HomeMy WebLinkAbout0895.06 DFR 165-172.pdfEarth Solutions NW, LLC LETTER OF TRANSMITTAL 15365 NE 90th Street, Suite 100 Redmond, WA 98052 (425) 449-4704 FAX (425) 449-4711 To: RJ Development 401 Central Street SE Olympia, WA 98501 Date: May 22, 2020 ESNW No.: ES-895.06 Project: Weatherly Inn Attn: Mr. Duane Meyer Email: duane@accrete.build No. of Copies Date Description 1 4/28-5/8/20 Daily Field Report(s) # 165-172 Comments: CC: 1: John Wilson ATTN: johnw@rinocon.com 2: Mark Richardson ATTN: mark@accrete.build 3: Jeff Bennett ATTN: jeffb@accrete.build 4: Jennifer Vogele ATTN: jennifer@accrete.build 5: Jonathan Chavez ATTN: jchavez@rentonwa.gov 6: Joe W ATTN: joew@accrete.build Transmitted By: Earth Solutions NW, LLC PM: Scott Riegel, L.G., L.E.G. Earth Solutions NWLLC Field Rep. Project No. Page of Report No. JTL 0895.06 1/1 165 1805 136th Place NE, Suite 201 Bellevue, WA 98005 (425) 449-4704 FAX: (425) 449-4711 TOLL FREE: (866) 366-8710 Time On Site Time Off Site Date Day of Week 8:30 AM 1:45 PM 4/28/20 Tuesday DAILY FIELD REPORT Travel Time Weather 1.25 Hr. RT 60soF, Clear Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Rino Construction Mike LAC Contractor #2 RM Construction NW, Inc Contact Project Manager SSR Reviewed Are approved Plans/Permits onsite YES NO Project No. Permit No. At the client’s request, ESNW rep was onsite to observe rockery construction and earthwork activities. The focus of the work is related to completing the rockeries along the south side of the project. Rockeries While onsite, rep used a ½” steel t-probe and observed the keyway for the rockery located at the southeast quadrant of the site. Rep observed the keyway to be very dense, firm, unyielding, and suitable for support of the proposed rockery. Rep observed contractor place courses of rocks. Rep observed contractor place a 4” perforated drain pipe behind the first course of the rockery, embed the pipe in an 18” lift of 1”-2” wash rock, geotextile, then backfill over the geotextile with 2”-4” quarry spalls. (See Image) ESNW rep will return to observe earthwork activities when requested by client. Jackson Lundgren, Field Technician, (206) 468-0991 Earth Solutions NWLLC Field Rep. Project No. Page of Report No. JTL 0895.06 1/1 166 1805 136th Place NE, Suite 201 Bellevue, WA 98005 (425) 449-4704 FAX: (425) 449-4711 TOLL FREE: (866) 366-8710 Time On Site Time Off Site Date Day of Week 10:30 AM 2:45 PM 4/29/20 Wednesday DAILY FIELD REPORT Travel Time Weather 1.25 Hr. RT 60soF, Clear Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Rino Construction Mike LAC Contractor #2 RM Construction NW, Inc Contact Project Manager SSR Reviewed Are approved Plans/Permits onsite YES NO Project No. Permit No. At the client’s request, ESNW rep was onsite to observe rockery construction and earthwork activities. The focus of the work is related to completing the rockeries along the south side of the project. Rockeries While onsite, rep used a ½” steel t-probe and observed the keyway for the rockery located at the southeast quadrant of the site. Rep observed the keyway to be very dense, firm, unyielding, and suitable for support of the proposed rockery. Rep observed contractor place upper course of rocks, then backfill with 2”-4” quarry spalls. Observation of the area above the rockery found no tension cracks, slumping or other obvious signs of instability of native material. ESNW rep recommended 2’ over-excavation for lower rockery keyway located at southwest quadrant of site. (See Image) ESNW rep will return to observe earthwork activities when requested by client. Jackson Lundgren, Field Technician, (206) 468-0991 Earth Solutions NWLLC Field Rep. Project No. Page of Report No. JTL 0895.06 1/1 167 1805 136th Place NE, Suite 201 Bellevue, WA 98005 (425) 449-4704 FAX: (425) 449-4711 TOLL FREE: (866) 366-8710 Time On Site Time Off Site Date Day of Week 10:00 AM 2:30 PM 4/30/20 Thursday DAILY FIELD REPORT Travel Time Weather 1.25 Hr. RT 60soF, Clear Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Rino Construction Mike LAC Contractor #2 RM Construction NW, Inc Contact Project Manager SSR Reviewed Are approved Plans/Permits onsite YES NO Project No. Permit No. At the client’s request, ESNW rep was onsite to observe rockery construction, earthwork activities, and test pH of stormwater. The focus of the work is related to completing the rockeries along the south side of the project. Test pH of Stormwater Rep took pH tests to determine the pH of stormwater. In the filled baker tank rep observed <25NTU. Rep observed that contractor added dry ice to lower the pH level to 6.5, suitable for sewer discharge. Rep observed that pH level was contained onsite. Rockeries While onsite, rep used a ½” steel t-probe and observed the keyway for the rockery located at the southwest quadrant of the site. Rep observed the keyway to be very dense, firm, unyielding, and suitable for support of the proposed rockery. Rep observed contractor place courses of rocks. Rep observed contractor place a 4” perforated drain pipe behind the first course of the rockery, embed the pipe in an 18” lift of 1”-2” wash rock, geotextile, then backfill over the geotextile with 2”-4” quarry spalls. Native material above the rockery was found to be in a stable condition. ESNW rep recommended 2’ over-excavation for rockery located at southwest quadrant of site. (See Image) ESNW rep will return to observe earthwork activities when requested by client. Jackson Lundgren, Field Technician, (206) 468-0991 Earth Solutions NWLLC Field Rep. Project No. Page of Report No. JTL 0895.06 1/1 172 1805 136th Place NE, Suite 201 Bellevue, WA 98005 (425) 449-4704 FAX: (425) 449-4711 TOLL FREE: (866) 366-8710 Time On Site Time Off Site Date Day of Week 11:00 AM 11:45 AM 5/8/20 Friday DAILY FIELD REPORT Travel Time Weather 1.25 Hr. RT 60soF, Clear Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Rino Construction Mike LAC Contractor #2 RM Construction NW, Inc Contact Project Manager SSR Reviewed Are approved Plans/Permits onsite YES NO Project No. Permit No. Supplementary Report: At the client’s request, ESNW rep was onsite to observe earthwork activities and test footing subgrade. Footing Backfill ESNW rep observed footing backfill. Rep. used a ½” steel T-probe to probe locations along the footing subgrade. ESNW rep. observed footing subgrade to be dense and composed of suitable material for footing construction. Footings were backfilled with sandy silty native material and compacted in 1’ lifts with a jumping jack. ESNW rep will return to observe earthwork activities when requested by client. Fig 1. Preparing the subgrade for slab pouring and backfilling footiongs Jackson Lundgren, Field Technician, (206) 468-0991