HomeMy WebLinkAboutERC Addendum DNSM Determination Ltr.Notice.Signatures_Paccar Pre-load Soil Retention _16-000620.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
ADDENDUM TO ENVIRONMENTAL (SEPA) DETERMINATION OF
NON-SIGNIFICANCE (DNS-M) - MITIGATED
Pursuant to WAC 197-11-600(4)(c) and WAC 197-11-625
Addendum to the Paccar Parts Distribution Building
as Addended by the City of Renton (LUA06-139)
Determination of Non-Significance - Mitigated (DNS-M)
Date of Addendum: January 30, 2017
Date of Original SEPA Threshold Determination: December 18, 2006
Proponent: PACCAR Inc.
Project Numbers: LUA06-139,ECF; LUA16-000620,SA-H,SP
Project Name: Paccar Parts Distribution Building
Proposal / Purpose of Addendum: The original SEPA threshold determination for the Paccar
Parts Distribution Buildings was issued on December 18, 2006. The original application included
a proposal for the construction of a new 255,000 square foot parts distribution center with
5,000 square feet of office space. The Environmental Review Committee Staff Report, project
description and the application materials did not explicitly disclose the site’s regrading of the
retained 139,000 cubic yards of pre-load surcharge soils. The intended purpose of this SEPA
Addendum is to disclose the proposed regrade of the site’s existing surcharge soils from the
current 2:1 slope along the Garden Ave N. frontage to a 4:1 slope with new tree and erosion
control planting. New trees are also proposed along the N. 4th St. frontage. The proposed
regrading of the slope will require approximately 2,700 cubic yards of soil to be cut from the
slope and relocated to an interior location on the existing graded pad.
Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971 as
amended), on December 18, 2006, the Environmental Review Committee issued a
Determination of Non-Significance - Mitigated (DNS-M) for the Paccar Parts Distribution
Building. The DNS-M included five mitigation measures related to geotechnical
recommendations, drainage and erosion control, truck traffic and mitigation fees. A 14-day
appeal period commenced on December 18, 2006 and ended on January 5, 2007. An appeal
was received on January 5, 2007 from the project proponents, requesting amending the
mitigation measure that limited the hours of operation for truck traffic. The decision of the ERC
was affirmed by the Hearing Examiner on March 19, 2007, resulting in no changes to the
Addendum to Environmental (SEPA) Review
Page 2 of 3
January 30, 2017
original DNS-M. As such, truck traffic would remain limited to the hours of 7:00 am to 10:00
pm.
An Addendum to the original SEPA determination was issued on August 26, 2013 to clarify that
an existing 28,500 square foot building was to be demolished as part of the project as part of
site development for the distribution center. A second Addendum to the SEPA determination
was issued June 15, 2015, to disclose the intended relocation and retention of 139,000 cubic
yards of pre-load surcharge fill to the western portion of the site.
It has been determined that the environmental impacts of the proposal were adequately
addressed under the analysis of significant impacts contained within the previously adopted
DNS-M. Based on WAC 197-11-600(4) c, the addendum process may be used if analysis or
information is added that does not substantially change the analysis of significant impacts and
alternatives in the existing environmental document.
The regrading of the site’s retained pre-load surcharge materials and new landscaping would
not change the analysis or impacts in the State Environmental Policy Act (SEPA) Review.
The City of Renton is hereby issuing a SEPA Addendum pursuant to WAC 197-11-625.
This Addendum is appropriate because it contains only minor information not included in the
original Determination and there are no environmental impacts related to inclusion of the new
information.
Location: 1400 N 4th Street
Lead Agency: City of Renton, Department of Community & Economic Development
Review Process: Addendum to previously issued Determination of Non-Significance -
Mitigated (DNS-M)
There is no comment period for this Addendum, dated January 30, 2017 issued by the City of
Renton Environmental Review Committee
Exhibits
Exhibit 1 DNS-M Addendum
Exhibit 2 Vicinity Map (Civil Cover Sheet)
Exhibit 3 TESC Plan
Exhibit 4 Site Sections
Exhibit 5 Landscape Plan
Exhibit 6 Geotechnical Report Update, dated November 29, 2016 and prepared by Hart
Crowser
ST
O
P
STOP
ST
O
P
ST
O
P
Approved by:
Approved by:
Approved by:
Approved by:
Date:
Date:
Date:
Date:
CITY OF RENTON
Know what's below.
before you dig.Call
R
Know what's below.
before you dig.Call
R
Know what's below.
before you dig.Call
R
SHEET NUMBER
WB
L
A
2
0
1
5
TITLE
201638
PROJECT NO.
DATE
CLIENT:
LOCATION:
PROJECT:
11.16.2016
PROFESSIONAL SEAL
DESIGNED
DRAWN
CHECKED CB
CB
CB
NO.DATE REVISION
11.22.2016 OWNER REVIEW
REGRADE
PACCAR PARTS
WAREHOUSE
RENTON, WA
PACCAR, INC.
777 106TH AVE. N.E.
BELLEVUE, WA 98004
SHEET SIZE: 22" x 34" AT 100%
11.30.2016 PERMIT
Know what's below.
before you dig.Call
R
L-1
LANDSCAPE
PLAN
SHEET NUMBER
WB
L
A
2
0
1
5
TITLE
201638
PROJECT NO.
DATE
CLIENT:
LOCATION:
PROJECT:
11.16.2016
PROFESSIONAL SEAL
DESIGNED
DRAWN
CHECKED CB
CB
CB
NO.DATE REVISION
11.22.2016 OWNER REVIEW
REGRADE
PACCAR PARTS
WAREHOUSE
RENTON, WA
PACCAR, INC.
777 106TH AVE. N.E.
BELLEVUE, WA 98004
SHEET SIZE: 22" x 34" AT 100%
11.30.2016 PERMIT
Know what's below.
before you dig.Call
R
L-2
LANDSCAPE
PLAN
3131 Elliott Avenue, Suite 600
Seattle, Washington 98121
Tel 206.324.9530
MEMORANDUM
DATE: November 29, 2016
TO: Rob Reifsnyder, PACCAR
FROM: Rolf B. Hyllseth, PE and Garry E. Horvitz, PE
RE: Geotechnical Report Update – SW Fill Area
PACCAR Renton Parts Distribution Center (PDC)
Renton, Washington
17946‐02
CC: Jason Hubbell, Barghausen Engineers
Vicki Zumbrunnen, PACCAR
As requested by the City of Renton, this memorandum provides updated geotechnical engineering
recommendations for the SW Fill Area of the PDC project site, located adjacent to Garden Avenue North
and North 4th Street as shown on the Barghausen Phase 3 Temporary Erosion Control and Grading Plans
for the project (dated November 15, 2016).
The fill placed in this portion of the site consists of relocated preload fill material from the original PDC
building pad. Hart Crowser monitored the preload fill placement and removal process during
construction. The updated recommendations in this memorandum should only be used in conjunction
with the general recommendations of our geotechnical engineering design study dated September 25,
2014, and subsequent supplemental recommendations provided by Hart Crowser.
This memorandum is for the exclusive use of PACCAR, Barghausen Engineers, and their consultants for
specific application to the subject project and site. We completed this memorandum in accordance with
geotechnical practices generally accepted for work of a similar nature done in the same timeframe, in
the same or similar localities, and under similar conditions. No other warranty, express or implied, is
made.
SW Fill Placement Recommendations
The fill placed in the SW portion of the site is considered non‐structural (i.e. not intended to support
buildings, paved roads, or other surface structures). As such, geotechnical field observation or
compaction testing was not required during placement. It is our opinion that track‐walking the fill
FOR FURTHER INFORMATION, PLEASE CONTACT THE CITY OF RENTON, DEPARTMENT OF
COMMUNITY & ECONOMIC DEVELOPMENT AT (425) 430-7200.
DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION.
OF PUBLIC HEARING
POSTED TO NOTIFY INTERESTED PERSONS OF A PUBLIC HEARING
PROJECT NAME: PACCAR PRE-LOAD SOIL RETENTION
PROJECT NUMBER: LUA16-000620, SA-H
LOCATION: 1400 N 4th St
DESCRIPTION: Applicant is requesting a Special Grade and Fill Permit and Site Plan Review to
retain the remaining pre-load soils that were used to construct the now completed Paccar Parts and Distribution Center
located at 1400 N. 4th Street. The total amount of pre-load soils to be retained is 139,000 cubic yards and is located in
the 9.5 acre vacant southwest portion of the Paccar property adjacent to the N. 4th Street and Garden Avenue N.
frontages. The applicant proposes to retain the pre-load soils until the area is developed in the future. The date of future
development has not yet been determined by the applicant. The subject property is within the Employment Area (EA)
land use designation and Heavy Industrial (IH) zoning district. An Addendum to the Determination of Non-Significance -
Mitigated (DNS-M) was issued June 15, 2015. The addendum determined the retention of the pre-load surcharge
materials for the distribution facility on the western area of the site, along with proposed mitigation, would not change
the analysis or impacts in the State Environmental Policy Act (SEPA) Review.
A PUBLIC HEARING WILL BE HELD BY THE RENTON HEARING EXAMINER AT HIS REGULAR MEETING IN THE
COUNCIL CHAMBERS ON THE 7TH FLOOR OF CITY HALL, 1055 SOUTH GRADY WAY, RENTON, WASHINGTON,
ON FEBRUARY 21, 2017 AT 11:00 AM TO CONSIDER THE SITE PLAN REVIEW AND GRADE AND FILL PERMIT.