HomeMy WebLinkAboutCITY WATER-COMMENTS-AND APPROVAL-052020-RFI 114-SCJ Response Revised 2020-0520.pdf Accrete Construction LLC Phone 253-286-3900 - www.accrete.build 801 Valley Ave NW Ste. A, Puyallup WA 98371 UUrrggeenntt__xx__ NNeeeedd RReessppoonnssee BByy:: 0055//1199//22002200 RRFFII ## 111144 Project: Weatherly Inn - Renton Date: 05/19/2020 Accrete Job #: W110001 Arch. Job #: Attention: Ross Jarvis Subject: Conflict between fire hydrant lateral and storm Reference: WT-1 Subject Matter: Architectural Structural Mechanical Electrical Civil Request: As discussed, there is a conflict between the storm sewer and the lateral for the fire hydrant between the building and the trash enclosure as the storm and the water are at the same elevation at this location. As noted on the attached, Rino Construction suggests installing bends to lower this lateral to go under the storm pipe and installing a deeper depth hydrant. Please confirm that this is acceptable or provide an alternate solution, provide updated plan sheets and submit revisions to the city if necessary. Attachments: _Rino RFI 3.pdf ______________ Requested By: Mark Richardson Cost Impact Schedule Impact Impact Yet To Be Determined RFI # 114 Response: This is an acceptable solution. Please see attached for additional notes (magenta). I will submit to the City and copy Mark Richardson. Response By: Ross Jarvis, PE Date: 05/19/2020 Request For Information XXXXXXXXXXXXXXXXXXXXXX Request for Information RINO CONSTRUCTION PO Box 667 Maple Valley, WA 98038 360‐469‐4941 OFFICE 425‐728‐8449 FAX RFI No: Revision No:0 Date: Project No: Date Required  Drawing  YES NO Use vertical bends and dive lower than the storm pipe and install a deeper bury depth fire hydrant.  Subject:Storm Utility and Temporary Electrical Conduit conflict Requested By:Nick Rawlins Email ASAP  The 6" fire hydrant pipe at the east side of the upper building slab is in conflict with the storm line. The Invert elevations are the same for both  pipes.  WT‐01 Spec Section Weatherly 3 Attention Mark Richardson Accrete Construction 19016 Signed: Signed: Signed: Corrective Action Approved:Correct as Follows:Response: Note: All signatures required to Close‐Out RFI for Document Control Binder Request for Information / Proposed Corrective Action: Description of Issue: Date: Date: Date: Date:RFI Sign Off: Response By: LOGO HERE 5/18/2020 Company  Project: DISTRIBUTION: 1 ‐ ORIGINAL TO DOCUMENT CONTROL BINDER                                                 1 ‐ COPY TO RFI ORIGINATOR     1 ‐ COPY TO PERSON COMPLETING TASK Response Approval By: Work Completed By: Signed: IN COMPLIANCE WITH CITY OF RENTON STANDARDSSENNIOALFEP R ON D43668IGERSERETSSTATEOFWASHIGINEERGTO N ROSS D. JARVISWATER UTILITYagafour 07/31/2019DEVELOPMENT ENGINEERINGjchavez 08/07/2019Conflict between storm line and water hydrant runINSTALL (2) 6" VERTICAL BEND W/ RESTRAINEDJOINT AND THUST BLOCKING. PROVIDE 18"VERTICAL SEPARATION BETWEEN STORMINVERT AND WATER LINE CROWN.SD SD SD SD SD SD SD SD RELOCATION OF HYDRANT LATERAL BELOW NEW STORM LINEAPPROVED BY: ABDOUL GAFOUR - WATER UTILITY MANAGER- CITY OF RENTON5/20/20