HomeMy WebLinkAboutAllura - Invoices for landscaping and wetland mitigation plantingsPicturesque Landscaping Invoice
P.O. Box 1683
Woodinville, WA 98072
425-487-0077
BILL TO
Mainvue WA LLC
INVOICE # DA'"- TOTAL DUE ENCLOSED
1582 10/12/2018 $52,921.50
DESCRIPTION
OTY
RAIE
AMOUNT
Allura at Tiffany Park
Dogwood
11
155.00
1,705.00T
6/7ft Evergreen
62
115.00
7,130.00T
Vine Maple
22
50.00
1,100.00T
#5 Shrubs
120
36.00
4,320.00T
#1 Groundcover
300
6.00
1,800.00T
Hydroseed
22,500
0.2077778
4,675.00T
Fine Bark
215
49.00
10,535.00T
Topsoil- Imported by others, placed by us
650
21.00
13,650.00T
Tree stakes (15$ per tree)
1,425.00
Topsoil- import and placed by us
50
38.00
1,900.00T
SUBTOTAL
48,240.00
TAX (10%)
4,681.50
TOTAL
52,921.50
BALANCE DUE $52,921.50
Picturesque Landscaping Invoice
P.O. Box 1683
Woodinville, WA 98072
425-487-0077
Mainvue WA LLC
INVOICE # DATE TOTAL DUE ENCLOSED
1583 10/12/2018 $12,430.00
DESCRIPTIMI CITY RATE AMOUNT
Tiffany Park additional plantings at park
#1 Groundcover 300 6.00 1,800.00T
#5 Shrubs 250 38.00 9,500.00T
SUBTOTAL 11,300.00
TAX (10%) 1,130.00
TOTAL 12,430.00
BALANCE DUE $12,430.00
Picturesque Landscaping Invoice
P.O. Box 1683
Woodinville, WA 98072
425-487-0077
BILL TO
Mainvue WA LLC
INVOICE # DATE TOTAL DUE ENCLOSED
1573 10/12/2018 $55,951.50
DESCRIPTION
Tiffany Park- Mitigation
Per Contract
9�1'�
OTY
SUBTOTAL
TAX (10%)
TOTAL
BALANCE DUE
RATE
AMOUNT
50,865.00T
50,865.00
5,086.50
55,951.50
$55,951.50
Picturesque Landscaping Invoice
P.O. Box 1683
Woodinville, WA 98072
425-487-0077
61111, TO
Mainvue WA LLC
Mainvue, WA
INVOICE # DATE TOTAL DUE ENCLOSED
1424 09/11/2018 $7,975.00
DESCRIPTION OTY RATE AMOUNT
Tiffany Park Tract C- added in with new plans
Replacement trees
2" caliper (6/7ft) Evergreen trees 29 154.8275862 4,490.00T
2 Gal Oregon Grape 27 30.00 810.00T
Temporary Irrigation 1,950.00T
SUBTOTAL 7,250.00
TAX (10%) 725.00
TOTAL 7,975.00
BALANCE DUE $7,975.00
/` - ";'{ _,X
7 �
f
Picturesque Landscaping Invoice
P.O. Box 1683
Woodinville, WA 98072
425-487-0077
BILL TO
Mainvue WA LLC
INVOICE # DA I L TOTAL DUE ENCLOSED
1584 10/12/2018 $3,520.00
DESCRIPTION OTY RATE AMOUNT
Tiffany at Allura Park - Rerake and prep soils for hydroseed
Labor- 4 men, 12 hours each, other trades damage, mostly 48 60.00 2,880.00T
footprints and some from concrete pours
Additional soil for new concrete pads 8 40.00 320.00T
SUBTOTAL 3,200.00
TAX (10%) 320.00
TOTAL 3,520.00
BALANCE DUE W1520.00
I