Washington State Auto
Dealers Association (WSADA)
Renton Parking Lot
Technical
Information Report
C18004950
R-4027
Prepared for:
Washington State Auto
Dealers Association
621 SW Grady Way
Renton, WA 98057
Contact: Vicki Giles Fabré
Phone: (206) 433-6300
Prepared by:
Sitts & Hill Engineers, Inc.
4815 Center Street
Tacoma, Washington 98409
Contact: Kathy Hargrave, P.E.
Phone: (253) 474-9449
May 2018
Revised June 2018
Revised July 2018
Revised September 2018
Revised October 2018
S&H Job Number 17,668
r-4027
DEVELOPMENT ENGINEERING
rnair 11/05/2018
SURFACE WATER UTILITY
rstraka 11/13/2018
Washington State Auto Dealers Association (WSADA)
Renton Parking Lot
Technical Information Report
C18004950
R-4027
Prepared for:
Washington State Auto Dealers Association (WSADA)
621 SW Grady Way
Renton, WA 98057
Contact: Vicki Giles Fabré
Phone: (206) 433-6300
Prepared by:
Sitts & Hill Engineers, Inc.
4815 Center Street
Tacoma, Washington 98409
Contact: Kathy Hargrave, P.E.
Phone: (253) 474-9449
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
May 2018
Revised June 2018
Revised July 2018
Revised September 2018
Revised October 2018 S&H Job Number 17,668
SURFACE WATER UTILITY
rstraka 11/13/2018
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON i
TABLE OF CONTENTS
1.0 PROJECT OVERVIEW ...................................................................................................................... 3
1.1 Scope ................................................................................................................................................................. 3
1.2 Existing Conditions ............................................................................................................................................ 4
1.3 Proposed Conditions ......................................................................................................................................... 4
2.0 Conditions and Requirements Summary ........................................................................................ 6
2.1 Discussion of Core and Special Requirements................................................................................................... 6
2.1.1 Core Requirement #1: Discharge at the Natural Location .......................................................................... 6
2.1.2 Core Requirement #2: Offsite Analysis ....................................................................................................... 6
2.1.3 Core Requirement #3: Flow Control ........................................................................................................... 6
2.1.4 Core Requirement #4: Conveyance System ................................................................................................ 6
2.1.5 Core Requirement #5: Erosion and Sediment Control ................................................................................ 6
2.1.6 Core Requirement #6: Maintenance and Operations ................................................................................. 6
2.1.7 Core Requirement #7: Financial Guarantees and Liability .......................................................................... 7
2.1.8 Core Requirement #8: Water Quality ......................................................................................................... 7
2.1.9 Core Requirement #9: Onsite BMPs ........................................................................................................... 7
2.1.10 Special Requirement #1: Other Adopted Area-Specific Requirements .................................................... 9
2.1.11 Special Requirement #2: Flood Hazard Area Delineation ......................................................................... 9
2.1.12 Special Requirement #3: Flood Protection Facilities ................................................................................ 9
2.1.13 Special Requirement #4: Source Control .................................................................................................. 9
2.1.14 Special Requirement #5: Oil Control ......................................................................................................... 9
2.1.15 Special Requirement #6: Aquifer Protection Areas .................................................................................. 9
3.0 OFF-SITE ANALYSIS ...................................................................................................................... 12
3.1 Define and Map the Study Area ...................................................................................................................... 12
3.2 Resource Review.............................................................................................................................................. 14
3.3 Field Inspection ................................................................................................................................................ 14
3.4 Drainage System Description and Problem Descriptions ................................................................................ 14
3.5 Mitigation of Existing or Potential Problems ................................................................................................... 14
4.0 FLOW CONTROL, LID, AND WATER QUALITY FACILITY ANALYSIS AND DESIGN .............................. 15
4.1 Existing Site Hydrology .................................................................................................................................... 15
4.2 Developed Site Hydrology ............................................................................................................................... 15
4.3 Performance Standards ................................................................................................................................... 15
4.4 Flow Control System ........................................................................................................................................ 15
4.4.1 Flow Control Exemptions Check ............................................................................................................... 15
4.4.2 Flow Control Area ..................................................................................................................................... 15
4.4.3 Flow Control Area Requirements and Exceptions .................................................................................... 15
4.4.4 Identify Applicable Flow Control BMPs per Core Requirement #9 ........................................................... 16
4.5 Water Quality .................................................................................................................................................. 16
5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN ............................................................................. 18
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON ii
6.0 SPECIAL REPORTS AND STUDIES ................................................................................................... 22
7.0 OTHER PERMITS .......................................................................................................................... 23
8.0 CSWPPP ANALYSIS AND DESIGN .................................................................................................. 24
9.0 BOND QUANTITIES and R/D FACILITY SUMMARIES ...................................................................... 25
9.1 Bond Quantities ............................................................................................................................................... 25
9.2 Facility Summaries ........................................................................................................................................... 25
10.0 OPERATIONS AND MAINTENANCE MANUAL .............................................................................. 26
10.1 Purpose .......................................................................................................................................................... 26
10.2 Permanent Facilities Description ................................................................................................................... 26
10.3 Discussion of Maintenance ............................................................................................................................ 26
10.4 Maintenance Frequency ................................................................................................................................ 27
10.5 Annual Cost Estimate ..................................................................................................................................... 27
TABLE OF APPENDICES
A.1 TIR Worksheet
A.2 Bond Quantity Worksheet
A.3 Existing and Proposed Surface Coverage Exhibits
A.4 Site Historical Aerial Photography
A.5 Stormwater Engineering Calculations
A.6 Geotechnical Engineering Report
A.7 WWHM Reports
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 3
1.0 PROJECT OVERVIEW
1.1 Scope
This Technical Information Report (TIR) addresses improvements associated with the proposed parking
lot located at 620 SW 12th Street, Renton, WA (Parcel No. 3340404805). Please see Figure 1 for the Site
Location Map. This parking lot is to serve as surplus parking for Washington State Auto Dealers
Association (WSADA) 621 SW Grady Way, parcel number 3340404730. This project proposes to develop
a vacant lot to create surplus parking for the WSADA building. The parking lot will have driveway
connections to SW 12th Street and an existing paved alley to the north.
This Technical Information Report has been prepared in accordance with the 2017 City of Renton
Surface Water Design Manual (SWDM). A copy of the TIR Worksheet, which provides basic information
about the scope of this project, is included with this report in Appendix A.1.
Figure 1 – Site Location Map
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 4
1.2 Existing Conditions
The subject site is located on 0.337 acres of vacant land. The site, as depicted on the topographical
survey, was previously highest in elevation just north of the center of the site, and sloped towards the
edges of the parcel (approximately 9 feet of relief). Since the development of the topographic survey,
the onsite stockpile of dirt has been removed. This TIR asserts that the stockpile and its environmental
effects are accounted for within this report and permit application.
The existing site (prior to removal of the stockpile) consisted of sparse vegetation; including grass, low
growing bushes, and trees along the eastern extent. Based on historical aerial photographs, the site was
previously stripped for what appears to be a construction staging area. It is evident that the site was not
properly restored with topsoil and plantings, as substantiated by the thin grasses and shrubs which
appear over the years in subsequent aerial imagery. See Appendix A.4, which includes a series of aerial
photographs dating back to August, 2004.
Upon a visual examination of existing site conditions, stormwater runoff on the north side of the site
discharges to the adjacent alley, and runoff on the south side of the site discharges to SW 12th Street.
Stormwater discharging to the alley to the north is captured by the existing 12-inch stormwater main (R-
365730). There is no existing stormwater main within SW 12th Street, and stormwater flowing to the
south is believed to be dispersed and undergo evapotranspiration. During heavy rainfall events, puddling
along the site frontage is also possible. Based upon a review of available information on the City of
Renton’s GIS as well as a field visit, we are not aware of any capacity problems with the existing drainage
facilities adjacent to this area. The City of Renton’s Public Works Maps combined with King County GIS
together indicate the site is not located within or near any critical areas. In addition, it is located within
the Peak Rate Flow Control Standard Zone.
1.3 Proposed Conditions
The purpose of site improvements for this project is to create additional parking for the WSADA building
located immediately north of the site. The project proposes grading, paving, landscaping, and drainage
(water quality facilities and conveyance piping) improvements for on-site and off-site areas. See Table 1
for a description of existing and proposed surface conditions.
The site is located within the Black River Drainage Basin and thus stormwater runoff generated will be
subject to enhanced basic water quality treatment before being conveyed to the conveyance system
located within the City’s right-of-way. The treatment requirement will be met with the use of Contech
Filterra® units. The flow control requirement will be met without the need for a new flow control facility
(see Section 4.0 of this report). Please see Appendix A.5 for the sub-basin exhibit as it outlines the
tributary area for each Filterra.
Please see Appendix A.3 for Existing and Proposed Surface Coverage Exhibits.
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 5
Table 1. Existing and Developed Condition Description
Description Onsite Offsite Total
Existing Conditions
Total Project Area (ft2) 14,692 4,660 19,352
Existing hard surface (ft2) 1,053 4,174 5,227
Existing landscaping/lawn area (ft2) 13,639 486 14,125
Developed Conditions
Total Project Area (ft2) 14,016 5,336 19,352
Amount of new hard surface (ft2) 10,838 432 11,270
Amount of new pollution generating hard surface (PGHS) (ft2) 10,838 432 11,270
Amount of replaced hard surface (ft2) 296 3,916 4,212
Amount of replaced PGHS (ft2) 296 3,916 4,212
Amount of new plus replaced hard surface (ft2) 11,134 4,348 15,482
Amount of new plus replaced PGHS (ft2) 11,134 4,348 15,482
Amount of existing hard surfaces converted to vegetation/landscaping (ft2) 385 631 1,016
Amount of Land Disturbed (ft2) 14,016 3,760 19,352
Native Vegetation to Pasture (acres) 0 0 0
Existing vegetation area to remain (ft2) 2,497 357 2,854
Existing hard surface to remain unaltered (ft2) 0 0 0
Value of proposed improvements ($) 90,000 10,000 100,000
Amount to be Graded/Approx. CUT (C.Y.) 2,019 0 2,019
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 6
2.0 CONDITIONS AND REQUIREMENTS SUMMARY
2.1 Discussion of Core and Special Requirements
This is a medium industrial (IM) project that adds more than 2,000 square feet of new and replaced
impervious surface. Therefore, the project is subject to a full drainage review and must satisfy all core
requirements (1-9) and all special requirements (1-6) of the 2017 City of Renton Surface Water Design
Manual (SWDM). See “Figure 2 – Drainage Review Flow Chart” at the end of this Section. Below is a
description of each core requirement and how the project proposes to satisfy each requirement.
2.1.1 Core Requirement #1: Discharge at the Natural Location
This requirement will be met by discharging surface water to its existing (natural) location.
2.1.2 Core Requirement #2: Offsite Analysis
The Off-Site Analysis included in Section 3.0 of this TIR will satisfy this Core Requirement.
2.1.3 Core Requirement #3: Flow Control
Please see Section 4.0 for a discussion of flow control for the project. The project proposes work within
the Peak Rate Flow Control Standards (Existing Site Conditions) Area. The project must match the
developed peak discharge rates to the existing site conditions peak discharge rates for the 2-, 10-, and
100-year return periods. When modeled in WWHM, a Washington State Department of Ecology-
approved continuous rainfall runoff modeling program, this project resulted in a slight increase of peak
rates for the 2-, 10-, and 100-year return events. However, per Exception 1 of Section 1.2.3.1.A of the
SWDM, this project is not required to provide flow control since the increase of peak flowrate during the
100-year event is less than 0.15 CFS. Per the calculations in Appendix A.5, the predeveloped condition
yields a 0.196 CFS flowrate during the 100-year event, and the developed condition yields 0.268 CFS, an
increase of 0.072 CFS. Therefore, this project does not propose a flow control facility.
2.1.4 Core Requirement #4: Conveyance System
Please see Section 5.0 of this TIR for the conveyance system analysis and design. This project proposes a
new conveyance system in order to manage stormwater runoff within the proposed parking lot and off-
site improvements in accordance with the requirements presented in Volume 1 Section 1.2.4.1 of the
City of Renton SWDM. The on-site improvements have been graded to convey water to either one of
two Contech Filterra® units located at the west and east extents of the parking lot. Stormwater from the
off-site improvements will be collected in a Filterra® located on the south side of the project area.
2.1.5 Core Requirement #5: Erosion and Sediment Control
A temporary Erosion and Sediment Control Plan (TESC) has been prepared and included in the plan set.
Additionally, a CSWPPP under separate cover, has been provided to satisfy this requirement.
2.1.6 Core Requirement #6: Maintenance and Operations
Please see Section 10.0 of this TIR for the Operations and Maintenance Manual, prepared to satisfy this
Core Requirement. Washington State Auto Dealers Association will be responsible for maintenance and
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 7
operation of the proposed on-site stormwater facilities upon completion. The City of Renton will
continue to be responsible for operation and maintenance of the right-of-way.
2.1.7 Core Requirement #7: Financial Guarantees and Liability
We anticipate that Washington State Auto Dealers Association will be required to provide a Construction
Bond to the City of Renton prior to issuance of the permit. The contractor/owner will be responsible for
all erosion and maintenance liabilities during construction.
2.1.8 Core Requirement #8: Water Quality
Please see Section 4.0 for a discussion of water quality for the project. We propose to use Filterra® units
by Contech, which satisfies the Manual’s water quality requirement for enhanced basic treatment.
When modeled in WWHM, the unit provided more than the required 91% treatment for each subbasin.
2.1.9 Core Requirement #9: Onsite BMPs
Target surfaces subject to Core Requirement #9 Onsite BMPs include new impervious surfaces, new
pervious surfaces, and replaces impervious surfaces, not already mitigated with an approved onsite
BMP. This site qualifies for the Small Lot BMP Requirements Per 1.2.9.2.1 of the City of Renton SWDM,
since it is smaller than 22,000 square feet. These requirements state that all proposed pervious surfaces
must implement the soil amendment BMP and roof downspout connections must be perforated pipe
connections. The soil amendment BMP will be implemented for proposed pervious surfaces, and the
downspout BMP does not apply to the proposed project (as no roof surfaces are proposed for this
project).
In addition, these requirements require the consideration of the following BMPs: full dispersion, full
infiltration, limited infiltration, rain gardens, bioretention, permeable pavement, basic dispersion,
reduced impervious surface credit, native growth retention credit, tree retention credit. None of the
listed BMPs are feasible for implementation on the project site. Therefore, Core Requirement #9 will be
implemented through the use of the soil amendment BMP only. The remainder of this section contains a
discussion of infeasibility for each BMP.
Full Dispersion – The application of this BMP depends on the sheet flow of runoff through an area of
native vegetation. The project site does not contain any native vegetation area (e.g., forested) in the
existing or proposed condition. Therefore, full dispersion is infeasible for this project.
Full Infiltration – Per Section C.2.2.2 of the Manual, full infiltration requires that “Existing soils must be
coarse sands or cobbles or medium sands and cannot be comprised of fill materials where the
infiltration device will be located.” Site soils do not meet this requirement as they are made
predominantly of fill material, silt, and silty sand. These conditions are described in the Geotechnical
Engineering Report prepared by Migizi Group, Inc. (dated May 18, 2018 revised October 18, 2018) for
the proposed project as well as the Geotechnical Letter Report prepared by E3RA (dated April 4, 2012)
for the office building on the north side of the alley adjacent to the project site. Both of these reports
include soil test pit logs that show a top layer of fill underlain by silt and silty material. Only one of the
nine total test pits indicate the presence of a sand layer, and this layer is only 1.5 feet in depth, which
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 8
does not provide any meaningful infiltrative capacity. The Geotechnical Engineer does not find that site
soils will support Full or Limited infiltration (see section 3.4 Infiltration Conditions of the Migizi report).
Therefore, full infiltration is infeasible for this project.
Limited Infiltration – The infeasibility criteria for limited infiltration are the same as those for full
infiltration except that appropriate soils may be fine sands, loamy sands, sandy loams, or loams. Note
that Section C.2.3.2 of the Manual states “Silt and clay loams, and cemented till (hardpan) are not
suitable for limited infiltration systems.” Only one of the nine total test pits indicate the presence of a
sand layer, and this layer is only 1.5 feet in depth, which does not provide any meaningful infiltrative
capacity. The Geotechnical Engineer stated that the blue/grey coloration of this material typically
indicates either saturation of the material for much of the year or contamination with hydrocarbons.
The Geotechnical Engineer does not find that site soils will support Full or Limited infiltration (see
section 3.4 Infiltration Conditions of the Migizi report). Therefore, limited infiltration is infeasible for this
project.
Rain Gardens – The infeasibility criteria for rain gardens are the same as those for bioretention. See the
bioretention discussion below. Construction of a rain garden is infeasible for this project.
Bioretention – The infiltration rate of the native soils below a bioretention facility must be at least 0.3
inches per hour. The site soil conditions are typified by being fill soils over silt soils. The silty soils under
the fill soils on the project site do not provide infiltration rates adequate for this function. The
Geotechnical Engineer does not recommend any system that would rely on infiltration for the
development of this site. The geotechnical engineer has indicated in his report that relying on infiltration
could lead to pavement failures in the vicinity of the system. Bioretention is infeasible for this project.
Permeable Pavement – The soil under a permeable pavement section must provide adequate treatment
for groundwater protection. The underlying soils should also infiltrate for this surfacing to be durable
and effective. The requirements for adequate treatment are a minimum organic content of 1.0% and a
minimum cation exchange capacity of 8 milliequivalents per 100 grams. The uppermost soil layer on the
project site is made up of fill material and does not meet these requirements. Per Appendix C, page C-
80, Section C.2.7.1 requirement number 5, a 6” layer of material meeting the treatment requirements
may be included in the design. This approach is optional and does not prompt the requirement that the
permeable pavement be implemented as part of the prescriptive BMP lists detailed in Core Requirement
# 9 of the SWDM and Section C1.3 of Appendix C. Again, trying to provide infiltration on this site could
lead to future pavement failures as the water has nowhere to go except laterally in adjacent pavement
subgrades and nearby utility trench bedding. Permeable Pavement is infeasible for this project.
Basic Dispersion – The implementation of basic dispersion requires a flowpath of 25 feet across a
vegetated surface. Such a flowpath cannot be provided on the project site without a drastic reduction in
the number of parking stalls. We have analyzed the implementation of Basic Dispersion for this project
and it yields a reduction of a minimum of 5 stalls from the original 32 to 27. This represents a 15.6
percent decrease in the parking provided. The intended use of the project site is as a parking lot, and as
such the removal of parking stalls presents a detriment to the intended use of the area available. We see
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 9
basic dispersion as infeasible to the project as approved through the SEPA and Land Use processes of the
City of Renton.
Reduced Impervious Surface Credit – This BMP presents four possible methods of impervious surface
reduction: restricted footprint, wheel strip driveways, minimum disturbance foundation, and open grid
decking over pervious surface. The restricted footprint method requires less than 4,000 square feet of
impervious area, which is not feasible for the proposed use of the site as a parking lot. A wheel strip
driveway is not applicable for a commercial parking lot. A minimum disturbance foundation is not
applicable as no foundations are proposed. Open grid decking over a pervious surface is also not
applicable to a parking lot. The reduced impervious surface credit is infeasible for this project.
Native Growth Retention Credit – The existing condition of the site does not contain any native growth.
Therefore, the native growth retention credit is infeasible for this project.
Tree Retention Credit – The existing condition of the site contains a single tree that is proposed to be
removed. Therefore, the tree retention credit is infeasible for this project.
2.1.10 Special Requirement #1: Other Adopted Area-Specific Requirements
N/A. The project site is not in a designated critical drainage area or in an area included in an adopted
master drainage plan, basin plan, salmon conservation plan, stormwater compliance plan, flood hazard
management plan, lake management plan, or shared facility drainage plan.
2.1.11 Special Requirement #2: Flood Hazard Area Delineation
N/A. Per the FEMA floodplain map at the end of this Section, Figure 3, the project site lies within Zone X
which is defined as “areas determined to be outside 500-year floodplain” and therefore flood-related
delineation on the project site is not required.
2.1.12 Special Requirement #3: Flood Protection Facilities
N/A. This project does not propose to rely on an existing flood protection facility nor does it modify or
construct a new flood protection facility.
2.1.13 Special Requirement #4: Source Control
WSADA shall implement Operational and Structural Source Control BMPs that includes the maintenance
of stormwater drainage and treatment systems as described in the Operations and Maintenance
Manual, included in Section 10.0 of this report.
2.1.14 Special Requirement #5: Oil Control
This project does not propose to develop a high-use site as defined by City of Renton SWDM; therefore,
this Special Requirement is not applicable.
2.1.15 Special Requirement #6: Aquifer Protection Areas
This project is not located within an Aquifer Protection Area per King County GIS.
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 10
Figure 2 – Drainage Review Flow Chart
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 11
Figure 3 – FEMA Map
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 12
3.0 OFF-SITE ANALYSIS
Per City of Renton SWDM Section 1.2.2, this project must provide an off-site analysis report that
assesses potential off-site drainage and water quality impacts associated with the redevelopment of the
project site. The level of analysis required depends on the specific site and downstream conditions. In
accordance with Section 1.2.2.1, a Level 1 Downstream Analysis has been performed.
3.1 Define and Map the Study Area
Based on the existing topography and soil characteristics, the site is mostly tributary to the City’s existing
conveyance system. Those portions of the site that do not discharge to the City’s existing conveyance
system likely disperse across vegetation. The project site does not have an existing conveyance system.
The project does not propose any significant improvements to the existing conveyance elements within
the alley right-of-way to the north of the site. A topographic site map is featured in Figure 4 of this
Report.
WSADA PARKING LOT TECHNICAL INFORMATION REPORT SITTS & HILL ENGINEERS, INC. TACOMA, WASHINGTON 13 Figure 4 – Topographic Survey
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 14
3.2 Resource Review
A thorough review of the resources provided by the City of Renton Maps, as outlined on page 2-11 of
the SWDM, has been completed for the study area. Research conducted on 2/14/2018 has shown that
there are not any adopted basin plans available for the study area. According to the FEMA Map
presented in Figure 3 of this report, the project site lies within Zone X, which is defined as areas outside
the 500-year floodplain. The site is located within the Duwamish – Green River Watershed, the Black
River Basin, and the Springbrook Creek Sub Basin. Based on the City of Renton GIS, the project area has
not been defined as a sensitive area. To our knowledge, there have not been any reported road drainage
problems associated with the roads surrounding the site. It was also found that the site does not have a
migrating river study, a 303d listing, or an adopted stormwater compliance plan available. Please see
Section 4.0 for a discussion of water quality for the project. A geotechnical report completed by Migizi
Group can be found in Appendix A.6.
3.3 Field Inspection
During field inspections on May 9, 2018, the weather was fair with no precipitation during the
inspection. The existing conveyance system located within the alley to the north of the project site
appeared to be working sufficiently. We do not anticipate any future problems with the proposed
stormwater system additions. The amount of area tributary to the existing conveyance system will
remain largely the same – there is not a substantive increase in stormwater runoff tributary to the
existing conveyance system as a result of this project. Please see Section A.5 Flow Control for the
modeled areas in the predeveloped and mitigated scenarios.
Since it has been determined that there are no anticipated stormwater problems associated with this
project, Level 2 and Level 3 downstream analyses are not required.
No problems were found related to constrictions, capacity deficiencies, flooding, scouring, overtopping
hazards, sedimentation or erosion, aquatic organisms or their habitation.
Land use associated with the study area includes medium industrial/commercial land applications such
as a veterinary hospital and advanced technology construction. In addition, the study area includes BPA
utilities and roadways. Existing impervious surfaces located within the study area include four
commercial businesses, compacted gravel access, paved parking lots, paved driveways, and the paved
public right-of-way. Based on existing site topography, stormwater runoff is captured within the City’s
right-of-way where it is collected by a storm conveyance system and discharged to the Black River.
3.4 Drainage System Description and Problem Descriptions
No drainage system problems were observed during the field inspection.
3.5 Mitigation of Existing or Potential Problems
The proposed project area does not have any existing or anticipated drainage problems as outlined in
Section 1.2.2.1 of the City of Renton SWDM.
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 15
4.0 FLOW CONTROL, LID, AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
4.1 Existing Site Hydrology
The site previously had a mound of soil located centrally onsite which slopes from the center down
towards the parcels limits. Prior to removal of the stockpile, the project site surfacing consisted of
compacted gravel with areas of sparse vegetation. The site is tributary to the City’s conveyance system
located within the alley to the north of the site; as well as to the south, to SW 12th Street.
4.2 Developed Site Hydrology
The proposed site will be comprised of new asphalt pavement and landscape areas. In the developed
condition, approximately 6,440 sf of area which was previously discharged to the south will now
discharge to the north. The project does not propose to alter the downstream flow path and will
maintain discharge to the natural location.
4.3 Performance Standards
The site is within a Peak Rate Flow Control Standards (Existing Site Conditions) Area, which requires
matching the existing site conditions 2-, 10-, and 100- year peak flows. The predeveloped site is
comprised of compacted gravel and vegetation. The proposed site conditions include both paved areas
as well as landscaping.
In areas where conveyance features are required, they have been designed in accordance with Section
1.2.4 of the SWDM. The proposed private conveyance elements include two Filterra® units and
conveyance piping from each Filterra® to a proposed public Type 1 catch basin. Proposed public
conveyance elements include one Filterra® unit, which is connected to the same new catch basin as the
on-site Filterra® units. Public conveyance piping connects this catch basin to an existing catch basin in
the alley.
4.4 Flow Control System
N/A. No flow control systems are required or provided for this site.
4.4.1 Flow Control Exemptions Check
The project site is exempt form flow control due to an increase of less than 0.15 cfs in the 100-year
storm event. See Section 2.1.3 of this report for further discussion.
4.4.2 Flow Control Area
The site falls within a Peak Rate Flow Control Standard – Match Existing Area, based on the Flow Control
Application Map provided by the City of Renton (Figure 5 of this TIR).
4.4.3 Flow Control Area Requirements and Exceptions
Peak Rate Flow Control Standard – Match Existing – Areas must match existing site conditions 2-,10-,
and 100-year peak rate runoff for areas draining to constructed (man-made) or highly modified drainage
systems so as to not create a downstream flooding problem. Per Section 1.2.3.1.A, Exception 1, of the
SWDM, the target surfaces subject to the Peak Rate Flow Control Standard Areas facility requirements
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 16
will generate no more than a 0.15-cfs increase in the existing site conditions 100-year peak flow.
Therefore, this project does not propose a flow control facility.
4.4.4 Identify Applicable Flow Control BMPs per Core Requirement #9
Please see Section 2.1.9 of this report for an evaluation of Flow Control BMPs per Core Requirement #9.
4.5 Water Quality
As mentioned in Section 4.3, the project proposes to satisfy the enhanced water quality requirement by
installing Filterra® units, providing over 91% treatment for the sub-basin runoff volume. Please see the
sub-basin exhibit provided in Appendix A.5.
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 17
Figure 5- City of Renton Flow Control Application Map
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 18
5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Proposed conveyance elements include three Filterra® units, one Type 1 catch basin, and conveyance
piping. Each Filterra® drains to the proposed catch basin via 8” PVC piping and the catch basin drains to
an existing catch basin in the alley via 12” CPEP piping.
We have analyzed each of the proposed conveyance pipes for capacity during the 25-year event, as
estimated using the 15-minute time step in WWHM. A basin map is included in Section A.5 of this
report.
Area tributary area to pipe from Filterra 01 Basin:
Pervious (C, Lawn, Flat) = 1,231 SF (0.028 acres)
Impervious (Roads, Flat) = 4,974 SF (0.114 acres)
Total= 6,205 SF (0.142 acres)
Q25= 0.078 CFS
Flow Frequency Results:
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 19
Area tributary area to pipe from Filterra 02 Basin:
Pervious (C, Lawn, Flat) = 1,670 SF (0.038 acres)
Impervious (Roads, Flat) = 6,375 SF (0.147 acres)
Total= 8,045 SF (0.185 acres)
Q25= 0.100 CFS
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 20
Area tributary area to pipe from Filterra 03 Basin:
Pervious (C, Lawn, Flat) = 1,010 SF (0.023 acres)
Impervious (Roads, Flat) = 4,515 SF (0.104 acres)
Total= 5,525 SF (0.127 acres)
Q25= 0.070 CFS
Flow Frequency Results:
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 21
Combined pipe flow to public system:
From Filterra 01 Basin= 0.078 CFS
From Filterra 02 Basin= 0.100 CFS
From Filterra 03 Basin= 0.070 CFS
Combined Basins= 0.248 CFS
Conveyance calculations are provided below per the Uniform Flow Analysis Method provided by the City
of Renton SWDM Section 4.2.1.2. The pipe is sized and sloped such that its barrel capacity at normal full
flow (computed by Manning’s equation) is equal to or greater than the design flow (25 year peak flow
rate).
= 1.49
Where:
Q= Flow rate (cfs)
n = Manning’s Roughness coefficient
A = Area of the pipe (sf)
R = Hydraulic Radius (ft)
S = Channel Slope (ft/ft)
Basin Pipe Size
(inches)
A (sf) R(ft) n S (ft/ft) Q-Normal
(cfs)
Q-Design
(cfs)
Filterra 01 8 0.349 0.167 0.013 0.0105 1.242 0.078
Filterra 02 8 0.349 0.167 0.013 0.0296 2.085 0.100
Filterra 03 8 0.349 0.167 0.013 0.0081 1.090 0.070
Combined 12 0.785 0.250 0.014 0.0095 3.233 0.248
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 22
6.0 SPECIAL REPORTS AND STUDIES
We are not aware of any site characteristics that are particularly sensitive to stormwater runoff.
A geotechnical report by Migizi Group can be found in Appendix A.6 of this report.
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 23
7.0 OTHER PERMITS
In addition to a Clear and Grade Permit, we anticipate that a Right-of-Way Use permit, Land Use Master
Application, Civil Construction Permit and an Environmental Review Permit (SEPA) will be required.
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 24
8.0 CSWPPP ANALYSIS AND DESIGN
See the Construction Stormwater Pollution Prevention Plan report which has been included with this
submittal under a separate cover.
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 25
9.0 BOND QUANTITIES AND R/D FACILITY SUMMARIES
9.1 Bond Quantities
See Appendix A.2 for a copy of the City of Renton bond report.
9.2 Facility Summaries
This project does not propose to implement any Retention / Detention (R/D) facilities, but the project
will install water quality facilities as previously discussed in Section 4.0.
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 26
10.0 OPERATIONS AND MAINTENANCE MANUAL
10.1 Purpose
The purpose of this manual is to provide guidelines for maintaining the storm drainage system as a part
of the parking lot expansion for WSADA. This existing building and associated parking lot are located
northwest of the project site. The site address is 620 SW 12th Street, Renton, WA 98057.
Storm utility improvements that have been proposed as a part of the project include:
o Catch Basins
o Filterra® Units
o Storm Drainage Piping
Each portion of the system has to be maintained in good working condition for the system to function
properly.
Operations and Maintenance of the drainage systems will be the responsibility of the Owner, WSADA.
Vicki Giles Fabré is the contact person at WSADA. Her contact information is:
Vicki Giles Fabré
Washington State Auto Dealers Association
621 Southwest Grady Way
Renton, WA 98057
Phone: (206) 433-6300
The City of Renton will continue to be responsible for the Operation and Maintenance of public
improvements as well as the alley right-of-way located to the north of the site.
10.2 Permanent Facilities Description
The proposed Filterra® units located within the parking lot and off-site will treat the stormwater, and
conveyance piping will convey stormwater back to the City’s main. The project does not propose to alter
downstream flow paths and will maintain ultimate discharge to the Black River.
10.3 Discussion of Maintenance
Any buildup of sediment, debris, vegetation, or trash that impedes the Filterra® units or the catch basins
will reduce the storm system capacity. As a result, care must be taken to keep all inlets clear of debris.
The applicable maintenance checklists and excerpts from the 2017 SWDM have been included with the
Operations and Maintenance Manual for review during routine maintenance inspections. In addition,
the Filterra’s Owner Manual from Contech has been provided for ease of reference.
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 27
10.4 Maintenance Frequency
Following construction of the project, the storm drainage system shall be inspected and maintained
according to their respective maintenance checklists included at the end of this manual.
Facilities will be inspected annually, or after every significant storm event where the precipitation is
greater than or equal to one inch in 24 hours
When deficiencies are noted, the problems are to be corrected as soon as possible. Any spill of
hazardous material (e.g. fuel, lubricant, herbicide, etc.) shall be cleaned up immediately and shall be
reported to the Division of Emergency Management (1-800-523-5044). Contaminated material will be
disposed of properly.
Any questions about the existence of a problem should be directed to a Professional Engineer.
10.5 Annual Cost Estimate
Annual maintenance costs for the proposed storm system, including Filterra® units, catch basins, and
conveyance piping, have been estimated to be approximately $3,000.
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 28
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 29
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 30
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 31
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 32
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 33
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 34
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 35
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 36
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 37
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 38
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 39
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 40
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 41
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 42
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 43
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 44
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 45
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 46
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 47
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 48
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 49
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 50
Cover Sheet for Inspection Forms
Name of Inspector:
_____________________________________________________________
Date of Inspection:
_____________________________________________________________
Number of Sheets Attached:
_____________________________________________________________
Inspector’s Signature:
_____________________________________________________________
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 51
Maintenance Log
Action
Taken
Name Date How Procedure
Was Performed
Problems
Encountered
Additional Actions
Recommended
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 52
A.1 TIR Worksheet
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 53
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 54
©
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 55
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 56
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 57
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON 58
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
A.2 Bond Quantity Worksheet
CED Permit #:########UnitReference #PriceUnitQuantity CostBackfill & compaction-embankmentESC-16.50$ CY Check dams, 4" minus rockESC-2SWDM 5.4.6.380.00$ Each Catch Basin ProtectionESC-335.50$ Each271.00Crushed surfacing 1 1/4" minusESC-4WSDOT 9-03.9(3)95.00$ CY DitchingESC-59.00$ CY Excavation-bulkESC-62.00$ CYFence, siltESC-7SWDM 5.4.3.11.50$ LF600900.00Fence, Temporary (NGPE)ESC-81.50$ LF Geotextile FabricESC-92.50$ SY Hay Bale Silt TrapESC-100.50$ Each HydroseedingESC-11SWDM 5.4.2.40.80$ SY Interceptor Swale / DikeESC-121.00$ LF Jute MeshESC-13SWDM 5.4.2.23.50$ SY Level SpreaderESC-141.75$ LF Mulch, by hand, straw, 3" deepESC-15SWDM 5.4.2.12.50$ SY Mulch, by machine, straw, 2" deepESC-16SWDM 5.4.2.12.00$ SY Piping, temporary, CPP, 6"ESC-1712.00$ LF Piping, temporary, CPP, 8"ESC-1814.00$ LF Piping, temporary, CPP, 12"ESC-1918.00$ LF Plastic covering, 6mm thick, sandbaggedESC-20SWDM 5.4.2.34.00$ SY180720.00Rip Rap, machine placed; slopesESC-21WSDOT 9-13.1(2)45.00$ CY Rock Construction Entrance, 50'x15'x1'ESC-22SWDM 5.4.4.11,800.00$ Each Rock Construction Entrance, 100'x15'x1'ESC-23SWDM 5.4.4.13,200.00$ Each13,200.00Sediment pond riser assemblyESC-24SWDM 5.4.5.22,200.00$ Each Sediment trap, 5' high berm ESC-25SWDM 5.4.5.119.00$ LF Sed. trap, 5' high, riprapped spillway berm section ESC-26SWDM 5.4.5.170.00$ LF Seeding, by handESC-27SWDM 5.4.2.41.00$ SY Sodding, 1" deep, level groundESC-28SWDM 5.4.2.58.00$ SY Sodding, 1" deep, sloped groundESC-29SWDM 5.4.2.510.00$ SY TESC SupervisorESC-30110.00$ HR404,400.00Water truck, dust controlESC-31SWDM 5.4.7140.00$ HR405,600.00UnitReference #PriceUnitQuantity Cost EROSION/SEDIMENT SUBTOTAL:14,891.00SALES TAX @ 10%1,489.10EROSION/SEDIMENT TOTAL:16,380.10(A)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR EROSION & SEDIMENT CONTROLDescription No.(A)WRITE-IN-ITEMS Page 3 of 14Ref 8-H Bond Quantity WorksheetSECTION II.a EROSION_CONTROLUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 10/26/2018
CED Permit #:########ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostGENERAL ITEMS Backfill & Compaction- embankmentGI-16.00$ CYBackfill & Compaction- trenchGI-29.00$ CYClear/Remove Brush, by hand (SY)GI-31.00$ SYBollards - fixedGI-4240.74$ EachBollards - removableGI-5452.34$ EachClearing/Grubbing/Tree RemovalGI-610,000.00$ Acre0.333,300.00Excavation - bulkGI-72.00$ CY2550.00Excavation - TrenchGI-85.00$ CYFencing, cedar, 6' highGI-920.00$ LFFencing, chain link, 4'GI-1038.31$ LFFencing, chain link, vinyl coated, 6' highGI-1120.00$ LFFencing, chain link, gate, vinyl coated, 20' GI-121,400.00$ EachFill & compact - common barrowGI-1325.00$ CYFill & compact - gravel baseGI-1427.00$ CY451,215.00Fill & compact - screened topsoilGI-1539.00$ CY22858.00Gabion, 12" deep, stone filled mesh GI-1665.00$ SYGabion, 18" deep, stone filled mesh GI-1790.00$ SYGabion, 36" deep, stone filled meshGI-18150.00$ SYGrading, fine, by handGI-192.50$ SYGrading, fine, with graderGI-202.00$ SY135270.0012302,460.00Monuments, 3' LongGI-21250.00$ EachSensitive Areas SignGI-227.00$ EachSodding, 1" deep, sloped groundGI-238.00$ SYSurveying, line & gradeGI-24850.00$ Day1850.0032,550.00Surveying, lot location/linesGI-251,800.00$ Acre0.33594.00Topsoil Type A (imported)GI-2628.50$ CY22627.001654,702.50Traffic control crew ( 2 flaggers )GI-27120.00$ HR404,800.00Trail, 4" chipped woodGI-288.00$ SYTrail, 4" crushed cinderGI-299.00$ SYTrail, 4" top courseGI-3012.00$ SYConduit, 2"GI-315.00$ LFWall, retaining, concreteGI-3255.00$ SFWall, rockeryGI-3315.00$ SFSUBTOTAL THIS PAGE:8,670.0013,606.50(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)Page 4 of 14Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 10/26/2018
CED Permit #:########ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)ROAD IMPROVEMENT/PAVEMENT/SURFACINGAC Grinding, 4' wide machine < 1000syRI-130.00$ SYAC Grinding, 4' wide machine 1000-2000syRI-216.00$ SY1852,960.00AC Grinding, 4' wide machine > 2000syRI-310.00$ SYAC Removal/DisposalRI-435.00$ SY401,400.00Barricade, Type III ( Permanent )RI-556.00$ LFGuard RailRI-630.00$ LFCurb & Gutter, rolledRI-717.00$ LFCurb & Gutter, verticalRI-812.50$ LF1501,875.004355,437.50Curb and Gutter, demolition and disposalRI-918.00$ LFCurb, extruded asphaltRI-105.50$ LFCurb, extruded concreteRI-117.00$ LFSawcut, asphalt, 3" depthRI-121.85$ LF310573.50Sawcut, concrete, per 1" depthRI-133.00$ LFSealant, asphaltRI-142.00$ LF330660.00Shoulder, gravel, 4" thickRI-1515.00$ SYSidewalk, 4" thickRI-1638.00$ SY762,888.00Sidewalk, 4" thick, demolition and disposalRI-1732.00$ SYSidewalk, 5" thickRI-1841.00$ SY843,444.00Sidewalk, 5" thick, demolition and disposalRI-1940.00$ SYSign, Handicap RI-2085.00$ Each2170.00Striping, per stallRI-217.00$ Each32224.00Striping, thermoplastic, ( for crosswalk )RI-223.00$ SFStriping, 4" reflectorized lineRI-230.50$ LF15075.00Additional 2.5" Crushed SurfacingRI-243.60$ SYHMA 1/2" Overlay 1.5" RI-2514.00$ SYHMA 1/2" Overlay 2"RI-2618.00$ SY1853,330.00HMA Road, 2", 4" rock, First 2500 SYRI-2728.00$ SYHMA Road, 2", 4" rock, Qty. over 2500SYRI-2821.00$ SYHMA Road, 4", 6" rock, First 2500 SYRI-2945.00$ SY1335,985.00HMA Road, 4", 6" rock, Qty. over 2500 SYRI-3037.00$ SYHMA Road, 4", 4.5" ATBRI-3138.00$ SYGravel Road, 4" rock, First 2500 SYRI-3215.00$ SYGravel Road, 4" rock, Qty. over 2500 SYRI-3310.00$ SYThickened EdgeRI-348.60$ LFSUBTOTAL THIS PAGE:8,923.5014,267.005,831.50(B)(C)(D)(E)Page 5 of 14Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 10/26/2018
CED Permit #:########ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)PARKING LOT SURFACINGNo.2" AC, 2" top course rock & 4" borrowPL-121.00$ SY2" AC, 1.5" top course & 2.5" base coursePL-228.00$ SY123034,440.004" select borrowPL-35.00$ SY1.5" top course rock & 2.5" base coursePL-414.00$ SYSUBTOTAL PARKING LOT SURFACING:34,440.00(B)(C)(D)(E)LANDSCAPING & VEGETATIONNo.Street TreesLA-1300.00$ 41,200.00Median LandscapingLA-236.00$ SY31511,340.00Right-of-Way LandscapingLA-32.00$ SY9251,850.00Wetland LandscapingLA-4SUBTOTAL LANDSCAPING & VEGETATION:3,050.0011,340.00(B)(C)(D)(E)TRAFFIC & LIGHTINGNo.SignsTR-1100.00$ EA3300.00Street Light System ( # of Poles)TR-2Traffic SignalTR-3Traffic Signal ModificationTR-4SUBTOTAL TRAFFIC & LIGHTING:300.00(B)(C)(D)(E)WRITE-IN-ITEMSParking Lot Light System (# of Poles)TR-5800.00$ 54,000.00SUBTOTAL WRITE-IN ITEMS:4,000.00STREET AND SITE IMPROVEMENTS SUBTOTAL:8,923.5025,987.0069,518.00SALES TAX @ 10%892.352,598.706,951.80STREET AND SITE IMPROVEMENTS TOTAL:9,815.8528,585.7076,469.80(B)(C)(D)(E)Page 6 of 14Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 10/26/2018
CED Permit #:########ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostDRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/DD-126.00$ SY* (CBs include frame and lid)BeehiveD-290.00$ EachThrough-curb Inlet FrameworkD-3400.00$ EachCB Type ID-41,500.00$ Each11,500.00CB Type ILD-51,750.00$ EachCB Type II, 48" diameterD-62,300.00$ Each for additional depth over 4' D-7480.00$ FTCB Type II, 54" diameterD-82,500.00$ Each for additional depth over 4'D-9495.00$ FTCB Type II, 60" diameterD-102,800.00$ Each for additional depth over 4'D-11600.00$ FTCB Type II, 72" diameterD-126,000.00$ Each for additional depth over 4'D-13850.00$ FTCB Type II, 96" diameterD-1414,000.00$ Each for additional depth over 4'D-15925.00$ FTTrash Rack, 12"D-16350.00$ EachTrash Rack, 15"D-17410.00$ EachTrash Rack, 18"D-18480.00$ EachTrash Rack, 21"D-19550.00$ EachCleanout, PVC, 4"D-20150.00$ EachCleanout, PVC, 6"D-21170.00$ EachCleanout, PVC, 8"D-22200.00$ EachCulvert, PVC, 4" D-2310.00$ LFCulvert, PVC, 6" D-2413.00$ LFCulvert, PVC, 8" D-2515.00$ LF731,095.001071,605.00Culvert, PVC, 12" D-2623.00$ LFCulvert, PVC, 15" D-2735.00$ LFCulvert, PVC, 18" D-2841.00$ LFCulvert, PVC, 24"D-2956.00$ LFCulvert, PVC, 30" D-3078.00$ LFCulvert, PVC, 36" D-31130.00$ LFCulvert, CMP, 8"D-3219.00$ LFCulvert, CMP, 12"D-3329.00$ LFSUBTOTAL THIS PAGE:2,595.001,605.00(B)(C)(D)(E)Quantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESPage 7 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 10/26/2018
CED Permit #:########ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostQuantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESDRAINAGE (Continued)Culvert, CMP, 15"D-3435.00$ LFCulvert, CMP, 18"D-3541.00$ LFCulvert, CMP, 24"D-3656.00$ LFCulvert, CMP, 30"D-3778.00$ LFCulvert, CMP, 36"D-38130.00$ LFCulvert, CMP, 48"D-39190.00$ LFCulvert, CMP, 60"D-40270.00$ LFCulvert, CMP, 72"D-41350.00$ LFCulvert, Concrete, 8"D-4242.00$ LFCulvert, Concrete, 12"D-4348.00$ LFCulvert, Concrete, 15"D-4478.00$ LFCulvert, Concrete, 18"D-4548.00$ LFCulvert, Concrete, 24"D-4678.00$ LFCulvert, Concrete, 30"D-47125.00$ LFCulvert, Concrete, 36"D-48150.00$ LFCulvert, Concrete, 42"D-49175.00$ LFCulvert, Concrete, 48"D-50205.00$ LFCulvert, CPE Triple Wall, 6" D-5114.00$ LFCulvert, CPE Triple Wall, 8" D-5216.00$ LFCulvert, CPE Triple Wall, 12" D-5324.00$ LFCulvert, CPE Triple Wall, 15" D-5435.00$ LFCulvert, CPE Triple Wall, 18" D-5541.00$ LFCulvert, CPE Triple Wall, 24" D-5656.00$ LFCulvert, CPE Triple Wall, 30" D-5778.00$ LFCulvert, CPE Triple Wall, 36" D-58130.00$ LFCulvert, LCPE, 6"D-5960.00$ LFCulvert, LCPE, 8"D-6072.00$ LFCulvert, LCPE, 12"D-6184.00$ LF403,360.00Culvert, LCPE, 15"D-6296.00$ LFCulvert, LCPE, 18"D-63108.00$ LFCulvert, LCPE, 24"D-64120.00$ LFCulvert, LCPE, 30"D-65132.00$ LFCulvert, LCPE, 36"D-66144.00$ LFCulvert, LCPE, 48"D-67156.00$ LFCulvert, LCPE, 54"D-68168.00$ LFSUBTOTAL THIS PAGE:3,360.00(B)(C)(D)(E)Page 8 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 10/26/2018
CED Permit #:########ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostQuantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESDRAINAGE (Continued)Culvert, LCPE, 60"D-69180.00$ LFCulvert, LCPE, 72"D-70192.00$ LFCulvert, HDPE, 6"D-7142.00$ LFCulvert, HDPE, 8"D-7242.00$ LFCulvert, HDPE, 12"D-7374.00$ LFCulvert, HDPE, 15"D-74106.00$ LFCulvert, HDPE, 18"D-75138.00$ LFCulvert, HDPE, 24"D-76221.00$ LFCulvert, HDPE, 30"D-77276.00$ LFCulvert, HDPE, 36"D-78331.00$ LFCulvert, HDPE, 48"D-79386.00$ LFCulvert, HDPE, 54"D-80441.00$ LFCulvert, HDPE, 60"D-81496.00$ LFCulvert, HDPE, 72"D-82551.00$ LFPipe, Polypropylene, 6"D-8384.00$ LFPipe, Polypropylene, 8"D-8489.00$ LFPipe, Polypropylene, 12"D-8595.00$ LFPipe, Polypropylene, 15"D-86100.00$ LFPipe, Polypropylene, 18"D-87106.00$ LFPipe, Polypropylene, 24"D-88111.00$ LFPipe, Polypropylene, 30"D-89119.00$ LFPipe, Polypropylene, 36"D-90154.00$ LFPipe, Polypropylene, 48"D-91226.00$ LFPipe, Polypropylene, 54"D-92332.00$ LFPipe, Polypropylene, 60"D-93439.00$ LFPipe, Polypropylene, 72"D-94545.00$ LFCulvert, DI, 6"D-9561.00$ LFCulvert, DI, 8"D-9684.00$ LFCulvert, DI, 12"D-97106.00$ LFCulvert, DI, 15"D-98129.00$ LFCulvert, DI, 18"D-99152.00$ LFCulvert, DI, 24"D-100175.00$ LFCulvert, DI, 30"D-101198.00$ LFCulvert, DI, 36"D-102220.00$ LFCulvert, DI, 48"D-103243.00$ LFCulvert, DI, 54"D-104266.00$ LFCulvert, DI, 60"D-105289.00$ LFCulvert, DI, 72"D-106311.00$ LFSUBTOTAL THIS PAGE:(B)(C)(D)(E)Page 9 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 10/26/2018
CED Permit #:########ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostQuantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESSpecialty Drainage ItemsDitching SD-19.50$ CYFlow Dispersal Trench (1,436 base+)SD-328.00$ LF French Drain (3' depth)SD-426.00$ LFGeotextile, laid in trench, polypropyleneSD-53.00$ SYMid-tank Access Riser, 48" dia, 6' deepSD-62,000.00$ EachPond Overflow SpillwaySD-716.00$ SYRestrictor/Oil Separator, 12"SD-81,150.00$ EachRestrictor/Oil Separator, 15"SD-91,350.00$ EachRestrictor/Oil Separator, 18"SD-101,700.00$ EachRiprap, placedSD-1142.00$ CYTank End Reducer (36" diameter)SD-121,200.00$ EachInfiltration pond testingSD-13125.00$ HRPermeable PavementSD-14Permeable Concrete SidewalkSD-15Culvert, Box __ ft x __ ftSD-16SUBTOTAL SPECIALTY DRAINAGE ITEMS:(B)(C)(D)(E)STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)Detention PondSF-1Each Detention TankSF-2Each Detention VaultSF-3Each Infiltration PondSF-4Each Infiltration TankSF-5Each Infiltration VaultSF-6Each Infiltration TrenchesSF-7Each Basic Biofiltration SwaleSF-8Each Wet Biofiltration SwaleSF-9Each WetpondSF-10Each WetvaultSF-11Each Sand FilterSF-12Each Sand Filter VaultSF-13Each Linear Sand FilterSF-14Each Proprietary FacilitySF-15Each Bioretention FacilitySF-16Each SUBTOTAL STORMWATER FACILITIES:(B)(C)(D)(E)Page 10 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 10/26/2018
CED Permit #:########ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostQuantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESWRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)Filterra® WI-115,000.00$ 115,000.00230,000.00WI-2WI-3WI-4WI-5WI-6WI-7WI-8WI-9WI-10WI-11WI-12WI-13WI-14WI-15SUBTOTAL WRITE-IN ITEMS:15,000.0030,000.00DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:20,955.0031,605.00SALES TAX @ 10%2,095.503,160.50DRAINAGE AND STORMWATER FACILITIES TOTAL:23,050.5034,765.50(B) (C) (D) (E)Page 11 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 10/26/2018
CED Permit #:########ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostConnection to Existing WatermainW-12,000.00$ EachDuctile Iron Watermain, CL 52, 4 Inch DiameterW-250.00$ LFDuctile Iron Watermain, CL 52, 6 Inch DiameterW-356.00$ LFDuctile Iron Watermain, CL 52, 8 Inch DiameterW-460.00$ LFDuctile Iron Watermain, CL 52, 10 Inch DiameterW-570.00$ LFDuctile Iron Watermain, CL 52, 12 Inch DiameterW-680.00$ LFGate Valve, 4 inch DiameterW-7500.00$ EachGate Valve, 6 inch DiameterW-8700.00$ EachGate Valve, 8 Inch DiameterW-9800.00$ EachGate Valve, 10 Inch DiameterW-101,000.00$ EachGate Valve, 12 Inch DiameterW-111,200.00$ EachFire Hydrant AssemblyW-124,000.00$ EachPermanent Blow-Off AssemblyW-131,800.00$ EachAir-Vac Assembly, 2-Inch DiameterW-142,000.00$ EachAir-Vac Assembly, 1-Inch DiameterW-151,500.00$ EachCompound Meter Assembly 3-inch DiameterW-168,000.00$ EachCompound Meter Assembly 4-inch DiameterW-179,000.00$ EachCompound Meter Assembly 6-inch DiameterW-1810,000.00$ EachPressure Reducing Valve Station 8-inch to 10-inchW-1920,000.00$ EachWATER SUBTOTAL:SALES TAX @ 10%WATER TOTAL:(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR WATERQuantity Remaining (Bond Reduction) (B)(C)Page 12 of 14Ref 8-H Bond Quantity WorksheetSECTION II.d WATERUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 10/26/2018
CED Permit #:########ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostClean OutsSS-11,000.00$ EachGrease Interceptor, 500 gallonSS-28,000.00$ EachGrease Interceptor, 1000 gallonSS-310,000.00$ EachGrease Interceptor, 1500 gallonSS-415,000.00$ EachSide Sewer Pipe, PVC. 4 Inch DiameterSS-580.00$ LFSide Sewer Pipe, PVC. 6 Inch DiameterSS-695.00$ LFSewer Pipe, PVC, 8 inch DiameterSS-7105.00$ LFSewer Pipe, PVC, 12 Inch DiameterSS-8120.00$ LFSewer Pipe, DI, 8 inch DiameterSS-9115.00$ LFSewer Pipe, DI, 12 Inch DiameterSS-10130.00$ LFManhole, 48 Inch DiameterSS-116,000.00$ EachManhole, 54 Inch DiameterSS-136,500.00$ EachManhole, 60 Inch DiameterSS-157,500.00$ EachManhole, 72 Inch DiameterSS-178,500.00$ EachManhole, 96 Inch DiameterSS-1914,000.00$ EachPipe, C-900, 12 Inch DiameterSS-21180.00$ LFOutside DropSS-241,500.00$ LSInside DropSS-251,000.00$ LSSewer Pipe, PVC, ____ Inch DiameterSS-26Lift Station (Entire System)SS-27LSSANITARY SEWER SUBTOTAL:SALES TAX @ 10%SANITARY SEWER TOTAL:(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR SANITARY SEWERQuantity Remaining (Bond Reduction) (B)(C)Page 13 of 14Ref 8-H Bond Quantity WorksheetSECTION II.e SANITARY SEWERUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 10/26/2018
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200Date:Name:Project Name: PE Registration No:CED Plan # (LUA):Firm Name:CED Permit # (U):Firm Address:Site Address:Phone No.Parcel #(s):Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a)Existing Right-of-Way Improvements Subtotal (b)(b)9,815.85$ Future Public Improvements Subtotal(c)28,585.70$ Stormwater & Drainage Facilities (Public & Private) Subtotal(d)(d)57,816.00$ (e)(f)Site RestorationCivil Construction PermitMaintenance Bond19,243.51$ Bond Reduction2Construction Permit Bond Amount 3Minimum Bond Amount is $10,000.001 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% willcover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering.* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.** Note: All prices include labor, equipment, materials, overhead and profit. EST1((b) + (c) + (d)) x 20%-$ MAINTENANCE BOND */**(after final acceptance of construction)16,380.10$ 9,815.85$ 72,539.78$ 16,380.10$ -$ 57,816.00$ -$ 88,919.88$ P (a) x 100%SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS8/28/2018Kathy Hargrave30794Sitts & Hill EngineersR((b x 150%) + (d x 100%))S(e) x 150% + (f) x 100%Bond Reduction: Existing Right-of-Way Improvements (Quantity Remaining)2Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2T(P +R - S)Prepared by:Project InformationCONSTRUCTION BOND AMOUNT */**(prior to permit issuance)(253) 474-9449kathyh@sittshill.comRenton Parking Lot##-######620 SW 12th St, Renton, WA 980573340404805FOR APPROVAL########4815 Center Street, Tacoma, WA 98409Page 14 of 14Ref 8-H Bond Quantity WorksheetSECTION III. BOND WORKSHEETUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 10/26/2018
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
A.3 Existing and Proposed Surface Coverage Exhibits
WSADA PARKING LOT TECHNICAL INFORMATION REPORT SITTS & HILL ENGINEERS, INC. TACOMA, WASHINGTON
WSADA PARKING LOT TECHNICAL INFORMATION REPORT SITTS & HILL ENGINEERS, INC. TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
A.4 Site Historical Aerial Photography
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
A.5 Stormwater Engineering Calculations
Flow Control
This project is in a location subject to meeting the Peak Rate Flow Control Standard, as described in
Section 4.4. Therefore, we have prepared the following calculations to determine if flow control will be
required for this project.
As previously mentioned, the site was historically stripped of topsoil and vegetation, and never properly
restored. As such, the surface during the predeveloped condition (prior to removal of the stockpile) was
essentially full coverage of hard packed gravel, with sparse vegetation which grew naturally over the
years since the initial site stripping.
Predeveloped Conditions:
Despite the graveled surface condition which is evident in historical aerial photographs, and site
photographs taken during our topographic survey of the site, the site was still largely covered with grass
and some shrubs. Therefore, to be conservative, we have modeled the full on-site area as grass
coverage for the predeveloped condition. The grades of the site in the existing condition (prior to
removal of the stockpile) were predominantly above the 5% limit allowed for “Flat”, and many of them
were above 15% (and therefore considered “Steep” surfaces. However, we conservatively modeled the
site as a combination of “Flat” and “Moderate” sloped surfaces. The off-site area was modeled as “Flat”
impervious surface for the predeveloped condition, as it was comprised of asphalt and gravel surfaces.
See the following excerpt from WWHM indicating the assumptions used in the “Predeveloped”
Condition:
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
Mitigated Conditions:
The mitigated site coverage is comprised solely of “Flat” lawn and paved parking/driving and sideway
surfaces. See the following excerpt from WWHM indicating the assumptions used in the “Mitigated”
Condition:
Flow Frequency Results:
The flow frequency table included on the following page indicates that the peak stormwater runoff from
the developed site will be greater than the predeveloped site. However, the peak flowrate increase
from the predeveloped to developed condition is 0.072 CFS for the 100-year event. This is less than 0.15
CFS, and is therefore subject to an exception to the Peak Rate Flow Control Standard, per Exception 1 in
Section 1.2.3.1.A.
Since this project will not increase the flowrate of the 100-year event by more than 0.15 CFS in the
developed condition, we are not proposing flow control measures for the site.
It should be noted that for the purpose of this calculation, we have excluded 1,650 SF of surface area
from the predeveloped and mitigated scenarios. This is for the asphalt pavement grind and overlay, as it
is not considered a replaced impervious surface.
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT TECHNICAL INFORMATION REPORT SITTS & HILL ENGINEERS, INC. TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
Water Quality
To determine the appropriate size of Filterra to be used for this project, we used WWHM to model the
Filterra as a sand filter per the Department of Ecology’s recommendations. The largest of the three sub-
basins tributary to a Filterra unit was used to size each of the structures. WWHM calculation results; an
exhibit identifying the three Filterra sub-basins; and the General Use Level Designation (GULD)
certification from DOE are included on the following pages.
Filterra 02 sub-basin (largest tributary area):
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
Filterra Unit Sizing:
WSADA PARKING LOT TECHNICAL INFORMATION REPORT SITTS & HILL ENGINEERS, INC. TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
A.6 Geotechnical Engineering Report
Geotechnical Engineering Report
Washington State Auto Dealers Association
621 SW Grady Way
Renton, Washington 98057
May 18, 2018
Rev. 2 October 26, 2018
prepared for:
Sitts & Hill Engineers, Inc.
Attention: Kathy Hargrave
4815 Center Street
Tacoma, Washington 98409
prepared by:
Migizi Group, Inc.
PO Box 44840
Tacoma, Washington 98448
(253) 537-9400
MGI Project P1258-T18
i
TABLE OF CONTENTS
Page No.
1.0 SITE AND PROJECT DESCRIPTION............................................................................................... 1
2.0 EXPLORATORY METHODS ............................................................................................................. 2
2.1 Test Pit Procedures ................................................................................................................ 2
3.0 SITE CONDITIONS ............................................................................................................................ 3
3.1 Surface Conditions ................................................................................................................. 3
3.2 Soil Conditions ....................................................................................................................... 3
3.3 Groundwater Conditions ...................................................................................................... 4
3.4 Infiltration Conditions ........................................................................................................... 4
3.5 Seismic Conditions ................................................................................................................. 5
3.6 Liquefaction Potential ............................................................................................................ 5
4.0 CONCLUSIONS AND RECOMMENDATIONS ............................................................................ 5
4.1 Site Preparation ...................................................................................................................... 6
4.2 Asphalt Pavement .................................................................................................................. 8
4.3 Structural Fill .......................................................................................................................... 9
5.0 RECOMMENDED ADDITIONAL SERVICES .............................................................................. 10
6.0 CLOSURE ........................................................................................................................................... 10
List of Tables
Table 1. Approximate Locations and Depths of Explorations ............................................................................. 2
List of Figures
Figure 1. Topographic and Location Map
Figure 2. Site and Exploration Plan
Figure 3. E3RA, Inc. Site and Exploration Plan
APPENDIX A
Soil Classification Chart and Key to Test Data .................................................................................................. A-1
Logs of Test Pits TP-1 through TP-3 .......................................................................................................... A-2…A-4
APPENDIX B
Kleinfelder Boring Logs B-1 through B-2 and Test Pit Logs TP-1 through TP-6
Page 1 of 10
MIGIZI GROUP, INC.
PO Box 44840 PHONE (253) 537-9400
Tacoma, Washington 98448 FAX (253) 537-9401
May 18, 2018
Revised October 26, 2018
Sitts & Hill Engineers, Inc.
4815 Center Street
Tacoma, Washington 98409
Attention: Kathy Hargrave
Subject: Geotechnical Engineering Report
Washington State Auto Dealers Association
621 SW Grady Way
Renton, Washington 98057
MGI Project P1258-T18
Dear Ms. Hargrave:
Migizi Group, Inc. (MGI) is pleased to submit this revised report describing the results of our
geotechnical engineering evaluation for a proposed asphalt parking lot expansion to be located in a
vacant lot immediately south of the existing parking lot for the Washington State Auto Dealers
Association (WSADA) building in Renton, Washington. A previous Geotechnical Letter Report was
prepared for the existing facilities by E3RA, Inc. dated April 4, 2012.
This report has been prepared for the exclusive use of Sitts & Hill Engineers, Inc., and their
consultants, for specific application to this project, in accordance with generally accepted
geotechnical engineering practice.
1.0 SITE AND PROJECT DESCRIPTION
The project site is located along the south side of SW Grady Way in a commercial area just north of
I-405 in Renton, Washington, as shown on the enclosed Topographic and Location Map (Figure 1).
The project area is rectangularly-shaped, encompassing a total area of 0.33-acres. The site is
undeveloped and lies in the ancestral floodplain of the Black and Green Rivers before the partial
draining of Lake Washington in 1916. The site is bordered by SW 12th St to the south, asphalt
parking lots to the north and east, and Bell Electronics to the west.
It is our understanding that the project area will be stripped, paved, and connected to the existing
WSADA parking area to the north. The new parking lot will be at or near existing grade.
Sitts & Hill Engineers, Inc. – WSADA, 621 SW Grady Way, Renton, WA May 18, 2018 / Revised October 26, 2018
Geotechnical Engineering Report P1258-T18
Migizi Group, Inc. Page 2 of 10
2.0 EXPLORATORY METHODS
We explored surface and subsurface conditions at the project site on April 27, 2018. Our exploration
and evaluation program comprised the following elements:
• Surface reconnaissance of the site;
• Three test pit explorations (designated TP-1, TP-2, and TP-3) advanced on April 27, 2018;
• A review of the Geotechnical Letter Report prepared by E3RA, Inc., dated April 4, 2012; and
• A review of published geologic and seismologic maps and literature.
Table 1 summarizes the approximate functional locations and termination depths of our subsurface
explorations, and Figure 2 depicts their approximate relative locations. The following sections
describe the procedures used for excavation of the test pits.
TABLE 1
APPROXIMATE LOCATIONS AND DEPTHS OF EXPLORATIONS
Exploration Functional Location
Termination
Depth
(feet)
TP-1
TP-2
TP-3
Roughly central to the western third of the property
Roughly the middle-most point of the property
Roughly central to the eastern third of the property
10
3
10
The specific numbers and locations of our explorations were selected in relation to the existing site
features, under the constraints of surface access, underground utility conflicts, and budget
considerations.
It should be realized that the explorations performed and utilized for this evaluation reveal
subsurface conditions only at discrete locations across the project site and that actual conditions in
other areas could vary. Furthermore, the nature and extent of any such variations would not
become evident until additional explorations are performed or until construction activities have
begun. If significant variations are observed at that time, we may need to modify our conclusions
and recommendations contained in this report to reflect the actual site conditions.
2.1 Test Pit Procedures
Our exploratory test pits were excavated with a rubber-tracked mini-excavator operated by an
excavation contractor under subcontract to MGI. An engineering geologist from our firm observed
the test pit excavations, collected soil samples, and logged the subsurface conditions.
The enclosed test pit logs indicate the vertical sequence of soils and materials encountered in our
test pits, based on our field classifications. Where a soil contact was observed to be gradational or
undulating, our logs indicate the average contact depth. We estimated the relative density and
consistency of the in-situ soils by means of the excavation characteristics and the stability of the test
pit sidewalls. Our logs also indicate the approximate depths of any sidewall caving or groundwater
seepage observed in the test pits. The soils were classified visually in general accordance with the
Sitts & Hill Engineers, Inc. – WSADA, 621 SW Grady Way, Renton, WA May 18, 2018 / Revised October 26, 2018
Geotechnical Engineering Report P1258-T18
Migizi Group, Inc. Page 3 of 10
system described in Figure A-1, which includes a key to the exploration logs. Summary logs of our
explorations are included as Figure A-2 through A-4.
3.0 SITE CONDITIONS
The following sections present our observations, measurements, findings, and interpretations
regarding surface, soil, groundwater, and infiltration conditions.
3.1 Surface Conditions
As previously indicated, the project site consists of a rectangularly-shaped, 0.33-acre commercial
property situated near the intersection of I-405 and WA-167 in Renton. The property lies in the
ancestral floodplain of the Black and Green Rivers before the partial draining of Lake Washington in
1916. The site was undeveloped and topographically flat at the time our explorations were
performed.
Site vegetation was limited to sparse grass and spiky bushes at the edges of the property over the
densely compacted fill.
No hydrologic features were observed on site, such as seeps, springs, ponds and streams.
3.2 Soil Conditions
We observed subgrade conditions in three test pits across the property. These explorations revealed
structural fill and construction-related debris such as concrete, asphalt, and brick in a dense
condition at surface elevations, down to approximately 2½ to 4½ feet below existing grade. This
material overlies native, alluvial flood plain deposits generally comprised of mottled silt, though a
thin sandy zone was observed in test pit exploration TP-1. Mottled silt was observed through the
termination of test pit explorations TP-1 and TP-3; a maximum depth of 10 feet. Native soils were
all poorly consolidated and oversaturated. While excavating TP-2, a block of concrete prevented
further excavation beyond 3 feet deep and the test pit was terminated.
In the Geotechnical Letter Report prepared by E3RA, Inc., they referenced subsurface explorations
previously performed by Kleinfelder across the parent property immediately to the north, as
highlighted in the attached Figure 3. In total, they performed 6 test pit explorations and 2 auger
borings; with the maximum depth explored being 44 feet below existing grade. In general,
Kleinfelder observed similar subsurface conditions, with existing fill material and fine-grained
alluvium being observed in close proximity to existing grade. Granular, sandy soils are not
encountered until a depth of 20 to 25 feet below existing grade. Kleinfelder boring logs and test pit
logs are attached as Appendix B.
In the Geologic Map of the Renton Quadrangle, King County, Washington, as prepared by the
Department of the Interior United States Geological Survey (USGS) (1965), the project site is
mapped as containing Qaw, or Quaternary Alluvium associated with the flood plains of the White
and Green Rivers. The upper part of these deposits are mostly clayey silt and fine sand, locally
peaty, being 10 to 20 feet thick near Kent, thickening to 30 to 40 feet near Tukwila. The lower part of
these deposits are mostly medium and coarse sand and can reach thicknesses of up to 75 feet.
Sitts & Hill Engineers, Inc. – WSADA, 621 SW Grady Way, Renton, WA May 18, 2018 / Revised October 26, 2018
Geotechnical Engineering Report P1258-T18
Migizi Group, Inc. Page 4 of 10
The National Cooperative Soil Survey (NCSS) for the King County Area classifies soils onsite as
Ur-Urban Land, surrounded by minor soil units of sand and silt loam. This soil series reportedly
formed along alluvial flood plains and is comprised of sandy loam, silt loam, silty clay loam and
sand. Our subsurface explorations generally correspond with the site classifications prepared by
the USGS and NCSS.
The enclosed exploration logs (Appendix A) provide a detailed description of the soil strata
encountered in our subsurface explorations.
3.3 Groundwater Conditions
We encountered groundwater seepage in two of our three subsurface explorations, at a depth of 4 to
4½ feet below existing grade. Given the fact that our explorations were performed just outside of
what is generally considered the rainy season (November 1 to March 31), we do not anticipate that
groundwater will rise much higher than that which we observed. Groundwater levels will fluctuate
with localized geology and precipitation.
3.4 Infiltration Conditions
As indicated in the above Soil Conditions and Groundwater Conditions sections of this report, densely
consolidated fill soils are encountered at surface elevations across the project area, generally
containing construction debris, such as concrete, asphalt and brick. This material extends 2 ½ to 4 ½
feet below existing grade, transitioning to native, alluvial soils, generally comprised of mottled silt
through a depth of 10 feet. The soil conditions encountered onsite was further corroborated by past
Kleinfelder explorations performed immediately offsite to the north. Additionally, groundwater
levels were encountered 4 to 4 ½ feet below existing grade across the project area.
As per the 2017 City of Renton Surface Water Design Manual (RSWDM), full infiltration requires
native soils to consist of medium sands or better, whereas limited infiltration can utilize loamy
sands, sandy loams and loams. Fill material, silt and clay loams, and cemented till (hardpan) are
not suitable for infiltration. Given the geologic conditions present within the project area, we do not
interpret full or limited infiltration as being feasible for this project, and we do not recommend
utilizing pervious pavements or bioretention. Site produced stormwater should be diverted to an
existing storm system.
A small, isolated sand seam was encountered in the vicinity of test pit exploration TP-1, from a
depth of 2 ½ to 4 feet, between existing fill and silt soils. This sand seam was not observed in any of
the other explorations performed onsite, or immediately offsite to the north, indicating its limited
extent. Additionally, this material was observed with a blue/grey coloration, a rarity among
granular soils. This coloration is typically only encountered in granular soils which are
contaminated with hydrocarbons, or ones which spend much of the year under water. If
stormwater were to be diverted to this region, it would most likely pond, and lead to pavement
failures in adjacent areas, or propagate horizontally and permeate into utility trenches or other
undesirable locations.
Sitts & Hill Engineers, Inc. – WSADA, 621 SW Grady Way, Renton, WA May 18, 2018 / Revised October 26, 2018
Geotechnical Engineering Report P1258-T18
Migizi Group, Inc. Page 5 of 10
3.5 Seismic Conditions
Based on our analysis of subsurface exploration logs and our review of published geologic maps,
we interpret the onsite soil conditions to generally correspond with site class E, as defined by
Table 30.2-1 in ASCE 7, per the 2015 International Building Code (IBC).
Using 2015 IBC information on the USGS Design Summary Report website, Risk Category I/II/III
seismic parameters for the site are as follows:
Ss = 1.442 g SMS = 1.298 g SDS = 0.865 g
S1 = 0.538 g SM1 = 1.292 g SD1 = 0.862 g
Using the 2015 IBC information, MCER Response Spectrum Graph on the USGS Design Summary
Report website, Risk Category I/II/III, Sa at a period of 0.2 seconds is 1.30 g and Sa at a period of
1.0 seconds is 1.30 g.
The Design Response Spectrum Graph from the same website, using the same IBC information and
Risk Category, Sa at a period of 0.2 seconds is 0.86 g and Sa at a period of 1.0 seconds is 0.86 g.
3.6 Liquefaction Potential
Liquefaction is a sudden increase in pore water pressure and a sudden loss of soil shear strength
caused by shear strains, as could result from an earthquake. Research has shown that saturated,
loose, fine to medium sands with a fines (silt and clay) content less than about 20 percent are most
susceptible to liquefaction. Poorly consolidated soils encountered below the water table (a depth of
4 to 4½ feet) present a moderate to severe risk for soil liquefaction. Recommendations for pavement
section design and construction contained within this report helps mitigate some of this risk, but the
risk for soil liquefaction and resultant post-construction settlement should still be considered
moderate across the project area in the instance of a large-scale seismic event.
4.0 CONCLUSIONS AND RECOMMENDATIONS
It is our understanding that the project area will be stripped, paved, and connected to the existing
WSADA parking area to the north. The new parking lot will be at or near existing grade. We offer
these recommendations:
• Feasibility: Based on our field explorations, research, and evaluations, the proposed
pavements appear feasible from a geotechnical standpoint.
• Pavement Sections: We recommend a conventional pavement section comprised of
an asphalt concrete pavement over a crushed rock base course over a properly
prepared (compacted) subgrade or a granular subbase.
All soil subgrades should be thoroughly compacted, then proof-rolled with a loaded
dump truck or heavy compactor. Any localized zones of yielding subgrade
disclosed during this proof-rolling operation should be over excavated to an
additional maximum depth of 12 inches and replaced with a suitable structural fill
material.
Sitts & Hill Engineers, Inc. – WSADA, 621 SW Grady Way, Renton, WA May 18, 2018 / Revised October 26, 2018
Geotechnical Engineering Report P1258-T18
Migizi Group, Inc. Page 6 of 10
The following sections of this report present our specific geotechnical conclusions and
recommendations concerning site preparation, spread footings, slab-on-grade floors, asphalt
pavement, and structural fill. The Washington State Department of Transportation (WSDOT)
Standard Specifications and Standard Plans cited herein refer to WSDOT publications M41-10,
Standard Specifications for Road, Bridge, and Municipal Construction, and M21-01, Standard Plans for
Road, Bridge, and Municipal Construction, respectively.
4.1 Site Preparation
Preparation of the project site should involve erosion control, temporary drainage, clearing,
stripping, excavations, cutting, subgrade compaction, and filling.
Erosion Control: Before new construction begins, an appropriate erosion control system should be
installed. This system should collect and filter all surface water runoff through silt fencing. We
anticipate a system of berms and drainage ditches around construction areas will provide an
adequate collection system. Silt fencing fabric should meet the requirements of WSDOT Standard
Specification 9-33.2 Table 3. In addition, silt fencing should embed a minimum of 6 inches below
existing grade. An erosion control system requires occasional observation and maintenance.
Specifically, holes in the filter and areas where the filter has shifted above ground surface should be
replaced or repaired as soon as they are identified.
Temporary Drainage: We recommend intercepting and diverting any potential sources of surface or
near-surface water within the construction zones before stripping begins. Because the selection of
an appropriate drainage system will depend on the water quantity, season, weather conditions,
construction sequence, and contractor's methods, final decisions regarding drainage systems are
best made in the field at the time of construction. Based on our current understanding of the
construction plans, surface and subsurface conditions, we anticipate that curbs, berms, or ditches
placed around the work areas will adequately intercept surface water runoff.
Clearing and Stripping: After surface and near-surface water sources have been controlled, sod,
topsoil, and root-rich soil should be stripped from the site. The proposed work area currently
contains a gravel surfacing and no stripping will be necessary.
Site Excavations: Based on our explorations, we expect that excavations will encounter loose/soft to
medium dense/stiff silty, sandy alluvial soils which can be easily excavated using standard
excavation equipment.
Dewatering: We encountered groundwater seepage in two of three of our explorations at a depth of
4 to 4½ feet below existing grade. Given the fact that our explorations were performed just outside
of what is generally considered the rainy season (November 1 to March 31), we do not anticipate
that groundwater will rise much higher than that which we observed. If groundwater is
encountered in shallower excavations, we anticipate that an internal system of ditches, sumpholes,
and pumps will be adequate to temporarily dewater most excavations. For deeper excavations well
below the water table, expensive dewatering equipment, such as well points, may need to be
utilized in order to adequately dewater excavations.
Sitts & Hill Engineers, Inc. – WSADA, 621 SW Grady Way, Renton, WA May 18, 2018 / Revised October 26, 2018
Geotechnical Engineering Report P1258-T18
Migizi Group, Inc. Page 7 of 10
Temporary Cut Slopes: All temporary soil slopes associated with site cutting or excavations should
be adequately inclined to prevent sloughing and collapse. Temporary cut slopes in site soils should
be no steeper than 1½H:1V, and should conform to Washington Industrial Safety and Health Act
(WISHA) regulations.
Subgrade Compaction: Exposed subgrades for the foundations of the planned additions should be
compacted to a firm, unyielding state before new concrete or fill soils are placed. Any localized
zones of looser granular soils observed within a subgrade should be compacted to a density
commensurate with the surrounding soils. In contrast, any organic, soft, or pumping soils observed
within a subgrade should be overexcavated and replaced with a suitable structural fill material.
Site Filling: Our conclusions regarding the reuse of onsite soils and our comments regarding wet-
weather filling are presented subsequently. Regardless of soil type, all fill should be placed and
compacted according to our recommendations presented in the Structural Fill section of this report.
Specifically, building pad fill soil should be compacted to a uniform density of at least 95 percent
(based on ASTM:D-1557).
Onsite Soils: We offer the following evaluation of these onsite soils in relation to potential use as
structural fill:
• Fill: The fill that overlies the site contains construction debris and some organic
material, so is not reusable as structural fill. If areas of debris and organic-free fill
are encountered during the construction process and are thought to be reusable, we
recommend that MGI evaluate their potential for reuse.
• Alluvial Silt and Silty Sand: The alluvial silty sand that underlies the site is very
moisture sensitive and will be difficult or impossible to reuse during most weather
conditions. The majority of this soil type is currently above the optimum moisture
content and will not compact adequately unless extensively aerated.
Permanent Slopes: All permanent cut slopes and fill slopes should be adequately inclined to reduce
long-term raveling, sloughing, and erosion. We generally recommend that no permanent slopes be
steeper than 2H:1V. For all soil types, the use of flatter slopes (such as 2½H:1V) would further
reduce long-term erosion and facilitate revegetation.
Slope Protection: We recommend that a permanent berm, swale, or curb be constructed along the
top edge of all permanent slopes to intercept surface flow. Also, a hardy vegetative groundcover
should be established as soon as feasible, to further protect the slopes from runoff water erosion.
Alternatively, permanent slopes could be armored with quarry spalls or a geosynthetic erosion mat.
Sitts & Hill Engineers, Inc. – WSADA, 621 SW Grady Way, Renton, WA May 18, 2018 / Revised October 26, 2018
Geotechnical Engineering Report P1258-T18
Migizi Group, Inc. Page 8 of 10
4.2 Asphalt Pavement
Since asphalt pavements will be used across much of the project site, we offer the following
comments and recommendations for pavement design and construction.
Subgrade Preparation: We recommend a conventional pavement section comprised of an asphalt
concrete pavement over a crushed rock base course over a properly prepared (compacted) subgrade
or a granular subbase.
All soil subgrades should be thoroughly compacted, then proof-rolled with a loaded dump truck or
heavy compactor. Any localized zones of yielding subgrade disclosed during this proof-rolling
operation should be over excavated to an additional maximum depth of 12 inches and replaced
with a suitable structural fill material. All structural fill should be compacted according to our
recommendations given in the Structural Fill section. Specifically, the upper 2 feet of soils
underlying pavement section should be compacted to at least 95 percent (based on ASTM D-1557),
and all soils below 2 feet should be compacted to at least 90 percent.
Pavement Materials: For the base course, we recommend using imported crushed rock, such as
"Crushed Surfacing Top Course” per WSDOT Standard Specification 9-03.9(3). If a subbase course
is needed, we recommend using imported, clean, well-graded sand and gravel such as “Ballast” or
“Gravel Borrow” per WSDOT Standard Specifications 9-03.9(1) and 9-03.14, respectively.
Conventional Asphalt Sections: A conventional pavement section typically comprises an asphalt
concrete pavement over a crushed rock base course. We recommend using the following
conventional pavement sections:
Minimum Thickness
Section Automobile Parking Areas Driveways and Areas Subject to
Truck Traffic
Asphalt Concrete Pavement 2 inches 3 inches
Crushed Rock Base 4 inches 6 inches
Compaction and Observation: All subbase and base course material should be compacted to at least
95 percent of the Modified Proctor maximum dry density (ASTM D-1557), and all asphalt concrete
should be compacted to at least 92 percent of the Rice value (ASTM D-2041). We recommend that
an MGI representative be retained to observe the compaction of each course before any overlying
layer is placed. For the subbase and pavement course, compaction is best observed by means of
frequent density testing. For the base course, methodology observations and hand-probing are
more appropriate than density testing.
Pavement Life and Maintenance: No asphalt pavement is maintenance-free. The above described
pavement sections present our minimum recommendations for an average level of performance
during a 20-year design life, therefore, an average level of maintenance will likely be required.
Furthermore, a 20-year pavement life typically assumes that an overlay will be placed after about
10 years. Thicker asphalt and/or thicker base and subbase courses would offer better long-term
Sitts & Hill Engineers, Inc. – WSADA, 621 SW Grady Way, Renton, WA May 18, 2018 / Revised October 26, 2018
Geotechnical Engineering Report P1258-T18
Migizi Group, Inc. Page 9 of 10
performance but would cost more initially; thinner courses would be more susceptible to “alligator”
cracking and other failure modes. As such, pavement design can be considered a compromise
between a high initial cost and low maintenance costs versus a low initial cost and higher
maintenance costs.
4.3 Structural Fill
The term "structural fill" refers to any material placed under foundations, retaining walls, slab-on-
grade floors, sidewalks, pavements, and other structures. Our comments, conclusions, and
recommendations concerning structural fill are presented in the following paragraphs.
Materials: Typical structural fill materials include clean sand, gravel, pea gravel, washed rock,
crushed rock, well-graded mixtures of sand and gravel (commonly called "gravel borrow" or "pit-
run"), and miscellaneous mixtures of silt, sand, and gravel. Recycled asphalt, concrete, and glass,
which are derived from pulverizing the parent materials, are also potentially useful as structural fill
in certain applications. Soils used for structural fill should not contain any organic matter or debris,
nor any individual particles greater than about 6 inches in diameter.
Fill Placement: Clean sand, gravel, crushed rock, soil mixtures, and recycled materials should be
placed in horizontal lifts not exceeding 8 inches in loose thickness, and each lift should be
thoroughly compacted with a mechanical compactor.
Compaction Criteria: Using the Modified Proctor test (ASTM:D-1557) as a standard, we
recommend that structural fill used for various onsite applications be compacted to the following
minimum densities:
Fill Application Minimum
Compaction
Asphalt pavement base
Asphalt pavement subgrade (upper 2 feet)
Asphalt pavement subgrade (below 2 feet)
95 percent
95 percent
90 percent
Subgrade Observation and Compaction Testing: Regardless of material or location, all structural fill
should be placed over firm, unyielding subgrades prepared in accordance with the Site Preparation
section of this report. The condition of all subgrades should be observed by geotechnical personnel
before filling or construction begins. Also, fill soil compaction should be verified by means of
in-place density tests performed during fill placement so that adequacy of soil compaction efforts
may be evaluated as earthwork progresses.
Soil Moisture Considerations: The suitability of soils used for structural fill depends primarily on
their grain-size distribution and moisture content when they are placed. As the "fines" content (that
soil fraction passing the U.S. No. 200 Sieve) increases, soils become more sensitive to small changes
in moisture content. Soils containing more than about 5 percent fines (by weight) cannot be
consistently compacted to a firm, unyielding condition when the moisture content is more than
2 percentage points above or below optimum. For fill placement during wet-weather site work, we
recommend using "clean" fill, which refers to soils that have a fines content of 5 percent or less (by
weight) based on the soil fraction passing the U.S. No. 4 Sieve.
APPROXIMATE SITE
LOCATION
P.O. Box 44840Tacoma, WA 98448
Location Job Number Figure
DateTitle
621 SW Grady WayRenton, Washington
Topographic and Location Map
1
05/16/18
P1258-T18
APPENDIX A
SOIL CLASSIFICATION CHART AND
KEY TO TEST DATA
LOGS OF TEST PITS
CLAYEY GRAVELS, POORLY GRADED GRAVEL-SAND-CLAY
MIXTURES
SILTS AND CLAYSCOARSE GRAINED SOILSMore than Half > #200 sieveLIQUID LIMIT LESS THAN 50
LIQUID LIMIT GREATER THAN 50
CLEAN GRAVELS
WITH LITTLE OR
NO FINES
GRAVELS WITH
OVER 15% FINES
CLEAN SANDS
WITH LITTLE
OR NO FINESMORE THAN HALF
COARSE FRACTION
IS SMALLER THAN
NO. 4 SIEVE
MORE THAN HALF
COARSE FRACTION
IS LARGER THAN
NO. 4 SIEVE
INORGANIC SILTS, MICACEOUS OR DIATOMACIOUS FINE
SANDY OR SILTY SOILS, ELASTIC SILTS
ORGANIC CLAYS AND ORGANIC SILTY CLAYS OF LOW
PLASTICITY
OH
INORGANIC SILTS AND VERY FINE SANDS, ROCK FLOUR,SILTY OR CLAYEY FINE SANDS, OR CLAYEY SILTS WITH
SLIGHT PLASTICITY
CH
SILTY GRAVELS, POORLY GRADED GRAVEL-SAND-SILT
MIXTURES
SANDS
SILTS AND CLAYS
Figure A-1
INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY,
GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS,LEAN CLAYS
R-Value
Sieve Analysis
Swell Test
Cyclic Triaxial
Unconsolidated Undrained Triaxial
Torvane Shear
Unconfined Compression
(Shear Strength, ksf)
Wash Analysis
(with % Passing No. 200 Sieve)
Water Level at Time of Drilling
Water Level after Drilling(with date measured)
RV
SA
SW
TC
TX
TV
UC
(1.2)
WA
(20)
Modified California
Split Spoon
Pushed Shelby Tube
Auger Cuttings
Grab Sample
Sample Attempt with No Recovery
Chemical Analysis
Consolidation
Compaction
Direct Shear
Permeability
Pocket Penetrometer
CA
CN
CP
DS
PM
PP
PtHIGHLY ORGANIC SOILS
TYPICAL NAMES
GRAVELS
ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY,
ORGANIC SILTS
WELL GRADED GRAVELS, GRAVEL-SAND MIXTURES
MAJOR DIVISIONS
PEAT AND OTHER HIGHLY ORGANIC SOILS
WELL GRADED SANDS, GRAVELLY SANDS
POORLY GRADED SANDS, GRAVELLY SANDS
SILTY SANDS, POORLY GRADED SAND-SILT MIXTURES
CLAYEY SANDS, POORLY GRADED SAND-CLAY MIXTURES
POORLY GRADED GRAVELS, GRAVEL-SAND MIXTURES
SOIL CLASSIFICATION CHART AND KEY TO TEST DATA
GW
GP
GM
GC
SW
SP
SM
SC
ML
FINE GRAINED SOILSMore than Half < #200 sieveLGD A NNNN02 GINT US LAB.GPJ 11/4/05INORGANIC CLAYS OF HIGH PLASTICITY, FAT CLAYS
CL
OL
MH
SANDS WITH
OVER 15% FINES
Migizi Group, Inc.
GBS-1
GP-
GM
SM
SP
ML
0.5
2.5
4.0
10.0
(GP-GM) Gray/brown gravel with silt and sand (dense, moist) (Fill)
(SM) Gray silty sand with gravel and concrete/asphalt/brick debris (dense, moist) (Fill)
(SP) Blue/gray fine to medium sand with gravel (medium dense, moist) (Alluvium)
(ML) Blue/gray silt (very soft, wet) (Alluvium)
Moderate caving observed from 4 to 10 feet
Moderate groundwater seepage observed at 4 feet
The depths on the test pit logs are based on an average of measurements across the test pit and should be
considered accurate to 0.5 foot.Bottom of test pit at 10.0 feet.
NOTES
LOGGED BY ZLL
EXCAVATION METHOD Rubber Tracked Mini Excavator
EXCAVATION CONTRACTOR Paulman GROUND WATER LEVELS:
CHECKED BY JEB
DATE STARTED 4/27/18 COMPLETED 4/27/18
AT TIME OF EXCAVATION 4.00 ft Moderate seepage
AT END OF EXCAVATION ---
AFTER EXCAVATION ---
TEST PIT SIZEGROUND ELEVATION
SAMPLE TYPENUMBERDEPTH(ft)0.0
2.5
5.0
7.5
10.0
PAGE 1 OF 1
Figure A-2
TEST PIT NUMBER TP-1
CLIENT Sitts & Hill Engineers, Inc.
PROJECT NUMBER P1258-T18
PROJECT NAME Washington State Auto Dealers Association
PROJECT LOCATION 621 SW Grady Way, Renton, WA
COPY OF GENERAL BH / TP LOGS - FIGURE.GDT - 5/16/18 11:29 - C:\USERS\JESSICA\DESKTOP\TEST PITS AND BORINGS - GINT\P1258-T18\P1258-T18 TEST PITS.GPJMigizi Group, Inc.
PO Box 44840
Tacoma, WA 98448
Telephone: 253-537-9400
Fax: 253-537-9401
U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION
GP-GM
SM
0.8
3.0
(GP-GM) Gray/brown gravel with silt and sand (dense, moist) (Fill)
(SM) Gray silty sand with gravel and concrete/asphalt/brick debris (dense, moist) (Fill)
Refusal at a depth of 3 feet atop a large section of concrete
No caving observedNo groundwater seepage observed
The depths on the test pit logs are based on an average of measurements across the test pit and should beconsidered accurate to 0.5 foot.Bottom of test pit at 3.0 feet.
NOTES
LOGGED BY ZLL
EXCAVATION METHOD Rubber Tracked Mini Excavator
EXCAVATION CONTRACTOR Paulman GROUND WATER LEVELS:
CHECKED BY JEB
DATE STARTED 4/27/18 COMPLETED 4/27/18
AT TIME OF EXCAVATION ---
AT END OF EXCAVATION ---
AFTER EXCAVATION ---
TEST PIT SIZEGROUND ELEVATION
SAMPLE TYPENUMBERDEPTH(ft)0.0
2.5
PAGE 1 OF 1
Figure A-3
TEST PIT NUMBER TP-2
CLIENT Sitts & Hill Engineers, Inc.
PROJECT NUMBER P1258-T18
PROJECT NAME Washington State Auto Dealers Association
PROJECT LOCATION 621 SW Grady Way, Renton, WA
COPY OF GENERAL BH / TP LOGS - FIGURE.GDT - 5/16/18 11:29 - C:\USERS\JESSICA\DESKTOP\TEST PITS AND BORINGS - GINT\P1258-T18\P1258-T18 TEST PITS.GPJMigizi Group, Inc.
PO Box 44840
Tacoma, WA 98448
Telephone: 253-537-9400
Fax: 253-537-9401
U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION
GP-GM
SM
SM
ML
1.0
3.5
4.5
10.0
(GP-GM) Gray/brown gravel with silt and sand (dense, moist) (Fill)
(SM) Gray silty sand with gravel and concrete/asphalt/brick debris (dense, moist) (Fill)
(SM) Gray silty sand with gravel, wood, glass, plastic and other detritus (loose, wet) (Fill)
(ML) Blue/gray mottled silt (very soft, wet) (Alluvium)
Moderate caving observed from 4.5 to 10 feet
Moderate groundwater seepage observed at 4.5 feet
The depths on the test pit logs are based on an average of measurements across the test pit and should be
considered accurate to 0.5 foot.Bottom of test pit at 10.0 feet.
NOTES
LOGGED BY ZLL
EXCAVATION METHOD Rubber Tracked Mini Excavator
EXCAVATION CONTRACTOR Paulman GROUND WATER LEVELS:
CHECKED BY JEB
DATE STARTED 4/27/18 COMPLETED 4/27/18
AT TIME OF EXCAVATION 4.50 ft Moderate seepage
AT END OF EXCAVATION ---
AFTER EXCAVATION ---
TEST PIT SIZEGROUND ELEVATION
SAMPLE TYPENUMBERDEPTH(ft)0.0
2.5
5.0
7.5
10.0
PAGE 1 OF 1
Figure A-4
TEST PIT NUMBER TP-3
CLIENT Sitts & Hill Engineers, Inc.
PROJECT NUMBER P1258-T18
PROJECT NAME Washington State Auto Dealers Association
PROJECT LOCATION 621 SW Grady Way, Renton, WA
COPY OF GENERAL BH / TP LOGS - FIGURE.GDT - 5/16/18 11:29 - C:\USERS\JESSICA\DESKTOP\TEST PITS AND BORINGS - GINT\P1258-T18\P1258-T18 TEST PITS.GPJMigizi Group, Inc.
PO Box 44840
Tacoma, WA 98448
Telephone: 253-537-9400
Fax: 253-537-9401
U.S.C.S.GRAPHICLOGMATERIAL DESCRIPTION
APPENDIX B
KLEINFELDER BORING LOGS AND
TEST PIT LOGS
WSADA PARKING LOT
TECHNICAL INFORMATION REPORT
SITTS & HILL ENGINEERS, INC.
TACOMA, WASHINGTON
A.7 WWHM Reports
WWHM2012
PROJECT REPORT
FILTERRA 01
CONVEYANCE
CALCULATION
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:17 AM Page 2
General Model Information
Project Name:2018-10-25 Filterra 01 Conveyance Calculation
Site Name:
Site Address:
City:
Report Date:10/25/2018
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2018/07/12
Version:4.2.15
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:17 AM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.011
Pervious Total 0.011
Impervious Land Use acre
DRIVEWAYS FLAT 0.06
Impervious Total 0.06
Basin Total 0.071
Element Flows To:
Surface Interflow Groundwater
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:17 AM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.028
Pervious Total 0.028
Impervious Land Use acre
DRIVEWAYS FLAT 0.114
Impervious Total 0.114
Basin Total 0.142
Element Flows To:
Surface Interflow Groundwater
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:17 AM Page 5
Routing Elements
Predeveloped Routing
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:17 AM Page 6
Mitigated Routing
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:17 AM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.011
Total Impervious Area:0.06
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.028
Total Impervious Area:0.114
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.02358
5 year 0.030031
10 year 0.034441
25 year 0.040191
50 year 0.044611
100 year 0.049154
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.045252
5 year 0.0578
10 year 0.066399
25 year 0.077628
50 year 0.086273
100 year 0.09517
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.031 0.060
1950 0.032 0.061
1951 0.019 0.038
1952 0.017 0.032
1953 0.018 0.034
1954 0.019 0.037
1955 0.022 0.041
1956 0.021 0.041
1957 0.025 0.047
1958 0.019 0.037
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:57 AM Page 8
1959 0.019 0.037
1960 0.020 0.039
1961 0.021 0.040
1962 0.018 0.034
1963 0.020 0.039
1964 0.019 0.037
1965 0.025 0.049
1966 0.017 0.032
1967 0.029 0.055
1968 0.033 0.063
1969 0.023 0.045
1970 0.022 0.042
1971 0.026 0.050
1972 0.028 0.054
1973 0.016 0.030
1974 0.024 0.047
1975 0.027 0.051
1976 0.019 0.036
1977 0.019 0.037
1978 0.024 0.045
1979 0.033 0.062
1980 0.031 0.061
1981 0.025 0.047
1982 0.035 0.068
1983 0.028 0.053
1984 0.018 0.034
1985 0.025 0.047
1986 0.021 0.040
1987 0.032 0.061
1988 0.019 0.037
1989 0.024 0.046
1990 0.045 0.088
1991 0.035 0.068
1992 0.018 0.034
1993 0.015 0.029
1994 0.016 0.031
1995 0.022 0.042
1996 0.024 0.046
1997 0.023 0.044
1998 0.023 0.043
1999 0.048 0.092
2000 0.023 0.045
2001 0.025 0.048
2002 0.031 0.059
2003 0.024 0.046
2004 0.044 0.086
2005 0.020 0.039
2006 0.018 0.035
2007 0.042 0.080
2008 0.035 0.067
2009 0.030 0.056
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0476 0.0919
2 0.0449 0.0880
3 0.0444 0.0855
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:57 AM Page 9
4 0.0417 0.0804
5 0.0351 0.0685
6 0.0351 0.0675
7 0.0345 0.0672
8 0.0328 0.0628
9 0.0327 0.0624
10 0.0323 0.0615
11 0.0322 0.0615
12 0.0314 0.0611
13 0.0312 0.0604
14 0.0306 0.0593
15 0.0296 0.0563
16 0.0288 0.0552
17 0.0280 0.0543
18 0.0278 0.0531
19 0.0267 0.0508
20 0.0262 0.0504
21 0.0254 0.0491
22 0.0251 0.0477
23 0.0246 0.0474
24 0.0245 0.0471
25 0.0245 0.0470
26 0.0242 0.0466
27 0.0242 0.0462
28 0.0239 0.0461
29 0.0239 0.0460
30 0.0238 0.0455
31 0.0234 0.0450
32 0.0232 0.0447
33 0.0230 0.0443
34 0.0226 0.0431
35 0.0220 0.0422
36 0.0217 0.0415
37 0.0216 0.0414
38 0.0213 0.0408
39 0.0210 0.0402
40 0.0209 0.0400
41 0.0203 0.0392
42 0.0202 0.0389
43 0.0201 0.0388
44 0.0195 0.0376
45 0.0195 0.0371
46 0.0194 0.0370
47 0.0194 0.0369
48 0.0194 0.0368
49 0.0192 0.0368
50 0.0192 0.0366
51 0.0187 0.0360
52 0.0181 0.0350
53 0.0179 0.0342
54 0.0178 0.0341
55 0.0178 0.0339
56 0.0177 0.0339
57 0.0166 0.0318
58 0.0166 0.0316
59 0.0162 0.0307
60 0.0159 0.0302
61 0.0151 0.0288
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:57 AM Page 10
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:57 AM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0118 1739 11727 674 Fail
0.0121 1589 10945 688 Fail
0.0125 1440 10237 710 Fail
0.0128 1288 9616 746 Fail
0.0131 1170 9035 772 Fail
0.0134 1062 8472 797 Fail
0.0138 973 7978 819 Fail
0.0141 896 7454 831 Fail
0.0144 823 6998 850 Fail
0.0148 749 6545 873 Fail
0.0151 686 6188 902 Fail
0.0154 636 5809 913 Fail
0.0158 590 5463 925 Fail
0.0161 551 5142 933 Fail
0.0164 510 4823 945 Fail
0.0168 463 4543 981 Fail
0.0171 431 4288 994 Fail
0.0174 398 4028 1012 Fail
0.0178 371 3797 1023 Fail
0.0181 351 3595 1024 Fail
0.0184 326 3418 1048 Fail
0.0188 303 3230 1066 Fail
0.0191 283 3071 1085 Fail
0.0194 261 2909 1114 Fail
0.0197 246 2744 1115 Fail
0.0201 228 2607 1143 Fail
0.0204 213 2466 1157 Fail
0.0207 201 2353 1170 Fail
0.0211 188 2227 1184 Fail
0.0214 174 2131 1224 Fail
0.0217 162 2010 1240 Fail
0.0221 151 1892 1252 Fail
0.0224 145 1791 1235 Fail
0.0227 136 1686 1239 Fail
0.0231 124 1621 1307 Fail
0.0234 117 1547 1322 Fail
0.0237 112 1474 1316 Fail
0.0241 105 1384 1318 Fail
0.0244 99 1309 1322 Fail
0.0247 92 1242 1350 Fail
0.0251 85 1173 1380 Fail
0.0254 82 1116 1360 Fail
0.0257 79 1064 1346 Fail
0.0260 78 1019 1306 Fail
0.0264 72 977 1356 Fail
0.0267 69 933 1352 Fail
0.0270 62 892 1438 Fail
0.0274 61 849 1391 Fail
0.0277 59 819 1388 Fail
0.0280 54 774 1433 Fail
0.0284 52 743 1428 Fail
0.0287 51 711 1394 Fail
0.0290 48 677 1410 Fail
0.0294 46 650 1413 Fail
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:57 AM Page 12
0.0297 42 627 1492 Fail
0.0300 40 606 1515 Fail
0.0304 38 575 1513 Fail
0.0307 35 562 1605 Fail
0.0310 32 534 1668 Fail
0.0313 29 520 1793 Fail
0.0317 27 499 1848 Fail
0.0320 25 474 1895 Fail
0.0323 23 454 1973 Fail
0.0327 20 431 2155 Fail
0.0330 16 418 2612 Fail
0.0333 16 403 2518 Fail
0.0337 15 387 2580 Fail
0.0340 14 373 2664 Fail
0.0343 12 360 3000 Fail
0.0347 11 354 3218 Fail
0.0350 10 342 3420 Fail
0.0353 8 326 4075 Fail
0.0357 8 315 3937 Fail
0.0360 8 307 3837 Fail
0.0363 8 294 3675 Fail
0.0367 8 281 3512 Fail
0.0370 8 268 3350 Fail
0.0373 8 260 3250 Fail
0.0376 8 250 3125 Fail
0.0380 8 244 3050 Fail
0.0383 8 232 2900 Fail
0.0386 8 225 2812 Fail
0.0390 8 219 2737 Fail
0.0393 8 209 2612 Fail
0.0396 7 204 2914 Fail
0.0400 6 199 3316 Fail
0.0403 6 192 3200 Fail
0.0406 6 184 3066 Fail
0.0410 6 178 2966 Fail
0.0413 6 171 2850 Fail
0.0416 6 164 2733 Fail
0.0420 5 160 3200 Fail
0.0423 5 153 3060 Fail
0.0426 4 146 3650 Fail
0.0430 4 145 3625 Fail
0.0433 4 141 3525 Fail
0.0436 3 135 4500 Fail
0.0439 3 131 4366 Fail
0.0443 3 127 4233 Fail
0.0446 2 122 6100 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:57 AM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0 acre-feet
On-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Off-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:35:57 AM Page 14
LID Report
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:36:26 AM Page 15
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:36:26 AM Page 16
Appendix
Predeveloped Schematic
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:36:27 AM Page 17
Mitigated Schematic
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:36:28 AM Page 18
Predeveloped UCI File
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:36:28 AM Page 19
Mitigated UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 2018-10-25 Filterra 01 Conveyance Calculation.wdm
MESSU 25 Mit2018-10-25 Filterra 01 Conveyance Calculation.MES
27 Mit2018-10-25 Filterra 01 Conveyance Calculation.L61
28 Mit2018-10-25 Filterra 01 Conveyance Calculation.L62
30 POC2018-10-25 Filterra 01 Conveyance Calculation1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 16
IMPLND 5
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Basin 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
16 C, Lawn, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
16 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
16 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:36:28 AM Page 20
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
16 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
16 0 4.5 0.03 400 0.05 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
16 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
16 0.1 0.25 0.25 6 0.5 0.25
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
16 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
5 DRIVEWAYS/FLAT 1 1 1 27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
5 0 0 1 0 0 0
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
5 0 0 4 0 0 0 1 9
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
5 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
5 400 0.01 0.1 0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
5 0 0
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:36:28 AM Page 21
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
5 0 0
END IWAT-STATE1
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Basin 1***
PERLND 16 0.028 COPY 501 12
PERLND 16 0.028 COPY 501 13
IMPLND 5 0.114 COPY 501 15
******Routing******
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:36:28 AM Page 22
END SPEC-ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
MASS-LINK 15
IMPLND IWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 15
END MASS-LINK
END RUN
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:36:28 AM Page 23
Predeveloped HSPF Message File
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:36:28 AM Page 24
Mitigated HSPF Message File
2018-10-25 Filterra 01 Conveyance Calculation 10/25/2018 7:36:28 AM Page 25
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2018; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
FILTERRA 02
CONVEYANCE
CALCULATION
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:47:54 AM Page 2
General Model Information
Project Name:2018-10-25 Filterra 02 Conveyance Calculation
Site Name:
Site Address:
City:
Report Date:10/25/2018
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2018/07/12
Version:4.2.15
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:47:54 AM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.011
Pervious Total 0.011
Impervious Land Use acre
DRIVEWAYS FLAT 0.06
Impervious Total 0.06
Basin Total 0.071
Element Flows To:
Surface Interflow Groundwater
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:47:54 AM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.038
Pervious Total 0.038
Impervious Land Use acre
DRIVEWAYS FLAT 0.147
Impervious Total 0.147
Basin Total 0.185
Element Flows To:
Surface Interflow Groundwater
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:47:54 AM Page 5
Routing Elements
Predeveloped Routing
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:47:54 AM Page 6
Mitigated Routing
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:47:54 AM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.011
Total Impervious Area:0.06
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.038
Total Impervious Area:0.147
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.02358
5 year 0.030031
10 year 0.034441
25 year 0.040191
50 year 0.044611
100 year 0.049154
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.058473
5 year 0.07473
10 year 0.085877
25 year 0.100438
50 year 0.111653
100 year 0.123196
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.031 0.078
1950 0.032 0.079
1951 0.019 0.049
1952 0.017 0.041
1953 0.018 0.044
1954 0.019 0.048
1955 0.022 0.053
1956 0.021 0.053
1957 0.025 0.061
1958 0.019 0.048
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:48:34 AM Page 8
1959 0.019 0.048
1960 0.020 0.050
1961 0.021 0.052
1962 0.018 0.044
1963 0.020 0.050
1964 0.019 0.047
1965 0.025 0.064
1966 0.017 0.041
1967 0.029 0.071
1968 0.033 0.081
1969 0.023 0.058
1970 0.022 0.055
1971 0.026 0.065
1972 0.028 0.070
1973 0.016 0.039
1974 0.024 0.060
1975 0.027 0.065
1976 0.019 0.047
1977 0.019 0.048
1978 0.024 0.059
1979 0.033 0.081
1980 0.031 0.079
1981 0.025 0.061
1982 0.035 0.087
1983 0.028 0.069
1984 0.018 0.044
1985 0.025 0.061
1986 0.021 0.052
1987 0.032 0.079
1988 0.019 0.047
1989 0.024 0.059
1990 0.045 0.114
1991 0.035 0.089
1992 0.018 0.044
1993 0.015 0.037
1994 0.016 0.040
1995 0.022 0.054
1996 0.024 0.060
1997 0.023 0.057
1998 0.023 0.056
1999 0.048 0.119
2000 0.023 0.058
2001 0.025 0.062
2002 0.031 0.077
2003 0.024 0.060
2004 0.044 0.111
2005 0.020 0.051
2006 0.018 0.045
2007 0.042 0.104
2008 0.035 0.087
2009 0.030 0.073
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0476 0.1189
2 0.0449 0.1142
3 0.0444 0.1106
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:48:34 AM Page 9
4 0.0417 0.1040
5 0.0351 0.0887
6 0.0351 0.0873
7 0.0345 0.0871
8 0.0328 0.0811
9 0.0327 0.0805
10 0.0323 0.0794
11 0.0322 0.0793
12 0.0314 0.0792
13 0.0312 0.0781
14 0.0306 0.0767
15 0.0296 0.0725
16 0.0288 0.0713
17 0.0280 0.0704
18 0.0278 0.0686
19 0.0267 0.0655
20 0.0262 0.0651
21 0.0254 0.0636
22 0.0251 0.0616
23 0.0246 0.0613
24 0.0245 0.0608
25 0.0245 0.0608
26 0.0242 0.0602
27 0.0242 0.0598
28 0.0239 0.0596
29 0.0239 0.0593
30 0.0238 0.0586
31 0.0234 0.0582
32 0.0232 0.0578
33 0.0230 0.0574
34 0.0226 0.0556
35 0.0220 0.0546
36 0.0217 0.0536
37 0.0216 0.0534
38 0.0213 0.0527
39 0.0210 0.0519
40 0.0209 0.0517
41 0.0203 0.0507
42 0.0202 0.0503
43 0.0201 0.0503
44 0.0195 0.0487
45 0.0195 0.0479
46 0.0194 0.0477
47 0.0194 0.0476
48 0.0194 0.0475
49 0.0192 0.0474
50 0.0192 0.0474
51 0.0187 0.0466
52 0.0181 0.0453
53 0.0179 0.0442
54 0.0178 0.0440
55 0.0178 0.0438
56 0.0177 0.0437
57 0.0166 0.0411
58 0.0166 0.0408
59 0.0162 0.0396
60 0.0159 0.0389
61 0.0151 0.0372
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:48:34 AM Page 10
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:48:34 AM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0118 1739 20364 1171 Fail
0.0121 1589 19276 1213 Fail
0.0125 1440 18296 1270 Fail
0.0128 1288 17310 1343 Fail
0.0131 1170 16380 1400 Fail
0.0134 1062 15492 1458 Fail
0.0138 973 14675 1508 Fail
0.0141 896 13918 1553 Fail
0.0144 823 13225 1606 Fail
0.0148 749 12611 1683 Fail
0.0151 686 11982 1746 Fail
0.0154 636 11372 1788 Fail
0.0158 590 10765 1824 Fail
0.0161 551 10220 1854 Fail
0.0164 510 9719 1905 Fail
0.0168 463 9263 2000 Fail
0.0171 431 8829 2048 Fail
0.0174 398 8393 2108 Fail
0.0178 371 8023 2162 Fail
0.0181 351 7627 2172 Fail
0.0184 326 7223 2215 Fail
0.0188 303 6894 2275 Fail
0.0191 283 6534 2308 Fail
0.0194 261 6261 2398 Fail
0.0197 246 5955 2420 Fail
0.0201 228 5696 2498 Fail
0.0204 213 5431 2549 Fail
0.0207 201 5176 2575 Fail
0.0211 188 4937 2626 Fail
0.0214 174 4708 2705 Fail
0.0217 162 4487 2769 Fail
0.0221 151 4297 2845 Fail
0.0224 145 4096 2824 Fail
0.0227 136 3882 2854 Fail
0.0231 124 3737 3013 Fail
0.0234 117 3583 3062 Fail
0.0237 112 3450 3080 Fail
0.0241 105 3300 3142 Fail
0.0244 99 3163 3194 Fail
0.0247 92 3052 3317 Fail
0.0251 85 2911 3424 Fail
0.0254 82 2785 3396 Fail
0.0257 79 2671 3381 Fail
0.0260 78 2567 3291 Fail
0.0264 72 2455 3409 Fail
0.0267 69 2370 3434 Fail
0.0270 62 2276 3670 Fail
0.0274 61 2190 3590 Fail
0.0277 59 2118 3589 Fail
0.0280 54 2023 3746 Fail
0.0284 52 1924 3700 Fail
0.0287 51 1845 3617 Fail
0.0290 48 1776 3700 Fail
0.0294 46 1686 3665 Fail
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:48:34 AM Page 12
0.0297 42 1637 3897 Fail
0.0300 40 1574 3934 Fail
0.0304 38 1519 3997 Fail
0.0307 35 1463 4180 Fail
0.0310 32 1393 4353 Fail
0.0313 29 1336 4606 Fail
0.0317 27 1280 4740 Fail
0.0320 25 1227 4908 Fail
0.0323 23 1178 5121 Fail
0.0327 20 1129 5645 Fail
0.0330 16 1083 6768 Fail
0.0333 16 1052 6575 Fail
0.0337 15 1013 6753 Fail
0.0340 14 980 7000 Fail
0.0343 12 948 7900 Fail
0.0347 11 922 8381 Fail
0.0350 10 883 8830 Fail
0.0353 8 856 10700 Fail
0.0357 8 827 10337 Fail
0.0360 8 797 9962 Fail
0.0363 8 765 9562 Fail
0.0367 8 740 9250 Fail
0.0370 8 714 8925 Fail
0.0373 8 690 8625 Fail
0.0376 8 673 8412 Fail
0.0380 8 647 8087 Fail
0.0383 8 629 7862 Fail
0.0386 8 617 7712 Fail
0.0390 8 587 7337 Fail
0.0393 8 572 7150 Fail
0.0396 7 561 8014 Fail
0.0400 6 541 9016 Fail
0.0403 6 526 8766 Fail
0.0406 6 515 8583 Fail
0.0410 6 497 8283 Fail
0.0413 6 481 8016 Fail
0.0416 6 463 7716 Fail
0.0420 5 444 8880 Fail
0.0423 5 427 8540 Fail
0.0426 4 417 10425 Fail
0.0430 4 410 10250 Fail
0.0433 4 394 9850 Fail
0.0436 3 383 12766 Fail
0.0439 3 372 12400 Fail
0.0443 3 364 12133 Fail
0.0446 2 358 17900 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:48:34 AM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0 acre-feet
On-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Off-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:48:34 AM Page 14
LID Report
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:49:04 AM Page 15
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:49:04 AM Page 16
Appendix
Predeveloped Schematic
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:49:05 AM Page 17
Mitigated Schematic
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:49:06 AM Page 18
Predeveloped UCI File
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:49:06 AM Page 19
Mitigated UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 2018-10-25 Filterra 02 Conveyance Calculation.wdm
MESSU 25 Mit2018-10-25 Filterra 02 Conveyance Calculation.MES
27 Mit2018-10-25 Filterra 02 Conveyance Calculation.L61
28 Mit2018-10-25 Filterra 02 Conveyance Calculation.L62
30 POC2018-10-25 Filterra 02 Conveyance Calculation1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 16
IMPLND 5
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Basin 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
16 C, Lawn, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
16 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
16 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:49:06 AM Page 20
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
16 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
16 0 4.5 0.03 400 0.05 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
16 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
16 0.1 0.25 0.25 6 0.5 0.25
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
16 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
5 DRIVEWAYS/FLAT 1 1 1 27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
5 0 0 1 0 0 0
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
5 0 0 4 0 0 0 1 9
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
5 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
5 400 0.01 0.1 0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
5 0 0
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:49:06 AM Page 21
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
5 0 0
END IWAT-STATE1
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Basin 1***
PERLND 16 0.038 COPY 501 12
PERLND 16 0.038 COPY 501 13
IMPLND 5 0.147 COPY 501 15
******Routing******
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:49:06 AM Page 22
END SPEC-ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
MASS-LINK 15
IMPLND IWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 15
END MASS-LINK
END RUN
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:49:07 AM Page 23
Predeveloped HSPF Message File
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:49:07 AM Page 24
Mitigated HSPF Message File
2018-10-25 Filterra 02 Conveyance Calculation 10/25/2018 7:49:07 AM Page 25
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2018; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
FILTERRA 03
CONVEYANCE
CALCULATION
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:29:57 AM Page 2
General Model Information
Project Name:2018-10-25 Filterra 03 Conveyance Calculation
Site Name:
Site Address:
City:
Report Date:10/25/2018
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2018/07/12
Version:4.2.15
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:29:57 AM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.011
Pervious Total 0.011
Impervious Land Use acre
DRIVEWAYS FLAT 0.06
Impervious Total 0.06
Basin Total 0.071
Element Flows To:
Surface Interflow Groundwater
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:29:57 AM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.023
Pervious Total 0.023
Impervious Land Use acre
DRIVEWAYS FLAT 0.104
Impervious Total 0.104
Basin Total 0.127
Element Flows To:
Surface Interflow Groundwater
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:29:57 AM Page 5
Routing Elements
Predeveloped Routing
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:29:57 AM Page 6
Mitigated Routing
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:29:57 AM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.011
Total Impervious Area:0.06
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.023
Total Impervious Area:0.104
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.02358
5 year 0.030031
10 year 0.034441
25 year 0.040191
50 year 0.044611
100 year 0.049154
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.041121
5 year 0.052463
10 year 0.060229
25 year 0.070364
50 year 0.078163
100 year 0.086184
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.031 0.055
1950 0.032 0.056
1951 0.019 0.034
1952 0.017 0.029
1953 0.018 0.031
1954 0.019 0.033
1955 0.022 0.038
1956 0.021 0.037
1957 0.025 0.043
1958 0.019 0.034
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:30:37 AM Page 8
1959 0.019 0.034
1960 0.020 0.035
1961 0.021 0.036
1962 0.018 0.031
1963 0.020 0.035
1964 0.019 0.033
1965 0.025 0.045
1966 0.017 0.029
1967 0.029 0.050
1968 0.033 0.057
1969 0.023 0.041
1970 0.022 0.038
1971 0.026 0.046
1972 0.028 0.049
1973 0.016 0.028
1974 0.024 0.042
1975 0.027 0.046
1976 0.019 0.033
1977 0.019 0.034
1978 0.024 0.041
1979 0.033 0.057
1980 0.031 0.055
1981 0.025 0.043
1982 0.035 0.061
1983 0.028 0.048
1984 0.018 0.031
1985 0.025 0.043
1986 0.021 0.036
1987 0.032 0.056
1988 0.019 0.034
1989 0.024 0.042
1990 0.045 0.079
1991 0.035 0.062
1992 0.018 0.031
1993 0.015 0.026
1994 0.016 0.028
1995 0.022 0.038
1996 0.024 0.042
1997 0.023 0.040
1998 0.023 0.039
1999 0.048 0.083
2000 0.023 0.041
2001 0.025 0.044
2002 0.031 0.054
2003 0.024 0.042
2004 0.044 0.078
2005 0.020 0.036
2006 0.018 0.032
2007 0.042 0.073
2008 0.035 0.061
2009 0.030 0.051
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0476 0.0833
2 0.0449 0.0793
3 0.0444 0.0776
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:30:37 AM Page 9
4 0.0417 0.0729
5 0.0351 0.0618
6 0.0351 0.0613
7 0.0345 0.0607
8 0.0328 0.0571
9 0.0327 0.0569
10 0.0323 0.0560
11 0.0322 0.0560
12 0.0314 0.0553
13 0.0312 0.0547
14 0.0306 0.0537
15 0.0296 0.0513
16 0.0288 0.0501
17 0.0280 0.0492
18 0.0278 0.0484
19 0.0267 0.0463
20 0.0262 0.0458
21 0.0254 0.0445
22 0.0251 0.0435
23 0.0246 0.0430
24 0.0245 0.0428
25 0.0245 0.0428
26 0.0242 0.0422
27 0.0242 0.0420
28 0.0239 0.0419
29 0.0239 0.0417
30 0.0238 0.0414
31 0.0234 0.0409
32 0.0232 0.0405
33 0.0230 0.0402
34 0.0226 0.0392
35 0.0220 0.0384
36 0.0217 0.0378
37 0.0216 0.0376
38 0.0213 0.0371
39 0.0210 0.0365
40 0.0209 0.0364
41 0.0203 0.0356
42 0.0202 0.0353
43 0.0201 0.0352
44 0.0195 0.0341
45 0.0195 0.0338
46 0.0194 0.0337
47 0.0194 0.0336
48 0.0194 0.0335
49 0.0192 0.0335
50 0.0192 0.0333
51 0.0187 0.0327
52 0.0181 0.0317
53 0.0179 0.0311
54 0.0178 0.0311
55 0.0178 0.0309
56 0.0177 0.0308
57 0.0166 0.0289
58 0.0166 0.0288
59 0.0162 0.0280
60 0.0159 0.0276
61 0.0151 0.0262
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:30:37 AM Page 10
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:30:37 AM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0118 1739 9281 533 Fail
0.0121 1589 8673 545 Fail
0.0125 1440 8094 562 Fail
0.0128 1288 7552 586 Fail
0.0131 1170 7035 601 Fail
0.0134 1062 6536 615 Fail
0.0138 973 6141 631 Fail
0.0141 896 5724 638 Fail
0.0144 823 5360 651 Fail
0.0148 749 5005 668 Fail
0.0151 686 4695 684 Fail
0.0154 636 4387 689 Fail
0.0158 590 4113 697 Fail
0.0161 551 3841 697 Fail
0.0164 510 3608 707 Fail
0.0168 463 3407 735 Fail
0.0171 431 3215 745 Fail
0.0174 398 3044 764 Fail
0.0178 371 2866 772 Fail
0.0181 351 2686 765 Fail
0.0184 326 2530 776 Fail
0.0188 303 2398 791 Fail
0.0191 283 2263 799 Fail
0.0194 261 2145 821 Fail
0.0197 246 2023 822 Fail
0.0201 228 1896 831 Fail
0.0204 213 1781 836 Fail
0.0207 201 1669 830 Fail
0.0211 188 1595 848 Fail
0.0214 174 1511 868 Fail
0.0217 162 1422 877 Fail
0.0221 151 1339 886 Fail
0.0224 145 1262 870 Fail
0.0227 136 1185 871 Fail
0.0231 124 1118 901 Fail
0.0234 117 1063 908 Fail
0.0237 112 1014 905 Fail
0.0241 105 962 916 Fail
0.0244 99 920 929 Fail
0.0247 92 874 950 Fail
0.0251 85 831 977 Fail
0.0254 82 790 963 Fail
0.0257 79 752 951 Fail
0.0260 78 718 920 Fail
0.0264 72 679 943 Fail
0.0267 69 653 946 Fail
0.0270 62 624 1006 Fail
0.0274 61 594 973 Fail
0.0277 59 571 967 Fail
0.0280 54 553 1024 Fail
0.0284 52 527 1013 Fail
0.0287 51 509 998 Fail
0.0290 48 482 1004 Fail
0.0294 46 455 989 Fail
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:30:37 AM Page 12
0.0297 42 434 1033 Fail
0.0300 40 418 1045 Fail
0.0304 38 402 1057 Fail
0.0307 35 385 1100 Fail
0.0310 32 367 1146 Fail
0.0313 29 358 1234 Fail
0.0317 27 347 1285 Fail
0.0320 25 330 1320 Fail
0.0323 23 314 1365 Fail
0.0327 20 308 1540 Fail
0.0330 16 293 1831 Fail
0.0333 16 279 1743 Fail
0.0337 15 266 1773 Fail
0.0340 14 258 1842 Fail
0.0343 12 247 2058 Fail
0.0347 11 236 2145 Fail
0.0350 10 227 2270 Fail
0.0353 8 220 2750 Fail
0.0357 8 209 2612 Fail
0.0360 8 203 2537 Fail
0.0363 8 200 2500 Fail
0.0367 8 189 2362 Fail
0.0370 8 181 2262 Fail
0.0373 8 175 2187 Fail
0.0376 8 168 2100 Fail
0.0380 8 162 2025 Fail
0.0383 8 156 1950 Fail
0.0386 8 146 1825 Fail
0.0390 8 145 1812 Fail
0.0393 8 141 1762 Fail
0.0396 7 136 1942 Fail
0.0400 6 130 2166 Fail
0.0403 6 124 2066 Fail
0.0406 6 120 2000 Fail
0.0410 6 116 1933 Fail
0.0413 6 113 1883 Fail
0.0416 6 111 1850 Fail
0.0420 5 104 2080 Fail
0.0423 5 101 2020 Fail
0.0426 4 100 2500 Fail
0.0430 4 95 2375 Fail
0.0433 4 90 2250 Fail
0.0436 3 84 2800 Fail
0.0439 3 82 2733 Fail
0.0443 3 82 2733 Fail
0.0446 2 80 4000 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:30:37 AM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0 acre-feet
On-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Off-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:30:37 AM Page 14
LID Report
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:31:11 AM Page 15
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:31:11 AM Page 16
Appendix
Predeveloped Schematic
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:31:13 AM Page 17
Mitigated Schematic
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:31:14 AM Page 18
Predeveloped UCI File
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:31:14 AM Page 19
Mitigated UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 2018-10-25 Filterra 03 Conveyance Calculation.wdm
MESSU 25 Mit2018-10-25 Filterra 03 Conveyance Calculation.MES
27 Mit2018-10-25 Filterra 03 Conveyance Calculation.L61
28 Mit2018-10-25 Filterra 03 Conveyance Calculation.L62
30 POC2018-10-25 Filterra 03 Conveyance Calculation1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 16
IMPLND 5
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Basin 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
16 C, Lawn, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
16 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
16 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:31:14 AM Page 20
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
16 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
16 0 4.5 0.03 400 0.05 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
16 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
16 0.1 0.25 0.25 6 0.5 0.25
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
16 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
5 DRIVEWAYS/FLAT 1 1 1 27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
5 0 0 1 0 0 0
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
5 0 0 4 0 0 0 1 9
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
5 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
5 400 0.01 0.1 0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
5 0 0
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:31:14 AM Page 21
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
5 0 0
END IWAT-STATE1
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Basin 1***
PERLND 16 0.023 COPY 501 12
PERLND 16 0.023 COPY 501 13
IMPLND 5 0.104 COPY 501 15
******Routing******
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:31:14 AM Page 22
END SPEC-ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
MASS-LINK 15
IMPLND IWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 15
END MASS-LINK
END RUN
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:31:14 AM Page 23
Predeveloped HSPF Message File
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:31:14 AM Page 24
Mitigated HSPF Message File
2018-10-25 Filterra 03 Conveyance Calculation 10/25/2018 7:31:15 AM Page 25
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2018; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
FLOW CONTROL
CALCULATION
2018-10-25 Flow Control Calculation 10/26/2018 12:49:45 PM Page 2
General Model Information
Project Name:2018-10-25 Flow Control Calculation
Site Name:
Site Address:
City:
Report Date:10/26/2018
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2018/07/12
Version:4.2.15
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
2018-10-25 Flow Control Calculation 10/26/2018 12:49:45 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.074
C, Lawn, Mod 0.25
Pervious Total 0.324
Impervious Land Use acre
DRIVEWAYS FLAT 0.082
Impervious Total 0.082
Basin Total 0.406
Element Flows To:
Surface Interflow Groundwater
2018-10-25 Flow Control Calculation 10/26/2018 12:49:45 PM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.089
Pervious Total 0.089
Impervious Land Use acre
DRIVEWAYS FLAT 0.317
Impervious Total 0.317
Basin Total 0.406
Element Flows To:
Surface Interflow Groundwater
2018-10-25 Flow Control Calculation 10/26/2018 12:49:45 PM Page 5
Routing Elements
Predeveloped Routing
2018-10-25 Flow Control Calculation 10/26/2018 12:49:45 PM Page 6
Mitigated Routing
2018-10-25 Flow Control Calculation 10/26/2018 12:49:45 PM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.324
Total Impervious Area:0.082
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.089
Total Impervious Area:0.317
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.057971
5 year 0.0873
10 year 0.109606
25 year 0.141175
50 year 0.16722
100 year 0.195496
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.126543
5 year 0.161895
10 year 0.186151
25 year 0.217859
50 year 0.242292
100 year 0.267452
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.097 0.169
1950 0.099 0.171
1951 0.057 0.106
1952 0.033 0.088
1953 0.029 0.095
1954 0.046 0.103
1955 0.047 0.116
1956 0.049 0.114
1957 0.068 0.133
1958 0.040 0.104
2018-10-25 Flow Control Calculation 10/26/2018 12:50:24 PM Page 8
1959 0.032 0.102
1960 0.061 0.109
1961 0.052 0.112
1962 0.032 0.094
1963 0.053 0.109
1964 0.045 0.102
1965 0.073 0.138
1966 0.036 0.089
1967 0.098 0.154
1968 0.079 0.176
1969 0.065 0.125
1970 0.053 0.118
1971 0.065 0.141
1972 0.092 0.153
1973 0.030 0.084
1974 0.067 0.130
1975 0.071 0.141
1976 0.050 0.101
1977 0.045 0.103
1978 0.054 0.126
1979 0.052 0.174
1980 0.114 0.172
1981 0.055 0.131
1982 0.108 0.189
1983 0.057 0.148
1984 0.041 0.096
1985 0.055 0.132
1986 0.056 0.112
1987 0.056 0.171
1988 0.027 0.102
1989 0.033 0.128
1990 0.187 0.249
1991 0.129 0.193
1992 0.043 0.095
1993 0.028 0.080
1994 0.023 0.085
1995 0.047 0.116
1996 0.088 0.130
1997 0.066 0.124
1998 0.051 0.120
1999 0.141 0.258
2000 0.060 0.126
2001 0.042 0.133
2002 0.093 0.167
2003 0.077 0.129
2004 0.125 0.240
2005 0.055 0.110
2006 0.054 0.098
2007 0.172 0.225
2008 0.125 0.189
2009 0.073 0.156
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.1871 0.2577
2 0.1719 0.2488
3 0.1407 0.2398
2018-10-25 Flow Control Calculation 10/26/2018 12:50:24 PM Page 9
4 0.1294 0.2255
5 0.1252 0.1930
6 0.1252 0.1895
7 0.1138 0.1892
8 0.1077 0.1756
9 0.0993 0.1737
10 0.0983 0.1722
11 0.0975 0.1714
12 0.0927 0.1712
13 0.0922 0.1694
14 0.0878 0.1665
15 0.0786 0.1565
16 0.0773 0.1542
17 0.0732 0.1529
18 0.0725 0.1482
19 0.0715 0.1412
20 0.0681 0.1410
21 0.0674 0.1378
22 0.0661 0.1330
23 0.0652 0.1329
24 0.0651 0.1316
25 0.0606 0.1314
26 0.0595 0.1304
27 0.0573 0.1299
28 0.0573 0.1294
29 0.0559 0.1279
30 0.0556 0.1265
31 0.0554 0.1260
32 0.0554 0.1253
33 0.0546 0.1244
34 0.0545 0.1202
35 0.0542 0.1181
36 0.0532 0.1160
37 0.0531 0.1155
38 0.0521 0.1140
39 0.0519 0.1125
40 0.0514 0.1116
41 0.0501 0.1099
42 0.0486 0.1091
43 0.0474 0.1089
44 0.0466 0.1056
45 0.0463 0.1035
46 0.0454 0.1031
47 0.0452 0.1029
48 0.0429 0.1025
49 0.0417 0.1024
50 0.0405 0.1023
51 0.0397 0.1009
52 0.0358 0.0983
53 0.0332 0.0956
54 0.0327 0.0950
55 0.0325 0.0947
56 0.0319 0.0945
57 0.0299 0.0888
58 0.0288 0.0880
59 0.0283 0.0853
60 0.0265 0.0840
61 0.0229 0.0804
2018-10-25 Flow Control Calculation 10/26/2018 12:50:24 PM Page 10
2018-10-25 Flow Control Calculation 10/26/2018 12:50:24 PM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0290 1210 15584 1287 Fail
0.0304 1057 14059 1330 Fail
0.0318 903 12754 1412 Fail
0.0332 772 11537 1494 Fail
0.0346 662 10386 1568 Fail
0.0360 581 9458 1627 Fail
0.0374 532 8566 1610 Fail
0.0388 469 7830 1669 Fail
0.0402 431 7075 1641 Fail
0.0416 383 6410 1673 Fail
0.0429 340 5852 1721 Fail
0.0443 312 5347 1713 Fail
0.0457 285 4870 1708 Fail
0.0471 267 4438 1662 Fail
0.0485 242 4062 1678 Fail
0.0499 224 3720 1660 Fail
0.0513 207 3446 1664 Fail
0.0527 186 3163 1700 Fail
0.0541 173 2920 1687 Fail
0.0555 155 2686 1732 Fail
0.0569 144 2473 1717 Fail
0.0583 128 2297 1794 Fail
0.0597 119 2137 1795 Fail
0.0611 110 1955 1777 Fail
0.0625 107 1796 1678 Fail
0.0639 104 1661 1597 Fail
0.0653 96 1547 1611 Fail
0.0667 91 1428 1569 Fail
0.0681 88 1309 1487 Fail
0.0695 83 1209 1456 Fail
0.0709 80 1119 1398 Fail
0.0723 77 1045 1357 Fail
0.0737 73 974 1334 Fail
0.0751 67 921 1374 Fail
0.0765 65 854 1313 Fail
0.0779 59 793 1344 Fail
0.0793 55 740 1345 Fail
0.0806 51 694 1360 Fail
0.0820 46 652 1417 Fail
0.0834 45 619 1375 Fail
0.0848 45 575 1277 Fail
0.0862 43 548 1274 Fail
0.0876 41 519 1265 Fail
0.0890 39 488 1251 Fail
0.0904 39 453 1161 Fail
0.0918 39 422 1082 Fail
0.0932 35 405 1157 Fail
0.0946 32 378 1181 Fail
0.0960 31 362 1167 Fail
0.0974 30 351 1170 Fail
0.0988 27 328 1214 Fail
0.1002 26 313 1203 Fail
0.1016 24 293 1220 Fail
0.1030 23 276 1200 Fail
2018-10-25 Flow Control Calculation 10/26/2018 12:50:24 PM Page 12
0.1044 21 260 1238 Fail
0.1058 21 245 1166 Fail
0.1072 21 234 1114 Fail
0.1086 18 226 1255 Fail
0.1100 17 209 1229 Fail
0.1114 17 201 1182 Fail
0.1128 17 190 1117 Fail
0.1142 15 183 1220 Fail
0.1156 13 173 1330 Fail
0.1170 13 162 1246 Fail
0.1183 13 154 1184 Fail
0.1197 13 146 1123 Fail
0.1211 13 142 1092 Fail
0.1225 12 131 1091 Fail
0.1239 11 128 1163 Fail
0.1253 7 119 1700 Fail
0.1267 7 114 1628 Fail
0.1281 7 111 1585 Fail
0.1295 5 106 2120 Fail
0.1309 5 99 1979 Fail
0.1323 5 95 1900 Fail
0.1337 5 88 1760 Fail
0.1351 5 82 1640 Fail
0.1365 5 82 1640 Fail
0.1379 5 80 1600 Fail
0.1393 4 79 1975 Fail
0.1407 4 78 1950 Fail
0.1421 2 75 3750 Fail
0.1435 2 71 3550 Fail
0.1449 2 68 3400 Fail
0.1463 2 66 3300 Fail
0.1477 2 63 3150 Fail
0.1491 2 60 3000 Fail
0.1505 2 57 2850 Fail
0.1519 2 55 2750 Fail
0.1533 2 54 2700 Fail
0.1547 2 49 2450 Fail
0.1560 2 48 2400 Fail
0.1574 2 47 2350 Fail
0.1588 2 45 2250 Fail
0.1602 2 43 2150 Fail
0.1616 2 40 2000 Fail
0.1630 2 40 2000 Fail
0.1644 2 39 1950 Fail
0.1658 2 35 1750 Fail
0.1672 2 32 1600 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
2018-10-25 Flow Control Calculation 10/26/2018 12:50:24 PM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0 acre-feet
On-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Off-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
2018-10-25 Flow Control Calculation 10/26/2018 12:50:24 PM Page 14
LID Report
2018-10-25 Flow Control Calculation 10/26/2018 12:50:52 PM Page 15
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
2018-10-25 Flow Control Calculation 10/26/2018 12:50:52 PM Page 16
Appendix
Predeveloped Schematic
2018-10-25 Flow Control Calculation 10/26/2018 12:50:54 PM Page 17
Mitigated Schematic
2018-10-25 Flow Control Calculation 10/26/2018 12:50:55 PM Page 18
Predeveloped UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 2018-10-25 Flow Control Calculation.wdm
MESSU 25 Pre2018-10-25 Flow Control Calculation.MES
27 Pre2018-10-25 Flow Control Calculation.L61
28 Pre2018-10-25 Flow Control Calculation.L62
30 POC2018-10-25 Flow Control Calculation1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 16
PERLND 17
IMPLND 5
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Basin 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
16 C, Lawn, Flat 1 1 1 1 27 0
17 C, Lawn, Mod 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
16 0 0 1 0 0 0 0 0 0 0 0 0
17 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
2018-10-25 Flow Control Calculation 10/26/2018 12:50:55 PM Page 19
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
16 0 0 4 0 0 0 0 0 0 0 0 0 1 9
17 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
16 0 0 0 0 0 0 0 0 0 0 0
17 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
16 0 4.5 0.03 400 0.05 0.5 0.996
17 0 4.5 0.03 400 0.1 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
16 0 0 2 2 0 0 0
17 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
16 0.1 0.25 0.25 6 0.5 0.25
17 0.1 0.25 0.25 6 0.5 0.25
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
16 0 0 0 0 2.5 1 0
17 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
5 DRIVEWAYS/FLAT 1 1 1 27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
5 0 0 1 0 0 0
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
5 0 0 4 0 0 0 1 9
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
5 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
2018-10-25 Flow Control Calculation 10/26/2018 12:50:55 PM Page 20
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
5 400 0.01 0.1 0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
5 0 0
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
5 0 0
END IWAT-STATE1
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Basin 1***
PERLND 16 0.074 COPY 501 12
PERLND 16 0.074 COPY 501 13
PERLND 17 0.25 COPY 501 12
PERLND 17 0.25 COPY 501 13
IMPLND 5 0.082 COPY 501 15
******Routing******
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
2018-10-25 Flow Control Calculation 10/26/2018 12:50:55 PM Page 21
<------><--------><--------><--------><--------><--------><--------> ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
END SPEC-ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 501 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
MASS-LINK 15
IMPLND IWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 15
END MASS-LINK
END RUN
2018-10-25 Flow Control Calculation 10/26/2018 12:50:55 PM Page 22
Mitigated UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 2018-10-25 Flow Control Calculation.wdm
MESSU 25 Mit2018-10-25 Flow Control Calculation.MES
27 Mit2018-10-25 Flow Control Calculation.L61
28 Mit2018-10-25 Flow Control Calculation.L62
30 POC2018-10-25 Flow Control Calculation1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 16
IMPLND 5
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Basin 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
16 C, Lawn, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
16 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
16 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
2018-10-25 Flow Control Calculation 10/26/2018 12:50:55 PM Page 23
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
16 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
16 0 4.5 0.03 400 0.05 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
16 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
16 0.1 0.25 0.25 6 0.5 0.25
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
16 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
5 DRIVEWAYS/FLAT 1 1 1 27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
5 0 0 1 0 0 0
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
5 0 0 4 0 0 0 1 9
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
5 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
5 400 0.01 0.1 0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
5 0 0
2018-10-25 Flow Control Calculation 10/26/2018 12:50:55 PM Page 24
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
5 0 0
END IWAT-STATE1
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Basin 1***
PERLND 16 0.089 COPY 501 12
PERLND 16 0.089 COPY 501 13
IMPLND 5 0.317 COPY 501 15
******Routing******
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
2018-10-25 Flow Control Calculation 10/26/2018 12:50:55 PM Page 25
END SPEC-ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
MASS-LINK 15
IMPLND IWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 15
END MASS-LINK
END RUN
2018-10-25 Flow Control Calculation 10/26/2018 12:50:55 PM Page 26
Predeveloped HSPF Message File
2018-10-25 Flow Control Calculation 10/26/2018 12:50:55 PM Page 27
Mitigated HSPF Message File
2018-10-25 Flow Control Calculation 10/26/2018 12:50:55 PM Page 28
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2018; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
WATER QUALITY
2018-08-28 Water Quality DCD 10/22/2018 10:16:33 AM Page 2
General Model Information
Project Name:2018-08-28 Water Quality DCD
Site Name:WSADA
Site Address:620 SW 12th St
City:Renton
Report Date:10/22/2018
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2018/07/12
Version:4.2.15
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
2018-08-28 Water Quality DCD 10/22/2018 10:16:33 AM Page 3
Landuse Basin Data
Predeveloped Land Use
2018-08-28 Water Quality DCD 10/22/2018 10:16:33 AM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.038
Pervious Total 0.038
Impervious Land Use acre
DRIVEWAYS FLAT 0.147
Impervious Total 0.147
Basin Total 0.185
Element Flows To:
Surface Interflow Groundwater
Sand Filter 1 Sand Filter 1
2018-08-28 Water Quality DCD 10/22/2018 10:16:33 AM Page 5
Routing Elements
Predeveloped Routing
2018-08-28 Water Quality DCD 10/22/2018 10:16:33 AM Page 6
Mitigated Routing
Sand Filter 1
Bottom Length:6.00 ft.
Bottom Width:4.00 ft.
Depth:0.75 ft.
Side slope 1:0.0001 To 1
Side slope 2:0.0001 To 1
Side slope 3:0.0001 To 1
Side slope 4:0.0001 To 1
Filtration On
Hydraulic conductivity:24.82
Depth of filter medium:1.8
Total Volume Infiltrated (ac-ft.):23.159
Total Volume Through Riser (ac-ft.):0.897
Total Volume Through Facility (ac-ft.):24.057
Percent Infiltrated:96.27
Total Precip Applied to Facility:0
Total Evap From Facility:0
Discharge Structure
Riser Height:0.7 ft.
Riser Diameter:100 in.
Element Flows To:
Outlet 1 Outlet 2
Sand Filter Hydraulic Table
Stage(feet)Area(ac.)Volume(ac-ft.)Discharge(cfs)Infilt(cfs)
0.0000 0.000551 0.000000 0.000 0.000
0.0083 0.000551 0.000005 0.000 0.013
0.0167 0.000551 0.000009 0.000 0.013
0.0250 0.000551 0.000014 0.000 0.014
0.0333 0.000551 0.000018 0.000 0.014
0.0417 0.000551 0.000023 0.000 0.014
0.0500 0.000551 0.000028 0.000 0.014
0.0583 0.000551 0.000032 0.000 0.014
0.0667 0.000551 0.000037 0.000 0.014
0.0750 0.000551 0.000041 0.000 0.014
0.0833 0.000551 0.000046 0.000 0.014
0.0917 0.000551 0.000051 0.000 0.014
0.1000 0.000551 0.000055 0.000 0.014
0.1083 0.000551 0.000060 0.000 0.014
0.1167 0.000551 0.000064 0.000 0.014
0.1250 0.000551 0.000069 0.000 0.014
0.1333 0.000551 0.000073 0.000 0.014
0.1417 0.000551 0.000078 0.000 0.014
0.1500 0.000551 0.000083 0.000 0.014
0.1583 0.000551 0.000087 0.000 0.015
0.1667 0.000551 0.000092 0.000 0.015
0.1750 0.000551 0.000096 0.000 0.015
0.1833 0.000551 0.000101 0.000 0.015
0.1917 0.000551 0.000106 0.000 0.015
0.2000 0.000551 0.000110 0.000 0.015
0.2083 0.000551 0.000115 0.000 0.015
0.2167 0.000551 0.000119 0.000 0.015
0.2250 0.000551 0.000124 0.000 0.015
2018-08-28 Water Quality DCD 10/22/2018 10:16:33 AM Page 7
0.2333 0.000551 0.000129 0.000 0.015
0.2417 0.000551 0.000133 0.000 0.015
0.2500 0.000551 0.000138 0.000 0.015
0.2583 0.000551 0.000142 0.000 0.015
0.2667 0.000551 0.000147 0.000 0.015
0.2750 0.000551 0.000152 0.000 0.015
0.2833 0.000551 0.000156 0.000 0.016
0.2917 0.000551 0.000161 0.000 0.016
0.3000 0.000551 0.000165 0.000 0.016
0.3083 0.000551 0.000170 0.000 0.016
0.3167 0.000551 0.000174 0.000 0.016
0.3250 0.000551 0.000179 0.000 0.016
0.3333 0.000551 0.000184 0.000 0.016
0.3417 0.000551 0.000188 0.000 0.016
0.3500 0.000551 0.000193 0.000 0.016
0.3583 0.000551 0.000197 0.000 0.016
0.3667 0.000551 0.000202 0.000 0.016
0.3750 0.000551 0.000207 0.000 0.016
0.3833 0.000551 0.000211 0.000 0.016
0.3917 0.000551 0.000216 0.000 0.016
0.4000 0.000551 0.000220 0.000 0.016
0.4083 0.000551 0.000225 0.000 0.016
0.4167 0.000551 0.000230 0.000 0.017
0.4250 0.000551 0.000234 0.000 0.017
0.4333 0.000551 0.000239 0.000 0.017
0.4417 0.000551 0.000243 0.000 0.017
0.4500 0.000551 0.000248 0.000 0.017
0.4583 0.000551 0.000253 0.000 0.017
0.4667 0.000551 0.000257 0.000 0.017
0.4750 0.000551 0.000262 0.000 0.017
0.4833 0.000551 0.000266 0.000 0.017
0.4917 0.000551 0.000271 0.000 0.017
0.5000 0.000551 0.000275 0.000 0.017
0.5083 0.000551 0.000280 0.000 0.017
0.5167 0.000551 0.000285 0.000 0.017
0.5250 0.000551 0.000289 0.000 0.017
0.5333 0.000551 0.000294 0.000 0.017
0.5417 0.000551 0.000298 0.000 0.017
0.5500 0.000551 0.000303 0.000 0.018
0.5583 0.000551 0.000308 0.000 0.018
0.5667 0.000551 0.000312 0.000 0.018
0.5750 0.000551 0.000317 0.000 0.018
0.5833 0.000551 0.000321 0.000 0.018
0.5917 0.000551 0.000326 0.000 0.018
0.6000 0.000551 0.000331 0.000 0.018
0.6083 0.000551 0.000335 0.000 0.018
0.6167 0.000551 0.000340 0.000 0.018
0.6250 0.000551 0.000344 0.000 0.018
0.6333 0.000551 0.000349 0.000 0.018
0.6417 0.000551 0.000354 0.000 0.018
0.6500 0.000551 0.000358 0.000 0.018
0.6583 0.000551 0.000363 0.000 0.018
0.6667 0.000551 0.000367 0.000 0.018
0.6750 0.000551 0.000372 0.000 0.019
0.6833 0.000551 0.000377 0.000 0.019
0.6917 0.000551 0.000381 0.000 0.019
0.7000 0.000551 0.000386 0.000 0.019
0.7083 0.000551 0.000390 0.067 0.019
2018-08-28 Water Quality DCD 10/22/2018 10:16:33 AM Page 8
0.7167 0.000551 0.000395 0.190 0.019
0.7250 0.000551 0.000399 0.349 0.019
0.7333 0.000551 0.000404 0.538 0.019
0.7417 0.000551 0.000409 0.752 0.019
0.7500 0.000551 0.000413 0.989 0.019
0.7583 0.000551 0.000418 1.246 0.019
2018-08-28 Water Quality DCD 10/22/2018 10:16:33 AM Page 9
Analysis Results
POC 1
POC #1 was not reported because POC must exist in both scenarios and both scenarios
must have been run.
2018-08-28 Water Quality DCD 10/22/2018 10:16:33 AM Page 10
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
2018-08-28 Water Quality DCD 10/22/2018 10:16:33 AM Page 11
Appendix
Predeveloped Schematic
2018-08-28 Water Quality DCD 10/22/2018 10:16:34 AM Page 12
Mitigated Schematic
2018-08-28 Water Quality DCD 10/22/2018 10:16:36 AM Page 13
Predeveloped UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 2018-08-28 Water Quality DCD.wdm
MESSU 25 Pre2018-08-28 Water Quality DCD.MES
27 Pre2018-08-28 Water Quality DCD.L61
28 Pre2018-08-28 Water Quality DCD.L62
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
END PRINT-INFO
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
END PWAT-PARM2
2018-08-28 Water Quality DCD 10/22/2018 10:16:36 AM Page 14
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
END IWAT-STATE1
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
******Routing******
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
2018-08-28 Water Quality DCD 10/22/2018 10:16:36 AM Page 15
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
END HYDR-INIT
END RCHRES
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
END MASS-LINK
END RUN
2018-08-28 Water Quality DCD 10/22/2018 10:16:36 AM Page 16
Mitigated UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 2018-08-28 Water Quality DCD.wdm
MESSU 25 Mit2018-08-28 Water Quality DCD.MES
27 Mit2018-08-28 Water Quality DCD.L61
28 Mit2018-08-28 Water Quality DCD.L62
30 POC2018-08-28 Water Quality DCD1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 16
IMPLND 5
RCHRES 1
COPY 1
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Sand Filter 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
16 C, Lawn, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
16 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
2018-08-28 Water Quality DCD 10/22/2018 10:16:36 AM Page 17
16 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
16 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
16 0 4.5 0.03 400 0.05 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
16 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
16 0.1 0.25 0.25 6 0.5 0.25
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
16 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
5 DRIVEWAYS/FLAT 1 1 1 27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
5 0 0 1 0 0 0
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
5 0 0 4 0 0 0 1 9
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
5 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
5 400 0.01 0.1 0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
2018-08-28 Water Quality DCD 10/22/2018 10:16:36 AM Page 18
# - # ***PETMAX PETMIN
5 0 0
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
5 0 0
END IWAT-STATE1
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Basin 1***
PERLND 16 0.038 RCHRES 1 2
PERLND 16 0.038 RCHRES 1 3
IMPLND 5 0.147 RCHRES 1 5
******Routing******
PERLND 16 0.038 COPY 1 12
IMPLND 5 0.147 COPY 1 15
PERLND 16 0.038 COPY 1 13
RCHRES 1 1 COPY 501 17
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
1 Sand Filter 1 2 1 1 1 28 0 1
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
1 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
1 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
1 0 1 0 0 4 5 0 0 0 0 0 0 0 0 2 2 2 2 2
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
2018-08-28 Water Quality DCD 10/22/2018 10:16:36 AM Page 19
1 1 0.01 0.0 0.0 0.5 0.0
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
1 0 4.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
END SPEC-ACTIONS
FTABLES
FTABLE 1
91 5
Depth Area Volume Outflow1 Outflow2 Velocity Travel Time***
(ft) (acres) (acre-ft) (cfs) (cfs) (ft/sec) (Minutes)***
0.000000 0.000551 0.000000 0.000000 0.000000
0.008333 0.000551 0.000005 0.000000 0.013853
0.016667 0.000551 0.000009 0.000000 0.013917
0.025000 0.000551 0.000014 0.000000 0.013980
0.033333 0.000551 0.000018 0.000000 0.014044
0.041667 0.000551 0.000023 0.000000 0.014108
0.050000 0.000551 0.000028 0.000000 0.014172
0.058333 0.000551 0.000032 0.000000 0.014236
0.066667 0.000551 0.000037 0.000000 0.014300
0.075000 0.000551 0.000041 0.000000 0.014363
0.083333 0.000551 0.000046 0.000000 0.014427
0.091667 0.000551 0.000051 0.000000 0.014491
0.100000 0.000551 0.000055 0.000000 0.014555
0.108333 0.000551 0.000060 0.000000 0.014619
0.116667 0.000551 0.000064 0.000000 0.014683
0.125000 0.000551 0.000069 0.000000 0.014746
0.133333 0.000551 0.000073 0.000000 0.014810
0.141667 0.000551 0.000078 0.000000 0.014874
0.150000 0.000551 0.000083 0.000000 0.014938
0.158333 0.000551 0.000087 0.000000 0.015002
0.166667 0.000551 0.000092 0.000000 0.015066
0.175000 0.000551 0.000096 0.000000 0.015129
0.183333 0.000551 0.000101 0.000000 0.015193
0.191667 0.000551 0.000106 0.000000 0.015257
0.200000 0.000551 0.000110 0.000000 0.015321
0.208333 0.000551 0.000115 0.000000 0.015385
0.216667 0.000551 0.000119 0.000000 0.015449
0.225000 0.000551 0.000124 0.000000 0.015513
0.233333 0.000551 0.000129 0.000000 0.015576
0.241667 0.000551 0.000133 0.000000 0.015640
0.250000 0.000551 0.000138 0.000000 0.015704
0.258333 0.000551 0.000142 0.000000 0.015768
0.266667 0.000551 0.000147 0.000000 0.015832
0.275000 0.000551 0.000152 0.000000 0.015896
0.283333 0.000551 0.000156 0.000000 0.015959
0.291667 0.000551 0.000161 0.000000 0.016023
0.300000 0.000551 0.000165 0.000000 0.016087
0.308333 0.000551 0.000170 0.000000 0.016151
0.316667 0.000551 0.000174 0.000000 0.016215
0.325000 0.000551 0.000179 0.000000 0.016279
0.333333 0.000551 0.000184 0.000000 0.016342
0.341667 0.000551 0.000188 0.000000 0.016406
0.350000 0.000551 0.000193 0.000000 0.016470
0.358333 0.000551 0.000197 0.000000 0.016534
0.366667 0.000551 0.000202 0.000000 0.016598
0.375000 0.000551 0.000207 0.000000 0.016662
0.383333 0.000551 0.000211 0.000000 0.016725
0.391667 0.000551 0.000216 0.000000 0.016789
0.400000 0.000551 0.000220 0.000000 0.016853
0.408333 0.000551 0.000225 0.000000 0.016917
0.416667 0.000551 0.000230 0.000000 0.016981
0.425000 0.000551 0.000234 0.000000 0.017045
2018-08-28 Water Quality DCD 10/22/2018 10:16:36 AM Page 20
0.433333 0.000551 0.000239 0.000000 0.017108
0.441667 0.000551 0.000243 0.000000 0.017172
0.450000 0.000551 0.000248 0.000000 0.017236
0.458333 0.000551 0.000253 0.000000 0.017300
0.466667 0.000551 0.000257 0.000000 0.017364
0.475000 0.000551 0.000262 0.000000 0.017428
0.483333 0.000551 0.000266 0.000000 0.017491
0.491667 0.000551 0.000271 0.000000 0.017555
0.500000 0.000551 0.000275 0.000000 0.017619
0.508333 0.000551 0.000280 0.000000 0.017683
0.516667 0.000551 0.000285 0.000000 0.017747
0.525000 0.000551 0.000289 0.000000 0.017811
0.533333 0.000551 0.000294 0.000000 0.017874
0.541667 0.000551 0.000298 0.000000 0.017938
0.550000 0.000551 0.000303 0.000000 0.018002
0.558333 0.000551 0.000308 0.000000 0.018066
0.566667 0.000551 0.000312 0.000000 0.018130
0.575000 0.000551 0.000317 0.000000 0.018194
0.583333 0.000551 0.000321 0.000000 0.018258
0.591667 0.000551 0.000326 0.000000 0.018321
0.600000 0.000551 0.000331 0.000000 0.018385
0.608333 0.000551 0.000335 0.000000 0.018449
0.616667 0.000551 0.000340 0.000000 0.018513
0.625000 0.000551 0.000344 0.000000 0.018577
0.633333 0.000551 0.000349 0.000000 0.018641
0.641667 0.000551 0.000354 0.000000 0.018704
0.650000 0.000551 0.000358 0.000000 0.018768
0.658333 0.000551 0.000363 0.000000 0.018832
0.666667 0.000551 0.000367 0.000000 0.018896
0.675000 0.000551 0.000372 0.000000 0.018960
0.683333 0.000551 0.000377 0.000000 0.019024
0.691667 0.000551 0.000381 0.000000 0.019087
0.700000 0.000551 0.000386 0.000000 0.019151
0.708333 0.000551 0.000390 0.067333 0.019215
0.716667 0.000551 0.000395 0.190433 0.019279
0.725000 0.000551 0.000399 0.349825 0.019343
0.733333 0.000551 0.000404 0.538557 0.019407
0.741667 0.000551 0.000409 0.752610 0.019470
0.750000 0.000551 0.000413 0.989273 0.019534
END FTABLE 1
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
RCHRES 1 HYDR RO 1 1 1 WDM 1000 FLOW ENGL REPL
RCHRES 1 HYDR O 1 1 1 WDM 1001 FLOW ENGL REPL
RCHRES 1 HYDR O 2 1 1 WDM 1002 FLOW ENGL REPL
RCHRES 1 HYDR STAGE 1 1 1 WDM 1003 STAG ENGL REPL
COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 2
PERLND PWATER SURO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 2
2018-08-28 Water Quality DCD 10/22/2018 10:16:36 AM Page 21
MASS-LINK 3
PERLND PWATER IFWO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 3
MASS-LINK 5
IMPLND IWATER SURO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 5
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
MASS-LINK 15
IMPLND IWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 15
MASS-LINK 17
RCHRES OFLOW OVOL 1 COPY INPUT MEAN
END MASS-LINK 17
END MASS-LINK
END RUN
2018-08-28 Water Quality DCD 10/22/2018 10:16:36 AM Page 22
Predeveloped HSPF Message File
ERROR/WARNING ID: 211 3
END INGRP was specified but, since ingroup contains no operations,
entire ingroup is ignored.
ERROR/WARNING ID: 211 4
END EXGRP was explicitly or implicitly specified but, since exgroup
contains no operations, entire exgroup is ignored.
2018-08-28 Water Quality DCD 10/22/2018 10:16:36 AM Page 23
Mitigated HSPF Message File
2018-08-28 Water Quality DCD 10/22/2018 10:16:36 AM Page 24
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2018; All