HomeMy WebLinkAboutSR_Paccar HEX Report with Exhibits_Paccar Pre-load Soil Retention_16-000620.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Project Location Map HEX Report Paccar A. REPORT TO THE HEARING EXAMINER HEARING DATE: February 21, 2017 Project Name: Paccar Pre-Load Soil Retention Owner: Paccar Inc., 777 106th Ave NE, Bellevue, WA 98004 Applicant/Contact: Jason Hubbell, PE, Barghausen Engineers, 18215 72nd Ave S., Kent, WA 98032 File Number: LUA16-000620,SA-H,SP Project Manager: Matthew Herrera, Senior Planner Project Summary: The applicant is requesting a Special Grade and Fill Permit and Site Plan approval to retain approximately 139,000 cubic yards of soil on the Paccar property located at 1400 N. 4th Street. The existing stockpile is currently located on the southwest portion of the subject property near the Garden Ave. N. and N. 4th St. frontages. The 25.13 acre site is within the Employment Area (EA) land use designation and Heavy Industrial (IH) zoning classification. The stockpile is the remnant of preload and surcharge material that was used for soil compaction related to the recently constructed Paccar Parts and Distribution Center (PDC) on the southwest portion of the site. The soil was moved to its current location in 2015 and stabilized. The PDC building permit approved locating the preload and surcharge materials in its current location for a period of 5-years and then the applicant would be required to take action. No building construction or access improvements are proposed with the applicant’s request. Project Location: 1400 N. 4th St. Site Area: 25.13 acres City of Renton Department of Community & Economic Development Hearing Examiner Recommendation PACCAR PRE-LOAD SOIL RETENTION LUA16-000620,SA-H,SP Report of Hearing February 21, 2017 Page 2 of 13 HEX Report Paccar B. EXHIBITS: Exhibits 1-6: As shown in the SEPA Addendum to DNS-M Exhibit 7: Paccar Parts and Distribution Center Building Permit Exhibit 8: Parts and Distribution Center Building Permit Conditions Exhibit 9: Consent Decree Exhibit 10: Paccar Interoffice Environmental Requirements Memorandum dated May 5, 2003 Exhibit 11: Paccar Parts and Distribution Center SEPA Determination, dated December 18, 2006 Exhibit 12: SEPA Determination Decision on Appeal, issued March 17, 2007 Exhibit 13: ERC Addendum to DNS-M related to building demolition issued August 26, 2013 Exhibit 14: ERC Addendum to DNS-M related to retention of preload soils issued June 15, 2015 Exhibit 15: Geotechnical Report prepared by Hart Crowser, dated September 26, 2014 Exhibit 16: Advisory Notes to Applicant C. GENERAL INFORMATION: 1. Owner(s) of Record: Robert Reifsnyder, Paccar Inc., 777 106th Ave NE, Bellevue, WA 98004 2. Zoning Classification: Heavy Industrial (IH) 3. Comprehensive Plan Land Use Designation: Employment Area (EA) 4. Existing Site Use: Industrial 5. Critical Areas: Wellhead Protection Zone 2 and High Seismic Hazard 6. Neighborhood Characteristics: a. North: Big Box Retail and Warehouse, UC and IH zones b. East: I-405 and Single-family residential across Interstate; R-8 zone c. South: Single-family residential and Office; R-10 and CA zones d. West: Office, surface parking, and School District Bus Barn; UC and IL zones 6. Site Area: 25.13 acres entire site / Project area is approximately 12 acres D. HISTORICAL/BACKGROUND: Action Land Use File No. Ordinance No. Date Comprehensive Plan N/A 5758 06/22/2015 Zoning N/A 5758 06/22/2015 City of Renton Department of Community & Economic Development Hearing Examiner Recommendation PACCAR PRE-LOAD SOIL RETENTION LUA16-000620,SA-H,SP Report of Hearing February 21, 2017 Page 3 of 13 HEX Report Paccar Annexation N/A 738 03/17/1925 Environmental DNS-M LUA06-139,ECF N/A 12/18/2006 PDC Building Permit B15000936 N/A 07/07/2015 E. PUBLIC SERVICES: 1. Existing Utilities a. Water: Water service will be provided by the City of Renton. There are existing water mains Garden Ave. N., N. 4th St, N. 3rd St., and Houser Way N. b. Sewer: Sewer service is provided by the City of Renton. There are existing sewer mains in Garden Ave. N., N. 4th St, N. 3rd St., and Houser Way N. c. Surface/Storm Water: Existing stormwater mains are located in Garden Ave. N., N. 4th St, N. 3rd St., and Houser Way N. 2. Streets: The subject property is bound by N. 8th St to the north; I-405 to the east; N. 4th St. to the south; and Garden Ave. N. to the west. 3. Fire Protection: Renton Fire Authority F. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE: 1. Chapter 2 Land Use Districts a. Section 4-2-020: Purpose and Intent of Zoning Districts b. Section 4-2-070: Zoning Use Table 2. Chapter 3 Environmental Regulations a. Section 4-3-050: Critical Area Regulations 3. Chapter 4 Property Development Standards a. Section 4-4-060: Grading, Excavation and Mining Regulations 4. Chapter 9 Permits - Specific a. Section 4-9-080: Grading, Excavation and Mining Permits and Licenses b. Section 4-9-200: Master Plan and Site Plan Review 5. Chapter 11 Definitions G. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN: 1. Land Use Element H. FINDINGS OF FACT (FOF): 1. The project site is located at 1400 N. 4th St. 2. The specific project location is a vacant portion of the southwest area within the 25-acre Paccar campus. Other portions of the site include the Kenworth Truck Plant, Paccar Parts and Distribution Center, several other office/warehouse buildings, and surface parking. 3. The property is located within the Employment Area (EA) Comprehensive Plan land use designation. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation PACCAR PRE-LOAD SOIL RETENTION LUA16-000620,SA-H,SP Report of Hearing February 21, 2017 Page 4 of 13 HEX Report Paccar 4. The site is located within the Heavy Industrial (IH) zoning classification. The site is not within a Design District Overlay. The subject property’s existing warehouse, manufacturing, office, and general industrial uses are permitted in the IH zone. 5. On July 7, 2015, the applicant was issued a building permit (Exhibit 7) for the construction of the Paccar Parts and Distribution Center (PDC), a new 169,147 square foot building that was recently completed on the southeast portion of the Paccar campus. 6. A condition of PDC building permit approval (Exhibit 8) allowed the 5-year retention of 139,000 cubic yards of soil in its current location. The soil was used as preload and surcharge material for the stabilization of the foundation area of the PDC building. The condition further stated that one of the following actions must occur no later than the first quarter of the fourth year: a. Submit a land use application for a Special Grade and Fill Permit to permit the fill to remain on the site for a period beyond 5-years; or b. Submit a land use application for another type of development that would necessitate the use of the fill as a pre-load; or c. Submit to the City a Utility Construction Permit for the removal of the fill that identifies finished site grades at the minimum necessary elevation to comply with the site remediation standards as identified in the Consent Decree. 7. The Planning Division of the City of Renton accepted the above master application for a Special Grade and Fill Permit and Site Plan Review to allow the fill to remain on the site for a period beyond 5-years on August 16, 2016 and determined the application complete on August 24, 2016. The application was placed on-hold September 26, 2016 to request additional information from the applicant. The application was taken off-hold on January 12, 2017 following a resubmittal. The project complies with the 120-day review period. 8. The existing 139,000 cubic yard stockpile is located on the southwest portion of the Paccar site adjacent to the Garden Ave. N. and N. 4th St. frontages. The stockpile contains an approximate 2H:1V slope along the perimeter and contains grades approximately 6-feet to 10-feet higher than the adjacent streets. 9. The applicant entered into a Consent Decree (Exhibit 9) with the State of Washington on November 8, 1991 related to contamination on the subject property caused by prior manufacturing uses. The decree1 and the applicant’s environmental procedures for complying with the decree (Exhibit 10) requires the Paccar to maintain a minimum 12-inch clean soil cap on contaminated soils on the subject property. The soil stockpile is currently on top of contaminated and/or presumed contaminated soils that include metals, volatile organic compounds, and semi-volatile organic compounds. 10. There are approximately 96 trees located on the project portion of the site all of which the applicant is proposing to retain. 11. Access to the site would remain in existing driveways along the site’s campus. 12. The site is mapped with a Wellhead Protection Zone 2 and High Seismic Area. 13. Approximately 2,700 cubic yards of material would be cut to reslope the existing fill along Garden Ave. N. site and approximately 139,000 cubic yard of material was brought into the site in 2015. 14. The applicant is proposing to begin and end construction in spring and summer of 2017. 1 Page 54 of the Final Cleanup Action Plan identifies a protective cover of imported fill with a minimum thickness of 12 - inches. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation PACCAR PRE-LOAD SOIL RETENTION LUA16-000620,SA-H,SP Report of Hearing February 21, 2017 Page 5 of 13 HEX Report Paccar 15. Surrounding property owners were notified at the time of application. No public or agency comments were received as of the date of this report. 16. Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971 as amended), on December 18, 2006 the Environmental Review Committee (ERC) issued a Determination of Non- Significance - Mitigated (DNS-M) for the Paccar Parts and Distribution Center (Exhibit 11). The DNS-M six mitigation measures. A 14-day appeal period commenced on December 5, 2006 and ended on January 5, 2007. An appeal of the threshold determination was filed by the applicant and the Hearing Examiner affirmed to ERC decision on March 19, 2007 (Exhibit 12) and no changes were made to the DNS-M. 17. Based on an analysis of probable impacts from the proposal, the ERC issued the following mitigation measures with the Determination of Non-Significance – Mitigated: a. The applicant shall comply with the recommendations found in the geotechnical report prepared by Hart Crowser, dated October 5, 2006. b. The applicant shall be required to provide a Temporary Erosion and Sedimentation Control Plan (TESCP) designed pursuant to the Department of Ecology’s Erosion and Sediment Control Requirements outlined in Volume II of the Stormwater Management Manual. This condition shall be subject to the review and approval of the Development Services Division. c. The detention system for this project shall be required to comply with the requirements found in the 2005 King County Surface Water Design Manual to meet both detention (Conservation Flow control – a.k.a. Level 2) and water quality improvements. d. All truck traffic associated within the distribution center shall be limited to the hours between 7:00 am and 10:00 pm. e. The applicant shall pay a Traffic Mitigation Fee in the amount of $75 for each new net daily trip prior to the issuance of the building permit. It is anticipated that the proposed project would result in the payment of $133,110.00 (1,774.8 net new daily trips x $75 = $133,110.00). f. The applicant shall pay a Fire Mitigation Fee based on $0.52 per new square foot of building area prior to the issuance of the building permit. The fee is estimated at $132,600.00 ($0.52 x 255,000 square feet = $132,600.00). 18. The ERC issued addenda to the initial DNS-M document on three occasions to add minor information that was not included with the original determination. In 2013, an addendum was issued to the DNS-M (Exhibit 13) to include the demolition of the existing buildings on the site. In 2015, an addendum was issued to the DNS-M (Exhibit 14) to disclose the retention of approximately 139,000 cubic yards of pre- load and surcharge soils that were used for the Parts and Distribution Center building and relocates the material to their current location on the southwestern portion of the Paccar campus. In 2016, an addendum was issued to the DNS-M (Exhibit 1) to propose regrading retained soils along the Garden Ave N frontage from a 2H:1V slope to a 4/5H:1V slope and plant additional vegetation along the soil stockpile perimeter. No changes to mitigation measures were made with the addenda. 19. Representatives from various city departments have reviewed the application materials to identify and address issues raised by the proposed development. These comments are contained in the official file, and the essence of the comments has been incorporated into the appropriate sections of this report and the Departmental Recommendation at the end of this report. 20. Comprehensive Plan Compliance: The site is designated an Employment Area (EA) on the City’s Comprehensive Plan Map. The purpose of the EA designation is to allow areas primarily used for industrial development, or mix of commercial and industrial uses such as office, industrial, warehousing, and manufacturing, with access to transportation networks and transit, within the Employment Area (EA) Land Use Designation. Employment Area provides significant economic development and employment base for the City. Maintain a variety and balance of uses through zoning which promotes the gradual transition of uses on sites with good access and visibility to more intensive City of Renton Department of Community & Economic Development Hearing Examiner Recommendation PACCAR PRE-LOAD SOIL RETENTION LUA16-000620,SA-H,SP Report of Hearing February 21, 2017 Page 6 of 13 HEX Report Paccar commercial and office uses. The proposal is compliant with the following development standards if all conditions of approval are met: Compliance Comprehensive Plan Analysis  Goal L-N: Sustain industrial areas that function as integrated employment activity areas and include a core of industrial uses and other related businesses and services, transit facilities, and amenities.  Goal L-U: Preserve, protect, and enhance the quality and functions of the City’s sensitive areas including: lakes, rivers, major and minor creeks, intermittent stream courses and their floodplains, wetlands, ground water resources, wildlife habitats, and areas of seismic and geological hazards.  Policy L-37: Land uses in areas subject to flooding, seismic, geologic, and coal mine hazards should be designed to prevent property damage and environmental degradation before, during, and after construction.  Policy L-57: Compliment the built environment with landscaping using native, naturalized, and ornamental planting that are appropriate for the situation and circumstance and which provide for respite, recreation, and sun/shade. 21. Special Grade and Fill Permit Criteria: In order to grant a special permit, the Hearing Examiner shall make a determination that the activity would not be unreasonably detrimental to the surrounding area. The Hearing Examiner shall consider, but not be limited to, the following: a. Size and Location of the activity. As noted above, the applicant is seeking approval of a Special Fill and Grade Permit to retain the existing soil stockpile that was used to stabilize the foundation area of the recently completed Parts and Distribution Center (PDC). The applicant’s initial geotechnical report for the building improvements (Exhibit 15) recommended using a preload and surcharge to help limit the settlement of the foundation system that would likely be susceptible to due to the subject property’s sand, silt, and peat soil structure. Preloading is temporarily placing weight on the soil in the building area that is approximately equal to the weight of the building which causes the underlying solids to pre-compress under the temporary load. Additional soils were placed on top of the preload, referred as a surcharge, to reduce long term time dependent settling related to the peat and fine-grained soils. These preload and surcharge soils were monitored by the geotechnical engineer to determine the appropriate pre-compression of the underlain site soils. Following the pre-compression the preload and surcharge soils were relocated to the southwest portion of the property and construction of the PDC building began. The project area is located adjacent to the Garden Ave. N. and N. 4th Street frontage. This approximately 12-acre portion of the Paccar campus is currently vacant and surrounded with perimeter vegetation. New frontage improvements along Garden Ave. N. were recently constructed by the applicant that included a new sidewalk and planter strip. The soil has already been located on the subject property. There are no activities associated with the soil stock pile with the exception of the regrading of the Garden Ave. N. frontage to a more gradual slope and the installation of new vegetation. The Renton School District Bus Barn and Boeing office with surface parking is located across Garden Ave. N. to the west. Zoning to the west is UC and IL. To the south of the project area multi-family duplexes and single-family residential is located across N. 4th St. to the south. Zoning to the south is R-10. The Paccar campus with Kenworth Truck Plant and the new PDC building is located to the north and east, respectively. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation PACCAR PRE-LOAD SOIL RETENTION LUA16-000620,SA-H,SP Report of Hearing February 21, 2017 Page 7 of 13 HEX Report Paccar b. Traffic Volumes and Patterns. The existing soil stockpile was located in its current location as part of the recently completed PDC building. Traffic impacts would be limited to bringing equipment to re-grade the slope along Garden Ave. N. from its current 2H:1V slope to a 4/5H:1V slope. The applicant would be required to use the City’s designated Truck Routes for any vehicles with a gross vehicle weight greater than 26,000 pounds. The nearest truck routes to the project site are Park Ave. N., N. 6th St., and N. 8th St. c. Screening, Landscaping, Fencing, and Setbacks. There is a six-foot tall chain link fence with barb wire around the perimeter of the project site. City staff has visited the site and the fence appears to be in good condition. The area between the fence and the stockpile is vegetated with a mix of mature evergreen trees such as Douglas Fir and Western Red Cedar and recently planted evergreen trees and shrubs. There are gaps along the Garden Ave. N. frontage where vegetation is sparse or the newly planted vegetation appears to be unhealthy. The applicant has submitted a revised landscaping plan (Exhibit 5) that provides 103 new Western Red Cedar trees to be planted on the existing perimeter adjacent to N. 4th St. and the proposed modified slope along Garden Ave. N. As a condition of approval, staff recommends the applicant submit an irrigation plan for the newly planted trees. Staff also recommends that the applicant’s Landscape Architect provide an assessment of the existing perimeter landscaping with regard to health and vigor and recommend a plan to return any unhealthy plants to healthy status or replace those shrubs and/or trees that are dead, diseased, or near death. A surety device shall be provided for the newly planted and any replanted vegetation to guarantee plant survival for a period of 5-years. d. Unsightliness, Noise, Dust. The existing soil stockpile ranges approximately 6 to 10-feet high with slopes of 2H:1V. The stockpile is setback from the Garden Ave. N. property line approximately 25-feet. Setbacks from N. 4th St. are approximately 40-feet. The City has not received any complaints on the existing stockpile during this application process. City staff has worked with the applicant to modify the existing slope along Garden Ave N and regrade the slope to between 4-5 foot horizontal run per 1-foot of vertical rise within 50-feet of the property line and to provide additional tree planting along the stockpile’s south and west perimeter. These treatments along the staff recommended condition to rehabilitate existing unhealthy vegetation will soften the impact from the rise in grade. The regrading of the western portion of the stockpile will require an approximate cut of 2,700 cubic yards of soil. The soil is proposed to be spread along the top of the existing pad in a thin layer. The proposed regrade will likely require the removal of a small area of contaminated soil as shown on the applicant’s cross-section plans (Exhibit 4). The applicant has proposed to locate contaminated soil west of the preload stockpile and cap with a minimum of one-foot of clean soil as shown on the temporary erosion control plan (Exhibit 3). Staff recommends as a condition of approval, the applicant comply with all applicable requirements of the Consent Decree (Exhibit 9) and the company policy document (Exhibit 10) with regard to contaminated soil handling and relocation. The amount of soil cuts and fills on the site are typical of a development project and therefore code based requirements for noise and dust control limitations should be appropriate. The applicant will be required to implement any additional dust and wheel wash procedures as identified in the Consent Decree and/or company policy document for those areas containing contaminated soil that will be disturbed as part of the slope regrade. Staff recommends as a condition of approval, the applicant submit a Construction Mitigation Plan that identifies the City of Renton Department of Community & Economic Development Hearing Examiner Recommendation PACCAR PRE-LOAD SOIL RETENTION LUA16-000620,SA-H,SP Report of Hearing February 21, 2017 Page 8 of 13 HEX Report Paccar construction dates, hours of construction, vehicle routes, measures to minimize dust, erosion, mud, and noise. The mitigation plan shall also identify all specific special procedures as required by the Consent Decree and company policy document to handle, store, and/or remove contaminated soils. The Construction Mitigation Plan shall be submitted to the Current Planning Project Manager for review and approval prior to grading license approval. e. Surface Drainage The preload soil stockpile was graded to drain to existing catch basins and conveyance pipes that were on the site prior to grading. The applicant’s updated Geotechnical Memorandum (Exhibit 6) does not consider the project area to be suitable for on-site stormwater infiltration due to the fine-grained nature of the surface soils and the presence of contaminated soils beneath the clean soil cap. Portions of the subject property are within a Wellhead Protection Zone 2. The applicant has provided fill source statements (Exhibit 6) certified by a professional engineer that the preload soil stockpile materials were obtained from sites that were not on the Hazardous Site List for Model Toxic Control Act or National Priority List for Federal “Superfund” List and the soils are native to the fill source site. The applicant’s landscape plan (Exhibit 5) identifies erosion control planting (hydroseed) for the regraded areas along the Garden Ave. N. frontage. The updated Geotechnical Memorandum recommends the exposed soil on the newly graded slopes be revegetated as soon as possible following regrading to minimize risk of erosion and sedimentation runoff. Staff recommends as a condition of approval the applicant comply with all recommendations of the Geotechnical Memorandum. f. Permit Expiration If approved by the Hearing Examiner, staff recommends the permit remain valid for 10-years from the date of the final decision. If the applicant intends to keep the preload materials longer than the 10-year time limitation, the applicant shall submit a new special fill and grade permit application no later than 9-years from the date of this decision. Removal and/or reuse of the soil stockpile will also require the applicant to obtain the applicable land use, building, and/or grading approvals no later than 9-years from the date of this decision. 22. Site Plan Review: Pursuant to RMC 4-9-200.B, Site Plan Review is required for development in the Employment Area land use designation when it is not exempt from Environmental (SEPA) Review. For Master Plan applications compliance with the review criteria for Site Plans are analyzed at a general level of detail to ensure nothing would preclude the development of the Site Plan. Given Site Plan applications are evaluated for compliance with the specific requirements of the RMC 4-9-200.E.3 the following table contains project elements intended to comply with level of detail needed for both the Master and Site Plan requests: Compliance Site Plan Criteria and Analysis Compliant if Conditions of Approval are Met a. Comprehensive Plan Compliance and consistency. Staff Comment: See previous discussion under FOF 20, Comprehensive Plan Analysis.  b. Zoning Compliance and Consistency. Staff Comment: The existing Heavy Industrial use is an allowed use in the IH zone. No new improvements are proposed for the Paccar campus. The Parts and Distribution Center (PDC) building was found compliant and consistent with the zoning regulations City of Renton Department of Community & Economic Development Hearing Examiner Recommendation PACCAR PRE-LOAD SOIL RETENTION LUA16-000620,SA-H,SP Report of Hearing February 21, 2017 Page 9 of 13 HEX Report Paccar when permitted. The preload soils were a component of the PDC building and those soils are proposed to be retained and screened with vegetation on the subject property. N/A c. Design Regulation Compliance and Consistency. Staff Comment: Not applicable. The subject property is not located within a design district. N/A d. Planned action ordinance and Development agreement Compliance and Consistency. Staff Comment: Not applicable  e. Off Site Impacts. Structures: Restricting overscale structures and overconcentration of development on a particular portion of the site. Staff Comment: Not applicable. No structures are proposed. Applicant is requesting to retain an existing preload soil stockpile used for the PDC building, a previously approved project. Circulation: Providing desirable transitions and linkages between uses, streets, walkways and adjacent properties. Staff Comment: Not applicable. The proposed preload soil stockpile retention request does not interfere with circulation patterns offsite. The stockpile is located on a vacant portion of the Paccar campus and fenced off from public use. Loading and Storage Areas: Locating, designing and screening storage areas, utilities, rooftop equipment, loading areas, and refuse and recyclables to minimize views from surrounding properties. Staff Comment: No applicable. No storage, utilities, rooftop equipment, loading areas, or refuse and recyclables are needed for the retention of the preload soil stockpile. Views: Recognizing the public benefit and desirability of maintaining visual accessibility to attractive natural features. Staff Comment: The soil stockpile is not anticipated to block views of the area’s surrounding natural features such as Lake Washington, Cascade foothills, or Mt. Rainier. The soil stockpile is approximately 10-feet above the street grade screened with evergreen trees and vegetation. Landscaping: Using landscaping to provide transitions between development and surrounding properties to reduce noise and glare, maintain privacy, and generally enhance the appearance of the project. Staff Comment: The existing soil stockpile contains a vegetative screen between 10 and 25 feet along the Garden Ave N and N 4th St frontages. Existing vegetation includes a mix of mature and recently planted Douglas Fir and Western Red Cedar trees with evergreen shrubs. The applicant’s landscape plan (Exhibit 5) further augments the existing screen with 103 new Western Red Cedar trees and staff has recommended a condition of approval for the special grade and fill permit to revitalize areas of vegetation that may be in decline. Lighting: Designing and/or placing exterior lighting and glazing in order to avoid City of Renton Department of Community & Economic Development Hearing Examiner Recommendation PACCAR PRE-LOAD SOIL RETENTION LUA16-000620,SA-H,SP Report of Hearing February 21, 2017 Page 10 of 13 HEX Report Paccar excessive brightness or glare to adjacent properties and streets. Staff Comment: Not applicable. No lighting is necessary for the preload soil stockpile. The project area will remain vacant and unimproved.  f. On Site Impacts. Structure Placement: Provisions for privacy and noise reduction by building placement, spacing and orientation. Staff Comment: Not applicable. No buildings or improvements are proposed with the application. Structure Scale: Consideration of the scale of proposed structures in relation to natural characteristics, views and vistas, site amenities, sunlight, prevailing winds, and pedestrian and vehicle needs. Staff Comment: Not applicable. No buildings or improvements are proposed with the application. Natural Features: Protection of the natural landscape by retaining existing vegetation and soils, using topography to reduce undue cutting and filling, and limiting impervious surfaces. Staff Comment: All existing vegetation is proposed to be retained and staff has recommended a condition of approval to revitalize areas that may be in decline. No impervious areas are proposed with the application. Landscaping: Use of landscaping to soften the appearance of parking areas, to provide shade and privacy where needed, to define and enhance open spaces, and generally to enhance the appearance of the project. Landscaping also includes the design and protection of planting areas so that they are less susceptible to damage from vehicles or pedestrian movements. Staff Comment: Existing and new landscaping planted between the property fence and soil stockpile softens the effects of the grade change from the street. A majority of the landscaping are evergreen varieties that will provide the screen year round. New frontage improvements along Garden Ave N. also incorporated several of the site’s existing mature evergreen trees, which provide a tree lined sidewalk along the portions of the frontage. Planting areas are located behind a 6-foot tall chainlink fence and therefore not be susceptible to damage. N/A g. Access Location and Consolidation: Providing access points on side streets or frontage streets rather than directly onto arterial streets and consolidation of ingress and egress points on the site and, when feasible, with adjacent properties. Staff Comment: Not applicable. No new access or changes to existing access are proposed with the preload soil retention proposal. Internal Circulation: Promoting safety and efficiency of the internal circulation system, including the location, design and dimensions of vehicular and pedestrian access points, drives, parking, turnarounds, walkways, bikeways, and emergency access ways. Staff Comment: Not applicable. No internal circulation changes are proposed with the preload soil retention proposal. Proposed work relating to regrading and new planting City of Renton Department of Community & Economic Development Hearing Examiner Recommendation PACCAR PRE-LOAD SOIL RETENTION LUA16-000620,SA-H,SP Report of Hearing February 21, 2017 Page 11 of 13 HEX Report Paccar are located in a vacant portion of the Paccar campus Loading and Delivery: Separating loading and delivery areas from parking and pedestrian areas. Staff Comment: Not applicable. No loading and delivery areas are proposed with the preload soil retention proposal. Proposed work relating to regrading and new planting are located in a vacant portion of the Paccar campus and separated from all parking and pedestrian areas. Transit and Bicycles: Providing transit, carpools and bicycle facilities and access. Staff Comment: Not applicable. No new parking is required or proposed with the preload soil retention application. Pedestrians: Providing safe and attractive pedestrian connections between parking areas, buildings, public sidewalks and adjacent properties. Staff Comment: Not applicable. The soil stockpile area is located on a vacant portion of the Paccar campus with no parking or buildings. The area is restricted from access with chain link fencing and barb wire for safety purposes and therefore no pedestrian connections to public sidewalks and adjacent properties is necessary. N/A h. Open Space: Incorporating open spaces to serve as distinctive project focal points and to provide adequate areas for passive and active recreation by the occupants/users of the site. Staff Comment: Not applicable. The soil stockpile area is restricted from public access with secured fencing. No areas for passive of active recreation are appropriate. The applicant has proposed new landscape plantings and the existing landscaping provides an attractive aesthetic for the property’s frontage.  i. Views and Public Access: When possible, providing view corridors to shorelines and Mt. Rainier, and incorporating public access to shorelines Staff Comment: The existing preload soil stockpile does not block view corridors to shorelines or Mt. Rainier. The public access requirement is not applicable to the proposal.  j. Natural Systems: Arranging project elements to protect existing natural systems where applicable. Staff Comment: The applicant has certified the preload materials brought onto the subject site are not contaminated and pose no risk to the Wellhead Protection Area Zone 2 located on the subject property. The soil stockpile site has been determined to be stable by the updated geotechnical report (Exhibit 6), which further states the regrading will further stabilize the fill long term. Hydro seeding, as proposed by the landscaping plan (Exhibit 5), on the regraded portion and other disturbed areas will provide erosion and sedimentation control.  k. Services and Infrastructure: Making available public services and facilities to accommodate the proposed use: Police and Fire. Staff Comment: Police and Fire Prevention staff indicated that the soil stockpile has no impacts to their services. As no improvements are proposed, no fire impact fees will be assessed. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation PACCAR PRE-LOAD SOIL RETENTION LUA16-000620,SA-H,SP Report of Hearing February 21, 2017 Page 12 of 13 HEX Report Paccar Water and Sewer. Staff Comment: No new water or sewer service or alterations to existing water or sewer service is required for the soil stockpile. Drainage. Staff Comment: No changes to drainage facilities on the site or within city owned facilities are required for the proposal. No new impervious surfaces are proposed. Transportation. Staff Comment: No changes to existing access to the site are proposed. Any truck traffic related to the regrading of the slope along the Garden Ave N. frontage is required to utilize the designated City Truck Routes. Nearby routes to the project location are Park Ave N., N. 6th St., and N. 8th St. No increased traffic impacts are created by the preload soil stockpile as the project site will remain vacant. No transportation impact fee will be assessed. N/A l. Phasing: The applicant is not requesting any additional phasing.  m. Stormwater: Providing optimal locations of stormwater infiltrating low impact development facilities. Avoiding placement of buildings or impervious areas on soils with infiltration capability to the maximum extent practicable. Staff Comment: As stated in the applicant’s updated geotechnical memorandum (Exhibit 6), infiltration is not appropriate for the soil stockpile as the soils near the surface are fine-grained and the presence of contaminated soils below the protective clean soil cap. 23. Critical Areas: Project sites which contain critical areas are required to comply with the Critical Areas Regulations (RMC 4-3-050). The proposal is consistent with the Critical Areas Regulations. The subject property is located with a Wellhead Protection Zone 2 and High Seismic Area. The applicant has submitted Fill Source Statements (Exhibit 6) certified by a professional engineer identifying the preload soils that were brought to the site are not contaminated. The applicant’s updated geotechnical memorandum (Exhibit 6) states the existing preload soil stockpile does not require compaction testing as it is non-structural. The report further states the track walking that occurred on the soil during its placement provided adequate compaction for its stockpile purpose. The report recommends the newly exposed slopes be revegetated as soon as possible to minimize the risk of erosion and sedimentation runoff and all potentially exposed soils be managed and capped with a minimum one-foot clean soil cap layer. As stated in the Special Grade and Fill Permit analysis (FOF 21), staff recommends the applicant implement all recommendations of the geotechnical report. I. CONCLUSIONS: 1. The subject site is located in the Employment Area (EA) Comprehensive Plan designation and complies with the goals and policies established with this designation, see FOF 20. 2. The subject site is located in the Heavy Industrial (IH) zoning designation and complies with the zoning and development standards established with this designation see FOF 4. 3. The proposed preload soil retention complies with the Special Grade and Fill Permit regulations provided the applicant complies with City Code and conditions of approval, see FOF 21. City of Renton Department of Community & Economic Development Hearing Examiner Recommendation PACCAR PRE-LOAD SOIL RETENTION LUA16-000620,SA-H,SP Report of Hearing February 21, 2017 Page 13 of 13 HEX Report Paccar 4. The proposed preload soil retention complies with Site Plan Review decisional criteria provided the applicant complies with City Code and conditions of approval, see FOF 22. 5. The proposed preload soil retention complies with the Critical Areas Regulations provided the applicant complies with City Code and conditions of approval, see FOF 23. 6. Key features, which are integral to this project include: (1) adequately screening the preload soil retention area with a meaningful landscape buffer of newly planted trees and rehabilitating and/or replacing existing vegetation that is unhealthy; (2) ensuring the long term success of the vegetation by providing irrigation; and (3) re-grading the slope within 50-feet of the property along the Garden Ave. N. frontage to a more gradual incline. J. RECOMMENDATION: Staff recommends approval of the Paccar Preload Soil Retention Special Fill and Grade Permit and Site Plan, File No. LUA16-000620, as depicted in Exhibits 3, 4, and 5 subject to the following conditions: 1. The applicant shall comply with the mitigation measures issued as part of the Determination of Non- Significance Mitigated, dated December 18, 2006. 2. The applicant shall submit an irrigation plan for the newly planted trees for review and approval by the Current Planning Project Manager prior to Grading License approval. 3. The applicant shall provide an assessment of the existing perimeter landscaping by a Landscape Architect with regard to health and vigor and recommend a plan to return any unhealthy plants to healthy status or replace those shrubs and/or trees that are dead, diseased, or near death. A surety device shall be provided for the newly planted and any replanted vegetation to guarantee plant survival for a period of 5-years. 4. The applicant shall comply with all applicable requirements of the Consent Decree and the company policy document (Exhibit 10) with regard to contaminated soil handling and relocation. 5. The applicant shall submit a Construction Mitigation Plan that identifies the construction dates, hours of construction, vehicle routes, and measures to minimize dust, erosion, mud, and noise. The mitigation plan shall also identify all specific special procedures as required by the Consent Decree and company policy document to handle, store, and/or remove contaminated soils. The Construction Mitigation Plan shall be submitted to the Current Planning Project Manager for review and approval prior to Grading License approval. 6. The applicant shall comply with all recommendations of the Geotechnical Memorandum prepared by Hart Crowser, dated November 29, 2016. 7. The Special Fill and Grade Permit is valid for 10-years from the date of the final decision. If the applicant intends to keep the preload materials longer than the 10-year time limitation, the applicant shall submit a new special fill and grade permit application no later than 9-years from the date of this decision. Removal and/or reuse of the soil stockpile will also require the applicant to obtain the applicable land use, building, and/or grading approvals no later than 9-years from the date of this decision. CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT REPORT TO THE HEARING EXAMINER EXHIBITS Project Name: Paccar Pre-Load Soil Retention Project Number: LUA16-000620,SA-H,SP Date of Hearing February 21, 2017 Staff Contact Matthew Herrera, Senior Planner Project Contact/Applicant Jason Hubbell Barghausen Engineers, 18215 72nd Ave. S., Kent, WA 98032 Project Location 1400 N. 4th St. The following exhibits were entered into the record: Exhibit 1: Addendum to DNS-M, dated January 30, 2017 Exhibit 2: Vicinity Map Exhibit 3: Temporary Erosion and Sedimentation Control (TESC) Plan Exhibit 4: Site Section Plan Exhibit 5: Landscape Plan Exhibit 6: Geotechnical Report Update Memorandum prepared by Hart Crowser dated November 29, 2016 Exhibit 7: Paccar Parts and Distribution Center Building Permit Exhibit 8: Parts and Distribution Center Building Permit Conditions Exhibit 9: Consent Decree Exhibit 10: Paccar Interoffice Environmental Requirements Memorandum dated May 5, 2003 Exhibit 11: Paccar Parts and Distribution Center SEPA Determination, dated December 18, 2006 Exhibit 12: SEPA Determination Decision on Appeal, issued March 17, 2007 Exhibit 13: ERC Addendum to DNS-M related to building demolition issued August 26, 2013 Exhibit 14: ERC Addendum to DNS-M related to retention of preload soils issued June 15, 2015 Exhibit 15: Geotechnical Report prepared by Hart Crowser, dated September 26, 2014 Exhibit 16: Advisory Notes to Applicant ST O P STOP ST O P ST O P Approved by: Approved by: Approved by: Approved by: Date: Date: Date: Date: CITY OF RENTON Know what's below. before you dig.Call R Know what's below. before you dig.Call R SHEET NUMBER WB L A 2 0 1 5 TITLE 201638 PROJECT NO. DATE CLIENT: LOCATION: PROJECT: 11.16.2016 PROFESSIONAL SEAL DESIGNED DRAWN CHECKED CB CB CB NO.DATE REVISION 11.22.2016 OWNER REVIEW REGRADE PACCAR PARTS WAREHOUSE RENTON, WA PACCAR, INC. 777 106TH AVE. N.E. BELLEVUE, WA 98004 SHEET SIZE: 22" x 34" AT 100% 11.30.2016 PERMIT Know what's below. before you dig.Call R L-1 LANDSCAPE PLAN    3131 Elliott Avenue, Suite 600 Seattle, Washington 98121 Tel 206.324.9530   MEMORANDUM   DATE:  November 29, 2016    TO:  Rob Reifsnyder, PACCAR      FROM:  Rolf B. Hyllseth, PE and Garry E. Horvitz, PE    RE:  Geotechnical Report Update – SW Fill Area    PACCAR Renton Parts Distribution Center (PDC)    Renton, Washington    17946‐02    CC:  Jason Hubbell, Barghausen Engineers    Vicki Zumbrunnen, PACCAR     As requested by the City of Renton, this memorandum provides updated geotechnical engineering  recommendations for the SW Fill Area of the PDC project site, located adjacent to Garden Avenue North  and North 4th Street as shown on the Barghausen Phase 3 Temporary Erosion Control and Grading Plans  for the project (dated November 15, 2016).   The fill placed in this portion of the site consists of relocated preload fill material from the original PDC  building pad. Hart Crowser monitored the preload fill placement and removal process during  construction. The updated recommendations in this memorandum should only be used in conjunction  with the general recommendations of our geotechnical engineering design study dated September 25,  2014, and subsequent supplemental recommendations provided by Hart Crowser.   This memorandum is for the exclusive use of PACCAR, Barghausen Engineers, and their consultants for  specific application to the subject project and site. We completed this memorandum in accordance with  geotechnical practices generally accepted for work of a similar nature done in the same timeframe, in  the same or similar localities, and under similar conditions. No other warranty, express or implied, is  made.  SW Fill Placement Recommendations The fill placed in the SW portion of the site is considered non‐structural (i.e. not intended to support  buildings, paved roads, or other surface structures). As such, geotechnical field observation or  compaction testing was not required during placement. It is our opinion that track‐walking the fill  DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Building Permit: B15000936 IVR Number: 15000936 Permit Information Permit Name: PACCAR PARTS DISTRIBUTION CENTER Address/Location:03/03/2015Application Date:7223000010Parcel Number: 405 HOUSER WAY N Permit Type:07/07/2015Issue Date:$11,013,894Total Valuation: Building Commercial Permit Work Class:07/06/2017Expiration Date:169,147Total Square Feet: New Building Height:42.0 # of Stories:1 Description: CONSTRUCT NEW 169,147 SQ FT PACCAR PARTS DISTRIBUTION CENTER Occupancy Information Square FeetType of ConstructionOccupancy Group Valuation B Business VB $1,111,682.88 9,072 S-2 Storage, low hazard VB $9,902,211.00 176,510 Contacts Name Address PhoneTypeBilling STEVE PAUL HOWARD S WRIGHT 415 1st Ave N, STE 400 SEATTLE, WA 98109 C: (206) 794-2240ContactX Royce Dawkins Balfour Beatty Construction LLC dba Howard S Wright 3100 Mckinnon, 7th Floor Dallas, TX 75201 B: (206) 447-7500 C: (214) 451-1018 ContractorX Construction Contractor: HOWARSW863BG Accounts Payable Paccar Parts Warehouse 750 Houser Way N Renton, WA 98057 B: (425) 254-4166 O: (425) 254-4400 OwnerX General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Ÿ Call (425) 430-7202 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ (Date)(Signature) Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit B15000936 Building 1 Erosion control shall be in place and inspection approved prior to disturbance of soil on site. 2 Ground Electrode System (Either 1 Or 2 Are Approved Methods): 1. An Electrode Of At Least 20 Ft Long Bare Copper, Sized In Accordance With Nec 2. An Electrode Of 20 Ft Long #4 Rebar (Not Less Than 1/2 Inch In Diameter) And Sized Per Nec Either One Shall Be Encased By At Least 2 Inches Of Concrete, Located Within And Near The Bottom Of A Concrete Footing That Is In Direct Contact With The Earth, And Shall Be Installed In All New Residential And Commercial Construction. 3 TREE PROTECTION MEASURES FOR ALL TREES IN THE CONSTRUCTION AREA OF A DEVELOPMENT SITE. THESE MEASURES INCLUDE: 1. 6 foot high chain link fences around the trees out to and including the drip line of the tree. 2. All the area within the fenced area needs a minimum of 3" of bark mulch. 3. Warning signs must also be included on the fence. 4. Construction activity, parking, and storage of materials and equipment is not allowed within the drip line (and therefore fenced) area of any tree. 5. The only new impervious surfaces allowed within the drip line of existing trees are those shown on approved building or construction plans, which typically should be limited to the new buildings, new driveways, new parking lots, new streets and new sidewalks. 4 Authorized Hours Of Construction/Activity: 7Am-8Pm Monday Through Friday 9Am-8Pm Saturday No Work Allowed On Sunday. Per Ordinance 4703, 2-2-1998 5 All Construction, Demolition And Land Clearing Waste Must Be Recycled At A King County Licensed Or Approved Facility, Or Taken To Regional Disposal Facilities. 6 Approval For Building Permit Only-Separate Approval And Permits Required For Any Mechanical, Plumbing, Electrical, Fire Suppression Or Hazardous Materials System. Fire 7 The building shall comply with the City of Renton Emergency Radio Coverage ordinance. Testing shall verify both incoming and outgoing minimum emergency radio signal coverage. If inadequate, the building shall be enhanced with amplification equipment in order to meet minimum coverage. Separate plans and permits are required for any proposed amplification systems. 8 Portable Fire Extinguishers Required, 2A10Bc Minimum Rating. 9 Fire Lanes/Fire Zones Shall Be Marked Per City Ordinance. Fire Department Access Roads Shall Be Paved A Minimum Of 20-Feet Wide And Shall Provide A Minimum Height Clearance Of 13.5-Feet. Applicant Shall Provide An 8.5 X 11-Inch Site Plan Showing Placement Of Required Fire Lanes For Fire Department Permanent Record Prior To Certificate Of Occupancy. 10 Fire Department Connection Location To Be Approved By The Fire Department. 11 Fire Alarm System Required. Plans To Be Submitted To Renton Fire Prevention Bureau For Approval (425)430-7024. Both An Electrical And Fire Alarm Permit Are Required For This Installation. System Shall Be Monitored By An Approved Ul-Listed Central Station. Full Detection And Fully Addressable Page 1 of 2 Required. 12 Required Fire Flow 5,500 Gpm. Proposed Hydrant Layout Is Acceptable. 13 Street Address Shall Be Posted On Building. Contrasting Color Minimum 24-Inches. 14 SPRINKLER SYSTEM IS REQUIRED. PLANS SHALL BE STAMPED BY A STATE CERTIFIED SPRINKLER CONTRACTOR. PLANS TO BE SUBMITTED TO RENTON FIRE PREVENTION BUREAU FOR REVIEW AND PERMITTING(425)430-7024. A PLUMBING PERMIT FOR A BACKFLOW PREVENTION DEVICE IS ALSO REQUIRED PRIOR TO ISSUANCE OF SPRINKLER PERMIT. Planning 15 Separate sign permits are required for the project, where wall signs are identified on the submitted building permit. 16 Separate building permit for the three flag poles (one permit for all) is required. 17 The relocation of the pre-load fill from the east side of the site along N 4th St. and Houser Way N to the west side of the site along N 4th St. and Garden Ave. N, is approved for 5 years. During the first quarter of the fourth year the applicant shall either: 1.Submit a land use application for a Special Grade and Fill Permit to permit the fill to remain on the site for a period beyond 5 years; or 2.Submit a land use application for another type of development that would necessitate the use of the fill as a pre-load; or 3.Submit to the City a Utility Construction Permit for the removal of the fill that identifies finished site grades at the minimum necessary elevation to comply with the site remediation standards as identified in the Consent Decree. 18 The existing mature trees on the private property side along Garden Ave N and N 4th St, behind the fence, are required to be retained unless approved for removal by the city. The trees were retained as mature trees and screening on-site where street trees in the right-of-way is usually required. Water 19 A new easement will be required for the new water line and the language must be reviewed and approved by the City Attorney. We do not have a word template of the previous easement and as such we will need Paccar to submit a new easement form. We will be need to (re) obtain the City Attorney's review and approval of the new easement since it is not a City standard easement form, even if the same language is used. The development, review and approval of the easement by all parties will take some time. We will need the final easement approved by the City before the connection of the new water main to the existing City' s water system. Page 2 of 2 INTEROFFICE COMMUNICATION CAT. NO. 4487 CORPORATE ENVIRONMENTAL DEPARTMENT May 5, 2003 To: D. D. Bennitt Cc: R. E. Bangert II V. L. ZumBrunnen From: L. C. Robbins Subject: Requirements related to the PDS Renton Superfund Site Environmental requirements related to the PDS Renton Superfund site follow. Please note however that this year, Ecology is due to review 5 years of groundwater monitoring data to determine if the site clean-up is performing as planned. The environmental requirements for redevelopment of the property may change as a result of this review. Costs for compliance with these requirements must be charged to the redevelopment project budget. 1. Both soil and groundwater may be contaminated and thus grading, excavation or trenching of soil below the minimum 12 " structural cap must be conducted by a contractor that is trained and conducts the work in accordance with WAC 296-62-300, Hazardous Waste Operations and Emergency Response. A Health and Safety Plan will be needed. See attached Heath and Safety Requirements applicable to any work performed below the level of the structural cap. 2. Soils greater than 12" in depth must be assumed to be contaminated. If the site soil is visibly clean and can be re-used on-site it must be stockpiled in a manner that prevents dust and stormwater contact including plastic sheeting underneath, and a cover each evening and during weather conditions that may result in dust or stormwater impacts. Berms should be used to avoid excessive stormwater contact with potentially contaminated soil. Erosion, stormwater and dust control plans will be needed. If the potentially contaminated but visibly clean soil is not re-used on-site, the soil stockpiles must be sampled with a 5-point composite sample for each individual stockpile or for each 500 cubic yards within a single stockpile, whichever is more, and tested for proper disposal. Soil stockpiles should be segregated in a manner that prevents contamination of clean soil and minimizes disposal costs. CED must pre-approve the disposal site(s). Copies of all test results, shipping papers and the final disposal site must be provided to CED. Off-site disposal of more than 200 cubic yards of potentially contaminated soil in any 3 month period must be pre-approved by CED and Ecology. 3. If visibly contaminated soil, debris or groundwater is encountered, CED should be notified immediately. With approval from CED, proceed with Hot Spot Removal Action (HSRA) for visibly contaminated soil as detailed in Item 15. Removed groundwater should be stored in a portable Baker tank. Visibly contaminated debris must be stockpiled on plastic and covered each evening or if weather conditions are such that wind or stormwater could contact and mobilize any contaminated soil that is adhering to the debris. Berms should be used to prevent excessive contact of stormwater runoff with potentially contaminated debris. DEPARTMENTOF COMMUNITY Cftyof AND ECONOMIC DEVELOPMENT ..:.JJ ) ADDENDUM TO ENVIRONMENTAL (SEPA)DETERMINATION OF NON-SIGNIFICANCE (DNS-M)-MITIGATED Pursuant to WAC 197-11-600(4)(c)and WAC 197-11-625 Addendum to the Paccar Parts Distribution Building as Addended by the City of Renton (LUAO6-139) Determination of Non-Significance -Mitigated (DNS-M) Date of Addendum:June 15,2015 Date of Original Issuance of SEPA Threshold Determination:December 18,2006 Proponent:PACCAR Inc. Project Numbers:LUAO6-139,ECF Project Name:Paccar Parts Distribution Building Proposal /Purpose of Addendum:The original SEPA threshold determination for the Paccar Parts Distribution Buildings was issued on December 18,2006.The original application included a proposal for the construction of a new 255,000 square foot parts distribution center,which included 5,000 square feet of office space.The Environmental Review Committee Staff Report, project description and the application materials did not explicitly disclose the site pre-load amount and distribution of the 139,000 cubic yards of pre-load surcharge soils.The intended purpose of the subject SEPA Addendum is to disclose the intended retention and grading of 139,000 cubic yards of fill on the site.Based on the information submitted by the applicant on June 8,2015;the location of the distribution building pre-load surcharge soils would be relocated from the new building vicinity in the southeast corner of the Paccar complex to the western portion of the site.The graded soils would be hydro seeded. Pursuant to the City of Renton’s Environmental Ordinance and SEPA (RCW 43.21C,1971 as amended),on December 18,2006,the Environmental Review Committee issued a Determination of Non-Significance -Mitigated (DNS-M)for the Paccar Parts Distribution Building.The DNS-M included five mitigation measures related to geotechnical recommendations,drainage and erosion control,truck traffic and mitigation fees.A 14-day appeal period commenced on December 18,2006 and ended on January 5,2007.An appeal was received on January 5,2007 from the project proponents,requesting amending the mitigation measure that limited the hours of operation for truck traffic.The decision of the ERC was affirmed by the Hearing Examiner on March 19,2007,resulting in no changes to the Geotechnical Recommendations Report PACCAR Renton Parts Distribution Center Renton, Washington Prepared for PACCAR September 26, 2014 17946-01 ADVISORY NOTES TO APPLICANT LUA16-000620 August 16, 2016 Name: Paccar Pre-load Soil Retention Application Date: 1400 N 4th St Renton, WA 98057-5507 Site Address: PLAN - Planning Review - Land Use Engineering Review Comments Contact: Rohini Nair | 425-430-7298 | rnair@rentonwa.gov 1. The geotech report recommendations for erosion control and construction should be followed. 2. Mulching / seeding of exposed soils should be done. 3. Silt fence should be provided on all down slopes. 4. No runoff should go from the site to adjacent properties. 5. All projects vested after January 2, 2017 will be subject to these new stormwater requirements. Please refer to RMC 4-1-045 for information regarding project vesting. Planning Review Comments Contact: Matt Herrera | 425-430-6593 | mherrera@rentonwa.gov 1. RMC section 4 4 030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial, multi family, new single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development Services Division’s approval of this work is required prior to final inspection and approval of the permit. 4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared. 6. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained. 7. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. 8. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and /or your U.S. Fish and Wildlife Service permit. Version 2 | February 13, 2017