HomeMy WebLinkAboutHEX Report_Highlands Reservoir and Emergency Generator_15-000864.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
CITY OF—Renton
A.REPORT TO THE HEARING EXAMINER
HEARING DATE:March 8,2016
Project Name:Highlands Reservoir &Emergency Generator
Owner:City of Renton,1055 S Grady Way,Renton WA 98057
Applicant/Contact:J.D.Wilson,Public Works,City of Renton,1055 5 Grady Way,Renton WA 98057
File Number:LUA15-000864,ECF,CU-H,SA-H,MOD
Project Manager:Clark H.Close,Senior Planner
Project Summary:The applicant is requesting Environmental (SEPA)Review,Hearing Examiner Site Plan
and Conditional Use Permit Reviews,and a Modification to street improvements for
development at the Highlands Reservoir site and associated improvements within the NE
12th St corridor.The 204,555 square foot property at 3410 NE 12th St is located in the
Residential-lO (R-10)zone.The project is part of the City’s public drinking water utility.
The proposed on-site improvements are the construction of a 6.3-million-gallon
reinforced concrete partially buried water storage tank,replacement of the emergency
generator,utilities improvements,new access road,and relocation of existing
telecommunication equipment.Off-site improvements within the NE 12th St right-of-
way include a new connection to the wastewater interceptor at NE 12th and NE Sunset
Blvd1 replacement of water main pipes that connect to NE 12th Street and Edmonds Ave
NE,and street improvements along the reservoir site.Access to the site is through two
driveways from NE 12th St.The project is located within the Wellhead Protection Area
zone.The project would excavate 20,000 cubic yards of soils and import 3,000 cubic
yards.Retention of 17 trees is proposed.New landscaping and screening is proposed.
The applicant requests a street modification from the RMC 4-6-060 standards along 3410
NE 12th St.The applicant proposes 2 feet of right-of-way dedication along the project
side of NE 12th St and new curb and gutter,5-foot bike lane,8-foot planting strip,and 5-
foot sidewalk.Documents submitted include environmental checklist,traffic study,
arborist,geotechnical,and drainage reports.
Project Location:3410 NE 12th St and NE 12th St Right-of-Way from Olympia Ave NE to Edmonds Ave NE
Site Area:204,555 SF (4.7 acres)
Project Location Map
Hex Report
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA1S-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 2 of 20
B.EXHIBITS:
Exhibits 1-15:As shown in the SEPA Environmental Review Report
Exhibit 16:Environmental “SEPA”Determination and ERC Mitigation Measures
Exhibit 17:Site Plan
Exhibit 18:Topography Map
Exhibit 19:Tree Cutting Plan,Land Clearing and Demolition Plan
Exhibit 20:Landscaping Plan
Exhibit 21:Arborist Report prepared by Greenforest Incorporated,dated November 18,2015
Exhibit 22:Artists Renderings
Exhibit 23:Onsite Utility Plan
Exhibit 24:Reservoir Floor Plans
Exhibit 25:Site Cross Sections
Exhibit 26:Street Modification Request
C.GENERAL INFORMATION:
City of Renton 1055 5 Grady Way Renton WA1.Owner(s)of Record:98057
2.Zoning Classification:Residential-lO (R-10)
3.Comprehensive Plan Land Use Designation:Residential High Density (RHD)
4.Existing Site Use:Highlands 435 Zone Reservoir and Emergency
Generator Site used for public drinking water and
public and private telecommunications.
5.Critical Areas:Located within the City of Renton Wellhead
Protection Zone 2 area
6.Neighborhood Characteristics:
a.North:Residential High Density (RHO)Comprehensive Plan Land Use Designation;
Residential-lU (R-lO)zone
b.East:Residential Medium Density (RMD)Comprehensive Plan Land Use Designation;
Residential-8 (R-8)zone
c.South:Residential High Density (RHO)Comprehensive Plan Land Use Designation;
Residential Multi-Family (RMF)zone
d.West:Residential High Density (RHO)Comprehensive Plan Land Use Designation;
Residential-lU (R-lO)zone
6.Site Area:4.7 acres
D.HISTORICAL/BACKGROUND:
Action Land Use File No.Ordinance No.Date
Comprehensive Plan N/A 5758 06/22/2015
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA15-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 3 of 20
Zoning N/A 5758 06/22/2015
Peacock Annexation A-005-54 1490 08/05/1954
E.PUBLIC SER VICES:
1.Existing Utilities
a.Water:The proposed development is within City of Renton Water District.
b.Sewer:Sewer service is provided by the City of Renton.The future phase would require a cut and
cap of the existing side sewer connection for the chlorination building and vault.
c.Surface/Storm Water:The proposed development would create stormwater runoff from the site.
New impervious surfaces would be collected and conveyed to the proposed on-site stormwater
detention vaults and then be released (Exhibit 12).
2.Streets:NE 12th St right-of-way is a minor arterial street.
3.Fire Protection:City of Renton Fire Department.
F.APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE:
1.Chapter 2 Land Use Districts
a.Section 4-2-020:Purpose and Intent of Zoning Districts
b.Section 4-2-060:Zoning Use Table —Uses Allowed in Zoning Designations
c.Section 4-2-110:Residential Development Standards
2.Chapter 3 Environmental Regulations
a.Section 4-3-050:Critical Area Regulations
3.Chapter 4 City-Wide Property Development Standards
4.Chapter 6 Streets and Utility Standards
a.Section 4-6-060:Street Standards
5.Chapter 9 Permits —Specific
a.Section 4-9-015:Aquifer Protection Area Permits
b.Section 4-9-030:Conditional Use Permit
c.Section 4-9-080:Grading,Excavation and Mining Permits and Licenses
d.Section 4-9-200:Master Plan and Site Plan Review
e.Section 4-9-250:Variances,Waivers,Modifications,and Alternates
6.Chapter 11 Definitions
G.APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN:
1.Land Use Element 3.Capital Facilities Element
2.Utilities Element
H.FINDINGS OF FACT (FOF,):
1.The Planning Division of the City of Renton accepted the above master application for review on
December 14,2015 and determined the application complete on December 28,2015.The project
complies with the 120-day review period.
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA15-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 4 of 20
2.The project site is located at 3410 NE 12th St (APN 0423059186).
3.The project site is currently developed with water storage tanks for public drinking water along with
several accessory buildings for storage or equipment protection.The site also is used for public and
private telecommunications purposes.
4.Access to the site would be provided via two (2)gated driveways from NE 12th St.
5.The property is located within the Residential High Density (RHD)Comprehensive Plan land use
designation.
6.The site is located within the Residential-lO (R-10)zoning classification.
7.There are approximately 116 trees located onsite of which the applicant is proposing to retain a total of
17 trees.
8.The site is mapped within the City of Renton Wellhead Protection Zone 2 area (Exhibit 11).
9.Approximately 20,000 cubic yards (38,000 tons)of material would be cut on site and approximately
3,000 cubic yards (5,700 tons)of fill is proposed to be brought into the site.
10.The applicant is proposing to go out for bids for part 1 in early 2016.The design and bid process for the
construction of the water storage tank or part 2 is expected to take one (1)year with construction
beginning within two (2)months of receipt of an acceptable bid.
11.Staff received a public comment from King County Metro Transit on January 12,2016 (Exhibit 5).Metro
Transit would be consulted during street improvement design (Exhibit 6).
12.No other public or agency comments were received.
13.Pursuant to the City of Renton’s Environmental Ordinance and SEPA (RCW 43.21C,1971 as amended),
on January 25,2016 the Environmental Review Committee issued a Determination of Non-Significance -
Mitigated (DNS-M)for the Highlands Reservoir and Emergency Generator project (Exhibit 16).The DNS
M included one mitigation measure.A 14-day appeal period commenced on January 29,2016 and
ended on February 12,2016.No appeals of the threshold determination have been filed.
14.Based on an analysis of probable impacts from the proposal,the Environmental Review Committee
(ERC)issued the following mitigation measures with the Determination of Non-Significance —Mitigated:
a.The applicant shall comply with the recommendations included in Technical Memorandum Review
of Existing Geologic,Hydrogeologic,and Geotechnical Information,prepared by RH2 Engineering
Inc,dated December 19,2014 and Geotechnical Report,prepared by ZZA-Terracon,dated January
19,2009 (Exhibit 8).
15.Representatives from various city departments have reviewed the application materials to identify and
address issues raised by the proposed development.These comments are contained in the official file,
and the essence of the comments has been incorporated into the appropriate sections of this report
and the Departmental Recommendation at the end of the ERC report (Exhibit 15).
16.Comprehensive Plan Compliance:The site is designated Residential High Density (RHD)on the City’s
Comprehensive Plan Map.The purpose of the RHD designation is to allow a variety of unit types where
there is existing multi-family development and infrastructure is adequate to handle impacts from
higher density uses.The Utilities Element guides future utility service within Renton’s planning area and
ensures that adequate utility services would be available to support existing and future development in
the City.The City provides water services to Renton residents,as well as some areas outside the City
boundaries.The proposal is compliant with the following development standards if all conditions of
approval are met:
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA5-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 5 of 20
Compliance Comprehensive Plan Analysis
Goal L-P:Minimize adverse impacts to natural systems,and address impacts of past
V practice where feasible,through leadership,policy,regulation,and regional
coordination.
Goal 1-U:Preserve,protect,and enhance the quality and functions of the City’s
V sensitive areas including:lakes,rivers,major and minor creeks,intermittent stream
courses and their floodplains,wetlands,ground water resources,wildlife habitats,and
areas of seismic and geological hazards.
Goal L-BB:Maintain a high quality of life as Renton grows by ensuring that new
development is designed to be functional and attractive.
Policy L-49:Address privacy and quality of life for existing residents by considering
scale and context in infill project design.
Policy U-3:Promote the co-location of new utility infrastructure within rights-of-way
and utility corridors,and coordinate construction and replacement of utility systems
with other public infrastructure projects to minimize construction related costs and
disruptions.
,,Policy U-6:Encourage the use of water and energy conservation technologies to
provide utility services in an environmentally responsible manner.
Policy U-7:Non-City utility systems should be constructed in a manner that minimizes
negative impacts to existing development and should not interfere with operation of
City utilities.City development regulations should otherwise not impair the ability of
utility providers to adequately serve customers.
V Policy U-$:Encourage the use of new technology to increase the quality and efficiency
of utility service and utility system management.
Policy U-9:Provide and maintain water supply,infrastructure,and service consistent
V with projected population growth within the City’s service area,as established in the
Land Use Element of this Comprehensive Plan and the Water System Comprehensive
Plan.
Policy U-1O:Extend water service within the City’s water service area in an orderly
V manner to serve anticipated growth and development in accordance with the Land
Use Element of this Comprehensive Plan.
Policy U-il:Ensure adequate water supply to meet both average and maximum daily
V demand.Employ monitoring of water supply sources and withdrawal limits as
necessary to comply with State issued water rights certificates and permits.
Policy U-12:Maintain and upgrade the water system to deliver adequate water flow
V and storage for fire protection to all customers and facilities connected to the City
water system.
V Policy U-13:Continue maintenance and upgrades to the water system to ensure water
quality that meets or exceeds all health requirements.
Policy U-16:Practice and support water resource management that achieves a
V maximum net benefit for all citizens and promotes enhancement of the natural
environment.
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA15-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 6 of 20
Policy CF-7:Protect public health,enhance environmental quality and promote
V conservation of man-made and natural resources through appropriate design and
installation of public facilities.
17.Zoning Development Standard Compliance:The site is classified Residential-lO (R-10)on the City’s
Zoning Map.Development in the R-10 Zone is intended to create high-quality infill development that
increases density while maintaining the single family character of the existing neighborhood.The
proposal is compliant with the following development standards if all conditions of approval are met:
Compliance R-8 Zone Develop Standards and Analysis
Density:The allowed density range in the R-10 zone is a minimum of 5.0 to a
maximum of 10.0 dwelling units per net acre.Net density is calculated after the
deduction of sensitive areas,areas intended for public right-of-way,and private access
N/A easements.
Staff Comment:Density is not applicable for the project,as there are no dwelling units
proposed.
Lot Dimensions:The minimum lot size permitted in the R-10 zone is 4,000 square feet
for detached dwelling units.There is no minimum lot size for attached dwelling units.A
minimum lot width of 40 feet is required (50 feet for corner lots)and a minimum lot
N/A depth of 70 feet is required.
Staff Comment:The existing lot measures 327.77 feet wide by 623.50 feet in length.
Except for right-of-way dedications along the property frontage,no other changes are
being proposed to the lot dimensions.
Setbacks:The required detached setbacks in the R-10 zone are as follows:front yard is
20 feet except when all vehicle access is taken from an alley,then 15 feet,side yard is
4 feet,side yard along the street 15 feet,and the rear yard is 15 feet.
Staff Comment:The outdoor generator and shelter would be located 38 feet from the
front or south property line or more than 99 feet from any of the remaining property
v lines.The 288,000 gallon stormwater and reservoir overflow detention vault measures
210 feet long by 30 feet wide.The vault is roughly 11 feet tall and is located
underground,immediately south of the reinforced concrete storage tank.The storage
tank is partially buried and measures 259 feet long by 174 feet wide (Exhibit 24).The
reinforced concrete storage tank is located roughly 34 feet from the west and east
property lines,roughly 33 feet from the north,and over 414 feet from the south
property line.The new structures comply with the setbacks of the zone.
Building Standards:The R-10 zone has a maximum building coverage of 55%,a
maximum impervious surface coverage of 70%,and a maximum building height of 30
feet.
Staff Comment:The reinforced concrete storage tank has a floor elevation of 425 feet
and a roof elevation of 450 feetfor an overall height of 25 feet (Exhibit 25).The bottom
V portion of the new storage tank is buried below finished grade.The redevelopment of
the site would add or replace more than 2,000 square feet of impervious surface.The
existing square footage of proposed buildings is 45,561 square feet.The existing
building coverage to remain is 55,191 square feet.Together the buildings total 100,752
square feet or more,or approximately 49%of the site.The impervious area is equal to
69%of the site.Anything more than 65%would trigger flow control BMP5 for the site.
The proposed development meets the building standards including maximum building
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA15-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 7 of 20
coverage,maximum impervious surface coverage,and maximum building height of the
R-10 zone.
Landscaping:The City’s landscape regulations (RMC 4-4-070)require a 10-foot
landscape strip along all public street frontages.A fifteen-foot (15’)wide partially
sight-obscuring landscaped visual barrier,or ten-foot (10’)wide fully sight-obscuring
landscaped visual barrier,is required along common property lines.Additional
minimum planting strip widths between the curb and sidewalk are established
according to the street development standards of RMC 4-6-060.Street trees and,at a
minimum,groundcover,are to be located in this area when present.Spacing standards
shall be as stipulated by the Department of Community and Economic Development,
provided there shall be a minimum of one street tree planted per address.Any
additional undeveloped right-of-way areas shall be landscaped unless otherwise
determined by the Administrator.Where there is insufficient right-of-way space or no
public frontage,street trees are required in the front yard subject to approval of the
Administrator.
Corn liant Staff Comment:The applicant is proposing street frontage improvements with an 8-
contion foot wide landscape planter strip.Within the planter strip the applicant is proposing
iacquemontii Birch street trees which can reach a mature height of 40 feet and have aapprovaISmaturespreadof25to30feet.There are overhead electric wires along NE 12th St;e therefore,only small maturing trees with 30-foot spacing should be planted.The City
Arborist is recommending Amelanchier laevis “Spring Flurry”Serviceberry.
The existing trees and shrubs along the public street frontage,located behind the
security fence,are proposed to be retained near the south property line.New
landscaping along the first 10 feet of public frontage includes a mixture of deciduous
and evergreen trees,shrubs,and groundcover from the east property line to the west
property line except at the vehicular entrance points.Around the concrete reservoir.
the applicant is proposing a 10-foot wide fully sight-obstructing landscaping buffer on
the north side and a 15-foot wide partially sight-obstructing landscape buffer around
the east and west sides (Exhibit 20).The conceptual plan only shows the intended areas
of landscaping and a detailed landscaping plan would be developed during the design
phase of the project.Staff recommends,as a condition of approval,that the applicant
prepare and submit for review and approval by the Current Planning Manager.a final
detailed landscape plan prior to issuance of the street and utility construction permits.
Tree Retention:The City’s adopted Tree Retention and Land Cleating Regulations
requiring the retention of 20 percent (20%)of trees in the R-10 residential zone.Utility
uses shall be exempt from the protected tree retention requirements if the applicant
can justify the exemption in writing to the Administrator’s satisfaction.
Significant trees shall be retained in the following priority order:
Cornpliantif Priority One:Landmark trees;significant trees that form a continuous canopy;
condition of significant trees on slopes greater than twenty percent (20%);Significant trees
approval is adjacent to critical areas and their associated buffers;and Significant trees over sixty
rnet feet (60’)in height or greater than eighteen inches (1$”)caliper.
Priority Two:Healthy tree groupings whose associated undergrowth can be preserved;
other significant native evergreen or deciduous trees;and Other significant non-native
trees.
Priority Three:Alders and cottonwoods shall be retained when all other trees have
been evaluated for retention and are not able to be retained,unless the alders and!or
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA5-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 8 of 20
cottonwoods ate used as part of an approved enhancement project within a critical
area or its buffer.
Landmark trees (greater than a thirty inch (30’)caliper)shall not be removed without
a Routine Vegetation Management Permit.
Staff Comment:The property is covered with a variety of trees and grass turf.Most of
the trees are located at the north end of the parcel,within two distinct groves,
separated by lawn.The Arborist Report,prepared by Greenforest Incorporated on
November 18,2015,identified 99 impacted significant onsite trees (trees over 6”in
caliper)included 3 Pacific Madrone,2 western red-cedar and 94 Douglas-fir trees
ranging in diameter from 8 to 36 (DBH)inches (Exhibit 21).Of the impacted 94
Douglas-fir trees onsite,a total of five (5)were considered to be landmark trees
(greater than a thirty inch (30”)caliper).Nearly every tree is in good condition (Exhibits
19-2 1).Only two (2)of the onsite tree were classified as dangerous.The net number of
trees designated for removal for this development was determined to be 97.The
average size of the trunk at diameter at breast height (DBH)for the 99 trees was
determined to be 19 inches (19”)with the largest landmark tree,a Douglas-fir (36”
DBH),located in the northwest corner of the site.After street and critical area
deductions,and the minimum requirement to retain 20%,the applicant is proposing to
retain seventeen (17)of the potential 114 healthy trees or 17 of the required 23 trees.
All 17 trees proposed to be retained are located on the south half of the property.
Provided the applicant only retains 17 onsite trees,the applicant would be required to
‘replace up to 72”caliper inches or retain more onsite trees.Based on the submitted
landscape plan the applicant is proposing to plant trees along the north,south and
portions of the east and west property lines for landscaping and screening
requirements.While still yet undetermined,the final landscaping plan would contain
significantly more than 72”caliper inches which could ultimately satisfy the 20%tree
retention requirement.The minimum tree density would be verified at the time of the
final detailed landscape plan.
During construction,trees required to be retained (i.e.,protected trees),would be
required to erect and maintain a six-foot-high chain link temporary construction fence
around the drip line of any tree to be retained.
Screening:Per RMC 4-4-095 all mechanical equipment and outdoor service and
storage areas shall be screened to reduce visibility,noise,and related impacts while
Compliant allowing accessibility for providers and users.
condition °f Staff Comment:The applicant is not proposing roof mounted equipment.The proposed
approval is outdoor generator and shelter.in addition to the proposed pad-mounted generator
met fuel cell and load bank,would be screened from NE 12th St.The final detailed
landscape plan would be submitted for review and approval in order to identify species
and planting patterns prior to issuance of building and/or electrical permits.
HEX Report 15-000864
City of Ren ton Department of Community &Economic Development Heating Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA15-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 9 of 20
Parking:Driveway cuts are required to be a minimum of 5 feet from property lines and
new commercial driveways may be a maximum of 24 feet in width at the property line.
Maximum driveway slopes shall not exceed fifteen percent (15%);provided,that
driveways exceeding eight percent f8%)shall provide slotted drains at the lower end
with positive drainage discharge to restrict runoff from entering the garage/residence
or crossing any public sidewalk.
Staff Comment:There are no specific parking regulations for public activities outside of
schools,post office or cultural facilities.Howe vet,the use does require maintenance of
the site so a minimum of one onsite space would be necessary.The water reservoirs
site has two (2)ingress and egress points along NE l2the St.Frontage improvements
would include driveway cuts that are a minimum of 5 feet from the east and west
property lines and will be designed with a commercial approach up to 20-foot wide
driveway approaches for access to the maintenance road and areas.There is one
existing space for maintenance vehicle to park in a gravel surface area near the
existing booster pump station when visits to site are made.Ample space is available
within the property limits to allow maintenance vehicles to park onsite.
18.Conditional Use Analysis:The applicant is requesting a conditional use permit for the subject property
to expand the existing use of the Highlands 435 Zone Reservoir site.The project property was first
purchased by the United States government during World War II as a water storage site to support the
large number of housing units constructed in the Renton Highlands to support the war manufacturing
efforts going on at Pacific Car Company (PACCAR)and Boeing.The federal government constructed a
1.5 million gallon (MG)uncovered partially buried water storage tank (aka a reservoir)and a 15,000-
gallon wooden elevated water tank.In 1958 the United States conveyed the property to the City of
Renton via a quit claim deed.In 1959 and 1960 the City demolished the wooden elevated tank and
constructed a 2 MG covered partially buried water storage tank and a booster pump station.In 1966 a
cover was placed on the 1.5 MG reservoir.In 1975 a re-chlorination station was added to the site.In
1985 an emergency electrical generator,housed in a shed,was added to the site.The generator
provides emergency power to the booster pump station.
The proposed use of the site would remain the same as has been continuously used since World War II
(circa 1942):the storage and pumping of water for distribution for domestic use (drinking,bathing,
cooking,etc.)and fighting fires and the storage of drinking water for use during natural disasters such
as earthquakes.The proposal is compliant with the following conditional use criteria,pursuant to RMC
4-9-030.Therefore,staff recommends approval of the requested Conditional Use Permit.
Compliance Conditional Use Criteria and Analysis
a.Consistency with Plans and Regulations:The proposed use shall be compatible
with the general goals,objectives,policies and standards of the Comprehensive
Plan,the zoning regulations and any other plans,programs,maps or ordinances of
the City of Renton.
Staff Comment:The City of Renton Water System is a publicly owned water system
,,operated by the City of Renton as a self-supporting enterprise utility.The proposal is
consistent with the policies and capital improvement plan stated in the City of Renton
Water System Plan as updated by the 2012 Water System Plan Update.The 2012
Water System Plan Update underwent a non-project SEPA review,was adopted by the
Renton City Council on August 13,2012 via City of Renton Resolution No.4154,was
approved by King County on September 10,2013 via King County Ordinance No.17653,
and was approved by the Washington State Department of Health via letter dated
September 19,2013.The Water System Plan is part of the City of Renton
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA15-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 10 of 20
Comprehensive Plan by adoption (effective date July 1,2015).The proposed project is
compatible with the general purpose,goals,objectives and standards of the
comprehensive plan,the zoning ordinance and all other plans,programs,maps and
ordinances of the City of Renton.See also FOF 16,Comprehensive Plan Analysis and
discussion under FOF 17,Zoning Development Standard Compliance.
b.Appropriate Location:The proposed location shall not result in the detrimental
overconcentration of a particular use within the City or within the immediate area
of the proposed use.The proposed location shall be suited for the proposed use.
Staff Comment:The proposed project is the replacement of an existing emergency
electrical generator and two existing water storage tanks (reservoirs)located at this
site.The site is suited for the proposed use in that it is at a high point in the area the
new reservoir is to serve.The new generator will occupy the same location as the
generator it would replace.The proposed location would not result in the detrimental
overconcentration of this use within the City or within the immediate area of the
proposed use —after the new reservoir is constructed and the Mount Olivet reservoir is
replaced the two existing reservoirs at this site would be demolished and the area that
they occupied would be converted to landscaping.Because of the difference in the
design of the new reservoir compared to the existing reservoirs (vertical sidewalls
versus sloped sidewalls)the new reservoir would occupy less surface area than the old
reservoirs.Sometime in the future the existing elevated water storage tank would also
be replaced with another elevated water storage tank.
c.Effect on Adjacent Properties:The proposed use at the proposed location shall
not result in substantial or undue adverse effects on adjacent property.
Staff Comment:The proposed continued use as a water storage and pumping site does‘not result in substantial or undue adverse effects on adjacent property.Architectural
features of the exterior walls of the new reservoir and the use of trees for screening
would seek to minimize the visual impact of the new reservoir located on the northern
part of the site.
d.Compatibility:The proposed use shall be compatible with the scale and character
of the neighborhood.
‘Staff Comment:The proposed continued use as a water storage and pumping site is
compatible with the scale and character of the neighborhood which grew up around
the reservoir site since World War II.
e.Parking:Adequate parking is,or will be made,available.
‘Staff Comment:A single vehicle visits the site.Adequate parking is already available
onsite.
f.Traffic:The use shall ensure safe movement for vehicles and pedestrians and
shall mitigate potential effects on the surrounding area.
Staff Comment:The proposed project does not generate any additional trips.The“current trips associated with the site are very small in number.The current use which
would not change after completion of the project already ensures safe movement for
vehicles and pedestrians and has minimal effects on the surrounding area.As a resuIt.
no mitigation measures are proposed as part of the improvements to the site.
Compliant if g.Noise,Light and Glare:Potential noise,light and glare impacts from the proposed
Conditions use shall be evaluated and mitigated.
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA15-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 11 of 20
of Approval Staff Comment:Noise,light and glare impacts have been evaluated.The proposed
are Met project is not anticipated to have any light or glare impacts.The applicant would
evaluate the existing lighting along NE 12th St as part of the frontage improvement
design.The lighting plan would be required to adequately provide for public safety
without casting excessive glare on adjacent properties.Staff recommends,as a
condition of approval,that the applicant provide a final lighting plan to be submitted
to,and approved by,the Current Planning Project Manager prior to construction
permit approval.
The emergency electrical generator would be housed in a metal cabinet that would
attenuate the noise emanating from the generator.There are two scenarios for noise
being generated:1)once a week on a weekday (Monday,Tuesday,Wednesday,
Thursday or Friday)and between the hours of 10:00 am and 2:00 pm,the generator
S would run for 15 minutes to verify that it remains operational;and 2)when there is a
commercial power outage.Even though this generator is exempt from WAC 1 73-60-40,
Maximum permissible environmental noise levels,via exemption WAC 173-60-50 (4)(f)
‘Sounds created by emergency equipment and work necessary in the interests of law
enforcement or for health safety or welfare of the community’,the generator would
meet the requirements of WAC 173-60-40 for daytime in a residential setting.
t h.Landscaping:Landscaping shall be provided in all areas not occupied by buildings,
e paving,or critical areas.Additional landscaping may be required to buffet adjacent
properties from potentially adverse effects of the proposed use.
v Staff Comment:The applicant is proposing a landscaping plan that would provide
landscaping in all areas not occupied by buildings,paving,or critical areas.Additional
landscaping would be used to buffer adjacent properties from potentially adverse
effects of the proposed use.See also discussion under FOF 17,Zoning Development
Standard:Landscaping.
19.Site Plan Review:Pursuant to RMC 4-9-200B,Site Plan Review is required for development in the R-1O
zoning classification when it is not exempt from Environmental (SEPA)Review.Given Site Plan
applications are evaluated for compliance with the specific requirements of the RMC 4-9-200E.3 the
following table contains project elements intended to comply with level of detail needed for Site Plan
req uests:
Compliance Site Plan Criteria and Analysis
Compliant if a.Comprehensive Plan Compliance and consistency.
Conditions ...Staff Comment:See previous discussion under FOF 16,Comprehensive Plan Analysis.of Approval
are Met
Compliant if b.Zoning Compliance and Consistency.
Conditions .Staff Comment:See discussion under FOF 17,Zoning Development StandardofApprovalCompliance.are Met
c.Design Regulation Compliance and Consistency.
N/A Staff Comment:The project location does not fall within one of the four (4)possible
design districts nor does RMC 4-2-115 Residential Design and Open Space Standards
apply,see applicability.
HEX Report 15-000864
City of Renton Department of Community &Economic Development Heating Examinet Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA15-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 12 of 20
N’A d.Planned action ordinance and Development agreement Compliance and
‘Consistency.
e.Off Site Impacts.
Structures:Restricting overscale structures and overconcentration of development on
a particular portion of the site.
Staff Comment:The structures on the site include the following:
•565 pressure zone water storage tank —an elevated steel tank with a nominal
storage capacity of 750,000 gallons.The tank is approximately 141.5 feet tall.
•435 pressure zone 1.5-million-gallons (MG)water storage tank —a partially
buried Portland cement concrete (PCC)water storage tank with a nominal
storage capacity of 1.5 MG.
•435 pressure zone 2 MG water storage tank —a partially buried PCC water
storage tank with a nominal storage capacity of 2 MG.
•Booster pump station —a 22 ft by 14.6 ft partially buried reinforced PCC
building.
•Re-chlorination building (no longer used for this purpose)—an l8ft by 11.8 ft
partially buried reinforced PCC building.
•Emergency electrical power generator shed on PCC slab —a l8ft by 14ft steel
shell
Compliant if •Six telecommunications cabinets on PCC slabs.Sizes:8’lO”x 8’lO”,9’lO”x
Conditions 9’lO”,6’lO”x 9’lO”,9’8”x 14’lO”,9’7”x 20’l “,and 9’ll”x 14’6”.
of Approval •One AMI collector radio cabinet on 4’4”x 4’4”PCC slab.
are Met
•Three wooden sheds on PCC slabs for City of Renton radio equipment and
emergency generator.Sizes:12’4”x 8’2”,12’l”x 9’4”,and $‘x 12’6”.
•Two SOft tall radio towers for City of Renton radios.
The applicant proposes to redevelop the site to remove the existing reservoirs and
appurtenant structures that have reached the end of their useful life cycle,and
reconstruct new portable water reservoirs and appurtenant structures that will
maximize the usability of the site for potable water storage and renew the useful life
of the facilities.The entire project improvements are expected to be phased over many
years.The current project schedule includes two parts.Part 1 includes the following:
replacing the 125 KV emergency electrical generator.remodeling a room in the
existing re-chlorination building to house City owned radio equipment,relocation of
the City of Renton UFH radio antenna equipment to the top rail of the existing water
tower,replacement and relocation of $individual electrical power meters with a new
meter bank with power bus and meters and the removal of 5 unused electrical
setvices,construction of approximately 3,150 linear feet of 24-inch diameter ductile
iron water main from south side of the site along NE 12th St to the intersection of NE
12th St and Edmonds Ave NE (replacing old 16-inch and 10-inch water mains),fence
replacement,and the planting of trees along the property frontage NE 12th St.Part 2
includes the following:construct a concrete water storage tank,street improvements,
construction of a stormwater detention vault,utility work,and installation of any
remaining plants from the landscape planting plan.
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA5-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 13 of 20
The reinforced concrete storage tank has a floor elevation of 425 feet and a roof
elevation of 450 feet for at overall height of 25 feet.The bottom portion of the new
storage tank is buried below finished grade in order to match the existing contours of
the site and reduce the overall scale and bulk of the structure.The design and bid
process of the 6.3 MG water storage tank is expected to begin after land use
approvals.The estimated duration of operation is 30 years for the generator for part;
and 80 years for part 2.The proposal would not be an overscale structure as the
proposal does not exceed maximum height,lot coverage,and setback requirements of
the R-10 zone.
Circulation:Providing desirable transitions and linkages between uses,streets,
walkways and adjacent properties.
Staff Comment:The proposal contains onsite structures that have linkages to internal
roadways and NE 12th St.The circulation would be improved in order to provide
access to the proposed improvements onsite.The new reservoir would have a road
around the perimeter of the structure.The public site is screened with a chain link
fencing and barbwire for safety.The proposal includes two (2)new gates (one manual
swing gate and one manual sliding gate)at the existing access location at NE 12th St.
Loading and Storage Areas:Locating,designing and screening storage areas,utilities,
rooftop equipment,loading areas,and refuse and recyclables to minimize views from
surrounding properties.
Staff Comment:The reservoir proposal includes access stairs to the roof top.On the
roof top there would be a security fence and guardrail with removable railing for
equipment access.See also discussion under FOF 17,Zoning Development Standard
Compliance:Screening.There would be no screening requited for rooftop equipment,
loading areas,and/or refuse and recyclables areas that require screening.
Views:Recognizing the public benefit and desirability of maintaining visual
accessibility to attractive natural features.
Staff Comment:The proposed reservoir would obstruct the views of the abutting
single family residential homes on the east and west sides of the site.The proposed
reservoir would also obstruct the views of senior living facility (independent living,
assisted living and Alzheimer’s and memory care)neighbors on the north side.The
biggest visual impact would be the loss of territorial views of the trees following their
removal from the site.
The applicant is proposing to break up the flat concrete wall of the reservoir by
providing a form liner pattern on the above ground façades and decorative trellises
along the north,east and west elevations for climbing decorative plants.
Landscaping:Using landscaping to provide transitions between development and
surrounding properties to reduce noise and glare,maintain privacy,and generally
enhance the appearance of the project.
Staff Comment:See discussion under FOF 17,Zoning Development Standard:
Landscaping.
Lighting:Designing and/or placing exterior lighting and glazing in order to avoid
excessive brightness or glare to adjacent properties and streets.
Staff Comment:A lighting plan was not provided with the application;therefore,staff
recommended that a lighting plan be provided at the time of building permit review.
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA5-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 14 of 20
f.On Site Impacts.
Structure Placement:Provisions for privacy and noise reduction by building
placement,spacing and orientation.
Staff Comment:It is anticipated that most of the noise impacts would occur during the
construction phase of the project.The applicant has submitted a Construction
Mitigation Plan (Exhibit 9)that provides measures to reduce construction impacts
such as noise,control of dust.traffic controls,etc.In addition,the project would be
requited to comply with the City’s noise ordinance regarding construction hours.
Structure Scale:Consideration of the scale of proposed structures in relation to
natural characteristics,views and vistas,site amenities,sunlight,prevailing winds,and
pedestrian and vehicle needs.
Staff Comment:The proposed structures would be located on approximately 100,752
square feet or more,which is toughly 49%of the site.Setbacks from the property lines
are anticipated to provide for access of sunlight,winds,and vehicle movement
through the site.Architectural treatments and partially burying the reservoir structure
reduces the structures overall scale.
Natural Features:Protection of the natural landscape by retaining existing
vegetation and soils,using topography to reduce undue cutting and filling,and
limiting impervious surfaces.
Staff Comment:The applicant proposes removal of a majority of the existing trees
onsite.The existing topography of the site is not proposed to significantly change.
There are some sensitive slopes (greater than 25 percent and less than or equal to 40
percent)on the project site and downstream of the project site.There are also slopes
downstream of the project site that would be at moderate risk for landslide.
Site preparation for the reservoir would include the removal of all vegetation,root
mass,organic soils,existing pavement and structures,and any deleterious debris from
construction areas including locations where structural fill would be placed.The
applicant’s engineer anticipates construction of the new reservoir may require
temporary excavations on the order of 4 to 12 feet below existing adjacent grade.
New landscaping is proposed around the east,west and north sides of the new
reservoir.
Landscaping:Use of landscaping to soften the appearance of parking areas,to
provide shade and privacy where needed,to define and enhance open spaces,and
generally to enhance the appearance of the project.Landscaping also includes the
design and protection of planting areas so that they are less susceptible to damage
from vehicles or pedestrian movements.
Staff Comment:See FOF 20,Zoning Development Standard:Landscaping.
g.Access
Location and Consolidation:Providing access points on side streets or frontage
streets rather than directly onto arterial streets and consolidation of ingress and
V egress points on the site and,when feasible,with adjacent properties.
Staff Comment:The applicant is proposing to retain the existing accesses and their
current locations from the south side of the lot onto NE 12th St.No other ingress or
egress points to side streets are available.
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA15-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 15 of 20
Internal Circulation:Promoting safety and efficiency of the internal circulation
system,including the location,design and dimensions of vehicular and pedestrian
access points,drives,parking,turnarounds,walkways,bikeways,and emergency
access ways.
Staff Comment:The proposal includes retaining the existing internal circulation
system to the existing improvements on the site and extending the vehicular roadway
around the perimeter of the new water storage tank from the east driveway.The
proposed access configuration would allow for complete internal circulation for
maintenance and operations of the facility.The internal roadways would be connected
to NE l2thSt.
Loading and Delivery:Separating loading and delivery areas from parking and
pedestrian areas.
Staff Comment:Following construction improvements,access to the site is entirely for
maintenance and operations.
Transit and Bicycles:Providing transit,carpools and bicycle facilities and access.
Staff Comment:Per RMC 4-4-080F.11.a bicycle parking must be provided for all
residential developments that exceed five (5)residential units and/or all non
residential developments that exceed four thousand (4,000)gross square feet in size.
The use does not require staffing at the site.Maintenance and operations to the site
would be served using vehicles only.
Immediately in front of the site,King County Transit Metro has a bus stop (#45130)
within the public right-of-way on the north side of NE 12th St.The bus stop has a
passenger shelter on a concrete footing and is served by Routes 105 and 240.Since
the project proposal includes half-street frontage improvements,KC Metro has
requested the inclusion of an ADA front door landing pad,rear door alighting pads,
and a new shelter footing as a part of this project to ensure adequate transit access
and safety.Public transit is not anticipated to serve the site.
Pedestrians:Providing safe and attractive pedestrian connections between parking
areas,buildings,public sidewalks and adjacent properties.
Staff Comment:The proposal includes right-of-way improvements for NE 12th St along
the property frontage.The proposed cross-section for the complete street shows two
10-foot lanes,with 6-foot parking strips,8-foot planters and 5-foot sidewalks.The
pedestrian access connections between the parking and improvements would be
improved through onsite roadway improvements.
h.Open Space:Incorporating open spaces to serve as distinctive project focal
points and to provide adequate areas for passive and active recreation by the
occupants/users of the site.
Staff Comment:The applicant would provide a 10-foot wide landscape area along NEamplantI’12th St (Exhibit 20).The applicant is proposing to replace an existing chain link fence
Ofl itions along NE 12th St and the visual screen is intended to be located on the inside of theo,pprova relocated fence.The height of the fence within the front or side yard along a streetareMet.setback may be a maximum of seventy-two inches (72 )above grade,provided the
permanent landscaping is located along the front of the fence.The landscaping areas
throughout the site would be for screening the facility from the neighboring parcels
only.Staff recommends,as a condition of approval,that the applicant locate the
____________
replacement fence behind the required 10-foot wide onsite landscaping required along
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA15-000864,ECF,CU-H,SA-H,MOD
March 2,2016 Page 16 of 20
the street frontage of NE 12th St.The location of the fence shall be reviewed and
approved by the Current Planning Manager,prior to installation.
i.Views and Public Access:When possible,providing view corridors to shorelines
and Mt.Rainier,and incorporating public access to shorelines
Staff Comment:The proposed structure would not block view corridors to shorelines or
Mt.Rainier.The public access would be improved along the north side of NE 12th St
through half-street frontage improvements.
j.Natural Systems:Arranging project elements to protect existing natural systems
where applicable.V
Staff Comment:Impacts to the Welihead Protection Area are not anticipated as a
result of the subject project.There are no other natural systems on the site.
k.Services and Infrastructure:Making available public services and facilities to
accommodate the proposed use.V
Staff Comment:The site improvements are entirely for water service and associated
infrastructure.
Police and Fire.
Staff Comment:Separate plans and permits for the relocation/replacement of the
emergency electrical generator would be required if it has an associated fuel storage
tank.
Schools.
Staff Comment:No residential units are proposed.A School Fee would not be required.
Parks.
Staff Comment:No residential units are proposed.A Park Impact Fee would not be
required.
Water and Sewer.
Staff Comment:The project is located within the City of Renton Wellhead Protection
Zone 2 area (Exhibit 11).Approximately 3,000 cubic yards of fill would be brought to
the reservoir site and fill is also anticipated with the associated NE 12th St corridor
improvements.The overall purpose of the aquifer protection regulations is to protect
aquifers used as potable water supply sources by the City from contamination by
hazardous materials.Some uses are restricted that store,handle,treat,use,or
produce substances that pose a hazard to groundwater quality.Since fill is proposed
for project deveIopment.a fill source statement would be required to be submitted to
the City to ensure clean fill is being used.Impacts to the Wellhead Protection Area are
not anticipated as a result of the subject project.A fill source statement would be
required to be submitted with the construction permit application.
Sewer service is provided by the City of Renton.The future phase would requite a cut
and cap of the existing side sewer connection for the chlorination building and vault.
Drainage.
Staff Comment:A Technical Information Report (hR)1 prepared by RH2 Engineering
Inc.,dated November 2015,was submitted with the project application (Exhibit 7).
The submitted TIR addresses construction of the subject new storage tank and
includes planning information for future phases of the water utility system expansion.
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA5-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 17 of 20
The proposed development would create stormwater runoff from the site
development at 3410 NE 12th St for the proposed water storage tank,generator
shelter,fuel storage tank and load bank,and access road.The existing impervious
surface coverage of the 3410 NE 12th St property is approximately 33 percent (33%).
Following development of the new water tank and associated improvements,the
property would have an approximate 69 percent (69%)impervious surface coverage
(Exhibit 4).New impervious surfaces would be collected and conveyed to the proposed
on-site stormwater detention vaults and then be released in a controlled manner to
North Renton Basin (aka John’s Creek Basin)Threshold Discharge Area (TDA)and
Honey Creek Basin TDA (Exhibit 12).
Water from within the new 6.3-million-gallon storage tank would be released as part
of maintenance and in emergency situations.The new wastewater/sewer interceptor
pipe in NE 12th St would be used for draining water from the new water storage tank
(Exhibit 4).This use of the interceptor is anticipated to occur for two situations,when
the water storage tank is drained of water for inspection and maintenance of the
interior of the new tank and on the rare occasion that water overflows from the new
tank.
Transportation.
Staff Comment:Access to the site is proposed via two connections.One is located near
the southeast side of the parcel and the other is located on the southwest side of the
parcel.Both are from NE 12th St.It is anticipated that there would not be an overall
increase in traffic following construction.
I.Phasing:
Staff Comment:The applicant is requesting to phase the project.This project (part
1 and part 2)is the first phase of a multi-phase plan for the use of the site.The
next phase will be the demolition of the existing 1.5 MG and 2 MG reservoirs after
the reservoir at the Mount Olivet site has been replaced.Other future phases
include:replacement of the existing booster pump station,replacement of the
existing elevated water storage tank and the construction of an additional partially
buried water storage tank.
Building permits,licenses or land use permits required for the operation of a
V Conditional Use Permit shall be applied for within two (2)years of the date of
Conditional Use Permit approval.A single two (2)year extension may be granted
for good cause by the Administrator.
Site Plan Approval expires two (2)years from the date of approval.An extension
may be requested pursuant to RMC section 4-9 -200.
Because the timing of the construction of the 6.3-million-gallon storage tank is
uncertain,staff recommends that the applicant be allowed to extend the
implementation periods of the both the Site Plan and Conditional Use Permit
approvals from two (2)years to five (5)years with a possible one (1)year
extension for good cause by the Administrator.
20.Street Modification Analysis:The applicant is requesting a modification from RMC 4-6-060F.2
“Minimum Design Standards Table for Public Streets and Alleys”to revise the street classification for NE
12th St to be consistent with the City of Renton Proposed Sunset Area Street Classification Map (Exhibit
26).
HEX Report 15-000864
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA15-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 18 of 20
The City of Renton Proposed Sunset Area Street Classification Map identifies a 60-foot right-of-way
width for NE 12th St from Edmonds Ave NE to Monroe Ave NE.The proposed cross-section for the
complete street shows two 10-foot lanes,with 6-foot parking strips,8-foot planters and 5-foot
sidewalks.The offsite improvements for the Reservoir project site are 150 feet east of Monroe Ave and
the boundary for the Sunset Area.
The proposal is compliant with the following modification criteria,pursuant to RMC 4-9-250D,if all
conditions of approval are met.Therefore,staff is recommending approval of the requested
modification,subject to conditions as noted below:
Compliance Street Modification Criteria and Analysis
a.Substantially implements the policy direction of the policies and objectives of the
Comprehensive Plan Land Use Element and the Community Design Element and the
proposed modification is the minimum adjustment necessary to implement these
policies and objectives.
Staff Comment:The Community Design Element has applicable policies listed under a
“separate section labeled Promoting a Safe,Healthy,and Attractive Community.These
policies address walkable neighborhoods,safety and shared uses.The intent of the
policies is to promote new development with walkable places that support grid and
flexible grid street and pathway patterns,and are visually attractive,safe,and healthy
environments.The requested street modification is consistent with these policy
guidelines.
b.Will meet the objectives and safety,function,appearance,environmental
protection and maintainability intended by the Code requirements,based upon
sound engineering judgment.
Staff Comment:The modified street improvements will meet the objectives of a safe
walkable environment.The proposed improvements are consistent with those
anticipated in the immediate area.
c.Will not be injurious to other property(ies)in the vicinity.
‘Staff Comment:There are no identified adverse impacts to other properties from the
requested modification.
d.Conforms to the intent and purpose of the Code.
Staff Comment:See comments under criterion “b’.
e.Can be shown to be justified and required for the use and situation intended;andV
Staff Comment:See comments under criterion ‘b’.
1.Will not create adverse impacts to other property(ies)in the vicinity.
Staff Comment:See comments under criterion ‘c’.
HEX Report 15-000864
City of Ren ton Department of Community &Economic Development Heating Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA5-000864,ECF,CU-H,SA-H,MOD
March$,2016 Pagel9of2O
I.CONCLUSIONS:
1.The subject site is located in the Residential High Density (RHD)Comprehensive Plan designation and
complies with the goals and policies established with this designation provided the applicant complies
with the conditions of approval,see FOF 16.
2.The subject site is located in the Residential-lO (R-10)zoning designation and complies with the zoning
and development standards established with this designation provided the applicant complies with City
Code and conditions of approval,see FOF 17.
3.The proposed conditional use complies with all the conditional use criteria,pursuant to RMC 4-9-030,
provided the project complies with all advisory notes and conditions of approval contained herein,see
FOF 18.
4.The proposed project complies with the site plan regulations as established by City Code provided all
advisory notes and conditions are complied with,see FOF 19.
5.The proposed project complies with the street modification criteria as established by City Code,
provided the project complies with all advisory notes and conditions of approval contained herein,see
FOF 20.
6.Key features,which are integral to this project,include project phasing and water and utility
infrastructure improvements.
J.RECOMMENDATION:
Staff recommends approval of the Hearing Examiner Site Plan,Conditional Use Permit,and Street
Modification Request for improvements to the Highlands Reservoir and Emergency Generator,File No.
LUA15-000864,as depicted in Exhibit 17.Staff also recommends a five (5)year Site Plan and Conditional Use
Permit implementation period with a possible one (1)year extension for good cause by the Administrator,
subject to the following conditions:
1.The applicant shall comply with the mitigation measure issued as part of the Determination of Non-
Significance Mitigated,dated on January 25,2016.
a.The applicant shall comply with the recommendations included in Technical Memorandum
Review of Existing Geologic,Hydrogeologic,and Geotechnical Information,prepared by RH2
Engineering Inc,dated December 19,2014 and Geotechnical Report,prepared by ZZA-Terracon,
dated January 19,2009 (Exhibit 8).
2.The applicant shall be required to submit a detailed landscaping plan that includes a fully sight-
obscuring landscaped visual barrier along the north property line.The final landscaping plan shall be
submitted to,and approved by,the Current Planning Project Manager prior to engineering permit
approval.
3.The applicant shall locate the replacement fence behind the required 10-foot wide onsite landscaping
required along the street frontage of NE 12th St.The location of the fence shall be reviewed and
approved by the Current Planning Manager,prior to installation.
4.The applicant shall provide a lighting plan that adequately provide for public safety without casting
excessive glare on adjacent properties.The final lighting plan shall be submitted to,and approved by,
the Current Planning Project Manager prior to construction permit approval.
HEX Report 15-000264
City of Renton Department of Community &Economic Development Hearing Examiner Recommendation
HIGHLANDS RESERVOIR &EMERGENCY GENERATOR LUA15-000864,ECF,CU-H,SA-H,MOD
March 8,2016 Page 20 of 20
EXPIRATION PERIODS:
Pursuant to RMC 4-8-100,the City declares that circumstances surrounding land use decisions change rapidly
over a period of time.In order to ensure the compatibility of a decision with current needs and concerns,any
such decision must be limited in duration,unless the action or improvements authorized by the decision is
implemented promptly.Any application or permit approved pursuant to this Chapter with the exception of
rezones shall be implemented within two (2)years of such approval unless other time limits are prescribed
elsewhere in the Renton Municipal Code.Any application or permit which is not so implemented shall
terminate at the conclusion of that period of time and become null and void.For large scale or phased
development projects,the Examiner may at the time of approval or recommendation set forth time limits for
expiration which exceed those prescribed in this Section for such extended time limits as are justified by the
record of the action.
Pursuant to RMC 4-9-200 the Hearing Examiner shall determine,and document in writing,an appropriate
expiration date for the master plan,granting up to five (5)years.An applicant shall submit a complete site plan
application for the development within the specified time frame if a site plan was not combined with the
master plan application.The Administrator may grant a one year extension for good cause.
Site Plan Approval expires two (2)years from the date of approval.An extension may be requested pursuant to
RMC section 4-9-200.
Pursuant to RMC 4-9-250 any variance granted,unless otherwise specified in writing,shall become null and
void in the event that the applicant or owner of the subject property for which a variance has been requested
has failed to commence construction or otherwise implement effectively the variance granted within a period
of two (2)years after such variance has been issued.For proper cause shown,an applicant may petition for an
extension of the two (2)year period during the variance application review process,specifying the reasons for
the request.The time may be extended but shall not exceed one additional year in any event.
HEX Report 15-000864