BOARD
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
PSE PUGETSOUNDENERGY
JOB101120691
601 MONSTER RD SW
REVISED 02/04/20
JOHN.CROFOOT@PSE.COM
425-424-6658
SHEET 1 of 4
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
N
MFP20000627
1212
MO
N
S
T
E
R
R
D
S
W
OA
K
E
S
D
A
L
E
A
V
E
S
W
MONSTER RD SW1311ONLYONLY111316var12ONLY1211121215
1
2
1
1
1313
J01
POLICEUPO W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'
350'
350'
W2
0
-
7
AROADWORKAHEADW2
0
-
1 BEPREPAREDTOSTOPW3-
4
350'
350'
350'
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE LEFTKEEPR4-8BRIGHTKEEPR4-7Bmaintain (2) 11' lanesROAD
WORK
AHEAD W20-1W20-7ALEFT LANE
CLOSED
AHEAD W20-5L100'100'100'SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
UNIFORMEDPOLICE OFFICERPOLICE
STOP
UG BOX/VAULTVault
CHEVRONARROW BOARD
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
PSE PUGETSOUNDENERGY
JOB101120691
601 MONSTER RD SW
REVISED 02/04/20
JOHN.CROFOOT@PSE.COM
425-424-6658
SHEET 2 of 4
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
N
MFP20000627
1212
MO
N
S
T
E
R
R
D
S
W
OA
K
E
S
D
A
L
E
A
V
E
S
W
MONSTER RD SW1311ONLYONLY111316var12ONLY1211121215
1
2
1
1
1313
W20
-
1 ROADWORKAHEADW20-1ROADWORKAHEADJ02
V02A
STOP
FLAGGER
STOP
FLAGGERW20-7AW20-4ONE LANEROADAHEADX'X'USE MAXIMUM AVAILABLE
SPACE FOR SIGNS
W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
UNIFORMEDPOLICE OFFICERPOLICE
STOP
UG BOX/VAULTVault
CHEVRONARROW BOARD
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
PSE PUGETSOUNDENERGY
JOB101120691
601 MONSTER RD SW
REVISED 02/04/20
JOHN.CROFOOT@PSE.COM
425-424-6658
SHEET 3 of 4
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
N
MFP20000627
1212
MO
N
S
T
E
R
R
D
S
W
OA
K
E
S
D
A
L
E
A
V
E
S
W
MONSTER RD SW1311ONLYONLY111316var12ONLY1211121215
1
2
1
1
1313
ARRW-BRD
OTHE
R
SI
D
E
S/W C
L
O
S
E
DSIDEWALKCLOSEDR9-9
PLACE SIGN AT
BEGINNING OF
SIDEWALK
ROADWORKAHEADW20-1350'
350'
350'RIGHT LANECLOSEDAHEADW20-5RW4-2LW20
-
1 ROADWORKAHEAD350'
PLACE SIGNS ALONG
WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR
K
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
UNIFORMEDPOLICE OFFICERPOLICE
STOP
UG BOX/VAULTVault
CHEVRONARROW BOARD
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
PSE PUGETSOUNDENERGY
JOB101120691
601 MONSTER RD SW
REVISED 02/04/20
JOHN.CROFOOT@PSE.COM
425-424-6658
SHEET 4 of 4
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
N
MFP20000627
NO
NO
NO
ABOVE
BELOW
NOTE
ABOVE
BELOW
NOTEVVCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT COMPACTCOMPACTCOMPACTCOMPACT
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTTAG
NOTE
TAG
NOTE
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTD
D
D
D
D
D
D
D
317631-165117
317631-165117
317624-165137
317620-165149
317629-165143
317614-165165
317607-165164
317610-165180 317610-165177
U3378
317610-165178
317609-165178
317609-165178
317609-165178
MON
S
T
E
R
R
D
S
W
MO
N
S
T
E
R
R
D
S
W
MONSTER RD SW"610"
317588-165175
317606-165155
317606-165125
750kVA 277/480V
N.O.
REMOVE
317587-165175
317581-165179
25kVA 120/240V
317580-165178
25kVA 120/240V 317579-165179
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
PROLOGIS LP
12720 GATEWAY DR, SUITE 110
TUKWILA, WA 98168
JUSTIN KIRK 206-414-7625
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
EAR-15
2019
127 126 116
NEW_A NEW_B NEW_C
TTL_A TTL_B TTL_C
N/A 108114172
N/A 586029061
N/A 594128518
N/A N/A
N/A N/A
N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DAVE HONEYSETT
253-245-0883
DAVE.HONEYSETT@PSE.COM
SCALE: 1" = 50'101120691THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
DAVE HONEYSETT 253-245-0883 10/28/19
JUSTIN HANG 253-508-7880 10/28/19
N/A N/A N/A
JUSTIN HANG 253-508-7880 10/28/19
REQUIRED CITY OF RENTON
PROLOGIS
PRIMARY LINE EXTENSION AND SET 2000A CT'S & METERS
601 MONSTER ROAD SW, RENTON, WA 98057
N/A N/A
N/A 101120691
N/A 1/2
KING N/A N/A CSPSKEIN
T23N, R04E, SEC 24 NW N/A N/A
A2304E094 D2305E076 R2304E094 EAR-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
101120691
N/A
N/A
505955067
N/A
JOB SITE
SITE SPECIFIC NOTES
J01 GRID NUMBER 317588-165175:
-EXISTING J-BOX AND VAULT TO REMAIN
-REMOVE EXISTING ELBOWS WITH CABLE TAGS AØAFD358, BØAFD359, & CØAFD360
-INSTALL 3 - 12KV ELBOW KITS (6041.1000, ELB10J)
-INSTALL CABLE TAGS AØX_______, BØ______, & CØ_______
M01 GRID NUMBER 317587-165175:
-POTELCO & PSE METERING DEPARTMENT TO REMOVE ASSOCIATE PRIMARY METER EQUIPMENT
-REMOVE EXISTING ELBOWS WITH CABLE TAGS AØAFD358, BØAFD359, & CØAFD360
-REMOVE EXISTING PRIMARY METER CABINET
-REMOVE/ABANDON EXISTING PRIMARY METER VAULT & LID
PV1 GRID NUMBER317606-165155:
-INSTALL 575 VAULT W/ ADJUSTABLE ANTI-SKID COVER LID (6051.1500, SVTDAAS)
-INSTALL 3 - 12kV 1/0 AL SOLID SPLICE KIT (6041.2000, SPL10J)
-INSTALL CABLE TAGS AØX_______, BØ______, & CØ_______
-INSTALL GRID NUMBERS 317606-165155
V01 GRID NUMBER 317606-165125:
-INSTALL 776 VAULT W/ 8' SQ COVER W/ 60" X 24" ACCESS (6045.5000, PM3P15M)
-INSTALL 750kVA 277/480V PM TRANSFORMER (MID: 6259300)
-INSTALL 3 - 12KV ELBOW KITS (6045.5000, ELB10J)
-INSTALL XX' - 4POS SECONDARY CONNECTOR BARS (MID:_______)
-INSTALL XX' - CONNECTOR MOUNTAIN BOLT KIT
-CONNECT XX - RUNS OF CUSTOMER PROVIDED, OWNED, & MAINTAINED ______ QUAD
M02:
-PSE METERING DEPARTMENT TO INSTALL 1 - 400A CT'S & METER
-PSE METERING DEPARTMENT TO INSTALL 1 - 200A CT'S & METER
J02 GRID NUMBER 317579-165179:
-REMOVE EXISTING ELBOWS FROM V02A
-INSTALL 1 - 12kV ELBOW KIT TOWARDS V02B
V02A GRID NUMBER 317581-165179:
-RELOCATE EXISTING 25kVA 120/240V PADMOUNT XMFR TO V02B
-REMOVE EXISTING MINIPAD HANDHOLE
V02B GRID NUMBER 317580-165178:
-IINSTALL UNISTRUT MINIPAD HANDHOLE VAULT
-TRANSFER & INSTALL 25kVA 120/240V FROM V02A
-CONNECT ALL EXISTING SERVICES
SPAN SPECIFIC NOTES
J01 TO M01:
-REMOVE ±80' OF (3) 1/0 AL JKT PRIMARY CABLES
J01 TO PV1:
-INSTALL ±280' OF 2 - 4" SCHEDULE 80 GREY PVC CONDUIT
-INSTALL ±340' OF (3) 1/0 JKT PRIMARY CABLES
PV1 TO V01:
-INSTALL ±320' OF 2 - 4" SCHEDULE 80 GREY PVC CONDUIT
-INSTALL ±380' OF (3) 1/0 JKT PRIMARY CABLES
JOB SITE
CUSTOMER APPROVAL
I approve the location of the trench, including road crossings,
and all electrical equipment as shown on print.
________________________
Customer's Signature
________________________
Print Name/Date
PRELI
MI
N
A
R
Y
MFP20000627
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS