HomeMy WebLinkAboutMFP20001697.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP20001697
IVR Number: 20001697
Permit Information
Permit Name: Comcast Cable Franchise Permit
Address/Location:04/16/2020Application Date:2146100033Parcel Number: 933 THOMAS AVE SW
Permit Type:05/06/2020Issue Date:Franchise
Permit Work Class:05/06/2021Expiration Date:Minor Utility
Job Number: JB#251061Franchise Type:Cable
Description: Comcast proposes to proof and pull 48ct fiber 295', replace existing pedestal, and set new vault. Restoration per City
of Renton standards.
APPROVED WITH COMMENTS OR REDLINES
Contacts
Name Address PhoneTypeBilling
Stefania Spencer
Sefnco Communications
Applicant
Cody Shackett
Comcast Cable Communications
Contact
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Scott Nall
SEFNCO Communications Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: 41108Construction Contractor: SEFNCCI850QD
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction x Repair/Relocate x Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench x Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management, LLC
253 235-7406
Owen "Cody" Shackett owen_shackett@comcast.com
SEFNCO Communications, Inc.253 999-2271
SEFNCC1850QD Exp. 11/21 BL029666
JB#251061
933 THOMAS AVE SW WARNTNH06700 2X2 OFF RN34D
Comcast proposes to proof/pull 48 ct fiber approximately 295' and replacing existing pedestal
and set new vault.
295'
4-16-2020
MFP20001697
Scott Warlick
RESTORATION PER CITY OF RENTON STANDARDS
Holly Powers 5/6/2020
5/6/2020
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 11/25/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 11/25/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.☐ A copy of the Traffic Control Plan (TCP) Application form.
2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
☐Include map(s) showing the location of the project and work area.
☐Be legible lettering and clear, contrasting, symbols of viewing or printing.
☐Must indicate street names, and north arrow and scale.
☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
☐Types of plans required:
☐Work hour plan – show all mobility impacts during construction hours.
☐Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
☐Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
☐Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
x
x
x
x
x
x
x
x
x
x
x
WARNTNH06700 2X2 OFF RN34D
933 THOMAS AVE SW
5/4/20 5/7/20 9:00 AM 3:30 PM
COMCAST IS PROPOSING TO PROOF/
PULL 48 CT FIBER ~295' / REPLACE EXISTING PEDESTAL / SET NEW 24 X 36 VAULT
SEFNCO COMMUNICATIONS, INC
ASHLEY KIEHN askiehn@sefnco.com
253 299 2271
4610 TACOMA AVENUE SUMNER,WA 98390
MFP20001697
Scott Warlick CED 4/21/2020
Monday - Friday 8:00AM - 3:00PM
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 11/25/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
•TCP must be approved prior to commencing the work, and all permit conditions shall be met.
•Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
•Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
•TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Approved Temporary TCP must be at the work site during work hours.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
•The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
Ashley Kiehn, Permit Area Mgr.4-16-2020
SEFNCOCOMMUNICATIONSUNDERGROUND INSTALLATIONCOMCASTWARNTNH06700 2x2 off RN34DSW 10TH ST & THOMAS AVE SW, RENTON, WAJB# 251061MFP20001697
REVISIONSDATEDESCRIPTIONINITIALCOMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATION SERVICES, INC. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSTCH04/10/20WARNTNH06700 2x2 off RN34D
SW 10TH ST & THOMAS AVE SW
RENTON, WA
JB-251061 VICINITY MAPPERMITTINGCOMCASTASHLEY KIEHN253-999-22714610 TACOMA AVESUMNER, WA 98104ASKIEHN.SEFNCO.COMSEFNCOCONTACTSPG#SHEET INDEX1COVER SHEET2VICINITY MAP, CONTACTS & SHEET INDEX3 - 4GENERAL NOTES5LEGEND6SITE-PLAN1TRAFFIC CONTROL PLAN62N/AN/ADESCRIPTION OF WORKTOTALPROFF / PULL 48CT FIBE295LFREPLACE PEDESTAL WITH NODE PEDESAL AND 24X36 VAULT.TOTAL:295LFVICINITY MAP WORK AREAJAMES COHN410 VALLEY AVEPUYALLUP, WA 98371PHONE: *EMAIL: JAMES_COHN@COMCAST.COMJUSTIN WITHROW4610 TACOMA AVESUMNER, WA 98104PHONE: (253) 457-2940EMAIL: JUWITHROW@SEFNCO.COMMFP20001697
REVISIONSDATEDESCRIPTIONINITIALCOMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATION SERVICES, INC. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSTCH04/10/20WARNTNH06700 2x2 off RN34D
SW 10TH ST & THOMAS AVE SW
RENTON, WA
JB-251061 GENERAL NOTES6REVISIONSDATEDESCRIPTIONINITIAL3N/AN/ATHE LOCATIONS OF UTILITIES SHOWN ON THESE DRAWING ARE ONLY APPROXIMATE. SEFNCO HEREBY DISCLAIMS ANYRESPONSIBILITY TO THIRD PARTIES FOR THE ACCURACY OF THIS INFORMATION. PERSONS WORKING IN THE AREACOVERED BY THIS DRAWING MUST CONTACT THE STATEWIDE CALL-BEFORE-YOU-DIG SYSTEM TO ASCERTAIN THELOCATION OF UNDERGROUND UTILITIES PRIOR TO PERFORMING ANY EXCAVATION.1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEEDSITE WORK STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LOCAL JURISDICTIONREGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEENTHESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARDSHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W. OR EASEMENTS MAY REQUIRE INSPECTED AND APPROVED BYTHE LOCAL JURISDICTION INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BEPROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER.2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTINGUTILITIES, AS SHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND,WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON ASBEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES. THECONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTIONPOINTS AND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TORELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESEPLANS.3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLEAGENCIES. THE CONTRACTOR SHALL NOTIFY THE LOCAL JURISDICTION INSPECTOR AT LEAST 48 HOURS PRIORTO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLICIMPROVEMENTS IF REQUIRED.4.THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE LOCAL JURISDICTION AND ALL UTILITYCOMPANIES WITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURINGCONSTRUCTION, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUMDISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIESAFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE.5.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THEAPPROPRIATE STANDARDS AND SPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSIONAGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO:EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.7.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HISSUBCONTRACTORS, OR OTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOTIDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEERIMMEDIATELY.8.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD,UNLESS SPECIFICALLY STATED OTHERWISE.9.FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE LOCAL JURISDICTION, THE CONTRACTORSHALL SUBMIT A TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL.PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTOR SHALLBE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAIDPLANS. PRIOR TO INSTALLATION A RECONSTRUCTION CONFERENCE SHALL BE HELD WITH LOCAL JURISDICTION.10.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THECOMPLETION OF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BEPROVIDED, INSTALLED, CONSTRUCTED, REMOVED OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE.11.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE ANDCLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE.12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORDDRAWINGS KEPT AT THE CONSTRUCTION SITE AND AVAILABLE TO THE LOCAL JURISDICTION INSPECTOR AT ALLTIMES.13.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONALINFORMATION CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS.14.ALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OFCONSTRUCTION PRIOR TO GROUND DISTURBING ACTIVITY. ALL E.S.C. MEASURES SHALL BE MAINTAINED INGOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITHHARD SURFACE OR LANDSCAPING.15.ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE LOCAL JURISDICTIONENGINEERING DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS.16.ALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNINGOF TRUCKS, EARTH MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATEDEQUIPMENT SHALL GENERALLY BE LIMITED TO THE TIME PERIOD APPROVED BY THE LOCAL JURISDICTION.17.CALL THE "CALL BEFORE YOU DIG" NUMBER 48HRS IN ADVANCE AT 1-800-424-5555 PRIOR TO DIGGING.GENERAL NOTESMFP20001697
6REVISIONSDATEDESCRIPTIONINITIAL4N/AN/AGENERAL NOTES
RENTONREVISIONSDATEDESCRIPTION
INITIALCOMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATION SERVICES, INC. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSTCH04/10/20WARNTNH06700 2x2 off RN34D
SW 10TH ST & THOMAS AVE SW
RENTON, WA
JB-251061 RENTON GENERAL NOTESTHE LOCATIONS OF UTILITIES SHOWN ON THESE DRAWING ARE ONLY APPROXIMATE. SEFNCO HEREBYDISCLAIMS ANY RESPONSIBILITY TO THIRD PARTIES FOR THE ACCURACY OF THIS INFORMATION. PERSONSWORKING IN THE AREA COVERED BY THIS DRAWING MUST CONTACT THE STATEWIDE CALL-BEFORE-YOU-DIGSYSTEM TO ASCERTAIN THE LOCATION OF UNDERGROUND UTILITIES PRIOR TO PERFORMING ANY EXCAVATION.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEEDSITE WORK STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LOCAL JURISDICTIONREGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEENTHESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARDSHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W. OR EASEMENTS MAY REQUIRE INSPECTED AND APPROVED BYTHE LOCAL JURISDICTION INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BEPROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTINGUTILITIES, AS SHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND,WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON ASBEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES. THECONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTIONPOINTS AND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TORELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESEPLANS.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLEAGENCIES. THE CONTRACTOR SHALL NOTIFY THE LOCAL JURISDICTION INSPECTOR AT LEAST 48 HOURS PRIORTO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLICIMPROVEMENTS IF REQUIRED.THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE LOCAL JURISDICTION AND ALL UTILITYCOMPANIES WITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURINGCONSTRUCTION, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUMDISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIESAFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THEAPPROPRIATE STANDARDS AND SPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSIONAGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO:EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HISSUBCONTRACTORS, OR OTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOTIDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEERIMMEDIATELY.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OFSAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE.FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE LOCAL JURISDICTION, THECONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITHM.U.T.C.D. FOR APPROVAL. PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTINGTHE RIGHT-OF-WAY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALLTRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAID PLANS. PRIOR TO INSTALLATION ARECONSTRUCTION CONFERENCE SHALL BE HELD WITH LOCAL JURISDICTION.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARYFOR THE COMPLETION OF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS ORDESIGNATED TO BE PROVIDED, INSTALLED, CONSTRUCTED, REMOVED OR RELOCATED UNLESSSPECIFICALLY NOTED OTHERWISE.11.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPINGROADWAYS FREE AND CLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THESITE.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SETOF RECORD DRAWINGS KEPT AT THE CONSTRUCTION SITE AND AVAILABLE TO THE LOCALJURISDICTION INSPECTOR AT ALL TIMES.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING.FOR ADDITIONAL INFORMATION CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ONTHE RECORD DRAWINGS.ALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITSOF CONSTRUCTION PRIOR TO GROUND DISTURBING ACTIVITY. ALL E.S.C. MEASURES SHALL BEMAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIREDISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING.ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE LOCALJURISDICTION ENGINEERING DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS.ALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTUREOR RUNNING OF TRUCKS, EARTH MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANYOTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THE TIME PERIODAPPROVED BY THE LOCAL JURISDICTION.1.)2.)3.)4.)5.)6.)7.)8.)9.)10.)11.)12.)13.)14.)15.)MFP20001697
REVISIONSDATEDESCRIPTIONINITIALCOMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATION SERVICES, INC. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSTCH04/10/20WARNTNH06700 2x2 off RN34D
SW 10TH ST & THOMAS AVE SW
RENTON, WA
JB-2510616REVISIONSDATEDESCRIPTIONINITIAL5 LEGENDTELECOMMUNICATIONSANITARY SEWERGAS LINEWATERSTORM DRAINRECYCLED WATERELECTRICALRAILROADRIGHT OF WAYDITCH LINECENTER LINEEDGE OF PAVEMENTFACE OF CURBPROPERTY LINELIP OF GUTTERGUARDRAILFENCETRENCHDIRECT BOREDBDBPROPOSED AERIAL STRAND AAPROPOSEDBASE LAYERSEXISTING UTILITIESEXISTING UTILITIES SYMBOLS POWER HANDHOLEPOWER MANHOLEPOWER CABINETSTREET LIGHT HANDHOLEPOWER SIDEWALK GUY SEWER CLEANOUTSTORM CATCH BASIN STORM MANHOLEWATER VALVEWATER METERTELECOM MANHOLETELECOM HANDHOLETELECOM CABINETTRAFFIC SIGNAL MANHOLETRAFFIC CABINETTRAFFIC SIGNAL PEDESTALPOWER VAULTSTREET LIGHT POLETRAFFIC SIGNAL VAULTTRAFFIC SIGNAL HANDHOLESIGN POSTPARKING METERCATV MANHOLECATV HANDHOLEPOWER PEDESTALGAS METERTEST VALVETRAFFIC LOOP DETECTORCATV PEDESTALBOLLARDWATER MANHOLETRAFFIC SIGNAL POLEPOWER GUYTRAFFIC DETECTORADA RAMPPEDESTAL(UNKNOWN UTILITY)MANHOLECULVERTFIRE HYDRANTGAS VALVE(UNKNOWN UTILITY)POWER ANCHORPOWER POLESEWER MANHOLETELECOM POLETELECOM PEDESTALPROPOSED VAULTPROPOSED ANCHORPROPOSED GUYPROPOSED MANHOLEPROPOSED SIDEWALK ANCHOR & GUYPROPOSED SYMBOLS ADA RAMP COMPLIANCEPEXISTING COMCAST VAULTEXISTING COMCAST SPLICEEXISTING COMCAST ANCHOREXISTING COMCAST GUYEXISTING COMCAST MANHOLEEXISTING COMCAST SIDEWALK ANCHOR & GUYP=VLP=GAS TEST POINTGAS MANHOLEPOWER UNKNOWN STORM CLEANOUTSTORM DRAIN VALVESTORM DRAIN UNKNOWN WATER UNKNOWNWATER WELLWATER PUMPWATER VAULTWATER RESERVOIRPPPPPP?PSLSLTSTSTSTSTSTSCCCTTTP=??TTSSSCSDD?DCDWWWWWVW?WELLPUMPGGGTLTLSDSEWER CATCH BASIN SSWATER SAMPLING STATIONOTHER UNKNOWNSTORM ACCESS POINTSEWER VALVESSEWER VAULT SSSEWER UNKNOWN S?SUB STATIONTRANSIT STOPSTORM DRAIN VAULT SDTREE PROPOSED RISEREXISTING COMCAST SYMBOLS POTHOLEBORE PITN/AN/ALEGEND PROOF/PULLTRENCHTRENCHEXISTING COMCAST PEDESTALPEXISTING COMCAST POLE W/ NEW RISERFIRE HYDRANTFMHMHBUILDING OUTLINEFLFOG LINER/WEOPD/LFOCOOOLIPTPGRWSSSDWMFP20001697
R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/
W
R/W R/W R/WFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOC
FOC295'DRIVEWAY907FOCFOCFOCFOCFO
CFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCDRIVEWAYDRIVEWAYDRIVEWAYP
REVISIONSDATEDESCRIPTIONINITIALCOMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF MCI COMMUNICATION SERVICES, INC. BOTHBEING ISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSTCH04/10/20WARNTNH06700 2x2 off RN34D
SW 10TH ST & THOMAS AVE SW
RENTON, WA
JB-251061 Know what'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.N6REVISIONSDATEDESCRIPTIONINITIAL6SITE PLAN TIE IN TO EXISTING VAULT.PROOF/PULL THRU EXISTINGCONDUIT WITH 48CT FIBER.EXISTING PEDESAL - REPLACE WITHNODE PEDESAL AND 24X36 VAULTMFP20001697