Loading...
HomeMy WebLinkAboutRE Avon Short Plat - C19000481.msgHamid, I apologize for the delay in getting you a response. I’ve been super swamped. I approve of the use of the ethafoam pad between the storm and water lines. Please have the contractor call in the inspection before this work occurs so that our inspector, Joel Mccann, can be present to witness the installation. Best Regards, Jonathan Chavez, P.E. Civil Engineer III | Dev. Eng. | CED City of Renton 1055 S. Grady Way, Renton, WA 98057 jchavez@rentonwa.gov <mailto:jchavez@rentonwa.gov> | COVID-19 UPDATE City Hall is currently closed to the public but we are still available to assist you. * Pay Invoice and Apply for Over-the-Counter Permit: Permitting Portal <https://permitting.rentonwa.gov/#/home> * Schedule an Inspection: Permitting Portal <https://permitting.rentonwa.gov/#/home> -OR- Building: 425-430-7202; Civil/Site: 425-430-7203 * Contact Staff: * Building or General Permitting: permittech@rentonwa.gov <mailto:permittech@rentonwa.gov?subject=Inquiry%20from%20Website> or 425-430-7200 * Planning: planningcustomerservice@rentonwa.gov <mailto:planningcustomerservice@rentonwa.gov?subject=Inquiry%20from%20City%20Website> or 425-430-7294 * Public Works Permitting: pwpermitting@rentonwa.gov <mailto:pwpermitting@rentonwa.gov?subject=Inquiry%20from%20City%20Website> or 206-402-8626 * Code Compliance: Renton Responds <https://rentonwa.gov/cms/one.aspx?portalId=7922741&pageId=15833143> or 425-430-7373. From: Hamid Korasani <hamidkorasani@yahoo.com> Sent: Monday, April 27, 2020 3:09 PM To: Jonathan Chavez <JChavez@Rentonwa.gov> Cc: CenturyLink Customer <harjit1@q.com> Subject: Re: Avon Short Plat - C19000481 Good afternoon Jonathan, I hope you and your family are well and keeping safe and healthy during these strange times... I am following up with you regarding the Avon Project to seek your final confirmation that using foam in between water and new storm\line would be acceptable; the minimum gap will be about 6 inches and and it occurs only on the 14th street crossing. Many Cities in our areas (Bellevue, Redmond, Kirkland) use Dow Plastics Ethafoam 220 Pad between lines as it is an acceptable procedures. I appreciate your follow up on this matter and looking forward to speaking with you soon. Please take care and stay healthy........ Again thank you. Kind Regards, Hamid Korasani, P.E. Principal SAZEI Design Group, LLC Tel: (425) 214-2280 Email: hamidkorasani@yahoo.com <mailto:hamidkorasani@yahoo.com> On Monday, March 9, 2020, 08:36:11 AM PDT, Hamid Korasani <hamidkorasani@yahoo.com <mailto:hamidkorasani@yahoo.com> > wrote: Good morning Jonathan, Here is the data that field provided us: 1- Top of water-main on 14th ave is 261.62 2- west end across Lincoln Ave is 260.76 Many Thanks, Hamid On Monday, March 9, 2020, 08:16:59 AM PDT, Jonathan Chavez <jchavez@rentonwa.gov <mailto:jchavez@rentonwa.gov> > wrote: Thank you for your email Hamid. Could you tell me what the elevation of the existing water pipe is? -Jonathan From: Hamid Korasani <hamidkorasani@yahoo.com <mailto:hamidkorasani@yahoo.com> > Sent: Monday, March 09, 2020 1:06 AM To: Jonathan Chavez <JChavez@Rentonwa.gov <mailto:JChavez@Rentonwa.gov> > Subject: Re: Avon Short Plat - C19000481 Hello Jonathan, Per our discussion earlier last week, the contractor has potholed the waterline and determined if we reduce the separation between stormwater pipe and water pipe by placing a foam between the lines, they would be able to achieve the stormwater pipe installation as planned. Would you please review if the use of Dow Plastics Ethafoam 220 pad between the waterline and stormline is acceptable. Thanking you in advance. Kind regards, Hamid Korasani, P.E. Principal SAZEI Design Group, LLC (425) 214-2280 On Friday, February 21, 2020, 09:31:48 AM PST, Jonathan Chavez <jchavez@rentonwa.gov <mailto:jchavez@rentonwa.gov> > wrote: Good morning Hamid, Per our phone conversation this morning, below is a link to the only record drawings we have of the existing water line. As you will note, they don’t include vertical profiles. The contractor will need to pothole the waterline at the crossings to verify the vertical elevations. https://edocs.rentonwa.gov/Documents/DocView.aspx?id=318926& <https://edocs.rentonwa.gov/Documents/DocView.aspx?id=318926&> Let me know if you have any other questions, Best Regards, Jonathan Chavez, P.E. Civil Engineer III | Dev. Eng. | CED City of Renton 1055 S. Grady Way, Renton, WA 98057 jchavez@rentonwa.gov <mailto:jchavez@rentonwa.gov> | Phone: (425) 430-7288 P Please consider the environment before printing this email Permit Counter 8:00 a.m. to 4:00 p.m. Financial Transactions 8:00 a.m. to 4:30 p.m. ents/cn=Jonathan Chavezd20