HomeMy WebLinkAboutAdmin Report
EXECUTIVE DEPARTMENT
M E M O R A N D U M
DATE: April 20, 2020
TO: Ruth Pérez, Council President
Members of Renton City Council
FROM: Armondo Pavone, Mayor
Robert Harrison, Chief Administrative Officer
SUBJECT: Administrative Report
The full length of the lower walk next to the Cedar River, between Liberty Park and
Logan Avenue, is open again to pedestrians – remember to observe social distancing
protocols. A section of the Cedar River Trail between the Dog Park and Riverview
Park remains closed until river bank repairs are made – design is currently in
process. Detours to Maple Valley Highway are through Cedar River Park and
Riverview Park. We apologize for any inconvenience. Contact Cailín Hunsaker, Parks
and Trails Director, at 425‐430‐6600 for more information or visit
rentonwa.gov/parks.
The city is holding a 2020 Census art competition for students in grades K‐12. To
enter, create art for census awareness; how does the census help our students and
our community? Email a photo of your creation to
rencensus@thevoiceofplanet.com. The deadline to enter is April 30. First prize is
$100; second is $75; third is $50; and there will be 10 honorable mention prizes at
$25 each. For more information, visit thevoiceofplanet.com or call 310‐986‐4280.
You can find information on the city’s website and social media pages regarding the
city’s COVID‐19 response. Additionally, the Mayor’s newsletter is published three
times per week and has the most up‐to‐date information and access to state and
county resources. If you haven’t signed up for the Mayor’s newsletter, you can do
so at http://rentonwa.gov/mnl.
Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open. Preventative street maintenance, traffic impact projects, and road
closures will be at the following locations:
Monday, April 20 through Tuesday, April 21, 8:30 a.m. to 3:30 p.m.
Intermittent lane closures in both directions on Duvall Avenue South from NE
10th Street to Sunset Avenue due to the Duvall Avenue Capital Improvement
Ruth Pérez, Council President
Members of Renton City Council
Page 2 of 2
April 20, 2020
Project utility construction. Questions may be directed to Joel McCann at 425‐
757‐9595.
Monday, April 20 through Sunday, April 26. Road closure on South 14th Street
between Smithers Avenue South and Davis Avenue South for utility construction.
Questions may be directed to Justin Johnson at 425‐902‐7102.
Monday, April 20 through Friday, April 24, 8:30 a.m. to 3:30 p.m. Single
intermittent lane closures in both directions on Talbot Road South at 4827 Talbot
Road South due to roadway and utility construction. Questions may be directed
to Tom Main at 206‐999‐1833.
Monday, April 20 through Friday, April 24, 8:30 a.m. to 3:30 p.m. Single
intermittent lane closures in both directions on Talbot Road South in the vicinity
of Valley Medical Hospital related to the construction of the new medical office
building. Questions may be directed to Tom Main at 206‐999‐1833.
Monday, April 20 through Friday, April 24, 8:30 a.m. to 3:30 p.m. Intermittent
lane closures on South 2nd Street, Wells Avenue South, South 3rd Street, and
Williams Avenue South due to utility construction. Questions may be directed to
Joel McCann at 425‐757‐9595.
Thursday, April 23, FULL DAY (23 hours). Roadway closure on Logan Avenue
North between North 8th Street and North 10th Street due to concrete panel
replacement. Reader boards will indicate lane and roadway closures. Questions
may be directed to Joel McCann at 425‐757‐9595.
Monday, April 20 through Friday, April 24, 8:30 a.m. to 3:30 p.m. Intermittent
lane closures in all directions at the intersection of SW 34th Street and Lind
Avenue SW due to utility construction. Questions may be directed to Tom Main
at 206‐999‐1833.
Monday, April 20 through Friday, April 24, 8:30 a.m. to 3:30 p.m. Single
intermittent lane closures on 160th Avenue SE at 14120 160th Avenue SE due to
roadway paving. Questions may be directed to Patrick DeCaro at 425‐207‐6013.
Monday, April 20 through Friday, April 24, 7:00 a.m. to 4:00 p.m. Westbound
Petrovitsky Road SE between 116th Avenue SE and 128th Avenue SE will be
reduced to one lane daily to allow maintenance crews to conduct asphalt
repairs.