HomeMy WebLinkAboutMFP20001548.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP20001548
IVR Number: 20001548
Permit Information
Permit Name: Comcast Cable Franchise Permit
Address/Location:04/07/2020Application Date:0423059076Parcel Number: 2007 UNION AVE NE
Permit Type:04/22/2020Issue Date:Franchise
Permit Work Class:04/22/2021Expiration Date:Minor Utility
Job Number: 2007 Union Ave SEFranchise Type:Cable
Description: JUT application. Contractor to trench and place new 2" pipe for new drop to home. contractor to provide all trenching,
backfill, restoration and traffic control for the ROW. Restoration per City of Renton standards.
Traffic control approved through civil construction permit for the Huynh Short Plat (C18003290 and R19002281)
APPROVED WITH COMMENTS OR REDLINES
Contacts
Name Address PhoneTypeBilling
Michele Moore
Prince Telecom LLC
H: (206) 388-4316Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Cody Shackett
Comcast Cable Communications
Contact
Akisha Brown
Prince Telecom Inc
551A Mews Dr
New Castle, DE 19720
B: (302) 482-8893
C: (302) 482-8892
Contractor
Business License Number: 29850Electrical Contractor: PRINCTL834BF
Construction Contractor: PRINCTL862PS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communication Management
Comcast JUT 2007 Union Ave NE 253-278-7520 Michele Moore Michele.moore@princetelecom.com
2007 Union Ave NE Renton Comcast JUT 2007 Union Ave NE
Joint trench applicaton. Contractor to trench and place new 1-2" pipe for new drop to home.
Contractor to provide all trenching, backfill & restoration.
X
X 15' ROW, Rest of trenching on private property
Prince Telecom LLC 253-278-7520
PRINCTL862PS BL029850
4014
2015
40053933
LOT 3
3924
3915 3921 3927
4002 4014
4008 40244020
LOT 2 LOT 1
NE 21ST ST
PRIVATE DRIVE
DWY
DWY
DWY
318868-167126
15 kVA 120/240V (B)4/0 ACSRABC
4/0 ACSRPRE
14
318891-167134
318892-167129
X356
SLAH4697318892-167114
T80382
318883-167127
UNK
SW T83576 (40T)
ROW
70'
318892-167100
25 kVA 120/240V (A)
318883-167107
37.5 kVA 120/240V (A)
4' X 4' WORK PIT
CUSTOMER SUPPLIED
45°
R=36"
1 CUBIC YARD 5/8" CRUSHED ROCK
CUSTOMER SUPPLIED
6' X 6' WORK PIT
CUSTOMER SUPPLIED
2/3 CUBIC YARDS OF 6” CRUSHED ROCK
CUSTOMER SUPPLIED
PSE INST. 1-RUN 1/0 UG JKT CABLE ± 240' (AØXXXXXX)
1-2" SCH'L 80 CONTINUOUS PVC CONDUIT ± 200'
PSE INST. 1-RUN 350 UG TPX ± 170'
PSE SUPPLIED
1-3" DB-120 DISCONTINUOUS PVC CONDUIT ± 160'
PSE INST. 1-RUN 4/0 UG TPX ± 15'
PSE INST. 1-RUN 4/0 UG TPX ± 40'
PSE SUPPLIED
1-3" DB-120 DISCONTINUOUS PVC CONDUIT ± 30'
90°
R=48"
90°
R=48"
165'5'30'30'130'
30'
318883-167107
37.5 kVA 120/240V (A)
318883-167107
37.5 kVA 120/240V (A)
318883-167127
UNK
SW___ (40T)
ROW
70'
5'UNION AVE NEDWY SIDEWALKSIDEWALKEOPEOP16'
42'1'1'
5'
3'
PRIVATE DRIVE
5'SIDEWALK318883-167127
UNK
SW___ (25T)
W
70' ROW
CL
E
NOT TO SCALE
CROSS SECTION - UNION AVE NE
LOOKING NORTH
00 1"2"
00 50'100'
SITE PLAN
SCALE: 1" = 50'
JOB SITE
POWER GENERAL NOTES - RESIDENTIAL PROJECT
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
8.
9.
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT
REQUIREMENTS.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01
-REQUIRED TO PROVIDE 6' X 6' WORK PIT 2/3 CUBIC YARDS OF 6” CRUSHED ROCK AT V01
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
N
Vicinity Map
N/A
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
JOB SITE
ASPLUNDH CONSTRUCTION CORP. - QA/QC E. SCHOTT
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. DOUCET 206-573-3576 01/22/20
F. WATSON 206-549-3901 01/22/20
T. MYER 714-893-2405 01/22/20
EASEMENT RENTON
HUYNH SHORT PLAT
PRI L/E, NEW XFMR
2007 UNION AVE NE, RENTON, WA 98059
105093331
AS NOTED 1 OF 1
KING CSPSKEPM
SE 4-23N-05E
2305E016 2305E040 2305E016 PRE-14
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JESSE DOUCET
206-573-3576
JESSE.DOUCET@PSE.COM
GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#
508217853 105093331Superior 105093331SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP 2305E040
Owner / Developer Contact Info
officeATTN:
KATHY HUYNH
2007 UNION AVENUE NE
RENTON, WA 98059
MILTON ORELLANA 425-891-3829
CIRCUIT FEET ADDED:
SQ. FOOTAGE:
PANEL SIZE:
HEAT TYPE:
EST. DEMAND:
LRC:
% V. DROP:
% FLICKER:
200'
4,552 SQ FT
200A
GAS
23kW
140A
1.6%
3.7%UNION AVE NEPARTIAL PLAN DETAIL
SCALE: 1" = 20'
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-14
11/19/2019
364.00 408.00 385.00
3.36 0.00 0.00
367.36 408.00 385.00
SITE SPECIFIC NOTES
AT P01: 318883-167127
-EXISTING POLE TO REMAIN
-INSTALL (1) STIRRUP, BOLTED & HOT CLAMP #4-4/0 & TAP AØ (MID: 2254000 &
2153100)
-INSTALL (1) 12kV 200AMP OH/UG TERMINATION PER STD 6043.1000 (TSU1C1)
-INSTALL (1) LB C/O ON NEW FG ARM, FUSE @ 40T (MID: 3412500)
-INSTALL SWITCH #T83576
-INSTALL (1) 2" PRIMARY RISER ON NEW STANDOFF BRACKETS PER STD
6042.1000
(RIS2CSS) ± 30' ___' ACTUAL
AT V01: 318883-167107
-INSTALL (1) 36" X 42" 38" MINI-PAD UNISTRUT HH W/ GROUNDS PER STD
6045.1010 (MINU1SR)
-INSTALL (1) 37.5KVA PADMOUNT TRF (MID: 6247050)
-INSTALL (1) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL (3) #6-350 KCMIL SECONDARY CONNECTION BLOCKS (MID: 4842002)
-INSTALL GRID #318883-167107
___
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
V01
318883-167107
37.5kVA
6247050
SPAN SPECIFIC NOTES
P01 TO V01:
-INSTALL 1-2" SCH'L 80 CONTINUOUS PVC CONDUIT, ± 200' ___' ACTUAL
-INSTALL 1-RUN 1/0 UG JKT CABLE, ± 240' ___' ACTUAL
V01 TO LOT1:
-INSTALL 1-3" DISCONTINUOUS DB-120 CONDUIT, ± 30' ___' ACTUAL
-INSTALL 1-RUN 4/0 UG TPX, ± 40’ ___' ACTUAL
V01 TO LOT2:
-INSTALL 1-RUN 4/0 UG TPX, ± 15’ ___' ACTUAL
V01 TO LOT3:
-INSTALL 1-3" DISCONTINUOUS DB-120 CONDUIT, ± 160' ___' ACTUAL
-INSTALL 1-RUN 350MCM UG TPX, ± 170' ___' ACTUAL