Loading...
HomeMy WebLinkAboutMFP20001548.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20001548 IVR Number: 20001548 Permit Information Permit Name: Comcast Cable Franchise Permit Address/Location:04/07/2020Application Date:0423059076Parcel Number: 2007 UNION AVE NE Permit Type:04/22/2020Issue Date:Franchise Permit Work Class:04/22/2021Expiration Date:Minor Utility Job Number: 2007 Union Ave SEFranchise Type:Cable Description: JUT application. Contractor to trench and place new 2" pipe for new drop to home. contractor to provide all trenching, backfill, restoration and traffic control for the ROW. Restoration per City of Renton standards. Traffic control approved through civil construction permit for the Huynh Short Plat (C18003290 and R19002281) APPROVED WITH COMMENTS OR REDLINES Contacts Name Address PhoneTypeBilling Michele Moore Prince Telecom LLC H: (206) 388-4316Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Cody Shackett Comcast Cable Communications Contact Akisha Brown Prince Telecom Inc 551A Mews Dr New Castle, DE 19720 B: (302) 482-8893 C: (302) 482-8892 Contractor Business License Number: 29850Electrical Contractor: PRINCTL834BF Construction Contractor: PRINCTL862PS CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Comcast Cable Communication Management Comcast JUT 2007 Union Ave NE 253-278-7520 Michele Moore Michele.moore@princetelecom.com 2007 Union Ave NE Renton Comcast JUT 2007 Union Ave NE Joint trench applicaton. Contractor to trench and place new 1-2" pipe for new drop to home. Contractor to provide all trenching, backfill & restoration. X X 15' ROW, Rest of trenching on private property Prince Telecom LLC 253-278-7520 PRINCTL862PS BL029850 4014 2015 40053933 LOT 3 3924 3915 3921 3927 4002 4014 4008 40244020 LOT 2 LOT 1 NE 21ST ST PRIVATE DRIVE DWY DWY DWY 318868-167126 15 kVA 120/240V (B)4/0 ACSRABC 4/0 ACSRPRE 14 318891-167134 318892-167129 X356 SLAH4697318892-167114 T80382 318883-167127 UNK SW T83576 (40T) ROW 70' 318892-167100 25 kVA 120/240V (A) 318883-167107 37.5 kVA 120/240V (A) 4' X 4' WORK PIT CUSTOMER SUPPLIED 45° R=36" 1 CUBIC YARD 5/8" CRUSHED ROCK CUSTOMER SUPPLIED 6' X 6' WORK PIT CUSTOMER SUPPLIED 2/3 CUBIC YARDS OF 6” CRUSHED ROCK CUSTOMER SUPPLIED PSE INST. 1-RUN 1/0 UG JKT CABLE ± 240' (AØXXXXXX) 1-2" SCH'L 80 CONTINUOUS PVC CONDUIT ± 200' PSE INST. 1-RUN 350 UG TPX ± 170' PSE SUPPLIED 1-3" DB-120 DISCONTINUOUS PVC CONDUIT ± 160' PSE INST. 1-RUN 4/0 UG TPX ± 15' PSE INST. 1-RUN 4/0 UG TPX ± 40' PSE SUPPLIED 1-3" DB-120 DISCONTINUOUS PVC CONDUIT ± 30' 90° R=48" 90° R=48" 165'5'30'30'130' 30' 318883-167107 37.5 kVA 120/240V (A) 318883-167107 37.5 kVA 120/240V (A) 318883-167127 UNK SW___ (40T) ROW 70' 5'UNION AVE NEDWY SIDEWALKSIDEWALKEOPEOP16' 42'1'1' 5' 3' PRIVATE DRIVE 5'SIDEWALK318883-167127 UNK SW___ (25T) W 70' ROW CL E NOT TO SCALE CROSS SECTION - UNION AVE NE LOOKING NORTH 00 1"2" 00 50'100' SITE PLAN SCALE: 1" = 50' JOB SITE POWER GENERAL NOTES - RESIDENTIAL PROJECT 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. 8. 9. CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01 -REQUIRED TO PROVIDE 6' X 6' WORK PIT 2/3 CUBIC YARDS OF 6” CRUSHED ROCK AT V01 JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . N Vicinity Map N/A ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. JOB SITE ASPLUNDH CONSTRUCTION CORP. - QA/QC E. SCHOTT PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. DOUCET 206-573-3576 01/22/20 F. WATSON 206-549-3901 01/22/20 T. MYER 714-893-2405 01/22/20 EASEMENT RENTON HUYNH SHORT PLAT PRI L/E, NEW XFMR 2007 UNION AVE NE, RENTON, WA 98059 105093331 AS NOTED 1 OF 1 KING CSPSKEPM SE 4-23N-05E 2305E016 2305E040 2305E016 PRE-14 E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSE DOUCET 206-573-3576 JESSE.DOUCET@PSE.COM GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# 508217853 105093331Superior 105093331SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 2305E040 Owner / Developer Contact Info officeATTN: KATHY HUYNH 2007 UNION AVENUE NE RENTON, WA 98059 MILTON ORELLANA 425-891-3829 CIRCUIT FEET ADDED: SQ. FOOTAGE: PANEL SIZE: HEAT TYPE: EST. DEMAND: LRC: % V. DROP: % FLICKER: 200' 4,552 SQ FT 200A GAS 23kW 140A 1.6% 3.7%UNION AVE NEPARTIAL PLAN DETAIL SCALE: 1" = 20' CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-14 11/19/2019 364.00 408.00 385.00 3.36 0.00 0.00 367.36 408.00 385.00 SITE SPECIFIC NOTES AT P01: 318883-167127 -EXISTING POLE TO REMAIN -INSTALL (1) STIRRUP, BOLTED & HOT CLAMP #4-4/0 & TAP AØ (MID: 2254000 & 2153100) -INSTALL (1) 12kV 200AMP OH/UG TERMINATION PER STD 6043.1000 (TSU1C1) -INSTALL (1) LB C/O ON NEW FG ARM, FUSE @ 40T (MID: 3412500) -INSTALL SWITCH #T83576 -INSTALL (1) 2" PRIMARY RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000 (RIS2CSS) ± 30' ___' ACTUAL AT V01: 318883-167107 -INSTALL (1) 36" X 42" 38" MINI-PAD UNISTRUT HH W/ GROUNDS PER STD 6045.1010 (MINU1SR) -INSTALL (1) 37.5KVA PADMOUNT TRF (MID: 6247050) -INSTALL (1) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J) -INSTALL (3) #6-350 KCMIL SECONDARY CONNECTION BLOCKS (MID: 4842002) -INSTALL GRID #318883-167107 ___ Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 318883-167107 37.5kVA 6247050 SPAN SPECIFIC NOTES P01 TO V01: -INSTALL 1-2" SCH'L 80 CONTINUOUS PVC CONDUIT, ± 200' ___' ACTUAL -INSTALL 1-RUN 1/0 UG JKT CABLE, ± 240' ___' ACTUAL V01 TO LOT1: -INSTALL 1-3" DISCONTINUOUS DB-120 CONDUIT, ± 30' ___' ACTUAL -INSTALL 1-RUN 4/0 UG TPX, ± 40’ ___' ACTUAL V01 TO LOT2: -INSTALL 1-RUN 4/0 UG TPX, ± 15’ ___' ACTUAL V01 TO LOT3: -INSTALL 1-3" DISCONTINUOUS DB-120 CONDUIT, ± 160' ___' ACTUAL -INSTALL 1-RUN 350MCM UG TPX, ± 170' ___' ACTUAL