Loading...
HomeMy WebLinkAboutC_Cover_Letter_Barghausen_180910_v1September 10, 2018 HAND DELIVERY City of Renton Community and Economic Development 1055 South Grady Way Renton, WA 98057 RE: Final Plat Application Plat of Allura at Tiffany Park City of Renton File No. LUA13-0001572 Our Job No. 16055 On behalf of our client MainVue WA LLC, we are pleased to submit this final plat application for the above referenced project. The preliminary plat was approved January 8, 2015, with a final approval upon reconsideration issued by the Hearing Examiner on January 26, 2015. The decision was affirmed by the Renton City Council on June 8, 2015. The following items have been included with this submittal for your review: 1. One completed Land Use Permit Master Application Form 2. One check for submittal review fees 3. One copy of the arborist reports including: a. One copy of the Tree Assessment prepared by Washington Forestry Consultants, Inc. dated May 24, 2018 b. One copy of the Revised Tree Protection Plan prepared by Washington Forestry Consultants, Inc. dated August 16, 2017 4. One copy of the lot closure calculations 5. One copy of the Certificate of Incorporation of HOA 6. One copy of the Composite Utility Plan approved August 23, 2017 7. One copy of the Confirmation of Compliance with all Conditions of Plat Approval statement 8. One copy of the Preliminary Plat Approval documents including: a. Hearing Examiner Decision issued January 8, 2015 b. Hearing Examiner Final Decision Upon Reconsideration issued January 26, 2015 c. Renton City Council affirmation of HEX Decision dated June 8, 2015 d. ERC Report 9. One copy of the draft Deed of Right-of-Way Dedication (see Final Plat Map) 10. One copy of the revised Density Worksheet CIVIL ENGINEERING, LAND PLANNING, SURVEYING 18215 72ND AVENUE SOUTH KENT, WA 98032 (425) 251-6222 (425) 251-8782 FAX BRANCH OFFICES ¨ TUMWATER, WA ¨ KLAMATH FALLS, OR ¨ LONG BEACH, CA ¨ ROSEVILLE, CA ¨ SAN DIEGO, CA www.barghausen.com City of Renton Community and Economic Development -2- September 10, 2018 11. One copy of the legal documents pertaining to the plat including: a. Draft Covenants, Conditions and Restrictions (CC&Rs) b. HOA Articles of Incorporation 12. One copy of the Landscape Plan dated August 28, 2018 13. One copy of the Letters of Acceptance from other Utility Districts (N/A - Utilities provided by the City of Renton) 14. One copy of the Monument Cards (N/A – To be provided following construction of final lift) 15. One copy of the Neighborhood Detail Map 16. One copy of the Title Report dated August 20, 2018 with referenced recorded documents 17. One copy of the Plat Plan for Final Plat dated August 27, 2018 18. One copy of the mailbox locations approved by the Postmaster on August 23, 2017 19. One copy of the Proof of Improvement Deferral or Installation form (N/A at this time) 20. One copy of the Public Works Approval (N/A) 21. One copy of the Stream and Lake Mitigation Plan (N/A) 22. One copy of the Tree Retention Plan 23. One copy of the Waiver Form (N/A) 24. One copy of the Wetland Mitigation Plan approved September 27, 2017 25. One copy of the Vicinity Map (8 ½ x 11) Please review at your earliest convenience. If you have questions or need additional information, please contact me at this office. Thank you. Sincerely, H. George Newman, AICP Senior Land Use Consultant/Project Manager HGN/mf 16055c.034.doc enc: As Noted cc: Lisa Cavell, MainVue WA LLC Mona Davis, MainVue WA LLC Thomas A. Barghausen, Barghausen Consulting Engineers, Inc.