HomeMy WebLinkAboutMFP20000991.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20000991 IVR Number: 20000991 Permit Informaon Permit Name:Puget Sound Energy - 1406 N 30TH ST Address/Locaon :03/03/2020Application Date:3342103245Parcel Number:1406 N 30TH ST Permit Type:03/12/2020Issue Date:Franchise Permit Work Class:03/12/2021Expiration Date:Minor Utility Job Number:105093562Franchise Type:Electric Description:Puget Sound Energy crew to install new riser and secondary UG line extension at P01(319229 166247). Customer to bore underneath road. Please see attached. POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (425) 892-0416ApplicantX Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contractor Business License Number: 5109Construction Contractor: POTELI*227PL RENTON CITY OF 1055 S GRADY WAY RENTON , WA 98057 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 1406 N 30TH ST TBD TBD TBD TBD PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 DAVE GOODALE DAVE.GOODALE@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP20000991 Scott Warlick C.E.D 3/12/2020 Monday - Friday 8:00AM - 3:00PM Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG 3/3/2020 1111121211111512ALL-WAYSTOP111112 201111N 30TH ST2222 I-405 ENTRANCEI-405 EXIT PARK AVE NN 30TH ST#1404N 30TH STP01HH1X01M6-2ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5RW1-4L100'100'100'ROADWORKAHEADW20-1 100'ROADWORKAHEADW20-1100' RIGHT KEEP R4-7B ROADWORK AHEAD W20-1W1-4R100'100'PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKRESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSUREEMERGENCY VEHICLES WILL BEALLOWED TO PASS WORK ZONE.DETOURM4-9bDETOURM4-9bR9-11SIDEWALKCLOSEDAHEADR9-11SIDEWALK CLOSED AHEAD S/W CLOSEDR9-9S/WCLOSEDR9-9NPSEPUGETSOUNDENERGYJOB#1050935621406 N 30th St, Renton, WA 98056February 5, 2020safaa.neema@pse.com(425) 398-6077SHEET 1 of 2TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT80604055 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840LEGENDTRENCHSIGN LOCATIONTRAFFIC FLOW28" TRAFFIC CONEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.PRINT ON11X17" SHEETS ONLYAdditional trafficcontrol may beneeded for thepotholing ofutilities. 111112121111151215ALL-WAYSTOPALL-WAYSTOP111112 111112 201111 12N 30TH ST2222I-405 ENTRANCEI-405 ENTRANCEI-405 EXIT I-405 EXIT PARK AVE NN 30TH ST#1404N 30TH STP01HH1X01M6-2M6-2RIGHT KEEP R4-7BRIGHTKEEPR4-7BPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROM TO TOW AWAY AREA PHONE 888-9999INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKRESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSUREEMERGENCY VEHICLES WILL BEALLOWED TO PASS WORK ZONE.ROADWORK AHEAD W20-1RIGHT LANECLOSEDAHEAD W20-5RW1-4L100'100'100'ROADWORKAHEADW20-1W1-4R100'100'ROADWORKAHEADW20-1X'DETOURM4-9bDETOUR M4-9bR9-11SIDEWALK CLOSED AHEADR9-11SIDEWALKCLOSEDAHEADS/W CLOSED R9-9S/WCLOSEDR9-9NPSEPUGETSOUNDENERGYJOB#1050935621406 N 30th St, Renton, WA 98056February 5, 2020safaa.neema@pse.com(425) 398-6077SHEET 2 of 2TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT80604055 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840LEGENDTRENCHSIGN LOCATIONTRAFFIC FLOW28" TRAFFIC CONEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.PRINT ON11X17" SHEETS ONLY 1N 30TH ST319229-16624737.5 kVA 480V (AC)25 kVA 120/240 (AC)310231021302130813091305121A27EXISTINGHANDHOLE FORFUTURE HAMRADIO CABLING.1PROPROSEDRESERVOIRFIRE STATION 151404319229-166233150 kVA 120/208V (ABC)319229-166261319233-16625775 kVA 120/208V (ABC)SLAH4812319230-166277319250-16625975 kVA 120/240V (B)319227-166215SLAU1350319229-166211SLAH4773319245-16621615 kVA 120/240V (B)ERROR-SET SWITCH ID (10T)SLAU1348319260-166218SLAH4774N 30TH ST319229-16624737.5 kVA 480V (A)25 kVA 120/240 (C)319228-166270X0607RHLWSPARK AVE NHIG15 CUSTOMER-OWNEDSERVICE CABLEEXISTING 4" ELECTRICALCONDUIT TO 7-ELEVEN336.4 MCM ACSRABC ROW60'FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.GASPHONECABLE TV508550017104321653PROJECT PHASEPWRNOTIF#ORDER#SuperiorPerm. Svc.DistributionHP Svc/MSAPOWER GENERAL NOTES - COMMERCIAL PROJECT8.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customerwill provide any and all shoring or they will side slope the trench to 1:1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation fromthis work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencingwork to get the underground facilities located.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or constructionmaterials which would restrict construction and/or equipment access, before work can begin.Roads shall be paved or have a compacted , crushed rock base in place.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guardposts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.All work is to be done in accordance with local municipal and county permit requirements as applicable.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduitsand crossings from the individual unit's meter base to the designated connection point.Inclement weather conditions may cause delays in construction times and dates.1.2.3.4.5.6.7.9.11.10.PSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"XXXXE-Mail:Cell Phone:Project Manager Contact Information:Manager:DAVE GOODALE425-495-7049DAVE.GOODALE@PSE.COMSCALE: 1" = 50'105093562THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPDAVE GOODALE425-495-704911/11/19TAYLOR PAULSEN253-318-689711/11/19N/AN/AN/ATAYLOR PAULSEN253-318-689711/11/19RW-116881RENTONKENNYDALE 308 ZONE RESERVOIR1Ø CONC HH INST FOR NEW COMM'L METER1406 N 30TH ST, RENTON, WA 98056N/AN/AN/A105093562AS NOTED1 OF 2KING COUNTYN/AN/ACSPSKEPMSW 32-24N-05EN/AN/A2405E1272405E1362405E127HIG-15N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AService Stubs105093562506159313PARTIAL PLANSCALE: 1" = 20'CIRCUIT FEET ADDED: 0'LRC:% V. Drop:% Flicker:Sq. Footage:Panel Size:Heat Type:Est. Demand:N/A200AMPSN/A1.292KW65A1.0%2.0%AT P01: EXISTING (319229-166247)-EXISTING 40' (1968) DIST. POLE TO REMAIN-EXISTING 37.5KVA 120/240V TRF TO REMAIN-EXISTING 25KVA 120/240V TRF TO REMAIN-INSTALL (1) 3" SECONDARY RISER ON EXISTING STANDOFF BRACKETS PER STD. 6042.1000 (RIS3CSS)±30'____'ACTUALAT HH1: NEW-INSTALL (1) CONC 3030 HH W/ 2'-4" SQ PLATE DOOR(MID:9995597) PER STD. 6050.2020 (HH13350SP)-INSTALL (3) #10-350 4-POS SECONDARY CONNECTOR BARS PER STD. 6050.2020 (MID:7651005)-CONNECT 1-RUN OF CUST. OWNED 3/0 AWG CU CABLE.AT M01: NEW-PSE METER DEPT. TO INSTALL NEW 200AMP COMMERCIAL METERSITE PLANNVicinity MapN/AOwner / Developer Contact InfoofficeATTN:CITY OF RENTON1055 SOUTH GRADY WAYRENTON, WA 98057ERIC OTT425-430-7313SITE SPECIFIC NOTESOVERHEAD CIRCUIT MAPSCALE: 6" = 1 MILE001"2"0050100'CUSTOMER DEVELOPMENT NOTES:A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITEWORK.CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGETSOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:CROSSING/BORING.-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMITREQUIREMENTS.-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TOCONSTRUCTION.-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTIONWORK IN RIGHT OF WAY.-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.VAULTS & WORK PITS.-PROVIDE A 4' X 4' WORK PIT & 1 YARD OF 5/8" CRUSHED ROCK AT P01.-PROVIDE A 7' X 6' WORK PIT W/ 6" BEDDING OF 5/8" CRUSHED ROCK AT HH1.TRENCHING & CONDUIT.-PSE TO INSTALL ±60' OF 1-3" SCH'L 80 CONDUIT FROM P01 TO X01.-CUSTOMER TO INSTALL ±80' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM X01 TO HH1 FOR BORE.-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.JOB SITE READINESS.-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BECOMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &TRENCH AT ALL TIMES.-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING.- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP ANDSCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .3000420390JOBSITEJOBSITE508550018P01 TO X01:-PSE TO INSTALL 1-3" SCH'L 80 CONDUIT IN CUSTOMER PROVIDED TRENCH ±60'P01 TO HH1:-PSE TO INSTALL 1-RUN OF 350MCM TRIPLEX CABLE ±170'____'ACTUALSPAN SPECIFIC NOTESUNDERGROUND CIRCUIT MAPSCALE: NONEJOBSITEPOTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDSMFP20000991 CUSTOMER INSTALLED& SUPPLIED1-RUNOF 3/0 SVC CABLE INCUSTOMER SUPPLIED& INST CONDUITCUSTOMER SUPPLIED7' X 6' WORK PITCUSTOMER SUPPLIED4' X 4' WORK PIT90°R=48''PSE SUPPLIED & INSTALLED350MCM TRIPLEX CABLE INCUSTOMER SUPPLIED& INST 3" SCH'L 80 CONDUITAT ROAD CROSSING±60'±80'319229-16624737.5 kVA 480V (AC)25 kVA 120/240 (AC)PSE SUPPLIED & INST3" SCH'L 80 CONDUITFROM P01 TO X01CUSTOMER PROVIDED4' X 8' BORE PIT105093562THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPDAVE GOODALE425-495-704911/11/19TAYLOR PAULSEN253-318-689711/11/19N/AN/AN/ATAYLOR PAULSEN253-318-689711/11/19RW-116881RENTONKENNYDALE 308 ZONE RESERVOIR1Ø CONC HH INST FOR NEW COMM'L METER1406 N 40TH ST, RENTON, WA 98056N/AN/AN/A105093562AS NOTED2 OF 2KING COUNTYN/AN/ACSPSKEPMSW 32-24N-05EN/AN/A2405E1272405E1362405E127HIG-15N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/ATV & TELElectric Service Cable in Conduit3" Schedule 80 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCoverBackfill for ConduitFree of rockslarger than 8"in diameterSeparation12" Minin ConduitSchedule 40 Yellow PVCGas Service Line40" Typical(Power, Gas,Phone & Cable)Separation12" Min12" MinSeparation36" MINIMUM COVERIN RIGHT OF WAY JOINT TRENCH DETAILJoint Service Line in Conduit (NTS)To Excavated Dirt PileBackfill for In Conduit - The backfill layer shall be soil that is free from construction debris,glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.SINGLE PHASE SECONDARY CONCRETE HANDHOLENot to scale6050.2020-1TOP VIEWSIDE VIEW2'-4"EXCAVATION: 5-1/3 CUBIC YARDS7'-0"6'-0"2"2'-6"Install PVC bell endsand grout into wall2'-6"Handhole820 lbsConduits and conductors shall enter fromends of handhole through knockouts providedTypical customer runservice conductors in ductSteel DoorSeal conduitwith foamCustomer-installed grounding wires ( the "4th" wire on the single-phase systems and the "5th" wire onthe three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall beremoved by customer or cut off at the vault wall.6" Crushed rock CIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEHIG-1511/19/201914812411400.21148124114.21ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.FLOW DIRECTIONLAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,SECURE WITH PEA GRAVEL BAGS (MID 9995692).6'3'8"TECHNIQUES FOR EROSION AND SEDIMENT CONTROLSILT FENCE DETAILNot to Scale0150.3200Standoff Bracket15" Min LengthConduit ClampConduitField FaceQuadrantClimbingSpaceRoad FaceQuadrantClimbingSpace5" MinCLLCDirection of Vehicular TrafficCONDUIT RISER PLACEMENT DETAILTOP VIEWNOT TO SCALEUTILITY POLE EROSION CONTROL DETAILNOT TO SCALEAdjacent to flowing ditches or bodies of waterUtility Pole Erosion ControlTOP VIEWFLOWING DITCH or BODY OD WATERSLOPESecure bottom of fencewith gravel bagsPlace straw mulchon disturbed areaExcavated orAugered HolePoleSLOPEInstall silt fence aroundpole excavationSCALE: NONECABLE & CONDUIT DIAGRAMSECONDARY UNDERGROUNDWill maintain 36" Min. depth while directional drilling36" MinDepthFinal GradeTYPICAL BORE COVERTYPICAL BORE NOTECALL (800) 424-5555 UTILITY NOTIFICATION CENTER A MINIMUM OF 2 BUSINESS DAYSBEFORE BEGINNING ANY EXCAVATION TO PREVENT DAMAGE TO UNDERGROUNDFACILITIES & AVOID BODILY INJURY.PSE/POTELCO REPRESENTIVE MUST BE ONSITE FOR DURATION OF BOREPOTHOLING IS REQUIRED PRIOR TO BORE. ALL OTHER UTILITIES SHALL HAVE THEIRALIGNMENTS AND PROFILES MAPPED. BORING CONTRACTOR SHALL PREPARE APROPOSED BORING ALIGNMENT AND PROFILE ON SITE AND PROVIDE IT TO THEPSE/POTELCO REPRESENTATIVE FOR APPROVAL BEFORE COMMENCING ANY WORKBORING CONTRACTOR SHALL USE CONDUIT AND MATERIALS PROVIDED ONLY BYPSE/POTELCO WHEN OPERATING IN PUBLIC RIGHT OF WAYNEW CONDUIT SHALL BE INSTALLED PER PSE STANDARDS AND ADHERE TO ALLJURISCITION REQUIREMENTS. NEW CONDUIT SHALL BE INSTALLED AT 36" MINIMUMCOVERAGE. LOCAL JURISIDICTIONS MAY HAVE DIFFERENT REQUIREMENTS FORMINIMUM COVERAGE IN PUBLIC RIGHT OF WAY.NEW CONDUIT SHALL MAINTAIN MINIMUM 1-FOOT VERTICAL CLEARANCE BETWEENOUTER SURFACES OF EXISTING UTILITIES AND STRUCTRES. IT SHALL ALSO MAINTAIN AMINIMUM 5-FOOT HORIZONTAL SEPARATION OF WATER MAIN, STORM DRAIN AND5-FOOT OF SEWER STRUCTURE. LOCAL JURSIDICTION MAY REQUIRE A DIFFERENTMINIUM SEPARATION.MFP20000991